Vous êtes sur la page 1sur 9

MUNICIPALIDAD DISTRITAL DE NEPEÑA

“MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO


DEL C.P. NEPEÑA, DISTRITO DE NEPEÑA - SANTA – ANCASH”

CASETA DE BOMBEO

ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total


01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00

03.00.00 MOVIMIENTO DE TIERRAS


02.01.00 EXCAVACION MANUAL DE ZANJA H=1.00M. M3 23.63
ZAPATA Z-1 2.00 1.20 0.60 1.20 1.73
EJE 1-1 1.00 10.00 0.60 1.00 6.00
EJE 1'-1' y 1"-1" 2.00 1.90 0.50 1.00 1.90
EJE 2-2 1.00 10.00 0.60 1.00 6.00
EJE A-A 1.00 4.00 0.60 1.00 2.40
EJE A'-A' 1.00 1.60 0.50 1.00 0.80
EJE C-C 1.00 4.00 0.60 1.00 2.40
EJE D-D 1.00 4.00 0.60 1.00 2.40

03.02.00 RELLENO MANUAL COMPACTADO C/MATERIAL PROPIO M3 4.86


RELLENO EN ÁREA DE PISOS - SALA DE MÁQUINAS 1.00 10.00 4.00 0.10 4.00
RELLENO EN ÁREA DE PISOS - SALA DE CLORACIÓN 1.00 3.65 1.65 0.10 0.60
RELLENO EN ÁREA DE PISOS - SALA DE CLORACIÓN 1.00 1.70 1.50 0.10 0.26

03.03.00 AFIRMADO 4" PARA VEREDAS M2


VEREDA PERIMETRAL 1.00 20.50 1.00 - 20.50

03.04.00 ELIMINACION DE MAT. EXCED. DIST. PROM. 5KM. M3 23.46


FACTOR DE ESPONJAMIENTO=1.25

04.00.00 CONCRETO SIMPLE


04.01.00 CIMIENTOS CORRIDOS 1:10 +30%P.G M3 5.30
ZAPATA Z-1 2.00 1.20 0.60 0.60 0.86
EJE 1-1 1.00 10.00 0.60 0.70 4.20
EJE 1'-1' y 1"-1" 2.00 1.90 0.50 0.60 1.14
EJE 2-2 1.00 10.00 0.60 0.70 4.20
EJE A-A 1.00 4.00 0.60 0.70 1.68
EJE A'-A' 1.00 1.60 0.50 0.60 0.48
EJE C-C 1.00 4.00 0.60 0.70 1.68
EJE D-D 1.00 4.00 0.60 0.70 1.68

04.02.00 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO M2 30.06


EJE 1-1 2.00 10.00 0.45 9.00
EJE 1'-1' y 1"-1" 4.00 1.90 0.45 3.42
EJE 2-2 2.00 10.00 0.45 9.00
EJE A-A 2.00 4.00 0.45 3.60
EJE A'-A' 2.00 1.60 0.45 1.44
EJE C-C 2.00 4.00 0.45 3.60
EJE D-D 2.00 4.00 0.45 3.60
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00

04.03.00 CONCRETO 1:8 + 25% P.M.PARA SOBRE CIMIENTO M3 5.23


ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
EJE 1-1 2.00 10.00 0.15 0.45 1.35
EJE 1'-1' y 1"-1" 4.00 1.90 0.15 0.45 0.51
EJE 2-2 2.00 10.00 0.15 0.45 1.35
EJE A-A 2.00 4.00 0.25 0.45 0.90
EJE A'-A' 2.00 1.60 0.15 0.45 0.22
EJE C-C 2.00 4.00 0.25 0.45 0.90
EJE D-D 2.00 4.00 0.25 0.45 0.90

04.04.00 ENC. Y DESENC. DE DADOS DE APOYO P/ARBOL HIRAÚLICO M2 0.70


2.00 1.40 0.25 0.70

04.05.00 CONCRETO F'C= 210KG/CM2 EN DADOS M3 0.06


2.00 0.30 0.40 0.25 0.06
04.06.00 CONCRETO F'C=100KG/CM2 PARA SOLADOS M3
Z-1 2.00 1.20 1.00 0.10 0.24

05.00.00 CONCRETO ARMADO


05.01.00 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 1.44
Z-1 2.00 1.20 1.00 0.60 1.44

