No Description Weight
Week-1 Week-2 Week-2 Week-4
I PRELIMINARIES
1 Site set-up (equipment, cabins, welfare, containers, fencing etc) 0.727
2 Health & Safety Management & Equipment 1.039
3 Security and coordination 1.166
4 Waste management & Removal 0.219
5 Mobilisation & Demobilization Jabodetabek 0.292
6 Mobilisation & Demobilization Bandung -
7 Mobilisation & Demobilization Surabaya -
8 Site final clean 0.175
9 Remote Accommodation (if required) 0.182
10 Temporary utilities (power, water, drainage, etc.) 0.219
11 Soil fill and compacting 1.479
12 Shop Drawing, as built drawings, documentation & progress report 0.364
13 Construction All Risk (CAR) Insurance 0.948
14 BPJS Tenaga Kerja Insurance 0.124
II DEMOLITION
1 Demolish existing building 0.090
2 Surface stripping, debris removal from site 1.245
3 Cut down trees, grind stumps & roots -
Mei - 2018
No Description Weight
Week-1 Week-2 Week-2 Week-4
IV FUEL TANKS
1 Tank pit shoring, mini pile 20x20 cm 2.646
2 Soil excavation for tank pit 0.587
3 Sand fill 1.912
4 Lean concrete 0.370
5 Concrete slab below tanks 1.595
6 Concrete tie beam and tank hold down anchors 0.410
7 Concrete column 0.046
8 Concrete capping beam 0.456
9 Concrete slab on top of tanks 1.139
10 Lifting and placement of tanks (type 45 KL) 0.249
11 Stabilise and water fill tanks to make safe; empty upon completion, clean, dry and certify 0.311
12 Construct; supply and install observation well to BP Standard Detail 0.131
13 Construct; supply and install tank monitoring well to BP Standard Detail 0.153
Mei - 2018
No Description Weight
Week-1 Week-2 Week-2 Week-4
14 Backfill of tank pit with screening material 1.941
15 Extra for permanently retained sheet piling (where specified) 0.031
Mei - 2018
No Description Weight
Week-1 Week-2 Week-2 Week-4
16 Supply and install new manway cover and frame only as per BP specification 1.312
17 De watering (where required) 0.055
V PUMPS
1 New pump island for car 0.431
2 New pump island for motorcycle 0.165
3 Supply and install bollards 0.095
VIII DRAINAGE
1 Excavation and installation of drainage pipe 0.240
2 Excavation and installation of drainage sumps including trafficable covers 0.262
3 Excavation and installation of crossover drainage, ingress and egress 0.436
4 Installation of grill grating, ingress and egress 0.307
5 Installation of grill grating, filling point 0.035
6 Supply and install site soak well complete with trafficable lids 0.455
7 Drainage pipe, PVC dia. 4 inch 0.077
8 Drainage pipe, PVC dia. 6 inch 0.482
IX FPCS
1 Excavate and construct oil water separator unit 0.970
2 Excavation for HDPE lines (install by fuel system contractor) 0.062
Mei - 2018
No Description Weight
Week-1 Week-2 Week-2 Week-4
3 Supply and install under canopy forecourt sumps for car 0.590
4 Supply and install under canopy forecourt sumps for motorcycle 0.840
5 Supply and install sumps for discharge point 0.124
X CANOPY
1 Canopy foundation, mini pile 20x20 cm 1.155
2 Soil excavation for foundation 0.059
3 Sand fill 0.007
4 Lean concrete 0.013
5 Concrete pilecap, pedestal, tie beam 0.456
6 Steel structure 4.264
7 Metal sheet roofing 0.783
8 Soffits 2.797
9 Fascia trusses 0.599
10 Column cladding 1.735
11 Roof flashing 0.212
12 Roofing ridge cap 0.077
13 Roof drain 0.009
14 RWDP PVC dia. 4 inch 0.026
15 Drainage manhole with cover 0.222
16 Grounding manhole with cover 0.157
XI FORECORT
1 New single RC surface complete inc. sub-base -
2 New double RC surface complete inc. sub-base -
