COURSE INFORMATION
YEAR/SEMESTER : 2 /SEMESTER 3
PREREQUISITE : -
CORE REQUISITE :
COURSE DESCRIPTION
This module is designed to give knowledge about building roofing system installations and how to construct the roof by selecting and preparing
the materials and the method of fixing. It also explains on how to carry out installation for roofing installation and also how to perform inspection
for roofing work.
APPLIED SKILLS:
Attitude:
Document Page 4/13
- Meticulous in
obtaining contract document
- Honesty in the privacy and
confidenciality of the contract documents
RELATED KNOWLEDGE :
i. Roofing system location confirmed as per
2. CARRY OUT i. Purpose roofing system setting construction drawing
ROOFING SYSTEM ii. Method of roofing system alignment such ii. Roofing system dimension confirmed as per
INSTALLATION as construction drawing
SETTING Laser iii. Roofing system squareness and roof pitch
String/Plumb bob degree and level confirmed as per
Spirit level construction drawing
L-angle iv. Roofing system installation set up as per
Measuring tape construction drawing
APPLIED SKILLS:
ASSESSMENT CRITERIA
i. Confirm roofing system location as per
drawing i. Roofing system location confirmed according to
construction drawing
ii. Confirm roofing system dimension as per
ii. Roofing system dimension, squareness, roof
drawing
pitch degree, level confirmed according to
iii. Confirm roofing system squareness and
construction drawing
roof pitch degree and level as per
iii. Roofing system installation properly set up
drawing
according to construction drawing
Set out roofing system installation
Attitude:
3. CARRY OUT RELATED KNOWLEDGE : i. Materials for roofing system such as nails,
INSTALLATION OF cement, roof finish, roof truss system,
ROOFING SYSTEM i. Types and functions of roofing system aluminum foil, rock wool, chicken netting,
materials such as rain water system, flashing, capping and
Nails fastener prepared according to installation
Cement practices
Roof finish ii. Tools and equipment for roofing system
Roof truss system such as right angle, hammer, ladder, and
Aluminium foil scaffolding, PPE, cutting and fastening
Rock wool equipment prepared according to
Chicken netting installation practices
Rain water system iii. Roof truss member fabricated according to
construction drawing
Flashing/Capping
iv. Roof truss system installed according to
Fastener
construction drawing
ii. Type and function of roofing system tools
v. Roof insulation and accessories installed
and equipment such as
according to specification
Right angle vi. Rain water system installed according to
Hammer construction drawing
Ladder/Scaffolding vii. Roof covering installed according to
PPE requirement
Cutting and fastening equipment viii. Housekeeping and 3R (reduce, reuse and
Crane recycle) activities carried out
Hoist
iii. Roofing system installation procedure ASSESSMENT CRITERIA
Area clearance
Measure and mark i. Materials condition for roofing system checked
Fabricate roof truss member and arranged according to installation
Install roof truss system requirement
Document Page 6/13
Install roof insulation and ii. Tools and equipment condition for roofing
accessories system checked and arranged according to
Install rain water system installation requirement
Install roof covering iii. Roof truss member fabricated according to
iv. Housekeeping and 3R activities approved shop drawing and roofing installation
quality
iv. Roof truss system installed according to
APPLIED SKILLS: approved shop drawing and roofing installation
quality
i. Prepare materials for roofing system v. Roof insulation and accessories installed
ii. Prepare tools and equipment for roofing according to approved shop drawing and
system roofing installation quality
iii. Fabricate roof truss member vi. Rain water system installed according to
iv. Install roof truss system approved shop drawing and roofing installation
v. Install roof insulation and accessories quality
vi. Install rain water system vii. Roof covering installed according to approved
vii. Install roof covering installed according shop drawing and roofing installation quality
to requirement viii. Housekeeping and 3R activities properly done
viii. Carry out housekeeping and 3R activities according to safety procedure
Attitude:
Safety
Attitude
CORE ABILITY
CORE ABILITY
1. Laser 1:5
2. String/Plumb bob 1:5
3. Spirit level 1:5
4. L-angle 1:5
5. Measuring tape 1:5
6. Nails 1:5
7. Cement As required
8. Roof finish 1:5
9. Roof truss system 1:5
10. Aluminum foil 1:5
11. Rock wool 1:5
12. Chicken netting 1:5
13. Rain water system 1:5
14. Flashing/Capping 1:5
15. Fastener 1:5
16. Right angle 1:5
17. Hammer 1:5
18. Ladder/Scaffolding 1:5
19. PPE 1:1
20. Cutting and fastening equipment 1:5
21. Sample for inspection form 1:1
22. Sample for construction drawing 1:1
23. Sample for authorities documents (Planning approval documents, 1:1
Building plan approval documents, Bomba approval documents)
REFERENCES
1. Edward Allen, Joseph Iano, (2009) Fundamentals of Building Construction: Material and Method, John Wiley And Son Inc, New Hersey, ISBN 978-
0-470-07468-8
2. Francis D.K. Ching, (2010), Building Construction Illustrated Fourth Edition, John Wiley And Son Inc, New Jersey, ISBN: 378-0-470-08781-7
3. Edward Allen, Rob Thallon, Fundamentals of Residential Construction, John Wiley And Son Inc, New Jersey, ISBN 978-0-470-5-4085-4
4. Tan Boon Tong, (2000) Teknologi Binaan Bangunan, DewanBahasa, Kuala Lumpur.
5. Whitney C Clark Huntington (2001), Building Construction Materials and Types Of Construction, Robert E. Mickadeit.
6. N. Jackson (1984), Civil Engineering Materials, English Language Book Society Macmillan (Elbs),ISBN
7. Case, J Chilver, A.H (1987),Kekuatan Bahan dan Struktur, Dewan Bahasa.
8. Wang, B.T.H (1987), Construction and Development - With Reference to Malaysian Practice', Pelanduk Publication.
9. Peter Domone, John Hilston(1994), Construction Materials.