05.01.02 ACERO F'y=4200KG/CM2 EN ZAPATAS KG #REF!


VER PLANILLA DE METRADO DE ACERO

05.02.00 COLUMNAS
05.02.01 ENCOFRADO Y DESCENCOFRADO DE COLUMNAS M2 39.83
COLUMNAS C-1 12.00 - 0.25 3.25 9.75
12.00 - 0.30 3.25 11.70

COLUMNAS C-2 4.00 - 0.25 3.75 3.75


4.00 - 0.80 3.75 12.00

COLUMNAS C-2 2.00 - 0.15 3.75 1.13


2.00 - 0.20 3.75 1.50

05.02.02 CONCRETO EN COLUMNA F'C=210 KG/CM2 M3 1.95


COLUMNAS C-1 6.00 0.25 0.25 3.25 1.22
COLUMNAS C-2 2.00 0.35 0.25 3.75 0.66
COLUMNAS C-3 1.00 0.15 0.15 3.25 0.07

05.02.03 ACERO F'y=4200KG/CM2 EN COLUMNAS KG #REF!


VER PLANILLA DE METRADO DE ACERO

05.03.00 VIGAS
05.03.01 ENCOFRADO Y DESCENCOFRADO DE VIGAS M2 22.09
VIGA VP-1 6.00 3.50 0.20 - 4.20
VIGA VP-2 2.00 3.40 0.35 - 2.38
VIGA VP-1 6.00 0.90 0.20 - 1.08
VIGA VP-2 2.00 0.90 0.35 - 0.63
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
VIGA VS-1 12.00 3.20 0.20 - 7.68

VIGA BORDE - VB 6.00 3.50 0.20 - 4.20

VIGA BORDE - V -1 2.00 4.80 0.20 - 1.92

05.03.02 CONCRETO EN VIGA F'C=210 KG/CM2 M3 3.32


VIGA VP-1 3.00 3.50 0.25 0.20 0.53
VIGA VP-2 1.00 3.40 0.25 0.35 0.30
VIGA VP-1 3.00 0.90 0.25 0.20 0.14
VIGA VP-2 1.00 0.90 0.10 0.20 0.02

VIGA VS-1 4.00 3.20 0.25 0.20 0.64


VIGA VS-1 2.00 2.60 0.25 0.20 0.26

VIGA BORDE - VB 3.00 3.20 0.25 0.20 0.48

VIGA BORDE - V -1 1.00 4.80 0.20 0.10 0.96

05.03.03 ACERO F'y=4200KG/CM2 EN VIGAS KG #REF!


VER PLANILLA DE METRADO DE ACERO

05.04.00 LOSAS ALIGERADAS


05.04.01 ENCOFRADO Y DESENCOFRADO DE LOSAS ALIGERADAS M2 71.93
3.00 3.50 3.20 - 33.60
3.00 3.50 0.90 - 9.45
DESCUENTO DE AREA EN DUCTO 1,92
FRISO PARA LOSA ALIGERADA H=0.20 2.00 10.50 21.00
2.00 4.90 9.80

05.04.02 CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 M3 6.29


V=0.0875 M³/ m², A=16.33 m²

05.04.03 ACERO F'y=4200KG/CM2 EN LOSAS ALIGERADAS KG #REF!


VER PLANILLA DE METRADO DE ACERO

05.04.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM UND 599.39


CANTIDAD= 8.33 LADRILLOS / M²
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
06.00.00 MUROS Y TABIQUES DE ALBAÑILERIA
06.01.00 MURO DE CABEZA DE LADRILLO KING-KONG DE ARCILLA M2 36.00
EJE A-A 3.00 4.00 - 3.00 36.00

06.02.00 MURO DE SOGA DE LADRILLO KING-KONG DE ARCILLA M2 55.03


EJE 1-1 5.00 1.00 - 2.20 11.00
2.00 1.18 - 3.00 7.05
1.00 1.60 - 3.00 4.80

S-H 1.00 1.90 - 3.00 5.70


1.00 1.85 - 3.00 5.55
1.00 1.65 - 3.00 4.95
EJE 2-2 2.00 1.40 - 3.00 8.40
1.00 0.65 - 2.20 1.43
1.00 1.45 - 0.90 1.31
1.00 1.80 - 0.70 1.26
1.00 0.80 - 0.70 0.56
2.00 0.90 - 0.70 1.26
1.00 1.45 - 0.70 1.02
1.00 0.25 - 3.00 0.75

