SUMMARY OF COMMENTS
Aquino, Charmaine Pearl L., Gutierrez, Venus Abigail D., Lacdao Drexler B., Nisortado, Harold P., Villano, Dhankay A.
5 141 State material balance & conversion basis Engr. Rhonalyn V. Maulion
5 145 Change the label in block flow diagram of Area 100 Engr. Rhonalyn V. Maulion
6 159 Recheck the tables for the summary of material balance Engr. Rhonalyn V. Maulion
6 163 Summarize the residence time in one table Engr. Rhonalyn V. Maulion
Change and use the proper symbol for the process flow diagram
6 167 Engr. Rhonalyn V. Maulion
and P&ID
7 182 Include column for unit/day in Table 7.4 Utility Requirements Engr. Rhonalyn V. Maulion
9 210 Recheck the unit for equipment capacity (like weighing scale) Engr. Rhonalyn V. Maulion
9 211 Change the dimensions of the Hot Water Basin Engr. Rhonalyn V. Maulion
9 212-213 Recheck computation for Filter Press 1 & 2 specification Engr. Rhonalyn V. Maulion
5 141 State material balance & conversion basis Engr. Joey C. Garcia
6 167 Change the Qualitative, Quantitative and P&ID Engr. Joey C. Garcia
7 176 Recompute mechanical energy balance of selected equipment Engr. Joey C. Garcia
8 183 Arrange operating temperature from highest to lowest Engr. Joey C. Garcia
8 184 Include Risk Hazard analysis of all process/equipments Engr. Joey C. Garcia
13 312 Recompute financial aspects based on adjustment made Engr. Joey C. Garcia
14 331 Change the amount of sugarcane bagasse required per day Engr. Joey C. Garcia
14 332 Write the correct value of updated Total Capital Investment Engr. Joey C. Garcia
Noted by: