Vous êtes sur la page 1sur 18
Pare : ETestReport wanna aan pe A Ding anne _— ot! a pees ot ri 66/11kV PSS-4 Substation Consultant | Energoprojekt ENTEL n= 66 kV Cable Pre commissioning Test ‘National Contracting ED ls on ee Contractor | Company Limited NCC) Be Power Transformer- 8A T-2 Site Test Report Contractor Electrical | ARAR Utility and Trading WLL a) Feeder/Bay No. :B21_| Page lof 12 Temperature: 28°C | Date = 23-03-2017 Cable Route | 66kV GiS(B21) to 66/11kV Transformer(BAT-2) | Cable | Red(mtr) | Yellow (mtr) | Blue(mtr) Cable Type _| 66kv, 1500 Sqmm, Cu, XLPE Length | 29.65 2850 | 27.85 66/11kV PSS-4 Substation Power Transformer- BA T-2 66 kV Cable Pre Commissioning Test Reports [Test — Report Test Name Reference No. o1 Sheath Continuity Verification R11-01 02 | Outer Sheath Integrity R11-02 03 | Insulation Resistance of Link box - R11-03 04 | Phasing Verification through Conductor R11-04 05 | Conductor insulation Resistance Measurement, R11-05 06 Capacitance Measurement R11-06 07 Conductor DC Resistance R11-07 08 Positive & Negative Sequence Impedance Measurement R11-08 09 Zero Sequence Impedance Measurement | r11-09 10 | Link-Box Contact Resistance | Rin-t0 n High Voltage AC Resonant Test R11-11 Tested by, Witnessed by, | Witnessed/Verified by, - i) Signature | fw per Name ~CSkalicharan | Farid Ahmad M. Abdul Rahman Date QHoyl ar 24]03 [201 CS. a __ ‘Site Test Report wanna aan lee, Dylan bale al Saas Geni eee ks aoe 66/11kV P5S-4 Substation Consultant | Energoprojekt ENTEL n= 66 kV Cable Pre commissioning Test | National Contracting - G@e@® Contractor | Company umited NCC) Power Transformer. BAT-2 Electrical | ARAR Utility and Trading WLL Feeder/Bay No.:821__| Page 2 of 12 Contractor Temperature :28°C | Date : 23-03-2017 Cable Route | 66kV GIS(BZ1) to 66/11kV Transformer(BAT-2) Cable | Red (mtr) Yellow (mtr) | Blue(mtr) Cable Type _| 66kV, 1X500 Samm, Cu, XLPE Length | 29.65 | 2850 27.85 Report No ~ R11-01 1, Sheath Continuity Verification Equipment used/Serial No ‘Megger MIT 525 Sno,: 101459059 Calibration due date 12-12-2017 - “7, | Phasing corresponds end to end ie. Local Measurement to match Remote | Criteria Settings | Phase Remote End Settings Local End Measurement | Red Earthed Red Shorted Red Yellow Open ‘Yellow Open Blue | open | Blue Open Red Open Red Open ‘Yellow Yellow Earthed | Yellow Shorted Blue Open | Blue Open Red Open Red ‘Open Blue Yellow Open Yellow Open Blue Earthed Blue Shorted Remarks Tested by, Witnessed by, | Witnessed/Verified by, Signature Ghat fat? a Name CS Kalicharan Farid Ahmad M. Abdul Rahman Date Qo al AR 2403 (Zi | 7 Aaja “Site Test Report wanna’ slap Dingbats 9 - = aes __B6/AIKV P5S-4 Substation Consultant | Energoprojekt ENTEL ne: 66 kV Cable Pre commissioning Test National Contracting GE® Contractor | pany Limited NCC) ( Power Transformer- BAT-2 Electrical | ARAR Utility and Trading WLL Feeder/Bay No.:821_| Page 3 of 12 Contractor Temperature: 28°C | Date: 23-03-2017 Cable Route | 6¢kV Gis(B21) to 66/11kV Transformer(BAT-2) | Cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type _| 66k, 1500 Samm, Cu, XLPE Length | 29.65 28.50 27.85 Report No ~ R11-02 Outer Sheath Integrity Test Equipment used/Serial No_ | HVA 28 TD, Sno:GH521213C002 — Calibration due date 05/08/2017 | Criteria_[ No insulation breakdown within 1 minute. J T ] Red Yellow Blue IR Before at SkV/1min 18.14GQ 21.806 19.9160 Duration Amin Amin Amin Voltage (DC) a2kv 12kV 22kV Measured Current 1.9 pA 1.5 pA | 3.2 pA IR After at SkV/1min 21.7060 23.306Q | 23.60GQ Result Passed Passed Passed Remarks J Witnessed by, Witnessed/Verified by, Signature Yao 3 fo Name CS Kalicharan Farid Ahmad M. Abdul Rahman ‘Date 221 Ny L310 7/20] ?- GS. = ape ; Site Test Report wanna aad les 4 Li 5 jalan! =! Sint Cates Gensel Elechiciy& Veter Comoraion 66/11kV PSS-4 Substation Consultant | Energoprojekt ENTEL ne 66 kV Cable Pre commissioning Test ‘National Contracting E® I a Contractor Company Limited (NCC) Power Transformer- BA T-2 Electrical | ARAR Utility and Trading WLL Feeder/BayNo.:B21 Page 4 of 12 Contractor (Temperature: 28°C | Date: 23-03-2017 Cable Route | Gékv GIS(B21) to 66/11kV Transformer(BAT-2) | Cable Red (mtr) | Yellow (mtr) | Blue(mtr) 29.65 28.50 — 27.85 Cable Type _| 66kV, 1X50 Sqmm, Cu, XLPE Length Report No ~ R11-03, 3. Insulation Resistance of Link box Equipment used/Serial No _| Megger MIT 525 Sno,: 101459059 Calibration due date | 12-12-2017 __ Criteria_| The measured insulation resistance should be at least 1OMQ. - Link box location Insulation Resistance at 5kV/1min | 66KV GIS Basement 118.669 | 66/11kV Transfermer-BAT- 2 19.72GQ Remarks Tested by, [_Witnessedby, | Witnessed/Verified by, signature ged i? | ibe Name CS alicharan_ Farid Ahmad M. Abdul Rahman Date 24) 1a 209) gol} comin ep Dagsillenit ol! So pte Oat Genesa Becca 4 Water Corporation Consultant | Energoprojekt ENTEL ne ‘National Contracting ace | Contractor | Company Limited (NCC) © | ite Test Report 66/11kV PSS-4 Substation 66 KV Cable Pre commissioning Test Power Transformer- BA T-2 21_| Page 5 of 12 Electrical | ARAR Utility and Trading WLL @ | Feeder/Bay No. : Contractor [Temperature :28°C | Date : 23-03-2017 Cable Route | 66kV GIS(B21) to 66/11kV Transformer(BAT-2) Cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type _| 66kV, 1X500 Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 4. Phasing Verific: Report No ~ R11-04 n through Conductor Equipment used/Serial No__| Megger MIT 525 Sno,: 101459059 Calibration due date 1212-2017 a Criteria | Phasing corresponds end to end ie. Local Measurement to match Remote | Settings Phase Remote End Settings Local End Measurement Red Earthed Red Shorted Red Yellow ‘Open Yellow Open Blue ‘Open Blue ‘Open Red ‘Open Red Open Yellow —_| Yellow Earthed Yellow Shorted Blue ‘Open Blue Open Red ‘Open Red Open Blue Yellow ‘Open Yellow Open Blue Earthed Blue Shorted Remarks Testedby, | __ Witnessed by, Witnessed/Verified by, signature (Shen Whe foe Name CSkalicharan | ———_—Farid Aad M. Abdul Rahman Date ae) 6) 1a [2yos/asiy | - Site Test Report Vag ae a ae 66/11kV PSS-4 Substati lo patter Qatar Genel Sectncy & Want Crporason tubstation Consultant | Energoprojekt ENTEL ne 66 kV Cable Pre commissioning Test ‘National Contracting 5 Carer [RTS GED) | toweriaomeranra Electrical | ARAR Utility and Trading WLL Feeder/Bay No.:B21 | Page 6 of 12 Contractor Temperature: 28°C | Date : 23-03-2017 Cable Route | 66KV GIS(B21) to 66/11KV Transformer(BAT-2) | cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type _| 66kV, 1X500 Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 Report No—R11-05 Conductor Insulation Resistan ____ Equipment used/Serial No Megger MIT 525 Sno,: 101459059 Calibration due date ‘| 12-12-2017 No insulation breakdown within 1 minute, and the insulation resistance should Criteria be>1G0 Before HVAC Test Red Yellow Blue Insulation Resistance at _ r kV / Imin 34.760 ee com al 35.960 Remarks Tested by, Witnessed by, [ Witnessed/Verified by, Sirature tt’ | We? | fre Name CS Kalicharan | Farid Ahmad ___M. Abdul Rahman Date 2m) 2H07/ A> | manna’ cho Fata Cate Genera Becincy & Water Corporation Consultant ‘National Contracting QE® Contractor | Company Limited (NCC) - Site Test Report naan sila Da filiantt gl! 66/12kV PSS-4 Substation Energoprojekt ENTEL 66 kV Cable Pre commissioning Test Power Transformer- BA T-2 Electrical ‘ARAR Utility and Trading WL Contractor “Feeder/Bay No. :821 | Page 7 of 12 Temperature:28°C | Date: 23-03-2017 Cable Route | 66kV GIS(B21) to 66/11kV Transformer(BAT-2) Cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type | G5kV, 1X50 Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 | 6. Capacitance Measurement Report No ~ R11-06 Equipment used/Serial No _| Fluke Multimeter 87V, Sr.no. 34160099 Calibration due date 15/05/2017 Criteria _| Similar to but not greater than manufacturer's quoted values (247 pF/m) Red Yellow Blue Measured Capacitance | ae 7.20F 7.0 nk 6.8nk Calculated Capacitance | 242.83 pF/m 245.61 pF/m 244.17 pF/m (pF/m) Results | Ok | Ok Ok Remarks a J Tested by, Witnessed by, (_Witnessed/Verified by, Signature wd i> Name CS Kalicharan Farid Ahmad M. Abdul Rahman’ Date 4al ahi 2YUe 3/2) y Site Test Report pia net 66/11kV PSS-4 Substation Consultant | Energoprojekt ENTEL n= 66 kV Cable Pre commissioning Test ‘National Contracting NG Contractor | Company Limited (NCC) CED Power Transformer BAT-2 Electrical | ARAR Utility and Trading WL Feeder/Bay No.:B21 | Page 8 of 12 Contractor Temperature: 28°C | Date : 23-03-2017 Cable Route | GEKV GIS(B21) to 66/11KV Transformer(BAT-2) | Cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type _| 66kV, 1X500 Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 Report No ~ R11-07 7. DC Conductor Resistance Equipment used/Serial No___| DLRO, Sno:6111-426/101454463 | [Calibration due date (| 15/0817 ~ Criteria _| Similar to Cable Manufacturer quoted values (36.60 p/m) | Red + Yellow Yellow + Blue Blue + Red Measured Resistance 2.635 2.760 3.122 (ma) Far end Resistance ane | 0.674 1.034 (ma) R20 (Calculated) Red Yellow Blue R20 | i | 35.05 36.40 35.37 (u/m) | Results oK | oK oK Remarks Tested by, Witnessed by, ___Witnessed/Verified by, Signature piu pr far Name_ CS Kalicharan (Farid Ahmad M. Abdul Rahman Date [aed ahian LYST /[L1F PSS- 4# BAT-2| 66kV Cable DC CONDUCTOR RESISTANCE CALCULATION: Results obtained from the si Temperature: 28°C Measured value of conductor resistance : Loop resistance: RHY= 2.635 m0 R= 0.493 ma Y4B= 2.760m0 ve 0.674 ma BeR= 3.122m0 Be 1.034 m2 Actual value of conductor resistance : Length of the cable: RHY= 2.142 m0 29.65 mtrs Y+B= 2.086 m0 28.50 mtrs BeR= 2.088 m0 27.85 mtrs DC Conductor resistance per Phase : 2R = (R+Y)-(¥+B)+(B4R) = 2.14mO Red= 1.07 ma) 2Y = (R+Y)HY+B)-(B+R) = 2.14mO Yellow = 1.07 ma) 2B= (Y#B)+(BeR){R+Y) = 2.03 mO Blue = 1.02ma DC Conductor resistance at 20 °C : Rog = 1 R alm R-> Resistance 20 = 7£0.00393(T — 20) * L> Length nero Roo = 0970 x 0.0362 0/m Yatow Phd Ro = 0970 x 0.0375 Q/m =: Yellow Roo 36.40 na/m BluePhase| "20= 9.970 X 0.0365. 