Vous êtes sur la page 1sur 51

EASTERN TRADING & CONST. EST.

Document No. ETE/QA/F/013 Rev. 00


Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
Visual Inspection for Site Bench Mark Location Identification at Plant N-26
1 C-0001 PLANT N-26 20-Feb-17 9:00 AM 21-Feb-17 9:00 AM RA-819401-001-00 SALMAAN WAIL BADAWI

Visual Inspection for Site Bench Mark Location Identification at Proposed


Shipping and Receiving Area @ Ju'Aymah Shops Plant N-26
SHIPPING & RECEIVING
2 C-0002 AREA 5-Mar-17 4:00 PM 6-Mar-17 9:00 AM RA-819401-001-00 QUADRI WAIL BADAWI

Soil Sample Collection of Excavated Material from ETE Laydown Area,


3 C-0003 Stock Pile # 1 for Sieve Analysis and Test Results Reviewing @ Ju'Aymah PLANT N-26 6-Mar-17 9:00 AM 7-Mar-17 2:00 PM RA-819400-001-00 SALMAAN WAIL BADAWI
Shops Plant N-26 (Source: Admin Building and Shipping & Receiving Area)

Soil Sample Collection of Existing Material from Proposed New Sub Due to water
4 C-0004 Station Building for Sieve Analysis and Test Results Reviewing @ Ju'Aymah ADMIN BUILDING 6-Mar-17 9:15 AM 7-Mar-17 2:30 PM RA-819472-001-00 SALMAAN WAIL BADAWI ponding at Site
Shops Plant N-26

Soil Sample Collection of Existing Material from Proposed Administration Due to water
5 C-0005 Building Area for Sieve Analysis and Test Results Reviewing @ J u'Aymah NEW SUB STATION 6-Mar-17 9:20 AM 7-Mar-17 3:00 PM RA-819474-001-00 ACIELO WAIL BADAWI ponding at Site
Shops Plant N-26

Soil Sample Collection of Sand, General Fill, Select Fill, Dune Sand and
6 C-0006 Marl from Al-Osais Stock Pile for Sieve Analysis and Test Results Reviewing AL-OSAIS 6-Mar-17 9:05 AM 7-Mar-17 9:00 AM RA-819400-001-00 ACIELO WAIL BADAWI
@ Al-Osais Fadhli Crusher

Soil Sample Collection of Clean Sand Material from Al-Osais Stock Pile for
7 C-0007 Sieve Analysis and Test Results Reviewing @ Al-Osais Fadhli Crusher AL-OSAIS 6-Mar-17 9:10 AM 7-Mar-17 9:30 AM RA-819400-001-00 ACIELO WAIL BADAWI

Soil Test Results Reviewing of General Fill, Select Fill and Marl from Al-
8 C-0008 Osais Stock Pile @ Ju'Aymah S hops Plant N-26 PLANT N-26 26-Mar-17 9:30 AM 27-Mar-17 8:30 AM RA-819400-001-00 ACIELO ISRAEL HENSON

9 C-0009 Soil Test Results Reviewing of Clean Sand Material from Al-Osais Stock Pile PLANT N-26 26-Mar-17 9:30 AM 27-Mar-17 9:00 AM RA-819400-001-00 ACIELO ISRAEL HENSON
@ J u'Aymah Shops Plant N-26

10 C-0010 Soil Test Results Reviewing of Excavated Material from ETE Laydown Area, PLANT N-26 26-Mar-17 9:30 AM 27-Mar-17 9:30 AM RA-819400-001-00 SALMAAN ISRAEL HENSON
Stock Pile # 1 @ Ju'Aymah Shops Plant N-26

Material Receiving Inspection of FBE Rebar (Straight) 10mm, 12mm,


11 C-0011 16mm, 20mm 25mm and 32mm as per attached List, PO-29445 Rev-01 PLANT N-26 5-Apr-17 10:00 AM 6-Apr-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
with Touch-Up Paint Kit (Jotun) from Al-Faisal Steel Products Co. @ ETE
Store Plant N-26

12 C-0012 Material Handling, Storage and Preservation of Inspection of FBE Rebar @ PLANT N-26 5-Apr-17 10:00 AM 6-Apr-17 10:30 AM RA-819400-001-00 BAQAR ISRAEL HENSON
ETE Store Plant N-26

Visual Inspection for Sample Collection of Potable Water for Testing and
13 C-0013 Analysis to use in Curing and Mixing from Baladia, Ras Tanura @ Ju'Aymah PLANT N-26 20-Apr-17 8:00 AM 22-Apr-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Shops Plant N-26

Visual Inspection Material Receiving, Handling, Storage and Preservation


14 C-0014 of PVC Coated Binding Wire (Tie Wire Ga-16#8 Kg) for Tying of FBE Rebar PLANT N-26 3-May-17 10:00 AM 4-May-17 10:30 AM RA-819400-001-00 BAQAR ISRAEL HENSON
50 Roll @ Ju'Aymah Shops Plant N-26

Visual Inspection Material Receiving, Handling, Storage and Preservation


15 C-0015 of Polyethylene Sheet LDPE 150 Micron (0.15 mm) 4x25 LM (QTY=120 PLANT N-26 3-May-17 10:05 AM 4-May-17 11:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Roll) f rom Isam Kabbani & Partner @ ETE Store Plant N-26

16 C-0016 Test Analysis Reviewing of Potable Water to use in Curing and Mixing from PLANT N-26 8-May-17 9:00 AM 9-May-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Baladia, Ras Tanura @ Ju'Aymah Shops Plant N-26

Material Receiving, Handling, Storage and Preservation Inspection of Coal


17 C-0017 Tar Epoxy APCS-3 Bitumastic 300 M (Black + Part B) (QTY= 15 Kit) and PLANT N-26 8-May-17 9:05 AM 9-May-17 10:30 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Thinner # 10, (QTY= 6 Pcs.) from Carboline @ ETE S tore, Ju'Aymah Shops
Plant N-26

Visual Inspection Material Receiving,Handling,Storage and Preservation of


18 C-0018 Bituman Impregnated Filler Board Thickness 12MM&4' X 7' (Qty 60 PLANT N-26 8-May-17 9:10 AM 9-May-17 11:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Sheet) from Isam kabbani & Partner @ ETE Laydown, Ju'Aymah Shops
Plant N-26

Visual Inspection of Material Receiving, Handling, Storage and


19 C-0019 Preservation of 4" Dia PVC Pipes SCH 80 (EPC 80), (QTY=100 Pcs) 6.0 M PLANT N-26 14-May-17 2:15 PM 15-May-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Length, using as Reinforcement Spacer from New Products Industries
(Nepro) @ ETE Laydown, Ju'Aymah Shops Plant N-26

Visual Inspection Material Receiving, Handling, Storage and Preservation


20 C-0020 of PVC Wheel Spacer 50 mm (Qty 200 pcs) And 75 mm (Qty 250 Pcs) PLANT N-26 16-May-17 1:30 PM 17-May-17 2:00 PM RA-819400-001-00 BAQAR ISRAEL HENSON
Using as Reinforcement Spacer from Isam Kabbani and Partners @ ETE
Laydown Ju'Aymah ,Shops Plant No- 26.

Soil Protection and Control, Drainage and De-Watering Inspection at SHIPPING & RECEIVING
21 C-0021 Shipping and Receiving Area, Grid Line 3(A- G) @ Ju'Aymah ,Shops Plant 16-May-17 3:00 PM 17-May-17 2:30 PM RA-819400-001-00 SALMAAN ISRAEL HENSON
No- 26 AREA

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


22 C-0022 Existing Sub Grade (Below Foundation of 0.60M as per Geotechnical SHIPPING & RECEIVING 16-May-17 3:05 PM 17-May-17 3:00 PM RA-819400-001-00 SALMAAN ISRAEL HENSON
Report / Recommendation) at Shipping and Receiving Area, Grid Line 3(A- AREA
G) @ Ju'Aymah ,Shops Plant No- 26

23 C-0023 Soil Protection and Control, Drainage and De-Watering Inspection at ADMIN BUILDING 16-May-17 3:10 PM 17-May-17 3:30 PM RA-819400-001-00 ACIELO ISRAEL HENSON
Admin Building Area @ Ju'Aymah ,Shops Plant No- 26

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


24 C-0024 Existing Sub Grade (Below Foundation of 0.60M as per Geotechnical ADMIN BUILDING 16-May-17 3:15 PM 17-May-17 4:00 PM RA-819400-001-00 ACIELO ISRAEL HENSON
Report / Recommendation) at Admin Building Area @ Ju'Aymah ,S hops
Plant No- 26

25 C-0025 Material Receiving Inspection of Select Fill from Existing Stock Pile # 1 PLANT N-26 18-May-17 3:00 PM 20-May-17 3:00 PM RA-819400-001-00 SALMAAN ISRAEL HENSON
(QTY=4162.35 M3) @ ETE Laydown Area, JuAymah, Shops Plant No-26

Soil Protection and Control, Drainage and De-Watering Inspection at SHIPPING & RECEIVING
26 C-0026 Shipping and Receiving Area, Grid Line 4(A- G) @ Ju'Aymah ,Shops Plant 21-May-17 9:00 AM 22-May-17 2:30 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
No- 26 AREA

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


27 C-0027 Existing Sub Grade (Below Foundation of 0.60M as per Geotechnical SHIPPING & RECEIVING 21-May-17 9:05 AM 22-May-17 3:00 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
Report / Recommendation) at Shipping and Receiving Area, Grid Line 4(A- AREA
G) @ Ju'Aymah ,Shops Plant No- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
28 C-0028 Material (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 21-May-17 3:30 PM 22-May-17 3:30 PM RA-819476-001-00 ACIELO ISRAEL HENSON
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material Due to Third Party
29 C-0029 (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 21-May-17 3:35 PM 22-May-17 3:45 PM RA-819476-001-00 ACIELO ISRAEL HENSON Troxler not
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26 working

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
30 C-0030 Material (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 21-May-17 3:40 PM 22-May-17 4:00 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material Due to Third Party
31 C-0031 (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 21-May-17 3:45 PM 22-May-17 4:15 PM RA-819477-001-00 SALMAAN ISRAEL HENSON Troxler not
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA working
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


32 C-0029-A (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 22-May-17 7:00 AM 23-May-17 8:00 AM RA-819476-001-00 ACIELO ISRAEL HENSON 24
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


33 C-0031-A (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 22-May-17 7:05 AM 23-May-17 8:30 AM RA-819477-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
34 C-0032 Material (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 22-May-17 3:40 PM 23-May-17 3:00 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


35 C-0033 (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 22-May-17 3:45 PM 23-May-17 3:15 PM RA-819477-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
36 C-0034 Material (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 22-May-17 3:50 PM 23-May-17 3:30 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Grid line 4 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


37 C-0035 (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 22-May-17 3:55 PM 23-May-17 3:45 PM RA-819477-001-00 SALMAAN ISRAEL HENSON 3
Recommendation) at Grid line 4 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
38 C-0036 Material (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 22-May-17 4:00 PM 23-May-17 4:00 PM RA-819476-001-00 ACIELO ISRAEL HENSON
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


39 C-0037 (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 22-May-17 4:05 PM 23-May-17 4:15 PM RA-819476-001-00 ACIELO ISRAEL HENSON 24
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
40 C-0038 Material (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 23-May-17 4:30 PM 24-May-17 1:00 PM RA-819476-001-00 ACIELO ISRAEL HENSON
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


41 C-0039 (below Foundation of 0.60M as per Geotechnical Report / ADMIN BUILDING 23-May-17 4:35 PM 24-May-17 1:15 PM RA-819476-001-00 ACIELO ISRAEL HENSON 24
Recommendation) @ Admin Building Area JuAymah, S hops Plant N-26

Final Fill Inspection of Backfilling Select Fill Material (below Foundation of


42 C-0040 0.60M as per Geotechnical Report / Recommendation) @ Admin Building ADMIN BUILDING 23-May-17 4:40 AM 24-May-17 1:30 PM RA-819476-001-00 ACIELO ISRAEL HENSON
Area JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
43 C-0041 Material (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 24-May-17 3:50 PM 25-May-17 9:00 AM RA-819477-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Grid line 4 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


44 C-0042 (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 24-May-17 3:55 PM 25-May-17 9:15 AM RA-819477-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) at Grid line 4 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
45 C-0043 Material (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 24-May-17 3:40 PM 23-May-17 3:00 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


46 C-0044 (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 24-May-17 3:45 PM 23-May-17 3:15 PM RA-819477-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) at Grid line 3 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling3rnd Layer Select Fill


47 C-0045 Material (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 24-May-17 3:50 PM 25-May-17 3:00 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Grid line 4 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


48 C-0046 (below Foundation of 0.60M as per Geotechnical Report / SHIPPING & RECEIVING 24-May-17 3:55 PM 25-May-17 3:15 PM RA-819477-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) at Grid line 4 (A to G) @ Shipping Receiving Area, AREA
JuAymah, Shops Plant N-26

Final Fill Inspection of Backfilling Select Fill Material (below Foundation of


49 C-0047 0.60M as per Geotechnical Report / Recommendation) at Grid line 3 (A to SHIPPING & RECEIVING 24-May-17 3:50 PM 25-May-17 3:00 PM RA-819477-001-00 SALMAAN ISRAEL HENSON
G) and Grid line 4 (A to G) @ Shipping Receiving Area, JuAymah, Shops AREA
Plant N-26

50 C-0048 Soil Protection and Control, Drainage and De-Watering Inspection at New NEW SUB STATION 24-May-17 3:55 AM 25-May-17 1:30 PM RA-819478-001-00 SALMAAN ISRAEL HENSON
Sub Station Building Grid Line (1-3) (A-C) @ Ju'Aymah ,Shops Plant N- 26

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


51 C-0049 Existing Sub Grade (Below Foundation of 0.60M as per Geotechnical NEW SUB STATION 24-May-17 3:56 AM 25-May-17 2:00 PM RA-819478-001-00 SALMAAN ISRAEL HENSON
Report / Recommendation) at New Sub Station Building Grid Line (1-3) (A-
C) @ J u'Aymah ,Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
52 C-0050 Material (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 27-May-17 11:15 AM 28-May-17 8:30 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
Recommendation) @ New Sub Station Building Area, JuAymah, Shops
Plant N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


53 C-0051 (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 27-May-17 11:20 AM 28-May-17 8:45 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) @ New Sub Station Building Area, JuAymah, Shops
Plant N-26

FDT Compaction Inspection of Existing Sub-Grade (Only Pad Area) below


54 C-0052 Foundation of 0.60M as per Geotechnical Report / Recommendation) @ NEW SUB STATION 27-May-17 11:25 AM 28-May-17 7:30 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 3
New Sub Station Building Area, J uAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
55 C-0053 Material (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 28-May-17 10:55 AM 29-May-17 8:30 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
Recommendation) @ New Sub Station Building Area, JuAymah, Shops
Plant N-26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


56 C-0054 (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 28-May-17 10:57 AM 29-May-17 8:45 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) @ New Sub Station Building Area, JuAymah, Shops
Plant N-26

57 C-0055 Concrete Batch Plant / Equipment and Laboratory Inspection of Al- AL-MARHOON 5-Jun-17 8:30 AM 6-Jun-17 9:00 AM RA-819400-001-00 MOIZULLAH ISRAEL HENSON
Marhoon Concrete Ready Mix Plant @ Rahima, Ras Tanura

58 C-0056 Concrete Ingredients Inspection of Al-Marhoon Concrete Ready Mix Plant AL-MARHOON 5-Jun-17 8:35 AM 6-Jun-17 9:30 AM RA-819400-001-00 MOIZULLAH ISRAEL HENSON
@ Rahima, Ras Tanura

Fill Placement & Compaction Inspection of Backfilling 3Rd Layer Select F ill
59 C-0057 Material (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 29-May-17 8:40 AM 30-May-17 8:00 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
Recommendation) @ New Sub Station Building Area, JuAymah, Shops
Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


60 C-0058 (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 29-May-17 8:45 AM 30-May-17 8:15 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 4
Recommendation) @ New Sub Station Building Area, JuAymah, Shops
Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
61 C-0059 Material (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 29-May-17 8:50 AM 30-May-17 8:30 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Pad Area @ New Sub Station Building Area,
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 1sr Layer Select Fill Material


62 C-0060 (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 29-May-17 8:55 AM 30-May-17 8:45 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 3
Recommendation) at Pad Area @ New Sub Station Building Area,
JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
63 C-0061 Material (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 30-May-17 9:55 AM 31-May-17 8:15 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Pad Area @ New Sub Station Building Area,
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


64 C-0062 (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 30-May-17 10:00 AM 31-May-17 8:30 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 3
Recommendation) at Pad Area @ New Sub Station Building Area,
JuAymah, Shops Plant N-26

Concrete Coating and Repair Material Receiving, Storage and Preservation


65 C-0063 Inspection of Renderoc-FC (QTY - 100 Bags) from Fosam Company @ ETE PLANT N-26 30-May-17 9:40 AM 31-May-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Store, JuAymah, Shops Plant N-26

66 C-0064 Anti-Termite Materials Receiving, Protection and Storage Inspection f rom PLANT N-26 30-May-17 9:30 AM 31-May-17 9:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Five Moon @ JuAymah, Shops Plant N-26

67 C-0065 Preparation / Mixing and Application Inspection of Anti Termite Material ADMIN BUILDING 30-May-17 9:35 AM 31-May-17 9:15 AM RA-819400-001-00 ACIELO ISRAEL HENSON
for Foundations at Admin Building Area @ Ju'Aymah ,Shops Plant N- 26

Grade & Site Preparation Inspection for Lean Concrete of 61 Nos.


68 C-0066 Foundations from Grid Line (1-12) (A-F) Admin Building Area @ ADMIN BUILDING 30-May-17 9:45 AM 31-May-17 3:00 PM RA-819720-001-00 ACIELO ISRAEL HENSON
Ju'Aymah ,Shops Plant N- 26

69 C-0067 Formwork Inspection for Lean Concrete of 61 Nos. Foundations from Grid ADMIN BUILDING 30-May-17 9:50 AM 31-May-17 3:15 PM RA-819720-001-00 ACIELO ISRAEL HENSON
Line (1-12) (A-F) Admin Building Area @ Ju'Aymah ,Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
70 C-0068 Material (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 31-May-17 8:50 AM 1-Jun-17 8:00 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
Recommendation) at Pad Area @ New Sub Station Building Area,
JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


71 C-0069 (below Foundation of 0.60M as per Geotechnical Report / NEW SUB STATION 31-May-17 8:55 AM 1-Jun-17 8:15 AM RA-819478-001-00 SALMAAN ISRAEL HENSON 3
Recommendation) at Pad Area @ New Sub Station Building Area,
JuAymah, Shops Plant N-26

Final Fill Inspection of Backfilling Select Fill Material (below Foundation of


72 C-0070 0.60M as per Geotechnical Report / Recommendation) Grid Line (1-3) (A- NEW SUB STATION 31-May-17 9:00 AM 1-Jun-17 8:45 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
C) @ New Sub Station Building Area, JuAymah, Shops Plant N-26

Sampling, Testing and Placement Inspection for Lean Concrete of 61 Nos.


73 C-0071 Foundations from Grid Line (1-12) (A-F) Admin Building Area @ ADMIN BUILDING 31-May-17 1:15 PM 1-Jun-17 9:00 AM RA-819720-001-00 ACIELO ISRAEL HENSON
Ju'Aymah ,Shops Plant N- 26

Preparation / Mixing and Application Inspection of Anti Termite Material


74 C-0072 for 14 Nos. Foundations at Shipping and Receiving Area Grid Line (3-4) (A- SHIPPINGAREA
& RECEIVING 1-Jun-17 1:00 PM 3-Jun-17 7:00 AM RA-819477-001-00 QUADRI ISRAEL HENSON
G) @ Ju'Aymah ,Shops Plant N- 26

Grade & Site Preparation Inspection for Lean Concrete of 14 Nos.


75 C-0073 Foundations at S hipping and Receiving Area Grid Line (3- 4) (A-G) @ SHIPPING & RECEIVING 1-Jun-17 1:05 PM 3-Jun-17 8:30 AM RA-819477-001-00 QUADRI ISRAEL HENSON
AREA
Ju'Aymah ,Shops Plant N- 26

Formwork Inspection for Lean Concrete of 14 Nos. Foundations at


76 C-0074 Shipping and Receiving Area Grid Line (3-4) (A-G) @ Ju'Aymah ,S hops SHIPPING & RECEIVING 1-Jun-17 1:10 PM 3-Jun-17 8:45 AM RA-819477-001-00 QUADRI ISRAEL HENSON
AREA
Plant N- 26

Sampling, Testing and Placement Inspection for Lean Concrete of 14 Nos.


77 C-0075 Foundations from at Shipping and Receiving Area Grid Line (3-4) (A-G) @ SHIPPINGAREA
& RECEIVING 3-Jun-17 9:10 AM 4-Jun-17 1:00 PM RA-819477-001-00 QUADRI ISRAEL HENSON
Ju'Aymah ,Shops Plant N- 26

Preparation / Mixing and Application Inspection of Anti Termite Material


78 C-0076 for Foundation at New Sub Station Area Grid Line (1-3) (A-C) @ NEW SUB STATION 3-Jun-17 9:15 AM 4-Jun-17 8:30 AM RA-819866-001-00 SALMAAN ISRAEL HENSON
Ju'Aymah ,Shops Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Grade & Site Preparation Inspection for Lean Concrete of Foundation at


79 C-0077 New Sub Station Area Grid Line (1-3) (A-C) @ Ju'Aymah ,Shops Plant N- 26 NEW SUB STATION 3-Jun-17 9:20 AM 4-Jun-17 10:30 AM RA-819866-001-00 SALMAAN ISRAEL HENSON

Formwork Inspection for Lean Concrete of Foundation at New Sub Station


80 C-0078 Area Grid Line (1-3) (A- C) @ Ju'Aymah ,Shops Plant N- 26 NEW SUB STATION 3-Jun-17 9:20 AM 4-Jun-17 10:45 AM RA-819866-001-00 SALMAAN ISRAEL HENSON

Sampling, Testing and Placement Inspection for Lean Concrete of


81 C-0079 Foundation at New Sub Station Area Grid Line (1-3) (A-C) @ Ju'Aymah NEW SUB STATION 4-Jun-17 10:45 AM 5-Jun-17 10:00 AM RA-819866-001-00 SALMAAN ISRAEL HENSON
,Shops Plant N- 26

Visual Inspection of Material Receiving, Handling, Storage and


Preservation of HDPE PIPES ISO, SDR-09 Black 225MM ɸ (Qty 6528
82 P-0001 Meters ) and 140MM ɸ (Qty 1560 Meters) from New Product Industrial PLANT N-26 7-Jun-17 11:40 AM 8-Jun-17 9:30 AM RA-819293-001-00 FAHEEM DAMIAN ABAA
Co, Ltd @ Work Shops Area J u'Aymah ,Shops Plant N-26.

Formwork Inspection for 21 Nos. Footing Foundations f rom Foundations


from Grid Line (9-12) (A-F) Admin Building Area @ J u'Aymah, Shops Plant
83 C-0080 N- 26, F1 = 6 Pcs, F3 = 2 Pcs, F4 = 8 Pcs, F5 = 3 Pcs. F6 = 1 Pc. and CF1 = ADMIN BUILDING 13-Jun-17 10:50 AM 14-Jun-17 8:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
1 Pc. (1st Part)

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for
21 Nos. Footing Foundations from Grid Line (9-12) (A-F) Admin Building
84 C-0081 Area @ J u'Aymah, Shops Plant N- 26, F1 = 6 Pcs, F3 = 2 Pcs, F4 = 8 Pcs, F5 ADMIN BUILDING 13-Jun-17 10:55 AM 14-Jun-17 8:30 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
= 3 Pcs. F6 = 1 Pc. and CF1 = 1 Pc. (1st Part)

Sampling, Testing and Placement Inspection for Concrete of 21 Nos.


Footing Foundations from Grid Line (9-12) (A-F) Admin Building Area @
85 C-0082 Ju'Aymah, Shops Plant N- 26, F1 = 6 Pcs, F3 = 2 Pcs, F4 = 8 Pcs, F5 = 3 Pcs. ADMIN BUILDING 14-Jun-17 9:00 AM 15-Jun-17 10:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
F6 = 1 Pc. and CF1 = 1 Pc. (1st Part)

Formwork Inspection for Footing Foundations FTG F 1 (7 Nos.), Grid Line 4 SHIPPING & RECEIVING
86 C-0083 (A to G) Shipping and Receiving Shelter @ Ju'Aymah, S hops Plant N- 26 AREA 15-Jun-17 3:00 PM 17-Jun-17 1:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for SHIPPING & RECEIVING
87 C-0084 FTG F1 (7 Nos.), Footing Foundations Grid line 4 (A to G) Shipping and 15-Jun-17 3:05 PM 17-Jun-17 2:00 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

88 C-0085 Formwork Inspection for Footing Foundations FTG F 1 (7 Nos.), Grid Line 3 SHIPPING & RECEIVING 17-Jun-17 9:30 AM 18-Jun-17 8:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
(A to G) Shipping and Receiving Shelter @ Ju'Aymah, S hops Plant N- 26 AREA

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for SHIPPING & RECEIVING
89 C-0086 FTG F1 (7 Nos.), Footing Foundations Grid line 3 (A to G) Shipping and 17-Jun-17 9:35 AM 18-Jun-17 8:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

Sampling, Testing and Placement Inspection for Concrete of Footing SHIPPING & RECEIVING
90 C-0087 Foundations FTG F1 (7 Nos.), Grid Line 4 (A to G) Shipping and Receiving 17-Jun-17 9:40 AM 18-Jun-17 8:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

Sampling, Testing and Placement Inspection for Concrete of Footing SHIPPING & RECEIVING
91 C-0088 Foundations FTG F1 (7 Nos.), Grid Line 3 (A to G) Shipping and Receiving 18-Jun-17 7:30 AM 19-Jun-17 8:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

Formwork Inspection for 21 Nos. Footing Foundations f rom Foundations


92 C-0089 from Grid Line (5-8') (A-F) Admin Building Area @ Ju'Aymah, Shops Plant ADMIN BUILDING 19-Jun-17 8:50 AM 20-Jun-17 10:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
N- 26, F1 = 1 Pc, F 2 = 2 Pcs, F4 = 10 Pcs, F4A = 2 Pcs and F5 = 6 Pcs. (2nd
Part)

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for
93 C-0090 21 Nos. Footing Foundations from Grid Line (5-8') (A-F) Admin Building ADMIN BUILDING 19-Jun-17 8:55 AM 20-Jun-17 10:30 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON Due to Concrete
Area @ J u'Aymah, Shops Plant N- 26, F1 = 1 Pc, F2 = 2 Pcs, F4 = 10 Pcs, Spacer Issue
F4A = 2 Pcs and F5 = 6 Pcs. (2nd Part)

Formwork Stripping for Concrete of 21 Nos. Footing Foundations from


94 C-0091 Grid Line (9-12) (A-F) Admin Building Area @ Ju'Aymah, Shops Plant N- 26, ADMIN BUILDING 19-Jun-17 9:00 AM 20-Jun-17 8:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
F1 = 6 Pcs, F3 = 2 Pcs, F4 = 8 Pcs, F5 = 3 Pcs. F6 = 1 Pc. and CF 1 = 1 Pc.
(1st Part)

Concrete Coatings and repair Materials Receiving, S torage % Preservation


95 C-0092 Inspection of 1) Renderoc TG (20kgs) Qty=58bags 2) Nitobond AR (4L) PLANT N-26 19-Jun-17 9:30 AM 20-Jun-17 9:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Qty=25 from Fosam Company @ ETE Store Upgrade Juaymah Shop Plant
N-26

Visual Inspection Material Receiving,Handling,Storage and Preservation of


96 C-0093 Nitobond SBR 25 Liter Nitobond SBR 25 Liter(Qty 16) form Fosam PLANT N-26 20-Jun-17 11:00 AM 21-Jun-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Company @ ETE Laydown,JuAymah,Shops Plant N-26
10 Nos. of
EXTERIOR Footings
FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for Foundation
97 C-0090-A 21 Nos. Footing Foundations from Grid Line (5-8') (A-F) Admin Building ADMIN BUILDING 20-Jun-17 2:00 PM 21-Jun-17 10:30 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Area @ J u'Aymah, Shops Plant N- 26, F1 = 1 Pc, F2 = 2 Pcs, F4 = 10 Pcs, ACCEPTED
F4A = 2 Pcs and F5 = 6 Pcs. (2nd Part) F4=4pcs, F5=2pcs,
F2=2pcs,
10 Nos. ofand
F4A=2pcs.
EXTERIOR Footings
Sampling, Testing and Placement Inspection for Concrete of 21 Nos. Foundation
98 C-0094 Footing Foundations from Grid Line (5-8') (A-F) Admin Building Area @ ADMIN BUILDING 20-Jun-17 2:05 PM 21-Jun-17 10:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26 F1 = 1 Pc, F2 = 2 Pcs, F4 = 10 Pcs, F4A = 2 Pcs ACCEPTED
and F5 = 6 Pcs. (2nd Part) F4=4pcs, F5=2pcs,
F2=2pcs, and
F4A=2pcs.
This is only
Curing Inspection for Concrete of 21 Nos. Footing Foundations from Grid surveillance
99 C-0095 Line (9-12) (A-F) Admin Building Area @ Ju'Aymah, Shops Plant N- 26, F1 = ADMIN BUILDING 21-Jun-17 7:00 AM 22-Jun-17 8:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON therefore
6 Pcs, F3 = 2 Pcs, F4 = 8 Pcs, F5 = 3 Pcs. F6 = 1 Pc. and CF1 = 1 Pc. (1st Contractor wants
Part) to cancelled this
RFI C-0095
Visual Inspection Material Receiving,Handling,Storage and Preservation of
100 C-0096 Pvc wheel Spacer 50 mm (Qty 1000 pcs) And 75 mm (Qty 1500 pcs) Using PLANT N-26 21-Jun-17 11:15 AM 22-Jun-17 10:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
as Reinforcement Spacer ,form issam Form Isam kabbani & Parthners @
ETE Laydown,JuAymah,Shops Plant N-26

Formworks Inspection for 10 Nos. Footing Foundation (Exterior Footing)


101 C-0097 from Grid Line (A-F) & (1-4') at Admin Building Area @ Juaymah Shops ADMIN BUILDING 21-Jun-17 3:10 PM 22-Jun-17 9:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Plant N-26., F6 = 1 Pc, F4 = 2 Pc, F5 = 7 Pcs.

FBE S teel Bars, Embedded Items and Form Closure Inspection 10 Nos.
102 C-0098 Footing Foundation (Exterior Footing) from Grid Line (A-F) & (1-4') at ADMIN BUILDING 21-Jun-17 3:15 PM 22-Jun-17 9:15 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Admin Building Area @ Juaymah Shops Plant N-26., F6 = 1 Pc, F4 = 2 Pcs,
F5 = 7 Pcs.

Sampling, Testing and Placement Inspection for Concrete of 10 Nos.


103 C-0099 Footing Foundations from Grid Line (A-F) & (1-4') (Exterior Footing) at ADMIN BUILDING 22-Jun-17 10:00 AM 24-Jun-17 9:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Admin Building Area @ Juaymah Shops Plant N-26, F6 = 1 Pc, F4 = 2 Pcs,
F5 = 7 Pcs.

104 C-0100 Formworks Inspection for 09 nos. foundation(interior footing) from grid ADMIN BUILDING 22-Jun-17 3:30 PM 24-Jun-17 9:30 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
line (B-F) & (1-8') F1=3pcs, F4=4pcs, F5=2pcs. Juaymah Shops Plant N-26

FBE Reinforcing Steel,Embedded Items and formclosure Inspection for 20


105 C-0101 nos. foundation(interior footing) from grid line (B-F) & (1-8') F1=4pcs, ADMIN BUILDING 22-Jun-17 3:45 PM 24-Jun-17 9:45 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
F4=10pcs, F5=6pcs. Juaymah Shops Plant N-26

Sampling, Testing and Placement Inspection for Concrete of 20 Nos.


106 C-0102 Footing Foundations from Grid Line (1-8') (B-F) (Interior Footing) Admin ADMIN BUILDING 29-Jun-17 8:00 AM 1-Jul-17 9:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Building Area @ Ju'Aymah, Shops Plant N- 26 F1 = 4 Pcs, F4 = 10 Pcs and
F5 = 6 Pcs.
Coupling are not
Material Receiving Visual Inspection of PVC Conduits 1", 2", 4" & 6" Dia Acceptable and
107 E-0001 NEMA TC-8, DB-120 and Fittings (Coupling, Bell Ends & Bends 45° & 90°) PLANT N-26 3-Jul-17 10:00 AM 4-Jul-17 11:00 AM RA-819460-002-00 HAFEEZ DAMIAN ABAA Rejected.
NEMA TC-9, DB-120 from New Products Industries Co. Ltd @ ETE Store Remaining Items
Plant N-26. (Quantity as per List Attached)
are ok
Surface Preparation & Moisture Test Inspection of 6 Nos. Footing
108 C-0103 Foundations from Grid Line (10-12) (A-B') Admin Building Area @ ADMIN BUILDING 3-Jul-17 9:30 AM 4-Jul-17 10:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26 F1 = 1 Pc, F3 = 2 Pcs, F4 = 1 Pc., F5 = 1 Pc.
and F6 = 1 Pc.

Surface Preparation & Moisture Test Inspection of FTG F1 (3 Nos.) Footing SHIPPING & RECEIVING
109 C-0104 Foundations from Grid Line 4 (E to G) Shipping and Receiving Shelter @ 3-Jul-17 10:30 AM 4-Jul-17 2:00 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26 AREA

Material Receiving Visual Inspection of PVC Insulated Grounding


110 E-0002 Conductor (1 x 70 mm2) 1015 M & (1 x 25 mm2) 510 M from Al-Abdullah PLANT N-26 3-Jul-17 10:00 AM 4-Jul-17 11:30 AM RA-819840-001-00 HAFEEZ DAMIAN ABAA
Karim Holding Co. @ ETE Store Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of Existing Sub Grade for Fire Wall


111 C-0105 Foundations at S ub Station Yard @ New Sub Station Building Area, NEW SUB STATION 4-Jul-17 8:10 AM 5-Jul-17 1:00 PM RA-819478-001-00 SALMAAN ISRAEL HENSON 3
JuAymah, Shops Plant N-26

112 C-0106 Grade & Site Preparation Inspection for Fire Wall Foundations at Sub NEW SUB STATION 4-Jul-17 8:15 AM 5-Jul-17 1:15 PM RA-819478-001-00 SALMAAN ISRAEL HENSON
Station Yard @ New Sub Station Building Area, JuAymah, Shops Plant N- 26

113 C-0107 Formwork Inspection for F ire Wall Foundations at Sub Station Yard @ New NEW SUB STATION 4-Jul-17 8:20 AM 5-Jul-17 1:30 PM RA-819478-001-00 SALMAAN ISRAEL HENSON
Sub Station Building Area, JuAymah, Shops Plant N-26

Surface Preparation & Moisture Test Inspection of 15 Nos. Footing


114 C-0108 Foundations from Grid Line (9-12) (B-F) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 4-Jul-17 11:00 AM 5-Jul-17 8:30 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
Shops Plant N- 26 F1 = 5 Pcs, Pcs, F4 = 7 Pcs, F5 = 2 Pcs. and CF1 = 1 Pc.

Material Receiving, Handling, Storage and Preservation Inspection of PVC


Pipes 2", 3", 4" & 6" and Fittings (Tee's, Reducer, Wye's, P-trap's &
115 P-0002 Elbow's 45° & 90°) from New Products Industries Co. Ltd and Solvent PLANT N-26 4-Jul-17 8:25 AM 5-Jul-17 8:00 AM RA-819439-001-00 FAHEEM ISRAEL HENSON
Cement Grey and Cleaner from Weldon @ ETE Store, J u'Aymah Shops,
Plant No- 26. (Quantity as per Attached List)

Surface Preparation & Moisture Test Inspection of FTG F1 (4 Nos.) Footing


116 C-0109 Foundations from Grid Line 4 (A to D) Shipping and Receiving Shelter @ SHIPPING & RECEIVING 4-Jul-17 2:30 PM 5-Jul-17 9:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26 AREA

Sampling, Testing and Placement Inspection for Lean Concrete of Fire Wall
117 C-0110 Foundation at Sub Station Yard @ New Sub S tation Building Area, NEW SUB STATION 5-Jul-17 1:30 PM 6-Jul-17 8:00 AM RA-819478-001-00 SALMAAN ISRAEL HENSON
JuAymah Shops, Plant N-26

Surface Preparation & Moisture Test Inspection of 14 Nos. Footing


118 C-0111 Foundations from Grid Line (1-8') (A-D) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 6-Jul-17 10:00 AM 8-Jul-17 9:00 AM RA-819720-001-0F1 BAQAR ISRAEL HENSON
Shops Plant N- 26 F2 = 2 Pcs, Pcs, F4 = 3 Pcs, F4A = 2 Pcs, F5 = 6 Pcs. and
F6 = 1 Pc.

Coating and Final Inspection of APCS-3, Carboline at 21 Nos. Footing


119 C-0112 Foundations from Grid Line (9-12) (A-F) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 6-Jul-17 10:05 AM 8-Jul-17 10:00 AM RA-819720-001-0F1 BAQAR ISRAEL HENSON
Shops Plant N- 26. F 1 = 6 Pcs, F3 = 2 Pcs, F4 = 8 Pcs, F 5 = 3 Pcs. F6 = 1 Pc.
and CF1 = 1 Pc. (DFT)

Coating and Final Inspection of APCS-3, Carboline at FTG F1 (7 Nos.) SHIPPING & RECEIVING
120 C-0113 Footing Foundations from Grid Line 4 (A to G) Shipping and Receiving 6-Jul-17 10:15 AM 8-Jul-17 10:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Shelter @ Ju'Aymah, Shops Plant N- 26 (DF T) AREA

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill SHIPPING & RECEIVING
121 C-0114 Material around Foundation at Grid line 4 (A to G) @ Shipping Receiving 9-Jul-17 9:00 AM 10-Jul-17 9:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material SHIPPING & RECEIVING
122 C-0115 around Foundation at Grid line 4 (A to G) @ Shipping Receiving Area, 9-Jul-17 9:05 AM 10-Jul-17 9:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
JuAymah, Shops Plant N-26 AREA

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
123 C-0116 Material around Foundation at Grid Line (9-12) (A-F) Admin Building Area ADMIN BUILDING 9-Jul-17 9:10 AM 10-Jul-17 8:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON
@ J u'Aymah, Shops Plant N- 26.

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


124 C-0117 around Foundation at Grid Line (9-12) (A-F) Admin Building Area @ ADMIN BUILDING 9-Jul-17 9:15 AM 10-Jul-17 8:15 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON 6
Ju'Aymah, Shops Plant N- 26.

125 C-0118 Material Receiving Inspection of Clean Sand from Al-Osais (QTY=32 M3) PLANT N-26 9-Jul-17 9:20 AM 10-Jul-17 10:00 AM RA-819500-001-00 BAQAR ISRAEL HENSON
at ETE Laydown Area @ Ju'Aymah, Shops Plant N- 26

Material Receiving Inspection of Cadd Welding Items Cross Joint


Termoweld Die 1.) 120x120 mm2 (5 Nos.), 2.) Termoweld Powder 150
126 E-0003 (200 EA.), 3.) Termoweld Powder 90 (600 EA), 4.), Ignitor 5 EA, 5.) Handle PLANT N-26 9-Jul-17 9:25 AM 10-Jul-17 9:30 AM RA-819840-001-00 HAFEEZ DAMIAN ABAA
(2 EA) from Guls Trans Power Trading Est. at ETE Store @ Ju'Aymah S hops
Plant N-26

Surface Preparation & Moisture Test Inspection of FTG F1 (7 Nos.) Footing


127 C-0119 Foundations from Grid Line 3 (A to G) S hipping and Receiving Shelter @ SHIPPING & RECEIVING 10-Jul-17 7:40 AM 11-Jul-17 9:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26 AREA

Coating and Final Inspection of APCS-3, Carboline at FTG F1 (7 Nos.) SHIPPING & RECEIVING
128 C-0120 Footing Foundations from Grid Line 3 (A to G) Shipping and Receiving 12-Jul-17 3:00 PM 13-Jul-17 9:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Shelter @ Ju'Aymah, Shops Plant N- 26 (DF T) AREA

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


129 C-0121 around Foundation at Grid Line (9-12) (A-F) Admin Building Area @ ADMIN BUILDING 10-Jul-17 11:05 AM 11-Jul-17 3:00 PM RA-819720-001-0F1 ACIELO ISRAEL HENSON 6
Ju'Aymah, Shops Plant N- 26.

Material Receiving Visual Inspection of 1.) 120 mm2 Insulated Copper


130 E-0004 Grounding Conductor 2.) 120 mm2 Bare Tinned Copper Conductor (QTY = PLANT N-26 10-Jul-17 11:10 AM 11-Jul-17 9:15 AM RA-819840-001-00 HAFEEZ DAMIAN ABAA
500 Mtr Each) from Al-Abdullah Karim Holding Co. at ETE Store @
Ju'Aymah Shops Plant N-26

Visual Inspection of Concrete Coatings & Repair Materials Receiving,


131 C-0122 Storage and Preservation of 1) Renderoc TG (20kgs) Qty=42 Bags 2) PLANT N-26 10-Jul-17 11:15 AM 11-Jul-17 9:30 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Nitobond SBR (25L) Qty=8 from Fosam Company @ ETE Store Upgrade
Juaymah Shop Plant N-26

Visual Inspection of Materials Receiving, Storage and Preservation of PVC


132 C-0123 Water Stoper 250 mm 150 Mtr (QTY = 7 Roll) from BASF @ ETE Store PLANT N-26 10-Jul-17 11:20 AM 11-Jul-17 9:45 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Upgrade Juaymah Shop Plant N-26

Surface Preparation & Moisture Test Inspection of 26 Nos. Footing


133 C-0124 Foundations from Grid Line (3-8') (B-F) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 10-Jul-17 11:25 AM 11-Jul-17 10:00 AM RA-819990-01-0F1 BAQAR ISRAEL HENSON
Shops Plant N- 26 F1 = 4 Pcs, Pcs, F4 = 14 Pcs and F5 = 8 Pcs.

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material SHIPPING & RECEIVING
134 C-0125 around Foundation at Grid line 4 (A to G) @ Shipping Receiving Area, AREA 10-Jul-17 12:30 PM 11-Jul-17 3:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
JuAymah, Shops Plant N-26

Material Receiving Inspection of Cad Welding Items 1.) T J oint Mold


135 E-0005 120x120 mm2 (4 Nos.), 2.) S traight Joint Mold 120x120 mm2 (2 Nos.), 3.) SHIPPING & RECEIVING 11-Jul-17 9:00 AM 12-Jul-17 3:30 PM RA-819840-001-00 HAFEEZ DAMIAN ABAA
T Joint Mold 120x70 mm2 (5 Nos.) from Guls Trans Power Trading Est. at AREA
ETE Store @ Ju'Aymah Shops Plant N-26

Visual Inspection of 120 mm2 Bare Tinned Grounding Conductor Laying SHIPPING & RECEIVING
136 E-0006 for SS - 2118 Grid Grouding at New Sub Station Building @ J u'Aymah AREA 11-Jul-17 9:02 AM 12-Jul-17 3:45 PM RA-819840-001-00 HAFEEZ DAMIAN ABAA
Shops Plant N-26

137 E-0007 Visual Inspection of Exothermic (Thermite) Welding for SS - 2118 Grid SHIPPING & RECEIVING 11-Jul-17 9:05 AM 12-Jul-17 4:00 PM RA-819840-001-00 HAFEEZ DAMIAN ABAA
Grounding at New Sub Station Building @ Ju'Aymah Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


138 C-0126 around Foundation at Grid Line (9-12) (A-F) Admin Building Area @ ADMIN BUILDING 11-Jul-17 3:45 PM 12-Jul-17 11:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON 6
Ju'Aymah, Shops Plant N- 26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


139 C-0127 Inspection of 4000 PSi for 21 Nos. Footing Foundations from Grid Line (9- MAAZ LAB 12-Jul-17 7:00 AM 13-Jul-17 2:00 PM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
12) (A-F) Admin Building Area, Ju'Aymah, Shops Plant N- 26 @ MAAZ Lab

Coating and Final Inspection of APCS-3, Carboline at 40 Nos. Footing


140 C-0128 Foundations from Grid Line (1-9) (A-F) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 12-Jul-17 3:45 PM 13-Jul-17 9:00 AM RA-819720-001-0F1 BAQAR ISRAEL HENSON
Shops Plant N- 26. F 1 = 4 Pcs, F2 = 2 Pcs, F4 = 16 Pcs, F4A = 2 Pcs., F5 =
15 Pcs. And F6 = 1 Pc. (DFT)

141 C-0129 Formworks Inspection for Lean Concrete of Grade Beam at Grid Line (A-F) ADMIN BUILDING 13-Jul-17 5:00 PM 15-Jul-17 9:30 AM RA-819720-001-0F1 BAQAR ISRAEL HENSON
& (10-12) at Exterior Admin Building Area @ Juaymah Shops Plant N-26

Sampling, Testing and Placement Inspection for Lean Concrete of Grade


142 C-0130 Beam at Grid Line (A-F) & (10-12) at Exterior Admin Building Area @ ADMIN BUILDING 16-Jul-17 5:05 PM 17-Jul-17 3:00 PM RA-819720-001-0F1 BAQAR ISRAEL HENSON
Juaymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


143 C-0131 Inspection of 4000 PSi for Footing Foundations FTG F1 (7 Nos.), Grid Line MAAZ LAB 15-Jul-17 12:15 PM 16-Jul-17 2:00 PM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
4 (A to G) S hipping and Receiving Shelter, Ju'Aymah, S hops Plant N- 26 @
MAAZ Lab

Visual Inspection of Materials Receiving, Storage and Preservation of


144 C-0132 Bituminous Coating APCS-10 1.) Nitoproof 120 200 Lit (QTY = 10) 2.) PLANT N-26 15-Jul-17 4:27 PM 16-Jul-17 9:00 AM RA-819400-001-00 BAQAR ISRAEL HENSON
Solvent 102 25 Lit (QTY = 8) from Fosam Campany Limitied at ETE Store @
Juaymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


145 C-0133 Inspection of 4000 PSi for Footing Foundations FTG F1 (7 Nos.), Grid Line MAAZ LAB 16-Jul-17 6:30 AM 17-Jul-17 2:00 PM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
3 (A to G) S hipping and Receiving Shelter, Ju'Aymah, S hops Plant N- 26 @
MAAZ Lab

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


146 C-0134 around Foundation at Grid Line (1-9) (A-F) Admin Building Area @ ADMIN BUILDING 16-Jul-17 10:02 AM 17-Jul-17 9:30 AM RA-819720-001-0F1 BAQAR ISRAEL HENSON 11
Ju'Aymah, Shops Plant N- 26.

Visual Inspection of Corrective Action for Closing of Internal INCR-E-001


147 E-0008 of Grounding Conductor Installation at SS - 2118, New Sub Station NEW SUB STATION 17-Jul-17 9:35 AM 18-Jul-17 9:30 AM RA-819840-001-00 HAFEEZ DAMIAN ABAA
Building @ Ju'Aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


148 C-0135 Inspection of 4000 PSi for 10 Nos. Footing Foundations Exterior from Grid MAAZ LAB 18-Jul-17 8:50 AM 19-Jul-17 2:00 PM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
Line (5-8') (A-F) Admin Building Area, Ju'Aymah, Shops Plant N- 26 @
MAAZ Lab (F4=4pcs, F 5=2pcs, F2=2pcs, and F4A=2pcs.)

Concrete 28 Days Compressive Strength Testing & Final Acceptance


149 C-0136 Inspection of 4000 PSi for 10 Nos. Footing Foundations from Grid Line (A- MAAZ LAB 20-Jul-17 7:15 AM 22-Jul-17 11:15 AM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
F) & (1-4') (Exterior Footing) at Admin Building Area @ Juaymah Shops
Plant N-26, F6 = 1 Pc, F4 = 2 Pcs, F 5 = 7 Pcs.

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


150 C-0137 around Foundation at Grid Line (1-9) (A-F) Admin Building Area @ ADMIN BUILDING 20-Jul-17 9:15 AM 22-Jul-17 10:00 AM RA-819720-001-0F1 ACIELO ISRAEL HENSON 14
Ju'Aymah, Shops Plant N- 26.

Formworks Inspection for 11 Nos. Neck Columns (from Top of Footing to


151 C-0138 Bottom of Grade Beam) at Grid Line (B-E) & (9-12) at Admin Building Area ADMIN BUILDING 23-Jul-17 3:00 PM 24-Jul-17 10:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON
@ J uaymah S hops Plant N-26. (B-9)C1, (B-10)C1, (B'-11')C6, (C-10)C1, (C'-
11)C7, (C-11')C6, (D-10)C1, (D-11)C1, (E-11')C1, (E-10)C5, (E-9')C3
FBE Reinforcing Steel, Embedded Items and formclosure Inspection for 11
Nos. Neck Columns (from Top of Footing to Bottom of Grade Beam) at
152 C-0139 Grid Line (B-E) & (9-12) at Admin Building Area @ Juaymah Shops Plant N- ADMIN BUILDING 23-Jul-17 3:05 PM 24-Jul-17 10:15 AM RA-819721-001-00 ACIELO ISRAEL HENSON
26. (B-9)C1, (B-10)C1, (B'-11')C6, (C-10)C1, (C'-11)C7, (C-11')C6, (D-10)C1,
(D-11)C1, (E-11')C1, (E-10)C5, (E-9')C3
Sampling, Testing and Placement Inspection of Concrete for 11 Nos. Neck
Columns (from Top of Footing to Bottom of Grade Beam) at Grid Line (B-E)
153 C-0140 & (9-12) at Admin Building Area @ Juaymah Shops Plant N-26. (B-9)C1, (B- ADMIN BUILDING 23-Jul-17 3:10 PM 24-Jul-17 3:30 PM RA-819721-001-00 ACIELO ISRAEL HENSON Due to Slump Fail
10)C1, (B'-11')C6, (C-10)C1, (C'-11)C7, (C-11')C6, (D-10)C1, (D-11)C1, (E-
11')C1, (E-10)C5, (E-9')C3
Visual Inspection of Material Receiving of Exothermic Weldiing Molds 1.)
Molds for connection 16mm Rod Conductor 120 mm2 (6 Nos.), 2.) Molds
154 E-0009 Conductor 120x120 mm2 (3 Nos.) and 3.) Molds Cleaning Brush (5 Nos.) PLANT N-26 24-Jul-17 7:00 AM 25-Jul-17 9:00 AM RA-819840-001-00 HAFEEZ DAMIAN ABAA
fro Gulf Trans Power Trading at ETE Store @ Ju'Aymah Shops Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 11 Nos. Neck


Columns (from Top of Footing to Bottom of Grade Beam) at Grid Line (B-E)
155 C-0140-A & (9-12) at Admin Building Area @ Juaymah Shops Plant N-26. (B-9)C1, (B- ADMIN BUILDING 24-Jul-17 5:00 PM 25-Jul-17 4:00 PM RA-819721-001-00 ACIELO ISRAEL HENSON
10)C1, (B'-11')C6, (C-10)C1, (C'-11)C7, (C-11')C6, (D-10)C1, (D-11)C1, (E-
11')C1, (E-10)C5, (E-9')C3

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


156 C-0141 around Foundation at Grid Line (2-9) (A-E) Admin Building Area @ ADMIN BUILDING 26-Jul-17 10:30 AM 27-Jul-17 3:30 PM RA-819720-001-0F1 ACIELO ISRAEL HENSON 10
Ju'Aymah, Shops Plant N- 26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 20 Nos. Footing Foundations from Grid Line (1-
157 C-0142 8') (B-F) (Interior Footing) Admin Building Area @ Ju'Aymah, Shops Plant MAAZ LAB 27-Jul-17 8:00 AM 29-Jul-17 11:15 AM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
N- 26 F1 = 4 Pcs, F 4 = 10 Pcs and F5 = 6 Pcs.

Grade & Site Preparation Inspection for Existing S ub Grade of Telecom


158 C-0143 Duct Bank between Grid Line (4-5) (F) Admin Building Area @ Ju'Aymah ADMIN BUILDING 27-Jul-17 4:20 PM 29-Jul-17 10:00 AM RA-819723-004-0F1 ACIELO ISRAEL HENSON
,Shops Plant N- 26

FDT Compaction Inspection for Existing Sub Grade of Telecom Duct Bank
159 C-0144 between Grid Line (4-5) (F) Admin Building Area @ Ju'Aymah ,Shops Plant ADMIN BUILDING 27-Jul-17 4:22 PM 29-Jul-17 10:15 AM RA-819723-004-0F1 ACIELO ISRAEL HENSON 1
N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 20 Nos. Footing Foundations from Grid Line (1-
160 C-0145 8') (B-F) (Interior Footing) Admin Building Area @ Ju'Aymah, Shops Plant MAAZ LAB 29-Jul-17 7:55 AM 30-Jul-17 2:00 PM RA-819720-001-0F1 MOIZULLAH ISRAEL HENSON
N- 26 F1 = 4 Pcs, F 4 = 10 Pcs and F5 = 6 Pcs. (Balance Foundations)
Formworks Inspection for 14 Nos. Neck Columns (from Top of Footing to
Bottom of Grade Beam) at Grid Line (B-F) & (2-8') at Admin Building Area
161 C-0146 @ J uaymah S hops Plant N-26. (B-3)C1, (B-4)C1, (C-3)C1, (D-3)C1, (E-4')C1, ADMIN BUILDING 2-Aug-17 7:10 AM 3-Aug-17 9:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON
(E-5)C1, (F-5)C1, (E-8)C1, (F-8)C1, (E-8')C1, (B-8)C2, (B-5)C2, (C'-2)C3 and
(D-2)C4
FBE Reinforcing Steel, Embedded Items and formclosure Inspection for 14
Nos. Neck Columns (from Top of Footing to Bottom of Grade Beam) at
Grid Line (B-F) & (2-8') at Grid Line (B-F) & (2-8') at Admin Building Area @
162 C-0147 Juaymah Shops Plant N-26. (B-3)C1, (B-4)C1, (C- 3)C1, (D-3)C1, (E-4')C1, (E- ADMIN BUILDING 2-Aug-17 7:15 AM 3-Aug-17 9:15 AM RA-819721-001-00 ACIELO ISRAEL HENSON
5)C1, (F- 5)C1, (E-8)C1, (F-8)C1, (E-8')C1, (B-8)C2, (B-5)C2, (C'-2)C3 and (D-
2)C4
Documents Review for Thrust Boring HDD Procedure, Final Pipeline Rout
163 P-0003 and Profile from West Side of New Admin to South Side of Security ID PLANT N-26 2-Aug-17 10:30 AM 3-Aug-17 8:00 AM RA-819460-001-0F1 FAHEEM DAMIAN ABAA
Office (R-82) @ Ju'Aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 2000 PSi for Lean Concrete of Fire Wall Foundation at Sub
164 C-0148 Station Yard at New Sub Station Building Area, JuAymah Shops, Plant N- MAAZ LAB 2-Aug-17 11:30 AM 3-Aug-17 2:00 PM RA-819478-001-00 MOIZULLAH ISRAEL HENSON
26 @ MAAZ Lab

Formworks Inspection for Lean Concrete of Grade Beam at Grid Line (A)
165 C-0149 (2-10) and (F) (8'-10) at Exterior Admin Building Area @ Juaymah Shops ADMIN BUILDING 5-Aug-17 10:55 AM 6-Aug-17 8:00 AM RA-819722-001-0F1 ACIELO ISRAEL HENSON
Plant N-26

Sampling, Testing and Placement Inspection for Lean Concrete of Grade


166 C-0150 Beam at Grid Line (A) (2-10) and (F) (8'-10) at Exterior Admin Building ADMIN BUILDING 5-Aug-17 11:00 AM 6-Aug-17 9:00 AM RA-819722-001-0F1 ACIELO ISRAEL HENSON
Area @ J uaymah S hops Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 14 Nos. Neck


Columns (from Top of Footing to Bottom of Grade Beam) at Grid Line (B-F)
167 C-0151 & (2-8') at Admin Building Area @ Juaymah Shops Plant N-26. (B-3)C1, (B- ADMIN BUILDING 5-Aug-17 11:15 AM 6-Aug-17 9:15 AM RA-819721-001-00 ACIELO ISRAEL HENSON
4)C1, (C-3)C1, (D-3)C1, (E-4')C1, (E-5)C1, (F-5)C1, (E-8)C1, (F-8)C1, (E-
8')C1, (B- 8)C2, (B-5)C2, (C'-2)C3 and (D-2)C4
Material Receiving Visual Inspection of PVC Conduit, PVC Pipe 4" NEMA
168 T-0001 TC8-DB-120SOC Gray 6M (21 pipe), PVC Pipe 2" NEMA TC8-DB-120SOC PLANT N-26 6-Aug-17 11:00 AM 7-Aug-17 9:30 AM RA-819517-001-00 RAFI M. Z. NAVEED
Gray 6M (5 pipe) from NEPROPLAST / National Marketing EST.CO. LTD. @
ETE Site Store, Ju'Aymah Shops Plant N-26
Material Receiving Visual Inspection of PVC Conduit Fitting & Accessories
type NEMA TC9/DB120, 1.) Spacers 4x2"(100 pcs), 2.) Plug 2"(10 pcs) &
169 T-0002 4"(18 pcs), 3.) Coupling 2"(10 pcs) & 4"(30 pcs) 4.) Bends 90° 2"(05 pcs) & PLANT N-26 6-Aug-17 11:05 AM 7-Aug-17 10:00 AM RA-819517-001-00 RAFI M. Z. NAVEED
4"(16 pcs), 5.) Solvent Cement (05 can), 6.) Cleaner C65(04 can) from
NEPROPLAST / National Marketing EST.CO. LTD. @ ETE Site Store,
Ju'Aymah Shops Plant N-26.
Surface Preparation & Moisture Test Inspection of 11 Nos. Neck Columns
(from Top of Footing to Bottom of Grade Beam) and Top of Foundation at
170 C-0152 Grid Line (B-E) & (9-12) at Admin Building Area @ Juaymah Shops Plant ADMIN BUILDING 7-Aug-17 3:50 PM 8-Aug-17 10:00 AM RA-819721-001-00 BAQAR ISRAEL HENSON
N-26. (B-9)C1, (B-10)C1, (B'-11')C6, (C-10)C1, (C'-11)C7, (C-11')C6, (D-
10)C1, (D-11)C1, (E-11')C1, (E-10)C5, (E-9')C3

171 C-0153 Material Receiving, Inspection of Select Fill From Al-Osais (Qty=161 M3) PLANT N-26 7-Aug-17 3:55 PM 8-Aug-17 9:00 AM RA-819500-001-00 BAQAR ISRAEL HENSON Not in QMIS
@ ETE Laydown, JuAymah Shops Plant N-26

Coating and Final Inspection of APCS-3, Carboline at 11 Nos. Neck


Columns (from Top of Footing to Bottom of Grade Beam) and Top of
172 C-0154 Foundation at Grid Line (B-E) & (9-12) at Admin Building Area @ Juaymah ADMIN BUILDING 9-Aug-17 10:50 AM 10-Aug-17 10:00 AM RA-819721-001-00 BAQAR ISRAEL HENSON
Shops Plant N-26. (B-9)C1, (B-10)C1, (B'-11')C6, (C-10)C1, (C'-11)C7, (C-
11')C6, (D-10)C1, (D-11)C1, (E-11')C1, (E-10)C5, (E-9')C3 (DFT)

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill SHIPPING & RECEIVING
173 C-0155 Material around Foundation at Grid line 3 (A to G) @ Shipping Receiving 9-Aug-17 11:10 AM 10-Aug-17 9:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material SHIPPING & RECEIVING
174 C-0156 around Foundation at Grid line 3 (A to G) @ Shipping Receiving Area, 9-Aug-17 11:12 AM 10-Aug-17 9:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
JuAymah, Shops Plant N-26 AREA

175 C-0157 Material Receiving, Inspection of Select Fill From Al-Osais (Qty=207 M3) PLANT N-26 10-Aug-17 3:45 PM 12-Aug-17 9:00 AM RA-819500-001-00 BAQAR ISRAEL HENSON Not in QMIS
@ ETE Laydown, JuAymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill SHIPPING & RECEIVING
176 C-0158 Material around Foundation at Grid line 3 (A to G) @ Shipping Receiving 12-Aug-17 4:10 PM 13-Aug-17 3:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material SHIPPING & RECEIVING
177 C-0159 around Foundation at Grid line 3 (A to G) @ Shipping Receiving Area, 12-Aug-17 4:15 PM 13-Aug-17 3:45 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
JuAymah, Shops Plant N-26 AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


178 C-0160 Inspection of 2000 PSi for Lean Concrete of Grade Beam at Grid Line (A- F) MAAZ LAB 13-Aug-17 7:00 AM 14-Aug-17 2:00 PM RA-819722-001-0F1 MOIZULLAH ISRAEL HENSON
& (10-12) at Exterior Admin Building Area @ JuAymah Shops, Plant N-26
at MAAZ Lab Raka
Concrete Finishing and Curing of 14 Nos. Neck Columns (from Top of
Footing to Bottom of Grade Beam) at Grid Line (B-F) & (2-8') at Admin
179 C-0161 Building Area @ Juaymah Shops Plant N-26. (B-3)C1, (B-4)C1, (C-3)C1, (D- ADMIN BUILDING 13-Aug-17 8:00 AM 14-Aug-17 7:30 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
3)C1, (E-4')C1, (E- 5)C1, (F-5)C1, (E-8)C1, (F-8)C1, (E-8')C1, (B-8)C2, (B-
5)C2, (C'-2)C3 and (D-2)C4

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
180 C-0162 Material at Grid Line (10-11) (B-E) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 13-Aug-17 9:05 AM 14-Aug-17 10:30 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N- 26.

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


181 C-0163 Grid Line (10-11) (B-E) Admin Building Area @ Ju'Aymah, Shops Plant N- ADMIN BUILDING 13-Aug-17 9:10 AM 14-Aug-17 10:45 AM RA-819721-001-00 ACIELO ISRAEL HENSON 2
26.

Pre-Cast Pre-Concreting Inspection of 19 Nos. F1 Type and 18 Nos. F 2 Due to no


182 C-0164 Type Footing Foundations (Total 37 Nos.) of Car Parking S hade at Pre-Cast CAR PARKING 13-Aug-17 10:50 AM 14-Aug-17 10:00 AM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
Area in Workshop Area @ Ju'Aymah, Shops Plant N- 26 Procedure

Visual Inspection of Material Receiving of END CAPs for HDPE Conduit 1.)
183 E-0010 225mm QTY= 32 Pcs. and 2.) 140mm QTY= 08 Pcs. from NEPROPLAST/ PLANT N-26 13-Aug-17 11:05 AM 14-Aug-17 4:30 PM RA-819460-001-0F1 HAFEEZ DAMIAN ABAA Not in QMIS
National Marketing at ETE Store @ Ju'Aymah Shops Plant N-26

Visual Inspection of Material Receiving of Thermoweld Exothermic


184 E-0011 Welding Dies (Molds) 120x25mm QTY = 10 Pcs from Gulf Trans Power Est. PLANT N-26 13-Aug-17 11:10 AM 14-Aug-17 4:45 PM RA-819982-001-00 HAFEEZ DAMIAN ABAA
at ETE Store @ Ju'Aymah Shops Plant N-26

185 C-0165 Material Receiving Inspection of Clean Sand from Al-Osais (QTY=23 M3) PLANT N-26 13-Aug-17 3:45 PM 14-Aug-17 8:15 AM RA-819500-001-00 BAQAR ISRAEL HENSON Not in QMIS
at ETE Laydown Area @ Ju'Aymah, Shops Plant N- 26

Pre-Cast Pre-Concreting Inspection of 19 Nos. F1 Type and 18 Nos. F 2


186 C-0164-A Type Footing Foundations (Total 37 Nos.) of Car Parking S hade at Pre-Cast CAR PARKING 14-Aug-17 4:30 PM 15-Aug-17 7:00 AM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
Area in Workshop Area @ Ju'Aymah, Shops Plant N- 26

Precast Concrete Placement, Sampling and Testing Inspection of 19 Nos.


