Vous êtes sur la page 1sur 2
No. CE/Admn/PLA/1014/2005 Office of the Chief Engineer PWD, Design & Administration Thiruvananthapuram 31-03-17 CIRCULAR Sub: PWD-Preparation of estimate through PRICE- Cost index to be adopted to 2016 Dsr, Ref- 1. DSR 2016 Published by cowo. i "2. Minutes of meeting held in the chamber of Addition8l Chief Secretary, Finance on 27-01-2017. Cow» has published DSR 2026 with base 102. Consequent on revision of CPWD to DSOR 2016 with base 102, the cost index over DSOR 2016 need to be equated as provided In the table below, Cost index with respect to PAR 2012 with base 100 Cost index to be added to DSR 2016 [THIRUVANANTHAPURAM PATHANAMTHITTA ICHENNERKARA [ALAPPUZHA 7|5a\ PUNNAMADA 59.80 % el Pals el 59.80 % 49.02 % ‘OOTHATTUKULAM / MANIMALAKUNNU 49.02 % 40.20 % PALAKKAD 143 40.20 % = IMALAPPURAM 143 ala 3 g 2 § g z 145 MAHE / BADAGARA la Me Finance ‘The Chief Engineer, PWD, Roads and Bridges, Thiruvananthapuram for information The Chief Engineer, PWD, National Highway, Thirwvananthapuram for information ‘The Chief Engineer, PWD, Buildings, Thiruvananthapuram for information ‘The Chief Engineer, PWD, KSTP, Thiruvananthapuram for information

Vous aimerez peut-être aussi