2/m Blue Roo = _35.37 wO/m . yr wf HE & 0.0351 9/m 0.0364. 0/m 0.0354 0/m wr comin Ser y sill ontll a = 2 86/11KV P5S-4 Substation Consultant | Energoprojekt ENTEL ne 66 kV Cable Pre commissioning Test ‘National Contracting QE® Contractor | Company Limited NCC) Power Transformer- BAT-2 Electrical | ARAR Utility and Trading WLL Feeder/Bay No. :821 | Page 9of 12 Contractor Temperature:28°C | Date: 23-03-2017 Cable Route | 66kV GiS(821) to 66/11kV Transformer(BAT-2) | cable | Red(mtr) | Yellow (mtr) | Blue(mtr) Cable Type | 66kV, 1X500 Sqmm, Cu, XLPE Length 29.65 28.50 27.85 Report No ~ R11-08 8. Positive and Negative Sequence Impedance Equipment used/Serial No | Megger PMM-1 Sno: 08070500003 Calibration due date 07-02-2018 Criteria_| Similar to Cable Manufacturer quoted values ] The actual impedance values will be different from manufacturer's quoted values Note | depending on following, 1.Cable sealing ends, 2.Entire grounding system of the | Plant/Sub-station, 3.Cable-laying formation 4.Induction from adjacent live lines. Red Yellow Blue Voltage (V) 0.60 ost 0.48 + {| Current (a) 80.17 79.33 81.64 Phase Angle (9) 67.98 69.47 69.39 Results - Zz 7. 94 +j 202.65 | pO/m | At Test Temperature Z1 | 96.94 +) 202.65 pQ/m_ | Temperature Compensated values at 90°C Z1 | 49.3+j 121 Q/m_ | Manufacturer Specified Value [Zi | 224.64 Ha/m Temperature Compensated values at 90°C |zi| | 130.66 n/m | Manufacturer Specified Value iL Tested by, a Witnessed by, 4 Witnessed/Verified by, Signature Qt pote? uae Name CS Kalicharan Farid Ahmad | 'M. Abdul Rahman Date ans 2303 | 21> | Positive & Negative Sequence Impedance BA Red Yellow Length 28.65 28.50 Voltage iV) 0.50 O51 (Current ( 80.17 73.33 [Phase Angle 67.98 69.47 S (VA) 40.08. 000 (Cos) 75.03 14 19 7 Sin@VAR) 37.16 37.89 _ VA (0.006 0.006 - | (Cosoe 0.375 0.354 [snd 0.827 0.936 Temp 28 * co + i Sieg ze 0.002338257 + j 0.008782 zr=(permetie) —zr/length of r phase 2r=(per metre) 7.88626-.05 + J 0.000195 (Zr=(permetre) 7886 e488 om aye 000225458 + 4 0.006021 zy=(permetre) zy length of y phase 2y=(permette) 7. 91081E-05 + i 0.000211 [Zy= (per mete) 7577 = 225 phim Zb= o.oo2t1272 + j 0.005618 2b =(permette) —zb/length of b phase Zb=(permetre) 758607605 + J a.000202 [=(permete) 7586 072 pm |] Z1= (2r+2y +26)/3 - Calculates at test z1= 77.94 + j 20265 um | rature |Temperature z= 96.94 + j 20265 nim |Compensated val Jat 90°C z15 493 + j 421 ttm |Theoretical Value Z1= VIRPEX?) zie 2464 yoim Measured Value Zz 13066 palm Theoretical Value i ex Dien Hla Desa ——g!! Site Test Report : as (or Onl tak aa Cope || (66/11KV PSS-4 Substation | consultant | Energoprojekt ENTEL ne 66 kV Cable Pre commissioning Test Contract nec) REO) | Power Transormer-BA7-2 Electrical | ARAR Utility and Trading WLL @ | Feeder/Bay No. :821 | Page 10 of 12 | Contractor Temperature : 28 °C Date : 23-03-2017 Cable Route | 66KV GIS{B21) to 66/11kV Transformer(BAT-2) | Cable | Red(mntr) | Yellow (mtr) | Blue(mtr) Cable Type | 66KV, 1X500 Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 Report No ~ R11-09 ). Zero Sequence Impedance Equipment used/Serial No [Megger PMM-1 Sno.: 08070500003 __| [Calibration due date [07-02-2018 J Criteria_| Similar to Cable Manufacturer quoted values ] | The actual impedance values will be different from manufacturer's quoted values Note | depending on following, 1.Cable sealing ends, 2.Entire grounding system of the lant/Sub-station, 3.Cable-laying formation 4.Induction from adjacent live lines. Direction Up Down Voltage (V) 1.19 1.20 Current (A) 72.05 71.08 Phase Angle (0) 37.03 36.12 Results : - — 20 1404.10 + j 1041.83 HO/m | At Test Temperature 20 | 1746.23+j 1041.83 uO/m | Temperature Compensated values at 90°C ZO | 97.7+j 1900 1Q/m | Manufacturer Specified Value | |zo| | 2033.40 10/m | Temperature Compensated values at 90°C 120] | 1902.51 1Q/m | Manufacturer Specified Value Tested by, Witnessed by, Witnessed/Verified by, a (pert ye ; per | Name Date CS Kalicharan Farid Ahmad M. Abdul Rahman ae 2403) 27> Zero Sequence Impedance BAT2 EB (UP) ReY=B (Down) ‘Average Length 2867 2867 2887 Votage (Vp 118 120 20 [Current 72.05. 71.06 7155 Phase Angle 3703 36.12 36.58) iS (VA 85.88, 35 18 85.53 P=VI Cos _(W) 6856 68.68 [=Vi SingiVAR) 51.72 J - 50.07, Vi O0T7 0.017 (Coser 0.796) 0.803) [sing 0.602, 0.596) Temp 28 c . v y T Zo= 0.040 + i 008 20 (per metre) = ZO /length 20 (permette)= 0.00140 + = j_—~—(0.0010 ZO= 740410 OATES pI [Calculated at test temperature ZO= 174623 7047.63 __pliim_]Temperature Compensated value at 90°C Zo oT 7800 pim] Theoretical Value ZO= REX?) 2o= 2033.40 nim Measured Value 20: 190251 aim | Theoretical Value ye oe Coz . a ; Site Test Report anna’ aan les Silents ie el eee Cater Genel Bech & Wate Corporation ioe Sth Cas So crencua BEL Consultant | Energoprojekt ENTEL n= 66 kV Cable Pre commissioning Test ‘National Contracting E® Contractor | Cempany Limited NCC) Power Transformer: BAT-2 Electrical | ARAR Utility and Trading WL Feeder/Bay No.:821 | Page 11 of 12 | Contractor Temperature: °C | Date: ] Cable Route §6kV GIS to 66/11kV Transformer Cable | Red{mtr) | Yellow (mtr) | Blue(mtr) Cable Type _| 66kV, 1X500 Samm, Cu, XLPE Length | 29.65 28.50 27.85 Report No-R11-10 10. Contact Resistance of Link Box Equipment used/Serial No Calibration due date = | Criteria sistance should be < 10 10 Resistance Across Contact Point (uO) 7 Type of LB tion ocak (XLB/SLB/SVL) A B c D E F G H 1 J | | L Remarks Tested by, Witnessed by, [ Witnessed/Verified by, Signature Name CS Kalicharan Date Ae ap bnpallnih oH" (Qatar General Bectrcy & Water Corporation Site Test Report 66/11kV PSS-4 Substation slo peta Consultant | Energoprojekt ENTEL {66 kV Cable Pre commissioning Test contraaer | Matne/conrering GEES) | Power ranma AT Electrical | ARAR Utility and Trading WLL a> Feeder/Bay No.:B21 | Page 12 of 12 Contractor Temperature: 30 °C | Date: 28-03-2017 Cable Route | 66KV GIS to 66/11KV Transformer Cable | Red(mtr) | Yellow (mtr) | Blue(mtr) Cable Type_| 66kV, 1X500 