187 C-0166 F1 Type and 18 Nos. F2 Type Footing Foundations (Total 37 Nos.) of Car CAR PARKING 14-Aug-17 7:45 AM 15-Aug-17 8:00 AM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
Parking Shade at Pre-Cast Area in Workshop Area @ Ju'Aymah, Shops
Plant N- 26

188 C-0167 Material Receiving, Inspection of Select Fill From Al-Osais (Qty=299 M3) PLANT N-26 14-Aug-17 4:45 PM 15-Aug-17 9:00 AM RA-819500-001-00 BAQAR ISRAEL HENSON Not in QMIS
@ ETE Laydown,JuAymah,Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
189 C-0168 Material at Grid Line (10-11) (B-E) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 15-Aug-17 4:15 PM 16-Aug-17 11:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N- 26.

FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at


190 C-0169 Grid Line (10-11) (B-E) Admin Building Area @ Ju'Aymah, Shops Plant N- ADMIN BUILDING 15-Aug-17 4:20 PM 16-Aug-17 11:15 AM RA-819721-001-00 ACIELO ISRAEL HENSON 2
26.

HDD Route and Profile Inspection (Crossing Pipe # 01) West Side of New
191 P-0004 Admin to South S ide of Security ID Office (R-82) @ Ju'Aymah Shops Plant PLANT N-26 16-Aug-17 7:35 AM 17-Aug-17 8:00 AM RA-819293-023-00 FAHEEM DAMIAN ABAA
N-26

HDD Center Line Marking (Crossing Pipe # 01)West Side of New Admin to
192 P-0005 South Side of Security ID Office (R- 82) @ Ju'Aymah Shops Plant N-26 PLANT N-26 16-Aug-17 7:40 AM 17-Aug-17 9:00 AM RA-819293-023-00 FAHEEM DAMIAN ABAA

Visual Inspection of Excavation and Trenching for Telecom Duct Bank


193 T-0003 between Grid Line (4-5) (F) at Admin Building Area @ Ju'Aymah Shops ADMIN BUILDING 16-Aug-17 8:40 AM 17-Aug-17 9:00 AM RA-891791-001-0F1 RAFI M. Z. NAVEED
Plant N-26

Visual Inspection of Job Site Fabricated Duct Bank & Initial Mandrel Test
194 T-0004 of 4" PVC conduit for Telecom System Stubbed up between Grid Line (4-5) ADMIN BUILDING 16-Aug-17 8:45 AM 17-Aug-17 9:30 AM RA-819791-001-0F1 RAFI M. Z. NAVEED
(F) at Admin Building Area @ Ju'Aymah Shops Plant N-26

Material Receiving Inspection of 1.) RTR Pipes and Fittings for Fire and
195 R-0001 Sewer Water Line from Future Pipe Industries 2.) Neoprene Rubber from PLANT N-26 16-Aug-17 3:55 PM 17-Aug-17 9:00 AM RA-891791-001-0F1 JACOB ISRAEL HENSON
ATCO (Quantity as per attached List) at ETE Laydown Area @ Ju'Aymah,
Shops Plant N- 26

Material Handling and Storage Inspection of RTR Pipes, Fittings and


196 R-0002 Neoprene Rubber for Fire and Sewer Water Line at ETE Laydown Area @ PLANT N-26 16-Aug-17 4:00 PM 17-Aug-17 9:30 AM RA-819791-001-0F1 JACOB ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
197 C-0170 Material at Grid Line (10-11) (B-E) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 17-Aug-17 2:00 PM 19-Aug-17 11:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N- 26.

FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at


198 C-0171 Grid Line (10-11) (B-E) Admin Building Area @ Ju'Aymah, Shops Plant N- ADMIN BUILDING 17-Aug-17 2:02 PM 19-Aug-17 11:15 AM RA-819721-001-00 ACIELO ISRAEL HENSON 2
26.

Formworks Inspection for Lean Concrete of Grade Beam GB-2 at Grid Line
199 C-0172 (B) (9- 10') and Grid Line (B-E) (10) and Grid Line (10-11) (D-E) at Admin ADMIN BUILDING 17-Aug-17 2:05 PM 19-Aug-17 4:30 PM RA-819722-001-0F2 ACIELO ISRAEL HENSON
Building Area @ Juaymah Shops Plant N-26

Formworks Inspection for 4 Nos. Columns (C1) at Grid Line ( C ) between Cover in RFI # C-
200 C-0173 (4-9) 1.3 M up from Top of Footing at Admin Building Area @ Juay mah ADMIN BUILDING 17-Aug-17 2:07 PM 19-Aug-17 3:00 PM RA-819721-001-00 ACIELO ISRAEL HENSON
Shops Plant N-26. 0222

FBE Reinforcing Steel, Embedded Items and formclosure Inspection for 4 Cover in RFI # C-
201 C-0174 Nos. Columns (C1) at Grid Line ( C ) between (4-9) 1.3 M up from Top at ADMIN BUILDING 17-Aug-17 2:09 PM 19-Aug-17 3:15 PM RA-819722-001-0F2 ACIELO ISRAEL HENSON
Admin Building Area @ Juaymah Shops Plant N-26. 0223

Formworks Inspection for 4 Nos. Columns (C1) at Grid Line ( D ) between


202 C-0175 (4-9) from Top Footing to Bottom of 2nd Floor Beam at Admin Building ADMIN BUILDING 17-Aug-17 2:15 PM 19-Aug-17 3:30 PM RA-819721-001-00 ACIELO ISRAEL HENSON
Area @ J uaymah S hops Plant N-26.

FBE Reinforcing Steel, Embedded Items and formclosure Inspection for 4


203 C-0176 Nos. Columns (C1) at Grid Line ( D ) between (4-9) from Top Footing to ADMIN BUILDING 17-Aug-17 2:20 PM 19-Aug-17 3:45 PM RA-819722-001-0F2 ACIELO ISRAEL HENSON
Bottom of 2nd Floor Beam at Admin Building Area @ Juaymah Shops
Plant N-26.

Material Receiving for Type 2 Anchor Bolts M20 ASTM F1554 Gr. 36, Hex Anchor Bolt for
204 C-0177 Nut ASTM A563M and S teel Washer ASTM F436M @ ETE Laydown, PLANT N-26 17-Aug-17 2:45 PM 19-Aug-17 4:00 PM RA-819500-001-00 OMAR ISRAEL HENSON Shipping &
Juaymah, Shops Plant N-26 for Shipping and Receiving Area Receiving Area

205 C-0178 Formworks Inspection of Telecom Duct Bank between Grid Line (4-5) (F) ADMIN BUILDING 17-Aug-17 4:02 PM 19-Aug-17 11:30 AM RA-819723-004-0F1 ACIELO ISRAEL HENSON
Admin Building Area @ Ju'Aymah ,Shops Plant N- 26

FBE Reinforcing Steel, Embedded Items and formclosure Inspection


206 C-0179 Telecom Duct Bank between Grid Line (4-5) (F) Admin Building Area @ ADMIN BUILDING 17-Aug-17 4:04 PM 19-Aug-17 11:45 AM RA-819723-004-0F1 ACIELO ISRAEL HENSON
Juaymah Shops Plant N-26.

FDT Compaction Inspection for Existing Sub Grade of Electrical Duct Bank
207 C-0180 between Grid Line (8-9) (E-F') Admin Building Area @ Ju'Aymah ,Shops ADMIN BUILDING 17-Aug-17 4:06 PM Duct Bank 1 19-Aug-17 12:00 PM RA-819723-004-0F1 ACIELO ISRAEL HENSON 1
Plant N- 26

Excavation, Placement and Compaction Inspection of Sub Grade for Sewer


208 C-0181 Water Line at Mechanical and Coffee Rooms in Admin Building Area @ ADMIN BUILDING 19-Aug-17 7:15 AM 20-Aug-17 11:00 AM RA-819744-001-0 ACIELO ISRAEL HENSON Not in QMIS
Ju'Aymah, Shops Plant N- 26

Send Bedding Compaction Inspection Water Flooding for Sewer Water


209 C-0182 Line at Mechanical and Coffee Rooms in Admin Building Area @ ADMIN BUILDING 19-Aug-17 7:20 AM 20-Aug-17 11:15 AM RA-819744-001-0 ACIELO ISRAEL HENSON 2
Ju'Aymah, Shops Plant N- 26

PVC Pipes Installation Inspection of 4" Dia for Sewer Water Line at
210 P-0006 Mechanical and Coffee Rooms in Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 19-Aug-17 7:25 AM 20-Aug-17 3:30 PM RA-819744-001-0 FAHEEM ISRAEL HENSON
Plant N- 26

FDT Compaction Inspection of Existing Sub Grade for Tele Comm Conduit
211 C-0183 Entrance Duct Bank to New Sub S tation Building @ JuAymah, Shops Plant NEW SUB STATION 19-Aug-17 8:00 AM 20-Aug-17 8:30 AM RA-819908-001-0F1 SALMAAN ISRAEL HENSON 1
N-26

212 C-0184 Grade & Site Preparation Inspection for Tele Comm Conduit Entrance Duct NEW SUB STATION 19-Aug-17 8:02 AM 20-Aug-17 8:45 AM RA-819908-001-0F1 SALMAAN ISRAEL HENSON
Bank to New Sub Station Building @ JuAymah, Shops Plant N-26

213 C-0185 Formwork Inspection for Lean Concrete of Tele Comm Conduit Entrance NEW SUB STATION 19-Aug-17 8:05 AM 20-Aug-17 9:00 AM RA-819908-001-0F1 SALMAAN ISRAEL HENSON
Duct Bank to New Sub Station Building @ JuAymah, S hops Plant N-26

Sampling, Testing and Placement Inspection for Lean Concrete at Tele


214 C-0186 Comm Conduit Entrance Duct Bank to New Sub Station Building @ NEW SUB STATION 19-Aug-17 8:10 AM 20-Aug-17 9:30 AM RA-819908-001-0F1 SALMAAN ISRAEL HENSON
JuAymah, Shops Plant N-26

215 C-0187 FBE Reinforcing Steel Inspection for 14 Nos. (P1) Pedestal Grid Line 3 and SHIPPING & RECEIVING 19-Aug-17 11:20 AM 20-Aug-17 9:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
4 (A to G) S hipping and Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

Sampling, Testing and Placement Inspection of Lean Concrete of Grade


216 C-0188 Beam GB-2 at Grid Line (B) (9-10') and Grid Line (B-E) (10) and Grid Line ADMIN BUILDING 19-Aug-17 11:22 AM 20-Aug-17 9:45 AM RA-819722-001-0F2 ACIELO ISRAEL HENSON
(10-11) (D-E) at Admin Building Area @ Juaymah Shops Plant N-26

FBE Reinforcing Steel Inspection for Grade Beam GB-3 Grid Line (A-F)
217 C-0189 South Side and Grid Line (10-12) West Side at Admin Building Area @ ADMIN BUILDING 19-Aug-17 11:25 AM 20-Aug-17 10:00 AM RA-819722-001-0F2 ACIELO ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26

Excavation, Placement and Compaction Inspection of Sub Grade for


218 C-0190 Sanitary Trench from Mechanical Room to Main Sanitary Line in New Sub NEW SUB STATION 19-Aug-17 12:40 PM 20-Aug-17 3:00 PM RA-819901-001-00 SALMAAN ISRAEL HENSON Not in QMIS
Station Building @ Ju'Aymah, Shops Plant N- 26

Sand Bedding Compaction Inspection Water F looding for Sanitary Trench


219 C-0191 from Mechanical Room to Main Sanitary Line in New S ub Station Building NEW SUB STATION 19-Aug-17 12:42 PM 21-Aug-17 3:15 PM RA-819901-001-00 SALMAAN ISRAEL HENSON 3
@ J u'Aymah, Shops Plant N- 26

Material Receiving for Type 3S Anchor Bolts M20 ASTM A193 Gr. B7, with
four Nuts ASTM A194 Gr. 2H, one Washer ASTM S436, All HDG finished Anchor Bolt for
220 C-0192 with one Plastic Sleeve. @ ETE Laydown, Juaymah, Shops Plant N-26 PLANT N-26 19-Aug-17 3:05 PM 20-Aug-17 4:15 PM RA-819500-001-00 OMAR ISRAEL HENSON New Sub Station
QTY=350 for Sub Station Building QTY =350

West side of new Admin to south side of security ID office (R-82) @


221 P-0007 Juaymah shop Plant N-26 HDD Route & profile (Crossing Pipe # 03) 2-Way PLANT N-26 19-Aug-17 3:20 PM 20-Aug-17 10:15 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
(ø140mm each) west side of new admin to south side of security ID office
(R-82) @ Ju'Aymah ,Shops Plant No- 26.

West side of new Admin to south side of security ID office (R-82) @


222 P-0008 Juaymah shop Plant N-26 HDD Center Line Marking (Crossing Pipe # 03) 2- PLANT N-26 19-Aug-17 3:14 PM 20-Aug-17 10:30 AM RA-819460-001-0F1 FAHEEM DAMIAN ABAA
Way (ø140mm each) west side of new admin to south side of security ID
office (R-82) @ Ju'Aymah ,S hops Plant No- 26.
West side of new Admin to south side of security ID office (R-82) @
Juaymah shop Plant N-26 Calibration of tracking system, Thrust Boring,
223 P-0009 Drill mud mixing, Pilot Drilling, Reaming, Pulling and HDPE conduit PLANT N-26 20-Aug-17 11:00 AM 21-Aug-17 8:30 AM RA-819293-026-0 FAHEEM DAMIAN ABAA
Installation(Crossing Pipe # 03) 2-Way (ø140mm each) west side of new
Admin to South side of Security ID office (R-82) @ Juaymah Shop Plant N-
26
Material Receiving Inspection of 1.) RTR Pipes and Fittings for Fire Water
224 R-0003 Line from Future Pipe Industries (Quantity as per attached List) at ETE PLANT N-26 19-Aug-17 4:05 PM 20-Aug-17 11:15 AM RA-819437-001-00 JACOB ISRAEL HENSON
Laydown Area @ Ju'Aymah, S hops Plant N- 26

Visual Material Receiving Inspection of Neoprene Rubber f rom ATCO


225 R-0004 (Quantity as per attached List) at ETE Laydown Area @ Ju'Aymah, Shops PLANT N-26 19-Aug-17 4:10 PM 20-Aug-17 11:30 AM RA-819437-001-00 JACOB ISRAEL HENSON Not in QMIS
Plant N- 26

Surface Preparation & Moisture Test Inspection of 11 Nos. Neck Columns


top of Foundation and (from Top of Footing to Bottom of Grade Beam) at
226 C-0193 Grid Line (B-F) & (2-8') at Admin Building Area @ Juaymah Shops Plant N- ADMIN BUILDING 19-Aug-17 5:00 PM 20-Aug-17 12:00 PM RA-819721-001-00 BAQAR ISRAEL HENSON
26. (B-3)C1, (B-4)C1, (C- 3)C1, (D-3)C1, (E-4')C1, (E-5)C1, (F-5)C1, (B-8)C2,
(B-5)C2, (C'-2)C3 and (D-2)C4

Excavation & Trenching Visual Inspection of Under Ground PVC Conduit


227 E-0012 and Duct Bank for Electrical Power Cables Inside Electrical Room between ADMIN BUILDING 19-Aug-17 5:05 PM 20-Aug-17 11:15 AM RA-819718-001-0F1 HAFEEZ DAMIAN ABAA Duct Bank 1
Grid Line (8-9) (E-F) at Admin Building @ JuAymah, Shops Plant N- 26

Formclosure Inspection for 4 Nos. Columns (C1) at Grid Line ( D ) between


228 C-0194 (4-9) from Top Footing to Bottom of 2nd Floor Beam at Admin Building ADMIN BUILDING 20-Aug-17 3:30 PM 21-Aug-17 3:30 PM RA-819722-001-0F2 ACIELO ISRAEL HENSON
Area @ J uaymah S hops Plant N-26.

229 C-0195 Formclosure Inspection Telecom Duct Bank between Grid Line (4-5) (F) ADMIN BUILDING 20-Aug-17 3:35 PM 21-Aug-17 3:45 PM RA-819723-004-0F1 ACIELO ISRAEL HENSON
Admin Building Area @ Juaymah Shops Plant N-26.

FDT Compaction Inspection of Sub Grade for Sanitary Trench from


230 C-0196 Mechanical Room to Main Sanitary Line New Sub Station Building @ NEW SUB STATION 20-Aug-17 3:40 PM 21-Aug-17 9:00 AM RA-819901-001-00 SALMAAN ISRAEL HENSON 3
Ju'Aymah, Shops Plant N- 26

Surface Preparation & Moisture Test Inspection of 3 Nos. Neck Columns


231 C-0197 top of Foundation and (from Top of Footing to Bottom of Grade Beam) at ADMIN BUILDING 21-Aug-17 9:40 AM 22-Aug-17 9:30 AM RA-819721-001-00 BAQAR ISRAEL HENSON
Grid Line (E-F) & (8-8') at Admin Building Area @ Juaymah Shops Plant N-
26. (E-8)C1, (F -8)C1, (E-8')C1
Coating and Final Inspection of APCS-3, Carboline at 11 Nos. Neck
Columns top of Foundation and (from Top of Footing to Bottom of Grade
232 C-0198 Beam) at Grid Line (B-F) & (2-8') at Admin Building Area @ Juaymah Shops ADMIN BUILDING 21-Aug-17 9:45 AM 22-Aug-17 9:45 AM RA-819721-001-00 BAQAR ISRAEL HENSON
Plant N-26. (B-3)C1, (B-4)C1, (C-3)C1, (D-3)C1, (E-4')C1, (E-5)C1, (F-5)C1,
(B-8)C2, (B-5)C2, (C'-2)C3 and (D- 2)C4 (DFT)

233 C-0199 Material Receiving, Inspection of Select Fill From Al-Osais (Qty=460 M3) PLANT N-26 21-Aug-17 9:50 AM 22-Aug-17 10:00 AM RA-819500-001-00 BAQAR ISRAEL HENSON Not in QMIS
@ ETE Laydown,JuAymah,Shops Plant N-26

PVC Pipes Installation Inspection of 3" Dia for Sanitary Trench from
234 P-0010 Battery Room to Neutralization Tank, New Sub Station Building @ NEW SUB STATION 21-Aug-17 10:25 AM 22-Aug-17 9:00 AM RA-819901-001-00 FAHEEM ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Material receiving visual inspection of PVC conduit fitting type NEMA-


TC9/DB120,1-PVC L/R Bends 90 ^ degree (50 PCs) from NEPROPLAST/
235 E-0013 National marketing EST.CO. LTD. @ ETE site store J u'Aymah Shops Plant N- PLANT N-26 19-Aug-17 5:06 PM 20-Aug-17 10:00 AM RA-819840-001-00 HAFEEZ DAMIAN ABAA Not in QMIS
26

Material Receiving Visual Inspection for )1.) Base Spacer 6x2 QTY=100 PCS
(S288RJN) 2.) 4X2 QTY=25 PCS (S288NJN) , 3.) Intr S pacer 6X2 QTY=200
236 E-0014 PCS (S289RJN), 4.)Intr Spacer 4X2 QTY=50 PCS (S289NJN) From NEPRO / PLANT N-26 21-Aug-17 11:40 AM 22-Aug-17 10:00 AM RA-819718-001-0F1 HAFEEZ DAMIAN ABAA Not in QMIS
National Marketing Co. Ltd @ ETE Laydown, Juaymah, Shops Plant N-26

Formwork Inspection for 14 Nos. (P1) Pedestal Grid Line 3 and 4 (A to G) SHIPPING & RECEIVING
237 C-0200 Shipping and Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 AREA 21-Aug-17 9:52 AM 22-Aug-17 10:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON

Form Closure and Embedded Items Anchor Bolt Installation Inspection for SHIPPING & RECEIVING
238 C-0201 14 Nos. (P1) Pedestal Grid Line 3 and 4 (A to G) Shipping and Receiving AREA 21-Aug-17 9:55 AM 22-Aug-17 10:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Shelter @ Ju'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Concrete for 14 Nos. (P1) SHIPPING & RECEIVING
239 C-0202 Pedestal Grid Line 3 and 4 (A to G) Shipping and Receiving Shelter @ AREA 21-Aug-17 10:00 AM 22-Aug-17 3:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for 11 Nos. Neck Columns (from Top of Footing to
Bottom of Grade Beam) at Grid Line (B-E) & (9-12) at Admin Building Area
240 C-0203 @ J uaymah S hops Plant N-26. (B-9)C1, (B-10)C1, (B'-11')C6, (C-10)C1, (C'- MAAZ LAB 21-Aug-17 7:00 AM 22-Aug-17 11:00 AM RA-819722-001-0F1 MOIZULLAH ISRAEL HENSON
11)C7, (C-11')C6, (D-10)C1, (D-11)C1, (E-11')C1, (E-10)C5, (E-9')C3 at
MAAZ Lab Raka

Formworks Inspection for Grade Beam GB-3 East Side from Grid Line (A)
241 C-0204 (2-6) & (7-11) at Admin Building Area, Juaymah Shops,Plant N-26 ADMIN BUILDING 22-Aug-17 4:50 PM 23-Aug-17 3:30 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON

FBE Reinforcing Stee Inspection for Grade Beam GB-3 East Side f rom Grid
242 C-0205 Line (A) (2-6) & (7- 11) at Admin Building Area, Juaymah Shops,Plant N-26 ADMIN BUILDING 22-Aug-17 4:55 PM 23-Aug-17 3:45 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON

PVC Pipes & Sleeves Installation Inspection of 3" Dia for Sanitary Trench
243 P-0011 from Mechanical Room to Main Sanitary Line in New S ub Station Building NEW SUB STATION 22-Aug-17 3:00 PM 23-Aug-17 8:30 AM RA-819901-001-00 FAHEEM M. YOUSUF IRFAN
@ J u'Aymah, Shops Plant N- 26

Material Receiving Visual Inspection of PVC Conduit Fitting & Accessories


244 T-0005 type NEMA TC9 / DB120 1.) Coupling 4"(11 pcs), 2.)Bends 90^ 4"(03 pcs) PLANT N-26 22-Aug-17 3:15 PM 23-Aug-17 10:00 AM RA-819517-001-00 RAFI M. Z. NAVEED
from NEPROPLAST/ National Marketing EST.CO. LTD. @ ETE Site Store,
Ju'Aymah Shops Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
245 C-0206 Material around Foundation at Grid Line (2-10) (B) Admin Building Area ADMIN BUILDING 23-Aug-17 4:15 PM 24-Aug-17 8:45 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
@ J u'Aymah, Shops Plant N-26.

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material


246 C-0207 around Foundation at Grid Line (2-10) (B) Admin Building Area @ ADMIN BUILDING 23-Aug-17 4:20 PM 24-Aug-17 9:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON 2
Ju'Aymah, Shops Plant N-26.

FDT Compaction Inspection of Sub Grade for Sanitary Trench from First
247 C-0208 Floor Male Toilet 116 to Main Sanitary Line @ Admin Building Area, ADMIN BUILDING 23-Aug-17 4:25 PM 24-Aug-17 7:30 AM RA-819774-001-00 ACIELO ISRAEL HENSON 1
JuAymah,Shops Plant N-26

Excavation, Placement and Compaction Inspection of Sand Bedding for


248 C-0209 Sanitary Trench from First Floor Male Toilet 116 to Main Sanitary Line ADMIN BUILDING 23-Aug-17 4:30 PM 24-Aug-17 7:45 AM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS
@Admin Building Area JuAymah, S hops Plant N-26

Compaction Inspection Water Flooding for Sanitary Trench from First


249 C-0210 Floor Male Toilet 116 to Main Sanitary Line @ ETE ADMIN BUILDING 23-Aug-17 4:35 PM 24-Aug-17 8:30 AM RA-819774-001-00 ACIELO ISRAEL HENSON 1
Laydown,JuAymah,Shops Plant N-26

250 C-0211 Sand Backfilling Inspection around and above the Pipe at Mechanical and ADMIN BUILDING 23-Aug-17 4:40 PM 24-Aug-17 8:00 AM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS
Coffee Rooms in Admin Building Area @ Ju'Aymah, Shops Plant N- 26

New Admin Building Male Toilet # 116 First Floor PVC Pipe & Sleeves
251 P-0012 Installation Inspection of 6" & 4" Dia for Sanitary Sewer Line in Admin ADMIN BUILDING 23-Aug-17 4:45 PM 24-Aug-17 9:30 AM RA-819774-001-00 FAHEEM M. YOUSUF IRFAN
Building @ Ju'aymah Shops Plant N-26

Cast-In-Place Concrete Curing Inspection 37 Nos Foundatoion Footing


252 C-0212 Type F1 19 nos. and Type F2 18 nos, (Pre-Cast) for New Parking Area. @ NEW SUB STATION 23-Aug-17 4:50 PM 26-Aug-17 4:30 PM RA-819945-001-0F1 SALMAAN ISRAEL HENSON Not in QMIS
Pre-Cast Yard in Work Shop Area Upgrade Ju’Aymah Shops, Plant N26.

Form Closure, Embedded Items and INCO Dowels Installation Inspection


253 C-0213 at Grade Beam GB-3 Grid Line (A-F) South Side, Grid Line (F) (10-12) West ADMIN BUILDING 24-Aug-17 11:06 AM 26-Aug-17 9:00 AM RA-819722-001-0F3 ACIELO ISRAEL HENSON
Side and Grid Line (A) (8-12) East Side at Admin Building Area @
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
254 C-0214 Material at Grid Line (2-10) (B) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 24-Aug-17 4:40 PM 26-Aug-17 3:15 PM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26.

255 C-0215 FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at ADMIN BUILDING 24-Aug-17 4:45 PM 26-Aug-17 3:30 PM RA-819721-001-00 ACIELO ISRAEL HENSON 3
Grid Line (2-10) (B) Admin Building Area @ Ju'Aymah, S hops Plant N-26.

Sampling, Testing and Placement Inspection of Concret at Grade Beam


256 C-0216 GB-3 Grid Line (A-F) South Side, Grid Line (F) (10-12) West Side and Grid ADMIN BUILDING 29-Aug-17 4:50 PM 30-Aug-17 3:00 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON
Line (A) (8-12) East Side at Admin Building Area @ Ju'Aymah, Shops Plant
N- 26
West Side of New Admin to South Side of Security ID Office (R-82) @
Juaymah shop Plant N-26
257 P-0013 HDD Route & Profile (Crossing Pipe # 04) 2- Way (Dia 225mm each) PLANT N-26 26-Aug-17 10:50 AM 27-Aug-17 8:00 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
Meduim Voltage (MV) West Side of New Admin to S outh side of security
ID office (R-82) @ Ju'Aymah, Shops Plant No- 26.
West Side of New Admin to South Side of Security ID Office (R-82) @
Juaymah shop Plant N-26 HDD Center Line Marking (Crossing Pipe # 04) 4-
258 P-0014 Way (ø 140mm each) Medium Voltage West Side of New Admin to South PLANT N-26 26-Aug-17 10:52 AM 27-Aug-17 9:30 AM RA-819460-001-0F1 FAHEEM DAMIAN ABAA
Side of Security ID Office (R-82) @ Ju'Aymah, Shops Plant No-26.

Material Receiving for Type 2 Anchor Bolts M24 x 600 ASTM F1554 Gr.
259 C-0217 A36 with 3 Nuts (1 Tack Welded and 2 Loose) ASTM A536 Class 10S and PLANT N-26 26-Aug-17 11:00 AM 27-Aug-17 11:00 AM RA-819735-001-00 OMAR ISRAEL HENSON
one Washer ASTM 436), All HDG as per A153 Class C, Total Qty 168, for
Car Parking Shed @ ETE Laydown, Juaymah, Shops Plant N-26

260 C-0215-A FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at ADMIN BUILDING 26-Aug-17 4:45 PM 27-Aug-17 7:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON 2
Grid Line (2-10) (B) Admin Building Area @ Ju'Aymah, S hops Plant N-26.

FDT Compaction Inspection of Sub Grade for Sanitary Trench at Coffee


261 C-0218 Room Crossing Grid Line 3 in Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 27-Aug-17 6:30 AM 28-Aug-17 8:00 AM RA-819992-001-0F1 ACIELO ISRAEL HENSON 1
Plant N- 26

Excavation, Placement and Compaction Inspection of Sand Bedding for


262 C-0219 Sewer Water Line at Coffee Room Crossing Grid Line 3 in Admin Building ADMIN BUILDING 27-Aug-17 6:45 AM 28-Aug-17 8:15 AM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS
Area @ J u'Aymah, Shops Plant N- 26
West side of New Admin to South Side of S ecurity ID Office (R-82) @
Juaymah Shop Plant N-26 Calibration of Tracking System, Thrust Boring,
263 P-0015 Drill Mud Mixing, Pilot Drilling, Reaming, Pulling and HDPE Conduit PLANT N-26 27-Aug-17 7:00 AM 28-Aug-17 8:30 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
Installation(Crossing Pipe # 04) 4-Way (ø 225 mm each) Medium Voltage
(MV) West Side of New Admin to South Side of Security ID Office (R-82) @
Juaymah Shop Plant N-26
Material Receiving, Inspection of Embedded Equal Angle Frame (QTY= 02)
264 C-0220 Frame # 01.HDG L50 X 50 X 6T X 1530 X610 Frame # 02.HDG L50 X 50 X PLANT N-26 27-Aug-17 8:15 AM 28-Aug-17 10:00 AM RA-819866-001-0F1 BAQAR ISRAEL HENSON
6T X1420X500 From Walouf trading Est @ ETE Store,JuAymah,Shops Plant
N-26

265 C-0221 Material Handling,Stroge and Preservation Inspection of Embedded Equal PLANT N-26 27-Aug-17 8:20 AM 28-Aug-17 10:30 AM RA-819866-001-0F1 BAQAR ISRAEL HENSON
Angle Frames @ ETE Store,JuAymah,Shops Plant N-26

Formworks Inspection for 4 Nos. Columns (C1) at Grid Line ( C ) (4-9) from
266 C-0222 Top of Footing to Bottom of Second F lloor Beam at Admin Building Area ADMIN BUILDING 27-Aug-17 8:30 AM 28-Aug-17 3:15 PM RA-819721-001-00 ACIELO ISRAEL HENSON Cover RFI C-0173
@ J uaymah S hops Plant N-26.

FBE Reinforcing Steel Inspection for 4 Nos. Columns (C1) at Grid Line ( C )
267 C-0223 (4-9) from Top of Footing to Bottom of Second Flloor Beam at Admin ADMIN BUILDING 27-Aug-17 8:35 AM 28-Aug-17 3:30 PM RA-819721-001-00 ACIELO ISRAEL HENSON Cover RFI C-0174
Building Area @ Juaymah Shops Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
268 C-0224 Material at Grid Line (2-10) (B) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 27-Aug-17 8:40 AM 28-Aug-17 9:30 AM RA-819721-001-00 ACIELO ISRAEL HENSON
Plant N-26.

269 C-0225 FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at ADMIN BUILDING 27-Aug-17 8:45 AM 28-Aug-17 9:45 AM RA-819721-001-00 ACIELO ISRAEL HENSON 2
Grid Line (2-10) (B) Admin Building Area @ Ju'Aymah, S hops Plant N-26.

Sampling, Testing and Placement Inspection of Concret at Telecom Duct


270 C-0226 Bank between Grid Line (4-5) (F) Admin Building Area @ Juaymah Shops ADMIN BUILDING 27-Aug-17 8:50 AM 28-Aug-17 9:15 AM RA-819723-004-0F2 ACIELO ISRAEL HENSON
Plant N-26.

Send Bedding Compaction Inspection Water Flooding for Sewer Water


271 C-0227 Line at Coffee Room Crossing Grid Line 3 in Admin Building Area @ ADMIN BUILDING 27-Aug-17 8:55 AM 28-Aug-17 8:45 AM RA-819721-001-00 ACIELO ISRAEL HENSON 1
Ju'Aymah, Shops Plant N- 26

Visual Inspection of Job Site Fabricated Duct Bank & Initial Mandrel Test
of 4" PVC Conduit for Telecom System Stubbed up between Grid Line (2-
272 T-0006 3) (C) at SubStation Building Area @ Ju'Aymah Shops Plant N-26. NEW SUB STATION 27-Aug-17 10:00 AM 28-Aug-17 9:00 AM RA-819908-001-0F1 RAFI M. Z. NAVEED

Material Receiving Visual Inspection of Replace Fabricated Register


273 E-0015 Coupling TC9 / DB-120, Size 6", 150 Pcs, 4", 25 Pcs, 2", 30 Pcs, 1", 30 Pcs PLANT N-26 27-Aug-17 10:05 AM 28-Aug-17 9:30 AM RA-819460-002-00 HAFEEZ DAMIAN ABAA Not in QMIS
From New Products Industries CO.Ltd @ ETE Site Store, Upgrade
Ju’Aymah S hops Project Plant N-26

274 C-0228 Material Receiving, Inspection of select Fill From Al-Osais (Qty=529 M3) PLANT N-26 27-Aug-17 10:20 AM 28-Aug-17 10:15 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
@ ETE Laydown,JuAymah,Shops Plant N-26

Sampling, Testing and Placement Inspection of Concert at 4 Nos. Columns


275 C-0229 (C1) at Grid Line ( D ) between (4-9) from Top Footing to Bottom of 2nd ADMIN BUILDING 27-Aug-17 4:20 PM 28-Aug-17 9:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON
Floor Beam at Admin Building Area @ Juaymah Shops Plant N-26.

276 P-0016 PVC Pipes Installation inspection of 4", 3" & 2" Dia for Sanitary Sewer PLANT N-26 28-Aug-17 7:05 AM 29-Aug-17 10:00 AM RA-819774-001-00 FAHEEM M. YOUSUF IRFAN
Line in Coffee Room @ New Admin Building @ Ju'aymah Shops Plant N-26

Pre-Cast Pre-Concreting Inspection of 37 Nos. P1 Type Pedestal of Car


277 C-0230 Parking Shade at Pre-Cast Area in Workshop Area @ Ju'Aymah, Shops CAR PARKING 28-Aug-17 7:10 AM 29-Aug-17 9:00 AM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
Plant N- 26

Visual Inspection for Job Site Fabricated Duct Bank & Under Ground PVC
278 E-0016 Conduit Installation for Electrical Power Cables Inside Electrical Room of ADMIN BUILDING 28-Aug-17 2:00 PM 29-Aug-17 10:00 AM RA-819718-001-0F1 HAFEEZ DAMIAN ABAA Duct Bank 1
Admin Building between Grade Line (8-9) (E-F) @ Ju'Aymah Shops Plant
N-26

Material Receiving, Handling, Storage and Preservation Inspection of PVC


279 P-0017 DMV Fittings Wye 6"X4" (1Pcs), Elbow's 2" 90⁰ (100 Pcs) & Bush Reducers ADMIN BUILDING 28-Aug-17 2:05 PM 29-Aug-17 8:00 AM RA-819774-001-00 FAHEEM ISRAEL HENSON
6"X4" (1 Pcs) from NEPRO at ETE Store, Ju'aymah Shops Plant N-26

280 P-0018 Sewer Gravity Test for PVC Pipes and Fittings for Mechanical Room in New NEW SUB STATION 28-Aug-17 3:00 PM 29-Aug-17 11:00 AM RA-819901-001-00 FAHEEM M. YOUSUF IRFAN
Sub Station Building @ J u'aymah Shops Plant N-26

281 P-0019 Sewer Gravity Test for PVC Pipes and Fittings for Battery Room in New Sub NEW SUB STATION 28-Aug-17 3:05 PM 29-Aug-17 12:30 PM RA-819901-001-00 FAHEEM M. YOUSUF IRFAN
Station Building @ Ju'aymah Shops Plant N-26

FBE Reinforcing Stee Inspection for Grade Beam GB-2 Grid Line 10'(A- B),
282 C-0231 Grid Line B(10-11), Grid Line B'(10-11), Grid Line C(11-12), Grid Line E(11- ADMIN BUILDING 28-Aug-17 4:50 PM 29-Aug-17 3:30 PM RA-819721-001-00 ACIELO ISRAEL HENSON
12) amd Grid Line 10'(E-F ) at Admin Building Area, Juaymah Shops,Plant
N-26

283 C-0232 Curing Inspection of Concrete for 14 Nos. (P1) Pedestal Grid Line 3 and 4 SHIPPING & RECEIVING 29-Aug-17 4:05 PM 30-Aug-17 7:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
(A to G) Shipping and Receiving Shelter @ Ju'Aymah, S hops Plant N- 26 AREA
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for Lean Concrete of Grade Beam at Grid Line (A)
(2-10) and (F) (8'-10) at Exterior Admin Building and 14 Nos. Neck
284 C-0233 Columns (from Top of Footing to Bottom of Grade Beam) at Grid Line (B-F) MAAZ LAB 30-Aug-17 8:00 AM 3-Sep-17 11:00 AM RA-819721-001-00 MOIZULLAH ISRAEL HENSON
& (2-8') at Admin Building Area @ Juaymah Shops Plant N-26. (B-3)C1, (B-
4)C1, (C-3)C1, (D-3)C1, (E-4')C1, (E-5)C1, (F-5)C1, (E-8)C1, (F-8)C1, (E-
8')C1, (B- 8)C2, (B-5)C2, (C'-2)C3 and (D-2)C4 at MAAZ Lab
Concrete Finishing and Curing Inspection of Telecom Duct Bank between
285 C-0234 Grid Line (4-5) (F) and 4 Nos. Columns (C1) at Grid Line ( D ) between (4- ADMIN BUILDING 5-Sep-17 12:40 PM 6-Sep-17 7:00 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
9) from Top Footing to Bottom of 2nd F loor Beam Admin Building @
Juaymah Shops Plant N-26.

286 C-0235 FDT Compaction Inspection of Sub Grade for Fire Water Line Trench at ADMIN BUILDING 5-Sep-17 9:00 AM 6-Sep-17 3:00 PM RA-819690-001-00 ACIELO ISRAEL HENSON 1
Grid Line (F -5) @ Admin Building Area, JuAymah,S hops Plant N-26

Excavation, Placement and Compaction Inspection of Sand Bedding for


287 C-0236 Fire Water Line Trench at Grid Line (F-5) @ Admin Building Area, ADMIN BUILDING 5-Sep-17 9:02 AM 6-Sep-17 3:15 PM RA-819690-001-00 ACIELO ISRAEL HENSON Not in QMIS
JuAymah,Shops Plant N-26

288 C-0237 Compaction Inspection Water Flooding for Fire Water Line Trench at Grid ADMIN BUILDING 5-Sep-17 9:05 AM 6-Sep-17 3:45 PM RA-819690-001-00 ACIELO ISRAEL HENSON 1
Line (F-5) @ Admin Building Area, JuAymah,Shops Plant N-26

Form Closure Inspection for 4 Nos. Columns (C1) at Grid Line ( C ) (4-9)
289 C-0238 from Top of Footing to Bottom of Second Floor Beam at Admin Building ADMIN BUILDING 5-Sep-17 10:15 AM 6-Sep-17 3:30 PM RA-819721-001-00 ACIELO ISRAEL HENSON
Area @ J uaymah S hops Plant N-26.

Formworks Inspection for Electrical Duct Bank at Grid Line (E-F) and
290 C-0239 between Grid Line (8-9) at Admin Building Area @ Juaymah Shops Plant ADMIN BUILDING 5-Sep-17 10:17 AM 6-Sep-17 10:15 AM RA-819718-001-0F1 ACIELO ISRAEL HENSON Duct Bank 1
N-26.

FBE Reinforcing Steel Inspection for Electrical Duct Bank at Grid Line (E-F )
291 C-0240 and between Grid Line (8-9) at Admin Building Area @ J uaymah S hops ADMIN BUILDING 5-Sep-17 10:20 AM 6-Sep-17 10:30 AM RA-819718-001-0F1 ACIELO ISRAEL HENSON Duct Bank 1
Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
292 C-0241 Material at Grid Line (6-7) (E-F) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 5-Sep-17 10:25 AM 6-Sep-17 4:00 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26.

293 C-0242 FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material at ADMIN BUILDING 5-Sep-17 10:28 AM 6-Sep-17 4:15 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON 1
Grid Line (6-7) (E-F) Admin Building Area @ Ju'Aymah, Shops Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
294 C-0243 Material at Grid Line (2-3) (D-C) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 5-Sep-17 10:30 AM 6-Sep-17 4:30 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26.

295 C-0244 FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at ADMIN BUILDING 5-Sep-17 10:40 AM 6-Sep-17 4:45 PM RA-819722-001-0F3 ACIELO ISRAEL HENSON 1
Grid Line (2-3) (D-C) Admin Building Area @ J u'Aymah, Shops Plant N-26.

296 C-0245 Sand Backfilling Inspection around and above the Pipe at Mechanical NEW SUB STATION 5-Sep-17 3:55 PM 6-Sep-17 8:00 AM RA-819901-001-00 SALMAAN ISRAEL HENSON Not in QMIS
Room in New S ub Station Building @ Ju'Aymah, Shops Plant N- 26

Visual Inspection Material Receiving, Handling, Storage and Preservation


297 C-0246 of Pigment Bayferrox Red 130 (25 kg bag) Qty=01 from CIC @ ETE PLANT N-26 5-Sep-17 4:30 PM 6-Sep-17 9:00 AM RA-819293-025-00 BAQAR ISRAEL HENSON Not in QMIS
Laydown, JuAymah, Shops Plant N-26

Pre-Cast Pre-Concreting, Embedded Items & Form Closure Inspection of


298 C-0247 37 Nos. P1 Type Pedestal of Car Parking Shade at Pre-Cast Area in CAR PARKING 6-Sep-17 11:45 AM 7-Sep-17 9:00 AM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
Workshop Area @ Ju'Aymah, Shops Plant N- 26

Precast Concrete Placement, Sampling and Testing Inspection of 37 Nos.


299 C-0248 P1 Type Pedestal of Car Parking S hade at Pre-Cast Area in Workshop Area CAR PARKING 6-Sep-17 11:50 AM 7-Sep-17 4:30 PM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
@ J u'Aymah, Shops Plant N- 26

Form Closure and Embedded Items Inspection for Electrical Duct Bank at
300 C-0249 Grid Line (E-F) and between Grid Line (8-9) at Admin Building Area @ ADMIN BUILDING 6-Sep-17 4:00 PM 7-Sep-17 3:15 PM RA-819718-001-0F1 ACIELO ISRAEL HENSON Duct Bank 1
Juaymah Shops Plant N-26.

Sampling, Testing and Placement Inspection of Concrete for Electrical


301 C-0250 Duct Bank at Grid Line (E-F) and between Grid Line (8-9) at Admin ADMIN BUILDING 6-Sep-17 4:02 PM 7-Sep-17 3:30 PM RA-819718-001-0F1 ACIELO ISRAEL HENSON Duct Bank 1
Building Area @ Juaymah Shops Plant N-26.

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


302 C-0251 Columns (C1) at Grid Line ( C ) (4-9) from Top of Footing to Bottom of ADMIN BUILDING 6-Sep-17 4:06 PM 7-Sep-17 3:00 PM RA-819721-001-00 ACIELO ISRAEL HENSON
Second Floor Beam at Admin Building Area @ Juaymah Shops Plant N-26.

Surface Preparation & Moisture Test Inspection of (7 Nos.) Top of


303 C-0252 Foundations and around Pedestal from Grid Line 4 (A to G) Shipping and SHIPPINGAREA
& RECEIVING 6-Sep-17 4:10 PM 7-Sep-17 9:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26

Concrete Finishing and Curing Inspection of Grade Beam GB-3 Grid Line
304 C-0253 (A-F) South Side, Grid Line (F) (10-12) West Side and Grid Line (A) (8-12) ADMIN BUILDING 7-Sep-17 7:25 AM 9-Sep-17 7:00 AM RA-819722-001-0F3 ACIELO ISRAEL HENSON Not in QMIS
East Side at Admin Building Area @ Ju'Aymah, Shops Plant N- 26

Visual Inspection Material Receiving, Handling, Storage and Preservation


305 C-0254 of Pigment Bayferrox Orange 960 (20 kg bag) Qty=01 from CIC @ ETE PLANT N-26 7-Sep-17 8:20 AM 9-Sep-17 9:00 AM RA-819293-025-00 BAQAR ISRAEL HENSON Not in QMIS
Laydown, JuAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st and Final Layer
306 C-0255 Select Fill Material above Sanitary Pipe Line from Mechanical Rool to NEW SUB STATION 7-Sep-17 8:25 AM 9-Sep-17 10:00 AM RA-819901-001-00 SALMAAN ISRAEL HENSON Not in QMIS
Main Sanitary Pipe Line @ New Sub Station Building JuAymah, Shops
Plant N-26

FDT Compaction Inspection of Backfilling 1st and Final Layer Select Fill
307 C-0256 Material above Sanitary Pipe Line from Mechanical Rool to Main S anitary NEW SUB STATION 7-Sep-17 8:30 AM 9-Sep-17 10:30 AM RA-819901-001-00 SALMAAN ISRAEL HENSON 3
Pipe Line @ New Sub S tation Building JuAymah, Shops Plant N-26

Sewer Gravity test for PVC Pipes and fittings for Coffee room (First Floor)
308 P-0020 in New Admin Building from Grid Line(1-3) (A-B) @ Ju'aymah Shops Plant ADMIN BUILDING 7-Sep-17 11:04 AM 9-Sep-17 7:30 AM RA-819774-001-00 FAHEEM M. YOUSUF IRFAN
N-26

Coating and Final Inspection of APCS-3, Carboline at (7 Nos.) Top of


309 C-0257 Foundations and around Pedestal from Grid Line 4 (A to G) Shipping and SHIPPINGAREA
& RECEIVING 9-Sep-17 3:55 PM 10-Sep-17 9:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 (DFT)

310 C-0258 FDT Compaction Inspection of Sub Grade for Sanitary Trench inside First ADMIN BUILDING 11-Sep-17 7:10 AM 12-Sep-17 3:00 PM RA-819774-001-00 ACIELO ISRAEL HENSON 1
Floor Male Toilet 116 @ Admin Building Area, JuAymah Shops Plant N-26

Excavation, Placement and Compaction Inspection of Sand Bedding for


311 C-0259 Sanitary Trench inside First Floor Male Toilet 116 @ Admin Building Area, ADMIN BUILDING 11-Sep-17 7:13 AM 12-Sep-17 3:15 PM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS
JuAymah Shops Plant N-26

312 C-0260 Compaction Inspection Water Flooding for Sanitary Trench inside First ADMIN BUILDING 11-Sep-17 7:15 AM 12-Sep-17 3:45 PM RA-819774-001-00 ACIELO ISRAEL HENSON 1
Floor Male Toilet 116 @ Admin Building Area, JuAymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Sand Backfilling Inspection around and above the Pipe at Coffee Room @
313 C-0261 Admin Building Area, JuAymah Shops Plant N-26 ADMIN BUILDING 10-Sep-17 7:20 AM 11-Sep-17 9:15 AM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS

Grade & Site Preparation Inspection for Lean Concrete over Sanitary Pipe Advance
314 C-0262 Line from Mechanical Room to Main Sanitary Pipe Line @ New Sub NEW SUB STATION 10-Sep-17 10:40 AM 11-Sep-17 7:30 AM RA-819901-001-00 SALMAAN ISRAEL HENSON Inspection
Station Building JuAymah, Shops Plant N-26

Sampling, Testing and Placement Inspection of Lean Concrete over Advance


315 C-0263 Sanitary Pipe Line from Mechanical Room to Main S anitary Pipe Line @ NEW SUB STATION 10-Sep-17 10:42 AM 11-Sep-17 8:00 AM RA-819901-001-00 SALMAAN ISRAEL HENSON Inspection
New Sub Station Building JuAymah, Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for Pre Cast 19 Nos. F1 Type and 18 Nos. F2 Type
316 C-0264 Footing Foundations (Total 37 Nos.) of Car Parking Shade at Pre-Cast Area MAAZ LAB 11-Sep-17 7:25 AM 12-Sep-17 9:30 AM RA-819945-001-0F1 MOIZULLAH ISRAEL HENSON
in Workshop Area @ Ju'Aymah, Shops Plant N- 26

Surface Preparation & Moisture Test Inspection of (7 Nos.) Top of SHIPPING & RECEIVING
317 C-0265 Foundations and around Pedestal from Grid Line 3 (A to G) Shipping and AREA 11-Sep-17 11:50 AM 12-Sep-17 10:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill SHIPPING & RECEIVING
318 C-0266 Material around Pedestal P1 and Foundation at Grid line 4 (A to G) @ AREA 11-Sep-17 11:50 AM 12-Sep-17 3:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Shipping Receiving Area, JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material SHIPPING & RECEIVING
319 C-0267 around Pedestal P1 and Foundation at Grid line 4 (A to G) @ Shipping AREA 11-Sep-17 11:55 AM 12-Sep-17 4:00 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
Receiving Area, JuAymah, Shops Plant N-26

Formwork Inspection for Grade Beam GB-2 at Grid Line (B) (9-11), (B') (10-
11), (10') (A-B), (10) (B-F), © (10-12), (11) (B'-C), (D) (10-11), (E) (9-12),
320 C-0268 (11) (C-E) (10') (E-F) and Grade Beam GB-3 at Grid Line (F) (9'-10) at ADMIN BUILDING 11-Sep-17 12:55 PM 12-Sep-17 10:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Admin Building Area, Juay mah Shops, Plant N-26
FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
Grade Beam GB-2 at Grid Line (B) (9-11), (B') (10-11), (10') (A-B), (10) (B-
321 C-0269 F), © (10-12), (11) (B'-C), (D) (10-11), (E) (9-12), (11) (C-E) (10') (E-F) and ADMIN BUILDING 11-Sep-17 12:59 PM 12-Sep-17 10:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Grade Beam GB-3 at Grid Line (F ) (9'-10) at Admin Building Area, Juaymah
Shops, Plant N-26
Sampling, Testing and Placement of Concrete Inspection for Grade Beam
GB-2 at Grid Line (B) (9-11), (B') (10-11), (10') (A-B), (10) (B-F), © (10-12),
322 C-0270 (11) (B'-C), (D) (10-11), (E) (9-12), (11) (C-E) (10') (E-F) and Grade Beam ADMIN BUILDING 11-Sep-17 1:05 PM 12-Sep-17 4:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
GB-3 at Grid Line (F) (9'-10) at Admin Building Area, Juaymah Shops, Plant
N-26
Material Receiving Inspection for Cable Accessories, Electrical Tape (1) 3M
323 E-0017 Tape Scotch Rubber Splicing Tape 23, 3/4" x 30', Black (Qty = 50 Pcs) and PLANT N-26 12-Sep-17 2:00 PM 13-Sep-17 10:30 AM RA-819712-001-00 HAFEEZ DAMIAN ABAA
(2) 3M Tape Scotch Vinyl Electrical Tape 35 Green 3/4" x 66', (Qty= 100
Pcs) @ ETE Laydown, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill SHIPPING & RECEIVING
324 C-0271 Material around Pedestal P1 and Foundation at Grid line 4 (A to G) @ 12-Sep-17 4:30 PM 13-Sep-17 4:00 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Shipping Receiving Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material SHIPPING & RECEIVING
325 C-0272 around Pedestal P1 and Foundation at Grid line 4 (A to G) @ Shipping 12-Sep-17 4:35 PM 13-Sep-17 4:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
Receiving Area, JuAymah, Shops Plant N-26 AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


326 C-0273 Inspection of 4000 PSi for Grade Beam GB-3 Grid Line (A- F) South Side, MAAZ LAB 26-Sep-17 9:55 AM 27-Sep-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISRAEL HENSON
Grid Line (F ) (10-12) West Side and Grid Line (A) (8-12) East Side at Admin
Building Area, Ju'Aymah, Shops Plant N- 26 @ MAAZ LAB Racka

Preparation / Mixing and Application Inspection of Anti Termite Material


327 C-0274 for Elevator Area at Grid Line (E-F) (1-2) @ Admin Building Area, JuAymah ADMIN BUILDING 25-Sep-17 11:02 AM 26-Sep-17 10:05 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON
Shops Plant N-26

328 C-0275 Grade & Site Preparation Inspection of Sub Grade for Elevator Area at Grid ADMIN BUILDING 25-Sep-17 11:05 AM 26-Sep-17 11:00 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON
Line (E-F) (1-2) @ Admin Building Area, JuAymah Shops Plant N-26

329 C-0276 Formworks Inspection for Lean Concrete of Elevator Area at Grid Line (E-F) ADMIN BUILDING 25-Sep-17 11:10 AM 26-Sep-17 11:15 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON
(1-2) @ Admin Building Area, JuAymah Shops Plant N-26

Sampling, Testing and Placement Inspection of Lean Concrete for Elevator


330 C-0277 Area at Grid Line (E-F) (1-2) @ Admin Building Area, JuAymah Shops Plant ADMIN BUILDING 25-Sep-17 11:13 AM 26-Sep-17 2:30 PM RA-819720-001-0F2 ACIELO ISRAEL HENSON
N-26

Coating and Final Inspection of APCS-3, Carboline at (7 Nos.) Top of SHIPPING & RECEIVING
331 C-0278 Foundations and around Pedestal from Grid Line 3 (A to G) Shipping and 14-Sep-17 10:30 AM 16-Sep-17 10:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 (DFT) AREA

332 C-0279 Material Receiving Inspection of Select Fill From Al-Osais (Qty = 621) @ PLANT N-26 14-Sep-17 11:05 AM 16-Sep-17 9:00 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
ETE Laydown, JaAymah Shops Plant N-26

Concrete Finishing and Curing Inspection of 37 Nos. P1 Type Pedestal of


333 C-0280 Car Parking Shade at Pre-Cast Area in Workshop Area @ Ju'Aymah, Shops CAR PARKING 14-Sep-17 11:10 AM 16-Sep-17 3:00 PM RA-819945-001-0F1 SALMAAN ISRAEL HENSON
Plant N- 26

Concrete Finishing and Curing Inspection of Concrete for Electrical Duct


334 C-0281 Bank at Grid Line (E-F) and between Grid Line (8-9) at Admin Building ADMIN BUILDING 16-Sep-17 7:30 AM 17-Sep-17 7:00 AM RA-819718-001-0F1 ACIELO ISRAEL HENSON Not in QMIS
Area @ J uaymah S hops Plant N-26.

Concrete Finishing and Curing Inspection of Concrete for 4 Nos. Columns


335 C-0282 (C1) at Grid Line ( C ) (4-9) from Top of Footing to Bottom of Second Floor ADMIN BUILDING 16-Sep-17 7:35 AM 17-Sep-17 7:15 AM RA-819721-001-00 ACIELO ISRAEL HENSON Not in QMIS
Beam at Admin Building Area @ Juaymah Shops Plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 2000 PSi for Lean Concrete at Tele Comm Conduit Entrance
336 C-0283 Duct Bank to New Sub Station Building and Lean Concrete of Grade Beam MAAZ LAB 16-Sep-17 7:40 AM 17-Sep-17 2:00 PM RA-819908-001-0F1 MOIZULLAH ISRAEL HENSON
GB-2 at Grid Line (B) (9-10') & Grid Line (B-E) (10) and Grid Line (10-11)
(D-E) @ JuAymah S hops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
337 C-0284 Material at Grid Line (A-B) (1-2) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 16-Sep-17 9:00 AM 17-Sep-17 9:00 AM RA-819722-001-0f4 ACIELO ISRAEL HENSON Not in QMIS
Plant N- 26

338 C-0285 FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material at ADMIN BUILDING 16-Sep-17 9:05 AM 17-Sep-17 9:15 AM RA-819722-001-0f4 ACIELO ISRAEL HENSON 1
Grid Line (A-B) (1-2) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

339 C-0286 Grade & Site Preparation Inspection of Sub Grade for Grade Beam GB-3 at ADMIN BUILDING 16-Sep-17 9:07 AM 17-Sep-17 9:30 AM RA-819722-001-0f4 ACIELO ISRAEL HENSON
Grid Line (A-B) (1-2) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

340 C-0287 Formworks Inspection for Lean Concrete of Grade Beam GB-3 at Grid Line ADMIN BUILDING 16-Sep-17 9:10 AM 17-Sep-17 9:45 AM RA-819722-001-0f4 ACIELO ISRAEL HENSON
(A-B) (1-2) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Lean Concrete for Grade


341 C-0288 Beam GB-3 at Grid Line (A-B) (1-2) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 16-Sep-17 9:15 AM 17-Sep-17 10:30 AM RA-819722-001-0f4 ACIELO ISRAEL HENSON
Shops Plant N- 26

Not in QMIS, PID


Visual Inspection for Installation of PVC Sleeves at HVAC Pit in New not willing to Sign
342 P-0021 Substation Building between Grid Line 2 & 3 @ Ju'aymah Shops Plant N- NEW SUB STATION 16-Sep-17 10:20 AM 17-Sep-17 8:00 AM RA-819810-001-00 FAHEEM M. YOUSUF IRFAN because its
26 Surveillance
Inspection

Visual Inspection for Concrete Incase PVC DB 120 Conduit (SLEEVES) for
343 T-0007 Grounding Conductors and for Control Cables of FACP of New Sub Station NEW SUB STATION 16-Sep-17 3:00 PM 17-Sep-17 9:00 AM RA-819840-001-0F1 RAFI M. Z. NAVEED
# 2118 @ JuAymah Shops Plant N-26

Visual Inspection for Concrete Incase PVC DB 120 Conduit (SLEEVES)for


344 E-0018 Grounding Conductors and for Control Cables of ACCUs of New Sub NEW SUB STATION 16-Sep-17 3:05 PM 17-Sep-17 9:30 AM RA-819840-001-0F1 HAFEEZ DAMIAN ABAA
Station # 2118 @ JuAymah Shops Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 5th (Final) Layer SHIPPING & RECEIVING
345 C-0289 Select Fill Material around Pedestal P1 at Grid line 4 (A to G) @ Shipping 16-Sep-17 3:45 PM 17-Sep-17 11:00 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Receiving Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 5th (Final) Layer Select Fill SHIPPING & RECEIVING
346 C-0290 Material around Pedestal P1 at Grid line 4 (A to G) @ S hipping Receiving 16-Sep-17 3:47 PM 17-Sep-17 11:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
Area, JuAymah, Shops Plant N-26 AREA

347 C-0291 Formworks Inspection for Foundation Slab at Grid Line (1-3) (A-C) at New NEW SUB STATION 18-Sep-17 4:40 PM 19-Sep-17 1:00 PM RA-819866-001-0F1 SALMAAN ISRAEL HENSON
Sub Station Building @ J u'Aymah, Shops Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
348 C-0292 Foundation Slab at Grid Line (1-3) (A-C) at New Sub Station Building @ NEW SUB STATION 18-Sep-17 4:42 PM 19-Sep-17 1:15 PM RA-819866-001-0F1 SALMAAN ISRAEL HENSON
Ju'Aymah, Shops Plant N-26

349 C-0293 Formworks Inspection for Telcom Conduit Entrance Duct Bank to Sub NEW SUB STATION 18-Sep-17 4:45 PM 19-Sep-17 3:45 PM RA-819866-001-0F1 SALMAAN ISRAEL HENSON
Station Building at Grid Line 2 and C, @ Juaymah Shops Plant N-26.

FBE Reinforcing Steel, Embedded Item and Form Closure Inspection for
350 C-0294 Telcom Conduit Entrance Duct Bank to Sub Station Building at Grid Line 2 NEW SUB STATION 18-Sep-17 4:50 PM 19-Sep-17 4:00 PM RA-819866-001-0F1 SALMAAN ISRAEL HENSON
and C, @ Juaymah Shops Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill SHIPPING & RECEIVING
351 C-0295 Material around Pedestal P1 and Foundation at Grid line 3 (A to G) @ 17-Sep-17 11:50 AM 18-Sep-17 8:15 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Shipping Receiving Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material SHIPPING & RECEIVING
352 C-0296 around Pedestal P1 and Foundation at Grid line 3 (A to G) @ Shipping 17-Sep-17 11:55 AM 18-Sep-17 8:30 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON 4
Receiving Area, JuAymah, Shops Plant N-26 AREA

Material Receiving, Handling ,Storage & Preservation Inspectionof Sch 80


353 P-0022 CPVC Unions Fittings of ½" (6 Pcs), 1" (4 Pcs), 1½" (4 Pcs), ¾" (11 Pcs), 2" PLANT N-26 17-Sep-17 3:00 PM 18-Sep-17 7:30 AM RA-819779-001-00 FAHEEM M. YOUSUF IRFAN
(20 Pcs) & 3" (6 Pcs) from NEPRO at ETE Store, Ju'aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


354 C-0297 Inspection of 4000 PSi for 14 Nos. (P1) Pedestal Grid Line 3 and 4 (A to G) MAAZ LAB 18-Sep-17 8:10 AM 19-Sep-17 2:00 PM RA-819908-001-0F1 MOIZULLAH ISRAEL HENSON
Shipping and Receiving Shelter, Ju'Aymah, Shops Plant N-26 @ MAAZ
LAB Racka

Form Closure and Embedded Items Inspection for Grade Beam GB-3 East PID Reject by
355 C-0298 Side from Grid Line (A) (2- 6) & (7-8) at Admin Building Area, Juaymah ADMIN BUILDING 18-Sep-17 12:50 PM 19-Sep-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops, Plant N-26 Mistake t

Formwork Inspection for Grade Beam GB-3 at Grid Line (2) (A-B), (B) (1-2)
356 C-0299 and Grade Beam GB-2 at Grid Line (3') (A-B), (5) (A- B) (8) (A-B) & (B) (2-9) ADMIN BUILDING 18-Sep-17 12:55 PM 19-Sep-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
at Admin Building, Juaymah Shops, Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection


357 C-0300 Formwork Inspection for Grade Beam GB-3 at Grid Line (2) (A-B), (B) (1-2) ADMIN BUILDING 18-Sep-17 1:00 PM 19-Sep-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
and Grade Beam GB-2 at Grid Line (3') (A-B), (5) (A- B) (8) (A-B) & (B) (2-9)
at Admin Building, Juaymah Shops, Plant N-26

Formwork Inspection for 4 Nos. Columns at Grid Line (A) (10' & 11) C9,
358 C-0301 Grid Line (B) (10') C1 and Grid Line (B') (12) C15 at Admin Building, ADMIN BUILDING 18-Sep-17 1:05 PM 19-Sep-17 2:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

PID Reject by
FBE Reinforcing Steel Inspection for 4 Nos. Columns at Grid Line (A) (10' & Mistake therefore
359 C-0302 11) C9, Grid Line (B) (10') C1 , and Grid Line (B') (12) C15 at Admin ADMIN BUILDING 18-Sep-17 1:10 PM 19-Sep-17 2:45 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Building, Juaymah Shops, Plant N-26 Cover in RFI # C-
0316

360 C-0303 Formwork Inspection for Grade Beam GB-1, at Grid Line (A & A') (6-7) @ ADMIN BUILDING 18-Sep-17 1:15 PM 19-Sep-17 3:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Admin Building, Juaymah Shops, Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
361 C-0304 Grade Beam GB-1, at Grid Line (A & A') (6-7) @ Admin Building, Juaymah ADMIN BUILDING 18-Sep-17 1:20 PM 19-Sep-17 3:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for Foundation


362 C-0305 Slab at Grid Line (1-3) (A- C) at New Sub Station Building @ J u'Aymah, NEW SUB STATION 19-Sep-17 11:20 AM 20-Sep-17 6:00 AM RA-819866-001-0F1 SALMAAN ISRAEL HENSON
Shops Plant N-26

Sampling, Testing and Placement Inspection of Concrete for Telcom


363 C-0306 Conduit Entrance Duct Bank to Sub Station Building at Grid Line 2 and C, NEW SUB STATION 19-Sep-17 11:25 AM 20-Sep-17 10:00 AM RA-819866-001-0F1 SALMAAN ISRAEL HENSON
@ J uaymah S hops Plant N-26.