07.00.00 REVOQUES ENLUCIDOS Y MOLDURAS


07.01.00 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2 68.53

EJE A-A 2.00 4.00 - 3.00 24.00

EJE 1-1 5.00 1.00 - 2.20 11.00


2.00 1.18 - 3.00 7.05
1.00 1.60 - 3.00 4.80

S-H 1.00 1.90 - 3.00 5.70

EJE 2-2 2.00 1.40 - 3.00 8.40


1.00 0.65 - 2.20 1.43
1.00 1.45 - 0.90 1.31
1.00 1.80 - 0.70 1.26
1.00 0.80 - 0.70 0.56
2.00 0.90 - 0.70 1.26
1.00 1.45 - 0.70 1.02
1.00 0.25 - 3.00 0.75
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
07.02.00 TARRAJEO EN INTERIORES CON CEMENTO - ARENA M2 103.03

EJE A-A 4.00 4.00 - 3.00 48.00

EJE 1-1 5.00 1.00 - 2.20 11.00


2.00 1.18 - 3.00 7.05
1.00 1.60 - 3.00 4.80
S-H 1.00 1.90 - 3.00 5.70
1.00 1.85 - 3.00 5.55
1.00 1.65 - 3.00 4.95
EJE 2-2 2.00 1.40 - 3.00 8.40
1.00 0.65 - 2.20 1.43
1.00 1.45 - 0.90 1.31
1.00 1.80 - 0.70 1.26
1.00 0.80 - 0.70 0.56
2.00 0.90 - 0.70 1.26
1.00 1.45 - 0.70 1.02
1.00 0.25 - 3.00 0.75

07.03.00 TARRAJEO EN CIELO RASO M2 71.93


3.00 3.50 3.20 - 33.60
3.00 3.50 0.90 - 9.45
DESCUENTO EN DUCTO 1,92
2.00 10.50 21.00
2.00 4.90 9.80

07.04.00 TARRAJEO EN ARISTAS DE COLUMNAS ML 18.00


COLUMNA C-2 3.00 - - 3.00 9.00
3.00 - - 3.00 9.00

07.05.00 TARRAJEO EN SUPERFICIE DE VIGAS M2 1.32


VIGA VP-101 2.00 3.30 0.20 1.32

07.06.00 VESTIDURA DE DERRAMES ML 51.30


VENTANA V-1 5.00 4.00 - - 20.00

VENTANA V-2 1.00 2.90 - - 2.90


VENTANA V-2 1.00 5.70 - - 5.70
PUERTA P-1 1.00 6.40 - - 6.40
PUERTA P-2 2.00 5.50 - - 11.00
PUERTA P-3 1.00 5.30 - - 5.30

08.00.00 PISOS Y PAVIMENTOS


08.01.00 FALSO PISO DE CEMENTO 1:8 E=10cm M2 33.50
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
1.00 21.72 - 21.72
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
1.00 1.50 1.70 - 2.55
1.00 2.60 2.35 - 6.11
1.00 2.60 1.20 - 3.12

08.02.00 PISO DE CEMENTO PULIDO BRUÑADO E=2" MEZCLA 1:4 M2 33.50


1.00 21.72 - 21.72
1.00 1.50 1.70 - 2.55
1.00 2.60 2.35 - 6.11
1.00 2.60 1.20 - 3.12

08.03.00 VEREDA CONCRETO F'c=140KG/CM2 E=4" M2 20.50


1.00 20.50 - 20.50

08.04.00 CONCRETO F'c=140KG/CM2 EN SARDINEL DE VEREDAS ML 33.00


VEREDA PERIMETRAL 1.00 33.00 0.00 - 33.00

08.05.00 JUNTA ASFÁLTICA ML


VEREDA PERIMETRAL 6.00 1.00 - - 6.00

09.00.00 CARPINTERIA DE MADERA


09.01.00 PUERTA DE MADERA 0.90 x 2.3 INC. COLOCACION UND 1.00 - - - 1.00
09.02.00 PUERTA DE MADERA 0.70 x 2.3 INC. COLOCACION UND 1.00 - - - 1.00
09.03.00 VENTANA DE MADERA 1.45 x 1.40 UND 1.00 - - - 1.00

