MACDOUGALL PRODUCTION DRAWING SET REQUIREMENTS

FLOOR PLAN

WALL TYPE LEGEND REQUIRED


W1 -1/2" WHITEWASHED BIRCH PLYWOOD Note all shear locations and tie down areas (Input into Revit - See AutoCAD PDF)
SW2(ASSEMBLY) -6MIL POLY ALL JOINTS TAPED(AB + VB) Show wall type tags
-2X6 SPF STUDS @ 16" O.C. Grid Lines
-C/W 7.25" BATT INSULATION Dimensions
-7/16 OSB SHEATHING (SEE SCHEDULE FOR NAIL SPACING) Stud pack locations
-TYVEK AIR BARRIER Window and Door Rough Opening sizes
Door and window Tags
-3/8 VERTICAL STRAPPING (MAX 80% COVERAGE) Section Reference
-CEDAR BOARD & BATTEN PANEL SIDING
Provide following notes:
EXT. -OR- NOTE:
ALL EXTERIOR DIMENSIONS ARE GIVEN TO OUTSIDE OF FRAMING
-CORRUGATED METAL SIDING
NOTE:
ALL WINDOW DIMENSIONS ARE ROUGH OPENING SIZES
SW1 -1/2" WHITEWASHED BIRCH PLYWOOD (SEE WINDOW SCHEDULES FOR DIMENSIONS)
-1/2" DFIR SHEATHING
-2X4 S-P-F @ 16" O.C. BLOCKED NOTE:
-1/2" WHITEWASHED BIRCH PLYWOOD ALL DOOR DIMENSIONS ARE ACTUAL OPENING SIZES
(SEE DOOR SCHEDULE FOR DIMENSIONS)
SHEAR REQUIREMENTS -2x4 SPF STUDS @16" O.C.
-DOUBLE STUDS AT BOTH ENDS C/W LSTA 30 (U.N.O.)
-7/16 (MIN) PLAYWOOD SHEATHING 1 SIDE-
-2" NAILS @ 4"/8" BLOCKED
-ALL JOINTS BLOCKED

SW2 -1/2" WHITEWASHED BIRCH PLYWOOD


-6MIL POLY ALL JOINTS TAPED(AB + VB)
-2X6 WALL STUDS @ 16" O.C.
-C/W R22 BATT INSULATION
-7/16 OSB SHEATHING (SEE SCHEDULE FOR NAIL SPACING)
-TYVEK AIR BARRIER

-3/8 VERTICAL STRAPPING (MAX 80% COVERAGE)


-CEDAR BOARD & BATTEN PANEL SIDING

-OR-

-CORRUGATED METAL SIDING

SHEAR REQUIREMENTS -2x6 SPF STUDS @16" O.C.


-DOUBLE STUDS AT BOTH ENDS C/W LASTA (U.N.O.)
-7/16 (MIN) PLAYWOOD SHEATHING 1 SIDE-
-2" NAILS @ 6"/12"
-ALL JOINTS BLOCKED

STRUCTURAL FLOOR PLANS

Create new sheet for Structural floor plan


Provide all information depicted on the autocad PDF provided

ELEVATIONS

REQUIRED

List all materials


Vertical lines - Cedar Board and Batten
Horizontal lines - Corrugated steel

Provide building height dimensions


Provide sill height dimensions

Create window tags


Create window and door rough opening dimensions
(See window and door schedule)

Roof Slope Triangle

SECTIONS

REQUIRED

Include all bottom and top plates


Insulation blocking
Venting strip from front to back (Ensure venting is adequate for roof area as per BCBC 2012 requirements)
All headers to be shown(Framed down)
Flashing Requirements (Part 9 BCBC 2012)
Insert foundation drainage and crushed rock detail

DETAILS

Show any required details that cannot be displayed accurately enough in the section

Show connection details for loft area using off the shelf Simpson products