Surface Preparation & Moisture Test Inspection of C1 Column (08 Nos)


364 C-0307 above the Foundations (Hight 1.5 meter) Grid line 4 to 9 Grid Lne C & D ADMIN BUILDING 20-Sep-17 3:00 PM 21-Sep-17 10:05 AM RA-819721-001-0F2 BAQAR ISRAEL HENSON
at Admin Building Area @ J u'Aymah Shops Plant N-26 (F4 = 4 Nos) (F1= 2
Nos) (F5 = 2 Nos)

Surface Preparation & Moisture Test Inspection of Telecomnication Duct


365 C-0308 Bank Grid Line (E-F) Grid Line (4-5) at Admin Building Area @ Ju'Aymah ADMIN BUILDING 20-Sep-17 3:05 PM 21-Sep-17 10:30 AM RA-819791-001-0F1 BAQAR ISRAEL HENSON
Shops Plant N-26

Surface Preparation & Moisture Test Inspection of Electrical Duct Bank


366 C-0309 Grid Line (E-F) Grid Line (8-9) at Admin Building Area @ Ju'Aymah Shops ADMIN BUILDING 20-Sep-17 3:10 PM 21-Sep-17 10:50 AM RA-819723-004-0F2 BAQAR ISRAEL HENSON Duct Bank 1
Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill SHIPPING & RECEIVING
367 C-0310 Material around Pedestal P1 at Grid line 3 (A to G) @ S hipping Receiving AREA 20-Sep-17 11:50 AM 21-Sep-17 10:10 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Area, JuAymah, Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material SHIPPING & RECEIVING
368 C-0311 around Pedestal P1 at Grid line 3 (A to G) @ Shipping Receiving Area, AREA 20-Sep-17 11:55 AM 21-Sep-17 10:20 AM RA-819990-01-0F1 QUADRI ISRAEL HENSON 4
JuAymah, Shops Plant N-26

369 C-0312 Grade & Site Preparation Inspection of Sub Grade for Grade Beam GB-2 at ADMIN BUILDING 20-Sep-17 4:30 PM 21-Sep-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Grid Line (B) (3-9) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

370 C-0313 Formworks Inspection for Lean Concrete of Grade Beam GB-2 at Grid Line ADMIN BUILDING 20-Sep-17 4:35 PM 21-Sep-17 8:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(B) (3- 9) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Lean Concrete for Grade


371 C-0314 Beam GB-2at Grid Line (B) (3-9) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 20-Sep-17 4:40 PM 21-Sep-17 4:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N- 26

Material Receiving, Handling, Storage and Preservation Inspection of PVC


372 P-0023 fittings ¾", ½", 1", 2", 3", 4" (Tee's, Reducer Bush, Wye's, P-trap's & PLANT N-26 20-Sep-17 4:45 PM 21-Sep-17 7:30 AM RA-819779-003-00 FAHEEM M. YOUSUF IRFAN
Elbow's 45⁰ & 90⁰) NEPRO at ETE Store, Ju'aymah Shops Plant N-26 (As
Per Attached List)

Concrete Finishing and Curing Inspection of Grade Beam GB-2 at Grid Line
373 C-0315 (B) (9- 11), (B') (10-11), (10') (A-B), (10) (B-F), © (10-12), (11) (B'-C), (D) ADMIN BUILDING 20-Sep-17 4:50 PM 21-Sep-17 7:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
(10-11), (E) (9-12), (11) (C-E) (10') (E-F) and Grade Beam GB-3 at Grid Line
(F) (9'-10) at Admin Building Area, Juaymah Shops, Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure for 4 Nos. PID Rejected RFI C-
374 C-0316 Columns at Grid Line (A) (10' & 11) C9, Grid Line (B) (10') C1 , and Grid ADMIN BUILDING 21-Sep-17 12:40 PM 23-Sep-17 9:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON 0302 by Mistake
therefore we make
Line (B') (12) C15 at Admin Building, Juaymah Shops, Plant N-26 new RFI

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


375 C-0317 Columns at Grid Line (A) (10' & 11) C9, Grid Line (B) (10') C1 , and Grid ADMIN BUILDING 21-Sep-17 12:45 PM 23-Sep-17 2:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Line (B') (12) C15 at Admin Building, Juaymah Shops, Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
376 C-0318 Material at Grid Line (E- F) (7-9) and Grid Line (E-F ) (3-6) @ Admin Building ADMIN BUILDING 21-Sep-17 12:50 PM 23-Sep-17 2:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Area, JuAymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material at


377 C-0319 Grid Line (E-F) (7-9) and Grid Line (E-F) (3-6) @ Admin Building Area, ADMIN BUILDING 21-Sep-17 12:55 PM 23-Sep-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 3
JuAymah Shops Plant N-26

Coating and Final Inspection of APCS-3, Carboline at 3 Nos. Neck


378 C-0320 Columns top of Foundation and (from Top of Footing to Bottom of Grade ADMIN BUILDING 21-Sep-17 1:00 PM 23-Sep-17 10:00 AM RA-819721-001-0F2 BAQAR ISRAEL HENSON
Beam) at Grid Line (E-F) & (8-8') at Admin Building Area @ Juaymah Shops
Plant N-26. (E-8)C1, (F-8)C1, (E- 8')C1 (DFT)

Coating and Final Inspection of APCS-3, Carboline at C1 Column (08 Nos)


379 C-0321 above the Foundations and Column Hight (1.0 Meter) Grid line 4 to 9 Grid ADMIN BUILDING 21-Sep-17 1:05 PM 23-Sep-17 10:15 AM RA-819721-001-0F2 BAQAR ISRAEL HENSON
Lne C & D at Admin Building Area @ Ju'Aymah Shops Plant N-26 (F 4 = 4
Nos) (F1= 2 Nos) (F5 = 2 Nos) (DFT)

Coating and Final Inspection of APCS-3, Carboline at Telecomnication


380 C-0322 Duct Bank Grid Line (E-F) Grid LIne (4-5) at Admin Building Area @ ADMIN BUILDING 21-Sep-17 1:05 PM 23-Sep-17 10:30 AM RA-819791-001-0F1 BAQAR ISRAEL HENSON
Ju'Aymah Shops Plant N-26 (DF T)

Coating and Final Inspection of APCS-3, Carboline at Electrical Duct Bank


381 C-0323 Grid Line (E-F) Grid Line (8-9) at Admin Building Area @ Ju'Aymah Shops ADMIN BUILDING 21-Sep-17 1:10 PM 23-Sep-17 10:45 AM RA-819723-004-0F2 BAQAR ISRAEL HENSON Duct Bank 1
Plant N-26 (DFT)

Form Closure and Embedded Items Inspection for Grade Beam GB-3 East
382 C-0298-A Side from Grid Line (A) (2- 6) & (7-8) at Admin Building Area, Juaymah ADMIN BUILDING 21-Sep-17 1:15 PM 23-Sep-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON PID Reject by
Mistake t
Shops, Plant N-26

Formwork Inspection for 4 Nos. Columen at Grid Line (12) (E) C16, (12) (F)
383 C-0324 C15, Grid Line (C) (10) C1 and (D) (10) C1 @ Admin Building, Juaymah ADMIN BUILDING 21-Sep-17 3:10 PM 23-Sep-17 9:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

FBE Reinforcing Steel Inspection for 4 Nos. Columen at Grid Line (12) (E)
384 C-0325 C16, (12) (F) C15, Grid Line (C) (10) C1 and (D) (10) C1 @ Admin Building, ADMIN BUILDING 21-Sep-17 3:15 PM 23-Sep-17 9:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Grade & Site Preparation Inspection of Sub Grade for Grade Beam GB-2 at
385 C-0326 Grid Line (3) (A-B), (5) (A-B), (8) (A-B) and (B) (2-3) Admin Building Area @ ADMIN BUILDING 21-Sep-17 4:05 PM 23-Sep-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26

Formworks Inspection for Lean Concrete of Grade Beam GB-2 at Grid Line
386 C-0327 (3) (A-B), (5) (A-B), (8) (A-B) and (B) (2- 3) Admin Building Area @ ADMIN BUILDING 21-Sep-17 4:10 PM 23-Sep-17 8:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Ju'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Lean Concrete for Grade


387 C-0328 Beam GB-2 at Grid Line (3) (A-B), (5) (A-B), (8) (A-B) and (B) (2-3) Admin ADMIN BUILDING 21-Sep-17 4:15 PM 23-Sep-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Building Area @ Ju'Aymah, Shops Plant N- 26

388 C-0329 Grade & Site Preparation Inspection of Sub Grade for Grade Beam GB-1 at ADMIN BUILDING 23-Sep-17 10:05 AM 24-Sep-17 7:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Grid Line (6-7) (A-A') Admin Building Area @ Ju'Aymah, Shops Plant N- 26

389 C-0330 Formworks Inspection for Lean Concrete of Grade Beam GB-1 at Grid Line ADMIN BUILDING 23-Sep-17 10:10 AM 24-Sep-17 7:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(6-7) (A-A') Admin Building Area @ J u'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Lean Concrete for Grade


390 C-0331 Beam GB-1 at Grid Line (6-7) (A-A') Admin Building Area @ Ju'Aymah, ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 7:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Form Closure Inspection for 4 Nos. Columen at Grid Line (12) (E) C16, (12)
391 C-0332 (F) C15, Grid Line (C) (10) C1 and (D) (10) C1 @ Admin Building, Juaymah ADMIN BUILDING 23-Sep-17 3:25 PM 24-Sep-17 10:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


392 C-0333 Columen at Grid Line (12) (E) C16, (12) (F) C15, Grid Line (C) (10) C1 and ADMIN BUILDING 23-Sep-17 3:30 PM 24-Sep-17 2:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(D) (10) C1 @ Admin Building, J uaymah Shops, Plant N-26

Grade & Site Preparation Inspection of Sub Grade for Grade Beam GB-3 at
393 C-0334 Grid Line (4-8) (F-F') Admin Building Area @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 10:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON

Formworks Inspection for Lean Concrete of Grade Beam GB-3 at Grid Line
394 C-0335 (4-8) (F-F') Admin Building Area @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 10:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON

Sampling, Testing and Placement Inspection of Lean Concrete for Grade


395 C-0336 Beam GB-3 at Grid Line (4-8) (F -F') Admin Building Area @ Ju'Aymah, ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
396 C-0337 Material at Grid Line (3-10) (B'-E') @ Admin Building Area, JuAymah Shops ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


397 C-0338 Grid Line (3-10) (B'-E') @ Admin Building Area, JuAymah Shops Plant N-26 ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 2:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 4

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


Existing Sub Grade (Below Foundation of 0.60M as per Geotechnical
398 C-0339 Report / Recommendation) for Elevator Foundation at New Admin ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 9:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Building Area @ Ju'Aymah ,Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
399 C-0340 Material at Elevator Foundation at New Admin Building Area @ ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 3:30 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Ju'Aymah ,Shops Plant N- 26 (Below Foundation of 0.60M as per
Geotechnical Report / Recommendation)

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material at


400 C-0341 Elevator Foundation at New Admin Building Area @ Ju'Aymah ,Shops ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 3:45 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON 1
Plant N- 26 (Below Foundation of 0.60M as per Geotechnical Report /
Recommendation)

Formwork Inspection for Grade Beam GB-3 at Grid Line (2) (A-B), (B) (1-2)
401 C-0299-A and Grade Beam GB-2 at Grid Line (3') (A-B), (5) (A- B) (8) (A-B) & (B) (2-9) ADMIN BUILDING 23-Sep-17 12:55 PM 24-Sep-17 8:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
at Admin Building, Juaymah Shops, Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection


402 C-0300-A Formwork Inspection for Grade Beam GB-3 at Grid Line (2) (A-B), (B) (1-2) ADMIN BUILDING 23-Sep-17 1:00 PM 24-Sep-17 8:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Due to LBE 162
and Grade Beam GB-2 at Grid Line (3') (A-B), (5) (A- B) (8) (A-B) & (B) (2-9)
at Admin Building, Juaymah Shops, Plant N-26

403 C-0303-A Formwork Inspection for Grade Beam GB-1, at Grid Line (A & A') (6-7) @ ADMIN BUILDING 23-Sep-17 1:15 PM 24-Sep-17 9:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Admin Building, Juaymah Shops, Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
404 C-0304-A Grade Beam GB-1, at Grid Line (A & A') (6-7) @ Admin Building, Juaymah ADMIN BUILDING 23-Sep-17 1:20 PM 24-Sep-17 9:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for Grade Beam


405 C-0342 GB-3 at Grid Line (2) (A-B), (B) (1-2) and Grade Beam GB- 2 at Grid Line (3') ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 4:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Due to LBE 161
(A-B), (5) (A-B) (8) (A-B) & (B) (2-9) at Admin Building, Juaymah Shops,
Plant N-26

Sampling, Testing and Placement Inspection of Concrete for Grade Beam


406 C-0343 GB-1, at Grid Line (A & A') (6-7) @ Admin Building, Juaymah Shops, Plant ADMIN BUILDING 23-Sep-17 10:15 AM 24-Sep-17 4:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
N-26

Grade & Site Preparation Inspection of Sub Grade for Existing Sub Grade
407 C-0344 of Electrical Duct Bank at Grid Line (8-9) (E-F) Admin Building Area @ ADMIN BUILDING 23-Sep-17 4:40 PM 24-Sep-17 1:30 PM RA-819723-004-0F2 ACIELO ISRAEL HENSON Duct Bank 2
Ju'Aymah, Shops Plant N-26

408 C-0345 FDT Compaction Inspection of Existing Sub Grade of Electrical Duct Bank ADMIN BUILDING 23-Sep-17 4:45 PM Duct Bank 2 24-Sep-17 1:45 PM RA-819723-004-0F2 ACIELO ISRAEL HENSON 1
at Grid Line (8-9) (E-F) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Concrete for Grade Beam


409 C-0346 GB-3 East Side from Grid Line (A) (2-6) & (7-8) at Admin Building Area, ADMIN BUILDING 23-Sep-17 4:50 PM 24-Sep-17 5:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Excavation & Trenching Visual Inspection of Under Ground PVC Conduit


for Electrical Lighting Power Cables between Grid Line (3 & 4) (A to G) at
410 E-0019 Shipping and Receiving Area @ Juaymah Shops, Plant N-26 SHIPPING & RECEIVING 23-Sep-17 12:00 PM 24-Sep-17 8:00 AM RA-819982-001-00 HAFEEZ DAMIAN ABAA
AREA

Visual Inspection of 150 mm Sweet Sand Bedding and Under Ground PVC
411 E-0020 Conduit Installation for Electrical Lighting Power Cables between Grid SHIPPING & RECEIVING 23-Sep-17 12:05 PM 24-Sep-17 2:15 PM RA-819982-001-00 HAFEEZ DAMIAN ABAA
Line (3 & 4) (A to G) at Shipping and Receiving Area @ JuaymahShops, AREA
Plant N-26
Visual Inspection of 300 mm Sweet Sand Bedding Over Under Ground
PVC Conduit for Electrical LightingPower Cables between Grid Line (3 & 4) Procured
412 E-0021 (A to G) at Shipping and Receiving Area @ J uaymah Shops, Plant N-26 SHIPPING & RECEIVING 23-Sep-17 12:10 PM 24-Sep-17 3:15 PM RA-819982-001-00 HAFEEZ DAMIAN ABAA
AREA receptacle outlets
has no bottom

Visual Inspection of 300mm Sweet Sand Bedding Over Underground PVC


413 E-0022 Conduit for Electrical Lighting Power cables Between Grid Line 8 & 9(E-F) ADMIN BUILDING 23-Sep-17 2:05 PM 24-Sep-17 10:45 AM RA-819718-001-0F2 HAFEEZ DAMIAN ABAA Duct Bank 2
at Admin Building @ J u’aymah Shop Plant N-26

414 E-0023 Visual Inspection of Initial Mandrel Test of 6” PVC Conduit for Electrical ADMIN BUILDING 23-Sep-17 2:10 PM 24-Sep-17 11:00 AM RA-819718-001-0F2 HAFEEZ DAMIAN ABAA Duct Bank 2
System at Admin Building @ Ju’aymah Shop Plant N-26

Surface Preparation & Moisture Test Inspection of GB3 Grade Beam Grid
415 C-0347 Line (B-F) (10- 12) & (B-A) (10'-11) at Admin Building Area @ J u'Aymah ADMIN BUILDING 24-Sep-17 9:30 AM 25-Sep-17 8:00 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
shops Plant N-26

Surface Preparation & Moisture Test Inspection of GB2 Grade Beam Grid
416 C-0348 line E (10-12) , (D) (10-11) (C) (10-12) 11 (C-E) 11' (B'-C) 10 (B-F) 11' (E-F) B ADMIN BUILDING 24-Sep-17 9:35 AM 25-Sep-17 8:15 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
(10-11) B' (10-11) at Admin Building Area @ Ju'Aymah shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for Telecom Duct Bank between Grid Line (4-5) (F)
417 C-0349 and 4 Nos. Columns (C1) at Grid Line ( D ) between (4-9) f rom Top Footing MAAZ LAB 24-Sep-17 9:40 AM 25-Sep-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISRAEL HENSON
to Bottom of 2nd Floor Beam at Admin Building Area, Juaymah Shops
Plant N-26. @ MAAZ LAB Racka

FOC HDD Route & Profile Inspection at West Side of New Admin Building
418 P-0024 to South Side of Security ID Office (R-82) (Crossing Pipe # 02) 2-Way (ø140 PLANT N-26 24-Sep-17 9:45 AM 25-Sep-17 8:00 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
mm Each) @ Ju'Aymah ,Shops Plant No- 26.

FOC HDD Center Line Marking Inspection at West Side of New Admin
419 P-0025 Building to South Side of Security ID Office (R-82) (Crossing Pipe # 02) 2- PLANT N-26 24-Sep-17 9:50 AM 25-Sep-17 10:00 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
Way (ø140 mm Each) @ Ju'Aymah ,Shops Plant No- 26.

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
420 C-0350 Material at Grid Line (3-10) (B'-E') @ Admin Building Area, JuAymah Shops ADMIN BUILDING 23-Sep-17 10:15 AM 25-Sep-17 7:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

421 C-0351 FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at ADMIN BUILDING 23-Sep-17 10:15 AM 25-Sep-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 4
Grid Line (3-10) (B'-E') @ Admin Building Area, JuAymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
422 C-0352 Material at Elevator Foundation at New Admin Building Area @ ADMIN BUILDING 24-Sep-17 10:15 AM 25-Sep-17 8:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Ju'Aymah ,Shops Plant N- 26 (Below Foundation of 0.60M as per
Geotechnical Report / Recommendation)

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material at


423 C-0353 Elevator Foundation at New Admin Building Area @ Ju'Aymah ,Shops ADMIN BUILDING 24-Sep-17 10:15 AM 25-Sep-17 8:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON 1
Plant N- 26 (Below Foundation of 0.60M as per Geotechnical Report /
Recommendation)

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
424 C-0354 Material at Elevator Foundation at New Admin Building Area @ ADMIN BUILDING 24-Sep-17 10:15 AM 25-Sep-17 2:45 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Ju'Aymah ,Shops Plant N- 26 (Below Foundation of 0.60M as per
Geotechnical Report / Recommendation)

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material at


425 C-0355 Elevator Foundation at New Admin Building Area @ Ju'Aymah ,Shops ADMIN BUILDING 24-Sep-17 10:15 AM 25-Sep-17 3:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON 1
Plant N- 26 (Below Foundation of 0.60M as per Geotechnical Report /
Recommendation)

Fill Placement & Compaction Inspection of Backfilling 5th (Final) Layer SHIPPING & RECEIVING
426 C-0356 Select Fill Material around Pedestal P1 at Grid line 3 (A to G) @ Shipping 24-Sep-17 3:00 PM 25-Sep-17 3:00 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON Not in QMIS
Receiving Area, JuAymah, Shops Plant N-26 AREA

FDT Compaction Inspection of Backfilling 5th (Final) Layer Select Fill SHIPPING & RECEIVING
427 C-0357 Material around Pedestal P1 at Grid line 3 (A to G) @ S hipping Receiving 24-Sep-17 3:05 PM 25-Sep-17 3:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON 4
Area, JuAymah, Shops Plant N-26 AREA

428 C-0358 FDT Compaction Inspection of Existing Sub Grde between Grid line (3 & 4) SHIPPING & RECEIVING 24-Sep-17 3:10 PM 25-Sep-17 3:30 PM RA-819990-01-0F1 QUADRI ISRAEL HENSON 6
(A to G) @ S hipping Receiving Area, JuAymah, Shops Plant N-26 AREA

Excavation & Trenching Visual Inspection of Under Ground PVC Conduit


429 E-0024 and Duct Bank for Electrical Power System Automation (PSA) of Admin ADMIN BUILDING 24-Sep-17 3:15 PM 25-Sep-17 9:30 AM RA-819718-001-0F2 HAFEEZ DAMIAN ABAA Duct Bank 2
Building between Grid Line (8-9) (E-F) @ Juaymah Shops Plant N-26

Calibration of Tracking System, Thrust Boring, Drill Mud Mixing, Pilot


430 P-0026 Drilling, Reaming, Pulling and HDPE FOC Conduit Installation (Crossing PLANT N-26 25-Sep-17 10:50 AM 26-Sep-17 10:00 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
Pipe # 02) 2-Way (ø140mm each) West Side of New Admin to S outh side
of Security ID office (R-82) @ Juaymah Shop Plant N-26

Visual Inspection for jobsite Fabricated Duct bank & Undergroung PVC
431 E-0025 Conduit Installation for Electrical Power System Automation (PSA) of ADMIN BUILDING 25-Sep-17 3:50 PM 26-Sep-17 9:30 AM RA-819718-001-0F2 HAFEEZ DAMIAN ABAA Duct Bank 2
Admin Building between Grid Line (8-9) (E-F) @ Juaymah Shops Plant N-
26

Formwork Inspection for 4 Nos. Columen at Grid Line (11) (B) C14, (11)
432 C-0359 (B') C6, Grid Line (B) (9) C1 and (A) (8') C9 @ Admin Building, Juaymah ADMIN BUILDING 25-Sep-17 2:00 PM 26-Sep-17 10:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

FBE Reinforcing Steel Inspection for 4 Nos. Columen at Grid Line (11) (B)
433 C-0360 C14, (11) (B') C6, Grid Line (B) (9) C1 and (A) (8') C9 @ Admin Building, ADMIN BUILDING 25-Sep-17 2:05 PM 26-Sep-17 10:20 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Grade & Site Preparation Inspection for Lean Concrete for Grade Beam
434 C-0361 GB-2 at Grid Line (3-8) (E-F) Admin Building Area @ J u'Aymah, Shops Plant ADMIN BUILDING 25-Sep-17 2:10 PM 26-Sep-17 2:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
N- 26

435 C-0362 Formworks Inspection for Lean Concrete of Grade Beam GB-2 at Grid Line ADMIN BUILDING 25-Sep-17 2:15 PM 26-Sep-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(3-8) (E-F ) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Lean Concrete for Grade


436 C-0363 Beam GB-2 at Grid Line (3-8) (E-F) Admin Building Area @ Ju'Aymah, ADMIN BUILDING 25-Sep-17 2:20 PM 26-Sep-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops Plant N- 26

437 C-0364 Formworks Inspection for Electrical Duct Bank at Grid Line (E-F) and ADMIN BUILDING 25-Sep-17 2:25 PM 26-Sep-17 9:00 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON Duct Bank 2
between (8-9) Admin Building Area @ Ju'Aymah, Shops Plant N- 26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
438 C-0365 Electrical Duct Bank at Grid Line (E-F) and between (8-9) Admin Building ADMIN BUILDING 25-Sep-17 2:30 PM 26-Sep-17 9:15 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON Duct Bank 2
Area @ J u'Aymah, Shops Plant N- 26

Sampling, Testing and Placement Inspection of Concrete for Electrical


439 C-0366 Duct Bank at Grid Line (E-F) and between (8-9) Admin Building Area @ ADMIN BUILDING 25-Sep-17 2:35 PM 26-Sep-17 3:15 PM RA-819718-001-0F2 ACIELO ISRAEL HENSON Duct Bank 2
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
440 C-0367 Material at Grid Line (3-10) (B'-E') @ Admin Building Area, JuAymah Shops ADMIN BUILDING 25-Sep-17 2:40 PM 26-Sep-17 10:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

441 C-0368 FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at ADMIN BUILDING 25-Sep-17 2:45 PM 26-Sep-17 10:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 5
Grid Line (3-10) (B'-E') @ Admin Building Area, JuAymah Shops Plant N-26

Coating and Final Inspection of APCS-3, Carboline at GB3 Grade Beam


442 C-0369 Grid Line (B-F) (10-12) & (B-A) (10'-11) at Admin Building Area @ ADMIN BUILDING 26-Sep-17 10:40 AM 27-Sep-17 10:00 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Ju'Aymah shops Plant N-26 (DF T)

Coating and Final Inspection of APCS-3, Carboline at GB2 Grade Beam


443 C-0370 Grid line E (10-12) (D) (10-11) (C) (10-12) 11 (C-E) 11' (B'-C) 10 (B-F ) 11' (E- ADMIN BUILDING 26-Sep-17 10:43 AM 27-Sep-17 10:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
F) B (10-11) B' (10-11) at Admin Building Area @ Ju'Aymah shops Plant N-
26 (DFT)

Formwork Inspection for 4 Nos. Columns at Grid Line (11') (F ) C16, (11')
444 C-0371 (E') C1, Grid Line (11') (D) C1 and (11') (C) C6 @ Admin Building, Juaymah ADMIN BUILDING 26-Sep-17 1:15 PM 27-Sep-17 8:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

FBE Reinforcing Steel Inspection for 4 Nos. Columns at Grid Line (11') (F )
445 C-0372 C16, (11') (E') C1, Grid Line (11') (D) C1 and (11') (C) C6 @ Admin Building, ADMIN BUILDING 26-Sep-17 1:13 PM 27-Sep-17 8:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Form Closure Inspection for 4 Nos. Columns at Grid Line (11) (B) C14, (11)
446 C-0373 (B') C6, Grid Line (B) (9) C1 and (A) (8') C9 @ Admin Building, Juaymah ADMIN BUILDING 26-Sep-17 1:15 PM 27-Sep-17 9:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


447 C-0374 Columns at Grid Line (11) (B) C14, (11) (B') C6, Grid Line (B) (9) C1 and (A) ADMIN BUILDING 26-Sep-17 1:20 PM 27-Sep-17 1:30 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(8') C9 @ Admin Building, Juaymah Shops, Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
448 C-0375 Material at Grid Line (4-8') (E'-F') @ Admin Building Area, JuAymah Shops ADMIN BUILDING 26-Sep-17 1:25 PM 27-Sep-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

449 C-0376 FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at ADMIN BUILDING 26-Sep-17 1:27 PM 27-Sep-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
Grid Line (4-8') (E'-F') @ Admin Building Area, JuAymah Shops Plant N-26

Form Closure Inspection for 4 Nos. Columns at Grid Line (11') (F) C16,
450 C-0377 (11') (E') C1, Grid Line (11') (D) C1 and (11') (C) C6 @ Admin Building, ADMIN BUILDING 27-Sep-17 12:15 PM 28-Sep-17 10:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


451 C-0378 Columns at Grid Line (11') (F) C16, (11') (E') C1, Grid Line (11') (D) C1 and ADMIN BUILDING 27-Sep-17 12:17 PM 28-Sep-17 1:30 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(11') (C) C6 @ Admin Building, J uaymah Shops, Plant N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
452 C-0379 Material at Grid Line (4-8') (E'-F') @ Admin Building Area, JuAymah Shops ADMIN BUILDING 27-Sep-17 12:20 PM 28-Sep-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

453 C-0380 FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at ADMIN BUILDING 27-Sep-17 12:25 PM 28-Sep-17 8:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
Grid Line (4-8') (E'-F') @ Admin Building Area, JuAymah Shops Plant N-26

Material Receiving Visual Inspection OF PVC Conduits Fitting, FEMALE


454 E-0026 Adaptor E942F-10 Pcs From Arabian Dunes at ETE Store @Ju'Aymah PLANT N-26 27-Sep-17 1:15 PM 28-Sep-17 9:00 AM RA-819981-001-00 HAFEEZ DAMIAN ABAA Not in QMIS
Shops Plant N-26

Material Receiving Visual Inspection for PVC Coated GRS Conduits and
455 E-0027 fittings as per MRR from Arabian Dunes at ETE Store @Ju'Aymah Shops PLANT N-26 27-Sep-17 1:20 PM 28-Sep-17 9:30 AM RA-819981-001-00 HAFEEZ DAMIAN ABAA Not in QMIS
Plant N-26

Material Receiving, Inspection of Embedded Angle Seat Frame, From


456 C-0381 Wolouf Trading Est. HDG Dimension 600 x 600 x L50 x 50 x 6T With PLANT N-26 27-Sep-17 4:45 PM 28-Sep-17 10:45 AM RA-819733-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
Anchor Rod M10 x 300 Max (Qty=01 pcs) Grating HDG 570 x 570 (QTY=01
pcs) @ ETE Laydown Ju'aymah,shops Plant N-26

Surface Preparation Inspection of Top Side Foundations 04 Nos. at Grid


457 C-0382 Line (F') (9') C8, ( F') (8) C15, (F ') (5) C15, F'(4') C8 at Admin Building Area ADMIN BUILDING 27-Sep-17 4:50 PM 28-Sep-17 11:00 AM RA-819721-001-0F2 BAQAR ISRAEL HENSON
@ J u'Aymah Shops Plant N-26

458 C-0383 FDT Compaction Inspection of Sub Grade for AHU 01 & AHU 02 NEW SUB STATION 27-Sep-17 4:52 PM 28-Sep-17 2:00 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON 2 +1
Foundations at New Sub Station @ J u'Aymah Shops Plant N-26

Preparation / Mixing and Application Inspection of Anti Termite Material


459 C-0384 for AHU 01 & AHU 02 Foundations at New Sub Station @ Ju'Aymah Shops NEW SUB STATION 27-Sep-17 4:55 PM 28-Sep-17 2:15 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON
Plant N-26

460 C-0385 Grade & Site Preparation Inspection for Lean Concrete of AHU 01 & AHU NEW SUB STATION 27-Sep-17 4:57 PM 28-Sep-17 2:45 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON
02 Foundations at New Sub Station @ Ju'Aymah Shops Plant N-26

461 C-0386 Formworks Inspection for Lean Concrete of AHU 01 & AHU 02 NEW SUB STATION 27-Sep-17 5:00 PM 28-Sep-17 3:30 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON
Foundations at New Sub Station @ J u'Aymah Shops Plant N-26

462 C-0387 Sampling, Testing and Placement Inspection of Lean Concrete for AHU 01 NEW SUB STATION 27-Sep-17 5:02 PM 28-Sep-17 4:00 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON
& AHU 02 Foundations at New Sub Station @ J u'Aymah Shops Plant N-26

Coating and Final Inspection of APCS-3, Carboline at Top Side


463 C-0388 Foundations 04 Nos. at Grid Line (F') (9') C8-F5, ( F') (8) C15-F4, (F') (5) ADMIN BUILDING 28-Sep-17 4:50 PM 30-Sep-17 10;30 RA-819721-001-0F2 BAQAR ISRAEL HENSON
C15-F4, F'(4') C8-F5 at Admin Building Area @ Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
464 C-0389 Material at Grid Line (4-8') (E'-F') @ Admin Building Area, JuAymah Shops ADMIN BUILDING 28-Sep-17 4:55 PM 30-Sep-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

465 C-0390 FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at ADMIN BUILDING 28-Sep-17 4:57 PM 30-Sep-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
Grid Line (4-8') (E'-F') @ Admin Building Area, JuAymah Shops Plant N-26

466 C-0391 Concrete Finishing and Curing Inspection of Foundation Slab at Grid Line NEW SUB STATION 1-Oct-17 9:15 AM 2-Oct-17 7:00 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
(1-3) (A-C) at New Sub Station Building @ Ju'Aymah, Shops Plant N-26

Concrete Finishing and Curing Inspection of Telcom Conduit Entrance


467 C-0392 Duct Bank to Sub Station Building at Grid Line 2 and C, @ Juaymah Shops NEW SUB STATION 1-Oct-17 9:17 AM 2-Oct-17 7:15 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
Plant N-26.

468 C-0393 Formwork Inspection of AHU 01 & AHU 02 Foundations at New Sub NEW SUB STATION 1-Oct-17 9:20 AM 2-Oct-17 8:00 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON
Station @ Ju'Aymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection of


469 C-0394 AHU 01 & AHU 02 Foundations at New Sub Station @ Ju'Aymah Shops NEW SUB STATION 1-Oct-17 9:25 AM 2-Oct-17 8:15 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON
Plant N-26

Formwork Inspection for 2 Nos. Columen at Grid Line (2) (A) C9, (3') (A)
470 C-0395 C9, @ Admin Building, J uaymah Shops, Plant N-26 ADMIN BUILDING 1-Oct-17 9:30 AM 2-Oct-17 9:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON

FBE Reinforcing Steel Inspection for 2 Nos. Columen at Grid Line (2) (A)
471 C-0396 C9, (3') (A) C9, @ Admin Building, Juaymah Shops, Plant N-26 ADMIN BUILDING 1-Oct-17 9:35 AM 2-Oct-17 9:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON

Formwork Inspection for Elevator Foundation at Grid Line (1-2) (E-F) @


472 C-0397 Admin Building, Juaymah Shops, Plant N-26 ADMIN BUILDING 1-Oct-17 9:40 AM 2-Oct-17 9:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
473 C-0398 Elevator Foundation at Grid Line (1-2) (E-F ) @ Admin Building, Juaymah ADMIN BUILDING 1-Oct-17 9:45 AM 2-Oct-17 9:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops, Plant N-26

Surface Preparation Inspection of Top Side Foundation(06 Nos.) at Grid


474 C-0399 Line (A) (11) F5, (A) (10') F6, (A) (8') F5, (B') (12) F1, (B) (11) F3 and (B') ADMIN BUILDING 1-Oct-17 10:00 AM 2-Oct-17 10:00 AM RA-819720-001-0F2 BAQAR ISRAEL HENSON
(11') F3 @ Admin Building Area, Ju'Aymah shops Plant N-26

Sampling, Testing and Placement Inspection of Concrete for Elevator


475 C-0400 Foundation at Grid Line (1-2) (E-F) @ Admin Building, Juaymah Shops, ADMIN BUILDING 1-Oct-17 11:40 AM 2-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

Form Closure Inspection for 2 Nos. Column at Grid Line (2) (A) C9, (3') (A)
476 C-0401 C9 @ Admin Building, Juaymah Shops, Plant N-26 ADMIN BUILDING 1-Oct-17 12:15 PM 2-Oct-17 10:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON

Sampling, Testing and Placement Inspection of Concrete for 2 Nos.


477 C-0402 Columns at Grid Line (2) (A) C9, (3') (A) C9, @ Admin Building, Juaymah ADMIN BUILDING 1-Oct-17 12:15 PM 2-Oct-17 1:45 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

Formwork Inspection for 1 No. Columen Foundation at Grid Line (2) (F')
478 C-0403 (C15/C15A) Inside Elevator Foundation @ Admin Building, Juaymah ADMIN BUILDING 1-Oct-17 12:20 PM 2-Oct-17 8:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for 1
479 C-0404 No. Columen Foundation at Grid Line (2) (F') (C15/C15A) Inside Elevator ADMIN BUILDING 1-Oct-17 12:25 PM 2-Oct-17 8:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Foundation @ Admin Building, J uaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 1 No. Column


480 C-0405 Foundation at Grid Line (2) (F') (C15/C15A) Inside Elevator Foundation @ ADMIN BUILDING 1-Oct-17 12:30 PM 2-Oct-17 2:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Admin Building, Juaymah Shops, Plant N-26

Formwork Inspection for 5 No. Columns at Grid Line (6) (A') C12, (7) (A')
481 C-0406 C12, (6) (A) C11, (7) (A) C11 and (5') (A) C9 @ Admin Building, Juaymah ADMIN BUILDING 1-Oct-17 12:35 PM 2-Oct-17 10:05 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

FBE Reinforcing Steel for 5 No. Columns at Grid Line (6) (A') C12, (7) (A')
482 C-0407 C12, (6) (A) C11, (7) (A) C11 and (5') (A) C9 @ Admin Building, Juaymah ADMIN BUILDING 1-Oct-17 12:40 PM 2-Oct-17 10:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops, Plant N-26

Grade & Site Preparation Inspection for Lean Concrete at Grade Bean GB-
483 C-0408 2 from Grid Line (4') (E-F), (5) (E-F), (8) (E-F ), (F') (4'-5) and (F') (8-9') @ ADMIN BUILDING 1-Oct-17 12:38 PM 2-Oct-17 10:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Admin Building, Juaymah Shops, Plant N-26

Formwork Inspection for Lean Concrete at Grade Bean GB-2 f rom Grid
484 C-0409 Line (4') (E-F), (5) (E-F), (8) (E-F), (F') (4'-5) and (F') (8-9') @ Admin ADMIN BUILDING 1-Oct-17 12:45 PM 2-Oct-17 11:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Building, Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Lean Concrete at Grade


485 C-0410 Bean GB-2 from Grid Line (4') (E-F), (5) (E-F), (8) (E-F), (F ') (4'-5) and (F') (8- ADMIN BUILDING 1-Oct-17 12:50 PM 2-Oct-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
9') @ Admin Building, Juaymah Shops, Plant N-26

486 C-0411 Sampling, Testing and Placement Inspection of Concrete for AHU 01 & NEW SUB STATION 1-Oct-17 12:55 PM 2-Oct-17 2:30 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON
AHU 02 Foundations at New Sub Station @ J u'Aymah Shops Plant N- 26

Concrete Finishing and Curing Inspection of 8 Nos. Columns at Grid Line


487 C-0412 (A) (11) C9, (10') (A-B), (10) (B-F ), (C) (10-12), (11) (B'-C), (D) (10-11), (E) ADMIN BUILDING 2-Oct-17 7:45 AM 3-Oct-17 7:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
(9-12), (11) (C-E) (10') (E-F ) and Grade Beam GB-3 at Grid Line (F) (9'-10)
at Admin Building Area, Juaymah Shops, Plant N-26

Concrete Finishing and Curing Inspection of Electrical Duct Bank at Grid


488 C-0413 Line (E-F) and between (8- 9) Admin Building Area @ Ju'Aymah, Shops ADMIN BUILDING 2-Oct-17 8:20 AM 3-Oct-17 7:15 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Plant N- 26

489 C-0414 Formwork Inspection for 3 Nos. Columns at Grid Line (10) (F) C15, (10) (E) ADMIN BUILDING 2-Oct-17 9:00 AM 3-Oct-17 8:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C5 and (9') (E) C3 @ Admin Building, Juaymah Shops, Plant N-26

490 C-0415 FBE Reinforcing Steel for 3 Nos. Columns at Grid Line (10) (F) C15, (10) (E) ADMIN BUILDING 2-Oct-17 9:05 AM 3-Oct-17 8:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C5 and (9') (E) C3 @ Admin Building, Juaymah Shops, Plant N-26

Form Closure Inspection for 5 Nos. Columns at Grid Line (6) (A') C12, (7)
491 C-0416 (A') C12, (6) (A) C11, (7) (A) C11 and (5') (A) C9 @ Admin Building, ADMIN BUILDING 2-Oct-17 9:10 AM 3-Oct-17 8:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 5 Nos.


492 C-0417 Columns at Grid Line (6) (A') C12, (7) (A') C12, (6) (A) C11, (7) (A) C11 and ADMIN BUILDING 2-Oct-17 9:15 AM 3-Oct-17 10:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(5') (A) C9 @ Admin Building, Juaymah Shops, Plant N-26

Surface Preparation Inspection of Top Side Foundation (02 Nos.) at Grid


493 C-0418 line (12) (E) F5, (12) (F) F 4 at Admin Building Area @ Ju'Aymah shops ADMIN BUILDING 2-Oct-17 11:08 AM 3-Oct-17 9:00 AM RA-819720-001-0F2 BAQAR ISRAEL HENSON
Plant N-26

Surface Preparation Inspection of Grade Beam GB3 at Outer Side Grid Line
494 C-0419 (B-F) (10-12) & (B-A) (10'-11) at Admin Building Area @ Ju'Aymah Shops ADMIN BUILDING 2-Oct-17 11:12 AM 3-Oct-17 9:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Plant N-26

Coating & Final Inspection of APCS-3, Carboline at Top Side Foundation


495 C-0420 (05 Nos.) (A) (11) F5, (A) (10') F6 , (A) (8') F5, (B') (12) F1 and (B) (11) F3 ADMIN BUILDING 2-Oct-17 11:35 AM 3-Oct-17 3:00 PM RA-819720-001-0F2 BAQAR ISRAEL HENSON
at Admin Building Area @ J u'Aymah Shops Plant N-26

Surface Preparation & Moisture Test Inspection of (10 Nos.) Precast


496 C-0421 Footings (F1) and Pedestals (P1) and (6 Nos.) Precast Footings (F2) and CAR PARKING 2-Oct-17 2:00 PM 3-Oct-17 9:15 AM RA-819945-001-0F2 BAQAR ISRAEL HENSON
Pedestals (P2) for Car Parking Area at Workshop Area @ Ju'aymah, Shops
Plant N-26

497 C-0422 Material Receiving, Inspection of Select Fill, from Al- Osais (Qty=690) @ PLANT N-26 2-Oct-17 2:05 PM 3-Oct-17 10:30 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
ETE Laydown Area, Ju'aymah Shops Plant N-26

498 C-0423 Form Closure Inspectioon for 3 Nos. Columns at Grid Line (10) (F) C15, ADMIN BUILDING 3-Oct-17 1:10 PM 4-Oct-17 9:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(10) (E) C5 and (9') (E) C3 @ Admin Building, Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 3 Nos.


499 C-0424 Columns at Grid Line (10) (F) C15, (10) (E) C5 and (9') (E) C3 @ Admin ADMIN BUILDING 3-Oct-17 1:15 PM 4-Oct-17 10:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Building, Juaymah Shops, Plant N-26

500 C-0425 Formwork Inspection for 2 Nos. Columns at Grid Line (12) (C) C16 and (11) ADMIN BUILDING 3-Oct-17 1:20 PM 4-Oct-17 9:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(C) C7 @ Admin Building, Juaymah Shops, Plant N-26

501 C-0426 FBE Reinforcing Steel Inspection for 2 Nos. Columns at Grid Line (12) (C) ADMIN BUILDING 3-Oct-17 1:25 PM 4-Oct-17 9:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C16 and (11) (C) C7 @ Admin Building, Juaymah Shops, Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
502 C-0427 Material at Grid Line (10'- 11) (A-B) and (10-12) (B-B') @ Admin Building ADMIN BUILDING 3-Oct-17 1:30 PM 4-Oct-17 10:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Area, JuAymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


503 C-0428 Grid Line (10'-11) (A-B) and (10-12) (B-B') @ Admin Building Area, ADMIN BUILDING 3-Oct-17 1:35 PM 4-Oct-17 10:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
JuAymah Shops Plant N-26

Surface Preparation & Moisture Test Inspection of Electrical Duct Bank at


504 C-0429 Grid Line (E-F) and between (8-9) at Admin Building Area @ Ju'Aymah ADMIN BUILDING 3-Oct-17 1:30 PM 4-Oct-17 8:45 AM RA-819718-001-0F2 BAQAR ISRAEL HENSON
Shops Plant N-26

Surface Preparation and Moisture Test Inspection around Foundation Slab


505 C-0430 at Grid Line (1-3) (A-C) @ New S ub Station Building, Ju'Aymah shops Plant NEW SUB STATION 3-Oct-17 1:35 PM 4-Oct-17 9:45 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON
N-26

Coating & Final Inspection of APCS-3, Carboline Inspection for (10 Nos.)
506 C-0431 Precast Footings (F1) and Pedestals (P1) and (6 Nos.) Precast Footings (F2) CAR PARKING 3-Oct-17 2:20 PM 4-Oct-17 2:15 PM RA-819948-001-0F2 BAQAR ISRAEL HENSON
and Pedestals (P2) for Car Parking Area at Workshop Area @ Ju'aymah,
Shops Plant N-26

HDD Route & Profile Inspection at West Side of New Admin Building to
507 P-0027 South Side of Security ID Office (R- 82) Crossing Pipe # 06 (4-Way : PLANT N-26 3-Oct-17 3:40 PM 4-Oct-17 8:00 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
ø225mm Each) Medium Voltage (MV) @ Ju'aymah Shops Plant N-26

HDD Center Line Marking Inspection at West Side of New Admin Building
508 P-0028 to South Side of Security ID Office (R-82) Crossing Pipe # 06 (4-Way : PLANT N-26 3-Oct-17 3:45 PM 4-Oct-17 10:00 AM RA-819460-001-0F1 FAHEEM DAMIAN ABAA
ø225mm Each) Medium Voltage (MV) @ Ju'aymah Shops Plant N-26

Surface Preparation & Moisture Test Inspection of Grade Bean GB-2 at


509 C-0432 Grid Line (B) (9-10) and (10') (A-B) at Admin Building Area @ Ju'Aymah ADMIN BUILDING 4-Oct-17 1:05 PM 5-Oct-17 8:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Shops Plant N-26

510 C-0433 Material Receiving,Inspection of Non-Shrink Grout 25 kg Bags (QTY= 60) ADMIN BUILDING 4-Oct-17 1:10 PM 5-Oct-17 9:00 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON
from CIC At ETE Laydown Store @ Ju'aymah Shops Plant N-26

Coating & Final Inspection of APCS-3, Carboline at around Foundation


511 C-0434 Slab at Grid Line (E-F) and between (8-9) at Admin Building Area @ ADMIN BUILDING 4-Oct-17 1:15 PM 5-Oct-17 10:00 AM RA-819718-001-0F2 BAQAR ISRAEL HENSON
Ju'Aymah Shops Plant N-26 (DF T)

512 C-0435 Surface Preparation & Moisture Test Inspection of Grade Bean GB-3 at ADMIN BUILDING 4-Oct-17 1:20 PM 5-Oct-17 9:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Grid Line (A) (8-10) at Admin Building Area @ Ju'Aymah Shops Plant N-26

513 C-0436 Surface Preparation Inspection of Top Side Foundation(01 No.) at Grid ADMIN BUILDING 4-Oct-17 1:25 PM 5-Oct-17 10:15 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
line (11') (F ) F 4 at Admin Building Area @ Ju'Aymah shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for Electrical Duct Bank at Grid Line (E-F) and
514 C-0437 between Grid Line (8-9) and 4 Nos. Columns (C1) at Grid Line ( C ) (4-9) ADMIN BUILDING 4-Oct-17 1:30 PM 5-Oct-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISRAEL HENSON
from Top of Footing to Bottom of Second Floor Beam at Admin Building
Area Juaymah Shops Plant N-26 @ MAAZ LAB Racka
Concrete 28 Days Compressive Strength Testing & Final Acceptance
515 C-0438 Inspection of 5000 PSi for Pre Cast 37 Nos. P1 Type Pedestal of Car CAR PARKING 4-Oct-17 1:35 PM 5-Oct-17 2:30 PM RA-819945-001-0F1 MOIZULLAH ISRAEL HENSON
Parking Shade at Pre-Cast Area in Workshop Area Juaymah Shops Plant N-
26 @ MAAZ LAB Racka

Coating & Final Inspection of APCS-3, Carboline at around Foundation


516 C-0439 Slab at Grid Line (1-3) (A-C) @ New Sub Station Building, Ju'Aymah shops NEW SUB STATION 4-Oct-17 1:40 PM 5-Oct-17 8:45 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON
Plant N-26 (DFT)

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
517 C-0440 Material at Grid Line (10'- 11) (A-B) and (10-12) (B-B') @ Admin Building ADMIN BUILDING 4-Oct-17 2:25 PM 5-Oct-17 7:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Area, JuAymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at


518 C-0441 Grid Line (10'-11) (A-B) and (10-12) (B-B') @ Admin Building Area, ADMIN BUILDING 4-Oct-17 2:27 PM 5-Oct-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
JuAymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
519 C-0442 Material at Grid Line (10'- 11) (A-B) and (10-12) (B-B') @ Admin Building ADMIN BUILDING 4-Oct-17 2:30 PM 5-Oct-17 1:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Area, JuAymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at


520 C-0443 Grid Line (10'-11) (A-B) and (10-12) (B-B') @ Admin Building Area, ADMIN BUILDING 4-Oct-17 2:35 PM 5-Oct-17 2:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
JuAymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
521 C-0444 Material at Electrical Duct Bank at Grid Line (E-F) and between (8-9) at ADMIN BUILDING 4-Oct-17 2:38 PM 5-Oct-17 8:15 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Admin Building Area @ Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


522 C-0445 Electrical Duct Bank at Grid Line (E-F) and between (8-9) at Admin ADMIN BUILDING 4-Oct-17 2:45 PM 5-Oct-17 9:15 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON 1
Building Area @ Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
523 C-0446 Material at Electrical Duct Bank at Grid Line (E-F) and between (8-9) at ADMIN BUILDING 4-Oct-17 2:48 PM 5-Oct-17 11:15 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Admin Building Area @ Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at


524 C-0447 Electrical Duct Bank at Grid Line (E-F) and between (8-9) at Admin ADMIN BUILDING 4-Oct-17 2:50 PM 5-Oct-17 11:30 AM RA-819718-001-0F2 ACIELO ISRAEL HENSON 1
Building Area @ Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
525 C-0448 Material at Electrical Duct Bank at Grid Line (E-F) and between (8-9) at ADMIN BUILDING 4-Oct-17 2:53 PM 5-Oct-17 2:15 PM RA-819718-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Admin Building Area @ Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at


526 C-0449 Electrical Duct Bank at Grid Line (E-F) and between (8-9) at Admin ADMIN BUILDING 4-Oct-17 2:55 PM 5-Oct-17 2:45 PM RA-819718-001-0F2 ACIELO ISRAEL HENSON 2 +1
Building Area @ Ju'Aymah Shops Plant N-26

Grade & Site Preparation Inspection for Lean Concrete at Grade Bean GB-
527 C-0450 2 at Grid Line (9') (E-F) and (E) (8-9') @ Admin Building, Juaymah Shops, ADMIN BUILDING 4-Oct-17 2:55 PM 5-Oct-17 3:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

528 C-0451 Formwork Inspection for Lean Concrete at Grade Bean GB-2 at Grid Line ADMIN BUILDING 4-Oct-17 2:55 PM 5-Oct-17 3:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(9') (E-F ) and (E) (8-9') @ Admin Building, Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Lean Concrete at Grade


529 C-0452 Bean GB-2 at Grid Line (9') (E-F) and (E) (8-9') @ Admin Building, Juaymah ADMIN BUILDING 4-Oct-17 2:55 PM 5-Oct-17 4:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Shops, Plant N-26

Surface Preparation & Moisture Test Inspection of(09 Nos) Precast Footing
530 C-0453 (F1) & Pedestals (P1) (12 Nos) Precast Footing (F2) & Pedestals (P1) for CAR PARKING 4-Oct-17 4:20 PM 5-Oct-17 3:00 PM RA-819948-001-0F2 BAQAR ISRAEL HENSON
Carparking Area Location Workshop Area At ju'aymah, shops, plant N-26

531 C-0454 Visual Inspection for Site Bench Mark Location Identification at New CAR PARKING 4-Oct-17 4:25 PM 5-Oct-17 11:00 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
Shaded Car Parking Area at Ju'aymah Shops Plant N-26

Soil Protection and Control, Drainage and De- Watering Inspection at New
532 C-0455 shaded Car Parking Area F2) (02 Nos) F1 (02 Nos at J u'aymah Shops Plant CAR PARKING 4-Oct-17 4:30 PM 5-Oct-17 11:45 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
N-26

Excavation,Surface Leveling and Proof Rolled Compaction Inspection of


533 C-0456 Existing Sub Grade Below Foundation of 0.60M as per Geotechnical CAR PARKING 4-Oct-17 4:33 PM 5-Oct-17 1:00 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
Report /Recommendation at New Shaded Car Parking Area (F2) (02 Nos)
F1 (02 Nos) @ ju'aymah shops plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
534 C-0457 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 4-Oct-17 4:40 PM 5-Oct-17 1:15 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
/Recommendation at New Shaded Car Parking Area(F2) (02 Nos) F1 (02
Nos) @ ju'aymah shops plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


535 C-0458 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 4-Oct-17 4:45 PM 5-Oct-17 1:45 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON 4
/Recommendation at New Shaded Car Parking Area(F2) (02 Nos) F1 (02
Nos) @ ju'aymah shops plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
536 C-0459 Material around 3 Sides (North, South and East Side) of Foundation Slab NEW SUB STATION 4-Oct-17 4:10 PM 5-Oct-17 4:15 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
at Grid Line (1-3) (A-C) @ New S ub Station Building, JuAymah Shops Plant
N-26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


537 C-0460 around 3 Sides (North, South and East Side) of Foundation Slab at Grid NEW SUB STATION 4-Oct-17 4:15 PM 5-Oct-17 4:30 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON 4
Line (1-3) (A-C) @ New Sub Station Building, J uAymah Shops Plant N-26

Calibration of Tracking System, Thrust Boring, Drill Mud Mixing, Pilot


Drilling, Reaming, Pulling and HDPE Conduit Installation(Crossing Pipe #
538 P-0029 06) 4-Way (ø 225mm each) Medium Voltage (MV) West side of New PLANT N-26 5-Oct-17 7:25 AM 7-Oct-17 8:30 AM RA-819293-026-00 FAHEEM DAMIAN ABAA
Admin to South S ide of Security ID office (R-82) @ Juaymah Shop Plant N-
26

539 C-0461 Formwork Inspection for 3 Nos. Column at Grid Line (B) (2) C16, (B) (3) C1 ADMIN BUILDING 5-Oct-17 2:00 PM 7-Oct-17 8:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
and (B) (4) C1 at Admin Building Area, JuAymah Shops Plant N-26

FBE Reinforcing Steel Inspection of 3 Nos. Column at Grid Line (B) (2) C16,
540 C-0462 (B) (3) C1 and (B) (4) C1 at Admin Building Area, J uAymah Shops Plant N- ADMIN BUILDING 5-Oct-17 2:02 PM 7-Oct-17 8:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
26

541 C-0463 Form Closure Inspection of 3 Nos. Column at Grid Line (B) (2) C16, (B) (3) ADMIN BUILDING 5-Oct-17 2:05 PM 7-Oct-17 1:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C1 and (B) (4) C1 at Admin Building Area, JuAymah Shops Plant N-26

542 C-0464 Form Closure Inspection for 2 Nos. Columns at Grid Line (12) (C) C16 and ADMIN BUILDING 5-Oct-17 2:07 PM 7-Oct-17 9:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(11) (C) C7 @ Admin Building, Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete of 2 Nos.


543 C-0465 Columns at Grid Line (12) (C) C16 and (11) (C) C7 @ Admin Building, ADMIN BUILDING 5-Oct-17 2:10 PM 7-Oct-17 3:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Sampling, Testing and Placement Inspection of Concrete of 3 Nos. Column


544 C-0466 at Grid Line (B) (2) C16, (B) (3) C1 and (B) (4) C1 at Admin Building Area, ADMIN BUILDING 5-Oct-17 2:15 PM 7-Oct-17 3:30 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
JuAymah Shops Plant N-26

Concrete Finishing and Curing Inspection of 8 Nos. Columns at Grid Line


545 C-0467 (8') (A) C9, (9) (B) C1, (B) (11) C14, (B') (11') C6, (C) (11') C6, (D) (11) C1, (E) ADMIN BUILDING 5-Oct-17 2:20 PM 7-Oct-17 7:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(11') C1 & (F) (11') C16 at Admin Building Area, JuAymah Shops Plant N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection


546 C-0300-B Formwork Inspection for Grade Beam GB-3 at Grid Line (2) (A-B), (B) (1-2) ADMIN BUILDING 5-Oct-17 2:25 PM 7-Oct-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON LBE 162
and Grade Beam GB-2 at Grid Line (3') (A-B), (5) (A- B) (8) (A-B) & (B) (2-9)
at Admin Building, Juaymah Shops, Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Sampling, Testing and Placement Inspection of Concrete for Grade Beam


GB-3 at Grid Line (2) (A-B), (B) (1-2) and Grade Beam GB- 2 at Grid Line (3')
547 C-0342-A (A-B), (5) (A-B) (8) (A-B) & (B) (2-9) at Admin Building, Juaymah Shops, ADMIN BUILDING 5-Oct-17 2:27 PM 7-Oct-17 8:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

Surface Preparation & Moisture Test Inspection of GB3 Grade Beam Grid
548 C-0468 line A (7-8) (A) (2-6), (2) (A-B), (7) (A- A'), (6) (A-A'), at Admin Building Area ADMIN BUILDING 5-Oct-17 3:00 PM 7-Oct-17 4:00 PM RA-819722-001-0F4 BAQAR ISRAEL HENSON
@ J u'Aymah shops Plant N-26

Surface Preparation & Moisture Test Inspection of GB1 Grade Beam Grid
549 C-0469 line ( A') (6-7), (A) (6-7) at Admin Building Area @ Ju'Aymah shops Plant ADMIN BUILDING 5-Oct-17 3:05 PM 7-Oct-17 4:15 PM RA-819722-001-0F4 BAQAR ISRAEL HENSON
N-26

Surface Preparation & Moisture Test Inspection of GB2 Grade Beam Grid
550 C-0470 line ( B) (2-9), (5) (A-B), (3') (A-B), (8) (A-B) at Admin Building Area @ ADMIN BUILDING 5-Oct-17 3:07 PM 7-Oct-17 4:30 PM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Ju'Aymah shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
551 C-0471 /Recommendation at New Shaded Car Parking Area(F2) (02 Nos) F1 (02 CAR PARKING 5-Oct-17 3:10 PM 7-Oct-17 1:00 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
Nos) @ ju'aymah shops plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
552 C-0472 /Recommendation at New Shaded Car Parking Area(F2) (02 Nos) F1 (02 CAR PARKING 5-Oct-17 3:12 PM 7-Oct-17 1:15 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON 4
Nos) @ ju'aymah shops plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
553 C-0473 /Recommendation at New Shaded Car Parking Area(F2) (02 Nos) F1 (02 CAR PARKING 5-Oct-17 3:15 PM 7-Oct-17 2:00 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
Nos) @ ju'aymah shops plant N-26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
554 C-0474 /Recommendation at New Shaded Car Parking Area(F2) (02 Nos) F1 (02 CAR PARKING 5-Oct-17 3:20 PM 7-Oct-17 2:15 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON 4
Nos) @ ju'aymah shops plant N-26

Soil Protection and Control, Drainage and De- Watering Inspection at New
555 C-0475 shaded Car Parking Area Grid line (2) (A & B) (F2) (02 Nos) Grid line (1) (A CAR PARKING 5-Oct-17 3:22 PM 7-Oct-17 10:00 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
& B) F1 (02 Nos ) at Ju'aymah Shops Plant N-26

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


Existing Sub Grade Below Foundation of 0.60M as per Geotechnical
556 C-0476 Report /Recommendation at New Shaded Car Parking Area Grid line (2) (A CAR PARKING 5-Oct-17 3:25 PM 7-Oct-17 2:15 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON
& B) (F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos ) ju'aymah shops plant
N-26
Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
557 C-0477 /Recommendation at New Shaded Car Parking Area Grid line (2) (A & B) CAR PARKING 5-Oct-17 3:20 PM 7-Oct-17 3:40 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos )@ ju'aymah shops plant N-
26
FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
558 C-0478 /Recommendation at New Shaded Car Parking Area Grid line (2) (A & B) CAR PARKING 5-Oct-17 3:22 PM 7-Oct-17 3:45 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON 4
(F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos )@ ju'aymah shops plant N-
26
Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
559 C-0479 Material around 3 Sides (North, South and East Side) of Foundation Slab NEW SUB STATION 5-Oct-17 3:25 PM 7-Oct-17 1:30 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
at Grid Line (1-3) (A-C) @ New S ub Station Building, JuAymah Shops Plant
N-26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


560 C-0480 around 3 Sides (North, South and East Side) of Foundation Slab at Grid NEW SUB STATION 5-Oct-17 3:30 PM 7-Oct-17 1:45 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON 4
Line (1-3) (A-C) @ New Sub Station Building, J uAymah Shops Plant N-26

Coating & Final Inspection of APCS-3, Carboline of Top side Foundation


561 C-0481 (03 Nos.) Grid line (11) (F) F4, (12) (E) F5,(12) (F) F4 at Admin Building ADMIN BUILDING 5-Oct-17 3:22 PM 7-Oct-17 9:45 AM RA-819720-001-0F2 BAQAR ISRAEL HENSON
Area at Ju'Aymah shops Plant N-26 (DFT)

Grade & Site Preparation Inspection for Lean Concrete (Grouting) at Grade
562 C-0482 Bean GB-2 from Grid Line (B) (10-11) and (B') (10-11) @ Admin Building, ADMIN BUILDING 7-Oct-17 11:20 AM 8-Oct-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Juaymah Shops, Plant N-26

Cement Based Non-S hrink Grout Surface Preparation & Final Formwork
563 C-0483 Inspection for Lean Concrete (Grouting) of Grade Beam GB-2 from Grid ADMIN BUILDING 7-Oct-17 11:25 AM 8-Oct-17 8:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Line (B) (10-11) and (B') (10-11) @ Admin Building, Juaymah Shops, Plant
N-26

Cement Based Non-S hrink Grout Mixing, Placement, Sampling, Testing,


564 C-0484 Curing and Final Inspection for Lean Concrete (Grouting)of Grade Bean ADMIN BUILDING 7-Oct-17 11:30 AM 8-Oct-17 2:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
GB-2 from Grid Line (B) (10-11) & (B') (10-11) @ Admin Building, Juaymah
Shops, Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
565 C-0485 Material at Grid Line (E- F) (11'-12) Admin Building Area @ Ju'Aymah ADMIN BUILDING 7-Oct-17 11:33 AM 8-Oct-17 1:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


566 C-0486 Grid Line (E-F) (11'-12) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 7-Oct-17 11:35 AM 8-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
26

Formwork Inspection for Grade Beam GB-3 at Grid Line (9'-4) (F-F') and
567 C-0487 Grade Beam GB-2 at Grid Line (9'-4) (E), (9') (E-F), (8) (E-F), (5) (E-F), (4') ADMIN BUILDING 7-Oct-17 12:15 PM 8-Oct-17 8:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(E-F), (F') (4'-5) and (F) (8- 8') Admin Building Area, JuAymah Shops Plant
N-26

FBE Reinforcing Steel, Embedded Items and Form Closure Inspection for
568 C-0488 Grade Beam GB-3 at Grid Line (9'-4) (F-F') and Grade Beam GB-2 at Grid ADMIN BUILDING 7-Oct-17 12:20 PM 8-Oct-17 8:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Line (9'-4) (E), (9') (E-F), (8) (E-F), (5) (E-F), (4') (E-F) (F') (4'-5) and (F) (8-8')
Admin Building Area, JuAymah Shops Plant N-26

Sampling, Testing and Placement Inspection of Concrete for Grade Beam


569 C-0489 GB-3 at Grid Line (9'-4) (F-F') and Grade Beam GB-2 at Grid Line (9'-4) (E), ADMIN BUILDING 7-Oct-17 12:25 PM 8-Oct-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(9') (E-F ), (8) (E-F), (5) (E-F), (4') (E-F) (F') (4'-5) and (F) (8-8') Admin
Building Area, JuAymah Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


570 C-0490 Inspection of 2000 PSi for Lean Concrete over Sanitary Pipe Line from MAAZ LAB 7-Oct-17 12:40 PM 8-Oct-17 10:30 AM RA-819901-001-00 MOIZULLAH ISRAEL HENSON
Mechanical Room to Main Sanitary Pipe Line at New S ub Station Building
JuAymah, Shops Plant N-26 @ MAAZ LAB

Fill Placement of Sand Backfilling Inspection for Grouting at Grade Bean


571 C-0491 GB-2 from Grid Line (B) (10-11) and (B') (10- 11) @ Admin Building, ADMIN BUILDING 7-Oct-17 4:00 PM 8-Oct-17 7:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops, Plant N-26

FDT Compaction of Sand Backfilling Inspection for Grouting at Grade Bean


572 C-0492 GB-2 from Grid Line (B) (10-11) and (B') (10- 11) @ Admin Building, ADMIN BUILDING 7-Oct-17 4:05 PM 8-Oct-17 7:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
Juaymah Shops, Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
573 C-0493 Material around 3 Sides (North, South and East Side) of Foundation Slab NEW SUB STATION 7-Oct-17 4:10 PM 8-Oct-17 2:15 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
at Grid Line (1-3) (A-C) @ New S ub Station Building, JuAymah Shops Plant
N-26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material


574 C-0494 around 3 Sides (North, South and East Side) of Foundation Slab at Grid NEW SUB STATION 7-Oct-17 4:15 PM 8-Oct-17 2:30 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON 4
Line (1-3) (A-C) @ New Sub Station Building, J uAymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
575 C-0495 /Recommendation at New Shaded Car Parking Area Grid line (2) (A & B) CAR PARKING 7-Oct-17 4:20 PM 8-Oct-17 1:00 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos )@ ju'aymah shops plant N-
26
FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
576 C-0496 /Recommendation at New Shaded Car Parking Area Grid line (2) (A & B) CAR PARKING 7-Oct-17 4:22 PM 8-Oct-17 1:45 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON 4
(F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos )@ ju'aymah shops plant N-
26
Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
577 C-0497 /Recommendation at New Shaded Car Parking Area Grid line (2) (A & B) CAR PARKING 7-Oct-17 4:25 PM 8-Oct-17 4:00 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos )@ ju'aymah shops plant N-
26
FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
578 C-0498 /Recommendation at New Shaded Car Parking Area Grid line (2) (A & B) CAR PARKING 7-Oct-17 4:30 PM 8-Oct-17 4:15 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON 4
(F2) (02 Nos) Grid line (1) (A & B) F1 (02 Nos )@ ju'aymah shops plant N-
26