3 Paving Block 80mm, K 400, with filling 4.969
4 Sand fill 0.493
Mei - 2018
No Description Weight
Week-1 Week-2 Week-2 Week-4
XII LANDSCAPING
1 Soft Landscaping (prepare, topsoil, planting) 0.797
2 12 month maintenance 0.408
TOTAL 100
-
SCHEDULE
BU BP - AKR
itri 1439
H
Idul Fitri 1
Jun-18 Jul-18 Aug-18
Ket
H
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
itri 1439
H
Idul Fitri 1
Jun-18 Jul-18 Aug-18
Ket
H
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Idul Fitri
H
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
i 1439
Idul Fitri 143
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
H
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
Jun-18 Jul-18 Aug-18
Ket
Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4 Week-1 Week-2 Week-2 Week-4
SOEKARTEDJO
Jun-18 Jul-18 Aug-18
Ket
H
No Element
1 Preliminaries
1.1 Preliminaries
1.2 Preliminaries
1.3 Preliminaries
1.4 Preliminaries
1.5 Preliminaries
1.6 Preliminaries
1.7 Preliminaries
1.8 Preliminaries
1.9 Preliminaries
1.10 Preliminaries
1.11 Preliminaries
1.12 Preliminaries
1.13 Preliminaries
1.14 Preliminaries
2 Demolition
2.1 Demolition
2.2 Demolition
2.3 Demolition
Other Site Specific Civils
3
3.1 MID Civils
3.2 Forecourt sign Civils
3.3 Forecourt sign Civils
3.4 Forecourt sign Civils
3.5 Forecourt sign Civils
3.6 Spare pipe Civils
3.7
3.8 Spare pipe Civils
3.9 Spare pipe Civils
4 Fuel Tanks
4.1 Fuel Tanks Civils
4.2 Fuel Tanks Civils
4.3 Fuel Tanks Civils
4.4 Fuel Tanks Civils
4.5 Fuel Tanks Civils
4.6 Fuel Tanks Civils
4.7 Fuel Tanks Civils
4.8 Fuel Tanks Civils
4.9 Fuel Tanks Civils
4.10 Fuel Tanks Civils
4.11 Fuel Tanks Civils
4.12 Fuel Tanks Civils
4.13 Fuel Tanks Civils
4.14 Fuel Tanks Civils
4.15 Fuel Tanks Civils
4.16 Fuel Tanks Civils
4.17 Fuel Tanks Civils
5 Pumps
5.1 Pumps Civils
5.2 Pumps Civils
5.3 Pump Civils
6 Fuel Lines Civils
6.1 Fuel Lines Civils
6.2 Fuel Lines Civils
6.3 Fuel Lines Civils
7 Fill Box Civils
7.1 Fiil Box Civils
8 Drainage
8.1 Drainage System
8.2 Drainage System
8.3 Drainage System
8.4 Drainage System
8.5 Drainage System
8.6 Drainage System
8.7 Drainage System
8.8 Drainage System
9 FPCS
9.1 FPCS
9.2 FPCS
9.3 FPCS
9.4 FPCS
9.5 FPCS
10 Canopy
10.1 Canopy
10.2 Canopy
10.3 Canopy
10.4 Canopy
10.5 Canopy
10.6 Canopy
10.7 Canopy
10.8 Canopy
10.9 Canopy
10.10Canopy
10.11Canopy
10.12Canopy
10.13Canopy
10.14Canopy
10.15Canopy
10.16Canopy
11 Forecourt
11.1 Forecourt Surface
11.2 Forecourt Surface
11.3 Forecourt Surface
11.4 Forecourt Surface
11.5 Forecourt Surface
11.6 Forecourt Surface
11.7 Forecourt Surface
11.8 Forecourt Surface
11.9 Forecourt Surface
11.10Forecourt Surface
11.11Forecourt Surface
11.12Forecourt Surface
11.13Kerbs
11.14External works
12 Landscaping
12.1 Landscaping
12.2 Landscaping
13 Payment Booth (kiosk)
13.1 Kiosk
14 Forecourt Other
14.1 Bollards
14.2 Fencing
14.3 Fencing
14.4 Fire Extinguishers
14.5 Fire Extinguishers
14.6 Air & Water
14.7 Air & Water
14.8 Air & Water
14.9 Air & Water
14.10Air & Water
15 Shop
15.1 Shop foundation
15.2 Shop foundation
15.3 Shop foundation
15.4 Shop foundation
15.5 Shop foundation
15.6 Shop structure
15.7 Shop roof
15.8 Shop roof
15.9 Shop masonry
15.10Shop wall finish
15.11Shop wall finish
15.12Shop wall finish
15.13Shop floor finish
15.14Shop floor finish
15.15Shop floor finish
15.16Shop floor finish
15.17Shop floor finish
15.18Shop floor finish
15.19Shop ceiling finish
15.20Shop ceiling finish
15.21Shop door & window
15.22Shop door & window
15.23Shop door & window
