Vous êtes sur la page 1sur 12

TECHNICAL EVALUATION OF CONSULTANTS

PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20)
Exp: in Yrs Exp: projects General Total
Sl NO Personnel Name (15) (7.5) (7.5) Remarks
(50)

Marks Marks Marks Marks Marks Marks Marks Marks


assigned gained assigned gained assigned gained assigned gained

1 Structural/Bridge Engineer
2 Geotechnical Engineer
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer Not proposed
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2
Total
Base Lines: Experience(Bridges)= 10 years, Proj Experience= 10 Bridge Projects, General Experience= 15 years

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
Name
(20) Exp: in Yr Exp: projects General
(15) (7.5) (7.5) Total
Sl NO Personnel Remarks
(50)
Marks Marks Marks Marks Marks Marks Marks Marks
assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2
Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20) Total
Sl NO Personnel Name Exp: in Yrs Exp: projects General Remarks
(50)
(15) (7.5) (7.5)
Marks Marks Marks Marks Marks Marks Marks Marks
assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2

Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20) Total
Sl NO Personnel Name Exp: in Yrs Exp: projects General Remarks
(50)
(15) (7.5) (7.5)
Marks Marks Marks Marks Marks Marks Marks Marks
assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer
Not proposed
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer Not proposed
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2
Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20) Total
Sl NO Personnel Name Exp: in Yrs Exp: projects General Remarks
(15) (7.5) (7.5) (50)

Marks Marks Marks Marks Marks Marks Marks Marks


assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2 Not proposed
Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20) Total
Sl NO Personnel Name Exp: in Yrs Exp: projects General Remarks
(50)
(15) (7.5) (7.5)
Marks Marks Marks Marks Marks Marks Marks Marks
assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer Not proposed
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2

Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20) Total
Sl NO Personnel Name Exp: in Yrs Exp: projects General Remarks
(50)
(15) (7.5) (7.5)
Marks Marks Marks Marks Marks Marks Marks Marks
assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer
3 Hydraulic Engineer
4 Design Engineer (Roads)
5 Material Expert/ Engineer Not proposed
6 CRE/ Team Leader
7 RE
8 ARE-1
9 ARE-2
Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS
PERSONNEL
Name of Work:
Name of Firm:

Practical Experience
Academics (30)
(20) Total
Sl NO Personnel Name Exp: in Yrs Exp: projects General Remarks
(50)
(15) (7.5) (7.5)
Marks Marks Marks Marks Marks Marks Marks Marks
assigned gained assigned gained assigned gained assigned gained
1 Structural/Bridge Engineer
2 Geotechnical Engineer No PEC Registration Number
3 Hydraulic Engineer No PEC Registration Number
4 Design Engineer (Roads)
5 Material Expert/ Engineer
6 CRE/ Team Leader
Staff not proposed for these
7 RE
positions
8 ARE-1
9 ARE-2
Total

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
TECHNICAL EVALUATION OF CONSULTANTS.
EXPERIENCE & STANDING OF THE FIRM/ METHODOLOGY & APPROACH

0
Name of Work:

Experience & Standing (20) Evaluation for Methodology & Approach (30)

Understanding Quality of Work Plan & Innovative- Proposal


S# Name & Address of Firm/Consultant of objective Methodology Manning ness presentation Total Remarks
Similar Total Cost of
Total Exp. (4) Schedule (4) (4) Methodology
Projects Consultancy
And Standing (4) (14) and Approach
(12) (8)
(30)

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management C&W Department Irrigation Department
FDRP C&W Department Peshawar Peshawar
Peshawar

Director Deputy
Roads &Director
Bridges Director General
FDRP C&W Department FDRP C&W Department FDRP C&W Department
Peshawar Peshawar Peshawar
No. of Works Cost of Consultancy

Completed Inhand Completed Inhand

6 9 203 82 202.813 81.99

12 2 148 191 148.283 191.25 6.72 7.883721

2 3 1 61 0.875 61.25 2.4 1.44186

1 1 9.372 10 0.96 0.450512

26 4 54.247 28.101 8.84 14.4 1.261558

6 7 41.25 31.35 6.24 1.688372

0 4 0 133.888 1.92 3.113674

2 276 0.96 6.418605


TECHNICAL EVALUATION OF CONSULTANTS.

Name of Work: Feasibility Study Design and Construction Supervision of 5 Bridges

1 2 3 4 5 6 7
Experience & Appraoch &
Personnel Grand Total Remarks/
S# Name & Address of Firm/Consultant Standing Methodology
(50) (3+4+5) Ranking
(20) (30)
1 0 0.00 0.00 0 0.00 1
2 0 0.00 0.00 0 0.00 2
3 0 0.00 0.00 0 0.00 4
4 0.00 0.00 0 0.00 6
0
0
5 0.00 0.00 0 0.00 3
6 0 0.00 0.00 0 0.00 8
7 0 0.00 0.00 0 0.00 5
8 0 0.00 0.00 0 0.00 7

Deputy Director Deputy Secretary (T-I) Deputy Secretary


Contract Management Irrigation
FDRP C&W Department C&W Department Department
Peshawar Peshawar Peshawar

Roads & Bridges


Director Deputy
FDRP Director
C&W Director General
FDRP C&W Department Department FDRP C&W Department
Peshawar Peshawar Peshawar
i. Team Leader / Chief Resident Engineer 1

ii. Resident Engineer 1

iii. Assistant Resident Engineers 2

iv. Quantity Surveyors 3

v. Laboratory Technicians 3

vi. Computer Operators 3

Vous aimerez peut-être aussi