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


579 C-0499 beam GB-3 Grid line (A) (8-10) at Admin Building Area @ Ju'aymah, shops, ADMIN BUILDING 8-Oct-17 1:45 PM 9-Oct-17 9:15 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
plant N-26 (DFT)

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


580 C-0500 beam GB-2 Grid line (B) (9-10) and (10) (A-B) at Admin Building Area @ ADMIN BUILDING 8-Oct-17 1:50 PM 9-Oct-17 9:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Ju'aymah, shops, plant N-26 (DFT)

Fill Placement & Compaction Inspection of Backfilling 4th (Final) Layer


581 C-0501 Select Fill Material around 3 Sides (North, South and East Side) of NEW SUB STATION 8-Oct-17 2:00 PM 9-Oct-17 2:00 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
Foundation Slab at Grid Line (1-3) (A-C) @ New Sub Station Building,
JuAymah Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th (Final) Layer Select Fill


582 C-0502 Material around 3 Sides (North, South and East Side) of Foundation Slab NEW SUB STATION 8-Oct-17 2:05 PM 9-Oct-17 2:15 PM RA-819866-001-0F1 QUADRI ISRAEL HENSON 4
at Grid Line (1-3) (A-C) @ New S ub Station Building, JuAymah Shops Plant
N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
583 C-0503 Material at Grid Line (E- F) (11'-12) Admin Building Area @ Ju'Aymah ADMIN BUILDING 8-Oct-17 2:10 PM 9-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at


584 C-0504 Grid Line (E-F) (11'-12) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 8-Oct-17 2:15 PM 9-Oct-17 1:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
585 C-0505 Material at Grid Line (8-10') (A-B) Admin Building Area @ Ju'Aymah S hops ADMIN BUILDING 8-Oct-17 2:20 PM 9-Oct-17 2:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

586 C-0506 FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at ADMIN BUILDING 8-Oct-17 2:25 PM 9-Oct-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Grid Line (8-10') (A-B) Admin Building Area @ Ju'Aymah Shops Plant N-26

Coating & Final Inspection of APCS-3, Carboline of Inspection of (09 Nos)


587 C-0507 Precast Footing (F1) and Pedestals (P1) (12 Nos) Precast Footing (F2) & CAR PARKING 8-Oct-17 2:30 PM 9-Oct-17 11:00 AM RA-819948-001-0F2 BAQAR ISRAEL HENSON
Pedestals (P1) for Car Parking Area Location Workshop Area At ju'aymah,
shops, plant N-26 Ju'aymah, shops, plant N-26 (DFT)

FDT Compaction Inspection of Sub Grade for RTR Trench from


588 C-0508 Neturalization Tank to SMH-08 New Sub Station Building Area, JuAymah NEW SUB STATION 8-Oct-17 2:35 PM 9-Oct-17 2:00 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Shops Plant N-26

Excavation, Placement and Compaction Inspection of Sand Bedding for


589 C-0509 RTR Trench from Neutralization Tank to SMH-08 @ New Substation NEW SUB STATION 8-Oct-17 2:40 PM 9-Oct-17 4:00 PM RA-819486-001-00 QUADRI ISRAEL HENSON Not in QMIS
Building Area, Juaymah Shops, Plant N-26

FDT Compaction Inspection Water Flooding for RTR Trench from


590 C-0510 Neutralization Tank to SMH-08 @ New Substation Building Area, Juaymah NEW SUB STATION 8-Oct-17 2:45 PM 9-Oct-17 4:30 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Shops, Plant N-26

Material Receiving Visual Inspection for Ground Rods 1) Copper grounding


591 E-0028 Rod 5/8 / 16mm (D) x 2.4 m (L) Brand-Furse Qty-26 Pcs 2) Copper PLANT N-26 8-Oct-17 3:00 PM 9-Oct-17 9:30 AM RA-819982-001-0F1 HAFEEZ DAMIAN ABAA
grounding rod 3/4" / 19 mm (D) x 3 m (L) Brand-Furse Qty-19 Pcs from
SESCO at ETE Store @Ju'Aymah Shops Plant N-26

Material Receiving Visual Inspection for Grounding Accessories for 1)


592 E-0029 Concrete Inspection Pit (PT005) Brand-Furse Qty-6 Pcs and 2) 'U' Bolt Rod PLANT N-26 8-Oct-17 3:05 PM 9-Oct-17 10:00 AM RA-819982-001-0F1 HAFEEZ DAMIAN ABAA
Clamp (CR705) Rod Diameter (5/8"-16mm) and (3/4"-20mm) Brand-Furse
Qty-21 Pcs from SESCO at ETE Store @Ju'Aymah Shops Plant N-26

RTR Pipes Joint and Assembly Inspection for 8" Sewer Line (25.0 M)
593 R-0005 between NT and SMH-08 at East Side of New Sub Station Building @ NEW SUB STATION 11-Oct-17 10:05 AM 12-Oct-17 3:30 PM RA-819486-001-00 JACOB ABDUL REHMAN
Ju'Aymah Shops Plant N-26

594 C-0511 FDT Compaction Inspection of Sub Grade for Sewer Trench at Male Toilet ADMIN BUILDING 9-Oct-17 10:10 AM 10-Oct-17 2:00 PM RA-819774-001-00 ACIELO ISRAEL HENSON 1
135 (Pipe Riser Part) Admin Building Area @ Ju'Aymah Shops Plant N-26

Excavation, Placement and Compaction Inspection of Sand Bedding for


595 C-0512 Sewer Trench at Male Toilet 135 (Pipe Riser Part) Admin Building Area @ ADMIN BUILDING 9-Oct-17 10:15 AM 10-Oct-17 2:15 PM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS
Ju'Aymah Shops Plant N-26

FDT Compaction Inspection Water Flooding for Sewer Trench at Male


596 C-0513 Toilet 135 (Pipe Riser Part) Admin Building Area @ Ju'Aymah Shops Plant ADMIN BUILDING 9-Oct-17 10:20 AM 10-Oct-17 3:00 PM RA-819774-001-00 ACIELO ISRAEL HENSON 1
N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
597 C-0514 Material at Grid Line (E- F) (11'-12) Admin Building Area @ Ju'Aymah ADMIN BUILDING 9-Oct-17 10:50 AM 10-Oct-17 1:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at


598 C-0515 Grid Line (E-F) (11'-12) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 9-Oct-17 10:55 AM 10-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
599 C-0516 Material at Grid Line (8-10') (A-B) Admin Building Area @ Ju'Aymah S hops ADMIN BUILDING 9-Oct-17 11:00 AM 10-Oct-17 1:35 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

600 C-0517 FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at ADMIN BUILDING 9-Oct-17 11:05 AM 10-Oct-17 1:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Grid Line (8-10') (A-B) Admin Building Area @ Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
601 C-0518 Material at Grid Line (11-12) (C-E) Admin Building Area @ Ju'Aymah ADMIN BUILDING 9-Oct-17 11:10 AM 10-Oct-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


602 C-0519 Grid Line (11-12) (C-E) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 9-Oct-17 11:15 AM 10-Oct-17 2:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
26

Concrete Finishing and Curing Inspection for 1 No. Column Foundation at


603 C-0520 Grid Line (2) (F') (C15/C15A) Inside Elevator Foundation @ Admin ADMIN BUILDING 9-Oct-17 11:20 AM 10-Oct-17 7:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Building, Juaymah Shops, Plant N-26

604 C-0521 Concrete Finishing and Curing Inspection for Elevator Foundation at Grid ADMIN BUILDING 9-Oct-17 11:25 AM 10-Oct-17 7:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Line (1-2) (E-F) @ Admin Building, Juaymah Shops, Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for for Grade Beam GB-2 at Grid Line (B) (9-11),
605 C-0522 (B') (10-11), (10') (A-B), (10) (B-F), © (10-12), (11) (B'-C), (D) (10-11), (E) MAAZ LAB 9-Oct-17 12:25 PM 10-Oct-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISRAEL HENSON
(9-12), (11) (C-E) (10') (E-F ) and Grade Beam GB-3 at Grid Line (F) (9'-10)
at Admin Building Area, Juaymah Shops, Plant N-26 @ MAAZ LAB

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


606 C-0523 beam GB-3 Grid line (A) (7-8) (A) (2-6), (2) (A-B), (7) (A-A'), (6) (A-A') at ADMIN BUILDING 9-Oct-17 12:50 PM 10-Oct-17 9:00 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Admin Building Area @ Ju'aymah, Shops Plant N-26 (DFT)

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


607 C-0524 beam GB-1, Grid line ( A') (6-7), (A) (6-7) at Admin Building Area @ ADMIN BUILDING 9-Oct-17 12:55 PM 10-Oct-17 10:00 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Ju'aymah, Shops Plant N-26 (DFT)

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


608 C-0525 Beam GB-2 Grid line ( B) (2-9), (5) (A-B), (3') (A-B), (8) (A-B) at Admin ADMIN BUILDING 9-Oct-17 1:00 PM 10-Oct-17 10:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
Building Area @ Ju'aymah, Shops Plant N-26 (DFT)

Formwork Inspection for 4 Nos. Column at Grid Line (A) (5) C10, (A) (8)
609 C-0526 C10 , (B) (5) C2 and (B) (8) C2 at Admin Building Area, JuAymah Shops ADMIN BUILDING 10-Oct-17 11:15 AM 11-Oct-17 8:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Plant N-26

FBE Reinforcing Steel Inspection of 4 Nos. Column at Grid Line (A) (5) C10,
610 C-0527 (A) (8) C10 , (B) (5) C2 and (B) (8) C2 at Admin Building Area, JuAymah ADMIN BUILDING 10-Oct-17 11:20 AM 11-Oct-17 8:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
611 C-0528 Material at Grid Line (8-10') (A-B) Admin Building Area @ Ju'Aymah S hops ADMIN BUILDING 10-Oct-17 11:25 AM 11-Oct-17 10:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

612 C-0529 FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at ADMIN BUILDING 10-Oct-17 11:27 AM 11-Oct-17 10:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Grid Line (8-10') (A-B) Admin Building Area @ Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
613 C-0530 Material at Grid Line (11-12) (C-E) Admin Building Area @ Ju'Aymah ADMIN BUILDING 10-Oct-17 11:30 AM 11-Oct-17 8:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at


614 C-0531 Grid Line (11-12) (C-E) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 10-Oct-17 11:35 AM 11-Oct-17 9:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
615 C-0532 Material at Grid Line (11-12) (C-E) Admin Building Area @ Ju'Aymah ADMIN BUILDING 10-Oct-17 11:40 AM 11-Oct-17 1:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at


616 C-0533 Grid Line (11-12) (C-E) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 10-Oct-17 11:45 AM 11-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1 +1
26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
617 C-0534 Material at Grid Line (11-12) (B'-C) Admin Building Area @ J u'Aymah ADMIN BUILDING 10-Oct-17 11:50 AM 11-Oct-17 9:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 4th Layer Select Fill Material at


618 C-0535 Grid Line (11-12) (B'- C) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 10-Oct-17 11:53 AM 11-Oct-17 10:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
619 C-0536 Material at Grid Line (11-12) (B'-C) Admin Building Area @ J u'Aymah ADMIN BUILDING 10-Oct-17 12:15 PM 11-Oct-17 11:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 5th Layer Select Fill Material at


620 C-0537 Grid Line (11-12) (B'- C) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 10-Oct-17 12:17 PM 11-Oct-17 11:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
621 C-0538 Material at Grid Line (11-12) (B'-C) Admin Building Area @ J u'Aymah ADMIN BUILDING 10-Oct-17 12:20 PM 11-Oct-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Backfilling 6th Layer Select Fill Material at


622 C-0539 Grid Line (11-12) (B'- C) Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 10-Oct-17 12:25 PM 11-Oct-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
26

Fill Placement of Sand Backfilling Inspection below Grade Bean GB-2 from
623 C-0540 Grid Line (A-B) (10'), (B-C') (11'), (C') (11-12), (11') (C-E), (11') (E-F), (10) (E- ADMIN BUILDING 10-Oct-17 12:27 PM 11-Oct-17 4:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
F), (E ) (9'-10) and (E ) (11-12) @ Admin Building, Juaymah Shops, Plant N-
26

FDT Compaction of Sand Backfilling Inspection below Grade Bean GB-2


624 C-0541 Grid Line (A-B) (10'), (B-C') (11'), (C') (11-12), (11') (C-E), (11') (E-F), (10) (E- ADMIN BUILDING 10-Oct-17 12:30 PM 11-Oct-17 4:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 8
F), (E ) (9'-10) and (E ) (11-12) @ Admin Building, Juaymah Shops, Plant N-
26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Formwork Inspection for 4 Nos. Column at Grid Line (F') (9') C8, (E) (9')
625 C-0542 C1 , (E) (8) C1 and (F') (8) C1 at Admin Building Area, J uAymah Shops ADMIN BUILDING 10-Oct-17 12:33 PM 11-Oct-17 7:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Plant N-26

FBE Reinforcing Steel Inspection of 4 Nos. Column at Grid Line (F') (9') C8,
626 C-0543 (E) (9') C1 , (E) (8) C1 and (F') (8) C1 at Admin Building Area, J uAymah ADMIN BUILDING 10-Oct-17 12:35 PM 11-Oct-17 8:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops Plant N-26

Surface Preparation Inspection of Top side Foundation (02 NOS) Grid line
627 C-0544 (12) (C) F4,(10) (F )F4 at Admin Building Area @ Ju'Aymah shops Plant N- ADMIN BUILDING 10-Oct-17 1:15 PM 11-Oct-17 9:00 AM RA-819720-001-0F2 BAQAR ISRAEL HENSON
26

Soil Protection and Control, Drainage and De- Watering Inspection at New
628 C-0545 Shaded Car Parking Area Grid Line (1) (C,D,E) (F1) (03 Nos.), Grid Line (2) CAR PARKING 10-Oct-17 1:20 PM 11-Oct-17 1:45 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(C,D,E) F2 (03 Nos.) and Grid Line (3) (C.) F2 @ Ju'aymah Shops Plant N-26

Excavation,Surface Leveling and Proof Rolled Compaction Inspection of


Existing Sub Grade Below Foundation of 0.60M as per Geotechnical
629 C-0546 Report /Recommendation at New Shaded Car Parking Area Grid line (1) CAR PARKING 10-Oct-17 1:25 PM 11-Oct-17 2:00 PM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(C,D,E) (F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos)and Grid line (3) (C.)
F2 Ju'yamah shops plant N-26

Surface Preparation and Moisture Test Inspection of Elevator Foundation


630 C-0547 (Side and Top) at Grid Line (E-F) (1-2) Admin Building Area @ Ju'Aymah ADMIN BUILDING 10-Oct-17 1:30 PM 11-Oct-17 9:15 AM RA-819721-001-0F2 BAQAR ISRAEL HENSON
shops Plant N-26

Concrete Finishing and Curing Inspection for AHU 01 & AHU 02


631 C-0548 Foundations at New Sub Station @ J u'Aymah Shops Plant N-26 NEW SUB STATION 10-Oct-17 3:20 PM 11-Oct-17 10:30 AM RA-819866-001-0F1 QUADRI ISRAEL HENSON Not in QMIS

Pre-Cast Pre-Concreting Inspection of 5 Nos. Footing Foundations Type


632 C-0549 F1, of Car Parking Area of Admin Building at Pre-Cast Area in Workshop PLANT N-26 10-Oct-17 3:25 PM 11-Oct-17 4:00 PM RA-819735-001-00 QUADRI ISRAEL HENSON
Area @ J u'Aymah, Shops Plant N- 26

633 P-0030 PVC Pipes Installation Inspection of 4" Dia for Sanitary Trench in Male ADMIN BUILDING 10-Oct-17 4:00 PM 11-Oct-17 7:30 AM RA-819774-001-00 FAHEEM ABDUL REHMAN
Toilet #135 First Floor, Admin Building @ Ju'aymah, Shops Plant N- 26

Material Receiving, Handling, Storage and Preservation Inspection of Coal


634 C-0550 Tar Epoxy APCS-3 (Bitumastic 300 M Black + Part B) (QTY=30 Kit) and PLANT N-26 11-Oct-17 1:30 PM 12-Oct-17 10:00 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON
Thinner #10,(QTY=12 Can.) From Carboline @ ETE Store, JuAymah Shops
Plant N-26

Coating & Final Inspection of APCS-3, Carboline of Elevator Foundation


635 C-0551 (Side & top) Grid line (E-F) (1-2) at Admin Building Area @ Ju'Aymah shops ADMIN BUILDING 11-Oct-17 1:33 PM 12-Oct-17 1:00 PM RA-819720-001-0F2 BAQAR ISRAEL HENSON
Plant N-26 (DFT)

Coating & Final Inspection of APCS-3, Carboline of Top side Foundation


636 C-0552 (02 NOS) Grid line (12) (C) F4,(10) (F) F4 at Admin Building Area @ ADMIN BUILDING 11-Oct-17 1:35 PM 12-Oct-17 1:30 PM RA-819720-001-0F2 BAQAR ISRAEL HENSON
Ju'Aymah shops Plant N-26 (DFT)

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
637 C-0553 /Recommendation at New Shaded Car Parking Area Grid line (1) (C,D,E) CAR PARKING 11-Oct-17 1:37 PM 12-Oct-17 10:15 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos)and Grid line (3) (C.) F2
Ju'aymah Shops Plant N-26
FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
638 C-0554 /Recommendation at New Shaded Car Parking Area Grid line (1) (C,D,E) CAR PARKING 11-Oct-17 1:40 PM 12-Oct-17 10:30 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON 7
(F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos)and Grid line (3) (C) F2
ju'aymah shops plant N-26

Form Closure Inspection of 4 Nos. Column at Grid Line (A) (5) C10, (A) (8)
639 C-0555 C10 , (B) (5) C2 and (B) (8) C2 at Admin Building Area, JuAymah Shops ADMIN BUILDING 11-Oct-17 1:30 PM 12-Oct-17 9:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


640 C-0556 Column at Grid Line (A) (5) C10, (A) (8) C10 , (B) (5) C2 and (B) (8) C2 at ADMIN BUILDING 11-Oct-17 1:30 PM 12-Oct-17 10:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Admin Building Area, JuAymah Shops Plant N-26

Form Closure Inspection of 4 Nos. Column at Grid Line (F') (9') C8, (E) (9')
641 C-0557 C1 , (E) (8) C1 and (F') (8) C1 at Admin Building Area, J uAymah Shops ADMIN BUILDING 11-Oct-17 1:35 PM 12-Oct-17 9:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Plant N-26

Sampling, Testing and Placement Inspection of Concrete for 4 Nos.


642 C-0558 Column at Grid Line (F') (9') C8, (E) (9') C1 , (E) (8) C1 and (F') (8) C1 at ADMIN BUILDING 11-Oct-17 1:40 PM 12-Oct-17 11:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Admin Building Area, JuAymah Shops Plant N-26

Formwork Inspection for 4 Nos. Column at Grid Line (F') (5) C1, (F) (4') C8 ,
643 C-0559 (E) (5) C1 and (E) (4') C1 at Admin Building Area, JuAymah Shops Plant N- ADMIN BUILDING 11-Oct-17 1:45 PM 12-Oct-17 8:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
26

FBE Reinforcing Steel Inspection of 4 Nos. Column at Grid Line (F') (5) C1,
644 C-0560 (F) (4') C8 , (E) (5) C1 and (E) (4') C1 at Admin Building Area, J uAymah ADMIN BUILDING 11-Oct-17 1:50 PM 12-Oct-17 8:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops Plant N-26

Grade & Site Preparation Inspection for Grouting at Grade Bean GB-2
645 C-0561 from Grid Line (A-B) (10') (B-C') (11'), (C') (11-12), (11') (C-E), (11') (E-F), ADMIN BUILDING 11-Oct-17 1:53 PM 12-Oct-17 10:45 AM RA-819722-001-0F4 ACIELO ABDUL REHMAN
(10) (E-F), (E ) (9'-10) and (E ) (11-12), @ Admin Building, Juaymah Shops,
Plant N-26

Cement Based Non-S hrink Grout Surface Preparation & Final Formwork
646 C-0562 Inspection of Grade Beam GB-2 from Grid Line (A-B) (10') (B-C') (11'), (C') ADMIN BUILDING 11-Oct-17 1:55 PM 12-Oct-17 11:00 AM RA-819722-001-0F4 ACIELO ABDUL REHMAN
(11-12), (11') (C-E), (11') (E-F), (10) (E-F), (E ) (9'-10) and (E ) (11-12), @
Admin Building, Juaymah Shops, Plant N-26

Cement Based Non-S hrink Grout Mixing, Placement, Sampling, Testing,


647 C-0563 Curing and Final Inspection of Grade Beam GB-2 from Grid Line (A-B) (10') ADMIN BUILDING 11-Oct-17 2:00 PM 12-Oct-17 11:15 AM RA-819722-001-0F4 ACIELO ABDUL REHMAN
(B-C') (11'), (C') (11-12), (11') (C-E), (11') (E-F), (10) (E-F), (E ) (9'-10) and
(E ) (11-12), @ Admin Building, Juaymah Shops, Plant N-26

Concrete Finishing and Curing Inspection for Columns at Grid Line (A') (2)
648 C-0564 C9, (A) (3') C9, (A) (5') C9, (A ) (6) C11, (A ) (7) C11, (A ) (6) C12, (A ) (7) ADMIN BUILDING 11-Oct-17 2:05 PM 12-Oct-17 7:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
C12, (E ) (10) C5, (E ) (9) C3 and (F ) (10) C15 @ Admin Building, Juaymah
Shops, Plant N-26

Sand Covering around and above Pipe Inspection for Sewer Trench at
649 C-0565 Male Toilet 135 (Pipe Riser Part) Admin Building Area @ Ju'Aymah Shops ADMIN BUILDING 11-Oct-17 2:10 PM 12-Oct-17 8:00 AM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS
Plant N-26

Pre-Cast Pre-Concreting Inspection Of 8 Nos.Footing Foundation Of


650 C-0566 Booster Pump Station -1 & 2 at Pre-Cast Area in Work S hop Area @ PLANT N-26 11-Oct-17 3:00 PM 12-Oct-17 8:15 AM RA-820020-001-00 QUADRI ISRAEL HENSON
Ju'Aymah Shops Plant N-26

Sampling,Testing and Placement Inspection of Pre-Cast Concrete For 5


651 C-0567 Nos Footing Foundation Type 1 Of Car Parking Area For Adim Bulding at PLANT N-26 11-Oct-17 3:05 PM 12-Oct-17 8:30 AM RA-819735-001-00 QUADRI ISRAEL HENSON
Pre-Cast Area In Work Shop Area At Ju'Aymah Shops Plant N-26

Sampling,Testing and Placement Inspection Of 8 Nos Footing Foundation


652 C-0568 Of Booster Pump Station 1 & 2 at Pre-Cast Area In Work S hop Area @ PLANT N-26 11-Oct-17 3:10 PM 12-Oct-17 9:45 AM RA-820020-001-00 QUADRI ISRAEL HENSON
Ju'Aymah Shops Plant N-26

Soil Protection and Control, Drainage and De- Watering Inspection at New
653 C-0569 shaded Car Parking Area Grid line (3) (D,E) (F2) (02 Nos), Grid line (4) (C) CAR PARKING 11-Oct-17 4:30 PM 12-Oct-17 11:30 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
F1 (01 Nos ) @ Ju'aymah Shops Plant N-26

Excavation,Surface Leveling and Proof Rolled Compaction Inspection of


Existing Sub Grade Below Foundation of 0.60M as per Geotechnical
654 C-0570 Report /Recommendation at New Shaded Car Parking Area Area Grid line CAR PARKING 11-Oct-17 4:35 PM 12-Oct-17 11:45 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(3) (D,E) (F2) (02 Nos), Grid line (4) (C) F1 (01 Nos ) @ J u'yamah shops
plant N-26

Surface Preparation Inspection of Top side Foundation (03 NOS) Grid


655 C-0571 line (2) (B) F5,(2) (A) F5 and Grid line (3) (A) F6 at Admin Building Area @ ADMIN BUILDING 12-Oct-17 1:55 PM 14-Oct-17 9:00 AM RA-819720-001-0F2 BAQAR ISRAEL HENSON
Ju'Aymah shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
656 C-0572 /Recommendation at New Shaded Car Parking Area Grid line (1) (C,D,E) CAR PARKING 12-Oct-17 2:00 PM 14-Oct-17 1:00 PM RA-819500-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos)and Grid line (3) (C.) F2
Ju'aymah Shops Plant N-26
FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
657 C-0573 /Recommendation at New Shaded Car Parking Area Grid line (1) (C,D,E) CAR PARKING 12-Oct-17 2:05 PM 14-Oct-17 1:45 PM RA-819500-001-0F1 BAQAR ISRAEL HENSON 7
(F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos)and Grid line (3) (C) F2
ju'aymah shops plant N-26
Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
658 C-0574 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 12-Oct-17 2:12 PM 14-Oct-17 2:00 PM RA-819500-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line (3) (D,E) F12
(02 Nos), Grid line (4) (C) F1 (01 No) Ju'aymah Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


659 C-0575 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 12-Oct-17 2:15 PM 14-Oct-17 2:45 PM RA-819500-001-0F1 BAQAR ISRAEL HENSON 3
/Recommendation at New Shaded Car Parking Area Grid line (3) (D,E) F12
(02 Nos), Grid line (4) (C) F1 (01 No) Ju'aymah Shops Plant N- 26

Fill placement & compaction inspection of 1st layer selectfill material


660 C-0576 around elevator foundation at gridline (1-2) (E-F) at Admin Bldg. @ ADMIN BUILDING 12-Oct-17 2:20 PM 14-Oct-17 8:45 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops Plant N26

FDT compaction inspection of 1st layer selectfill material around elevator


661 C-0577 foundation at gridline (1-2) (E-F) at Admin Bldg. @ J uaymah Shops Plant ADMIN BUILDING 12-Oct-17 2:25 PM 14-Oct-17 9:00 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON 3
N26

Fill placement & compaction inspection of 2nd layer selectfill material


662 C-0578 around elevator foundation at gridline (1-2) (E-F) at Admin Bldg. @ ADMIN BUILDING 12-Oct-17 2:30 PM 14-Oct-17 10:15 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops Plant N26

FDT compaction inspection of 2nd layer selectfill material around elevator


663 C-0579 foundation at gridline (1-2) (E-F) at Admin Bldg. @ J uaymah Shops Plant ADMIN BUILDING 12-Oct-17 2:35 PM 14-Oct-17 10:30 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON 3
N26

Fill placement & compaction inspection of 3rd layer selectfill material


664 C-0580 around elevator foundation at gridline (1-2) (E-F) at Admin Bldg. @ ADMIN BUILDING 12-Oct-17 2:40 PM 14-Oct-17 1:15 PM RA-819720-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops Plant N26

FDT compaction inspection of 3rd layer selectfill material around elevator


665 C-0581 foundation at gridline (1-2) (E-F) at Admin Bldg. @ J uaymah Shops Plant ADMIN BUILDING 12-Oct-17 2:45 PM 14-Oct-17 1:30 PM RA-819720-001-0F2 ACIELO ISRAEL HENSON 3
N26

666 C-0582 Fill placement & compaction inspection of 3rd layer selectfill material at ADMIN BUILDING 12-Oct-17 2:50 PM 14-Oct-17 9:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (1-2) (B-C) at Admin Bldg. @ Juaymah Shops Plant N26

667 C-0583 FDT compaction inspection of 3rd layer selectfill material at gridline (1-2) ADMIN BUILDING 12-Oct-17 2:55 PM 14-Oct-17 9:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
(B-C) at Admin Bldg. @ Juaymah Shops Plant N26

668 C-0584 Fill placement & compaction inspection of 4th layer selectfill material at ADMIN BUILDING 12-Oct-17 3:00 PM 14-Oct-17 9:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (B-C) at Admin Bldg. @ Juaymah Shops Plant N26

669 C-0585 FDT compaction inspection of 4th layer selectfill material at gridline (2-3) ADMIN BUILDING 12-Oct-17 3:05 PM 14-Oct-17 10:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
(B-C) at Admin Bldg. @ Juaymah Shops Plant N26

670 C-0586 Fill placement & compaction inspection of 5th layer selectfill material at ADMIN BUILDING 12-Oct-17 3:10 PM 14-Oct-17 11:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (B-C) at Admin Bldg. @ Juaymah Shops Plant N26

671 C-0587 FDT compaction inspection of 5th layer selectfill material at gridline (2-3) ADMIN BUILDING 12-Oct-17 3:15 PM 14-Oct-17 11:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
(B-C) at Admin Bldg. @ Juaymah Shops Plant N26

672 C-0588 Fill placement & compaction inspection of 6th layer selectfill material at ADMIN BUILDING 12-Oct-17 3:20 PM 14-Oct-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (B-C) at Admin Bldg. @ Juaymah Shops Plant N26

673 C-0589 FDT compaction inspection of 6th layer selectfill material at gridline (2-3) ADMIN BUILDING 12-Oct-17 3:25 PM 14-Oct-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
(B-C) at Admin Bldg. @ Juaymah Shops Plant N26

674 C-0590 Formwork inspection for 2 nos column at gridline (F') (5) C15 and (F')(8) ADMIN BUILDING 12-Oct-17 3:30 PM 14-Oct-17 8:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C15 at Admin Bldg Area,Juaymah Shops N-26

675 C-0591 FBE Reinforcing Steel, inspection for 2 nos. columns at gridline (F') (5) C15 ADMIN BUILDING 12-Oct-17 3:35 PM 14-Oct-17 8:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
and (F') (8) C15 at Admin Bldg Area,J uaymah S hops N-26

676 C-0592 FDT Compaction Inspection of Parameter For Grade On Slab at Shipping SHIPPING & RECEIVING 12-Oct-17 3:40 PM 14-Oct-17 10:00 AM RA-819992-001-0F1 QUADRI ISRAEL HENSON 8
Receiving Area @ juAymah Shops Plant N-26 AREA

677 R-0006 Gravity Test Inspection of 8"Dia RTR Sewer Line 25M Between NT to SMH- NEW SUB STATION 12-Oct-17 3:45 PM 14-Oct-17 9:00 AM RA-819486-001-00 JACOB ABDUL REHMAN
08 at East Side of New Substation Area @ Juaymah Shop Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


678 C-0593 Inspection of 2000 PSi for Lean Concrete for Grade Beam GB-3 at Grid MAAZ LAB 14-Oct-17 12:20 PM 15-Oct-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISRAEL HENSON
Line (A-B) (1-2) Admin Building Area, Ju'Aymah, Shops Plant N- 26 @
MAAZ LAB

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
679 C-0594 Material at Grid Line (2'-2) (E-F) South Side of Elevator Foundation @ ADMIN BUILDING 14-Oct-17 1:05 PM 15-Oct-17 7:45 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON
Admin Building Area, Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material at


680 C-0595 Grid Line (2'-2) (E-F) South Side of Elevator Foundation @ Admin Building ADMIN BUILDING 14-Oct-17 1:10 PM 15-Oct-17 8:00 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON 1
Area, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
681 C-0596 Material at Grid Line (2'-2) (E-F) South Side of Elevator Foundation @ ADMIN BUILDING 14-Oct-17 1:13 PM 15-Oct-17 9:15 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON
Admin Building Area, Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 5th Layer Select Fill Material at


682 C-0597 Grid Line (2'-2) (E-F) South Side of Elevator Foundation @ Admin Building ADMIN BUILDING 14-Oct-17 1:15 PM 15-Oct-17 9:30 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON 1
Area, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
683 C-0598 Material at Grid Line (2'-2) (E-F) South Side of Elevator Foundation @ ADMIN BUILDING 14-Oct-17 1:20 PM 15-Oct-17 10:45 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON
Admin Building Area, Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 6th Layer Select Fill Material at


684 C-0599 Grid Line (2'-2) (E-F) South Side of Elevator Foundation @ Admin Building ADMIN BUILDING 14-Oct-17 1:22 PM 15-Oct-17 11:00 AM RA-819720-001-0F2 ACIELO ISRAEL HENSON 1
Area, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
685 C-0600 Material at Grid Line (1-2) (C'-E) @ Admin Building Area, Ju'Aymah Shops ADMIN BUILDING 14-Oct-17 1:25 PM 15-Oct-17 8:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

686 C-0601 FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material at ADMIN BUILDING 14-Oct-17 1:30 PM 15-Oct-17 8:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1 +1
Grid Line (1-2) (C'-E) @ Admin Building Area, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
687 C-0602 Material at Grid Line (1-2) (C'-E) @ Admin Building Area, Ju'Aymah Shops ADMIN BUILDING 14-Oct-17 1:00 PM 15-Oct-17 9:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

688 C-0603 FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material at ADMIN BUILDING 14-Oct-17 1:35 PM 15-Oct-17 10:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Grid Line (1-2) (C'-E) @ Admin Building Area, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
689 C-0604 Material at Grid Line (2-3) (C'-D') @ Admin Building Area, Ju'Aymah Shops ADMIN BUILDING 14-Oct-17 1:37 PM 15-Oct-17 7:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

690 C-0605 FDT, Compaction Inspection of Backfilling 5th Layer Select Fill Material at ADMIN BUILDING 14-Oct-17 1:40 PM 15-Oct-17 7:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Grid Line (2-3) (C'-D') @ Admin Building Area, Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
691 C-0606 Material at Grid Line (2-3) (C'-D') @ Admin Building Area, Ju'Aymah Shops ADMIN BUILDING 14-Oct-17 1:45 PM 15-Oct-17 10:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Plant N-26

692 C-0607 FDT, Compaction Inspection of Backfilling 6th Layer Select Fill Material at ADMIN BUILDING 14-Oct-17 1:50 PM 15-Oct-17 10:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Grid Line (2-3) (C'-D') @ Admin Building Area, Ju'Aymah Shops Plant N-26

Form Closure inspection for 6 Nos. Columns at Grid Line (F) (5) C1, (F) (4')
693 C-0608 C8, (F') (5) C15, (F') (8) C15, (E) (5) C1 and (E) (4') C1 at Admin Building ADMIN BUILDING 14-Oct-17 1:55 PM 15-Oct-17 9:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Area, Ju'Aymah Shops N-26

Sampling, Testing and Placement Inspection of Concrete for 6 Nos.


694 C-0609 Columns at Grid Line (F) (5) C1, (F) (4') C8, (F') (5) C15, (F ') (8) C15, (E) (5) ADMIN BUILDING 14-Oct-17 2:00 PM 15-Oct-17 11:15 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C1 and (E) (4') C1 at Admin Building Area, Ju'Aymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select F ill
Material Below Foundation of 0.60M as per Geotechnical Report
695 C-0610 /Recommendation at New Shaded Car Parking Area Grid line (1) (C,D,E) CAR PARKING 14-Oct-17 3:00 PM 15-Oct-17 10:10 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON
(F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos )and Grid line (3) (C) F 2 @
ju'aymah shops plant N-26
FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
696 C-0611 /Recommendation at New Shaded Car Parking Area Grid line(1) (C,D,E) CAR PARKING 14-Oct-17 3:05 PM 15-Oct-17 10:20 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON 7
(F1) (03 Nos), Grid line (2) (C,D,E) F2 (03 Nos ) and Grid line (3) (C.) F2
@ju'aymah shops plant N-26
Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
697 C-0612 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 14-Oct-17 3:07 PM 15-Oct-17 10:40 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON
/Recommendation at New Shaded Car Parking Area Grid line (3) (D,E) (F2)
(02 Nos), Grid line (4) (C) F1 (01 Nos) @ ju'aymah shops plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


698 C-0613 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 14-Oct-17 3:10 PM 15-Oct-17 10:50 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON 3
/Recommendation at New Shaded Car Parking Area Grid line (3) (D,E) (F2)
(02 Nos), Grid line (4) (C) F1 (01 Nos) @ ju'aymah shops plant N- 26

Coating & Final Inspection of APCS-3, Carboline of Top side Foundation


699 C-0614 (03 Nos.) Grid line (2) (B) F5,(2) (A) F 5 and Grid line (3) (A) F6 at Admin ADMIN BUILDING 14-Oct-17 3:15 PM 15-Oct-17 1:05 PM RA-819721-001-0F2 BAQAR ISRAEL HENSON
Building Area @ Ju'Aymah shops Plant N-26 (DFT)

Sand Backfilling Inspection Around and Above the RTR Pipe line from
700 C-0615 Neurtralization Tank to S MH-08 @ New Substation Building NEW SUB STATION 14-Oct-17 4:10 PM 15-Oct-17 7:10 AM RA-819486-001-00 QUADRI ISRAEL HENSON
Area.Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of Sub Grade for RTR Trench for Sewer line
701 C-0616 from SMH-08 To Oil Tank @ New Substation Building Area.Ju'Aymah NEW SUB STATION 14-Oct-17 4:15 PM 15-Oct-17 8:10 AM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Shops Plant N-26

Excavation,Placement and Compaction Inspection of Sand Bedding for


702 C-0617 RTR Trench for Sewer line from SMH-08 to Oil Tank @ New Substation NEW SUB STATION 14-Oct-17 4:20 PM 15-Oct-17 9:40 AM RA-819486-001-00 QUADRI ISRAEL HENSON
Building Area.J u'Aymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FDT Compaction Inspection & Water Flooding of RTR Trench for Sewer
703 C-0618 Line from SMH-08 to Oil Tank @ New Substation Building Area.Ju'Aymah NEW SUB STATION 14-Oct-17 4:25 PM 15-Oct-17 10:20 AM RA-819486-001-00 QUADRI ISRAEL HENSON
Shops Plant N-26

Curing inspection for 5 Nos. Columns at Grid Line (B) (2) C16, (B) (3) C1,
704 C-0619 (B) (4) C1, (C') (11) C7 and (C') (12) C16 at Admin Bldg Area, Juaymah ADMIN BUILDING 15-Oct-17 1:15 PM 16-Oct-17 7:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Shops N-26

FDT INSPECTION OF SUB GRADE OF SANITARY PIPE TRENCH AT MALE


705 C-0620 TOILET 135 IN ADMIN AREA @ JU'AYMAH SHOP PLANT N-26 ADMIN BUILDING 15-Oct-17 1:22 PM 16-Oct-17 1:30 PM RA-819774-001-00 ACIELO ISRAEL HENSON 2

SAND BEDDING INSPECTION OF SANITARY PIPE TRENCH AT MALE TOILET


706 C-0621 135 IN ADMIN AREA @ JU'AYMAH SHOP PLANT N-26 ADMIN BUILDING 15-Oct-17 1:25 PM 16-Oct-17 3:00 PM RA-819774-001-00 ACIELO ISRAEL HENSON Not in QMIS

FDT AND WATER FLOODING INSPECTION OF SANITARY PIPE TRENCH AT


707 C-0622 MALE TOILET 135 IN ADMIN AREA @ JU'AYMAH SHOP PLANT N-26 ADMIN BUILDING 15-Oct-17 1:27 PM 16-Oct-17 4:00 PM RA-819774-001-00 ACIELO ISRAEL HENSON 2

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
708 C-0623 /Recommendation at New Shaded Car Parking Area Grid line (3) (D,E) (F2) CAR PARKING 15-Oct-17 1:30 PM 16-Oct-17 10:30 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
(02 Nos), Grid line (4) (C) F1 (01 Nos) @ ju'aymah shops plant N- 26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
709 C-0624 /Recommendation at New Shaded Car Parking Area Grid line (3) (D,E) CAR PARKING 15-Oct-17 1:35 PM 16-Oct-17 11:00 AM RA-819945-001-0F1 BAQAR ISRAEL HENSON 3
(F2) (02 Nos), Grid line (4) (C) F1 (01 Nos) @ ju'aymah shops plant N-26

Fill Placement & Compaction Inspection of 5th Layer Select Fill Material at
710 C-0625 Grid Line (1-2) (C-D) at Admin Bldg. @ Juaymah Shops Plant N-26 ADMIN BUILDING 15-Oct-17 1:40 PM 16-Oct-17 8:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS

711 C-0626 FDT Inspection of 5th Layer Select Fill Material at Grid Line (1-2) (C-D) at ADMIN BUILDING 15-Oct-17 1:42 PM 16-Oct-17 8:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Admin Bldg. @ J uaymah S hops Plant N-26

712 C-0627 Fill Placement & Compaction Inspection of 6th Layer Select Fill Material at ADMIN BUILDING 15-Oct-17 1:45 PM 16-Oct-17 9:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Grid Line (1-2) (C-D) at Admin Bldg. @ Juaymah Shops Plant N-26

713 C-0628 FDT Inspection of 6th Layer Select Fill Material at Grid Line (1-2) (C-D) at ADMIN BUILDING 15-Oct-17 1:48 PM 16-Oct-17 9:45 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Admin Bldg. @ J uaymah S hops Plant N-26

714 C-0629 Fill placement & compaction inspection of 3rd layer selectfill material at ADMIN BUILDING 15-Oct-17 1:55 PM 16-Oct-17 9:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (E-F) at Admin Bldg. @ Juaymah Shops Plant N26

715 C-0630 FDT inspection of 3rd layer selectfill material at gridline (2-3) (E-F) at ADMIN BUILDING 15-Oct-17 2:00 PM 16-Oct-17 9:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Admin Bldg. @ J uaymah S hops Plant N26

716 C-0631 Fill placement & compaction inspection of 4th layer selectfill material at ADMIN BUILDING 15-Oct-17 2:05 PM 16-Oct-17 10:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (E-F) at Admin Bldg. @ Juaymah Shops Plant N26

717 C-0632 FDT inspection of 4th layer selectfill material at gridline (2-3) (E-F) at ADMIN BUILDING 15-Oct-17 2:08 PM 16-Oct-17 10:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Admin Bldg. @ J uaymah S hops Plant N26

718 C-0633 Fill placement & compaction inspection of 5th layer selectfill material at ADMIN BUILDING 15-Oct-17 2:10 PM 16-Oct-17 11:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (E-F) at Admin Bldg. @ Juaymah Shops Plant N26

719 C-0634 FDT inspection of 6th layer selectfill material at grid line (2-3) (E-F) at ADMIN BUILDING 15-Oct-17 2:15 PM 16-Oct-17 11:30 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Admin Bldg. @ J uaymah S hops Plant N26

720 C-0635 Fill placement & compaction inspection of 6th layer selectfill material at ADMIN BUILDING 15-Oct-17 2:17 PM 16-Oct-17 1:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
gridline (2-3) (E-F) at Admin Bldg. @ Juaymah Shops Plant N26

721 C-0636 FDT inspection of 6th layer selectfill material at grid line (2-3) (E-F) at ADMIN BUILDING 15-Oct-17 2:20 PM 16-Oct-17 1:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 1
Admin Bldg. @ J uaymah S hops Plant N26

Site & Grade Preparation inspection for lean concrete of GB#3 at gridline
722 C-0637 (B-E) (1),(F)(2-3) and GB#2 at gridline (C')(1-3),(2)(C'-E),(3)(C-F),(D)(2- ADMIN BUILDING 15-Oct-17 2:22 PM 16-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
3),E(2-3) at Admin Bldg.Juatmah Shops N-26

Formworks inspection for lean concrete of GB#3 at gridline (B- E) (1),(F)(2-


723 C-0638 3) and GB#2 at gridline (C')(1-3),(2)(C'- E),(3)(C-F),(D)(2-3),E(2-3) at Admin ADMIN BUILDING 15-Oct-17 2:25 PM 16-Oct-17 1:35 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Bldg.Juatmah Shops N-26

Sampling ,Testing & Placement of concrete inspection for lean concrete of


724 C-0639 GB#3 at gridline (B- E) (1),(F)(2-3) and GB#2 at gridline (C')(1-3),(2)(C'- E), ADMIN BUILDING 15-Oct-17 2:30 PM 16-Oct-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
(3)(C-F),(D)(2-3),E(2-3) at Admin Bldg.Juatmah Shops N-26

Surface Preparation Inspection of Top side Foundation (07 NOS) Grid line
725 C-0640 (A) (5) F4A, (A) (5') F5, (A) (6) F2, (A) (6') F4, (A) (7) F2, (A) (7') F4,(A) (8) ADMIN BUILDING 15-Oct-17 2:35 PM 16-Oct-17 4:10 PM RA-819720-001-0F2 BAQAR ISRAEL HENSON
F4A at Admin Building Area @ Ju'Aymah shops Plant N-26

RTR pipe joint and assembly inspection for 8" RTR Sewer line 19.20 m
726 R-0007 between SMH-08 & Oily pit at North side of New Sub Station area @ NEW SUB STATION 15-Oct-17 2:40 PM 16-Oct-17 10:00 AM RA-819486-001-00 JACOB ABDUL REHMAN
Juaymah shop plant N-26

Concrete Finishing and Curing Inspection for Grade Beam GB-3 at Grid
727 C-0641 Line (9'-4) (F-F') and Grade Beam GB-2 at Grid Line (9'-4) (E), (9') (E-F), (8) ADMIN BUILDING 16-Oct-17 11:45 AM 17-Oct-17 7:00 AM RA-819722-001-F4 ACIELO ISRAEL HENSON Not in QMIS
(E-F), (5) (E-F), (4') (E-F) (F') (4'-5) and (F) (8-8') Admin Building Area,
JuAymah Shops Plant N-26

Fill Placement & Compaction Inspection of 4th Layer Select Fill Material
728 C-0642 Backfil at Grid Line (2-5) (A-B) at Admin Building @ Juaymah Shops Plant ADMIN BUILDING 16-Oct-17 11:48 AM 17-Oct-17 1:15 PM RA-819722-001-F4 ACIELO ISRAEL HENSON Not in QMIS
N-26

729 C-0643 FDT Compaction Inspection of 4th layer Select Fill Material Backfilling at ADMIN BUILDING 16-Oct-17 12:10 PM 17-Oct-17 1:30 PM RA-819722-001-F4 ACIELO ISRAEL HENSON 2
Grid Line (2-5) (A-B) at Admin Building @ Juaymah Shops Plant N-26

Fill Placement & Compaction Inspection of 5th Layer Select Fill Material
730 C-0644 Backfil at Grid Line (2-5) (A-B) at Admin Building @ Juaymah Shops Plant ADMIN BUILDING 16-Oct-17 12:15 PM 17-Oct-17 2:45 PM RA-819722-001-F4 ACIELO ISRAEL HENSON Not in QMIS
N-26

731 C-0645 FDT Compaction Inspection of 5th layer Select Fill Material Backfilling at ADMIN BUILDING 16-Oct-17 12:18 PM 17-Oct-17 3:00 PM RA-819722-001-F4 ACIELO ISRAEL HENSON 2
Grid Line (2-5) (A-B) at Admin Building @ Juaymah Shops Plant N-26

Fill Placement &compaction Inspection of Backfilling 1st Layer Select


732 C-0646 Material for above the RTR Pipe line from Neurtralization Tank to SMH- NEW SUB STATION 16-Oct-17 12:15 PM 17-Oct-17 2:00 PM RA-819486-001-00 QUADRI ISRAEL HENSON Not in QMIS
08 @ New Substation Building Area. Ju'Aymah Shops Plant N-26

FDT Compaction Inspection Of Backfilling 1st Layer Select Material for


733 C-0647 above the RTR Pipe line from Neurtralization Tank to SMH-08 @ New NEW SUB STATION 16-Oct-17 12:18 PM 17-Oct-17 2:30 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Substation Building Area. Ju'Aymah Shops Plant N-26

734 R-0008 Gravity test inspection for 8" RTR Sewer line 19.20 m between SMH-08 to NEW SUB STATION 16-Oct-17 12:30 PM 17-Oct-17 9:00 AM RA-819486-001-00 JACOB ABDUL REHMAN
Oily pit at north side of New Sub Station area @ Juaymah shop plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


735 C-0648 Inspection of 4000 PSi for Lean Concrete for Grade Beam GB-2at Grid Line MAAZ LAB 17-Oct-17 9:00 AM 18-Oct-17 2:00 PM RA-819722-001-F4 MOIZULLAH ISRAEL HENSON
(B) (3- 9) Admin Building Area @ Ju'Aymah, Shops Plant N- 26 @ MAAZ
LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


736 C-0649 Inspection of 4000 PSi for Foundation Slab at Grid Line (1-3) (A-C) at New MAAZ LAB 17-Oct-17 9:05 AM 18-Oct-17 2:30 PM RA-819866-001-0F1 MOIZULLAH ISRAEL HENSON
Sub Station Building Ju'Aymah, Shops Plant N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


737 C-0650 Inspection of 4000 PSi for Concrete of Telcom Conduit Entrance Duct Bank MAAZ LAB 17-Oct-17 9:10 AM 18-Oct-17 3:00 PM RA-819866-001-0F1 MOIZULLAH ISRAEL HENSON
to Sub Station Building at Grid Line 2 and C, Juaymah Shops Plant N-26.
@ MAAZ LAB

Fill Placement & Compaction Inspection of 6th Layer Select Fill Material
738 C-0651 Backfill at Grid Line (2-5) (A-B) at Admin Building @ Juaymah Shops Plant ADMIN BUILDING 17-Oct-17 10:05 AM 18-Oct-17 1:15 PM RA-819722-001-F4 ACIELO ISRAEL HENSON Not in QMIS
N-26

739 C-0652 FDT Compaction Inspection of 6th layer Select Fill Material Backfilling at ADMIN BUILDING 17-Oct-17 10:10 AM 18-Oct-17 1:30 PM RA-819722-001-F4 ACIELO ISRAEL HENSON 2
Grid Line (2-5) (A-B) at Admin Building @ Juaymah Shops Plant N-26

Fill Placement & Compaction Inspection of 7th Layer (Final Layer) Select
740 C-0653 Fill Material Backfilling at Grid Line (11-12) (C-E) at Admin Building @ ADMIN BUILDING 17-Oct-17 10:12 AM 18-Oct-17 2:00 PM RA-819722-001-F4 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops Plant N-26

FDT Compaction Inspection of 7th Layer (F inal Layer) Select Fill Material
741 C-0654 Backfilling at Grid Line (11-12) (C-E) including Thickenings Area at Admin ADMIN BUILDING 17-Oct-17 10:15 AM 18-Oct-17 2:15 PM RA-819722-001-F4 ACIELO ISRAEL HENSON 3
Building @ Juaymah Shops Plant N-26

Formworks Inspection for Elevator Shear Wall from Top of Footing to FFL
742 C-0655 at Grid Line (E-F) (1-2) at Admin Building Area @ Ju'Aymah Shops Plant N- ADMIN BUILDING 17-Oct-17 10:20 AM 18-Oct-17 2:30 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
26

FBE Reinforcing Steel, inspection for Elevator Shear Wall from Top of
743 C-0656 Footing to FFL at Grid Line (E-F) (1-2) at Admin Building Area @ Ju'Aymah ADMIN BUILDING 17-Oct-17 10:25 AM 18-Oct-17 2:45 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
Shops Plant N-26

Fill Placement &compaction Inspection of Backfilling 2nd Layer Select


744 C-0657 Material for above the RTR Pipe line from Neurtralization Tank to SMH- NEW SUB STATION 17-Oct-17 2:15 PM 18-Oct-17 3:15 PM RA-819486-001-00 QUADRI ISRAEL HENSON Not in QMIS
08 @ New Substation Building Area. Ju'Aymah Shops Plant N-26

FDT Compaction Inspection Of Backfilling 2nd Layer Select Material for


745 C-0658 above the RTR Pipe line from Neurtralization Tank to SMH-08 @ New NEW SUB STATION 17-Oct-17 2:20 PM 18-Oct-17 3:30 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Substation Building Area. Ju'Aymah Shops Plant N-26

PVC Pipes Installation & Inspection of 6",4",3" & 2" Dia for Sanitary Trench
746 P-0031 in Male Toilet # 135 First Floor, Admin Building @ Ju'aymah, Shops Plant ADMIN BUILDING 17-Oct-17 2:30 PM 18-Oct-17 9:30 AM RA-819774-001-00 FAHEEM ABDUL REHMAN
N- 26.

Sand Backfilling Inspection Around and Above the RTR Pipe line for Sewer
747 C-0659 line from SMH-08 to Oil Tank @ New Substation Building Area.Ju'Aymah NEW SUB STATION 18-Oct-17 2:15 PM 19-Oct-17 10:30 AM RA-819486-001-00 QUADRI ISRAEL HENSON Not in QMIS
Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


748 C-0660 Inspection of 4000 PSi for 4 Nos. Columns at Grid Line (A) (10' & 11) C9, MAAZ LAB 19-Oct-17 8:30 AM 21-Oct-17 10:00 AM RA-819721-001-F2 MOIZULLAH ISRAEL HENSON
Grid Line (B) (10') C1 , and Grid Line (B') (12) C15 at Admin Building,
Juaymah Shops, Plant N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


749 C-0661 Inspection of 2000 PSi for Lean Concrete for Grade Beam GB-2 at Grid MAAZ LAB 19-Oct-17 8:35 AM 21-Oct-17 10:30 AM RA-819722-001-F4 MOIZULLAH ISRAEL HENSON
Line (3) (A-B), (5) (A-B), (8) (A-B) and (B) (2-3) and Grade Beam GB-1, Grid
Line (6-7) (A-A') Admin Building, Juaymah Shops, Plant N-26 @ MAAZ LAB

Concrete Finishing and Curing Inspection for 8 Nos. Columns at Grid Line
750 C-0662 (F') (9') C8, (E) (9') C1 , (E) (8) C1 , (F') (8) C1 and Grid Line (A) (5) C10, (A) ADMIN BUILDING 19-Oct-17 9:15 AM 21-Oct-17 7:00 AM RA-819721-001-F2 ACIELO ISRAEL HENSON Not in QMIS
(8) C10 , (B) (5) C2 and (B) (8) C2 at Admin Building Area, Juaymah Shops
N-26

Formwork inspection for Grade Beam # 03 at Grid Line (1) (B- E), (F) (4-2)
751 C-0663 and Grade Beam # 02 at Grid Line (3) (B-F ), (2) (B-E), (C') (1-3), (D) (2-3) ADMIN BUILDING 19-Oct-17 11:00 AM 21-Oct-17 10:00 AM RA-819722-001-F4 ACIELO ISRAEL HENSON
and E (2-4) at Admin Bldg. Juay mah Shops Plant N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for
752 C-0664 Grade Beam #03 at Grid Line (1) (B-E), (F) (4-2) and Grade Beam #02 at ADMIN BUILDING 19-Oct-17 11:05 AM 21-Oct-17 10:15 AM RA-819722-001-F4 ACIELO ISRAEL HENSON
Grid Line (3) (B-F), (2) (B-E), (C') (1-3), (D) (2-3), E(2-4) at Admin Building
@ J uaymah S hops Plant N-26

Sampling,Testing & Placement Inspection of Concrete for Grade Beam #


753 C-0665 03 at Grid Line (1) (B-E), (F) (4-2) and Grade Beam # 02 at Grid Line (3) (B- ADMIN BUILDING 19-Oct-17 11:10 AM 21-Oct-17 3:30 PM RA-819722-001-F4 ACIELO ISRAEL HENSON
F), (2) (B-E), (C') (1-3), (D) (2-3), E(2-4) at Admin Building @ Juaymah
Shops Plant N-26

754 C-0666 Formclosure inspection for Elevator Shear Wall (from top of footing to FFL ADMIN BUILDING 19-Oct-17 11:15 AM 21-Oct-17 10:30 AM RA-819721-001-F2 ACIELO ISRAEL HENSON
elevation) at gridline (E-F) (1-2) at Admin Bldg Area,Juaymah Shops, N-26

Sampling ,Testing & Placement inspection for for Elevator Shear Wall
755 C-0667 (from top of footing to FFL elevation) at gridline (E-F) (1-2) at Admin Bldg ADMIN BUILDING 19-Oct-17 11:20 AM 21-Oct-17 4:00 PM RA-819721-001-F2 ACIELO ISRAEL HENSON
Area,Juaymah Shops N-26

Preparation / Mixing and Application Inspection of Anti Termite Material


756 C-0668 at Grid Line (C'-E) (11-12) Admin Building Area @ Ju'Aymah Shops Plant ADMIN BUILDING 19-Oct-17 11:30 AM 21-Oct-17 7:30 AM RA-819721-001-F2 ACIELO ISRAEL HENSON
N-26

Coating & Final Inspection of APCS-3, Carboline of Inspection for Top side
757 C-0669 Foundation (07 NOS ) Grid line (A) (5) F4A, (A) (5') F5, (A) (6) F2, (A) (6') ADMIN BUILDING 19-Oct-17 11:35 AM 21-Oct-17 9:00 AM RA-819720-001-0F2 BAQAR ISRAEL HENSON
F4, (A) (7) F2, (A) (7') F4,(A) (8) F4A at Admin Building Area @ Ju'Aymah
shops Plant N-26 (DFT)

Surface Preparation & Moisture Test Inspection of Grade Beam (GB2) Grid
758 C-0670 line (4 to 10) (E). (4') (E to F),(5) (E to F),(8) (E to F ),(9') (E to F),(F') (8 to 9') ADMIN BUILDING 19-Oct-17 11:40 AM 21-Oct-17 9:15 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
(F') (4' to 5) at Admin Building Area @ Ju'Aymah shops Plant N-26

759 C-0671 Surface Preparation & Moisture Test Inspection of Grade Beam (GB3) Grid ADMIN BUILDING 19-Oct-17 11:45 AM 21-Oct-17 9:30 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
line (4 to10) (F). at Admin Building Area @ Ju'Aymah shops Plant N-26

Pre Cast Concrete Sand Bedding, Erection and Alignment Inspection of car
760 C-0672 parking Foundation Grid line (1) (A-E) , (2) (A-E) , (3) (A-E) , (4) (A-C) @ ADMIN BUILDING 19-Oct-17 11:50 AM 21-Oct-17 9:45 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
JuAymah, Shops Plant N-26.

Concrete Finishing and Curing Inspection for Pre-Cast Concrete For 5 Nos
761 C-0673 Footing Foundation Type 1 Of Car Parking Area For Adim Bulding at Pre- ADMIN BUILDING 19-Oct-17 12:55 PM 21-Oct-17 7:30 AM RA-819735-001-00 QUADRI ISRAEL HENSON Not in QMIS
Cast Area In Work S hop Area At Ju'Ay mah Shops Plant N-26

Concrete Finishing and Curing Inspection for 8 Nos Footing Foundation Of


762 C-0674 Booster Pump Station 1 & 2 at Pre-Cast Area In Work Shop Area @ ADMIN BUILDING 19-Oct-17 1:00 PM 21-Oct-17 7:45 AM RA-820020-001-00 QUADRI ISRAEL HENSON Not in QMIS
Ju'Aymah Shops Plant N-26

Pre Cast Pre Concreting Inspection of 5 Nos. P1 Type Pedestal of Car


763 C-0675 Parking Shade of Admin Building at Pre Cast Area in Workshop Area @ @ ADMIN BUILDING 19-Oct-17 1:05 PM 21-Oct-17 8:00 AM RA-819735-001-00 QUADRI ISRAEL HENSON
Ju'Aymah Shops Plant N-26

Pre Cast Pre Concreting Embedded Items Inspection of 5 Nos. P1 Type


764 C-0676 Pedestal of Car Parking Shade of Admin Building at Pre Cast Area in ADMIN BUILDING 19-Oct-17 1:10 PM 21-Oct-17 8:30 AM RA-820020-001-00 QUADRI ISRAEL HENSON
Workshop Area @ @ Ju'Aymah Shops Plant N-26

Pre-Cast Pre-Concreting Inspection of 5 Nos. P1 Type Pedestal of Car


765 C-0677 Parking Shade of Admin Building at Pre Cast Area in Workshop Area @ @ ADMIN BUILDING 19-Oct-17 1:15 PM 21-Oct-17 9:00 AM RA-819735-001-00 QUADRI ISRAEL HENSON
Ju'Aymah Shops Plant N-26

Pre-Cast Pre-Concreting Inspection of 08 Nos Pedestal of Booster Pump


766 C-0678 Station 1 & 2 at Pre-Cast Area in Workshop Area @ @ Ju'Aymah Shops ADMIN BUILDING 19-Oct-17 1:20 PM 21-Oct-17 3:30 PM RA-820020-001-00 QUADRI ISRAEL HENSON
Plant N-26

Pre-Cast Concrete Sampling,Testing & Placement Inspection of 08 Nos Correct description


767 C-0679 Pedestal of Booster Pump Station 1 & 2 at Pre-Cast Area in Workshop ADMIN BUILDING 19-Oct-17 1:25 PM 21-Oct-17 4:00 PM RA-820020-001-00 QUADRI ISRAEL HENSON of this RFI is cover
Area @ in RFI # C-0760

Pre-Cast Concrete Sampling,Testing & Placement Inspection of 5 Nos. P1


768 C-0680 Type Pedestal of Admin Bldg. of Car Parking Shade at pre-Cast Area in ADMIN BUILDING 19-Oct-17 1:30 PM 21-Oct-17 4:30 PM RA-819735-001-00 QUADRI ISRAEL HENSON
Workshop Area@ Ju'Aymah, Shops Plant N- 26

769 C-0681 Site & Grade Preparation inspection for slab on grade at gridline (C-E) ADMIN BUILDING 19-Oct-17 1:35 PM 21-Oct-17 2:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
((11-12) at Admin Bldg.Juatmah Shops N-26

770 C-0682 Formworks inspection for slab on grade at gridline (C-E) ((11-12) at ADMIN BUILDING 19-Oct-17 1:40 PM 21-Oct-17 2:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
Admin Bldg.Juatmah Shops N-26

771 C-0683 FBE Rebars,Embedded items & Formclosure inspection for slab on grade ADMIN BUILDING 19-Oct-17 1:45 PM 21-Oct-17 2:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
at gridline (C-E)(11-12) at Admin Bldg.Juatmah Shops N-26

772 C-0684 Sampling, Testing and Placement Inspection of Concrete for Slab on grade ADMIN BUILDING 21-Oct-17 1:50 PM 22-Oct-17 8:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON
at gridline (C-E)(11-12) at Admin Bldg.Juatmah Shops N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for 4 Nos. Columen at Grid Line (12) (E) C16, (12)
(F) C15, Grid Line (C) (10) C1 and (D) (10) C1 Beam GB-3 at Grid Line (4-8)
773 C-0685 (F-F'), GB-3 at Grid Line (2) (A-B), (B) (1-2) and GB-2 at Grid Line (3') (A-B), MAAZ LAB 21-Oct-17 1:55 PM 22-Oct-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISRAEL HENSON
(5) (A-B) (8) (A-B) & (B) (2-9), GB-3 East S ide from Grid Line (A) (2-6) & (7-
8) at Admin Building, Juaymah Shops, Plant N-26 @ MAAZ LAB

Fill Placement &compaction Inspection of Backfilling 3rd Layer Select


774 C-0686 Material for above the RTR Pipe line from Neurtralization Tank to SMH- NEW SUB STATION 21-Oct-17 1:58 PM 22-Oct-17 3:00 PM RA-819486-001-00 QUADRI ISRAEL HENSON
08 @ New Substation Building Area. Ju'Aymah Shops Plant N-26

FDT Compaction Inspection Of Backfilling 3rd Layer Select Material for


775 C-0687 above the RTR Pipe line from Neurtralization Tank to SMH-08 @ New NEW SUB STATION 21-Oct-17 2:05 PM 22-Oct-17 3:15 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Substation Building Area. Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st layer Select Fill
776 C-0688 Material For Above RTR Trench for Sewer line From SM-08 to Oil Tank@ NEW SUB STATION 21-Oct-17 2:10 PM 22-Oct-17 3:30 PM RA-819486-001-00 QUADRI ISRAEL HENSON
New Substation Building Area @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st layer Select Fill Material For
777 C-0689 Above RTR Trench for Sewer line From SM-08 to Oil Tank@ New NEW SUB STATION 21-Oct-17 10:12 AM 22-Oct-17 3:45 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Substation Building Area @ Ju'Aymah, Shops Plant N- 26

778 P-0032 Sewer Gravity test for PVC Pipes and fittings for Male Toilet # 135 (First ADMIN BUILDING 21-Oct-17 10:00 AM 22-Oct-17 8:00 AM RA-819774-001-00 FAHEEM ABDUL REHMAN
Floor) in New Admin Building @ Ju'aymah Shops Plant N-26

Fill placement & compaction inspection of 4th layer selectfill material at


779 C-0690 gridline (5-8) (A-B) and (6-7) (A- A') at Admin Bldg. @ Juaymah Shops Plant ADMIN BUILDING 22-Oct-17 1:10 PM 23-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON
N26

780 C-0691 FDT inspection of 4th layer selectfill material at gridline (5-8) (A-B) and (6- ADMIN BUILDING 22-Oct-17 1:15 PM 23-Oct-17 1:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
7) (A-A') at Admin Bldg. @ Juaymah Shops Plant N26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Fill Placement & Compaction Inspection of Backfilling 2nd layer Select Fill
781 C-0692 Material For Above RTR Trench for Sewer line From SM-08 to Oil Tank@ NEW SUB STATION 22-Oct-17 1:20 PM 23-Oct-17 3:30 PM RA-819486-001-00 QUADRI ISRAEL HENSON
New Substation Building Area @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd layer Select Fill Material For
782 C-0693 Above RTR Trench for Sewer line From SM-08 to Oil Tank@ New NEW SUB STATION 22-Oct-17 1:25 PM 23-Oct-17 3:45 PM RA-819486-001-00 QUADRI ISRAEL HENSON 2
Substation Building Area @ Ju'Aymah, Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for Lean Concrete for Elevator Area at Grid Line (E-
783 C-0694 F) (1-2), Lean Concrete for Grade Beam GB-2 at Grid Line (3-8) (E-F) and MAAZ LAB 23-Oct-17 9:00 AM 24-Oct-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISRAEL HENSON
Electrical Duct Bank at Grid Line (E-F) between (8-9) in Admin Building
Area, JuAymah Shops Plant N-26 @ MAAZ Lab

Fill placement & compaction inspection of 5th layer selectfill material at


784 C-0695 gridline (5-8) (A-B) and (6-7) (A- A') at Admin Bldg. @ Juaymah Shops Plant ADMIN BUILDING 23-Oct-17 11:15 AM 24-Oct-17 11:00 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
N26

FDT inspection of 5th layer selectfill material at gridline (5-8) (A-B) and (6-
785 C-0696 7) (A-A') at Admin Bldg. @ Juaymah Shops Plant N26 ADMIN BUILDING 23-Oct-17 11:20 AM 24-Oct-17 11:15 AM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2

Fill placement & compaction inspection of 6th layer selectfill material at


786 C-0697 gridline (5-8) (A-B) and (6-7) (A- A') at Admin Bldg. @ Juaymah Shops Plant ADMIN BUILDING 23-Oct-17 11:25 AM 24-Oct-17 3:00 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
N26

FDT inspection of 6th layer selectfill material at gridline (5-8) (A-B) and (6-
787 C-0698 7) (A-A') at Admin Bldg. @ Juaymah Shops Plant N26 ADMIN BUILDING 23-Oct-17 11:30 AM 24-Oct-17 3:15 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2

FDT Compaction Inspection of Sub Grade for Sewer Trench at Mechanical


788 C-0699 Room (1st Floor) (Balance Part) at Admin Building @ Juaymah Shops Plant ADMIN BUILDING 23-Oct-17 2:10 PM 24-Oct-17 11:30 AM RA-819745-001-00 ACIELO ISRAEL HENSON 1
N-26

Sand Bedding and Placement Inspection of Sub Grade for Sewer Trench at
789 C-0700 Mechanical Room (1st Floor) (Balance Part) at Admin Building @ Juaymah ADMIN BUILDING 23-Oct-17 2:15 PM 24-Oct-17 1:30 PM RA-819745-001-00 ACIELO ISRAEL HENSON Not in QMIS
Shops Plant N-26

FDT Compaction Inspection of Sand Bedding for S ewer Trench at


790 C-0701 Mechanical Room (1st Floor) (Balance Part) at Admin Building @ Juaymah ADMIN BUILDING 23-Oct-17 2:20 PM 24-Oct-17 1:45 PM RA-819745-001-00 ACIELO ISRAEL HENSON 1
Shops Plant N-26

Sand Backfilling Inspection Around and Above at Sewer Pipe Trench at


791 C-0702 Male Toilet # 135 (1st Floor) at Admin Building @ Juaymah Shops Plant N- ADMIN BUILDING 23-Oct-17 2:25 PM 24-Oct-17 8:00 AM RA-819745-001-00 ACIELO ISRAEL HENSON Not in QMIS
26

792 C-0703 Material Receiving Inspection of FBE wire mesh Size 100 x100 x 6 x 6 MM PLANT N-26 23-Oct-17 4:30 PM 24-Oct-17 9:00 AM RA-819992-001-0F1 BAQAR ISRAEL HENSON
2.40 x 4.80 from BRC Industries @ ETE Store, J uAymah Shops Plant N-26

793 C-0704 Material Handling, Storage and Presevation Inspection of FBE wire mesh PLANT N-26 23-Oct-17 4:35 PM 24-Oct-17 9:15 AM RA-819992-001-0F1 BAQAR ISRAEL HENSON Not in QMIS
@ ETE Store, JuAymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


794 C-0705 Inspection of 4000 PSi for 4 Nos. Columns at Grid Line (11) (B) C14, (11) MAAZ LAB 24-Oct-17 7:00 AM 25-Oct-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISRAEL HENSON
(B') C6, Grid Line (B) (9) C1 and (A) (8') C9 at Admin Building Area,
Juaymah Shops, Plant N-26 @ MAAZ Lab.