15.24Shop door & window
15.25Shop door & window
15.26Shop door & window
15.27Shop door & window
15.28Shop door & window
15.29Shop door & window
15.30Shop door & window
16 Mechanical, Electrical, Plumbing
16.1 MEP panel room
16.2 MEP panel room
16.3 MEP panel room
16.4 MEP panel room
16.5 MEP panel room
16.6 MEP panel room
16.7 MEP panel room
16.8 MEP panel room
16.9 MEP panel room
16.10MEP panel room
16.11MEP panel room
16.12MEP forecourt
16.13MEP forecourt
16.14MEP forecourt
16.15MEP forecourt
16.16MEP KiosK
16.17MEP KiosK
16.18MEP KiosK
16.19MEP KiosK
16.20MEP KiosK
16.21MEP KiosK
16.22MEP KiosK
16.23MEP KiosK
16.24MEP KiosK
16.25MEP Fuel system
16.26MEP Lightning protect
16.27MEP Lightning protect
16.28MEP Lightning protect
16.29MEP Lightning protect
16.30MEP Lightning protect
16.31MEP Building
16.32MEP Building
16.33MEP Building
16.34MEP Building
16.35MEP Building
16.36MEP Building
16.37MEP Building
16.38MEP Building
16.39MEP Building
16.40MEP Building
16.41MEP Building
16.42MEP Building
16.43MEP Building
16.44MEP Building
16.45MEP Building
16.46MEP Building
16.47MEP Building
16.48MEP Building
16.49MEP Building
16.50MEP grounding
16.51MEP grounding
16.52MEP CCTV
16.53MEP CCTV
16.54MEP CCTV
16.55MEP CCTV
16.56MEP CCTV
16.57MEP CCTV
16.58MEP communication
16.59MEP communication
16.60MEP communication
16.61MEP STP
16.62MEP air and water
16.63MEP air and water
16.64MEP air and water
16.65MEP air and water
16.66MEP air and water
16.67MEP air and water
16.68MEP forecourt
16.69MEP forecourt
16.70MEP forecourt
16.71MEP forecourt
16.72MEP forecourt
16.73MEP forecourt
16.74MEP forecourt
16.75MEP forecourt
16.76MEP forecourt
16.77MEP forecourt
16.78MEP pump
16.79MEP pump
16.80MEP pump
16.81MEP pump
16.82MEP pump
16.83MEP utilities
16.84MEP utilities
16.85MEP utilities
16.86MEP utilities
16.87MEP utilities
16.88MEP utilities
Description Of Work
m 660.00 225,000
m3 575.00 0
m3 558.00 185,000
m3 29.00 675,000
m3 35.00 2,350,000
m3 9.00 2,350,000
m3 1.00 2,350,000
m3 10.00 2,350,000
m3 25.00 2,350,000
Each 3.00 0
Each 3.00 3,350,000
Number 4.00 1,750,000
Number 2.00 1,750,000
m3 354.00 326,000
m2 1.00 1,860,000
Number 5.00 16,750,000
Lump sum 1.00 750,000
m 102.00 0
m 102.00 185,000
Lump sum 1.00 5,750,000
m 194.00 0
Number 21.00 600,000
m 26.00 850,000
m 26.00 560,000
m 3.00 560,000
Number 8.00 2,750,000
m 72.00 56,250
m 174.00 140,000
m 288.00 225,000
m3 48.00 0
m3 2.00 185,000
m3 1.00 675,000
m3 10.00 2,350,000
kg 13,000.00 17,000
m2 307.00 140,000
m2 307.00 550,000
m2 75.00 414,000
m2 36.00 1,856,000
m 83.00 131,250
m 27.00 146,500
Number 4.00 116,000
m 24.00 56,250
Number 4.00 2,950,000
Number 4.00 1,950,000
m2
m2
m2 2,053.00 126,000
m3 144.00 185,000
m3 205.00 675,000
m3 604.00 285,000
m3 18.00 675,000
m3 72.00 2,350,000
m3 5.00 2,350,000
m3 10.00 2,350,000
Lump sum 1.00 13,000,000
Lump sum 1.00 14,780,000
m 195.00 155,000
m
m2 405.00 100,000
Lump sum 1.00 3,000,000
m3 7.92 2,350,000
m3 1.23 2,350,000
m3 11.86 2,350,000
m3 37.80 2,350,000
m3 46.81 877,500
kg 8,500.00 17,000
m2 378.00 140,000
m2 378.00 96,700
m2 566.80 150,000
m2 26.00 275,000
m2 420.00 42,500
m2 350.00 48,000
m2 63.60 265,000
m2 110.00 265,000
m2 121.60 265,000
m2 79.20 265,000
m2 23.10 265,000
m2 45.00 265,000
m2 63.60 135,000
m2 368.50 135,000
Unit 1.00 2,600,000
Unit 4.00 1,500,000
Unit 3.00 1,500,000
Unit 3.00 1,200,000
Unit 1.00 6,750,000
Unit 1.00 2,250,000
Unit 2.00 1,100,000
Unit 3.00 1,100,000
Unit 1.00 1,100,000
Unit 2.00 650,000