Samm, Cu, XLPE Length | 29.65 | 2850 | 27.85 Report No ~ R11-11 11. AC High Voltage Test Equipment used/Serial No__| HighVolt Sno. 918 268/ 918 269/918 323, Calibration due date [14-03-2018 Criterig_| Cable should withstand the applied voltage for the specified duration 76 kV/60_ minutes Red Yellow Blue IRBeforeHVat | - Sei | 83160 13770 1.6470 Duration (min) 60 Mins 60 Mins 60 Mins, Voltage {kV) 76 kV 76kVv 76 kV Frequency (Hz) 170.65 Hz 171.42 He 171.61 Hz Current (A) 44a 440 44k t IR After HV at 1.35 78 GI SkV/min _ 1.2572 | Ta 878GQ Results | HV Test Completed successfully Tested by, Witnessed by, Witnessed/Verified by, Sarature hue ye? Or" Name c3Xalicharan Farid Ahmad Frabraham Date ast 17 29/09 [ae Aan sles in saan _— hg pete Cats General Heciichy & Waster Comporaion 66/11kV PSS-4 Substation Consultant | Energoprojekt ENTEL n= 66 KV Cable Pre commissioning Test Contractor ere E® Power Transformer- BA T-2 | Electrical | ARAR Utility and Trading WLL & Feeder/Bay No. : 821 Contractor Temperature: 30 °C | Date: 28-03-2017 “Cable Route | G6kV GIS to 66/11KV Transformer able | Red (nt) | Yellow (mtr) | Blue(mt) Cable Type | G6kV, 1X500 Samm, Cu, XLPE Length | 29.65 2850 | 27.85 200 700 600. 500 | 400 300 | 200 10.0 00 t Uset Uact ‘freso Time No. | kM | te) | Hz] | thimmss} | state | Remarks — | | 1_| 78 | 76 | 17065 | 01:00:00 | ot. | Passed _ j Tested by, Witnessed by, | ‘Witnessed/Verified by, Signature he Met for Name 'Skalicharan Farid Ahmad C | Abraham Date ae 8) 1 20/03] a> | : - vale sles piano a! sto. (Qatar Genesal Secricy & Waser Corporation, ~ Site Test Report 66/11kV PSS-4 Substation =] Consultant | Energoprojekt ENTEL ne ‘66 kV Cable Pre commissioning Test Contactor | ac) AC® Power Transformer: BAT-2 Electrical ARAR Utility and Trading WLL > Feeder/Bay No. : 821 Contractor Temperature: 30 °C Date : 28-03-2017 Cable Route | G6KV GIS to 66/11kV Transformer Cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type | 66KV, 1X500 Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 foltage time characteristic ~ Yellow Phas UtkVI 800 700 600 500 400 300 \ 200 100 | 00 t Uset | Uact ‘freso ‘Time | No. IkV] [kv] [Hz] | {hh:mm:ss} State Remarks: Ta] 76 [76 [171.42 | 01:00:00 ok. | Passed Tested by, Witnessed by, I Witnessed/Verified by, signature ge Yt or Name licharan ___ Farid Ahmad Abraham Date 28th) 1 Ab l03/ 2017 | Site Test Report hs wearin FD wan U0 Susilo! = Ga contd bara Gop 66/23kY PSS-4 Substation Consultant | Energoprojekt ENTEL n= 66 kV Cable Pre commissioning Test . ‘National Contracting eo ‘Contractor Company Limited (NCC) Power Transformer- BA T-2 a Electrical | ARAR Utility and Trading WL Feeder/Bay No. : B21 Contractor Temperature: 30 °C | Date 2803-2017 Table Route | GEKY GIS to G6/LIKv Transformer Cavie | Redintr) | Yellow (mtr) | Blue(rntr) Cable Type | 66KV, 1X500Sqmm, Cu, XLPE Length | 29.65 28.50 27.85 uty) 800 700 600 500 400 300 200 100 00 t Uset_| Uact | reso | Time ] a No] tk) | IRV) | [Hz] [hhemmss) | State Remarks 1 | 76 76 | 171.61 | 01:00:00 ok Passed_ 1 Tested by, Witnessed by, ___ Witnessed/Verified by, 7 a Signature | Aye Name | CSKalicharan Farid Anmad Abraham | Date ad v1 1 28 [03 [2017

Vous aimerez peut-être aussi