FDT inspection for subgrade for sewer trench from male toilet#135 to
795 C-0706 SMH#13 to LUP fence and from coffee room(outer connection) and ADMIN BUILDING 24-Oct-17 1:15 PM 25-Oct-17 7:30 AM RA-819489-001-00 ACIELO ISRAEL HENSON 4
toilet#116 to SMH #11 at Admin Bldg. @ Juaymah Shops Plant N26

Sand bedding inspection for sewer trench from male toilet#135 to


796 C-0707 SMH#13 to LUP fence and from coffee room(outer connection) and ADMIN BUILDING 24-Oct-17 1:20 PM 25-Oct-17 8:30 AM RA-819489-001-00 ACIELO ISRAEL HENSON Not in QMIS
toilet#116 to SMH #11 at Admin Bldg. @ Juaymah Shops Plant N26

FDT inspection for sand bedding of sewer trench from male toilet#135 to
797 C-0708 SMH#13 to LUP fence and from coffee room(outer connection) and ADMIN BUILDING 24-Oct-17 1:25 PM 25-Oct-17 8:45 AM RA-819489-001-00 ACIELO ISRAEL HENSON 4
toilet#116 to SMH #11 at Admin Bldg. @ Juaymah Shops Plant N26

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


798 C-0709 Beam (GB2) Grid line (4 to 10) (E)(4') (E to F),(5) (E to F),(8) (E to F),(9') (E ADMIN BUILDING 24-Oct-17 1:30 PM 25-Oct-17 11:00 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
to F),(F') (8 to 9') (F') (4' to 5) at Admin Building Area @ Ju'Aymah shops
Plant N-26 (DFT)

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


799 C-0710 Beam (GB3) Grid line (4 to10) (F) at Admin Building Area @ Ju'Aymah ADMIN BUILDING 24-Oct-17 1:35 PM 25-Oct-17 10:45 AM RA-819722-001-0F4 BAQAR ISRAEL HENSON
shops Plant N-26 (DFT)

Formwork inspection for 10 nos column at gridline (3)(C)C1,(3)(D)C1,(3)


800 C-0711 (E)C8,(3)(F)C15,(2)(F)C15, (2)(D) C4, (2)(C)C3,(1)(B)C13,(1)C')C16,(1) ADMIN BUILDING 24-Oct-17 1:40 PM 25-Oct-17 10:30 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(D)C17at Admin Bldg Area,Juaymah Shops N-26

FBE S teel inspection for 10 nos column at gridline (3)(C)C1,(3)(D)C1, (3)


801 C-0712 (E)C8,(3)(F)C15,(2)(F)C15,(2)(D) C4, (2)(C)C3,(1)(B)C13,(1)C')C16,(1)(D)C17 ADMIN BUILDING 24-Oct-17 1:45 PM 25-Oct-17 10:45 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
at Admin Bldg Area,Juaymah Shops N-26

Preparation / Mixing and Application Inspection of Anti Termite Material SHIPPING & RECEIVING
802 C-0713 for Grade on Slab at Grid line 3 & 4 ( A to G ) Pannel ( 2 ) 6 Nos at 24-Oct-17 2:50 PM 25-Oct-17 8:00 AM RA-819992-001-0F1 QUADRI ISRAEL HENSON
Shipping and Receiving Area @ Ju'Aymah, Shops Plant N- 26 AREA

PVC Pipes Installation & Inspection of 4",3" & 2" Dia for S anitary waste
803 P-0033 pipe Line at Mechanical Room First Floor in Admin Building @ Ju'aymah, ADMIN BUILDING 24-Oct-17 2:55 PM 25-Oct-17 10:30 AM RA-819774-001-00 FAHEEM ABDUL REHMAN
Shops Plant N- 26.

804 E-0030 material receiving inspection for cable tiles red color 200*200*50 mm PLANT N-26 24-Oct-17 3:00 PM 25-Oct-17 9:00 AM RA-819460-001-0F1 NOLI ESSA
with PO NO-29474 at ETE

Concrete 28 Days Compressive Strength Testing & Final Acceptance


805 C-0714 Inspection of 4000 PSi for 4 Nos. Columns at Grid Line (11') (F) C16, (11') MAAZ LAB 25-Oct-17 10:20 AM 26-Oct-17 9:30 AM RA-819721-001-0F2 MOIZULLAH ISRAEL HENSON
(E') C1, Grid Line (11') (D) C1 and (11') (C) C6 at Admin Building Area,
Juaymah Shops, Plant N-26 @ MAAZ Lab.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


806 C-0715 Inspection of 4000 PSi for Lean Concrete for AHU 01 & AHU 02 MAAZ LAB 25-Oct-17 10:25 AM 26-Oct-17 10:00 AM RA-819866-001-0F1 MOIZULLAH ISRAEL HENSON
Foundations at New Sub Station, Ju'Aymah Shops Plant N-26 @ MAAZ
Lab.

807 P-0034 Sewer Gravity test for PVC Pipes and fittings for Mechanical room First ADMIN BUILDING 25-Oct-17 10:30 AM 26-Oct-17 8:30 AM RA-819774-001-00 FAHEEM ABDUL REHMAN
Floor in New Admin Building @ Ju'aymah Shops Plant N-26

PVC Pipes Installation & Inspection of 4" & 6" Dia for Sanitary Sewer
808 P-0035 piping in Admin Building from Executive Toilet #116 First Floor to S MH-11 ADMIN BUILDING 25-Oct-17 10:35 AM 26-Oct-17 8:00 AM RA-819486-001-00 FAHEEM ABDUL REHMAN
& from Coffee Room towards SMH-11 @ Ju'aymah S hops Plant N-26

Form Closure and Embedded Items Inspection for 10 Nos Column at Grid
809 C-0716 Line (3) (C) C1, (3) (D) C1, (3) (E) C8, (3) (F) C15, (2) (F) C15, (2) (D) C4, (2) ADMIN BUILDING 25-Oct-17 10:40 AM 26-Oct-17 11:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON
(C) C3, (1) (B) C13 ,(1) (C') C16, (1) (D) C17 at Admin Bldg Area,Juaymah
Shops N-26

Sampling, Testing & Placement of Concrete Inspection for 10 Nos Column


810 C-0717 at Grid Line (3) (C) C1, (3) (D) C1, (3) (E) C8, (3) (F) C15, (2) (F) C15, (2) (D) ADMIN BUILDING 25-Oct-17 10:45 AM 26-Oct-17 2:00 PM RA-819721-001-0F2 ACIELO ISRAEL HENSON
C4, (2) (C) C3, (1) (B) C13 ,(1) (C') C16, (1) (D) C17 at Admin Bldg
Area,Juaymah Shops N-26

Material Receiving Inspection of FBE wire mesh Size 100 x100 x 5 x 5 MM


811 C-0718 2.40 x 4.80 M and 150 x 150 x 5 x 5MM 2.150 x 5.0 M From BRC PLANT N-26 25-Oct-17 10:50 AM 26-Oct-17 9:00 AM RA-819723-003-0F2 BAQAR ISRAEL HENSON
Industries @ ETE Store,JuAymah,Shops Plant N-26

Material Handling ,Storage and Preservation Inspection of FBE wire mesh


812 C-0719 Size 100 x100 x 5 x 5 MM 2.40 x 4.80 M and 150 x 150 x 5 x 5MM 2.150 x PLANT N-26 25-Oct-17 10:55 AM 26-Oct-17 9:30 AM RA-819723-003-0F2 BAQAR ISRAEL HENSON
5.0 M From BRC Industries @ ETE Store,JuAymah,Shops Plant N-26

Visual Inspection of Material Receiving, Handling, Storage and


813 C-0720 Preservation of 4" Dia pvc Pipes SCH 80 (EPC 80), (QTY=100 Pcs) 6.0 M PLANT N-26 25-Oct-17 11:00 AM 26-Oct-17 10:00 AM RA-819500-001-0F1 BAQAR ISRAEL HENSON
Length, using as Reinforcement Spacer from Sappco Dammam Factory @
ETE Laydown ju'aymah shops plant N-26

Site & Grade Preparation Inspection Of Grade on Slab at Grid line 3 & 4 ( A SHIPPING & RECEIVING
814 C-0721 to G ) Panel ( 2 ) 6 Nos. at Shipping and Receiving Area @ Ju'Aymah, 25-Oct-17 11:05 AM 26-Oct-17 10:00 AM RA-819992-001-0F1 QUADRI ISRAEL HENSON
Shops Plant N- 26 AREA

815 C-0722 Formwork Inspection Of Grade on Slab at Grid line 3 & 4 ( A to G ) Panel SHIPPING & RECEIVING 25-Oct-17 11:10 AM 26-Oct-17 10:30 AM RA-819992-001-0F1 QUADRI ISRAEL HENSON
( 2 ) 6 Nos. At Shipping and Receiving Area @ Ju'Aymah, Shops Plant N- 26 AREA

FBE Rebar, Embedded Items & Formwork Closure Inspection of Grade on SHIPPING & RECEIVING
816 C-0723 Slab at Grid line 3 & 4 ( A to G ) Panel ( 2 ) 6 Nos At Shipping and 25-Oct-17 11:15 AM 26-Oct-17 11:00 AM RA-819992-001-0F1 QUADRI ISRAEL HENSON
Receiving Area @ J u'Aymah, Shops Plant N- 26 AREA

Concrete Sampling,Testing & Placement Inspection Of Grade on Slab at SHIPPING & RECEIVING
817 C-0724 Grid line 3 & 4 ( A to G ) Panel ( 2 ) 6 Nos at S hipping and Receiving Area 25-Oct-17 11:20 AM 26-Oct-17 12:30 PM RA-819992-001-0F1 QUADRI ISRAEL HENSON
@ J u'Aymah, Shops Plant N- 26 AREA

Material Receiving Inspection of PVC Spacer Size 6x2 & 4x2 (QTY=4000
818 E-0031 Pcs.) Inter Spacer 6x2 (QTY=2000 Pcs.) and Base Spacer 4x2 (QTY=500 PLANT N-26 25-Oct-17 2:30 PM 26-Oct-17 9:00 AM RA-819460-001-0F1 NOLI ESSA Not in QMIS
Pcs.) Inter Spacer 4x2 (QTY=500 Pcs) at ETE Store @ Juaymah Shops Plant
N-26

Cable Trench Inspection for grounding cable installation in mechanical


819 E-0032 room & electrical room @ First Floor Admin Building, Juaymah Shops, ADMIN BUILDING 26-Oct-17 10:00 AM 26-Oct-17 8:30 AM RA-819714-001-0F1 NOLI ESSA
Plant N26

Cable Trench Inspection for grounding cable installation in mechanical


820 E-0033 room & electrical room @ First Floor Admin Building, Juaymah Shops, ADMIN BUILDING 26-Oct-17 10:05 AM 26-Oct-17 4:00 PM RA-819714-001-0F1 NOLI ESSA
Plant N26

821 E-0034 Installation of PVC Pipe for Grounding Cable in Mechanical Room and ADMIN BUILDING 26-Oct-17 10:10 AM 28-Oct-17 10:00 AM RA-819714-001-0F1 NOLI ESSA
Electrical Room at Admin Building, Juaymah Shops, Plant N-26

Curing inspection for 6 nos. columns at gridline (8')(A)C9, (9)(B)C1, (F) (5)
822 C-0725 C1, (F) (4)C8, (F)(5)C15,(F')(8)C15,(E)(5)C1 &(E)(4')C1 , at Admin Bldg Area ADMIN BUILDING 26-Oct-17 10:15 AM 28-Oct-17 7:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops N-26

823 C-0726 Formworks inspection for staircase at gridline (C-E) ((11-12) at Admin ADMIN BUILDING 26-Oct-17 10:20 AM 28-Oct-17 10:30 AM RA-819745-001-00 ACIELO ISRAEL HENSON
Bldg.Juatmah Shops N-26

824 C-0727 FBE Rebars,Embedded items & Formclosure inspection for staircase at ADMIN BUILDING 26-Oct-17 10:25 AM 28-Oct-17 10:45 AM RA-819745-001-00 ACIELO ISRAEL HENSON
gridline (C-E) ((11-12) at Admin Bldg.Juatmah Shops N-26

825 C-0728 Sampling,Testing & Placement of concrete inspection for staircase at ADMIN BUILDING 26-Oct-17 10:30 AM 28-Oct-17 3:30 PM RA-819745-001-00 ACIELO ISRAEL HENSON
gridline (C-E) (11-12) at Admin Bldg.Juatmah Shops N-26

826 P-0036 Sewer Gravity test for PVC Pipes and fittings Coffee Room to SMH- 11 ADMIN BUILDING 26-Oct-17 10:35 AM 28-Oct-17 8:00 AM RA-819486-001-00 FAHEEM ABDUL REHMAN
Connection First Floor in Admin Building @ Ju'aymah Shops Plant N-26

Medium Voltage (MV) HDD Route & profile Inspection at west side of New
827 P-0037 Admin Building to South Side of S ecurity ID Office (R-82) Crossing Pipe # PLANT N-26 26-Oct-17 10:40 AM 28-Oct-17 8:30 AM RA-819293-026-00 FAHEEM ESSA
07 (2-Way : ø225mm Each) @ Ju'aymah Shops Plant N-26.

Medium Voltage (MV) HDD Center Line Marking Inspection at west side of
828 P-0038 New Admin Building to South Side of Security ID Office (R-82) Crossing PLANT N-26 26-Oct-17 10:45 AM 28-Oct-17 9:30 AM RA-819460-001-0F1 FAHEEM ESSA
Pipe # 07 (2-Way : ø225mm Each) @ Ju'aymah Shops Plant N-26.

Calibration of tracking system, Thrust Boring, Drill mud mixing, Pilot


829 P-0039 Drilling, Reaming, Pulling and HDPE conduit Installation(Crossing Pipe # PLANT N-26 26-Oct-17 10:50 AM 28-Oct-17 3:30 PM RA-819293-026-00 FAHEEM ESSA
07) 2-Way (ø225mm each) Medium Voltage (MV) west side of new Admin
to South side of Security ID office (R-82) @ Juaymah Shop Plant N-26

PVC Pipes Installation & Inspection of 6" Dia for Sanitary Sewer piping in
830 P-0040 Admin Building from Male Toilet # 135 First Floor to SMH- 13 @ Ju'aymah ADMIN BUILDING 26-Oct-17 10:55 AM 28-Oct-17 9:00 AM RA-819774-001-00 FAHEEM ABDUL REHMAN
Shops Plant N-26

Material Receiving, Handling ,Storage & preservation Inspection of PVC


831 P-0041 pipes 2", 3", 4", 6" & fittings (Tee's, Reducer, Wye's, P-trap's & Elbow's 45° PLANT N-26 28-Oct-17 11:00 AM 29-Oct-17 7:30 AM RA-819779-003-.00 FAHEEM ABDUL REHMAN
& 90°) f rom NEPRO & solvent cement grey & cleaner from WELDON @
ETE store Juaymah Shop Plant N-26 (As per attached Quantity list)

Visual Inspection for Final Backfilling of Grounding Trench Cable


832 E-0035 Installation in Mechanical Room & Electrical Room @ 1st Floor Admin ADMIN BUILDING 28-Oct-17 11:05 AM 29-Oct-17 9:30 AM RA-819714-002-0F1 NOLI ESSA
Building, Juaymah Shops, Plant N-26

Material Receiving Visual Inspection of PVC Conduits Pipe 1",2", Dia TC-6,
833 E-0036 TC-8 TYPE DB-120 From New products Industries Nepro at ETE STORE PLANT N-26 28-Oct-17 11:02 AM 29-Oct-17 9:30 AM RA-819712-001-0F1 NOLI ESSA Not in QMIS
JU'AYMAH SHOPS PLANT N-26. QUATITY AS PER HIGHLIGHTED ATTACHED.

Fill Placement & Compaction Inspection of 7th Layer (Final Layer) Selectfill
834 C-0729 Material at Grid Line (5-8) (A-B) and (6-7) (A-A') at Admin Bldg. @ ADMIN BUILDING 28-Oct-17 11:10 AM 29-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
Juaymah Shops Plant N-26 (including Thickenings Area)

FDT Inspection of 7th layer (Final Layer) Selectfill Material at Grid Line (5-
835 C-0730 8) (A-B) and (6-7) (A-A') at Admin Bldg. @ Juaymah Shops Plant N-26 ADMIN BUILDING 28-Oct-17 11:15 AM 29-Oct-17 1:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 3 FDT Failed
(including Thickenings Area)

Sand Backfilling Inspection around & above of Pipe for Sewer Trench from
836 C-0731 Coffee Room (Outer Connection) to SMH # 11 at Admin Building @ ADMIN BUILDING 28-Oct-17 11:20 AM 29-Oct-17 8:30 AM RA-819486-001-00 ACIELO ISRAEL HENSON
Juaymah Shops Plant N-26

Concrete Finishing and Curing Inspection for Slab on Grade at Grid Line
837 C-0732 (C-E) (11-12), Elevator Shear Wall (from Top of Footing to FFL Elevation), ADMIN BUILDING 29-Oct-17 8:50 AM 30-Oct-17 7:00 AM RA-819721-001-0F2 ACIELO ISRAEL HENSON Not in QMIS
(E-F) (1-2), GB # 03, (1) (B-E), (F) (4-2) and GB # 02 (3) (B-F), (2) (B-E), (C')
(1-3), (D) (2-3), E (2-4) at Admin Building @ Juaymah Shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for 1) 2 Nos. Columns at Grid Line (2) (A) C9, (3')
(A) C9, 2.) Elevator Foundation at Grid Line (1-2) (E-F), 3). 1 No. Column
838 C-0733 Foundation at Grid Line (2) (F') (C15/C15A) Inside Elevator Foundation , 4) MAAZ LAB 29-Oct-17 8:55 AM 30-Oct-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISRAEL HENSON
Lean Concrete at Grade Bean GB-2 from Grid Line (4') (E-F), (5) (E- F), (8)
(E-F), (F') (4'-5) and (F') (8-9') at Admin Building, Juaymah Shops, Plant N-
26 @ MAAZ Lab.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
839 C-0734 Inspection of 4000 PSi for AHU 01 & AHU 02 Foundations at New Sub MAAZ LAB 29-Oct-17 9:00 AM 30-Oct-17 2:30 PM RA-819866-001-0F1 MOIZULLAH ISRAEL HENSON
Station at Ju'Aymah Shops Plant N-26 @ MAAZ Lab

Sand Backfilling Inspection around & above of Pipe for Sewer Trench at
840 C-0735 Mechanical Room (First F loor) in Admin Building @ Juaymah Shops Plant ADMIN BUILDING 29-Oct-17 1:55 PM 30-Oct-17 9:00 AM RA-819486-001-00 ACIELO ISRAEL HENSON Not in QMIS
N-26

FDT Inspection of 7th layer (Final Layer) Selectfill Material at Grid Line (5-
841 C-0730-A 8) (A-B) and (6-7) (A-A') at Admin Bldg. @ Juaymah Shops Plant N-26 ADMIN BUILDING 29-Oct-17 2:35 PM 30-Oct-17 8:00 AM RA-819722-001-0f4 ACIELO ISRAEL HENSON 4
(including Thickenings Area)

Soil Protection and Control, Drainage and De- Watering Inspection at New
842 C-0736 shaded Car Parking Area Grid line (4) (F,G,H,I ) (F1) (04 Nos) @ Ju'aymah CAR PARKING 29-Oct-17 4:05 PM 30-Oct-17 2:30 PM RA-819945-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
Shops Plant N-26

Excavation,Surface Leveling and Proof Rolled Compaction Inspection of


843 C-0737 Existing Sub Grade Below Foundation of 0.60M as per Geotechnical CAR PARKING 29-Oct-17 4:10 PM 30-Oct-17 3:00 PM RA-819945-001-0F1 QUADRI ISRAEL HENSON Not in QMIS
Report /Recommendation at New Shaded Car Parking Area Area Grid line
(4) (F,G,H,I ) (F1) (04 Nos ) @ Ju'yamah shops plant N-26

Material Receiving Visual Inspection of Poly plug 6' (15 PCS), Poly plug
844 E-0037 w/pull ring 2' (5 pcs), Inter Spacer 4 x 2' (15 pcs), Bas Spacer 4 x 2' (15 PLANT N-26 29-Oct-17 4:15 PM 30-Oct-17 10:00 AM RA-8197112-001-0F1 NOLI ESSA Not in QMIS
pcs), at ETE Laydown Ju'aymah Shops Plant N-26, As per highlighted
attachment.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


845 C-0738 Inspection of 4000 PSi for 5 Nos. Columns at Grid Line (6) (A') C12, (7) (A') MAAZ LAB 30-Oct-17 8:35 AM 31-Oct-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISRAEL HENSON
C12, (6) (A) C11, (7) (A) C11 and (5') (A) C9 @ Admin Building, Juaymah
Shops, Plant N-26 @ MAAZ Lab.

Fill placement & compaction inspection of 4th layer selectfill material at


846 C-0739 gridline (2-5) (east side) outside of Admin Bldg. @ Juaymah Shops Plant ADMIN BUILDING 30-Oct-17 10:00 AM 31-Oct-17 1:30 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON Not in QMIS
N-26

847 C-0740 FDT inspection of 4th layer selectfill material at gridline (2-5) (east side) ADMIN BUILDING 30-Oct-17 10:05 AM 31-Oct-17 1:45 PM RA-819722-001-0F4 ACIELO ISRAEL HENSON 2
outside of Admin Bldg. @ Juaymah Shops Plant N-26

Preparation / Mixing and Application Inspection of Anti Termite Material


848 C-0741 for Grade on Slab at Grid line 3 & 4 ( A to G ) Pannel ( 1 ) 3 Nos at SHIPPING & RECEIVING 30-Oct-17 11:00 AM 31-Oct-17 1:30 PM RA-819992-001-0F1 QUADRI ISRAEL HENSON
AREA
Shipping and Receiving Area

VIS UAL INSPECTION FOR GROUNDING CABLE PULLING 120mm2 FROM


849 E-0038 MAIN GRID TO INSIDE TELECOM EQUIPMENT ROOM AND AIR LOCK ADMIN BUILDING 30-Oct-17 11:10 AM 31-Oct-17 9:30 AM RA-819714-001-0F1 NOLI ESSA
ROOM AT ADMIN BLDG, SEE ATTACHED HIGHLIGHTED DRAWING.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


850 C-0742 Inspection of 4000 PSi for 3 Nos. Columns at Grid Line (10) (F) C15, (10) MAAZ LAB 31-Oct-17 7:30 AM 1-Nov-17 10:00 AM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
(E) C5 and (9') (E) C3 in Admin Building, Juaymah Shops, Plant N-26 @
MAAZ LAB

Site & Grade Preparation Inspection Of Grade on Slab at Grid line 3 & 4 ( A
851 C-0743 to G ) Pannel ( 1 ) 3 No at Shipping and Receiving Area @ Ju'Aymah, Shops SHIPPINGAREA
& RECEIVING 31-Oct-17 1:05 PM 1-Nov-17 10:30 AM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
Plant N- 26

852 C-0744 Formwork Inspection Of Slab on Grade at Grid line 3 & 4 ( A to G ) Pannel SHIPPING & RECEIVING 31-Oct-17 1:10 PM 1-Nov-17 10:45 AM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
( 1 ) 3 Nos At Shipping and Receiving Area @ Ju'Aymah, Shops Plant N- 26 AREA

FBE Rebar, Embedded Items & Formwork Closure Inspection Of Slab on


853 C-0745 Grade at Grid line 3 & 4 ( A to G ) Pannel ( 1 ) 3 Nos At Shipping and SHIPPING & RECEIVING 31-Oct-17 1:15 PM 1-Nov-17 11:00 AM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
AREA
Receiving Area @ J u'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection Of Slab on Grade at


854 C-0746 Grid line 3 & 4 ( A to G ) Pannel ( 1 ) 3 Nos at Shipping and Receiving Area SHIPPINGAREA
& RECEIVING 31-Oct-17 1:20 PM 1-Nov-17 12:30 PM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
@ J u'Aymah, Shops Plant N- 26

Concrete Finishing and Curing Inspection For 8 Nos Pedestal Of Booster


855 C-0747 Pump Station 1 &2 at Pre- Cast Area In Work Shop Area At Ju'Aymah Shops CAR PARKING 31-Oct-17 1:25 PM 1-Nov-17 7:00 AM RA-820020-001-00 QUADRI ISHFAQ AHMED
Plant N-26.

Concrete Finishing & Curing Inspection Of 5 Nos P1 Type Pedestal Of


856 C-0748 Admin Building at Pre-Cast Area In Work Shop Area At Ju'Aymah Shops CAR PARKING 31-Oct-17 1:30 PM 1-Nov-17 7:15 AM RA-819735-001-00 QUADRI ISHFAQ AHMED
Plant N-26.

Soil Protection and Control. Drainage and De- Watering Inspection at New
857 C-0749 Shaded Car Parking Area Grid line 1 (F to I) and Grid line 2 & 3 ( G to I ) CAR PARKING 31-Oct-17 1:35 PM 1-Nov-17 1:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Total 10 Nos@ Ju'Aymah, Shops Plant N- 26.

Excavation. Surface Leveling and Proof Rolled Compaction Inspection of


858 C-0750 Existing Sub Grade Below Foundation Of 0.6M as per Geotechnical Report CAR PARKING 31-Oct-17 1:40 PM 1-Nov-17 1:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 1 (F to I) and
Grid line 2 & 3 (G to I) Total 10 Nos@ Ju'Aymah, Shops Plant N- 26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
859 C-0751 /Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1) CAR PARKING 31-Oct-17 1:50 PM 1-Nov-17 2:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
(F1) (04 Nos) @ju'aymah shops plant N-26.

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
860 C-0752 /Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1) CAR PARKING 31-Oct-17 1:55 PM 1-Nov-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 4
(F1) (04 Nos) @ju'aymah shops plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 2000 PSi for Lean Concrete at Grade Bean GB-2 at Grid Line
861 C-0753 (9') (E-F ) and (E) (8-9') @ Admin Building, Juaymah Shops, Plant N-26 @ MAAZ LAB 1-Nov-17 7:30 AM 2-Nov-17 10:00 AM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
MAAZ Lab.

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
862 C-0754 /Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1) CAR PARKING 1-Nov-17 1:50 PM 2-Nov-17 2:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
(F1) (04 Nos) @ju'aymah shops plant N-26.

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
863 C-0755 /Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1) CAR PARKING 1-Nov-17 1:55 PM 2-Nov-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 4
(F1) (04 Nos) @ju'aymah shops plant N-26.
Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
864 C-0756 /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 1-Nov-17 1:50 PM 2-Nov-17 2:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant
N-26
FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
865 C-0757 /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 1-Nov-17 1:55 PM 2-Nov-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 10
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant
N-26

Medium Voltage (MV) HDD Route & profile Inspection at west side of New
866 E-0039 Admin Building to South Side of S ecurity ID Office (R-82) Crossing Pipe # PLANT N-26 1-Nov-17 2:00 PM 2-Nov-17 8:30 AM RA-819293-026-00 NOLI ESSA
05 (4-Way : ø225mm Each) @ Ju'aymah Shops Plant N-26.

Medium Voltage (MV) HDD Center Line Marking Inspection at west side of
867 E-0040 New Admin Building to South Side of Security ID Office (R-82) Crossing PLANT N-26 1-Nov-17 2:05 PM 2-Nov-17 9:30 AM RA-819460-001-0F1 NOLI ESSA
Pipe # 05 (4-Way : ø225mm Each) @ Ju'aymah Shops Plant N-26.

Visual Inspection Material Receiving, Verification, Protection, Storage and


868 E-0041 Preservation of HDPE PIPES ISO SDR 09 Black 225MM (Qty 804 Meters ) PLANT N-26 1-Nov-17 2:10 PM 2-Nov-17 7:30 AM RA-819460-001-0F1 NOLI ESSA
from NEPRO Co, Ltd at Pipe S ide area Ju'Aymah ,Shops Plant No- 26.

Concrete Finishing & Curing Inspection10 Nos Column at Grid Line (3) (C)
869 C-0758 C1, (3) (D) C1, (3) (E) C8, (3) (F) C15, (2) (F) C15, (2) (D) C4, (2) (C) C3, (1) ADMIN BUILDING 2-Nov-17 8:45 AM 4-Nov-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED Not in QMIS
(B) C13 ,(1) (C') C16, (1) (D) C17 at Admin Bldg Area, Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


870 C-0759 Inspection of 4000 PSi for 2 Nos. Columns at Grid Line (12) (C) C16 and MAAZ LAB 2-Nov-17 8:50 AM 4-Nov-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
(11) (C) C7 and 3 Nos. Column at Grid Line (B) (2) C16, (B) (3) C1 and (B)
(4) C1 at Admin Building, Juaymah Shops, Plant N-26 @ MAAZ LAB
This RFI is raising to correct the description of RFI # C-0679 dated
10/21/2017, Pre-Cast Concrete Sampling,Testing & Placement Inspection
871 C-0760 of 08 Nos Pedestal of Booster Pump Station 1 & 2 at Pre-Cast Area in ADMIN BUILDING 2-Nov-17 9:00 AM 4-Nov-17 7:00 AM RA-820020-001-00 QUADRI ISRAEL HENSON
Workshop Area @ @ Ju'Aymah Shops Plant N-26 Cover RFI # C-0679

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
872 C-0761 /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 2-Nov-17 1:50 PM 4-Nov-17 2:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant
N-26
FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report Due to technician
873 C-0762 /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 2-Nov-17 1:55 PM 4-Nov-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED not available and
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant SITE not ready
N-26
Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
874 C-0763 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 2-Nov-17 1:50 PM 4-Nov-17 2:40 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1)
(F1) (04 Nos) @ju'aymah shops plant N-26.

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material Due to technician
875 C-0764 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 2-Nov-17 1:55 PM 4-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
/Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1) not available and
(F1) (04 Nos) @ju'aymah shops plant N-26. SITE not ready

Preparation / Mixing and Application Inspection of Anti Termite Material


876 C-0765 for Slab On Grade at Grid line 3 & 4 ( A to G ) Pannel ( 1 ) 3 Nos at CAR PARKING 2-Nov-17 2:00 PM 4-Nov-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Shipping and Receiving Area

Concrete Finishing and Curing Inspection for Slab On Grade at Grid line 3
877 C-0766 & 4 (A to G ) Pannel ( 2 ) 6 Nos At Shipping and Receiving @ Ju'Aymah CAR PARKING 2-Nov-17 2:05 PM 4-Nov-17 7:15 AM RA-820020-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Shops Plant N-26

Calibration of tracking system, Thrust Boring, Drill mud mixing, Pilot


878 E-0042 Drilling, Reaming, Pulling and HDPE conduit Installation(Crossing Pipe # PLANT N-26 2-Nov-17 8:00 AM 4-Nov-17 10:00 AM RA-819722-001-0F4 NOLI ESSA
05) 4-Way (ø225mm each) Medium Voltage (MV) west side of new Admin
to South side of Security ID office (R-82) @ Juaymah Shop Plant N-26
Material Receiving Visual Inspection of OS P Single Mode Fiber Optic Cable
From MEFC and On reel continuity testing. (1)Out door Duct non-Metalic
879 T-0008 048F SM G.625D (QTY=2120 METER) P.O.#29853 (2)Out door Duct non- PLANT N-26 2-Nov-17 8:15 AM 4-Nov-17 2:00 PM RA-819517-001-00 AFZAL M. Z. NAVEED
Metalic 012F SM G.625D(QTY=6020 METER) D.N.#DNFGD-201701136
(3)Out door Duct non-Metalic 012F SM G.625D (QTY=1415 METER)@ ETE
Laydown,JaAymah,shops
Material Receiving Visual Plant N- 26 of Bldg. Single Mode Fiber Optic
Inspection
Cable From MEFC and On- reel continuiuty testing. (1)In door Duct non-
880 T-0009 Metalic 048F SM G.625D (QTY=1014 METER) (2)Out door Duct non- PLANT N-26 2-Nov-17 8:20 AM 4-Nov-17 9:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
Metalic 012F SM G.625D(QTY=6020 METER) D.N.#DNFGD-201701136
P.O#29853, D.N#DNFGD-2017011306 @ ETE Laydown,JaAymah,shops
Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for Grade Beam GB-3 at Grid Line (9'-4) (F-F') and
881 C-0767 Grade Beam GB-2 at Grid Line (9'-4) (E), (9') (E-F), (8) (E-F), (5) (E-F), (4') MAAZ LAB 4-Nov-17 8:00 AM 5-Nov-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISHFAQ AHMED
(E-F) (F') (4'-5) and (F) (8-8') at Admin Building, Juaymah Shops, Plant N- 26
@ MAAZ LAB

Material Receiving Visual Inspection of PVC Conduit Fitting Type NEMA-


882 E-0043 TC8/DB120, Bend Elbow 90 deg.2" 80 EA. And Bend Elbow 90 deg.1" 100 PLANT N-26 4-Nov-17 8:05 AM 5-Nov-17 9:00 AM RA-819712-001-0F1 NOLI ESSA Not in QMIS
EA. For Admin Bldg. At ETE Store Ju'aymah shops plant N-26.

Excavation and Trenching Visual Inspection For Underground PVC Conduit


883 E-0044 and stub-up For Electrical power outlet inside Admin Building Between ADMIN BUILDING 4-Nov-17 8:10 AM 5-Nov-17 1:30 PM RA-819712-001-0F1 NOLI ESSA
Grid line (2-5) (A-B Area).

884 E-0045 Visual Inspection of 1inch PVC conduit pipe installation and stub-up for ADMIN BUILDING 4-Nov-17 8:15 AM 5-Nov-17 1:45 PM RA-819712-001-0F1 NOLI ESSA
power outlet layout inside admin bldg. grade line (2-5)(A-B AREA.

Visual Inspection for Trench Backfilling 1 Inch PVC Conduit Pipe and
885 E-0046 Stub-Pp for Power Outlet Layout Inside Admin building Grade Line (2-5) ADMIN BUILDING 4-Nov-17 8:20 AM 5-Nov-17 2:00 PM RA-819712-001-0F1 NOLI ESSA
(A-B) Area.

Formwork inspection for 2nd Flr. Beams at gridline (A-F)(9- Due to Job not
886 C-0768 12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at gridline (B'-C)(11'-12) at ADMIN BUILDING 4-Nov-17 1:30 PM 5-Nov-17 10:30 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Admin Bldg.,Juaymah Shops N-26 Ready

FBE Reinforcing Steel,Embedded Items & Formclosure inspection for 2nd Due to Job not
887 C-0769 Flr. Beams at gridline (A-F)(9-12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at ADMIN BUILDING 4-Nov-17 1:35 PM 5-Nov-17 10:45 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
gridline (B'-C)(11'- 12) at Admin Bldg.,Juaymah Shops N-26 Ready

Sampling,Testing and Placement of concrete inspection for 2nd Flr. Beams Due to Job not
888 C-0770 at gridline (A-F)(9-12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at gridline (B'- ADMIN BUILDING 4-Nov-17 1:40 PM 5-Nov-17 2:00 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
C)(11'-12) at Admin Bldg.,Juaymah Shops N-26 Ready

889 C-0771 Formwork inspection for Staircase (2nd Lift) at gridline (C-E)(11-12) at ADMIN BUILDING 4-Nov-17 1:45 PM 5-Nov-17 11:00 AM RA-819746-001-00 ACIELO ISHFAQ AHMED Due to Job not
Admin Bldg.,Juaymah Shops N-26 Ready

FBE Reinforcing Steel,Embedded Items & Formclosure inspection for Due to Job not
890 C-0772 Staircase (2nd Lift) at gridline (C- E)(11-12)at Admin Bldg.,Juaymah Shops ADMIN BUILDING 4-Nov-17 1:50 PM 5-Nov-17 11:15 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
N-26 Ready

891 C-0773 Sampling,Testing & Placement of concrete inspection for Staircase (2nd ADMIN BUILDING 4-Nov-17 1:55 PM 5-Nov-17 2:30 PM RA-819746-001-00 ACIELO ISHFAQ AHMED Due to Job not
Lift) at gridline (C-E)(11-12)at Admin Bldg.,Juaymah Shops N-26 Ready

Site & Grade Preparation Inspection Of Slab On Grade at Grid line 3 & 4 SHIPPING & RECEIVING
892 C-0774 ( A to G ) Pannel ( 1 ) 3 No at S hipping and Receiving Area @ Ju'Aymah, 4-Nov-17 4:15 PM 5-Nov-17 2:10 PM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
Shops Plant N- 26 AREA

893 C-0775 Formwork Inspection Of Slab on Grade at Grid line 3 & 4 ( A to G ) Pannel SHIPPING & RECEIVING 4-Nov-17 4:20 PM 5-Nov-17 2:30 PM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
( 1 ) 3 Nos at Shipping and Receiving Area @ Ju'Aymah, Shops Plant N- 26 AREA

FBE Rebar, Embedded Items & Formwork Closure Inspection Of Slab on SHIPPING & RECEIVING
894 C-0776 Grade at Grid line 3 & 4 ( A to G ) Pannel ( 1 ) 3 Nos At Shipping and 4-Nov-17 4:25 PM 5-Nov-17 2:45 PM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
Receiving Area @ Ju'Aymah, Shops Plant N- 26 AREA

Concrete Sampling,Testing & Placement Inspection Of Slab on Grade at


895 C-0777 Grid line 3 & 4 ( A to G ) Pannel ( 1 ) 3 Nos at Shipping and Receiving Area SHIPPING & RECEIVING 4-Nov-17 4:30 PM 5-Nov-17 3:30 PM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
@ J u'Aymah, Shops Plant N- 26 AREA

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
896 C-0762-A /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 5-Nov-17 4:55 PM 6-Nov-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 10
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant
N-26
FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material
897 C-0764-A Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 5-Nov-17 5:00 PM 6-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 4
/Recommendation at New Shaded Car Parking Area Grid line (4) (F,G,H,1)
(F1) (04 Nos) @ju'aymah shops plant N-26.

898 C-0778 Concrete Finishing and Curing Inspection for staircase at gridline (C-E)(11 ADMIN BUILDING 5-Nov-17 8:00 AM 6-Nov-17 7:00 AM RA-819745-001-00 ACIELO ISHFAQ AHMED
-12) at Admin Bldg. Juaymah Shops N-26

Formwork inspection for 2nd Flr. Beams at gridline (A-F)(9-


899 C-0768-A 12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at gridline (B'-C)(11'-12) at ADMIN BUILDING 5-Nov-17 1:30 PM 6-Nov-17 10:30 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Admin Bldg.,Juaymah Shops N-26

FBE Reinforcing Steel,Embedded Items & Formclosure inspection for 2nd


900 C-0769-A Flr. Beams at gridline (A-F)(9-12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at ADMIN BUILDING 5-Nov-17 1:35 PM 6-Nov-17 10:45 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
gridline (B'-C)(11'- 12) at Admin Bldg.,Juaymah Shops N-26

Sampling,Testing and Placement of concrete inspection for 2nd Flr. Beams


901 C-0770-A at gridline (A-F)(9-12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at gridline (B'- ADMIN BUILDING 5-Nov-17 1:40 PM 6-Nov-17 2:00 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
C)(11'-12) at Admin Bldg.,Juaymah Shops N-26

902 C-0771-A Formwork inspection for Staircase (2nd Lift) at gridline (C-E)(11-12) at ADMIN BUILDING 5-Nov-17 1:45 PM 6-Nov-17 11:00 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
Admin Bldg.,Juaymah Shops N-26

FBE Reinforcing Steel,Embedded Items & Formclosure inspection for


903 C-0772-A Staircase (2nd Lift) at gridline (C- E)(11-12)at Admin Bldg.,Juaymah Shops ADMIN BUILDING 5-Nov-17 1:50 PM 6-Nov-17 11:15 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
N-26

904 C-0773-A Sampling,Testing & Placement of concrete inspection for Staircase (2nd ADMIN BUILDING 5-Nov-17 1:55 PM 6-Nov-17 2:30 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
Lift) at gridline (C-E)(11-12)at Admin Bldg.,Juaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
Material Below Foundation of 0.60M as per Geotechnical Report
905 C-0779 /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 5-Nov-17 1:50 PM 6-Nov-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant
N-26
FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material
Below Foundation of 0.60M as per Geotechnical Report
906 C-0780 /Recommendation at New Shaded Car Parking Area Grid line(1) (F,G,H,I) CAR PARKING 5-Nov-17 1:55 PM 6-Nov-17 4:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 10
(F1) 4 Nos Grid line 2&3 ( F2 ) (G to I ) (06 Nos) @ ju'aymah shops plant
N-26
Visual Inspection Handling Storage and Preservation of Duct plug Blank 4"
907 T-0010 (QTY=06 pcs) and Namconduct Inter spacer4x2" Black IKKPF KSA PLANT N-26 5-Nov-17 2:00 PM 6-Nov-17 10:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED Not in QMIS
Namco(QTY=400 PCS) from Nepro products industries (NEPRO)@ ETE
Store, JuAymah, Shops Plant N-26

908 C-0781 FDT Inspection of Sub Grade for Sewer Trench from LUP Fence to SMH -14 ADMIN BUILDING 6-Nov-17 3:00 PM 7-Nov-17 3:30 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
at South Side of Admin Building @ Juaymah Shops Plant N-26

909 C-0782 Sand Bedding Inspection for Sewer Trench from LUP Fence to SMH -14 at ADMIN BUILDING 6-Nov-17 3:05 PM 7-Nov-17 4:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
South Side of Admin Building @ Juaymah Shops Plant N-26

910 C-0783 FDT Inspection of Sand Bedding for Sewer Trench from LUP Fence to SMH ADMIN BUILDING 6-Nov-17 3:10 PM 7-Nov-17 4:15 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
-14 at South Side of Admin Building @ Juaymah Shops Plant N-26

911 C-0784 FDT Inspection of Sub Grade for Sewer Trench from SMH -11 to LUP Fence ADMIN BUILDING 6-Nov-17 3:15 PM 7-Nov-17 3:45 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 2
at North Side of Admin Building @ Juaymah Shops Plant N-26

912 C-0785 Sand Bedding Inspection for Sewer Trench from SMH -11 to LUP Fence at ADMIN BUILDING 6-Nov-17 3:20 PM 7-Nov-17 4:30 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
North Side of Admin Building @ Juaymah Shops Plant N-26

913 C-0786 FDT Inspection of Sand Bedding for Sewer Trench from SMH -11 to LUP ADMIN BUILDING 6-Nov-17 3:25 PM 7-Nov-17 4:45 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 2
Fence at North Side of Admin Building @ Juaymah Shops Plant N-26

Preparation / Mixing and Application Inspection of Anti Termite Material


914 C-0787 at Grid Line (5-8) (A-B) and (6-7) (A-A') at Admin Building Area @ Juaymah ADMIN BUILDING 6-Nov-17 3:30 PM 7-Nov-17 3:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Shops Plant N-26

Materials Receiving Visual Inspection of cemtec dry shake non metalic


915 E-0047 color dye red color for top layer of the concrete duck bank, quantity 50 PLANT N-26 6-Nov-17 3:35 PM 7-Nov-17 9:00 AM RA-819293-026-00 NOLI ESSA
bags, at ETE Laydown Ju'aymah shops plant N-26.As per attached
document.

916 C-0788 Site & Grade Preparation Inspection for Slab on Grade at Grid Line (A-B) ADMIN BUILDING 7-Nov-17 2:00 PM 8-Nov-17 10:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
(5-8) & (6-7) (A-A') at Admin Building, Juaymah Shops N-26

917 C-0789 Formwork Inspection for S lab on Grade at Grid Line (A-B) (5-8) & (6- 7) (A- ADMIN BUILDING 7-Nov-17 2:05 PM 8-Nov-17 10:45 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
A') at Admin Building, Juaymah Shops N-26

FBE S teel Rebars, Embedded Items & Form Closure Inspection for Slab on
918 C-0790 Grade at Grid Line (A-B) (5-8) & (6-7) (A-A') at Admin Building, Juaymah ADMIN BUILDING 7-Nov-17 2:10 PM 8-Nov-17 11:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Shops N-26

919 C-0791 Sampling,Testing & Placement of Concrete Inspection for Slab on Grade at ADMIN BUILDING 7-Nov-17 2:15 PM 8-Nov-17 2:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Grid Line (A-B) (5-8) & (6-7) (A-A') at Admin Building, Juaymah Shops N-26

920 P-0042 Material Receiving, Handling, Storage & Preservation Inspection of PVC PLANT N-26 7-Nov-17 2:20 PM 8-Nov-17 7:30 AM RA-819779-003-00 FAHEEM SYED SHAFIULLAH
Pipes 3" (09 Pcs.) from NEPRO @ ETE Store Juaymah Shops Plant N-26

Material Receiving, Handling, Storage & Preservation Inspection of CPVC


921 P-0043 Pipes 2", 3" & 4" & Fittings (Tee's, Reducing Tee's, Reducer, Flanges & PLANT N-26 7-Nov-17 2:25 PM 8-Nov-17 8:00 AM RA-819779-003-00 FAHEEM SYED SHAFIULLAH
Elbow 90°) & Solvent Cement Grey & Cleaner from NEPRO @ ETE Store
Juaymah Shops Plant N-26 (As per Attached Quantity List)
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for 4 Nos. Column at Grid Line (A) (5) C10, (A) (8)
922 C-0792 C10 , (B) (5) C2 and (B) (8) C2 and 4 Nos. Column at Grid Line (F') (9') C8, MAAZ LAB 8-Nov-17 7:40 AM 9-Nov-17 11:00 AM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
(E) (9') C1 , (E) (8) C1 and (F') (8) C1 at Admin Building Area, J uAymah
Shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
923 C-0793 Inspection of 5000 PSi for Pre-Cast Concrete for 5 Nos Footing Foundation MAAZ LAB 8-Nov-17 7:45 AM 9-Nov-17 11:30 AM RA-819735-001-00 MOIZULLAH ISHFAQ AHMED
Type 1 of Car Parking Area for Adim Bulding at Pre-Cast Area In Work
Shop Area, Ju'Aymah Shops Plant N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


924 C-0794 Inspection of 5000 PSi for Pre-Cast Concrete for 8 Nos Footing Foundation MAAZ LAB 8-Nov-17 7:50 AM 9-Nov-17 11:40 AM RA-820020-001-00 MOIZULLAH ISHFAQ AHMED
of Booster Pump S tation 1 & 2 at Pre-Cast Area In Work Shop Area,
Ju'Aymah Shops Plant N-26 @ MAAZ LAB

Concrete Finishing & Curing Inspection Of Slab on Grade at Grid line 3 &
925 C-0795 4 ( A to G ) Pannel ( 1 ) 3 Nos At Shipping and Receiving Area @Ju'Aymah SHIPPING & RECEIVING 8-Nov-17 4:00 PM 9-Nov-17 9:00 AM RA-819992-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
AREA
Shops Plant N-26

Soil Protection and Control, Drainage and De-Watering Inspection at New


926 C-0796 Shaded Car Parking Area Grid line 4 (D & E ) 2 Nos @ Ju'Aymah, Shops CAR PARKING 8-Nov-17 4:05 PM 9-Nov-17 8:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Plant N- 26

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


927 C-0797 Existing Sub Grade Below Foundation Of 0.6M as per Geotechnical Report CAR PARKING 8-Nov-17 4:10 PM 9-Nov-17 9:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 4 (D & E ) @
Ju'Aymah, Shops Plant N- 26

Pre-Cast Concret Sand Bedding Inspection at New S haded Car Parking


928 C-0798 Area Grid line 1 &4 (F,G.H,I ) and Grid line 2&3 (G,H,I ) Total 14 Nos @ CAR PARKING 8-Nov-17 4:15 PM 9-Nov-17 2:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
929 C-0799 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 8-Nov-17 4:20 PM 9-Nov-17 1:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 4 (D,E) 2
Nos @ ju'aymah shops plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


930 C-0800 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 8-Nov-17 4:25 PM 9-Nov-17 1:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2
/Recommendation at New Shaded Car Parking Area Grid line (4) (D,E) 2
Nos @ ju'aymah shops plant N-26

RTR pipe joint and assembly inspection for 8" RTR sewer line 33M
931 R-0009 between SHM-13 and SMH-14 at south side of New Admin Building @ ADMIN BUILDING 8-Nov-17 10:00 AM 9-Nov-17 10:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
JUAYMAH SHOPS PLANT N-26

932 R-0010 Storage and handling of RTR pipes and fittings for F ire and sewer water ADMIN BUILDING 8-Nov-17 10:05 AM 9-Nov-17 9:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
line from FPI at ETE laydown area @ Juaymah shops plant N-26.

Surface Preparation & Moisture Test Inspection of Grade Beam # 03 at


933 C-0801 Grid line (1) (B-E), (F) (4-2) and Grade Beam # 02 at Grid Line (3) (B-F), (2) ADMIN BUILDING 9-Nov-17 11:30 AM 11-Nov-17 9:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
(B-E), (C') (1-3), (D) (2-3) and (E) (2-4) at Admin Building Area @ Ju'Aymah
shops Plant N-26

Fill placement & compaction inspection of 1st layer selectfill material for
934 C-0802 sewer trench from outside of coffee room to SMH-11(northside)(13m) in ADMIN BUILDING 9-Nov-17 11:35 AM 11-Nov-17 11:15 AM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Admin Bldg. @ J uaymah S hops Plant N26

FDT inspection of 1st layer selectfill material for sewer trench from
935 C-0803 outside of coffee room to SMH- 11(northside)(13m) in Admin Bldg. @ ADMIN BUILDING 9-Nov-17 11:40 AM 11-Nov-17 11:30 AM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
Juaymah Shops Plant N26

Fill Placement & Compaction Inspection of Backfilling 2bd Layer Select Fill
936 C-0804 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 9-Nov-17 1:30 PM 11-Nov-17 11:15 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 4 (D,E) 2
Nos @ ju'aymah shops plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


Below Foundation of 0.60M as per Geotechnical Report
937 C-0805 /Recommendation at New Shaded Car Parking Area Grid line (4) (D,E) 2 CAR PARKING 9-Nov-17 1:35 PM 11-Nov-17 11:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2
Nos @ ju'aymah shops plant N-26

Visual Inspection to Close Proactive Notification # 232, regarding Material


938 C-0806 Storage, Handling and Preservation of FBE Coated Steel Rebar at PLANT N-26 9-Nov-17 3:50 PM 11-Nov-17 9:30 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Fabrication / Laydown Area @ Ju'Aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 6 Nos. Columns at Grid Line (F) (5) C1, (F) (4')
939 C-0807 C8, (F') (5) C15, (F') (8) C15, (E) (5) C1 and (E) (4') C1 at Admin Building MAAZ LAB 11-Nov-17 7:40 AM 12-Nov-17 2:00 PM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
Area, Ju'Aymah Shops N-26 @ MAAZ LAB

Visual Inspection of excavation trench for the main grounding cable


940 E-0048 before grounding cable laying, at outside Admin Bldg gridline (1-5) north ADMIN BUILDING 11-Nov-17 8:00 AM 12-Nov-17 9:30 AM RA-819714-001-0F1 NOLI ALI M. AL YASEEN
side area. As per highlighted attached Drawing.

Visual Inspection of 120mm2 Grounding cable laying below grade,


941 E-0049 Outside Admin Bldg, Grid line (1- 5) north side area. As per highlighted ADMIN BUILDING 11-Nov-17 8:05 AM 12-Nov-17 10:00 AM RA-819714-001-0F1 NOLI ALI M. AL YASEEN
attached Drawing.

Visual Inspection for Backfilling Trench of Below grade Grounding Cable


942 E-0050 Laying, Outside Admin Bldg, Gridline (1-5) north side area. As per ADMIN BUILDING 11-Nov-17 8:10 AM 12-Nov-17 10:30 AM RA-819714-001-0F1 NOLI ALI M. AL YASEEN
highlighted attached Drawing

Material Receiving,Handling, Storage & preservation Inspection of PVC


Pipe of 2"Dia (21Pcs) & fittings 4"Elbows45° (47Pcs),2"Elbows 90°(147Pcs)
943 P-0044 and Reducing Bush 4"X3"(10 Pcs) from NEPRO @ ETE store Juaymah Shop PLANT N-26 11-Nov-17 11:00 AM 12-Nov-17 7:30 AM RA-819779-003-00 FAHEEM SYED SHAFIULLAH Not in QMIS
Plant N-26

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


fittings (Tee's,Unions, V.Stone Flanges, Solid Flanges & Elbow 90°) from
944 P-0045 NEPRO @ ETE store Juaymah Shop Plant N-26 (As per attached Quantity PLANT N-26 11-Nov-17 11:05 AM 12-Nov-17 8:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH Not in QMIS
list)

Pre-Cast Concrete Erection and Alignment Inspection of New Car Parking


945 C-0808 Area at Grid Line 1 (A-E) Type F1 Foundation 5 Nos. and Grid Line 2 & 3 CAR PARKING 11-Nov-17 2:00 PM 12-Nov-17 11:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
(A-E) Type F2 Foundation 10 Nos. and Grid Line 4 (A-C) Type F 1 3 Nos.
Foundation Total (18 Nos.) @ Juaymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


946 C-0809 Inspection of 2000 PSi for Lean Concrete of GB # 3 at Grid Line (B-E) (1), MAAZ LAB 12-Nov-17 8:00 AM 13-Nov-17 11:00 AM RA-819722-001-0F4 MOIZULLAH ISHFAQ AHMED
(F) (2-3) and GB # 2 at Grid Line (C') (1-3), (2) (C'-E), (3) (C-F), (D) (2-3), (E)
(2-3) at Admin Building Juatmah Shops N-26 @ MAAZ LAB

Concrete Finishing & Curing Inspection Of Slab on Grade at Grid line 3 & SHIPPING & RECEIVING
947 C-0810 4 ( A to G ) Pannel ( 1 ) 3 Nos At Shipping and Receiving Area @Ju'Aymah 12-Nov-17 11:30 AM 13-Nov-17 9:00 AM RA-819992-001-0F1 QUADRI ISHFAQ AHMED
Shops Plant N-26 AREA

Calibration of tracking system, Thrust Boring, Drill mud mixing, Pilot


948 E-0051 Drilling, Reaming, Pulling and HDPE conduit Installation(Crossing Pipe # PLANT N-26 12-Nov-17 11:35 AM 13-Nov-17 9:30 AM RA-819293-026-00 NOLI ALI M. AL YASEEN
01) 4-Way (ø225mm each) Medium Voltage (MV) west side of new Admin
to South side of Security ID office (R-82) @ Juaymah Shop Plant N-26

Material Receiving Visual Inspection of PVC Conduit pipe Nema TC8/DB


949 E-0052 SOC. Gray Size 6"-100 EA.4"-50 EA, From New Products Industries CO. Ltd PLANT N-26 12-Nov-17 11:40 AM 13-Nov-17 10:00 AM RA-819460-002-00 NOLI ALI M. AL YASEEN Not in QMIS
@ ETE Site Store, Upgrade Ju'Aymah Shops Plant N-26

Material Receiving Visual Inspection of Additional PVC Conduit Fitting


950 E-0053 Type NEMA-TC8/DB120, Bend (Fab.) 90 deg. DB R 18" Size 2 inch 260 EA. PLANT N-26 12-Nov-17 11:45 AM 13-Nov-17 10:30 AM RA-819460-002-00 NOLI ALI M. AL YASEEN Not in QMIS
And Bend (Fab) 90 deg. DB Size 1 inch, At ETE Store J u'aymah shops plant
N-26

Coating & Final Inspection of APCS-3, Carboline of Inspection of Grade


951 C-0811 Beam # 03 at Grid Line (1) (B-E), (F) (4-2) and Grade Beam # 02 at Grid CAR PARKING 12-Nov-17 1:30 PM 13-Nov-17 10:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Line (3) (B-F), (2) (B-E), (C') (1-3), (D) (2-3) and (E) (2-4) at Admin Building
Area @ J u'Aymah shops Plant N-26 (DFT)

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
952 C-0812 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 12-Nov-17 1:35 PM 13-Nov-17 1:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 4 (D,E) 2
Nos @ ju'aymah shops plant N-26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material


953 C-0813 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 12-Nov-17 1:40 PM 13-Nov-17 1:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2
/Recommendation at New Shaded Car Parking Area Grid line (4) (D,E) 2
Nos @ ju'aymah shops plant N-26

954 C-0814 Soil Sample Collection of Existing Material Sub Grade (sub Base ) at New CAR PARKING 12-Nov-17 1:45 PM 13-Nov-17 1:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Parking Area for CBR Test Value @ ju'aymah shops plant N-26

955 C-0815 Soil Sample Collection Of Select Fill Material at ETE Laydown for CBR Test PLANT N-26 12-Nov-17 1:50 PM 13-Nov-17 1:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Value @ Ju'aymah shops plant N-26 (from Al-Osais)

956 E-0054 Visual Inspection of Grounding Rod Installation at Admin Bldg. Gridline (5) ADMIN BUILDING 12-Nov-17 2:10 PM 13-Nov-17 2:00 PM RA-819714-001-0F1 NOLI ALI M. AL YASEEN
(A), As per highlighted Attached Drawing.

