No. CE/Admn/PLA/1014/2005 Office of the Chief Engineer
PWD, Design & Administration
Thiruvananthapuram
31-03-17
CIRCULAR
Sub: PWD-Preparation of estimate through PRICE- Cost index to be adopted to 2016 Dsr,
Ref- 1. DSR 2016 Published by cowo. i
"2. Minutes of meeting held in the chamber of Addition8l Chief Secretary,
Finance on 27-01-2017.
Cow» has published DSR 2026 with base 102. Consequent on revision of CPWD to DSOR 2016 with
base 102, the cost index over DSOR 2016 need to be equated as provided In the table below,
Cost index with
respect to PAR 2012
with base 100
Cost index to be added to DSR
2016
[THIRUVANANTHAPURAM
PATHANAMTHITTA
ICHENNERKARA
[ALAPPUZHA
7|5a\ PUNNAMADA
59.80 %
el Pals el
59.80 %
49.02 %
‘OOTHATTUKULAM / MANIMALAKUNNU
49.02 %
40.20 %
PALAKKAD 143 40.20 %
=
IMALAPPURAM 143
ala
3
g
2
§
g
z
145
MAHE / BADAGARAla Me
Finance
‘The Chief Engineer, PWD, Roads and Bridges, Thiruvananthapuram for information
The Chief Engineer, PWD, National Highway, Thirwvananthapuram for information
‘The Chief Engineer, PWD, Buildings, Thiruvananthapuram for information
‘The Chief Engineer, PWD, KSTP, Thiruvananthapuram for information