PRESUPUESTO APROBADO
DESCRIPCIÓN DE ACTIVIDADES UND METR. P.U.. PARCIALES
01.00 TRABAJOS PRELIMINARES 3,367.34
01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS GLB 1.00 1,450.00 1,450.00
01.02 CASETA PARA ALMACEN Y GUARDIANIA GLB 1.00 841.24 841.24
01.03 POZAS DE CIRCULACION DE LODOS BENTONITICOS GLB 1.00 1,076.10 1,076.10
09.00
09.01
09.02
1,950.00
1.00 1,100.00
1.00 850.00
52,948.61
65.00 11,700.00
63.80 12,760.00
63.80 14,036.00
63.80 14,452.61
48,225.00
40.50 18,225.00 2,250.00
24.00 30,000.00
6,275.00
12.00 5,400.00
35.00 875.00
6,720.00
48.00 6,720.00
10,116.12
1.00 294.12
1.00 100.00
72.00 9,720.00
1.00 2.00
404.75
25.00 254.75
1.00 150.00
130,006.83
16,250.85
146,257.68
26,326.38
172,584.06
´(1)
´(2)
´(3)
´(2) - ´(3)
ADICIONAL PERFORACION POZO TUBULAR - ESTADIO LAGUNAS
PRESUPUESTO
ITEM DESCRIPCION PARTIDAS
UNIDAD METRADO P.UNITARIO
3.00.00 PERFORACION DE POZO
3.01 PERFORACION POZO PILOTO Ø 8" m 5.00 180.00
03.02 RIMADO DE PERFORACION DE 8" A 12" m 3.80 200.00
03.03 RIMADO DE PERFORACION DE 12" A 15" m 3.80 220.00
03.04 RIMADO DE PERFORACION DE 15" A 17 1/2" m 3.80 226.53
COSTO DIRECTO
GASTOS GENERALES (12.5%)
SUB TOTAL
IGV (18%)
TOTAL
UPUESTO
TOTAL
900.00
760.00
836.00
860.81
2250.00
-1250.00
4356.81
544.60
4901.42
882.25
S/. 5,783.67