Curing inspection of concrete for 2nd Flr. Beams at gridline (A- F)(9-
957 C-0816 12)B1.B2,B4,B5,B6,& B7 and 2nd Flr.slab at gridline (B'-C)(11'-12) and ADMIN BUILDING 13-Nov-17 2:00 PM 14-Nov-17 7:00 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Staircase (2nd lift) at gridline (C-E)(11-12) at Admin Bldg.,Juaymah Shops
N-26

958 C-0817 Pre-cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection INCO 13-Nov-17 2:05 PM 14-Nov-17 8:45 AM 016-CIG-A-18 & 19 WILFREDO ISHFAQ AHMED Mock-Up
for Admin Building (Panel Mark CIG-A-18 & CIG-A-19 Mock-Up Panels)

Pre-cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


959 C-0818 Formwork/Molding Closure) Inspection for Admin Building (Panel Mark INCO 13-Nov-17 2:10 PM 14-Nov-17 9:00 AM 016-CIG-A-18 & 19 WILFREDO ISHFAQ AHMED Mock-Up
CIG-A-18 & CIG-A-19 Mock-Up Panels)

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


960 C-0819 Sampling and Testing Inspection for Admin Building (Panel Mark CIG-A-18 INCO 13-Nov-17 2:15 PM 14-Nov-17 9:30 AM 016-CIG-A-18 & 19 WILFREDO ISHFAQ AHMED Mock-Up
& CIG-A-19 Mock-Up Panels)

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


961 C-0820 Sampling and Testing Inspection for Admin Building (Panel Mark CIG-A-18 INCO 13-Nov-17 2:20 PM 14-Nov-17 2:30 PM 016-CIG-A-18 & 19 WILFREDO ISHFAQ AHMED Mock-Up
& CIG-A-19 Mock-Up Panels)

962 C-0821 Formwork inspection for Main Staircase at gridline (A-B)(5-8) at Admin ADMIN BUILDING 13-Nov-17 2:25 PM 14-Nov-17 11:00 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Bldg.,Juaymah Shops N-26

963 C-0822 FBE Reinforcing Steel, Embedded Items & Formclosure inspection for ADMIN BUILDING 13-Nov-17 2:30 PM 14-Nov-17 11:15 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Main Staircase at gridline (A-B)(5-8) at Admin Bldg., Juaymah Shops N-26

964 C-0823 Sampling,Testing & Placement of concrete inspection for Main S taircase ADMIN BUILDING 13-Nov-17 2:35 PM 14-Nov-17 3:30 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
at gridline (A-B)(5-8) at Admin Bldg., J uaymah Shops N-26

FDT, Compaction inspection of existing subgrade for electrical and


965 C-0824 telecom duct bank near to new substation (south side) @ Juaymah Shops, NEW SUB STATION 13-Nov-17 4:30 PM 14-Nov-17 10:00 AM RA-819460-002-00 QUADRI ISHFAQ AHMED 1
Plant N26

966 C-0825 Precast sand bedding inspection at new car shaded parking area grid line CAR PARKING 13-Nov-17 4:40 PM 14-Nov-17 10:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
4 (D, E) 2 no.s @ Juaymah Shops, Plant N26

Sand backfilling inspection for sewer trench around & above pipe from
967 C-0826 SMH -13 to SMH-14 at south side of Admin Bldg. @ Juaymah Shops Plant ADMIN BUILDING 14-Nov-17 11:00 AM 15-Nov-17 9:00 AM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
N26

968 C-0827 FDT, Compaction Inspection of Existing Subgrade for Sewer Trench from NEW SUB STATION 14-Nov-17 3:15 PM 15-Nov-17 10:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 2
Substation to G.C.O at New Sub Station @ ju'aymah shops plant N-26

Excavation,Placement and Compaction Inspection of Sand beddingfor


969 C-0828 Sewer Trench from New Substation to G.C.O at New Sub Station @ NEW SUB STATION 14-Nov-17 3:20 PM 15-Nov-17 11:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
ju'aymah shops plant N-26

970 C-0829 Compaction Inspection of Water Fiooding for Sewer Trench from New NEW SUB STATION 14-Nov-17 3:25 PM 15-Nov-17 3:00 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 2
Substation to G.C.O at New Sub Station @ ju'aymah shops plant N-26

Pre-Cast Concrete Erection & Alignment Inspection of New S haded Car


971 C-0830 Parking Area Grid line 1 (F to I ) Type F1 Foundation 4 Nos,Grid line 2 & 3 CAR PARKING 14-Nov-17 3:30 PM 15-Nov-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
(G to I ) Type F2 Foundation 6 Nos and Grid line 4 (F to I ) Type F 1
Foundation 4 Nos Total 14 Nos @ ju'aymah shops plant N-26

972 C-0831 Site & Grade Preparation Inspection Of Electrical & Telecom Duct Bank NEW SUB STATION 14-Nov-17 3:35 PM 15-Nov-17 2:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Near to New Substation (South side ) @ Ju'Aymah, Shops Plant N- 26

973 C-0832 Formwork Inspection Of Electrical & Telecom Duct Bank Near to New NEW SUB STATION 14-Nov-17 3:40 PM 15-Nov-17 3:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Substation (South side) @ Ju'Aymah, Shops Plant N- 26

FBE Rebar,Embedded Items & Formwork Closure Inspection Of Electrical


974 C-0833 & Telecom Duct Bank Near to New Substatio(South side ) @ Ju'Aymah, NEW SUB STATION 14-Nov-17 3:45 PM 15-Nov-17 3:30 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection Of Electrical &


975 C-0834 Telecom Duct Bank Near to New Substatio (South side ) @ Ju'Aymah, NEW SUB STATION 14-Nov-17 3:50 PM 15-Nov-17 4:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Shops Plant N- 26

976 E-0055 Visual Inspection of Electrical Duck Bank anD Conduit excavation and NEW SUB STATION 14-Nov-17 3:55 PM 15-Nov-17 2:00 PM RA-819714-001-0F1 NOLI ALI M. AL YASEEN
trenching at Sub S tation Area. As per highlighted Attached Drawing.

977 P-0046 Material Receiving, Handling ,Storage & preservation Inspection of PVC PLANT N-26 14-Nov-17 1:20 PM 15-Nov-17 7:30 AM RA-819779-001-0F1 FAHEEM ISHFAQ AHMED
pipes 2" (04 Pcs) from NEPRO @ ETE store Juaymah Shop Plant N-26

Formwork inspection for 2nd Flr. Beams at gridline (C-F)(4-9)B1,B5,B6,&


978 C-0835 B7 and 2nd Flr.slab at gridline (E-F)(4-9) at Admin Bldg.,Juaymah Shops N- ADMIN BUILDING 15-Nov-17 1:20 PM 16-Nov-17 1:30 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
26

FBE Reinforcing Steel, Embedded Items & Formclosure inspection for 2nd
979 C-0836 Flr. Beams at gridline (C-F) (4-9) B1, B5, B6 & B7 and 2nd Flr. slab at ADMIN BUILDING 15-Nov-17 1:25 PM 16-Nov-17 1:45 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
gridline (E-F) (4-9) at Admin Bldg., Juaymah Shops N-26

Sampling,Testing and Placement of concrete inspection for 2nd Flr. Beams


980 C-0837 at gridline (C-F) (4-9) B1, B5, B6 & B7 and 2nd Flr. slab at gridline (E-F ) (4- ADMIN BUILDING 15-Nov-17 1:30 PM 16-Nov-17 3:30 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
9) at Admin Bldg., Juaymah Shops N-26

Surface Preparation & Moisture Test Inspection of Top side Foundation


981 C-0838 (nos=05) Grid line (1) Grid Line (B,C,D) and (3) Grid Line (E,F) @A dmin ADMIN BUILDING 15-Nov-17 2:00 PM 16-Nov-17 9:00 AM RA-819720-001-0F2 QUADRI ISHFAQ AHMED
Building At ju'aymah, shops, plant N-26

Surface Preparation & Moisture Test Inspection of Elevator Foundation


982 C-0839 Shear wall Top of Foundation to FF L -0.05 @ Admin Building At ju'aymah, ADMIN BUILDING 15-Nov-17 2:05 PM 16-Nov-17 9:30 AM RA-819720-001-0F2 QUADRI ISHFAQ AHMED
shops, plant N-26

983 C-0840 Concrete Finishing & Curing Inspection for slab on grade at Grid Line (5-8) ADMIN BUILDING 15-Nov-17 2:10 PM 16-Nov-17 7:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
(A-B) and (6-7) (A-A') at Admin Bldg.,Juaymah Shops N-26

Pre-Cast Concrete Erection and Alignment Inspection of New Shaded Car


984 C-0841 Parking Area Grid Line 4 (D, E) Type F1 Foundation 2 Nos. @ Juaymah CAR PARKING 15-Nov-17 2:15 PM 16-Nov-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Shops, Plant N-26

Visual Inspection of .Electrical Duck Bank, Conduit Pipe & spacers


985 E-0056 Installation , and embedded hardware prior to concrete placement, At NEW SUB STATION 15-Nov-17 2:20 PM 16-Nov-17 2:00 PM RA-819714-001-0F1 NOLI ALI M. AL YASEEN
Sub Station Area.As per highlighted Attached Drawing.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for Grade Beam # 03 at Grid Line (1) (B-E), (F) (4-2)
986 C-0842 and Grade Beam # 02 at Grid Line (3) (B-F), (2) (B-E), (C') (1-3), (D) (2-3), MAAZ LAB 16-Nov-17 9:30 AM 18-Nov-17 2:00 PM RA-819722-001-0F4 MOIZULLAH ISHFAQ AHMED
E(2-4) and Slab on Grade at Grid Line (C-E) (11-12) at Admin Building @
Juaymah Shops Plant N-26 @ MAAZ LAB
Concrete 28 Days Compressive Strength Testing & Final Acceptance
987 C-0843 Inspection of 4000 PSi for Elevator Shear Wall (f rom Top of Footing to FFL MAAZ LAB 16-Nov-17 9:35 AM 18-Nov-17 2:15 PM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
Elevation) at Grid Line (E-F) (1-2) at Admin Building Area, Juaymah Shops
N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


988 C-0844 Inspection of 5000 PSi for 08 Nos Pedestal of Booster Pump Station 1 & 2 MAAZ LAB 16-Nov-17 9:40 AM 18-Nov-17 3:00 PM RA-820020-001-00 MOIZULLAH ISHFAQ AHMED
at Pre-Cast Area in Workshop Area at Ju'Aymah Shops Plant N-26 @
MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


989 C-0845 Inspection of 5000 PSi for 5 Nos. P1 Type Pedestal of Admin Bldg. of Car MAAZ LAB 16-Nov-17 9:45 AM 18-Nov-17 3:15 PM RA-819735-001-00 MOIZULLAH ISHFAQ AHMED
Parking Shade at pre-Cast Area in Workshop Area@ Ju'Aymah, Shops
Plant N- 26 @ MAAZ LAB

Gravity test inspection for 8" RTR sewer line 33M between SMH-13 to
990 R-0011 SMH-14 at south side of New Admin Building area @ Juaymah Shops ADMIN BUILDING 12-Nov-17 4:50 PM 13-Nov-17 8:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
Plant N-26

991 P-0047 Requesting for closure of INCR-P-001 : Pipe Ends are open in Admin and ADMIN BUILDING 16-Nov-17 4:00 PM 18-Nov-17 7:30 AM RA-819500-001-0F1 FAHEEM SYED SHAFIULLAH
Substation Area @ Juaymah Shop Plant N-26

Coating & Final Inspection of APCS-3, Carboline of Elevator Foundation


992 C-0846 Shear wall Top of Foundation to FF L -0.05 @ Admin Building Ju'aymah ADMIN BUILDING 16-Nov-17 4:15 PM 18-Nov-17 9:30 AM RA-819720-001-0F2 QUADRI ISHFAQ AHMED
Shops Plant N-26

Coating & Final Inspection of APCS-3, Carboline at Top side Foundation


993 C-0847 (nos=05) Grid line (1) Grid Line (B,C,D) and (3) Grid Line (E,F) @ Admin ADMIN BUILDING 16-Nov-17 4:20 PM 18-Nov-17 9:00 AM RA-819720-001-0F2 QUADRI ISHFAQ AHMED
Building Ju'aymah, shops, plant N- 26

Request for closing OF INCR-M-0001 for improper handling and storage


994 R-0012 and preservation of RTR material at ETE LAYDOWN YARD @ JUAYMAH PLANT N-26 16-Nov-17 4:25 PM 18-Nov-17 8:00 AM RA-819437-001-00 JACOB SYED SHAFIULLAH
SHOPS PLANT N-26

995 C-0848 Fill placement & compaction inspection of 4th layer selectfill material at ADMIN BUILDING 18-Nov-17 8:00 AM 19-Nov-17 8:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
gridline (1-2) (B-C) in Admin Bldg. @ J uaymah Shops Plant N-26

996 C-0849 FDT inspection of 4th layer selectfill material at gridline (1-2) (B-C) in ADMIN BUILDING 18-Nov-17 8:05 AM 19-Nov-17 8:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 1
Admin Bldg. @ J uaymah S hops Plant N-26

997 C-0850 Fill placement & compaction inspection of 5th layer selectfill material at ADMIN BUILDING 18-Nov-17 8:10 AM 19-Nov-17 10:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
gridline (1-2) (B-C) in Admin Bldg. @ J uaymah Shops Plant N-26

998 C-0851 FDT inspection of 5th layer selectfill material at gridline (1-2) (B-C) in ADMIN BUILDING 18-Nov-17 8:15 AM 19-Nov-17 10:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 1 +1
Admin Bldg. @ J uaymah S hops Plant N-26

999 C-0852 Fill placement & compaction inspection of 6th layer selectfill material at ADMIN BUILDING 18-Nov-17 8:20 AM 19-Nov-17 3:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
gridline (1-2) (B-C) in Admin Bldg. @ J uaymah Shops Plant N-26

1000 C-0853 FDT inspection of 6th layer selectfill material at gridline (1-2) (B-C) in ADMIN BUILDING 18-Nov-17 8:25 AM 19-Nov-17 3:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 1
Admin Bldg. @ J uaymah S hops Plant N-26

1001 C-0854 Fill placement & compaction inspection of 5th layer selectfill material at ADMIN BUILDING 18-Nov-17 8:30 AM 19-Nov-17 8:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
gridline (1-2) (D-E) in Admin Bldg. @ Juaymah Shops Plant N26

1002 C-0855 FDT inspection of 5th layer selectfill material at gridline (1-2) (D-E) in ADMIN BUILDING 18-Nov-17 8:35 AM 19-Nov-17 8:45 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 1
Admin Bldg. @ J uaymah S hops Plant N26

1003 C-0856 Fill placement & compaction inspection of 6th layer selectfill material at ADMIN BUILDING 18-Nov-17 8:40 AM 19-Nov-17 8:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
gridline (1-2) (D-E) in Admin Bldg. @ Juaymah Shops Plant N26

1004 C-0857 FDT inspection of 6th layer selectfill material at gridline (1-2) (D-E) in ADMIN BUILDING 18-Nov-17 8:45 AM 19-Nov-17 8:45 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 1
Admin Bldg. @ J uaymah S hops Plant N26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1005 C-0858 for New Sub S tation Building (Panel Mark SS-WIG-03, SS- WIG-04 & S S- INCO 21-Nov-17 7:00 AM 22-Nov-17 8:45 AM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
WIG-02B) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1006 C-0859 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 21-Nov-17 7:05 AM 22-Nov-17 9:00 AM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
(Panel Mark SS-WIG-03, SS-WIG-04 & SS-WIG-02B) at INCO Pre-Cast
Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1007 C-0860 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 21-Nov-17 7:10 AM 22-Nov-17 9:30 AM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
SS-WIG-03, SS-WIG-04 & SS-WIG-02B) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1008 C-0861 Sampling and Testing Inspection for Admin Building (Panel Mark SS-WIG- INCO 21-Nov-17 7:15 AM 22-Nov-17 2:30 PM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
03, SS-WIG-04 & SS-WIG-02B) at INCO Pre-Cast Fabrication Yard

1009 C-0862 FDT inspection for subgrade of S anitary line Trench inside Male Toilet 116 ADMIN BUILDING 18-Nov-17 8:50 AM 19-Nov-17 2:45 PM RA-819774-001-00 ACIELO ISHFAQ AHMED 2 Re-Work
(1st Flr.) Admin Bldg. @ Juaymah Shops Plant N26

1010 C-0863 Sand Bedding placement inspection of S anitary line Trench inside Male ADMIN BUILDING 18-Nov-17 8:55 AM 19-Nov-17 3:20 PM RA-819774-001-00 ACIELO ISHFAQ AHMED Re- Work Not in
Toilet 116 (1st Flr.) Admin Bldg. @ Juaymah Shops Plant N26 QMIS

1011 C-0864 FDT inspection for sand bedding of Sanitary line Trench inside Male Toilet ADMIN BUILDING 18-Nov-17 9:00 AM 19-Nov-17 4:30 PM RA-819774-001-00 ACIELO ISHFAQ AHMED 2 Re-Work
116 (1st Flr.) Admin Bldg. @ Juaymah Shops Plant N26

1012 C-0865 FDT, compaction inspection of existing subgrade for sewer trench from NEW SUB STATION 18-Nov-17 2:10 PM 19-Nov-17 11:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 2
G.C.O. to MH#9 @ New Sub Station, Juaymah Shops, Plant N26

Excavation, Placement and Compaction Inspection of Sand beddingfor


1013 C-0866 Sewer Trench from G.C.O to MH# 09 New Sub Station @ ju'aymah shops NEW SUB STATION 18-Nov-17 2:15 PM 19-Nov-17 11:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
plant N-26

1014 C-0867 Compaction Inspection of Water Fiooding for Sewer Trench from G.C.O to NEW SUB STATION 18-Nov-17 2:20 PM 19-Nov-17 4:10 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 2
MH # 09 at New Substation @ ju'aymah shops plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FDT, Compaction Inspection of Existing Subgrade for Electric Duct Bank


1015 C-0868 .Length 15.00 M,14.00 M and 11.00 M at Car Parking Area @ ju'aymah CAR PARKING 18-Nov-17 2:25 PM 19-Nov-17 4:15 PM RA-819936-001-00 QUADRI ISHFAQ AHMED 6 +2
shops plant N-26

Soil Protection and Control,Drainage and De-Watering Inspection at New


1016 C-0869 Shaded Car Parking Area Grid line 2 & 3 ( F ) 2 Nos @ Ju'Aymah, Shops CAR PARKING 18-Nov-17 2:30 PM 19-Nov-17 4:20 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Plant N- 26

Excavation, Surface Leveling and Proof Rolled Compaction Inspection of


Existing Sub Grade Below Foundation Of 0.6M as per Geotechnical Report
1017 C-0870 /Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @ CAR PARKING 18-Nov-17 2:35 PM 19-Nov-17 4:35 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

Visual Inspection of .Electrical Duck Bank Mandrel Test of HDPE Pipe


225mm Prior for Cable Laying at West Side of new Admin to S outh Side of
1018 E-0057 Security ID Office R #. 82 @ Ju'aymah S hop Plant N-26 .As per highlighted PLANT N-26 19-Nov-17 1:30 PM 20-Nov-17 9:00 AM RA-819460-001-0F1 NOLI ALI M. AL YASEEN
Attached Drawing.

Visual inspection and Material receiving of Register coupling 4"(QTY=52


PCS), Namco Duct base Spacer 4*2" black(QTY 1400 pcs),Duct plug
1019 T-0011 4"(Qty+06 Pcs), LR Bend 4" Radius 6 meter angle 90^ length 9.42 meters PLANT N-26 19-Nov-17 2:00 PM 20-Nov-17 10:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
as per P.O. 4258 and P.O.4257

Visual inspection and Material receiving of PVC pipe 4" TC8 6


1020 T-0012 meter(QTY=100 PCS)as per P.O.4257. PLANT N-26 19-Nov-17 2:05 PM 20-Nov-17 10:15 AM RA-819517-001-00 AFZAL M. Z. NAVEED

Visual Inspection and Final Test of HDPE Pipe 140 mm Prior to FOC Cable
1021 T-0013 Pulling ad per highlighted in drawing and cordinates are showed at 11 to PLANT N-26 19-Nov-17 2:10 PM 20-Nov-17 9:00 AM RA-819460-001-0F1 AFZAL M. Z. NAVEED
12 @ ETE Store J uAymah Shops Plant N-26

Fill placement & compaction inspection of 7th layer (final layer) selectfill
1022 C-0871 material at gridline (1-2) (B-C) in Admin Bldg. @ J uaymah Shops Plant ADMIN BUILDING 19-Nov-17 2:15 PM 20-Nov-17 2:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
N26

1023 C-0872 FDT inspection of 7th layer (final layer) selectfill material at gridline (1-2) ADMIN BUILDING 19-Nov-17 2:20 PM 20-Nov-17 2:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 2
(B-C) in Admin Bldg. @ Juaymah Shops Plant N26

1024 C-0873 Preparation, Mixing and Application Inspection of Anti Termite for Slab on ADMIN BUILDING 19-Nov-17 2:25 PM 20-Nov-17 4:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Grade at Grid Line (1-2) (B-C) in Admin Bldg. @ Juaymah Shops Plant N26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1025 C-0874 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 19-Nov-17 3:30 PM 20-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


1026 C-0875 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 19-Nov-17 3:35 PM 20-Nov-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2
/Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @
Ju'Aymah, Shops Plant N- 26

Visual inspection and Material receiving of Duct plug 4"(QTY=06 PCS),


1027 T-0014 NAMCO DUCT inter spacer 4*2" black IKKPF KSA Namco (QTY=400 PCS) as PLANT N-26 19-Nov-17 4:30 PM 20-Nov-17 10:25 AM RA-819517-001-00 AFZAL M. Z. NAVEED
per P.O.4257 and 4258.

1028 C-0876 FDT inspection for subgrade of S ewer Trench from LUP fence to SMH- 12 ADMIN BUILDING 20-Nov-17 11:30 AM 21-Nov-17 2:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
(6m) north side Admin Bldg. @ Juaymah Shops Plant N26

1029 C-0877 Sand Bedding placement inspection of S ewer Trench from LUP fence to ADMIN BUILDING 20-Nov-17 11:35 AM 21-Nov-17 3:45 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
SMH-12 (6m) north side Admin Bldg. @ Juaymah Shops Plant N26

1030 C-0878 FDT inspection of sand bedding for Sewer Trench from LUP fence to SMH- ADMIN BUILDING 20-Nov-17 11:40 AM 21-Nov-17 4:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
12 (6m) north side Admin Bldg. @ Juaymah Shops Plant N26

1031 C-0879 Site & Grade Preparation inspection for slab on grade at gridline (B-C) ((1- ADMIN BUILDING 20-Nov-17 3:15 PM 21-Nov-17 1:00 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
2) at Admin Bldg.Juaymah Shops N-26

1032 C-0880 Formworks inspection for slab on grade at gridline (B-C) ((1-2) at Admin ADMIN BUILDING 20-Nov-17 3:20 PM 21-Nov-17 1:15 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
Bldg.Juaymah Shops N-26

1033 C-0881 FBE Reinforcing Steel,Embedded Items & Formclosure inspection for slab ADMIN BUILDING 20-Nov-17 3:25 PM 21-Nov-17 1:30 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
on grade at gridline (B-C) ((1-2) at Admin Bldg.Juaymah Shops N-26

1034 C-0882 Sampling,Testing & Placement of concrete inspection for slab on grade at ADMIN BUILDING 20-Nov-17 3:30 PM 21-Nov-17 3:00 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
gridline (B-C) ((1-2) at Admin Bldg.Juaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1035 C-0883 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 20-Nov-17 3:50 PM 21-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1036 C-0884 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 20-Nov-17 3:55 PM 21-Nov-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2
/Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1037 C-0885 Material around Foundation at Grid Line (1,2,3) (A, B, C, D, E, G, H, I) and CAR PARKING 20-Nov-17 4:00 PM 21-Nov-17 3:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Grid Line (1) (F) at New Shaded Car Parking Area @ Ju'Aymah, Shops
Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


1038 C-0886 around Foundation at Grid Line (1,2,3) (A, B, C, D, E, G, H, I) and Grid Line CAR PARKING 20-Nov-17 4:05 PM 21-Nov-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 25
(1) (F) at New Shaded Car Parking Area @ Ju'Aymah, Shops Plant N- 26

1039 C-0887 Formwork inspection for Main Staircase at gridline (B)(5-8) (2nd lift) at ADMIN BUILDING 21-Nov-17 11:00 AM 22-Nov-17 2:00 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
Admin Bldg.,Juaymah Shops N-26

1040 C-0888 FBE Reinforcing Steel,Embedded Items & Formclosure inspection for Main ADMIN BUILDING 21-Nov-17 11:05 AM 22-Nov-17 2:15 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
Staircase at gridline (B)(5-8) (2nd lift) at Admin Bldg.,Juaymah Shops N-26

1041 C-0889 Sampling,Testing & Placement of concrete inspection for Main S taircase ADMIN BUILDING 21-Nov-17 11:10 AM 22-Nov-17 3:30 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
at gridline (B)(5-8) (2nd lift) at Admin Bldg.,Juaymah Shops N-26

1042 C-0890 FDT, Compaction Inspection of existing Sub Grade for LV Duct Bank, South NEW SUB STATION 21-Nov-17 11:15 AM 22-Nov-17 3:30 PM RA-819746-002-00 SALMAAN ISHFAQ AHMED 1
West Side @ New Substation Area, Juaymah Shops, Plant N-26

Formwork inspection for 2nd Flr. Beams at gridline (A-C)(4-


1043 C-0891 9)B1,B2,B3,B5,& B6 and cantilever slab at gridline (A-A')(5'-7') at Admin ADMIN BUILDING 21-Nov-17 11:20 AM 22-Nov-17 1:30 PM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
Bldg.,Juaymah Shops N-26

FBE Reinforcing Steel,Embedded Items & Formclosure inspection for 2nd


1044 C-0892 Flr. Beams at gridline (A-C)(4-9)B1,B2,B3,B5,& B6 and cantilever slab at ADMIN BUILDING 21-Nov-17 11:25 AM 22-Nov-17 1:45 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
gridline (A- A')(5'-7') at Admin Bldg.,Juaymah Shops N-26

Sampling,Testing & Placement of concrete inspection for 2nd F lr. Beams


1045 C-0893 at gridline (A-C)(4-9)B1,B2,B3,B5,& B6 and cantilever slab at gridline (A- ADMIN BUILDING 21-Nov-17 11:30 AM 22-Nov-17 3:00 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
A')(5'-7') at Admin Bldg.,Juaymah Shops N-26

1046 C-0894 Curing inspection of concrete for main staircase at gridline (A-B)(5-8) at ADMIN BUILDING 21-Nov-17 11:35 AM 22-Nov-17 7:00 AM RA-819745-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Admin Bldg.,Juaymah Shops N-26

PVC pipe joint and assembly inspection for 3" &4" PVC sewer line 48 m
1047 P-0048 from substation to SMH-09 at south side of New substation area @ NEW SUB STATION 21-Nov-17 11:40 AM 22-Nov-17 8:00 AM RA-819486-001-00 FAHEEM SYED SHAFIULLAH
Juaymah shops plant N-26

Gravity test inspection for 3" & 4" PVC sewer line 48 m from substation to
1048 P-0049 SMH-09 at south side of New substation area @ Juaymah shops plant N- NEW SUB STATION 21-Nov-17 11:45 AM 22-Nov-17 9:00 AM RA-819486-001-00 FAHEEM SYED SHAFIULLAH
26

Pre-Cast & Pre-Stressed Concrete Curing Inspection for Admin Building


1049 C-0895 Building (Panel Mark CIG-A-18 & CIG-A-19 Mock-Up Panels) at INCO Pre- INCO 22-Nov-17 7:30 AM 23-Nov-17 4:30 PM 0016-ER-001 WILFREDO ISHFAQ AHMED Not in QMIS
Cast Fabrication Yard

1050 C-0896 Curuing Inspection Of Concrete for Electrical & Telecom Duct Bank near to SHIPPING & RECEIVING 22-Nov-17 7:45 AM 23-Nov-17 10:00 AM RA-819486-002-00 QUADRI ISHFAQ AHMED Not in QMIS
New Sub station (South side ) @ Ju'Aymah, Shops Plant N- 26 AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 10 Nos Column at Grid Line (3) (C) C1, (3) (D)
1051 C-0897 C1, (3) (E) C8, (3) (F) C15, (2) (F) C15, (2) (D) C4, (2) (C) C3, (1) (B) C13 ,(1) MAAZ LAB 22-Nov-17 8:30 AM 23-Nov-17 11:00 AM RA-819721-001-0F2 MOIZULLAH ISHFAQ AHMED
(C') C16, (1) (D) C17 at Admin Bldg Area,Juaymah Shops N-26 @ MAAZ
LAB
Concrete 28 Days Compressive Strength Testing & Final Acceptance
1052 C-0898 Inspection of 4000 PSi for Grade on Slab at Grid line 3 & 4 ( A to G ) Panel MAAZ LAB 22-Nov-17 8:35 AM 23-Nov-17 11:15 AM RA-819992-001-0F1 MOIZULLAH ISHFAQ AHMED
( 2 ) 6 Nos at Shipping and Receiving Area at Ju'Aymah, Shops Plant N- 26
@ MAAZ LAB

Compaction Testing (FDT) Inspection of Subgrade for Sever Water line


1053 C-0899 trench, 40 linear Meter from SMH-9 toward South. New S ubstation @ NEW SUB STATION 22-Nov-17 1:30 PM 23-Nov-17 1:00 PM RA-819486-001-00 SALMAAN ISHFAQ AHMED 3
ju'aymah shops, plant N-26

Fill placement Inspection of Sweet Sand Bedding 15 cm thick, for Sever


1054 C-0900 Water line trench, 40 linear Meter, from SMH-9 toward South. New NEW SUB STATION 22-Nov-17 1:35 PM 23-Nov-17 3:00 PM RA-819486-001-00 SALMAAN ISHFAQ AHMED Not in QMIS
Substation @ ju'aymah shops, plant N-26

Compaction Testing (FDT) Inspection of Sweet Sand Bedding 15cm thick


1055 C-0901 for Sever Water line trench, 40 linear Meter from SMH-9 toward South. NEW SUB STATION 22-Nov-17 1:40 PM 23-Nov-17 4:00 PM RA-819486-001-00 SALMAAN ISHFAQ AHMED 2
New Substation @ ju'aymah shops, plant N-26

1056 C-0902 Compaction Testing (FDT) Inspection of Subgrade for Raw Water line and NEW SUB STATION 22-Nov-17 1:45 PM 23-Nov-17 1:15 PM RA-819438-001-00 SALMAAN ISHFAQ AHMED 2
Potable Water Line trench, New Substation @ ju'aymah shops, plant N-26

Fill placement Inspection of Sweet Sand Bedding 15cm thick , for Raw
1057 C-0903 Water line and Potable Water Line trench, New Substation @ ju'aymah NEW SUB STATION 22-Nov-17 1:50 PM 23-Nov-17 3:15 PM RA-819438-001-00 SALMAAN ISHFAQ AHMED Not in QMIS
shops, plant N-26

Compaction testing (FDT) inspection of Sweet Sand Bedding 15cm thick ,


1058 C-0904 for Raw Water line and Potable Water Line trench, New S ubstation @ NEW SUB STATION 22-Nov-17 1:55 PM 23-Nov-17 4:15 PM RA-819438-001-00 SALMAAN ISHFAQ AHMED 3
ju'aymah shops, plant N-26

1059 C-0905 Grade & Site Preparation Inspection for Lv Duct Bank,South West site NEW SUB STATION 22-Nov-17 3:00 PM 23-Nov-17 2:00 PM RA-819460-002-00 SALMAAN ISHFAQ AHMED
@New Substation Area At ju'aymah, shops, plant N-26

1060 C-0906 Installation of Epoxy Coated Steel Bars,Inspection for Lv Duct Bank,S outh NEW SUB STATION 22-Nov-17 3:05 PM 23-Nov-17 2:30 PM RA-819460-002-00 SALMAAN ISHFAQ AHMED
West site New Substation Area At ju'aymah, shops, plant N-26

1061 C-0907 Concrete Sampling, Testing & Placement Inspection for Lv Duct NEW SUB STATION 22-Nov-17 3:10 PM 23-Nov-17 3:00 PM RA-819460-002-00 SALMAAN ISHFAQ AHMED
Bank,South West site New Substation Area At Ju'aymah, Shops, Plant N-26

Site & Grade Preparation Inspection Of Electrical Duct Bank for length
1062 C-0908 14.00 meter,11.00 meter and15.00 meter at New Car Parking Area @ CAR PARKING 22-Nov-17 3:15 PM 23-Nov-17 2:15 PM RA-819936-001-00 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

FBE Rebar,Embedded Items Inspection Of Electrical l Duct Bank for


1063 C-0909 length 14.00 meter,11.00 meter and15.00 meter at New Car Parking Area CAR PARKING 22-Nov-17 3:20 PM 23-Nov-17 3:15 PM RA-819936-001-00 QUADRI ISHFAQ AHMED
@ J u'Aymah, Shops Plant N- 26

Concrete,Sampling,Testing and Placement For Electrical Duct Bank for


1064 C-0910 length 14.00 meter 11.00 mete and15.00 meter at New Car Parking Area CAR PARKING 22-Nov-17 3:25 PM 23-Nov-17 4:30 PM RA-819936-001-00 QUADRI ISHFAQ AHMED
@ J u'Aymah, Shops Plant N- 26

Visual Inspection of LV Electrical Duck Bank, Conduit Pipe & S pacers


1065 E-0058 Installation and Embedded hardware prior to concrete placement, at Car CAR PARKING 22-Nov-17 3:30 PM 23-Nov-17 1:30 PM RA-819936-001-00 NOLI ALI M. AL YASEEN
Parking Area as per Highlighted attached Drawing.

Visual Inspection of LV Electrical Duck Bank Conduit Pipe & Spacers


1066 E-0059 Installation and Embedded hardware prior to concrete placement at New NEW SUB STATION 22-Nov-17 3:35 PM 23-Nov-17 2:00 PM RA-819460-002-00 NOLI ALI M. AL YASEEN
Sub Station Area. as per Highlighted attached Drawing.

Visual Inspection of Electrical Duck Bank and Conduit excavation and


1067 E-0060 trenching at New Sub Station Area prior to concrete placement, As per NEW SUB STATION 22-Nov-17 3:40 PM 23-Nov-17 10:00 AM RA-819460-002-00 NOLI ALI M. AL YASEEN
highlighted Attached Drawing.

Visual Inspection of Electrical Duck Bank anD Conduit excavation and


1068 E-0061 trenching at Car Parking Area, prior to concrete placement, As per CAR PARKING 22-Nov-17 3:45 PM 23-Nov-17 10:30 AM RA-819936-001-00 NOLI ALI M. AL YASEEN
highlighted Attached Drawing.

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1069 C-0911 for New Sub S tation Building (Panel Mark SS-WIG-05, & SS-WIG-06 ) at INCO 23-Nov-17 8:00 AM 25-Nov-17 8:45 AM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1070 C-0912 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 23-Nov-17 8:05 AM 25-Nov-17 9:00 AM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
(Panel Mark SS-WIG-05 & SS-WIG-06) at INCO Pre-Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1071 C-0913 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 23-Nov-17 8:10 AM 25-Nov-17 9:30 AM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
SS-WIG-05 & SS-WIG-06) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1072 C-0914 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 23-Nov-17 8:15 AM 25-Nov-17 2:30 PM 0016-ER-001-10 WILFREDO ISHFAQ AHMED
MarkSS-WIG-05 & SS-WIG-06) at INCO Pre-Cast Fabrication Yard

Concrete Finishing & Curing Inspection for 2nd Flr. Beams at gridline (C-
1073 C-0915 F)(4-9)B1,B5,B6,& B7 and 2nd F lr.slab at gridline (E-F)(4-9) at Admin ADMIN BUILDING 23-Nov-17 8:20 AM 25-Nov-17 7:00 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED Not in QMIS
Bldg.,Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1074 C-0916 Inspection of 4000 PSi for staircase at gridline (C-E) (11-12) at Admin MAAZ LAB 23-Nov-17 11:30 AM 25-Nov-17 11:00 AM RA-819745-001-00 MOIZULLAH ISHFAQ AHMED
Bldg.Juatmah Shops N-26

1075 C-0917 Soil Sample Collection Inspection of Excavated Material from ETE PLANT N-26 23-Nov-17 1:10 PM 25-Nov-17 1:30 PM RA-819500-001-0F1 QUADRI ISHFAQ AHMED
Laydown, Stock Pile for Sieve Analysis at Ju'aymah Shops Plant N- 26

Sand Covering Inspection for Sewer Line PVC Pipe around & above 30 cm
1076 C-0918 from G.C.O to SMH-09 New Sub Station Building Area @ J uaymah S hops NEW SUB STATION 23-Nov-17 3:35 PM 25-Nov-17 8:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Plant N-26

1077 E-0062 Visual Inspection of Sand Bedding Final Backfilling of MV Electrical Duck NEW SUB STATION 23-Nov-17 3:40 PM 25-Nov-17 1:30 PM RA-819936-001-00 NOLI ALI M. AL YASEEN
Bank at New Sub Station Area As per highlighted Attached Drawing.

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1078 C-0919 for New Sub S tation Building (Panel Mark SS-WIG-02C, & SS- WIG-16 ) at INCO 25-Nov-17 8:00 AM 26-Nov-17 8:45 AM 0016-ER-001-10 WILFREDO MAMDOOH
INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1079 C-0920 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 25-Nov-17 8:05 AM 26-Nov-17 9:00 AM 0016-ER-001-10 WILFREDO MAMDOOH
(Panel Mark SS-WIG-02C & S S-WIG-16) at INCO Pre- Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1080 C-0921 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 25-Nov-17 8:10 AM 26-Nov-17 9:30 AM 0016-ER-001-10 WILFREDO MAMDOOH
SS-WIG-02C & SS-WIG- 16) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1081 C-0922 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 25-Nov-17 8:15 AM 26-Nov-17 2:30 PM 0016-ER-001-10 WILFREDO MAMDOOH
Mark SS-WIG- 02C & SS-WIG-16) at INCO Pre-Cast Fabrication Yard

1082 C-0923 Formwork inspection for Exit Staircase at gridline (B-C)(1-2) (1st lift) at ADMIN BUILDING 25-Nov-17 10:20 AM 26-Nov-17 2:00 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
Admin Bldg.,Juaymah Shops N-26

FBE Reinforcing Steel,Embedded Items & Formclosure inspection for exit


1083 C-0924 Staircase at gridline (B-C)(1-2) (1st lift) at Admin Bldg.,Juaymah Shops N- ADMIN BUILDING 25-Nov-17 10:25 AM 26-Nov-17 2:15 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
26

1084 C-0925 Sampling,Testing & Placement of concrete inspection for exit S taircase at ADMIN BUILDING 25-Nov-17 10:30 AM 26-Nov-17 4:00 PM RA-819745-001-00 ACIELO ISHFAQ AHMED
gridline (B-C)(1-2) (1st lift) at Admin Bldg.,Juaymah Shops N-26

Visual Inspection Material Handling S torage and Preservation of PVC Pipe


1085 T-0015 4" Nema TC8, 6 meter (QTY=100 PCS), LR Bend 4" Radius 6 meter angle CAR PARKING 13-Nov-17 11:00 AM 14-Nov-17 10:15 AM RA-819517-001-00 AFZAL M. Z. NAVEED Not in QMIS
90^ length 9.42 meter (Qty=4) @ ETE Storage JuAymah Shops Plant N-26

Visual Inspection Material Handling S torage and Preservation of Register


1086 T-0016 Coupling 4" (QTY=52 pcs), Namcoduct Base Spacer 4x2" Black (QTY=1400 CAR PARKING 13-Nov-17 11:05 AM 14-Nov-17 10:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED Not in QMIS
pcs), Duct Plug 4" (Qty=06 Pcs) @ ETE Storage JuAymah Shops Plant N-26

Pre-Cast Post-Concreting & Final Inspection of Panel Mark CIG-A-18 &


1087 C-0926 CIG-A-19 Admin Building (Mock-Up Panels) @ INCO Pre- Cast Fabrication INCO 25-Nov-17 11:30 AM 26-Nov-17 11:00 AM 0016-ER-001-10 WILFREDO MAMDOOH
Yard

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1088 C-0927 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 25-Nov-17 3:20 PM 26-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material


1089 C-0928 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 25-Nov-17 3:25 PM 26-Nov-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2+2
/Recommendation at New Shaded Car Parking Area Grid line 2 & 3 (F ) @
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1090 C-0929 Material around Foundation at Grid Line (1,2,3) (A, B, C, D, E, G, H, I) and CAR PARKING 25-Nov-17 3:30 PM 26-Nov-17 3:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Grid Line (1) (F) at New Shaded Car Parking Area @ Ju'Aymah, Shops
Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1091 C-0930 around Foundation at Grid Line (1,2,3) (A, B, C, D, E, G, H, I) and Grid Line CAR PARKING 25-Nov-17 3:35 PM 26-Nov-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 25
(1) (F) at New Shaded Car Parking Area @ Ju'Aymah, Shops Plant N- 26

First Layer Selectfill Placement and Compaction Inspection on MV Duct


1092 C-0931 Bank South West Side of New Substation Building @ ju'aymah shops, NEW SUB STATION 25-Nov-17 3:40 PM 26-Nov-17 2:30 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED Not in QMIS
plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

First Layer Selectfill Compaction Testing (FDT) Inspection on MV Duct


1093 C-0932 Bank South West Side of New Substation Building @ ju'aymah shops, NEW SUB STATION 25-Nov-17 3:45 PM 26-Nov-17 2:45 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED 1
plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1094 C-0933 Material on MV Duct Bank South West Side of New Sub Station Building NEW SUB STATION 26-Nov-17 1:10 PM 27-Nov-17 1:45 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED Not in QMIS
@ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material on


1095 C-0934 MV Duct Bank South West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 26-Nov-17 1:15 PM 27-Nov-17 2:00 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED 1
Shops Plant N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1096 C-0935 for New Sub S tation Building (Panel Mark SS-WIG-02D & SS-WIG-10 ) at INCO 26-Nov-17 1:25 PM 27-Nov-17 8:45 AM 0016-ER-001-7 WILFREDO MAMDOOH
INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1097 C-0936 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 26-Nov-17 1:30 PM 27-Nov-17 9:00 AM 0016-ER-001-7 WILFREDO MAMDOOH
(Panel Mark SS-WIG-02D & SS-WIG-10) at INCO Pre-Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1098 C-0937 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 26-Nov-17 1:35 PM 27-Nov-17 9:30 AM 0016-ER-001-7 WILFREDO MAMDOOH
SS-WIG-02D & SS-WIG-10) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1099 C-0938 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 26-Nov-17 1:40 PM 27-Nov-17 2:30 PM 0016-ER-001-7 WILFREDO MAMDOOH
MarkSS-WIG-02D & SS-WIG-10) at INCO Pre-Cast Fabrication Yard

Compaction Testing (FDT) Inspection of Subgrade for Potable Water Line


1100 C-0939 Trench from VB-0010 to Battery Room New Substation @ Ju'aymah Ahops NEW SUB STATION 26-Nov-17 4:05 PM 27-Nov-17 8:45 AM RA-819739-003-00 SALMAAN ISHFAQ AHMED 3
Plant N-26

Fill Placement Inspection of S weet Sand 15cm Thick for Potable Water
1101 C-0940 Line Trench from VB-0010 to Battery Room New Substation @ Ju'aymah NEW SUB STATION 26-Nov-17 4:10 PM 27-Nov-17 9:00 AM RA-819739-003-00 SALMAAN ISHFAQ AHMED Not in QMIS
Ahops Plant N-26

FDT Compaction Inspection of Sweet Sand Bedding 15cm Thick for


1102 C-0941 Potable Water Line Trench from VB-0010 to Battery Room New Substation NEW SUB STATION 26-Nov-17 4:15 PM 27-Nov-17 10:00 AM RA-819739-003-00 SALMAAN ISHFAQ AHMED 3
@ J u'aymah Ahops Plant N-26

RTR pipe joint and assembly inspection for 8" RTR Sewer line 23 m
1103 R-0013 between SMH-11 & SMH-12 at 'North side of New Admin building area @ NEW SUB STATION 26-Nov-17 4:20 PM 27-Nov-17 9:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
Juaymah shop plant N-26

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1104 P-0050 fittings Couplings with 1" (20Pcs), ½" (30Pcs), ¾" (30Pcs), 2" (170Pcs), 3" PLANT N-26 26-Nov-17 4:25 PM 27-Nov-17 7:30 AM RA-819900-001-00 FAHEEM SYED SHAFIULLAH Not in QMIS
(36Pcs), 4" (20Pcs) from NEPRO @ ETE store Juaymah Shop Plant N-26

Material Receiving, Handling ,Storage & preservation Inspectionof PVC


1105 P-0051 Pipes with 6" & 8" ø & fittings with 2",3" & 4"(V.Stone Flanges,WYE'S, & PLANT N-26 26-Nov-17 4:30 PM 27-Nov-17 8:30 AM RA-819779-003-00 FAHEEM SYED SHAFIULLAH Not in QMIS
Elb's 45⁰ & 90⁰) As Per from NEPRO at ETE store, Ju'aymah Shops Plant N-
26. (As Per Attached List)

1106 C-0942 Formwork Inspection for Elevator Shear Wall (2nd Lift up to Elev. 4.20 m) ADMIN BUILDING 27-Nov-17 10:30 AM 28-Nov-17 2:00 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
@ Admin Building Juaymah Shops N- 26

1107 C-0943 FBE Reinforcing Steel, Inspection for Elevator Shear Wall (2nd Lift up to ADMIN BUILDING 27-Nov-17 10:35 AM 28-Nov-17 2:15 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Elev. 4.20 m) @ Admin Building Juaymah Shops N-26

1108 C-0944 Pre-Cast Concrete Sand Bedding Inspection at Grid line 2 & 3 (F) at Car CAR PARKING 27-Nov-17 3:00 PM 28-Nov-17 10:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Parking Area @ Juaymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1109 C-0945 Material Around Foundation at New Shaded Car Parking Area Grid line 4 CAR PARKING 27-Nov-17 3:05 PM 28-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
( A, B, C, E, F, G, H. I ) @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


1110 C-0946 Around Foundation at New Shaded Car Parking Area Grid line 4 ( A, B, C, CAR PARKING 27-Nov-17 3:10 PM 28-Nov-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 8
E, F, G, H. I ) @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1111 C-0947 Material on MV Duct Bank South West Side of New Sub Station Building NEW SUB STATION 27-Nov-17 3:15 PM 28-Nov-17 7:15 AM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED Not in QMIS
@ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material on


1112 C-0948 MV Duct Bank South West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 27-Nov-17 3:20 PM 28-Nov-17 7:45 AM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED 1
Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1113 C-0949 Material on MV Duct Bank South West Side of New Sub Station Building NEW SUB STATION 27-Nov-17 3:25 PM 28-Nov-17 9:15 AM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED Not in QMIS
@ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material on


1114 C-0950 MV Duct Bank South West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 27-Nov-17 3:30 PM 28-Nov-17 2:45 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED 1
Shops Plant N-26

CPVC Pipes and Fittings Installation Inspection of 2"ø for Portable Water
1115 P-0052 Line from Battery Room to VB-0010 and from VB-0010 to Till 19 Linear NEW SUB STATION 27-Nov-17 3:35 PM 28-Nov-17 8:30 AM RA-819438-003-00 FAHEEM SYED SHAFIULLAH
Meter Outside New Substation Area @ Ju'aymah, S hops Plant N- 26.

CPVC Pipes and Fittings Installation Inspection of 2"ø for Raw Water Line
1116 P-0053 from Mechanical Room to VB-0010 and from VB-0010 to Till 19 Linear NEW SUB STATION 27-Nov-17 3:40 PM 28-Nov-17 9:00 AM RA-819438-003-00 FAHEEM SYED SHAFIULLAH
Meter Outside New Substation Area @ Ju'aymah, S hops Plant N- 26.

1117 R-0014 Gravity test inspection for 8" RTR sewer line 23m between S MH-11 & ADMIN BUILDING 27-Nov-17 3:45 PM 28-Nov-17 9:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
SMH-12at North side Admin building area @ Juaymah Shops Plant N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1118 C-0951 for New Sub S tation Building (Panel Mark SS-WIG-02, SS-WIG-11, SS-WIG- INCO 28-Nov-17 7:00 AM 29-Nov-17 8:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
09 & SS-WIG-17 ) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1119 C-0952 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 28-Nov-17 7:05 AM 29-Nov-17 8:15 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-02, SS-WIG-11, SS-WIG-09 & SS-WIG-17) at INCO Pre-
Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1120 C-0953 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 28-Nov-17 7:10 AM 29-Nov-17 8:30 AM 0016-ER-001-7 SALMAAN MAMDOOH
SS-WIG-02, SS-WIG-11, SS -WIG-09 & SS-WIG-17) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1121 C-0954 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 28-Nov-17 7:15 AM 29-Nov-17 3:00 PM 0016-ER-001-7 SALMAAN MAMDOOH
MarkSS-WIG-02, SS-WIG-11, SS-WIG-09 & SS-WIG-17) at INCO Pre-Cast
Fabrication Yard

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1122 C-0955 Inspection of 4000 PSi for Slab on Grade at Grid line 3 & 4 ( A to G ) MAAZ LAB 28-Nov-17 7:20 AM 29-Nov-17 11:00 AM RA-819745-001-00 SALMAAN ISHFAQ AHMED
Pannel ( 1 ) 3 Nos at Shipping and Receiving Area @ Ju'Aymah, Shops
Plant N- 26
Material Receiving Visual Inspection of PVC Conduit Fitting TC8/DB R=67
(1700mm) L/R Bends 90° 18 EA. Coupling Fab.4' TC9/DB 120, 50 EA, Poly
1123 E-0063 Plug 4" 50 EA., Coupling 6" TC9/DB120 10 EA., PVC BellEnd TC9/DB-120 PLANT N-26 28-Nov-17 9:30 AM 29-Nov-17 9:30 AM RA-819460-002-00 NOLI ALI M. AL YASEEN Not in QMIS
200 EA.,PVC Bell End 2" & 1" TC9/DB-120 (2" 30 EA. & 1" 50 EA.), From
NEPROPLAST/ National Marketing Est. Co. at ETE Laydown Store @
Ju'aymah Shop Plant N26.
Material Receiving Visual Inspection of PVC Cleaner weld-on C65, And
1124 E-0064 PVC Solvent Cement Grey Weld-ON 717 for PVC Conduit S ealing PLANT N-26 28-Nov-17 9:35 AM 29-Nov-17 10:00 AM RA-819460-002-00 NOLI ALI M. AL YASEEN Not in QMIS
Accessories from NEPROPLAST at ETE Store Ju'aymah Shop Plant N-26. As
per highlighted attached document.

Soil Protection and Control, Drainage and De-Watering Inspection of


1125 C-0956 Foundation Type F1 at Grid Line 1 Nerar Existing Fence at New Shaded Car CAR PARKING 28-Nov-17 11:00 AM 29-Nov-17 8:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Parking Area @ Ju'Aymah, S hops Plant N- 26

Excavation,Surface Leveling and Proof Rolled Compaction Inspection of


1126 C-0957 Existing Sub Grade Below Foundation Of 0.6M as per Geotechnical Report CAR PARKING 28-Nov-17 11:05 AM 29-Nov-17 9:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation of Foundation type F1 at Grid line 1 Nerar Existing
Fence at New Shaded Car Parking Area @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1127 C-0958 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 28-Nov-17 11:10 AM 29-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at Grid line 1 near Existing Fence Type 1 Foundation at
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

FDT & Compaction Inspection of Backfilling 1st Layer Select Fill Material
1128 C-0959 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 28-Nov-17 11:15 AM 29-Nov-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 1
/Recommendation at Grid line 1 near Existing Fence Type 1 Foundation at
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26
Material Receiving Inspection of Angle Frame Hot dip Galvanized
L100x100x6,10mm Dia x 200mm Long Anchor Welded to L300 C/C
1129 C-0960 6mmx40mm Flat bar Welded to Angle Size 900x900 And Checkered Plate PLANT N-26 28-Nov-17 11:20 AM 29-Nov-17 9:00 AM RA-819499-001-00 SALMAAN ISHFAQ AHMED
Hot dip galvanized 1000x1000mm W/4-12 Dia hole Drop Handle,10mm
Dia Plain Bar Threaded at Each end,Nut Spot Welded Size 1000x10006T @
Ete Store,JuAymah,Shops
Material PlantPreservation
Handling,Stroge and N-26 Inspection of Angle F rame Hot
dip Galvanized L100x100x6,10mm Dia x 200mm Long Anchor Welded to
1130 C-0961 L300 C/C 6mmx40mm Flat bar Welded to Angle Size 900x900 And PLANT N-26 28-Nov-17 11:25 AM 29-Nov-17 9:45 AM RA-819499-001-00 SALMAAN ISHFAQ AHMED Not in QMIS
Checkered Plate Hot dip galvanized 1000x1000mm W/4-12 Dia hole Drop
Handle,10mm Dia Plain Bar Threaded at Each end,Nut Spot Welded Size
1000x10006T @ Ete Store,JuAymah,Shops Plant N-26
Visual Inspection of Excavation Trenching Before Cable Laying of SHIPPING & RECEIVING
1131 E-0065 Grounding Cable 120mm2 at New Shipping & Receiving Area, As per 28-Nov-17 11:30 AM 29-Nov-17 2:00 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached Highlighted Drawing. AREA

Visual Inspection of 120 mm² Copper Bare tinned Grounding Conductor


1132 E-0066 Laying for Main Grounding Grid at New Shipping & Receiving Area. As per SHIPPING & RECEIVING 28-Nov-17 11:35 AM 29-Nov-17 2:30 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing, AREA

Sueface Preparation & Moisture Test Inspection of Pre-Cast Foundation


1133 C-0962 and Pedestals ( 08 Nos ) of Booster Pump Station at Pre-cast area (Work CAR PARKING 29-Nov-17 2:00 PM 30-Nov-17 9:30 AM RA-820020-001-00 QUADRI ISHFAQ AHMED
shop ) @ J u'Aymah, Shops Plant N- 26

Pre-Cast Concret Erection & Aligment Inspection of Foundation at Grid


1134 C-0963 line 2 & 3 ( F ) 02 Nos for New Shaded Car Parking Area @ Ju'Aymah, CAR PARKING 29-Nov-17 2:05 PM 30-Nov-17 2:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Shops Plant N- 26

Concrete Finishing & Curing Inspection for 2nd Floor Beams at Grid Line
1135 C-0964 (A-C) (4-9) B1, B2, B3, B5 & B6 and Cantilever Slab at Grid Line (A-A') (5'- ADMIN BUILDING 29-Nov-17 2:10 PM 30-Nov-17 7:00 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
7') and Main Staircase at Grid Line (B) (5-8) (2nd Lift) at Admin Building @
Ju'Aymah, Shops Plant N- 26

1136 C-0965 Formwork inspection for 2nd Floor Beams and Conc. Slab at Grid Line (A- ADMIN BUILDING 29-Nov-17 2:15 PM 30-Nov-17 10:30 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
F) (1-4) B1, B1A, B2, B4, B5,& B6 at Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Formclosure Inspection for 2nd
1137 C-0966 Floo. Beams and Conc. Slab at Grid Line (A-F) (1-4) B1, B1A, B2, B4, B5 & ADMIN BUILDING 29-Nov-17 2:20 PM 30-Nov-17 10:45 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
B6 at Admin Building Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for 2nd Floor.


1138 C-0967 Beams and Conc. Slab at Grid Line (A-F) (1-4) B1, B1A, B2, B4, B5 & B6 at ADMIN BUILDING 29-Nov-17 2:25 PM 30-Nov-17 2:30 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Admin Building Juaymah Shops N-26

1139 C-0968 Formwork inspection for Exit Staircase (1st floor) at Grid Line (B- C) (1-2) ADMIN BUILDING 29-Nov-17 2:30 PM 30-Nov-17 11:00 AM RA-819726-001-00 ACIELO ISHFAQ AHMED
(2nd Lift) at Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Formclosure Inspection for Exit
1140 C-0969 Staircase (1st Floor) at Grid Line (B-C) (1-2) (2nd Lift) @ Admin Building ADMIN BUILDING 29-Nov-17 2:35 PM 30-Nov-17 11:15 AM RA-819726-001-00 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Exit S taircase


1141 C-0970 (1st Floor) at Grid Line (B-C) (1-2) (2nd Lift) @ Admin Building Juaymah ADMIN BUILDING 29-Nov-17 2:40 PM 30-Nov-17 3:00 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
Shops N-26

1142 C-0971 Embedded Items and Formclosure Inspection for Elevator Shear Wall (2nd ADMIN BUILDING 29-Nov-17 2:45 PM 30-Nov-17 11:30 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Lift up to Elev. 4.20 m) @ Admin Building Juaymah Shops N-26

1143 C-0972 Sampling,Testing & Placement of Concrete Inspection for Elevator Shear ADMIN BUILDING 29-Nov-17 2:50 PM 30-Nov-17 3:30 PM RA-819724-001-0F1 ACIELO ISHFAQ AHMED
Wall (2nd Lift up to Elev. 4.20 m) @ Admin Building Juaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1144 C-0973 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 29-Nov-17 2:55 PM 30-Nov-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at Grid line 1 near Existing Fence Type 1 Foundation at
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

FDT & Compaction Inspection of Backfilling 2nd Layer S elect Fill Material
1145 C-0974 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 29-Nov-17 3:00 PM 30-Nov-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 1
/Recommendation at Grid line 1 near Existing Fence Type 1 Foundation at
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1146 C-0975 Material Around Foundation at New Shaded Car Parking Area Grid line 2 CAR PARKING 29-Nov-17 3:05 PM 30-Nov-17 3:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
& 3 (F )

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


1147 C-0976 Around Foundation at New Shaded Car Parking Area Grid line 2 & 3 ( F ) at CAR PARKING 29-Nov-17 3:10 PM 30-Nov-17 4:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 2
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

Visual Inspection for Exothermic Thermite Cadwelding of Grounding Cable SHIPPING & RECEIVING
1148 E-0067 120mm2 to 25mm2 for Structure Grounding at New Shipping & Receiving AREA 29-Nov-17 3:15 PM 30-Nov-17 9:30 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Area. As per Attached highlighted Drawing,

Visual Inspection of 25 mm² Copper Insulated Grounding Conductor SHIPPING & RECEIVING
1149 E-0068 Laying for Structure Grounding at New Shipping & Receiving Area. As per AREA 29-Nov-17 3:20 PM 30-Nov-17 10:00 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing,

Visual Inspection for Backfilling Trench of Main Grounding Grid After SHIPPING & RECEIVING
1150 E-0069 Grounding Cable Laying at New Shipping & Receiving Area. As per AREA 29-Nov-17 3:25 PM 30-Nov-17 3:00 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing,

Visual Inspection Material Receiving,Handling Storage and Preservation of


Register Coupling 4" (Qty=148 pcs),PVC L/R Bend 4" 90^TC9/ DB R=9
1151 T-0017 Meter L=14.14(Qty=11 pcs) Meter,and Duct Plug Blank 4" 40D102U PLANT N-26 29-Nov-17 3:30 PM 30-Nov-17 10:00 AM RA-819517-002-00 AFZAL M. Z. NAVEED
(Qty=18 pcs) P.O No 4257 at ETE Storage Laydown @ Juaymah Shops Plant
N-26
Visual Inspection Material Receiving, Handling Storage and Preservation
1152 T-0018 of Cemtech Dry Shake NON-Metallic Color Floor Hardener (Orange Color) PLANT N-26 29-Nov-17 3:35 PM 30-Nov-17 10:30 AM RA-819517-002-00 AFZAL M. Z. NAVEED
(Qty=50 Bags) 25 kg/ per bag P.O No 25130 at ETE Storage Laydown @
Juaymah Shops Plant N-26

Visual Inspection Material Receiving, Handling Storage and Preservation


1153 T-0019 of Pvc Pipe 4" TC8 DB SOC Gray 6 Meter (Qty=234) P.O No 4257 at ETE PLANT N-26 29-Nov-17 3:40 PM 30-Nov-17 11:00 AM RA-819517-002-00 AFZAL M. Z. NAVEED
Storage Laydown @ Juaymah Shops Plant N- 26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1154 C-0977 for New Sub S tation Building (Panel Mark SS-WIG-02E, SS-WIG-02G, SS- INCO 30-Nov-17 7:15 AM 2-Dec-17 8:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
WG-01 ) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1155 C-0978 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 30-Nov-17 7:20 AM 2-Dec-17 8:15 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-02E, SS-WIG-02G, SS-WG-01) at INCO Pre-Cast
Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1156 C-0979 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 30-Nov-17 7:25 AM 2-Dec-17 8:30 AM 0016-ER-001-7 SALMAAN MAMDOOH
SS-WIG-02E, SS-WIG-02G, SS-WG-01) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1157 C-0980 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 30-Nov-17 7:30 AM 2-Dec-17 3:00 PM 0016-ER-001-7 SALMAAN MAMDOOH
Mark SS-WIG- 02E, SS-WIG-02G, SS- WG-01) at INCO Pre-Cast Fabrication
Yard

1158 C-0981 Concrete Finishing & Curing Inspection for Slab on Grade at Grid Line (B-C) ADMIN BUILDING 30-Nov-17 8:00 AM 2-Dec-17 7:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
(1-2) at Admin Building @ Ju'Aymah, S hops Plant N- 26

Sand Covering Around 30CM Above The Sewer Pipe From SMH-11 To
1159 C-0982 SMH-12 North Side At New Admin Building @ ETE Storge,Ju'aymah S hops ADMIN BUILDING 30-Nov-17 3:00 PM 2-Dec-17 3:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1160 C-0983 Material Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 30-Nov-17 3:15 PM 2-Dec-17 2:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
/Recommendation at Grid line 1 near Existing Fence Type 1 Foundation at
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

FDT & Compaction Inspection of Backfilling 3rd Layer Select Fill Material
1161 C-0984 Below Foundation of 0.60M as per Geotechnical Report CAR PARKING 30-Nov-17 3:20 PM 2-Dec-17 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Re-Schedule 1 + 1
/Recommendation at Grid line 1 near Existing Fence Type 1 Foundation at
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1162 C-0985 Material Around Foundation at New Shaded Car Parking Area Grid line 2 CAR PARKING 30-Nov-17 3:25 PM 2-Dec-17 3:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
& 3 (F )

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1163 C-0986 Around Foundation at New Shaded Car Parking Area Grid line 2 & 3 ( F ) at CAR PARKING 30-Nov-17 3:30 PM 2-Dec-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Re-Schedule 2 + 2
New Shaded Car Parking Area @ J u'Aymah, Shops Plant N- 26

Pre-Cast Concret Sand Bedding Inspection of Foundation Type 1 at Grid


1164 C-0987 Line 1 Near Existing Fence at New Shaded Car Parking Area @ Ju'Aymah, CAR PARKING 30-Nov-17 3:50 PM 2-Dec-17 4:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Re-Schedule
Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1165 C-0988 Inspection of 4000 PSi for Slab on Grade at Grid line 3 & 4 ( A to G ) MAAZ LAB 2-Dec-17 9:00 AM 3-Dec-17 11:00 AM RA-819992-001-0F1 SALMAAN ISHFAQ AHMED
Pannel ( 1 ) 3 Nos at Shipping and Receiving Area at Ju'Aymah, Shops
Plant N- 26 @ MAAZ LAB

1166 C-0989 Concrete Finishing & Curing Inspection for Lv Duct Bank South West S ide NEW SUB STATION 2-Dec-17 9:30 AM 3-Dec-17 7:00 AM RA-819460-002-00 SALMAAN ISHFAQ AHMED Not in QMIS
of New Substation Area @ Ju'Aymah, Shops Plant N- 26

1167 C-0990 Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station INCO 2-Dec-17 10:00 AM 3-Dec-17 10:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-05 & SS-WIG-06) at INCO Pre-Cast Fabrication Yard

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1168 C-0991 Material on LV Duct Bank South West Side of New Sub Station Building @ NEW SUB STATION 2-Dec-17 10:25 AM 3-Dec-17 2:30 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED Not in QMIS
Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material on


1169 C-0992 LV Duct Bank S outh West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 2-Dec-17 10:30 AM 3-Dec-17 3:45 PM RA-819460-001-0F1 SALMAAN ISHFAQ AHMED 1
Shops Plant N-26

1170 E-0070 Visual Inspection of Sand Bedding Final Backfilling of LV Electrical Duck NEW SUB STATION 2-Dec-17 11:45 AM 3-Dec-17 2:30 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Bank at New Sub Station Area As per highlighted Attached Drawing.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1171 C-0993 Material Around Foundation at New Shaded Car Parking Area Grid line 4 CAR PARKING 2-Dec-17 3:10 PM 3-Dec-17 3:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
( A, B, C, E, F, G, H. I ) @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1172 C-0994 Around Foundation at New Shaded Car Parking Area Grid line 4 ( A, B, C, CAR PARKING 2-Dec-17 3:15 PM 3-Dec-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 8
E, F, G, H. I ) @ Ju'Aymah, Shops Plant N- 26

Concrete Finishing & Curing Inspection for Electrical l Duct Bank 1.)
1173 C-0995 Length 14.00 M, 2. 11.00 M and 3.) 15.00 M at New Car Parking Area @ CAR PARKING 2-Dec-17 3:45 PM 3-Dec-17 7:15 AM RA-819936-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

Review of Test Reports and CBR Value for Existing Material Sub Grade
1174 C-0996 (sub Base ) at New Parking Area @ J u'Aymah Shops Plant N- 26 PLANT N-26 2-Dec-17 4:15 PM 3-Dec-17 8:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED

Review of Test Reports and CBR Value for Select Fill Material at ETE
1175 C-0997 Laydown Stockpile from Al-Osais @ Ju'Aymah Shops Plant N-26 PLANT N-26 2-Dec-17 4:20 PM 3-Dec-17 8:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1176 C-0998 for New Sub S tation Building (Panel Mark SS-WIG-12H, SS-WIG-18, SS- INCO 3-Dec-17 8:00 AM 4-Dec-17 8:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
WG-04) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


Formwork/Molding Closure) Inspection for New S ub-S tation Building
1177 C-0999 (Panel Mark SS-WIG-12H, SS-WIG- 18, SS-WG-04) at INCO Pre-Cast INCO 3-Dec-17 8:05 AM 4-Dec-17 8:15 AM 0016-ER-001-7 SALMAAN MAMDOOH
Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1178 C-1000 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 3-Dec-17 8:10 AM 4-Dec-17 8:30 AM 0016-ER-001-7 SALMAAN MAMDOOH
SS-WIG-12H, SS-WIG-18, SS-WG-04) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1179 C-1001 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 3-Dec-17 8:15 AM 4-Dec-17 3:00 PM 0016-ER-001-7 SALMAAN MAMDOOH
Mark SS-WIG- 12H, S S-WIG-18, SS-WG-04) at INCO Pre-Cast Fabrication
Yard

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1180 C-1002 Inspection of 4000 PSi for 2nd Floor Beams at Grid Line (A-F) (9-12) B1, MAAZ LAB 3-Dec-17 8:20 AM 4-Dec-17 11:00 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
B2, B4, B5, B6 & B7 and 2nd Floor Slab at Grid Line (B'-C) (11'-12) at
Admin Building Ju'Aymah, Shops Plant N- 26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1181 C-1003 Inspection of 4000 PSi for Staircase (2nd Lift) at Grid Line (C-E) (11-12) at MAAZ LAB 3-Dec-17 8:25 AM 4-Dec-17 11:30 AM RA-819746-001-00 SALMAAN ISHFAQ AHMED
Admin Building Ju'Aymah, Shops Plant N- 26 @ MAAZ LAB

1182 C-1004 Concrete Finishing & Curing Inspection for Exit Staircase (1st Lift) at Grid ADMIN BUILDING 3-Dec-17 10:00 AM 4-Dec-17 7:00 AM RA-819745-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Line (B-C) (1-2) at Admin Building @ Ju'Aymah, Shops Plant N- 26

Material Receiving Inspection of FBE wire Mesh 5MM x 4.5M x 1.5M x


1183 C-1005 150MM LW x CW 10 x 30 (QTY=496 Sheets) From Al- Faisal Steel Products PLANT N-26 3-Dec-17 10:05 AM 4-Dec-17 9:00 AM RA-819725-001-00 ACIELO ISHFAQ AHMED
Company P.o No 4477 @ ETE Store,JuAymah,Shops Plant N-26

Material Handling, Storage and Presevation Inspection of FBE Wire Mesh


1184 C-1006 5 MM x 4.5 M x 1.5 M x 150 MM LW x CW 10 x 30 (QTY=496 Sheets) from PLANT N-26 3-Dec-17 10:10 AM 4-Dec-17 9:30 AM RA-819725-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Al- Faisal Steel Products Company P.O No 4477 @ ETE
Store,JuAymah,Shops Plant N-26

1185 C-1007 Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station INCO 3-Dec-17 10:15 AM 4-Dec-17 10:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-02C & S S-WIG-16) at INCO Pre- Cast Fabrication Yard

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1186 C-1008 Material on LV Duct Bank South West Side of New Sub Station Building @ NEW SUB STATION 3-Dec-17 10:20 AM 4-Dec-17 9:45 AM RA-819460-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material on


1187 C-1009 LV Duct Bank S outh West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 3-Dec-17 10:25 AM 4-Dec-17 10:00 AM RA-819460-001-0F1 QUADRI ISHFAQ AHMED 1
Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1188 C-1010 Material on LV Duct Bank South West Side of New Sub Station Building @ NEW SUB STATION 3-Dec-17 10:20 AM 4-Dec-17 9:45 AM RA-819460-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material on


1189 C-1011 LV Duct Bank S outh West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 3-Dec-17 10:25 AM 4-Dec-17 10:00 AM RA-819460-001-0F1 QUADRI ISHFAQ AHMED 1
Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1190 C-1012 Material on Sewer Line PVC Pipe Trench from G.C.O to SMH-09 at New NEW SUB STATION 3-Dec-17 10:30 AM 4-Dec-17 10:15 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station Building @ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material on


1191 C-1013 Sewer Line PVC Pipe Trench f rom G.C.O to SMH- 09 at New Sub Station NEW SUB STATION 3-Dec-17 1:35 PM 4-Dec-17 10:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 4
Building @ Ju'Aymah Shops Plant N-26

RTR pipe joint and assembly inspection for 8" RTR Sewer line from SMH-
1192 R-0015 09 to SMH-010 at South side of Substation area at Juaymah shop plant N- NEW SUB STATION 3-Dec-17 2:10 PM 4-Dec-17 3:00 PM RA-819486-001-00 JACOB SYED SHAFIULLAH
26

Visual Inspection of Excavation Trenching Before Cable Laying of SHIPPING & RECEIVING
1193 E-0071 Grounding Cable 120mm2 at New Shipping & Receiving Area, As per 3-Dec-17 2:15 PM 4-Dec-17 11:00 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached Highlighted Drawing. AREA

Visual Inspection of 120 mm² Copper Bare tinned Grounding Conductor SHIPPING & RECEIVING
1194 E-0072 Laying for Main Grounding Grid at New Shipping & Receiving Area. As per 3-Dec-17 2:20 PM 4-Dec-17 2:00 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing, AREA

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable SHIPPING & RECEIVING
1195 E-0073 120mm2 to 25mm2 for Structure Grounding at New Shipping & Receiving 3-Dec-17 2:25 PM 4-Dec-17 3:00 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Area. As per Attached highlighted Drawing, AREA

1196 C-1014 Sand Covering Around and Above The Sewer Pipe 30CM F rom SMH-09 To NEW SUB STATION 4-Dec-17 2:00 PM 5-Dec-17 10:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
SMH-10 at New Sub Station Building @ Ju'aymah Shops Plant N-26

1197 C-1020-A FDT, Compaction Inspection of Existing Sub Grade for Electrical Duct Bank CAR PARKING 4-Dec-17 2:05 PM 5-Dec-17 1:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED 1
New Car Parking Area @ Ju'Aymah Shops Plant N-26

Visual Inspection of 25 mm² Copper Insulated Grounding Conductor SHIPPING & RECEIVING
1198 E-0074 Laying for Structure Grounding at New Shipping & Receiving Area. As per 4-Dec-17 2:10 PM 5-Dec-17 8:30 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing, AREA

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable SHIPPING & RECEIVING
1199 E-0075 120mm2 to 120mm2 for Main GRID Grounding at New Shipping & 4-Dec-17 2:15 PM 5-Dec-17 9:00 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Receiving Area. As per Attached highlighted Drawing, AREA

Visual Inspection for Backfilling Trench of Main Grounding Grid After SHIPPING & RECEIVING
1200 E-0076 Grounding Cable Laying at New Shipping & Receiving Area. As per 4-Dec-17 2:20 PM 5-Dec-17 2:30 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing, AREA

Visual Inspection of LV Electrical Duck Bank and Conduit excavation and


1201 E-0077 trenching at Parking Area, prior to concrete placement, As per CAR PARKING 4-Dec-17 2:25 PM 5-Dec-17 10:00 AM RA-819460-002-00 NOLI ALI M. AL YASEEN
highlighted Attached Drawing.

