Vous êtes sur la page 1sur 7

POZO TUBULAR ESTADIO - LAGUNAS

PRESUPUESTO APROBADO
DESCRIPCIÓN DE ACTIVIDADES UND METR. P.U.. PARCIALES
01.00 TRABAJOS PRELIMINARES 3,367.34
01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS GLB 1.00 1,450.00 1,450.00
01.02 CASETA PARA ALMACEN Y GUARDIANIA GLB 1.00 841.24 841.24
01.03 POZAS DE CIRCULACION DE LODOS BENTONITICOS GLB 1.00 1,076.10 1,076.10

2.00 TRABAJOS PRELIMINARES 1,950.00


2.01 TRANSPORTE MONTAJE Y DESMONTAJE DE EQUIPOS DE PERFORACION GLB 1.00 1,100.00 1,100.00
2.02 TRANSPORTE MONTAJE Y DESMONTAJE DE EQUIPOS DE PRUEBA DE BOMBEO GLB 1.00 850.00 850.00

03.00 PERFORACION 49,591.80


03.01 PERFORACION DE POZO PILOTO 8" ML 60.00 180.00 10,800.00
03.02 RIMADO DE PERFORACION DE 8" A 12" ML 60.00 200.00 12,000.00
03.03 RIMADO DE PERFORACION DE 12" A 15" ML 60.00 220.00 13,200.00
03.04 RIMADO DE PERFORACION DE 15" A 17 1/2" ML 60.00 226.53 13,591.80

04.00 TUBERIA CIEGA PARA POZO 47,225.00


04.01 SUMINISTRO, HABILITACIO E INSTLACION DE TUBERIA DE ACERO NEGRO DE 10" X 6MM ML 35.50 450.00 15,975.00
04.02 SUMINISTRO, HABILITACIO E INSTLACION DE TUBERIA FILTRO ACERO INOX 10" X 4MM ML 25.00 1,250.00 31,250.00
TIPO PUENTE TRAPEZOIDAL

05.00 VACIADO DE GRVAS Y LIMPIEZA Y DESARROLLO 6,275.00


05.01 SUMINISTRO Y COLOCACION DE GRAVA(PRE FILTRO) M3 12.00 450.00 5,400.00
05.02 SUMINISTRO Y APLICACIÓN DE TRIPOLOFOSFATO KG 35.00 25.00 875.00
06.00 LAVADO HIDRAULICO , DESARROLLO Y LIMPIEZA DE POZO
06.01 LAVADO, DESARROLLO Y LIMPIEZA DE POZO CON INYECCION DE AIRE COMPRIMIDO HR 48.00 140.00 6,720.00
Y AIRE A PRESION

07.00 ANALISIS Y PRUEBAS DE POZO 10,116.12


07.01 ANALISIS FISICO QUIMICO DEL AGUA UND 1.00 294.12 294.12
07.02 ANALISIS BACTERIOLOGICO UND 1.00 100.00 100.00
07.03 PRUEBA DE BOMBEO DE AGUA HM 72.00 135.00 9,720.00
07.04 PRUEBA DE VERTICALIDAD UND 1.00 2.00 2.00

08.00 LIMPIEZA Y PROTECCION DEL POZO 404.75


07.01 LIMPIEZA FINAL Y ELIMINACION DE DESMONTE M3 25.00 10.19 254.75
07.02 PROTECCION CON PLANCHA DE ACERO SOLDADA EN BOCA DE POZO UND 1.00 150.00 150.00

09.00
09.01
09.02

Presupuesto costo Directo 125,650.01


Gastos Generales y Utlidad (12.5%) 15,706.25
Subtotal 141,356.26
IGV (18%) 25,444.13
Total Presupuesto incluido IGV 166,800.39

PRESUESTO CONTRATO S/. 166,800.39


EJECUTADO S/. 172,584.06
ADELANTO S/. 83,400.20
SALDO FINAL S/. 89,183.87
-S/. 5,783.67
EJECUTADO
M EJE PARCIAL
3,367.34
1.00 1,450.00
1.00 841.24
1.00 1,076.10

1,950.00
1.00 1,100.00
1.00 850.00

52,948.61
65.00 11,700.00
63.80 12,760.00
63.80 14,036.00
63.80 14,452.61

48,225.00
40.50 18,225.00 2,250.00
24.00 30,000.00

6,275.00
12.00 5,400.00
35.00 875.00
6,720.00
48.00 6,720.00

10,116.12
1.00 294.12
1.00 100.00
72.00 9,720.00
1.00 2.00

404.75
25.00 254.75
1.00 150.00

130,006.83
16,250.85
146,257.68
26,326.38
172,584.06

´(1)
´(2)
´(3)
´(2) - ´(3)
ADICIONAL PERFORACION POZO TUBULAR - ESTADIO LAGUNAS

PRESUPUESTO
ITEM DESCRIPCION PARTIDAS
UNIDAD METRADO P.UNITARIO
3.00.00 PERFORACION DE POZO
3.01 PERFORACION POZO PILOTO Ø 8" m 5.00 180.00
03.02 RIMADO DE PERFORACION DE 8" A 12" m 3.80 200.00
03.03 RIMADO DE PERFORACION DE 12" A 15" m 3.80 220.00
03.04 RIMADO DE PERFORACION DE 15" A 17 1/2" m 3.80 226.53

04.00 TUBERIA CIEGA PARA POZO


04.01 SUMINISTRO, HABILITACIO E INSTALACION DE TUBERIA DE ACERO NEGRO DE 10" X 6MM m 5.00 450.00
04.02 SUMINISTRO, HABILITACIO E INSTALACION DE TUBERIA FILTRO ACERO INOX DE 10" X 4MM m -1.00 1250.00

COSTO DIRECTO
GASTOS GENERALES (12.5%)
SUB TOTAL
IGV (18%)
TOTAL
UPUESTO
TOTAL

900.00
760.00
836.00
860.81

2250.00
-1250.00

4356.81
544.60
4901.42
882.25
S/. 5,783.67