10.00.00 CARPINTERIA METÁLICA


10.01.00 PUERTA METÁLICA 0.90 x 2.30 M. INC. COLOCACION UND 1.00 - - - 1.00
10.02.00 PUERTA METÁLICA 1.80 x 2.30 M. INC. COLOCACION UND 1.00 - - - 1.00
10.03.00 VENTANA METÁLICA 1.00 x 0.80 M. INC. COLOCACION UND 5.00 - - - 5.00
10.04.00 VENTANA METÁLICA 0.70 x 0.80 M. INC. COLOCACION UND 1.00 - - - 1.00

11.00.00 CERRAJERIA
11.01.00 BISAGRA METALICA DE 4" PZA 9.00 - - - 9.00
11.02.00 CHAPA DE 2 GOLPES CON 2 BARRAS UND 2.00 - - - 2.00
11.03.00 CHAPA DE 3 GOLPES GUARDIANIA UND 1.00 - - - 1.00
11.04.00 CHAPA TIPO BOLA UND 1.00 - - - 1.00
11.05.00 NISAAGRAS DE 3 " PZA 6.00 - - - 6.00

12.00.00 PINTURA
12.01.00 PINTURA BASE EN MUROS INTERIORES Y EXTERIORES M2 171.56
AREA DE MUROS EN INTERIORES - - - 103.03
AREA DE MUROS EN EXTERIORES - - - 68.53

12.02.00 PINTURA LATEX 2 MANOS EN MUROS INTERIORES Y EXTERI M2 171.56


AREA DE MUROS EN INTERIORES - - - 103.03
AREA DE MUROS EN EXTERIORES - - - 68.53

12.03.00 PINTURA AL TEMPLE EN CIELO RASO Y VIGAS M2 71.93


PINTURA EN CIELO RASO - - - 71.93

13.00.00 INSTALACIONES ELÉCTRICAS


13.01.00 SALIDA DE TECHO (CENTRO LUZ) PTO 8.00 - - - 8.00
13.02.00 SALIDA PARA TOMACORRIENTES PTO 4.00 - - - 4.00
ITEM DESCRIPCION DE PARTIDAS Und. N° Largo Ancho Alto Total
01.00.00 OBRAS PROVISIONALES

01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - 1.00


01.02.00 ALMACÉN Y CASETA DE GUARDIANIA GLB 1.00 - - - 1.00

02.00.00 TRABAJOS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 4.00 - 40.00


02.02.00 TRAZO NIVELACIÓN Y REPLANTEO M2 1.00 10.00 4.00 - 40.00
13.03.00 TABLERO DISTRIBUCIÓN CAJA METÁLICA PZA 1.00 - - - 1.00
13.04.00 LUMINARIA 10 W UND 3.00 3.00
14.00.00 INSTALACIONES SANITARIAS
14.01.00 INODORO COLOR BLANCO (INC. ACSESORIOS) PZA 1.00 - - - 1.00
14.03.00 LAVATORIO OVALIN LOSA COLOR (INC. ACCESORIOS) PZA 1.00 - - - 1.00
14.04.00 DUCHA PZA 1.00 - - - 1.00
14.05.00 SALIDA DE DESAGUE EN PVC 4'' PZA 1.00 - - - 1.00
14.06.00 SALIDA DE DESAGUE EN PVC 2'' PZA 1.00 - - - 1.00
14.07.00 SALIDA DE VENTILACIÓN PVC 2'' PZA 1.00 - - - 1.00
14.08.00 TUBERIA PVC SAP 2'' ml 7.50 - - - 7.50
14.09.00 TUBERIA PVC SAP 4" ml 6.50 - - - 6.50
14.10.00 SALIDA P/SUMIDERO 2'' und 2.00 - - - 2.00
14.11.00 SUMIDERO DE BRONCE 2" und 2.00 - - - 2.00
14.12.00 SALIDA P/REGISTRO DE 4'' und 1.00 - - - 1.00
14.13.00 REGISTRO DE BRONCE ROSCADO DE PISO 4'' und 1.00 - - - 1.00
14.14.00 CAJA DE REGISTRO PREFAB. 12'' X 24'' C/TAPA und 1.00 - - - 1.00
14.15.00 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" Pto 3.00 - - - 3.00
14.16.00 TUBERIA PVC CLASE 10 - 1/2" ml 5.00 - - - 5.00
14.17.00 VALVULA CIERRE RAPIDO 1/2" und 1.00 - - - 1.00