Visual Inspection of LV Electrical Duck Bank , conduit Pipe & spacers


1202 E-0078 Installation , and embedded hardware prior to concrete placement, At CAR PARKING 4-Dec-17 2:30 PM 5-Dec-17 3:00 PM RA-819460-002-00 NOLI ALI M. AL YASEEN
Parking Area.As per highlighted Attached Drawing.

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1203 P-0054 (Nepro FlowGuard) Pipes with 1X½",1" & ¾" and fittings Elbow 90⁰ PLANT N-26 4-Dec-17 2:35 PM 5-Dec-17 7:30 AM RA-819900-001-00 FAHEEM SYED SHAFIULLAH
3"(06Pcs), Elbow 90⁰ 2"(64Pcs) , TEE 3 "(06Pcs) & UNION ¾" (09Pcs) from
NEPRO@ ETE store J uaymah S hop Plant N-26

Material Receiving,Handling ,Storage & preservation Inspection of PVC


1204 P-0055 Pipes with 3"ø(32Pcs) & fittings with V.Stone Flanges 6" (04Pcs) from PLANT N-26 4-Dec-17 2:40 PM 5-Dec-17 8:30 AM RA-819900-001-00 FAHEEM SYED SHAFIULLAH
NEPRO at ETE store, Ju'aymah S hops Plant N-26

1205 R-0016 Gravity Test Inspection for 8" RTR Sewer Line 41 LM between SMH-09 and NEW SUB STATION 4-Dec-17 2:45 PM 5-Dec-17 9:00 AM RA-819486-001-00 JACOB ABDUL REHMAN
SMH-010 at at South side of Substation area at Juaymah shop plant N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1206 C-1015 for New Sub S tation Building (Panel Mark SS-WIG-01, SS- WIG-13, SS-WIG- INCO 3-Dec-17 3:30 PM 6-Dec-17 8:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
14, SS-WG-02) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1207 C-1016 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 3-Dec-17 3:35 PM 6-Dec-17 8:15 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-01, SS-WIG-13, SS-WIG-14, SS-WG-02) at INCO Pre-
Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1208 C-1017 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 3-Dec-17 3:40 PM 6-Dec-17 8:30 AM 0016-ER-001-7 SALMAAN MAMDOOH
SS-WIG-01, SS-WIG-13, SS -WIG-14, SS-WG-02) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1209 C-1018 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 3-Dec-17 3:45 PM 6-Dec-17 3:00 PM 0016-ER-001-7 SALMAAN MAMDOOH
Mark SS-WIG- 01, SS-WIG-13, SS-WIG-14, SS-WG-02) at INCO Pre-Cast
Fabrication Yard

1210 C-1019 Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station INCO 3-Dec-17 3:50 PM 6-Dec-17 9:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-02D & SS-WIG-10) at INCO Pre-Cast Fabrication Yard

1211 C-1020 FDT, Compaction Inspection of Existing Sub Grade for Electrical Duct Bank CAR PARKING 3-Dec-17 4:20 PM 4-Dec-17 1:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED 1
New Car Parking Area @ Ju'Aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1212 C-1021 Inspection of 4000 PSi for Slab on Grade at Grid Line (A-B) (5-8) & (6-7) (A- MAAZ LAB 3-Dec-17 8:20 AM 6-Dec-17 11:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
A') at Admin Building Ju'Aymah, Shops Plant N- 26 @ MAAZ LAB

Formwork inspection for 10 Nos. Column at Grid Line (11) (A) C9, (11) (B)
1213 C-1022 C14, (11') (B') C6, (10) (B) C1, (12) (B) C15, (11) (D) C1, (11') (E) C1, (12) (E) ADMIN BUILDING 5-Dec-17 2:00 PM 6-Dec-17 10:30 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C16, (11') (F) C16 and (12) (F) C15 at Admin Building Area, Juaymah Shops
N-26

FBE Reinforcing Steel, Inspection for 10 Nos. Columns at Grid Line (11) (A)
1214 C-1023 C9, (11) (B) C14, (11') (B') C6, (10) (B) C1, (12) (B) C15, (11) (D) C1, (11') (E) ADMIN BUILDING 5-Dec-17 2:05 PM 6-Dec-17 10:45 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C1, (12) (E) C16, (11') (F) C16 and (12) (F) C15 at Admin Building Area,
Juaymah Shops N-26

1215 C-1024 Site & Grade Preparation Inspection Of Electrical Duct Bank ( 6.00 meter CAR PARKING 5-Dec-17 10:00 AM 6-Dec-17 2:45 PM RA-819486-002-00 QUADRI ISHFAQ AHMED
length ) at New Car Parking Area @ Ju'Aymah, S hops Plant N- 26

1216 C-1025 FBE S teel Rebar, Embedded Item Inspection of Electrical Duct Bank (6.00 CAR PARKING 5-Dec-17 10:05 AM 6-Dec-17 3:00 PM RA-819486-002-00 QUADRI ISHFAQ AHMED
Meter Length ) at New Car Parking Area @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Electrical Duct


1217 C-1026 Bank ( 6.00 meter length )at New Car Parking Area @ J u'Aymah, Shops CAR PARKING 5-Dec-17 10:10 AM 6-Dec-17 3:30 PM RA-819486-002-00 QUADRI ISHFAQ AHMED
Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1218 C-1027 Material on LV Duct Bank South West Side of New Sub Station Building @ NEW SUB STATION 5-Dec-17 2:00 PM 6-Dec-17 2:15 PM RA-819460-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material on


1219 C-1028 LV Duct Bank S outh West Side of New Sub Station Building @ Ju'Aymah NEW SUB STATION 5-Dec-17 2:05 PM 6-Dec-17 3:00 PM RA-819460-001-0F1 QUADRI ISHFAQ AHMED 1
Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1220 C-1029 Material on Sewer Line PVC Pipe Trench from G.C.O to SMH-09 at New NEW SUB STATION 5-Dec-17 2:10 PM 6-Dec-17 3:15 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station Building @ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material on


1221 C-1030 Sewer Line PVC Pipe Trench f rom G.C.O to SMH- 09 at New Sub Station NEW SUB STATION 5-Dec-17 2:15 PM 6-Dec-17 3:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'Aymah Shops Plant N-26

Pre-Cast Concrete Erection & Alignment Inspection of New S haded Car


1222 C-1031 Parking Area at Grid line 1 nera Existing Fence @ ju'aymah shops plant N- CAR PARKING 5-Dec-17 2:20 PM 6-Dec-17 9:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1223 C-1032 Material Around around Foundation Grid Line 1 near Existing Fence at CAR PARKING 5-Dec-17 2:25 PM 6-Dec-17 3:45 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
New Shaded Car Parking Area@ Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


1224 C-1033 around Foundation Grid Line 1 near Existing Fence at New Shaded Car CAR PARKING 5-Dec-17 2:30 PM 6-Dec-17 4:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 1
Parking Area@ Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1225 C-1034 Material Around Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 5-Dec-17 2:35 PM 6-Dec-17 3:40 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Building @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


1226 C-1035 above the Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 5-Dec-17 2:40 PM 6-Dec-17 4:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'aymah Shops Plant N-26

1227 C-1036 Material Receiving Inspection of Select Fill from Al-Osais (Qty=80 M3) @ PLANT N-26 6-Dec-17 2:00 PM 7-Dec-17 8:00 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
ETE Laydown, Ja'Aymah Shops Plant N-26

1228 C-1037 Material Receiving Inspection of Clean Sand from Al-Osais (Qty=23 M3) PLANT N-26 6-Dec-17 2:05 PM 7-Dec-17 8:15 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
@ ETE Laydown, Ja'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1229 C-1038 Material Around Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 6-Dec-17 2:10 PM 7-Dec-17 2:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Building @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1230 C-1039 above the Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 6-Dec-17 2:15 PM 7-Dec-17 3:00 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1231 C-1040 Material Around around Foundation Grid Line 1 near Existing Fence at CAR PARKING 6-Dec-17 2:20 PM 7-Dec-17 3:15 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
New Shaded Car Parking Area@ Ju'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1232 C-1041 around Foundation Grid Line 1 near Existing Fence at New Shaded Car CAR PARKING 6-Dec-17 2:25 PM 7-Dec-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 1
Parking Area@ Ju'Aymah Shops Plant N-26

Formwork Inspection for 7 Nos Column at Grid Line (11) (C) C7, (11') (C)
1233 C-1042 C6, (10) (C) C1, (12) (C) C16, (10) (D) C1, (10) (E) C5 and (10) (F) C15 at ADMIN BUILDING 6-Dec-17 1:30 PM 7-Dec-17 9:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Admin Building Area, Juay mah Shops N-26

FBE Reinforcing Steel Inspection for 7 Nos Column at Grid Line (11) (C) C7,
1234 C-1043 (11') (C) C6, (10) (C) C1, (12) (C) C16, (10) (D) C1, (10) (E) C5 and (10) (F) ADMIN BUILDING 6-Dec-17 1:35 PM 7-Dec-17 9:15 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C15 at Admin Building Area, Juaymah Shops N-26

Form Closure Inspection for 10 Nos. Columns at Grid Line (11) (A) C9, (11)
1235 C-1044 (B) C14, (11') (B') C6, (10) (B) C1, (12) (B) C15, (11) (D) C1, (11') (E) C1, (12) ADMIN BUILDING 6-Dec-17 1:40 PM 7-Dec-17 9:30 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(E) C16, (11') (F) C16 and (12) (F) C15 at Admin Building Area, Juaymah
Shops N-26

Sampling, Testing & Placement of Concrete Inspection for 10 Nos.


1236 C-1045 Columns at Grid Line (11) (A) C9, (11) (B) C14, (11') (B') C6, (10) (B) C1, ADMIN BUILDING 6-Dec-17 1:45 PM 7-Dec-17 11:30 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(12) (B) C15, (11) (D) C1, (11') (E) C1, (12) (E) C16, (11') (F) C16 and (12)
(F) C15 at Admin Building Area, Juaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1237 C-1046 Material on Sewer Line PVC Pipe Trench from G.C.O to SMH-09 at New NEW SUB STATION 6-Dec-17 3:55 PM 7-Dec-17 3:15 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station Building @ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material on


1238 C-1047 Sewer Line PVC Pipe Trench f rom G.C.O to SMH- 09 at New Sub Station NEW SUB STATION 6-Dec-17 4:00 PM 7-Dec-17 4:00 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'Aymah Shops Plant N-26

Visual Inspection Material Receiving,Handling Storage and Preservation of


Sign Single Arrow, 90 x 90MM,(Qty=07Pcs) Sign Double Arrow, 90 x 90
1239 T-0020 MM(Qty=19Pcs) Sign Under Ground Tele Cable 280 x 90 MM And PLANT N-26 6-Dec-17 2:25 PM 7-Dec-17 10:30 AM RA-819517-002-00 AFZAL M. Z. NAVEED
Concrete Slab For Telecom Marking (305 x 305 mm) (Qty=26 Pcs) P.O No
25126 @ ETE Storge,Ju'aymah Shops Plant N-26

Materials Receiving Visual Inspection for Conduit Elecrtical Metal Tubing


1240 E-0079 (EMT) 1" X 3.05 MTR. TA (200 EA.) from Tabalsa Arabia, At ETE S tore PLANT N-26 6-Dec-17 2:30 PM 7-Dec-17 8:30 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
Ju'aymah Shop Plant N26. As per attached highlighted Document.

Materials Receiving Visual Inspection for EMT Fittings and Accessories,


1241 E-0080 ( EMT Compression Connector 1" 100 EA. EMT Two Hole Straps 1" 500 PLANT N-26 6-Dec-17 2:35 PM 7-Dec-17 9:00 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
EA.) from Tabalsa Arabia, at ETE Store Ju'aymah Shop Project Plant N26.
As per attached highlighted Document.

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1242 P-0056 SCH-80 (Nepro FlowGuard) Pipes with ½" (35 Pcs) and fittings Elbow 90⁰ PLANT N-26 6-Dec-17 4:15 PM 7-Dec-17 8:30 AM RA-819900-001-00 FAHEEM SYED SHAFIULLAH
½" (111 Pcs) from NEPRO @ ETE store Juaymah Shop Plant N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1243 C-1048 for New Sub S tation Building (Panel Mark SS-WIG-02A, SS-WIG-07, SS- INCO 7-Dec-17 11:00 AM 9-Dec-17 8:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
WIG-19, SS-WG-03) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1244 C-1049 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 7-Dec-17 11:05 AM 9-Dec-17 8:15 AM 0016-ER-001-7 SALMAAN MAMDOOH
(Panel Mark SS-WIG-02A, SS-WIG-07, SS-WIG-19, SS-WG-03) at INCO Pre-
Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1245 C-1050 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 7-Dec-17 11:10 AM 9-Dec-17 8:30 AM 0016-ER-001-7 SALMAAN MAMDOOH
SS-WIG-02A, SS-WIG-07, SS-WIG-19, SS-WG-03) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1246 C-1051 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 7-Dec-17 11:15 AM 9-Dec-17 3:00 PM 0016-ER-001-7 SALMAAN MAMDOOH
Mark SS-WIG- 02A, SS-WIG-07, SS-WIG-19, SS-WG-03) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1247 C-1052 (Panel Mark SS-WIG-02, SS-WIG-09, SS-WIG-11 & SS-WIG-17) at INCO Pre- INCO 7-Dec-17 11:20 AM 9-Dec-17 9:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
Cast Fabrication Yard

Concrete Finishing & Curing Inspection for 2nd Flr. Beams,Concrete


1248 C-1053 slab,staircase (2nd Lift) & Elevator Shear Wall (2nd lift) at Grid Line (A-F) ADMIN BUILDING 7-Dec-17 1:15 PM 9-Dec-17 7:00 AM RA-819724-001-0F1 ACIELO ISHFAQ AHMED Not in QMIS
(1-4) B1, B1A, B2, B4, B5 & B6 at Admin Building @ Ju'Aymah, Shops Plant
N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Formclosure Inspection for 7 Nos Column at Grid Line (11) (C) C7, (11') (C)
1249 C-1054 C6, (10) (C) C1, (12) (C) C16, (10) (D) C1, (10) (E) C5 and (10) (F) C15 at ADMIN BUILDING 7-Dec-17 1:30 PM 9-Dec-17 10:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Admin Building Area, Juay mah Shops N-26

Sampling, Testing & Placement of Concrete Inspection for 7 Nos Column


1250 C-1055 at Grid Line (11) (C) C7, (11') (C) C6, (10) (C) C1, (12) (C) C16, (10) (D) C1, ADMIN BUILDING 7-Dec-17 1:35 PM 9-Dec-17 2:30 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(10) (E) C5 and (10) (F) C15 at Admin Building Area, Juaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1251 C-1056 Material Around Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 7-Dec-17 3:05 PM 9-Dec-17 2:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Building @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material


1252 C-1057 above the Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 7-Dec-17 3:10 PM 9-Dec-17 2:45 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1253 C-1058 Material on Sewer Line PVC Pipe Trench from G.C.O to SMH-09 at New NEW SUB STATION 7-Dec-17 3:15 PM 9-Dec-17 3:00 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station Building @ J u'Aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material on


1254 C-1059 Sewer Line PVC Pipe Trench f rom G.C.O to SMH- 09 at New Sub Station NEW SUB STATION 7-Dec-17 3:20 PM 9-Dec-17 3:15 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'Aymah Shops Plant N-26

Visual Inspection of Material Receiving, Handling, Storage and


Preservation of Hydrated Lime Powder (QTY=05 Bags) from Abdul
1255 C-1060 Rahman Al-Turki Corporation (ATCO) P.O. No. 29141 @ ETE Store, PLANT N-26 7-Dec-17 3:25 PM 9-Dec-17 9:00 AM RA-819745-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Ju’Aymah S hops Plant N-26

Cement Based Non-S hrink Grout Surface Preparation for Pre-Cast


1256 C-1061 Foundation after Cutting Lifting Hook Grid line 1 & 2 ( A to I ) 18 Nos at CAR PARKING 7-Dec-17 3:30 PM 9-Dec-17 1:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
New Car Parking Area @ ju'aymah shops plant N-26

Cement Based Non-S hrink Grout Mixing, Testing, Sampling & Placement
1257 C-1062 of Pre-Cast Foundation after cutting Lifting Hook Grid line 2 & 3 ( A TO I ) CAR PARKING 7-Dec-17 3:35 PM 9-Dec-17 3:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
18 Nos at New Car Parking Area @ ju'aymah shops plant N-26

FDT, Compaction Inspection of Existing Sub Grade for Telecom Duct Bank (
1258 C-1063 78.00 Meter Length ) in between Substation & Back Log Storage Building BACK LOG 7-Dec-17 3:40 PM 9-Dec-17 3:45 PM RA-819517-001-00 QUADRI ISHFAQ AHMED 6
@ ju'aymah shops plant N-26

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1259 C-1064 (Panel Mark SS-WIG-02E, SS-WIG-02G, SS-WG-01) at INCO Pre-Cast INCO 9-Dec-17 10:00 AM 10-Dec-17 9:00 AM 0016-ER-001-7 SALMAAN MAMDOOH
Fabrication Yard

Formwork Inspection for 7 Nos Column at Grid Line (10) (A) C9, (9) (B) C1,
1260 C-1065 (9) (C) C1, (9) (D) C1, (9') (E) C1, (9) (E) C3 and (9') (F) C8 at Admin ADMIN BUILDING 9-Dec-17 1:05 PM 10-Dec-17 2:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Building Area, Juaymah Shops N-26

FBE Reinforcing Steel Inspection for 7 Nos Column at Grid Line (10) (A) C9,
1261 C-1066 (9) (B) C1, (9) (C) C1, (9) (D) C1, (9') (E) C1, (9) (E) C3 and (9') (F) C8 at ADMIN BUILDING 9-Dec-17 10:10 AM 10-Dec-17 2:15 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Admin Building Area, Juay mah Shops N-26

Site & Grade Preparation Inspection of Telecom Duct Bank 78.0 M Length
1262 C-1067 in between Sub Station and Back Log Storage Room @ Ju'aymah Shops BACK LOG 9-Dec-17 3:45 PM 10-Dec-17 3:30 PM RA-819517-001-00 QUADRI ISHFAQ AHMED
Plant N-26

Sampling, Testing & Placement of Concrete Inspection of Telecom Duct


1263 C-1068 Bank 78.0 M Length in between Sub Station and Back Log Storage Room BACK LOG 9-Dec-17 3:50 PM 10-Dec-17 3:45 PM RA-819517-001-00 QUADRI ISHFAQ AHMED
@ J u'aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1264 C-1069 Material Around Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 9-Dec-17 3:55 PM 10-Dec-17 11:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Building @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material


1265 C-1070 above the Sewer Pipe From SMH-09 To SMH-10 at New Sub Station NEW SUB STATION 9-Dec-17 4:00 PM 10-Dec-17 11:45 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Building @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of Existing Sub Grade of Trench 30.0 M


1266 C-1071 Length from SMH-10 towards SMH-03 at New Sub Station Building @ NEW SUB STATION 9-Dec-17 4:05 PM 10-Dec-17 11:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 2
Ju'aymah Shops Plant N-26

Fill Placement Inspection of 15 CM Sand Bedding at Sewer Line Trench


1267 C-1072 30.0 M Length from SMH-10 to towards SMH-03 at New Sub Station NEW SUB STATION 9-Dec-17 4:10 PM 10-Dec-17 3:55 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Building @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of 15 CM Sand Bedding at Sewer Line Trench


1268 C-1073 30.0 M Length from SMH-10 to towards SMH-03 at New Sub Station NEW SUB STATION 9-Dec-17 4:15 PM 10-Dec-17 4:05 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 2
Building @ Ju'aymah Shops Plant N-26

Visual Inspection of telecom Trench for the Duct Bank of 78 Meter Length
1269 T-0021 In Between Substation and Black Log Storage Building @ Juaymah Shops BACK LOG 9-Dec-17 3:00 PM 10-Dec-17 8:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
Plant N-26

Visual Inspection of PVC Conduit Installation of the Duct Bank and


1270 T-0022 Mandrel Test For the Duct Bank of 78 Meter Length In Between BACK LOG 9-Dec-17 3:05 PM 10-Dec-17 3:30 PM RA-819517-001-00 AFZAL M. Z. NAVEED
Substation and Black Log Storage Building @ Juaymah Shops Plant N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1271 C-1074 for New Sub S tation Building (Panel Mark SS-WIG-08, SS- WIG-21, SS-WG- INCO 10-Dec-17 10:25 AM 11-Dec-17 8:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
10, SS-WG-06) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1272 C-1075 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 10-Dec-17 10:30 AM 11-Dec-17 8:15 AM 0016-ER-001-10 SALMAAN MAMDOOH
(Panel Mark SS-WIG-08, SS-WIG-21, SS-WG-10, SS-WG-06) at INCO Pre-
Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1273 C-1076 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 10-Dec-17 10:35 AM 11-Dec-17 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WIG-08, SS-WIG-21, SS -WG-10, SS-WG-06) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1274 C-1077 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 10-Dec-17 10:40 AM 11-Dec-17 3:00 PM 0016-ER-001-10 SALMAAN MAMDOOH
Mark SS-WIG- 08, SS-WIG-21, SS-WG-10, SS-WG-06) at INCO Pre-Cast
Fabrication Yard

Material Receiving Inspection of Non- Shrink Grout 25 Kg Packing


1275 C-1078 (QTY=10 Bags) From CIC P.o No 25142 @ ETE Laydown Store, JuAymah, PLANT N-26 10-Dec-17 11:55 AM 11-Dec-17 8:00 AM RA-819948-001-0F2 QUADRI ISHFAQ AHMED
Shops Plant N-26

Form Closure Inspection for 7 Nos Column at Grid Line (10) (A) C9, (9) (B)
1276 C-1079 C1, (9) (C) C1, (9) (D) C1, (9') (E) C1, (9) (E) C3 and (9') (F) C8 at Admin ADMIN BUILDING 10-Dec-17 12:20 PM 11-Dec-17 11:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Building Area, Juaymah Shops N-26

Sampling, Testing & Placement of Concrete Inspection for 7 Nos Column


1277 C-1080 at Grid Line (10) (A) C9, (9) (B) C1, (9) (C) C1, (9) (D) C1, (9') (E) C1, (9) (E) ADMIN BUILDING 10-Dec-17 12:25 PM 11-Dec-17 2:30 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C3 and (9') (F) C8 at Admin Building Area, J uaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Selectfill


1278 C-1081 Material for Sewer Trench from SMH # 11 to SMH # 12 (22.0 M) in Admin ADMIN BUILDING 10-Dec-17 12:30 PM 11-Dec-17 2:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Building @ Juaymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 1st Layer Selectfill Material for


1279 C-1082 Sewer Trench from SMH # 11 to SMH # 12 (22.0 M) in Admin Building @ ADMIN BUILDING 10-Dec-17 12:35 PM 11-Dec-17 2:15 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 2
Juaymah Shops Plant N-26

1280 C-1083 FDT & compaction Inspection of Existing Sub Grade for Sewer Trench ADMIN BUILDING 10-Dec-17 3:30 PM 11-Dec-17 3:00 PM RA-819945-001-0F1 ACIELO ISHFAQ AHMED 4
SMH-12 to SMH-14 New Admin Building @ JuAymah, Shops Plant N- 26

Cement Based Non-S hrink Grout Mixing, Testing, Sampling & Placement
1281 C-1062-A of Pre-Cast Foundation after cutting Lifting Hook Grid line 2 & 3 ( A TO I ) CAR PARKING 10-Dec-17 3:55 PM 11-Dec-17 1:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
18 Nos at New Car Parking Area @ ju'aymah shops plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1282 C-1084 Inspection of 4000 PSi for Main Staircase at Grid Line (A-B) (5-8) at Admin MAAZ LAB 11-Dec-17 10:30 AM 12-Dec-17 11:00 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
Building Juaymah Shops N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1283 C-1085 Inspection of 5000 PSi for White and Grey Cement for 1st and 2nd Lift of MAAZ LAB 11-Dec-17 10:35 AM 12-Dec-17 11:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Mock-Up Panels for Admin Building (Panel Mark CIG-A-18 & CIG-
A-19) @ MAAZ LAB

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1284 C-1086 (Panel Mark SS-WIG-12H, SS-WIG- 18, SS-WG-04) at INCO Pre-Cast INCO 11-Dec-17 10:40 AM 12-Dec-17 9:00 AM 00616-ER-001-001-10 SALMAAN MAMDOOH
Fabrication Yard

1285 C-1087 Sand Bedding placement inspection of S ewer Trench from SMH# 12 to ADMIN BUILDING 11-Dec-17 1:05 PM 12-Dec-17 10:00 AM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
SMH-14 at new Admin Bldg. @ Juaymah Shops Plant N26

1286 C-1088 FDT inspection for sand bedding of Sewer Trench from SMH# 12 to SMH- ADMIN BUILDING 11-Dec-17 1:10 PM 12-Dec-17 3:30 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 4
14 at new Admin Bldg. @ Juaymah Shops Plant N26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Selectfill


1287 C-1089 Material for Sewer Trench from SMH # 11 to SMH # 12 (22.0 M) in Admin ADMIN BUILDING 11-Dec-17 1:15 PM 12-Dec-17 2:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Building @ Juaymah Shops Plant N-26

FDT, Compaction Inspection of Backfilling 2nd Layer Selectfill Material for


1288 C-1090 Sewer Trench from SMH # 11 to SMH # 12 (22.0 M) in Admin Building @ ADMIN BUILDING 11-Dec-17 1:20 PM 12-Dec-17 2:15 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 2
Juaymah Shops Plant N-26

1289 C-1091 Formwork Inspection for F irewall Foundation (03 N0s) At New Sub Station NEW SUB STATION 11-Dec-17 3:30 PM 12-Dec-17 2:00 PM RA-819885-001-00 QUADRI ISHFAQ AHMED
At J uAymah,Shops Plant N-26

Installation of Epoxy Coated Steel Bars, and Form Closure Inspection for
1290 C-1092 Firewall Foundation (03 N0s) At New Sub Station At JuAymah,Shops Plant NEW SUB STATION 11-Dec-17 3:35 PM 12-Dec-17 2:30 PM RA-819885-001-00 QUADRI ISHFAQ AHMED
N-26

1291 C-1093 Concrete Sampling, Testing & Placement Inspection for Firewall NEW SUB STATION 11-Dec-17 3:40 PM 12-Dec-17 3:00 PM RA-819885-001-00 QUADRI ISHFAQ AHMED
Foundation (03 N0s) At New Sub Station @ JuAymah,Shops Plant N-26

Materials Receiving Visual Inspection for Conduit Galvanized Rigid Steel


(GRS) Conduit & Fittings PVC Coated & HD Galvanized, (4" GRS External
1292 E-0081 PVC Coated =10 EA. 2" GRS External PVC Coated= 10 EA, 1" GRS External PLANT N-26 11-Dec-17 3:45 PM 12-Dec-17 9:00 AM RA-819323-003-00 NOLI DAMIAN ABAA
PVC Coated= 112 EA, 1" RGS COUPLING PVC Coated=50 EA, 1" Straps 1
hole pvc coated= 50 EA, 1" Locknut HD= 50 EA & 1" Bushing Insulated
throat = 50 EA, At ETE Store J u'aymah Shop.
Materials Receiving Visual Inspection for PVC Conduit Pipe Fitting, L/R
1293 E-0082 Bend 6" 90 deg. TC8 DB R= 67 (1700mm), 25 EA, PVC Bell End 4" TC9/DB- PLANT N-26 11-Dec-17 3:50 PM 12-Dec-17 2:00 PM RA-819323-003-00 NOLI ALI M. AL YASEEN Not in QMIS
120 ( 75 EA,) At ETE Store Ju'aymah Shops.

Formwork Inspection for 10 Nos Column at Grid Line (8') (A) C9, (8) (A)
1294 C-1094 C10, (8) (B) C2,(8) (D) C1, (8) (E) C1, (8) (F) C1, (8) (F') C15, (5) (D) C1, (5) ADMIN BUILDING 12-Dec-17 11:15 AM 13-Dec-17 2:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(E) C1 and (5) (F) C1 at Admin Building Area, Juaymah Shops N- 26

FBE Reinforcing Steel Inspection for 10 Nos Column at Grid Line (8') (A)
1295 C-1095 C9, (8) (A) C10, (8) (B) C2,(8) (D) C1, (8) (E) C1, (8) (F) C1, (8) (F') C15, (5) ADMIN BUILDING 12-Dec-17 11:20 AM 13-Dec-17 2:15 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(D) C1, (5) (E) C1 and (5) (F) C1 at Admin Building Area, Juaymah Shops N-
26

1296 C-1096 Formwork Inspection for Exit Staircase (2nd Floor) at Grid Line (C-E) (11- ADMIN BUILDING 12-Dec-17 11:25 AM 13-Dec-17 3:00 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
12) (1st Lift) at Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Formclosure Inspection for Exit
1297 C-1097 Staircase (2nd Floor) at Grid Line (C-E) (11-12) (1st Lift) at Admin Building ADMIN BUILDING 12-Dec-17 11:30 AM 13-Dec-17 3:15 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1298 C-1098 Inspection of 4000 PSi for Electrical & Telecom Duct Bank Near to New MAAZ LAB 12-Dec-17 12:40 PM 13-Dec-17 11:00 AM RA-819460-002-00 SALMAAN ISHFAQ AHMED
Substatio (South side ) @ Ju'Aymah, S hops Plant N- 26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1299 C-1099 for New Sub S tation Building (Panel Mark SS-WIG-20, SS- WIG-23, SS-WG- INCO 12-Dec-17 12:45 PM 13-Dec-17 8:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
05 & SS-WG-07) at INCO Pre- Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1300 C-1100 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 12-Dec-17 12:50 PM 13-Dec-17 8:15 AM 0016-ER-001-10 SALMAAN MAMDOOH
(Panel Mark SS-WIG-20, SS-WIG-23, SS-WG-05 & S S-WG- 07) at INCO Pre-
Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1301 C-1101 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 12-Dec-17 12:55 PM 13-Dec-17 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WIG-20, SS-WIG-23, SS -WG-05 & SS-WG-07) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1302 C-1102 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 12-Dec-17 1:00 PM 13-Dec-17 3:00 PM 0016-ER-001-10 SALMAAN MAMDOOH
Mark SS-WIG- 20, SS-WIG-23, SS-WG-05 & SS-WG-07) at INCO Pre- Cast
Fabrication Yard

Material Receiving, Handling ,Storage & Preservation Inspection of PVC


1303 P-0057 SCH-40 Pipes with 2" (21 Pcs) and 4" (22 Pcs) from NEPRO @ ETE store PLANT N-26 12-Dec-17 11:00 AM 13-Dec-17 9:00 AM RA-819779-003-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26

Material Receiving Inspection of Non- Shrink Grout 25 Kg Packing


1304 C-1103 (QTY=10 Bags) From CIC P.o No 25146 @ ETE Laydown Store, JuAymah, PLANT N-26 12-Dec-17 4:10 PM 13-Dec-17 8:00 AM RA-819948-001-0F2 QUADRI ISHFAQ AHMED
Shops Plant N-26

Material Receiving Inspection of Structural S teel Elements for Shipping


1305 S-0001 and Receiving Shed @ Shipping and Receiving Area, Ju'aymah Shops, PLANT N-26 12-Dec-17 2:00 PM 13-Dec-17 7:30 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26.

Material Receiving Inspection of Bolts, Nuts and Washers (Fastners) for


1306 S-0002 Shipping and Receiving Shed @ Shipping and Receiving Area, Ju'aymah PLANT N-26 12-Dec-17 2:05 PM 13-Dec-17 7:45 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Shops, Plant N26.

Material Receiving Inspection of Fabricated Steel Structure for Shipping


1307 S-0003 and Receiving Shed @ Shipping and Receiving Area, Ju'aymah Shops, PLANT N-26 12-Dec-17 2:10 PM 13-Dec-17 8:00 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26.

Material Receiving Inspection of Roof Panels, Gutter, Accessories etc. for


1308 S-0004 Shipping and Receiving Shed @ Shipping and Receiving Area, Ju'aymah PLANT N-26 12-Dec-17 2:15 PM 13-Dec-17 8:15 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Shops, Plant N26.

Surveillance Inspection for S torage, Handling and Preservation for


1309 S-0005 Shipping and Receiving Shed material @ Shipping and Receiving Area, PLANT N-26 12-Dec-17 2:20 PM 13-Dec-17 8:30 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Ju'aymah Shops, Plant N26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1310 C-1104 Inspection of 4000 PSi for 2nd Floor Beams at Grid Line (C-F) (4-9) B1, B5, MAAZ LAB 13-Dec-17 7:40 AM 14-Dec-17 11:00 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
B6 & B7 and 2nd F loor Slab at Grid Line (E-F) (4-9) at Admin Building,
Juaymah Shops N-26 @ MAAZ LAB

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1311 C-1105 (Panel Mark SS-WIG-01, SS-WIG-13, SS-WIG-14, SS-WG-02) at INCO Pre- INCO 13-Dec-17 7:45 AM 14-Dec-17 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
Cast Fabrication Yard

Visual Inspection of Material Receiving of Gravel Size 3/8" (QTY=10 M3)


1312 C-1106 from Al-Osais P.o No 25145 @ ETE Laydown Store, JuAymah, Shops Plant PLANT N-26 13-Dec-17 11:30 AM 14-Dec-17 9:00 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
N-26

1313 C-1107 Sample Collection of Gravel Size 3/8" from ETE Laydown Area for Sieve PLANT N-26 13-Dec-17 11:35 AM 14-Dec-17 9:30 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Analysis and Test Results Reviewing @ JuAymah, Shops Plant N-26

Cement Based Non-S hrink Grout Surface Preparation for Pre-Cast


1314 C-1108 Foundation after Cutting Lifting Hook Grid line 3 ( A to I ) & Grid line 4 CAR PARKING 13-Dec-17 1:05 PM 14-Dec-17 11:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
(A,B,C,E,F,G,H,I ) Total 17 Nos at New Car Parking Area @ ju'aymah shops
plant N-26

Cement Based Non-S hrink Grout Mixing,Testing, Sampling & Placement of


1315 C-1109 Pre-Cast Foundation after cutting Lifting Hook Grid line 3 ( A to I ) & Grid CAR PARKING 13-Dec-17 1:10 PM 14-Dec-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
line 4 (A,B,C,E,F,G,H,I ) Total 17 Nos at New Car Parking Area @ ju'aymah
shops plant N-26

1316 C-1110 Curing Inspection of Concrete for Electrical Duct Bank (6.00 Meter length ) CAR PARKING 13-Dec-17 1:15 PM 14-Dec-17 10:00 AM RA-819460-002-00 QUADRI ISHFAQ AHMED Not in QMIS
at New Car Parking Area @ Ju'Aymah, Shops Plant N- 26

Coating and Final Final Inspection of APCS-3 Carboline fro Pre- Cast
1317 C-1111 Foundation and Pedestal (8 Nos.) of Booster Pump Station at Pre-Cast CAR PARKING 13-Dec-17 3:15 PM 14-Dec-17 10:30 AM RA-820020-001-00 QUADRI ISHFAQ AHMED
Area(Work Shop Area) @ Ju'Aymah, Shops Plant N- 26

Form Closure Inspection for 10 Nos Column at Grid Line (8') (A) C9, (8) (A)
1318 C-1112 C10, (8) (B) C2, (8) (D) C1, (8) (E) C1, (8) (F) C1, (8) (F ') C15, (5) (D) C1, (5) ADMIN BUILDING 13-Dec-17 4:15 PM 14-Dec-17 11:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(E) C1 and (5) (F) C1 at Admin Building Area, Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for 10 Nos Column


1319 C-1113 at Grid Line (8') (A) C9, (8) (A) C10, (8) (B) C2, (8) (D) C1, (8) (E) C1, (8) (F) ADMIN BUILDING 13-Dec-17 4:30 PM 14-Dec-17 3:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C1, (8) (F') C15, (5) (D) C1, (5) (E) C1 and (5) (F) C1 at Admin Building Area,
Juaymah Shops N-26

Sampling, Testing & Placement of Concrete Inspection for Exit S taircase


1320 C-1114 (2nd Floor) at Grid Line (C-E) (11-12) (1st Lift) at Admin Building Juaymah ADMIN BUILDING 13-Dec-17 4:35 PM 14-Dec-17 3:30 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Shops N-26

Visual Inspection of Reinforced detectable warning tape (FOR


1321 T-0023 TELECOMMUNICATION), 6" WIDE * 305 MTR Long, 8 MILS thick.color- PLANT N-26 13-Dec-17 4:40 PM 14-Dec-17 9:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
Orange P.O.NO#29872, D.N.No.3262 @Jua'ymah shops, ETE Store, Plant
N-26.

Pre Test Punch Listing for Hydro Test Package No. UJS-SS B-PW-001-00
1322 P-0058 [Potable Water] around Battery Room Outside New Substation Area at NEW SUB STATION 13-Dec-17 4:40 PM 14-Dec-17 7:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26

Internal Cleaning or Flushing for Hydro Test Package No. UJS-SSB-PW-001-


1323 P-0059 00 [Potable Water] around Battery Room Outside New Substation Area at NEW SUB STATION 13-Dec-17 4:42 PM 14-Dec-17 7:05 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26

Verification of Testing Equipment for Hydro Test Package No. UJS-SSB-PW-


1324 P-0060 001-00 [Potable Water] around Battery Room Outside New Substation NEW SUB STATION 13-Dec-17 4:15 PM 14-Dec-17 7:10 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

Verification of Test Preparation for Hydro Test Package No. UJS-SSB-PW-


1325 P-0061 001-00 [Potable Water] around Battery Room Outside New Substation NEW SUB STATION 13-Dec-17 4:18 PM 14-Dec-17 7:15 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

Filling and Pressurization for Hydro Test Package No. UJS-SSB-PW-001-00


1326 P-0062 [Potable Water] around Battery Room Outside New Substation Area at NEW SUB STATION 13-Dec-17 4:20 PM 14-Dec-17 7:20 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection at Test Pressure for Hydro Test Package No. UJ S-SSB-PW-
1327 P-0063 001-00 [Potable Water] around Battery Room Outside New Substation NEW SUB STATION 13-Dec-17 4:22 PM 14-Dec-17 7:25 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

De- Pressurization and Water Disposal for Hydro Test Package No. UJS-SSB-
1328 P-0064 PW-001-00 [Potable Water] around Battery Room Outside New Substation NEW SUB STATION 13-Dec-17 4:25 PM 14-Dec-17 11:35 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

Pre Test Punch Listing for Hydro Test Package No. UJS-SS B-RW-001-00
1329 P-0065 [Raw Water] around Mechanical Room Outside New Substation Area at NEW SUB STATION 13-Dec-17 4:28 PM 14-Dec-17 12:05 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26

Internal Cleanliness and/or Flushing for Hydro Test Package No. UJ S-SSB-
1330 P-0066 RW-001-00 [Raw Water] around Mechanical Room Outside New NEW SUB STATION 13-Dec-17 4:30 PM 14-Dec-17 12:10 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Substation Area at Juaymah Shop Plant N-26

Verification of Testing Equipment for Hydro Test Package No. UJS-SSB-RW-


1331 P-0067 001-00 [Raw Water] around Mechanical Room Outside New Substation NEW SUB STATION 13-Dec-17 4:32 PM 14-Dec-17 12:15 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

Verification of Test Preparation for Hydro Test Package No. UJS-SSB-RW-


1332 P-0068 001-00 [Raw Water] around Mechanical Room Outside New Substation NEW SUB STATION 13-Dec-17 4:35 PM 14-Dec-17 12:20 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

Filling and Pressurization for Hydro Test Package No. UJS-SSB-RW-001-00


1333 P-0069 [Raw Water] around Mechanical Room Outside New Substation Area at NEW SUB STATION 13-Dec-17 4:38 PM 14-Dec-17 12:25 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26

Visual Inspection at Test Pressure for Hydro Test Package No. UJ S-SSB-RW-
1334 P-0070 001-00 [Raw Water] around Mechanical Room Outside New Substation NEW SUB STATION 13-Dec-17 4:40 PM 14-Dec-17 12:30 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area at Juaymah Shop Plant N-26

De- Pressurization and Water Disposal for Hydro Test Package No. UJS-SSB-
1335 P-0071 RW-001-00 [Raw Water] around Mechanical Room Outside New NEW SUB STATION 13-Dec-17 4:42 PM 14-Dec-17 4:35 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Substation Area at Juaymah Shop Plant N-26

Concrete Finishing & Curing Inspection for 10 Nos Columns at Gridl Lne
1336 C-1115 (11) (A) C9, (11) (B) C14, (11') (B') C6, (10) (B) C1, (12) (B) C15, (11) (D) C1, ADMIN BUILDING 14-Dec-17 8:00 AM 16-Dec-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(11') (E) C1, (12) (E) C16, (11') (F) C16 and (12) (F) C15 at Admin Building
Area, Juaymah Shops N- 26

Formwork Inspection for 9 Nos Column at Grid Line (7) (A') C12, (7) (A)
1337 C-1116 C11, (6) (A') C12, (6) (A) C11, (5) (A) C10, (5) (B) C2, (5) (C) C1, (8) (C) C1 ADMIN BUILDING 14-Dec-17 9:00 AM 16-Dec-17 2:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
and (5) (F') C15 at Admin Bldg Area,J uaymah S hops N-26

FBE Reinforcing Steel Inspection for 9 Nos Column at Grid Line (7) (A')
1338 C-1117 C12, (7) (A) C11, (6) (A') C12, (6) (A) C11, (5) (A) C10, (5) (B) C2, (5) (C) C1, ADMIN BUILDING 14-Dec-17 9:15 AM 16-Dec-17 2:15 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(8) (C) C1 and (5) (F') C15 at Admin Bldg Area,Juaymah Shops N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1339 C-1118 for New Sub S tation Building (Panel Mark SS-WIG-12,SS-WIG-20H,SS-WG- INCO 14-Dec-17 11:05 AM 16-Dec-17 8:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
08,SS- WG-09) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1340 C-1119 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 14-Dec-17 11:10 AM 16-Dec-17 8:15 AM 0016-ER-001-10 SALMAAN MAMDOOH
(Panel Mark SS-WIG-12,SS-WIG-20H,SS-WG-08,SS-WG-09) at INCO Pre-
Cast Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1341 C-1120 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 14-Dec-17 11:15 AM 16-Dec-17 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WIG-12,SS-WIG-20H,SS-WG-08,SS-WG-09) at INCO Pre-Cast
Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1342 C-1121 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 14-Dec-17 11:20 AM 16-Dec-17 3:00 PM 0016-ER-001-10 SALMAAN MAMDOOH
Mark SS-WIG- 12,SS-WIG-20H,SS-WG-08,SS-WG-09) at INCO Pre-Cast
Fabrication Yard

Sand Covering Around and Above the Potable Water Pipe 30CM from
1343 C-1122 Battery Room 53 LM West Side of New Sub Station Building @ Ju'aymah NEW SUB STATION 14-Dec-17 2:35 PM 16-Dec-17 8:00 AM RA-819439-003-00 QUADRI ISHFAQ AHMED Not in QMIS
Shops Plant N-26

Sand Covering Around and Above the Raw Water Pipe 30CM from
1344 C-1123 Mechanical Room 26 LM West Side of New Sub Station Building @ NEW SUB STATION 14-Dec-17 2:40 PM 16-Dec-17 8:15 AM RA-819438-003-00 QUADRI ISHFAQ AHMED Not in QMIS
Ju'aymah Shops Plant N-26

Cement Based Non-S hrink Grout Surface Preparation for Pre-Cast


1345 C-1124 Foundation after Cutting Lifting Hook Grid line 1 near existing fence CAR PARKING 14-Dec-17 2:45 PM 16-Dec-17 11:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
( North East Corner ) at New Car Parking Area ju'aymah shops plant N-26

Cement Based Non-S hrink Grout Mixing,Testing,Sampling & Placement of


1346 C-1125 Pre-Cast Foundation after cutting Lifting Hook Grid line 1 near existing CAR PARKING 13-Dec-17 2:50 PM 14-Dec-17 2:30 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
fence ( North East Corner ) at New Car Parking Area @ ju'aymah shops
plant N-26

Final Inspection of Telecom duct bank and Final Mandrel test for the duct
1347 T-0024 bank of 78 meter length in between substation and black log storage BACK LOG 14-Dec-17 2:55 PM 16-Dec-17 8:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
building @ J u'aymah Shops Plant N-26.

Visual Inspection of Telecom Ductbank Backfilling and oranage color


1348 T-0025 warning tape installation above telecom ductbank of 78 meter length in BACK LOG 14-Dec-17 3:00 PM 16-Dec-17 10:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
between substation and black log storage building @Ju'aymah Shops
Plant N-26.

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1349 C-1126 (Panel Mark SS-WIG-02A, SS-WIG-07, SS-WIG-19, SS-WG-03) at INCO Pre- INCO 16-Dec-17 8:45 AM 17-Dec-17 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
Cast Fabrication Yard

Concrete Finishing & Curing Inspection for 7 Nos Columns at Gridl Lne
1350 C-1127 (11) (C') C7, (11') (C) C6, (10) (C) C1, (12) (C) C16, (10) (D) C1, (10) (E) C5 ADMIN BUILDING 16-Dec-17 11:10 AM 17-Dec-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
and (10) (F) C15 at Admin Building Area, Juaymah Shops N-26

Form Closure Inspection for 9 Nos Column at Grid Line (7) (A') C12, (7) (A)
1351 C-1128 C11, (6) (A') C12, (6) (A) C11, (5) (A) C10, (5) (B) C2, (5) (C) C1, (8) (C) C1 ADMIN BUILDING 16-Dec-17 11:15 AM 17-Dec-17 10:30 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
and (5) (F') C15 at Admin Building Area, Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for 9 Nos Column at


1352 C-1129 Grid Line (7) (A') C12, (7) (A) C11, (6) (A') C12, (6) (A) C11, (5) (A) C10, (5) ADMIN BUILDING 16-Dec-17 11:20 AM 17-Dec-17 3:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(B) C2, (5) (C) C1, (8) (C) C1 and (5) (F') C15 at Admin Building Area,
Juaymah Shops N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer( Final


1353 C-1130 Layer ) Select Fill Material Above Potable Water Pipe from Battery Room NEW SUB STATION 16-Dec-17 3:50 PM 17-Dec-17 2:45 PM RA-819739-003-00 QUADRI ISHFAQ AHMED Not in QMIS
53 LM West Side of New Sub Station @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer( Final Layer ) S elect Fill
1354 C-1131 Material Above Potable Water Pipe from Battery Room 53 LM West Side NEW SUB STATION 16-Dec-17 3:55 PM 17-Dec-17 3:00 PM RA-819739-003-00 QUADRI ISHFAQ AHMED 4
of New Sub Station @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer( Final


1355 C-1132 Layer ) Select Fill Material Above Raw Water Pipe from Mechanical Room NEW SUB STATION 16-Dec-17 4:00 PM 17-Dec-17 3:15 PM RA-819738-003-00 QUADRI ISHFAQ AHMED Not in QMIS
26 LM West Side of New Sub Station @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer( Final Layer ) S elect Fill
1356 C-1133 Material Above Raw Water Pipe from Mechanical Room 26 LM West Side NEW SUB STATION 16-Dec-17 4:05 PM 17-Dec-17 3:30 PM RA-819738-003-00 QUADRI ISHFAQ AHMED 2
of New Sub Station @ Ju'Aymah, Shops Plant N- 26

1357 C-1134 Material Receiving Inspection of Clean Sand (Qty=179 M3) from Al-Osais PLANT N-26 17-Dec-17 8:50 AM 18-Dec-17 9:00 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
P.o No. 29435 @ ETE Laydown, Ja'Aymah Shops Plant N-26

Pre-Cast & Pre-Stressed Pre-Concreting (Molding/Formworks) Inspection


1358 C-1135 for New Sub S tation Building (Panel Mark SS-WIG-02F, SS-WIG-15, SS- INCO 17-Dec-17 8:50 AM 18-Dec-17 8:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
WIG-22) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1359 C-1136 Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 17-Dec-17 8:52 AM 18-Dec-17 8:15 AM 0016-ER-001-10 SALMAAN MAMDOOH Due to spacer size
(Panel Mark SS-WIG-02F, SS-WIG-15, SS-WIG-22) at INCO Pre-Cast
Fabrication Yard

Pre-cast & Pre-Stressed Pre-Stressed first Layer Concrete Placement,


1360 C-1137 Sampling and Testing Inspection for New Sub-Station Building (Panel Mark INCO 17-Dec-17 8:55 AM 18-Dec-17 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WIG-02F, SS-WIG-15, SS-WIG-22) at INCO Pre-Cast Fabrication Yard

Pre-Cast & Pre-Stressed Pre-Stressed Second Layer Concrete Placement,


1361 C-1138 Sampling and Testing Inspection for New Sub Station Building (Panel INCO 17-Dec-17 8:58 AM 18-Dec-17 3:00 PM 0016-ER-001-10 SALMAAN MAMDOOH
Mark SS-WIG- 02F, SS-WIG-15, S S- WIG-22) at INCO Pre-Cast Fabrication
Yard

Material Receiving Inspection of Non- Shrink Grout 25 Kg Packing


1362 C-1139 (QTY=10 Bags) From CIC P.o No 25146 @ ETE Laydown Store, JuAymah, PLANT N-26 17-Dec-17 9:45 AM 18-Dec-17 8:00 AM RA-819948-001-0F2 QUADRI ISHFAQ AHMED
Shops Plant N-26

Cement Based Non-S hrink Grout Surface Preparation for Shim Plate SHIPPING & RECEIVING
1363 C-1140 Installation at 14 Nos. Pedestal (P1) Grid Line (3 & 4) (A to G) Shipping & 17-Dec-17 9:45 AM 18-Dec-17 8:15 AM RA-819990-001-0F1 QUADRI ISHFAQ AHMED
Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

Cement Based Non-S hrink Grout Mixing, Testing & Placement of Shim SHIPPING & RECEIVING
1364 C-1141 Plate Installation at 14 Nos. Pedestal (P1) Grid Line (3 & 4) (A to G) 17-Dec-17 9:50 AM 18-Dec-17 8:30 AM RA-819990-001-0F1 QUADRI ISHFAQ AHMED
Shipping & Receiving Shelter @ Ju'Aymah, Shops Plant N- 26 AREA

Visuak Inspection of Material Receiving Floor Hardener 1. Cico Floor EP


1365 C-1142 3700 40 Kg (QTY=250 Set), 2. Cico Prime-10, 10 Kg (QTY=14 Set) f rom CIC PLANT N-26 17-Dec-17 12:30 PM 18-Dec-17 9:30 AM RA-820000-001-00 QUADRI ISHFAQ AHMED Not in QMIS
P.o. No. 4577 @ ETE Laydown Store, JuAymah, Shops Plant N-26

1366 C-1143 FBE Rebar,Embedded Items Inspectiom of F ire Wall (3 NOS ) upto FGL at NEW SUB STATION 17-Dec-17 2:00 PM 18-Dec-17 11:00 AM RA-819767-001-0F4 QUADRI ISHFAQ AHMED
New Substation @ Ju'Aymah, Shops Plant N- 26

FDT inspection of subgrade for trench of potable water and raw water
1367 C-1144 lines (40m.north side) and (60m.east side) in Admin building ADMIN BUILDING 17-Dec-17 2:00 PM 18-Dec-17 9:00 AM RA-819438-002-00 ACIELO ISHFAQ AHMED 7
area,Juaymah Shops N26

Sand Bedding placement inspection of trench for potable water and raw
1368 C-1145 water lines (40m.north side) and (60m.east side) in Admin building ADMIN BUILDING 17-Dec-17 2:02 PM 18-Dec-17 2:00 PM RA-819438-002-00 ACIELO ISHFAQ AHMED Not in QMIS
area,Juaymah Shops N26

FDT inspection of sandbedding placement for trench of potable water and


1369 C-1146 raw water lines (40m.north side) and (60m.east side) in Admin building ADMIN BUILDING 17-Dec-17 2:05 PM 18-Dec-17 2:30 PM RA-819438-002-00 ACIELO ISHFAQ AHMED 7
area,Juaymah Shops N26

FDT inspection for subgrade of S ewer Trench (10 m.) from mechanical
1370 C-1147 room to sewerline header (west side) of Admin Bldg. @ Juaymah Shops ADMIN BUILDING 17-Dec-17 2:08 PM 18-Dec-17 2:15 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
Plant N26

Sand bedding placement inspection for subgrade of Sewer Trench (10 m)


1371 C-1148 from mechanical room to sewerline header (west side) of Admin Bldg. @ ADMIN BUILDING 17-Dec-17 2:10 PM 18-Dec-17 3:15 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Juaymah Shops Plant N26

FDT inspection of sandbedding placement for subgrade of Sewer Trench


1372 C-1149 (10 m.) from mechanical room to sewerline header (west side) of Admin ADMIN BUILDING 17-Dec-17 2:12 PM 18-Dec-17 4:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 1
Bldg. @ Juaymah Shops Plant N26

1373 ST-0006 Material Receiving Inspection of Structural S teel Elements for Booster SHIPPING & RECEIVING 17-Dec-17 2:00 PM 18-Dec-17 7:30 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Pump Shed 1 @ Shipping and Receiving Area, Ju'aymah Shops, Plant N26. AREA

Material Receiving Inspection of Bolts, Nuts and Washers (Fastners) for SHIPPING & RECEIVING
1374 ST-0007 Booster Pump Shed 1 @ Shipping and Receiving Area, Ju'aymah Shops, 17-Dec-17 2:02 PM 18-Dec-17 7:45 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26. AREA

1375 ST-0008 Material Receiving Inspection of Fabricated Steel Structure for Booster SHIPPING & RECEIVING 17-Dec-17 2:05 PM 18-Dec-17 8:00 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Pump Shed 1 @ Shipping and Receiving Area, Ju'aymah Shops, Plant N26. AREA

Material Receiving Inspection of Roof Panels, Gutter, Accessories etc. for SHIPPING & RECEIVING
1376 ST-0009 Booster Pump Shed 1 @ Shipping and Receiving Area, Ju'aymah Shops, 17-Dec-17 2:08 PM 18-Dec-17 8:15 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26. AREA

Surveillance Inspection for S torage, Handling and Preservation for Booster SHIPPING & RECEIVING
1377 ST-0010 Pump Shed 1 material @ Shipping and Receiving Area, Ju'aymah Shops, AREA 17-Dec-17 2:10 PM 18-Dec-17 8:30 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26.

1378 ST-0011 Material Receiving Inspection of Structural S teel Elements for Booster SHIPPING & RECEIVING 17-Dec-17 2:12 PM 18-Dec-17 8:45 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Pump Shed 2 @ Shipping and Receiving Area, Ju'aymah Shops, Plant N26. AREA

Material Receiving Inspection of Bolts, Nuts and Washers (Fastners) for SHIPPING & RECEIVING
1379 ST-0012 Booster Pump Shed 2 @ S hipping and Receiving Area, Ju'aymah Shops, AREA 17-Dec-17 2:15 PM 18-Dec-17 9:00 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26.

1380 ST-0013 Material Receiving Inspection of Fabricated Steel Structure for Booster SHIPPING & RECEIVING 17-Dec-17 2:17 PM 18-Dec-17 9:15 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Pump Shed 2 @ Shipping and Receiving Area, Ju'aymah Shops, Plant N26. AREA

Material Receiving Inspection of Roof Panels, Gutter, Accessories etc. for SHIPPING & RECEIVING
1381 ST-0014 Booster Pump Shed 2 @ S hipping and Receiving Area, Ju'aymah Shops, AREA 17-Dec-17 2:20 PM 18-Dec-17 9:30 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26.

Surveillance Inspection for S torage, Handling and Preservation for Booster SHIPPING & RECEIVING
1382 ST-0015 Pump Shed 2 material @ Shipping and Receiving Area, Ju'aymah Shops, AREA 17-Dec-17 2:22 PM 18-Dec-17 9:45 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Plant N26.

Inspection of Support Foundation Prior to Structural Installation for SHIPPING & RECEIVING
1383 ST-0016 Shipping and Receiving Shed @ Shipping and Receiving Area, Ju'aymah AREA 17-Dec-17 2:25 PM 18-Dec-17 10:00 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
Shops, Plant N26.

FDT, Compaction Inspection of Existing Sub Grade for Potable Water &
1384 C-1150 Raw Water Trench ( 50 LM ) At South Of New Sub Station @ Ju'Aymah, NEW SUB STATION 17-Dec-17 4:05 PM 18-Dec-17 11:15 AM RA-819438-003-00 QUADRI ISHFAQ AHMED 4
Shops Plant N- 26

1385 C-1151 Placement of Sand for Potable Water & Raw Water Trench ( 50 LM )At NEW SUB STATION 17-Dec-17 4:10 PM 18-Dec-17 3:00 PM RA-819438-003-00 QUADRI ISHFAQ AHMED Not in QMIS
South Of New S ub Station @ Ju'Aymah, Shops Plant N- 26

1386 C-1152 Compaction Test of Sand for Potable Water & Raw Water Trench ( 50 LM ) NEW SUB STATION 17-Dec-17 4:15 PM 18-Dec-17 3:40 PM RA-819438-003-00 QUADRI ISHFAQ AHMED 4
At S outh Of New nSub Statio @ Ju'Aymah, Shops Plant N- 26

Pre-Cast & Pre-Stressed Pre-Concreting (Rebar, Embedded Items &


1387 C-1036-A Formwork/Molding Closure) Inspection for New S ub-S tation Building INCO 18-Dec-17 11:40 AM 18-Dec-17 11:55 AM 0016-ER-001-10 SALMAAN MAMDOOH
(Panel Mark SS-WIG-02F, SS-WIG-15, SS-WIG-22) at INCO Pre-Cast
Fabrication Yard

Materials Receiving Visual Inspection for EMT Fittings and Accessories,


1388 E-0083 (EMT Compression Type Coupling 1") (150 EA), from Tabalsa Arabia, at PLANT N-26 18-Dec-17 10:00 AM 19-Dec-17 9:00 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
ETE Store Ju'aymah Shop Plant N26. As per attached highlighted
Document.

Concrete Finishing & Curing Inspection for 7 Nos Columns at Gridl Lne
1389 C-1153 (10) (A) C9, (9) (B) C1, (9) (C) C1, (9) (D) C1, (9') (E) C1, (9) (E) C3 and (9') ADMIN BUILDING 18-Dec-17 11:05 AM 19-Dec-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(F) C8 at Admin Building Area, Juaymah Shops N-26

1390 C-1154 Formwork Inspection for 4 Nos Column at Grid Line (4) (C) C1, (4) (D) C1, ADMIN BUILDING 18-Dec-17 11:08 AM 19-Dec-17 10:30 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(4') (E) C1 and (4') (F) C8 at Admin Building Area, Juaymah Shops N-26

FBE Reinforcing Steel Inspection for 4 Nos Column at Grid Line (4) (C) C1,
1391 C-1155 (4) (D) C1, (4') (E) C1 and (4') (F) C8 at Admin Building Area, Juaymah ADMIN BUILDING 18-Dec-17 11:10 AM 19-Dec-17 10:45 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Shops N-26

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1392 C-1156 (Panel Mark SS-WIG-08, SS-WIG-21, SS-WG-10, SS-WG-06) at INCO Pre- INCO 18-Dec-17 1:25 PM 19-Dec-17 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
Cast Fabrication Yard

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1393 C-1157 Inspection of 4000 PSi for Slab on Grade at Grid Line (B-C) (1-2) at MAAZ LAB 18-Dec-17 1:30 PM 19-Dec-17 11:00 AM RA-819745-001-00 SALMAAN ISHFAQ AHMED
Admin Building, Juaymah Shops N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1394 C-1158 Inspection of 4000 PSi for Main Staircase at Grid Line (B)(5-8) (2nd Lift) MAAZ LAB 19-Dec-17 10:15 AM 20-Dec-17 11:00 AM RA-819746-001-00 SALMAAN ISHFAQ AHMED
Admin Building, Juaymah Shops N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1395 C-1159 Inspection of 4000 PSi for 2nd Floor Beams at Grid Line (A-C) (4-9) B1, B2, MAAZ LAB 19-Dec-17 10:20 AM 20-Dec-17 11:15 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
B3, B5& B6 and Cantilever Slab at Grid Line (A-A') (5'-7') at Admin
Building, Juaymah Shops Plant N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1396 C-1160 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-03, SS-WIG-04 & MAAZ LAB 19-Dec-17 10:25 AM 20-Dec-17 11:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WIG-02B of New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB

1397 C-1161 Form Closure Inspection for 4 Nos Column at Grid Line (4) (C) C1, (4) (D) ADMIN BUILDING 19-Dec-17 11:35 AM 20-Dec-17 10:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C1, (4') (E) C1 and (4') (F) C8 at Admin Building Area, Juaymah Shops N-26

Formwork Inspection for 7 Nos. Column at Grid Line (4') (A) C9, (4) (B) C1,
1398 C-1162 (3') (A) C9, (3) (B) C1, (2) (A) C9, (2) (B) C16 and (1) (B) C13 at Admin ADMIN BUILDING 19-Dec-17 11:40 AM 20-Dec-17 10:30 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Building Area, Juaymah Shops N-26

FBE Reinforcing Steel Inspection for 7 Nos. Column at Grid Line (4') (A) C9,
1399 C-1163 (4) (B) C1, (3') (A) C9, (3) (B) C1, (2) (A) C9, (2) (B) C16 and (1) (B) C13 at ADMIN BUILDING 19-Dec-17 11:45 AM 20-Dec-17 10:45 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Admin Building Area, Juay mah Shops N-26

CPVC Pipes and fittings Installation & Inspection of 2"ø for Portable Water
1400 P-0072 line 40 M North Side and 66 M East Side Outside New Admin Building ADMIN BUILDING 19-Dec-17 1:05 PM 20-Dec-17 1:30 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah,Shops Plant N- 26.

CPVC Pipes and fittings Installation & Inspection of 2"ø for Raw Water line
1401 P-0073 40 M North side and 66 M East Side Outside New Admin Building Area @ ADMIN BUILDING 19-Dec-17 1:10 PM 20-Dec-17 2:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Ju'aymah, Shops Plant N- 26.

CPVC Pipes and fittings Installation & Inspection of 2"ø for Portable Water
1402 P-0074 line 60 M South S ide Outside New S ub Station Area @ Ju'aymah, Shops NEW SUB STATION 19-Dec-17 1:15 PM 20-Dec-17 2:30 PM RA-819439-003-00 FAHEEM SYED SHAFIULLAH
Plant N- 26.

CPVC Pipes and fittings Installation & Inspection of 2"ø for Raw Water line
1403 P-0075 60 M South Side Outside New Sub Station Area @ Ju'aymah, Shops Plant NEW SUB STATION 19-Dec-17 1:20 PM 20-Dec-17 3:00 PM RA-819438-00e-00 FAHEEM SYED SHAFIULLAH
N- 26.

RTR pipe joint and assembly inspection for 8" RTR sewer line 59.7 m
1404 R-0017 including 8"x4" wye, 4"x 45 deg elbow and 4" pipe spool at East side of ADMIN BUILDING 19-Dec-17 2:00 PM 20-Dec-17 9:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
NEW ADMIN BUILDING AREA @ Juaymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Gravity test inspection for 8" RTR sewer line 59.7 m including 8"x4" wye,
1405 R-0018 4"x 45 deg elbow and 4" pipe spool at East side of NEW ADMIN BUILDING ADMIN BUILDING 19-Dec-17 2:05 PM 20-Dec-17 11:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
AREA @ Juaymah Shops Plant N-26

Curing Inspection of Concrete Fire Wall Foundation ( 03 Nos ) at New S ub


1406 C-1164 Station @ Ju'Aymah, Shops Plant N- 26 CAR PARKING 19-Dec-17 3:05 PM 20-Dec-17 8:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS

Curing Inspection of Cement Based Non-Shrink Grout of Pre-Cast


1407 C-1165 Foundation after cutting Lifting Hook Grid line 2 & 3 ( A TO I ) 18 Nos at CAR PARKING 19-Dec-17 3:10 PM 20-Dec-17 9:00 AM RA-819945-001-00 QUADRI ISHFAQ AHMED
New Car Parking Area @ J u'Aymah, Shops Plant N- 26

Surface Preparation & Moisture Test Inspection of Pre-Cast Foundation


1408 C-1166 and Pedestal ( 05 Nos ) of Car Parking area for Adim Building at Pre-Cast CAR PARKING 19-Dec-17 3:15 PM 20-Dec-17 9:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED
area ( work Shop ) @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Existing Sub Grade for Sewer line Trench
1409 C-1167 ( 12.5 LM ) Infront of Back Log Building @ Ju'Aymah, Shops Plant N- 26 BACK LOG 19-Dec-17 3:20 PM 20-Dec-17 1:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 1

Sand Bedding Inspecting for S ewer line Trench ( 12.5 LM ) Infront of Back
1410 C-1168 Log Building @ Ju'Aymah, Shops Plant N- 26 BACK LOG 19-Dec-17 3:25 PM 20-Dec-17 2:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED

Compaction Test of Sand Bedding for Sewer line Trench ( 12.5 LM )


1411 C-1169 Infront of Back Log Building @ J u'Aymah, Shops Plant N- 26 BACK LOG 19-Dec-17 3:30 PM 20-Dec-17 3:00 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 1

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1412 C-1170 Inspection of 4000 PSi for LV Duct Bank, South West Side of New MAAZ LAB 20-Dec-17 11:15 AM 21-Dec-17 11:00 AM RA-819460-002-00 SALMAAN ISHFAQ AHMED
Substation Area, Juaymah Shops N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1413 C-1171 Inspection of 4000 PSi for Electrical Duct Bank Length 14.0 M, 11.0 M & MAAZ LAB 20-Dec-17 11:20 AM 21-Dec-17 11:15 AM RA-819936-001-00 SALMAAN ISHFAQ AHMED
15.0 M at New Car Parking Area , Juaymah Shops N-26 @ MAAZ LAB

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1414 C-1172 (Panel Mark SS-WIG-20, SS-WIG-23, SS-WG-05 & S S-WG- 07) at INCO Pre- INCO 20-Dec-17 11:25 AM 21-Dec-17 9:00 AM 0016-ER-001-10 SALMAAN ISHFAQ AHMED
Cast Fabrication Yard

Form Closure Inspection for 7 Nos. Column at Grid Line (4') (A) C9, (4) (B)
1415 C-1173 C1, (3') (A) C9, (3) (B) C1, (2) (A) C9, (2) (B) C16 and (1) (B) C13 at Admin ADMIN BUILDING 20-Dec-17 12:45 PM 21-Dec-17 9:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Building Area, Juaymah Shops N-26

Sampling,Testing & Placement of Concrete for 7 Nos. Column at Grid Line


1416 C-1174 (4') (A) C9, (4) (B) C1, (3') (A) C9, (3) (B) C1, (2) (A) C9, (2) (B) C16 and (1) ADMIN BUILDING 20-Dec-17 12:48 PM 21-Dec-17 1:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(B) C13 at Admin Building Area, Juaymah Shops N-26

1417 C-1175 Sampling,Testing & Placement of Concrete Inspection for 4 Nos Column at ADMIN BUILDING 20-Dec-17 12:50 PM 21-Dec-17 1:30 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
Grid Line (4) (C) C1, (4) (D) C1, (4') (E) C1 and (4') (F) C8

1418 C-1176 Formwork Inspection for Exit Staircase (2nd Floor) at Grid Line (C-E) (11- ADMIN BUILDING 20-Dec-17 12:53 PM 21-Dec-17 9:30 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
12) (2nd Lift) @ Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for Exit
1419 C-1177 Staircase (2nd Floor) at Grid Line (C-E) (11-12) (2nd Lift) @ Admin Building ADMIN BUILDING 20-Dec-17 12:55 PM 21-Dec-17 9:45 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Exit S taircase


1420 C-1178 (2nd Floor) at Grid Line (C-E) (11-12) (2nd Lift) @ Admin Building Juaymah ADMIN BUILDING 20-Dec-17 12:58 PM 21-Dec-17 12:00 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Shops N-26

1421 C-1179 Formwork Inspection for Grid Line (A-F) (9-12) RB1, RB1A, RB2 & RB3 @ ADMIN BUILDING 20-Dec-17 1:00 PM 21-Dec-17 10:00 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for
1422 C-1180 Grid Line (A-F) (9-12) RB1, RB1A, RB2 & RB3 @ Admin Building Juaymah ADMIN BUILDING 20-Dec-17 1:02 PM 21-Dec-17 10:15 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Shops N-26

1423 C-1181 Sampling,Testing & Placement of Concrete Inspection for Grid Line (A-F) ADMIN BUILDING 20-Dec-17 1:05 PM 21-Dec-17 11:00 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
(9-12) RB1, RB1A, RB2 & RB3 @ Admin Building Juaymah Shops N-26

1424 C-1182 Formwork Closure Inspectiom of Fire Wall (3 NOS ) upto FGL at New NEW SUB STATION 20-Dec-17 1:40 PM 21-Dec-17 2:00 PM RA-819767-001-0F4 QUADRI ISHFAQ AHMED
Substation @ Ju'Aymah, Shops Plant N- 26

1425 C-1183 Form Closure Inspectiom of Fire Wall (3 NOS ) upto FGL at New NEW SUB STATION 20-Dec-17 1:40 PM 21-Dec-17 2:30 PM RA-819767-001-0F4 QUADRI ISHFAQ AHMED
Substation @ Ju'Aymah, Shops Plant N- 26

1426 C-1184 Sampling,Testing & Placement of Concrete Inspectiom of Fire Wall (3 NEW SUB STATION 20-Dec-17 1:45 PM 21-Dec-17 3:30 PM RA-819767-001-0F4 QUADRI ISHFAQ AHMED
NOS ) upto FGL at New Substation @ Ju'Aymah, Shops Plant N- 26

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1427 P-0076 SCH-80 fittings Elbow 45⁰ 2" (24 Pcs) from SAPPCO @ ETE store Juaymah PLANT N-26 20-Dec-17 2:50 PM 21-Dec-17 8:30 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Shop Plant N-26

Sand Backfilling Placement inspection around and above pipe of Sewer


1428 C-1185 Trench from SMH# 12 to SMH-14 at new Admin Bldg. @ Juaymah Shops ADMIN BUILDING 20-Dec-17 3:50 PM 21-Dec-17 3:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Plant N26

1429 C-1186 FDT, Compaction Inspection of Existing Sub Grade for Telecom Duct Bank BACK LOG 20-Dec-17 4:00 PM 21-Dec-17 3:00 PM RA-819517-001-00 QUADRI ISHFAQ AHMED 4
(55.0 M) infront of Back Log Building @ Ju'Aymah Shops Plant N-26

1430 P-0077 Pre-Test Punch Listing for HT Package UJS-ADMB-PW-001- 00 (Potable ADMIN BUILDING 20-Dec-17 2:20 PM 21-Dec-17 7:30 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-ADMB-PW-001- 00


1431 P-0078 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 20-Dec-17 2:25 PM 21-Dec-17 7:45 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Verification of Testing Equipment for HT Package UJS-ADMB-PW-001-00


1432 P-0079 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 20-Dec-17 2:30 PM 21-Dec-17 8:00 AM RA-819439-002--00 FAHEEM SYED SHAFIULLAH
Plant N-26

1433 P-0080 Pre-Test Punch Listing for HT Package UJS-ADMB-RW- 001-00 (Raw Water) ADMIN BUILDING 20-Dec-17 2:35 PM 21-Dec-17 8:15 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Oustside New Admin Building Area @ Ju'aymah Shop Plant N-26

1434 P-0081 Internal Cleaning / Flushing for HT Package UJS-ADMB-RW- 001-00 (Raw ADMIN BUILDING 20-Dec-17 2:40 PM 21-Dec-17 8:20 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-ADMB-RW-001-00


1435 P-0082 (Raw Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant ADMIN BUILDING 20-Dec-17 2:45 PM 21-Dec-17 8:30 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
N-26

Pre-Test Punch Listing for HT Package UJS-SSB-PW-002-00 (Potable


1436 P-0083 Water) Oustside New Substation Building Towards Work Shop Area @ NEW SUB STATION 20-Dec-17 2:50 PM 21-Dec-17 1:30 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-SSB-PW-002-00 (Potable


1437 P-0084 Water) Oustside New Substation Building Towards Work Shop Area @ NEW SUB STATION 20-Dec-17 2:55 PM 21-Dec-17 1:45 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-SSB-PW-002-00


1438 P-0085 (Potable Water) Oustside New Substation Building Towards Work Shop NEW SUB STATION 20-Dec-17 3:00 PM 21-Dec-17 2:00 PM RA-819439-002--00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-SSB-RW-002-00 (Raw Water)


1439 P-0086 Oustside New Substation Building Towards Work Shop Area @ Ju'aymah NEW SUB STATION 20-Dec-17 3:05 PM 21-Dec-17 2:15 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-SSB-RW-002-00 (Raw


1440 P-0087 Water) Oustside New Substation Building Towards Work Shop Area @ NEW SUB STATION 20-Dec-17 3:10 PM 21-Dec-17 2:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-SSB-RW-002-00


1441 P-0088 (Raw Water) Oustside New Substation Building Towards Work Shop Area NEW SUB STATION 20-Dec-17 3:15 PM 21-Dec-17 2:45 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

Concrete Finishing & Curing Inspection for 10 Nos. Column at Grid Line
1442 C-1187 (8') (A) C9, (8) (A) C10, (8) (B) C2, (8) (D) C1, (8) (E) C1, (8) (F) C1, (8) (F') ADMIN BUILDING 21-Dec-17 8:00 AM 23-Dec-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED Not in QMIS
C15, (5) (D) C1, (5) (E) C1 and (5) (F) C1 at Admin Building Area, Juaymah
Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1443 C-1188 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-05 & SS-WIG-06 of MAAZ LAB 21-Dec-17 10:15 AM 23-Dec-17 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB

Coating & Final Inspection of APCS-3, Carboline for Pre-Cast Foundation


1444 C-1189 and Pedestal ( 05 Nos ) of Car Parking area for Adim Building at Pre-Cast CAR PARKING 21-Dec-17 4:00 PM 23-Dec-17 10:00 AM RA-819735-001-00 QUADRI ISHFAQ AHMED
area ( work Shop ) @ Ju'Aymah, Shops Plant N- 26 (DFT)

Material Receiving Visual Inspection of PVC Conduit Fitting, Fab. Conduit


1445 E-0084 Coupling TC9/DB 120 6 Inch. (40 EA) PVC Bell End TC9/DB 120 2 Inch. (53 PLANT N-26 21-Dec-17 3:00 PM 23-Dec-17 9:00 AM RA-819323-003-00 NOLI ALI M. AL YASEEN Not in QMIS
EA.) And L/R Bend 90 deg. R=36" 6 Inch. (100 EA.) At ETE Store Ju'aymah
Shops. N26. as per attached highlighted document.

Verification of Test Preparation for HT Package UJS-SSB-PW-002-00


1446 P-0089 (Potable Water) Oustside New Sub Station Building Towards Work Shop NEW SUB STATION 21-Dec-17 3:15 PM 23-Dec-17 8:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-SSB-PW-002-00 (Potable


1447 P-0090 Water) Oustside New Sub Station Building Towards Work Shop Area @ NEW SUB STATION 21-Dec-17 3:20 PM 23-Dec-17 8:20 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-SSB- PW-002-00


1448 P-0091 (Potable Water) Oustside New Sub Station Building Towards Work Shop NEW SUB STATION 21-Dec-17 3:25 PM 23-Dec-17 8:45 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

De- Pressurization & Disposal for HT Package UJS-SSB-PW- 002-00 (Potable


1449 P-0092 Water) Oustside New Sub Station Building Towards Work Shop Area @ NEW SUB STATION 21-Dec-17 3:30 PM 23-Dec-17 1:35 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1450 C-1190 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-02C & SS-WIG-16 MAAZ LAB 23-Dec-17 7:40 AM 24-Dec-17 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
of New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1451 C-1191 Inspection of 4000 PSi for Exit S taircase at Grid Line (B-C) (1-2) (1st Lift) MAAZ LAB 23-Dec-17 7:45 AM 24-Dec-17 11:30 AM RA-859745-001-00 SALMAAN ISHFAQ AHMED
Admin Building Juaymah Shops N-26 @ MAAZ LAB

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1452 C-1192 (Panel Mark SS-WIG-12,SS-WIG-20H,SS-WG-08,SS-WG-09) at INCO Pre- INCO 23-Dec-17 7:50 AM 24-Dec-17 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
Cast Fabrication Yard

Formwork Inspection for 9 Nos. Column at Grid Line (1) (C) C16, (2) (C) C3,
1453 C-1193 (3) (C) C1, (1) (D) C17, (2) (D) C4, (3) (D) C1, (3) (E) C8, (3) (F) C15 and (2) ADMIN BUILDING 23-Dec-17 1:05 PM 24-Dec-17 2:00 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(F) C15 at Admin Building Area, Juaymah Shops N-26

FBE Reinforcing Steel Inspection for 9 Nos. Column at Grid Line (1) (C)
1454 C-1194 C16, (2) (C) C3, (3) (C) C1, (1) (D) C17, (2) (D) C4, (3) (D) C1, (3) (E) C8, (3) ADMIN BUILDING 23-Dec-17 1:10 PM 24-Dec-17 2:15 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(F) C15 and (2) (F) C15 at Admin Building Area, Juaymah Shops N-26

Curing Inspection of Cement Based Non-Shrink Grout of Pre-Cast


1455 C-1195 Foundation after cutting Lifting Hook Grid line 3 ( A to I ) & Grid line 4 CAR PARKING 23-Dec-17 1:15 PM 24-Dec-17 10:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
(A,B,C,E,F,G,H,I ) and Grid line 1 near existing fence (North East Corner)
Total 18 Nos New Car Parking Area @ ju'aymah shops plant N-26

1456 C-1196 Review of Test Reports for Excavated Material from ETE Laydown, Stock PLANT N-26 23-Dec-17 1:20 PM 24-Dec-17 10:30 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED
Pile @ Ju'aymah Shops Plant N-26

FDT, Compaction Inspection of Existing Sub Grade for Electrical Duct Bank
1457 C-1197 (9.4 LM ) at West Side of New Car Parking Area @ J u'Aymah, Shops Plant CAR PARKING 23-Dec-17 2:20 PM 24-Dec-17 9:30 AM RA-819460-002-00 QUADRI ISHFAQ AHMED 1
N- 26

Site & Grade Preparation Inspection Of Electrical Duct Bank for Electrical
1458 C-1198 Duct Bank (9.4 LM ) at West Side of New Car Parking Area @ Ju'Aymah, CAR PARKING 23-Dec-17 2:25 PM 24-Dec-17 2:30 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Shops Plant N- 26

1459 C-1199 FBE Rebar, Embedded Items Inspection for Electrical Duct Bank (9.4 LM ) CAR PARKING 23-Dec-17 2:30 PM 24-Dec-17 3:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
at West Side of New Car Parking Area @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Electrical Duct Bank


1460 C-1200 (9.4 LM ) at West Side of New Car Parking Area @ Ju'Aymah, Shops Plant CAR PARKING 23-Dec-17 2:35 PM 24-Dec-17 3:30 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
N- 26

Material Receiving Visual Inspection of Metallic Wireways Boxes, 200 EA.


Box square 4" DP Steel (8) 3/4" SKO & (1) 1/2" BK, 100 EA. 4" DP 2 1/8"
1461 E-0085 Steel (8) 1" SKO & (3) 1/2" (2) 3/4" KO, 500 EA. Square 4x4" Steel Box PLANT N-26 23-Dec-17 11:00 AM 24-Dec-17 9:00 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
cover and Cover Handy Box Toggle Switch Steel 10 EA,At ETE Store
Ju'aymah Shops. N26. As per Attached Highlighted Document.

Material Receiving Visual Inspection of PVC Insulated Grounding


1462 E-0086 Conductor 1X25mm² 500 mtrs. From Al-Abdul Karim Holding Co. @ ETE PLANT N-26 23-Dec-17 11:05 AM 24-Dec-17 9:30 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
Store Ju'Aymah Shops Plant N-26. As per Highlighted attached Documents

Visual Inspection of LV Electrical Duck Bank and Conduit Excavation and


1463 E-0087 Trenching at Parking Area, prior to concrete placement, As per highlighted CAR PARKING 23-Dec-17 11:10 AM 24-Dec-17 10:30 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
Attached Drawing.

Visual Inspection of LV Electrical Duck Bank , conduit Pipe & spacers


1464 E-0088 Installation , and embedded hardware prior to concrete placement, At CAR PARKING 23-Dec-17 11:20 AM 24-Dec-17 11:00 AM RA-819323-003-00 NOLI ALI M. AL YASEEN
Parking Area.As per highlighted Attached Drawing.

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1465 P-0093 SCH-80 fittings with 2"X1" TEE (10 Pcs) , 2X½" Reducer Bush (1 Pcs) & PLANT N-26 23-Dec-17 2:05 PM 24-Dec-17 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
1½"X1" Reducer (09 Pcs) from IPEX @ ETE store Juaymah Shop Plant N-26

Verification ot Test Preparation for HT Package UJS-S SB-RW-002- 00 (Raw


1466 P-0094 Water) Oustside New Sub Station Building Towards Work Shop Area @ NEW SUB STATION 23-Dec-17 2:10 PM 24-Dec-17 7:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-SSB- RW-002-00


1467 P-0095 (Raw Water) Oustside New Sub Station Building Towards Work Shop Area NEW SUB STATION 23-Dec-17 2:15 PM 24-Dec-17 7:45 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-SSB- RW-002-00


1468 P-0096 (Raw Water) Oustside New Sub Station Building Towards Work Shop Area NEW SUB STATION 23-Dec-17 2:20 PM 24-Dec-17 8:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

De- Pressurization & Disposal for HT Package UJS-SSB-RW-002-00 (Raw


1469 P-0097 Water) Oustside New Sub Station Building Towards Work Shop Area @ NEW SUB STATION 23-Dec-17 2:25 PM 24-Dec-17 1:35 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

1470 T-0026 Visual Inspection of Telecom Duct Bank Trench Excavation of 52 Meter In BACK LOG 23-Dec-17 2:20 PM 24-Dec-17 9:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
front of Backlog Building @ Juaymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1471 C-1201 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-02D & SS-WIG-10 MAAZ LAB 24-Dec-17 9:15 AM 25-Dec-17 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
of New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB

Concrete Finishing & Curing Inspection for 9 Nos Column at Grid Line (7)
1472 C-1202 (A') C12, (7) (A) C11, (6) (A') C12, (6) (A) C11, (5) (A) C10, (5) (B) C2, (5) (C) ADMIN BUILDING 24-Dec-17 11:05 AM 25-Dec-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED Not in QMIS
C1, (8) (C) C1 & (5) (F') C15 at Admin Bldg Area,Juaymah Shops N-26

1473 C-1203 FDT Inspection of Sub Grade for Trench of Potable Water and Raw Water ADMIN BUILDING 24-Dec-17 11:10 AM 25-Dec-17 8:00 AM RA-819438-002-00 ACIELO ISHFAQ AHMED 3
Lines (35.0 M) South Side in Admin Building Area, Juaymah Shops N-26

Sand Bedding Placement Inspection of Trench for Potable Water and Raw
1474 C-1204 Water Lines (35.0 M) South Side in Admin Building Area, Juaymah Shops ADMIN BUILDING 24-Dec-17 11:15 AM 25-Dec-17 10:45 AM RA-819438-002-00 ACIELO ISHFAQ AHMED Not in QMIS
N-26

FDT Inspection of Sand Bedding Placement for Trench of Potable Water


1475 C-1205 and Raw Water Lines (35.0 M) South Side in Admin Building Area, ADMIN BUILDING 24-Dec-17 11:20 AM 25-Dec-17 11:00 AM RA-819438-002-00 ACIELO ISHFAQ AHMED 2
Juaymah Shops N-26

Form Closure Inpection for 9 Nos. Column at Grid Line (1) (C) C16, (2) (C)
1476 C-1206 C3, (3) (C) C1, (1) (D) C17, (2) (D) C4, (3) (D) C1, (3) (E) C8, (3) (F) C15 and ADMIN BUILDING 24-Dec-17 11:25 AM 25-Dec-17 1:15 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
(2) (F) C15 at Admin Building Area, Juaymah Shops N-26

Sampling, Testing & Placement of Concrete Inpection for 9 Nos. Column at


1477 C-1207 Grid Line (1) (C) C16, (2) (C) C3, (3) (C) C1, (1) (D) C17, (2) (D) C4, (3) (D) ADMIN BUILDING 24-Dec-17 11:30 AM 25-Dec-17 3:15 PM RA-819721-001-0F2 ACIELO ISHFAQ AHMED
C1, (3) (E) C8, (3) (F) C15 and (2) (F) C15 at Admin Building Area, Juaymah
Shops N-26

1478 C-1208 Material Receiving Inspection of Clean Sand (QTY = 454 M3) From Al- PLANT N-26 24-Dec-17 3:30 PM 25-Dec-17 9:00 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Osais P.o No 29435 @ ETE Laydown,JuAymah,Shops Plant N-26

1479 C-1209 Base Course Sample Collection Inspection from Al-Osais at ETE Laydown, PLANT N-26 24-Dec-17 3:35 PM 25-Dec-17 9:30 AM RA-819500-001-0F1 QUADRI ISHFAQ AHMED
Stock Pile for Sieve Analysis @ Ju'aymah Shops Plant N-26

Fill Placement & Compaction Inspection of 1st Layer Backfilling Selectfill


1480 C-1210 Material at Sewer Line Trench from SMH # 12 to SMH # 14 (West Side) in ADMIN BUILDING 24-Dec-17 3:40 PM 25-Dec-17 10:00 AM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Admin Building @ Juaymah Shops Plant N-26

FDT Compaction Inspection of 1st Layer Backfilling Selectfill Material at


1481 C-1211 Sewer Line Trench from SMH # 12 to SMH # 14 (West Side) in Admin ADMIN BUILDING 24-Dec-17 3:45 PM 25-Dec-17 10:15 AM RA-819486-001-00 ACIELO ISHFAQ AHMED 4
Building @ Juaymah Shops Plant N-26

Verification ot Test Preparation for HT Package UJS-ADMB-PW-001-00


1482 P-0098 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 24-Dec-17 3:50 PM 25-Dec-17 7:45 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Verification ot Test Preparation for HT Package UJS-ADMB-PW-001-00


1483 P-0099 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 24-Dec-17 3:55 PM 25-Dec-17 8:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-PW-001-00


1484 P-0100 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 24-Dec-17 4:00 PM 25-Dec-17 8:30 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Plant N-26

De- Pressurization & Disposal for HT Package UJS-ADMB-PW-001-00


1485 P-0101 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 24-Dec-17 4:05 PM 25-Dec-17 1:30 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Sand Covering Inspection of Around and Above ( 30 CM ) For Raw Water


1486 C-1212 & Potable Water Pipe ( 60 LM ) South Side Of New Substation Building NEW SUB STATION 24-Dec-17 4:10 PM 25-Dec-17 8:30 AM RA-819438-003-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Area.Ju'Aymah Shops Plant N-26 ( RA-819439 -03 Rev-0F1 )

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
Material for Raw Water & Potable Water Pipe ( 60 LM ) South Side Of
1487 C-1213 New Substation Building Area @ Ju'Aymah, Shops Plant N- 26 ( RA-819439 NEW SUB STATION 24-Dec-17 4:15 PM 25-Dec-17 2:45 PM RA-819438-003-0F1 QUADRI ISHFAQ AHMED Not in QMIS
-03 Rev-0F1 )

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material for
1488 C-1214 Raw Water & Potable Water Pipe ( 60 LM ) South Side Of New Substation NEW SUB STATION 24-Dec-17 4:20 PM 25-Dec-17 3:00 PM RA-819438-003-0F1 QUADRI ISHFAQ AHMED 4
Building Area @ Ju'Aymah, Shops Plant N- 26 ( RA-819439 -03 Rev-0F1 )

Pre-Cast & Pre-Stressed Concrete Curing Inspection for New Sub Station
1489 C-1215 (Panel Mark SS-WIG-02F, SS-WIG-15, SS-WIG-22) at INCO Pre-Cast INCO 25-Dec-17 7:10 AM 26-Dec-17 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
Fabrication Yard

CPVC Pipes & F ittings Installation Inspection of 2"ø for Portable Water
1490 P-0102 Line 35 M South Side Outside New Admin Building Area @ ADMIN BUILDING 25-Dec-17 7:15 AM 26-Dec-17 7:30 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Ju'aymah,Shops Plant N- 26.

CPVC Pipes & F ittings Installation Inspection of 2"ø for Raw Water Line 35
1491 P-0103 M South Side Outside New Admin Building Area @ Ju'aymah, Shops ADMIN BUILDING 25-Dec-17 7:20 AM 26-Dec-17 7:45 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Plant N- 26.

Verification ot Test Preparation for HT Package UJS-ADMB-RW-001-00


1492 P-0104 (Raw Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant ADMIN BUILDING 25-Dec-17 8:00 AM 26-Dec-17 8:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
N-26

1493 P-0105 Filling and Pressurization for HT Package UJS-ADMB-RW-001-00 (Raw ADMIN BUILDING 25-Dec-17 8:05 AM 26-Dec-17 8:15 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-RW-001-00


1494 P-0106 (Raw Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant ADMIN BUILDING 25-Dec-17 8:10 AM 26-Dec-17 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
N-26

1495 P-0107 De- Pressurization & Disposal for HT Package UJS-ADMB-RW-001-00 (Raw ADMIN BUILDING 25-Dec-17 8:15 AM 26-Dec-17 2:00 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-ADMB-PW-002- 00 (Potable


1496 P-0108 Water) Oustside New Admin Building Area @ Ju'aymah Shop Plant N-26 ADMIN BUILDING 25-Dec-17 8:30 AM 26-Dec-17 1:30 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Pre-Test Punch Listing for HT Package UJS-ADMB-PW-002- 00 (Potable
Water)

Internal Cleaning / Flushing for HT Package UJS-ADMB-PW-002- 00


1497 P-0109 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 25-Dec-17 1:45 PM 26-Dec-17 1:45 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Verification of Testing Equipment for HT Package UJS-ADMB-PW-002-00


1498 P-0110 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 25-Dec-17 3:30 PM 26-Dec-17 2:00 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Verification of Test Preparation for HT Package UJS-ADMB-PW-002-00


1499 P-0111 (Potable Water) Oustside New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 25-Dec-17 3:35 PM 26-Dec-17 2:15 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

1500 P-0112 Pre-Test Punch Listing for HT Package UJS-ADMB-RW- 002-00 (Raw Water) ADMIN BUILDING 25-Dec-17 3:40 PM 26-Dec-17 2:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
South Side of New Admin Building Area @ J u'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-ADMB-RW- 002-00 (Raw


1501 P-0113 Water) South side of New Admin Building Area @ Ju'aymah Shop Plant N- ADMIN BUILDING 25-Dec-17 3:45 PM 26-Dec-17 2:45 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
26

Verification of Testing Equipment for HT Package UJS-ADMB-RW-002-00


1502 P-0114 (Raw Water) South side of New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 25-Dec-17 3:50 PM 26-Dec-17 3:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Verification ot Test Preparation for HT Package UJS-ADMB-RW-002-00


1503 P-0115 (Raw Water) South side of New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 25-Dec-17 3:55 PM 26-Dec-17 3:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Surface Preparation & Moisture Test Inspection for Pre-Cast Foundation


1504 C-1216 after cutting lifting Hook area at Grid line 1,2 & 3 ( A To I ) and Grid line 4 ( CAR PARKING 25-Dec-17 4:00 PM 26-Dec-17 9:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
A,B,C, E,F,G,H,I ) and Grid line 1 Near Existing Fence total 36 Nos at New
Car Parking Area @ Ju'Aymah, Shops Plant N- 26

1505 C-1217 Site & Grade Preparation Inspection Of Telecom Duct Bank ( 58 LM ) BACK LOG 25-Dec-17 3:25 PM 26-Dec-17 3:00 PM RA-819517-001-00 QUADRI ISHFAQ AHMED
infront of Back log S torage Building @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection Of Telecom Duct Bank


1506 C-1218 k ( 58 LM ) inforent of Back log Storage Building @ Ju'Aymah, Shops Plant BACK LOG 25-Dec-17 3:30 PM 26-Dec-17 3:30 PM RA-819517-001-00 QUADRI ISHFAQ AHMED
N- 26

FDT, Compaction Inspection of Existing Sub Grade for Electrical ( FOC)


1507 C-1219 Duct Bank Trench ( (21 LM ) In Between Shipping Receiving & New Work BACK LOG 25-Dec-17 3:35 PM 26-Dec-17 9:10 AM RA-819517-001-00 QUADRI ISHFAQ AHMED 2
Shop Area @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of 2nd Layer Backfilling Selectfill


1508 C-1220 Material at Sewer Line Trench from SMH # 12 to SMH # 14 (West Side) in ADMIN BUILDING 25-Dec-17 3:40 PM 26-Dec-17 8:45 AM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Admin Building @ Juaymah Shops Plant N-26

FDT Compaction Inspection of 2nd Layer Backfilling Selectfill Material at


1509 C-1221 Sewer Line Trench from SMH # 12 to SMH # 14 (West Side) in Admin ADMIN BUILDING 25-Dec-17 3:45 PM 26-Dec-17 9:00 AM RA-819486-001-00 ACIELO ISHFAQ AHMED 4
Building @ Juaymah Shops Plant N-26

Visual Inspection of PVC Conduit Installation and Initial Mandrel Test for
1510 T-0027 52 Meter Telecom Duct bank In front of Backlog Building @ Juaymah BACK LOG 25-Dec-17 3:50 PM 26-Dec-17 9:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
Shops Plant N-26

Materials Receiving, Visual Inspection of Tined Copper Bare Grounding


1511 E-0089 Conductor 1x120mm2, From Al Abdulakarim Holding Co.At ETE Laydown PLANT N-26 26-Dec-17 3:55 PM 27-Dec-17 11:00 AM RA-819460-001-0F1 NOLI ALI M. AL YASEEN
Yard Juaymah Shops Plant N26.

RTR pipe joint and assembly inspection for 8" RTR sewer line 36 m
1512 R-0019 between SMH-010 and SMH-03 at South side of New Sub station area @ NEW SUB STATION 25-Dec-17 4:00 PM 26-Dec-17 7:00 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
Juaymah Shops Plant N-26

Gravity test inspection for 8" RTR sewer line 36 m between SMH-010 and
1513 R-0020 SMH-03 at south side of New Sub Station area @ Juaymah Shops Plant N- NEW SUB STATION 25-Dec-17 4:05 PM 26-Dec-17 7:15 AM RA-819486-001-00 JACOB SYED SHAFIULLAH
26

Sand Covering around and 30CM above the Pipe of Potable Water and
1514 C-1222 Raw Water Lines (60.0L M) East Side and (40.0 LM) North S ide, Admin ADMIN BUILDING 25-Dec-17 4:10 PM 26-Dec-17 3:00 PM RA-819438-002-00 ACIELO ISHFAQ AHMED Not in QMIS
Building Area, Juaymah Shops N-26

1515 C-1223 Formwork Inspection for Roof Beams at Grid Line (A'-F) (4-9) RB1, RB3 & ADMIN BUILDING 26-Dec-17 11:00 AM 27-Dec-17 1:30 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
RB4 @ Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for
1516 C-1224 Roof Beams at Grid Line (A'-F ) (4-9) RB1, RB3 & RB4 @ Admin Building ADMIN BUILDING 26-Dec-17 11:05 AM 27-Dec-17 1:45 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling, Testing & Placement of Concrete Inspection for Roof Beams at


1517 C-1225 Grid Line (A'-F) (4-9) RB1, RB3 & RB4 @ Admin Building J uaymah Shops ADMIN BUILDING 26-Dec-17 11:10 AM 27-Dec-17 3:00 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1518 C-1226 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-02, SS-WIG-11, SS- MAAZ LAB 26-Dec-17 12:55 PM 27-Dec-17 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
WIG-09 & SS-WIG-17 of New Sub Station Juaymah Shops Plant N-26 @
MAAZ LAB

Site & Grade Preparation Inspection for Electrical ( FOC ) Duct Bank
1519 C-1227 Trench ( 21 LM ) in Between Shipping Receiving & New Work Shop Area BACK LOG 26-Dec-17 10:25 AM 27-Dec-17 2:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
@ J u'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection for Electrical ( FOC )


1520 C-1228 Duct Bank Trench ( 21 LM ) in Between Shipping Receiving & New Work BACK LOG 26-Dec-17 10:30 AM 27-Dec-17 2:30 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Shop Area @ J u'Aymah, Shops Plant N- 26

Sand Covering Inspection of Around and Above ( 30 CM ) For Sewer line


1521 C-1229 Pipe Trench ( 36 LM ) South from SMH-10 ,informent of Back Log BACK LOG 26-Dec-17 10:35 AM 27-Dec-17 8:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED
Building (@.Ju'Aymah Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1522 C-1230 Material For Sewer line Pipe Trench ( 36 LM ) South from SMH-10 BACK LOG 26-Dec-17 10:40 AM 27-Dec-17 2:45 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
,informent of Back Log Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material For
1523 C-1231 Sewer line Pipe Trench ( 36 LM ) South f rom S MH-10 ,informent of Back BACK LOG 26-Dec-17 10:45 AM 27-Dec-17 3:00 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Log Building @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of 3rd (Final Layer) Selectfill


1524 C-1232 Material at Sewer Line trench from S MH # 12 to SMH # 14 (West Side) in ADMIN BUILDING 26-Dec-17 11:30 AM 27-Dec-17 2:45 PM RA-819486-001-00 ACIELO ISHFAQ AHMED Not in QMIS
Admin Bldg. @ J uaymah S hops Plant N26

FDT Compaction Inspection of 3rd (Final Layer) Selectfill Material at S ewer


1525 C-1233 Line trench from SMH # 12 to SMH # 14 (West Side) in Admin Bldg. @ ADMIN BUILDING 26-Dec-17 11:35 AM 27-Dec-17 3:00 PM RA-819486-001-00 ACIELO ISHFAQ AHMED 4
Juaymah Shops Plant N26

Visual Inspection of Trench Excavation of 21 meters for Telecom Duct


1526 T-0028 Bank inbetween shipping receiving area and new workshop area BACK LOG 26-Dec-17 2:10 PM 27-Dec-17 8:00 AM RA-819460-002-00 AFZAL M. Z. NAVEED
@Ju'aymah Shops Plant N-26.

Visual Inspection of PVC 4x4"conduit installation and Mandrel test of 21


1527 T-0029 meters for Telecom Duct Bank inbetween shipping receiving area and BACK LOG 26-Dec-17 2:15 PM 27-Dec-17 12:00 AM RA-819460-002-00 AFZAL M. Z. NAVEED
new workshop area @Ju'aymah S hops Plant N-26.

Material Receiving Inspection of Fabricated Steel Structure for Shipping


1528 ST-0017 and Receiving Shed, Rigid Frame Rafter # 23-2013 after repair as of INCR- PLANT N-26 25-Dec-17 7:15 AM 26-Dec-17 10:00 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
PROC-002 @ Shipping and Receiving Area, Ju'aymah Shops, Plant N26.

Filling and Pressurization for HT Package UJS-ADMB-PW-002-00 (Potable


1529 P-0116 Water) South side of New Admin Building Area @ Ju'aymah Shop Plant N- ADMIN BUILDING 26-Dec-17 4:00 PM 27-Dec-17 7:30 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-PW-002-00


1530 P-0117 (Potable Water) South side of New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 26-Dec-17 4:05 PM 27-Dec-17 7:45 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

De- Pressurization & Disposal for HT Package UJS-ADMB-PW-002-00


1531 P-0118 (Potable Water) South side of New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 26-Dec-17 4:10 PM 27-Dec-17 12:00 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

Filling and Pressurization for HT Package UJS-ADMB-RW-002-00 (Raw


1532 P-0119 Water) South side of New Admin Building Area @ Ju'aymah Shop Plant N- ADMIN BUILDING 26-Dec-17 4:15 PM 27-Dec-17 12:15 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-RW-002-00


1533 P-0120 (Raw Water) South side of New Admin Building Area @ Ju'aymah Shop ADMIN BUILDING 26-Dec-17 4:20 PM 27-Dec-17 12:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Plant N-26

De- Pressurization & Disposal for HT Package UJS-ADMB-RW-002-00 (Raw


1534 P-0121 Water) South side of New Admin Building Area @ Ju'aymah Shop Plant N- ADMIN BUILDING 26-Dec-17 4:25 PM 27-Dec-17 5:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1535 C-1234 Inspection of 4000 PSi for 2nd Floor. Beams and Conc. Slab at Grid Line (A- MAAZ LAB 27-Dec-17 9:15 AM 28-Dec-17 11:00 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
F) (1-4) B1, B1A, B2, B4, B5 & B6 and Elevator Shear Wall (2nd Lift up to
Elev. 4.20 m) at Admin Building Juaymah Shops N- 26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1536 C-1235 Inspection of 4000 PSi for Exit S taircase (1st Floor) at Grid Line (B-C) (1-2) MAAZ LAB 27-Dec-17 9:20 AM 28-Dec-17 11:30 AM RA-819746-001-00 SALMAAN ISHFAQ AHMED
(2nd Lift) at Admin Building Juaymah Shops N-26 @ MAAZ LAB

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1537 C-1236 Material For Sewer line Pipe Trench ( 36 LM ) South from SMH-10 BACK LOG 27-Dec-17 11:15 AM 28-Dec-17 9:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
,informent of Back Log Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1538 C-1237 For Sewer line Pipe Trench ( 36 LM ) S outh from SMH- 10 ,informent of BACK LOG 27-Dec-17 11:20 AM 28-Dec-17 10:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Back Log Building @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1539 C-1238 Material For Sewer line Pipe Trench ( 36 LM ) South from SMH-10 BACK LOG 27-Dec-17 11:25 AM 28-Dec-17 3:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
,informent of Back Log Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 3rd Layer Select Fill Material For
1540 C-1239 Sewer line Pipe Trench ( 36 LM ) South f rom S MH-10 ,informent of Back BACK LOG 27-Dec-17 11:30 AM 28-Dec-17 4:30 PM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Log Building @ Ju'Aymah, Shops Plant N- 26

Material Receiving,Handling,Stroge and Preservation Inspection of


1541 C-1240 Ordinary Portland Cement (Type 1) 50 Kg Packing (QTY= 500 Bags) From PLANT N-26 27-Dec-17 3:30 PM 28-Dec-17 10:00 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Saudi Cement At ETE Store,JuAymah,S hops Plant N-26

1542 C-1241 FDT, Compaction Inspection of Existing Sub Grade for Booster Pump BOOSTER PUMP 27-Dec-17 4:50 PM 28-Dec-17 2:00 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
Foundation Near New Car Parking Area At JuAymah,Shops Plant N-26

1543 E-0090 Visual Inspection of Excavation Trenching for Grounding Conductor Before CAR PARKING 27-Dec-17 1:20 PM 28-Dec-17 9:00 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
Cable Laying, At New Parking Area, As per Attached Highlighted Drawing.

Visual Inspection of 120 mm² Copper Bare tinned Grounding Conductor


1544 E-0091 Laying for Main Grounding Grid at New Parking Area. As per Attached CAR PARKING 27-Dec-17 1:25 PM 28-Dec-17 9:30 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
highlighted Drawing,

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable


1545 E-0092 120mm2 to 120mm2 for Main GRID Grounding at New Parking Area. As CAR PARKING 27-Dec-17 1:30 PM 28-Dec-17 2:00 PM RA-819939-001-00 NOLI ALI M. AL YASEEN
per Attached highlighted Drawing,

Visual Inspection of LV Electrical Duck Bank Mandrel Test of 4" PVC Pipe
1546 E-0093 Prior for Cable Laying at New Parking Area. As per highlighted Attached NEW SUB STATION 27-Dec-17 1:35 PM 28-Dec-17 8:00 AM RA-819936-001-00 NOLI ALI M. AL YASEEN
Drawing.

Concrete Finishing & Curing Inspection for 7 Nos Column at Grid Line (4')
(A) C9, (4) (B) C1, (3') (A) C9, (3) (B) C1, (2) (A) C9, (2) (B) C16, (1) (B) C13
1547 C-1242 and 4 Nos Column at Grid Line (4) (C) C1, (4) (D) C1, (4') (E) C1, and (4') (F) ADMIN BUILDING 28-Dec-17 10:00 AM 30-Dec-17 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED Not in QMIS
C8 and Exit S taircase(2nd floor) (2nd lift) at GL (C-E)(11-12) Admin
Building

Sand Backfilling Inspection around and above Pipe for Trench of Potable
1548 C-1243 Water and Raw Water Lines (35m. South Side) in Admin Building Area, ADMIN BUILDING 28-Dec-17 10:05 AM 30-Dec-17 8:00 AM RA-819438-002-00 ACIELO ISHFAQ AHMED Not in QMIS
Juaymah Shops N-26

Fill Placement & Compaction Inspection of 1st Layer Selectfill Material for
1549 C-1244 Trench of Potable Water and Raw Water Lines (40 m North Side) & (60 m ADMIN BUILDING 28-Dec-17 10:10 AM 30-Dec-17 3:00 PM RA-819438-002-00 ACIELO ISHFAQ AHMED Not in QMIS
East Side) in Admin Building Area, Juaymah Shops N-26

FDT, Compaction Inspection of 1st Layer Selectfill Material for Trench of


1550 C-1245 Potable Water and Raw Water Lines (40 m North Side) & (60 m East Side) ADMIN BUILDING 28-Dec-17 10:15 AM 30-Dec-17 3:15 PM RA-819438-002-00 ACIELO ISHFAQ AHMED 7
in Admin Building Area, Juaymah Shops N-26

1551 C-1246 Material Receiving Inspection of Non-Shrink Grout 25 Kg Packing (QTY= PLANT N-26 28-Dec-17 1:30 PM 30-Dec-17 10:00 AM RA-819991-001-0F2 BAQAR ISHFAQ AHMED
140 Bags) From CIC At ETE S tore,JuAymah,Shops Plant N-26

1552 C-1247 Concrete Finishing & Curing Inspection for Roof Beam at Grid Line (A-F) ADMIN BUILDING 28-Dec-17 10:30 AM 30-Dec-17 7:15 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED Not in QMIS
(9-12)RB1,RB1A,RB2 & RB3 at Admin Bldg.,Juaymah Shops N-26

1553 C-1248 Review of Test Reports of Structural Backfill Material From Al-Osais With PLANT N-26 28-Dec-17 1:35 PM 30-Dec-17 10:30 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
CBR Value At ETE Laydown Area,JuAymah,Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1554 C-1249 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-02E, SS-WIG-02G, MAAZ LAB 28-Dec-17 1:40 PM 30-Dec-17 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WG-01 of New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB

Visual Inspection of Excavation Trenching for LV Direct Buried PVC Conduit


1555 E-0094 Pipes Between New Workshop Area and Shipping & Receiving Area. As SHIPPING & RECEIVING 28-Dec-17 1:45 PM 30-Dec-17 10:00 AM RA-819460-002-00 NOLI DAMIAN ABAA
AREA
per Attached highlighted drawing.

Visual Inspection of Excavation Trenching for Fire Alarm Direct Buried PVC
1556 E-FA-0095 Conduit Pipes Between New Work shop Area and Shipping & Receiving SHIPPING & RECEIVING 28-Dec-17 1:50 PM 30-Dec-17 10:15 AM RA-819283-001-00 NOLI DAMIAN ABAA
AREA
Area. As per Attached highlighted drawing.

Visual Inspection of 4" Direct Buried PVC Conduit Pipes Installation for
1557 E-FA-0096 Fire Alarm Between New Work shop Area and Shipping & Receiving Area. SHIPPINGAREA
& RECEIVING 28-Dec-17 1:55 PM 30-Dec-17 1:30 PM RA-819283-001-00 NOLI DAMIAN ABAA
As per Attached highlighted drawing.

Visual Inspection of Final Backfilling for 4" Direct Buried PVC Conduit
1558 E-FA-0097 Pipes Installation for Fire Alarm Between New Work shop Area and SHIPPING & RECEIVING 28-Dec-17 2:00 PM 30-Dec-17 3:30 PM RA-819283-001-00 NOLI DAMIAN ABAA
AREA
Shipping & Receiving Area. As per Attached highlighted drawing.

Visual Inspection of 6" Direct Buried PVC Conduit Pipes Installation for LV
1559 E-FA-0098 Power Cable Between New Work shop Area and Shipping & Receiving SHIPPING & RECEIVING 28-Dec-17 2:05 PM 30-Dec-17 10:30 AM RA-819460-002-00 NOLI DAMIAN ABAA
AREA
Area. As per Attached highlighted drawing.

Visual Inspection of Final Backfilling for 6" Direct Buried PVC Conduit
1560 E-FA-0099 Pipes Installation for LV Power Cable Between New Work shop Area and SHIPPING & RECEIVING 28-Dec-17 2:10 PM 30-Dec-17 3:45 PM RA-819460-002-00 NOLI DAMIAN ABAA
Shipping & Receiving Area. As per Attached highlighted drawing. AREA
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection of PVC 4x4"conduit installation with colour orange die


layer on TDB and Final Mandrel test of 21 meters for Telecom Duct Bank SHIPPING & RECEIVING
1561 T-0030 inbetween shipping receiving area DD and new workshop area AREA 28-Dec-17 2:15 PM 30-Dec-17 8:30 AM RA-819460-002-00 AFZAL M. Z. NAVEED
@Ju'aymah Shops Plant N-26

Visual Inspection of PVC 4x4" conduit installation with Orange colour die
1562 T-0031 layer on TDB and Final mandrel test for 52 meters Telecom duct bank BACK LOG 28-Dec-17 2:20 PM 30-Dec-17 9:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
infront of Backlog Building @Ju'aymah Shops Plant N-26.

Concrete Finishing & Curing Inspection of Fire Wall (3 Nos.) upto FGL at
1563 C-1250 New Substation @ J u'Aymah, Shops Plant N- 26 BACK LOG 28-Dec-17 2:25 PM 30-Dec-17 8:00 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS

FDT, Compaction Inspection of Existing Sub Grade for Electrical FDAS & LV
1564 C-1251 Conduit Trench ( 11 LM ) In Between Shipping Receiving & New Work BACK LOG 28-Dec-17 2:40 PM 30-Dec-17 9:00 AM RA-819283-001-00 QUADRI ISHFAQ AHMED 2
( RA-819460-02 Rev-0 @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1565 C-1252 Material For Sewer line Pipe Trench ( 36 LM ) South from SMH-10 CAR PARKING 28-Dec-17 2:30 PM 30-Dec-17 11:00 AM RA-819486-001-00 QUADRI ISHFAQ AHMED Not in QMIS
,inforent of Back Log Building

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material


1566 C-1253 For Sewer line Pipe Trench ( 36 LM ) S outh from SMH- 10 ,inforent of Back CAR PARKING 28-Dec-17 2:35 PM 30-Dec-17 11:30 AM RA-819486-001-00 QUADRI ISHFAQ AHMED 3
Log Building

Pre-Cast Concrete Erection & Alignment Inspection of Booster Pump


1567 C-1254 Foundation ( 04 Nos ) Station-1 ( Shaded ) at South side of New Car BOOSTER PUMP 28-Dec-17 2:45 PM 30-Dec-17 4:00 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Parking Area @ ju'aymah shops plant N-26

Formwork Inspection for 6 Nos. Column (Upper Roof) at Grid Line (11) (C)
1568 C-1255 C7, (12) (C) C16, (11) (D) C1, (12) (E) C16, (12) (D) PC1 and (11) (E) PC1 at ADMIN BUILDING 30-Dec-17 12:35 PM 31-Dec-17 10:30 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
Admin Bldg Area,Juaymah Shops N-26

FBE Reinforcing Steel Inspection for 6 Nos. Column (Upper Roof) at Grid
1569 C-1256 Line (11) (C) C7, (12) (C) C16, (11) (D) C1, (12) (E) C16, (12) (D) PC1 and ADMIN BUILDING 30-Dec-17 12:40 PM 31-Dec-17 10:45 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
(11) (E) PC1 at Admin Bldg Area,J uaymah Shops N-26

Fill Placement & Compaction Inspection of 1st Layer (Final) Selectfill


1570 C-1257 Material for Trench of Potable Water and Raw Water Lines (35 M S outh ADMIN BUILDING 30-Dec-17 2:45 PM 31-Dec-17 10:00 AM RA-819438-002-00 ACIELO ISHFAQ AHMED Not in QMIS
Side) in Admin Building Area, Juaymah Shops N-26

FDT, Compaction Inspection of 1st Layer (Final) Selectfill Material for


1571 C-1258 Trench of Potable Water and Raw Water Lines (35 M South S ide) in ADMIN BUILDING 30-Dec-17 2:50 PM 31-Dec-17 10:15 AM RA-819438-002-00 ACIELO ISHFAQ AHMED 3
Admin Building Area, Juay mah Shops N-26

1572 C-1259 Material Receiving Inspection of Sub Base Material from Al-Osais (QTY = PLANT N-26 30-Dec-17 2:55 PM 31-Dec-17 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
124 M3) at ETE Laydown J uAymah Shops Plant N-26

Visual Inspection of FOC Telcom Duct bank sand bedding and colour
1573 T-0032 orange warning tape instllation of 21 meters inbetween shipping SHIPPING & RECEIVING 30-Dec-17 3:30 PM 31-Dec-17 9:30 AM RA-819460-002-00 AFZAL M. Z. NAVEED
receiving area and new workshop area @Ju'aymah Shops Plant N-26 AREA
(For the following location/equipment)

Visual Inspection of FOC Telecom Duct Bank sand bedding and orange
1574 T-0033 coloour warning tape installation of 52 meters infront of Backlog Building BACK LOG 30-Dec-17 3:35 PM 31-Dec-17 10:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
@J u'aymah Shops Plant N-26. For the following location/equipment

Material Receiving Visual Inspection of Metallic Wireways Boxes, 10 EA.


1575 E-0100 Box Square 4"X 2" 1-7/8 DP Steel 8-KOS 3/4" At ETE Store Ju'aymah PLANT N-26 30-Dec-17 3:40 PM 31-Dec-17 9:00 AM RA-819500-001-0F1 NOLI ALI M. AL YASEEN
Shops N-26 As per attached highlighted document.

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1576 C-1260 Material for Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between SHIPPING & RECEIVING 30-Dec-17 3:45 PM 31-Dec-17 9:00 AM RA-819283-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Shipping Receiving & New Work shop (RA-819460-02 Rev-0 @ J u'Aymah, AREA
Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material for
1577 C-1261 Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between Shipping SHIPPING & RECEIVING 30-Dec-17 3:48 PM 31-Dec-17 9:30 AM RA-819283-001-00 QUADRI ISHFAQ AHMED 1
Receiving & New Work shop (RA-819460-02 Rev-0 @ Ju'Aymah, Shops AREA
Plant N- 26

1578 C-1262 Surface Preparation & Moisture Test for Fire Wall Foundation (03 Nos ) at NEW SUB STATION 30-Dec-17 3:50 PM 31-Dec-17 10:00 AM RA-819767-001-0F4 QUADRI ISHFAQ AHMED
New Sub Station @ Ju'Aymah, Shops Plant N- 26

1579 C-1263 Surface Preparation & Moisture Test for Fire Wall upto FGL (03 Nos ) at NEW SUB STATION 30-Dec-17 3:55 PM 31-Dec-17 10:15 AM RA-819767-001-0F4 QUADRI ISHFAQ AHMED
New Sub Station @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1580 C-1264 Material for Telecom Duct Bank (58 LM ) inforent Backlog Storage BACK LOG 30-Dec-17 3:58 PM 31-Dec-17 3:15 PM RA-819517-001-00 QUADRI ISHFAQ AHMED
Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material for
1581 C-1265 Telecom Duct Bank (58 LM ) inforent Backlog Storage Building @ BACK LOG 30-Dec-17 4:00 PM 31-Dec-17 3:30 PM RA-819517-001-00 QUADRI ISHFAQ AHMED 4
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1582 C-1266 Material for Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between SHIPPING & RECEIVING 30-Dec-17 4:02 PM 31-Dec-17 9:00 AM RA-819283-001-00 QUADRI ISHFAQ AHMED
Shipping Receiving & New Work shop (RA-819460-02 Rev-0 @ J u'Aymah, AREA
Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material for
1583 C-1267 Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between Shipping SHIPPING & RECEIVING 30-Dec-17 4:05 PM 31-Dec-17 9:30 AM RA-819283-001-00 QUADRI ISHFAQ AHMED 1
Receiving & New Work shop (RA-819460-02 Rev-0 @ Ju'Aymah, Shops AREA
Plant N- 26

1584 C-1268 Concrete Finishing & Curing Inspection of Electrical Duct Bank (9.4 LM ) NEW SUB STATION 31-Dec-17 4:15 PM 1-Jan-18 7:00 AM RA-819460-002-00 QUADRI ISHFAQ AHMED
at West side of New Car Parking Area @ Ju'Aymah, Shops Plant N- 26

Sampling Testing Cement Based Mortar and Grout Trial Mix Review of
1585 C-1269 Compressive Strength Test Results at ETE Laydown JuAymah Shops Plant PLANT N-26 30-Dec-17 4:45 PM 31-Dec-17 2:00 PM RA-819723-004-0F2 SALMAAN ISHFAQ AHMED
N-26

Material Receiving, Handling ,Storage & preservation Inspection of PVC


1586 P-0122 SCH-40 Fittings Reducing Tee,Cap & Plug's,Wye-45⁰,Solid Flanges & CPVC- PLANT N-26 30-Dec-17 4:50 PM 31-Dec-17 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
SCH-80 fittings Solid Flanges, V.Stone Flanges & ELB-45⁰ from NEPRO &
NIBCO @ ETE store Juaymah Shop Plant N-26
Pre-cast & Pre-Stressed Pre Concreting Inspection (Bed and Pre-stressing
of stands) of Hollow Core Panels (Panel Mark H1-701 ,H1-701A, H1-702,
1587 C-1270 H1-702C, H1-703, H1-703A, H1-703B, H1-703C, H1-704, H1-705 (4 Nos), INCO 31-Dec-17 11:00 AM 1-Jan-18 8:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
H1-707A, H1-708, H1-708A, H1- 709 (2 Nos), H1-710, H1-710H, H1- 711,
H1-711H, H1-712, H1-712A, H1-713 (2NOS), H1-714, H1-715, H1-716, H1-
717 (4 Nos.)
Pre-cast for Admin Building
& Pre-Stressed ConcreteatTesting,
INCO Pre-Cast Fabrication
Sampling Yard
and Placement
Inspection of Hollow Core Panels, (Panel Mark H1-701,H1-701A,H1-
1588 C-1271 702,H1-702C,H1-703,H1-703A,H1-703B,H1-703C, H1-704, H1-705 INCO 31-Dec-17 11:05 AM 1-Jan-18 8:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
(4NOS) ,H1-707A,H1-708,H1-708A,H1-709 (2NOS) ,H1-710,H1-710H,H1-
711,H1-711H,H1-712, H1-712A, H1-713(2NOS) ,H1-714,H1-715,H1-
716,H1-717(4NOS) for Admin Building at INCO Pre-Cast Fabrication Yard
Form Closure Inspection for 6 Nos. Column (Upper Roof ) at Grid Line (11)
1589 C-1272 (C) C7, (12) (C) C16 (11) (D) C1, (12) (E) C16, (12) (D) PC1 and (11) (E) PC1 ADMIN BUILDING 31-Dec-17 11:10 AM 1-Jan-18 10:00 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
at Admin Building Area, Juaymah Shops N- 26

Sampling,Testing & Placement of Concrete Inspection for 6 Nos. Column


1590 C-1273 (Upper Roof) at Grid Line (11) (C) C7, (12) (C) C16 (11) (D) C1, (12) (E) C16, ADMIN BUILDING 31-Dec-17 11:12 AM 1-Jan-18 2:00 PM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
(12) (D) PC1 and (11) (E) PC1 at Admin Building Area, Juaymah Shops N-
26

1591 C-1274 Formwork Inspection for Exit Staircase (2nd Floor) (1st Lift) at Grid Line (B- ADMIN BUILDING 31-Dec-17 11:15 AM 1-Jan-18 10:30 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
C) (1-2) at Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for Exit
1592 C-1275 Staircase (2nd Floor) (1st Lift) at Grid Line (B-C) (1-2) at Admin Building ADMIN BUILDING 31-Dec-17 11:20 AM 1-Jan-18 10:45 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Exit S taircase


1593 C-1276 (2nd Floor) (1st Lift) at Grid Line (B-C) (1-2) at Admin Building Juaymah ADMIN BUILDING 31-Dec-17 11:25 AM 1-Jan-18 2:30 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1594 C-1277 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-12H, SS-WIG-18, MAAZ LAB 31-Dec-17 11:30 AM 1-Jan-18 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WG-04 of New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1595 C-1278 Material for Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between SHIPPING & RECEIVING 31-Dec-17 2:40 PM 1-Jan-18 3:45 PM RA-819283-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Shipping Receiving & New Work shop (RA-819460-02 Rev-0 @ J u'Aymah, AREA
Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material for
1596 C-1279 Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between Shipping SHIPPING & RECEIVING 31-Dec-17 2:45 PM 1-Jan-18 4:00 PM RA-819283-001-00 QUADRI ISHFAQ AHMED 1
Receiving & New Work shop (RA-819460-02 Rev-0 @ Ju'Aymah, Shops AREA
Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1597 C-1280 Material for Telecom Duct Bank (18 LM ) inforent Backlog Storage BACK LOG 31-Dec-17 2:50 PM 1-Jan-18 2:00 PM RA-819517-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material for
1598 C-1281 Telecom Duct Bank (18 LM ) inforent Backlog Storage Building @ BACK LOG 31-Dec-17 2:55 PM 1-Jan-18 2:30 PM RA-819517-001-00 QUADRI ISHFAQ AHMED 2
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Clean sand
1599 C-1282 Material around Foundation for Pre-Cast Booster Pump Foundation (04 CAR PARKING 31-Dec-17 3:00 PM 1-Jan-18 9:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED Not in QMIS
Nos ) Station-1 (shaded ) At South Side Of New Car Parking area @
Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Clean sand Material


1600 C-1283 around Foundation for Pre-Cast Booster Pump Foundation (04 Nos ) BOOSTER PUMP 31-Dec-17 3:05 PM 1-Jan-18 9:30 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
Station-1 (shaded ) At South Side Of New Car Parking area @ Ju'Aymah,
Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Clean


1601 C-1284 sand Material around Foundation for Pre-Cast Booster Pump Foundation CAR PARKING 31-Dec-17 3:08 PM 1-Jan-18 2:00 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED Not in QMIS
(04 Nos ) Station-1 (shaded ) At South Side Of New Car Parking area @
Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Clean sand Material


1602 C-1285 around Foundation for Pre-Cast Booster Pump Foundation (04 Nos ) BOOSTER PUMP 31-Dec-17 3:10 PM 1-Jan-18 2:30 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
Station-1 (shaded ) At South Side Of New Car Parking area @ Ju'Aymah,
Shops Plant N- 26

Visual Inspection of 25mm2 Copper Insulated Grounding Conductor


1603 E-0101 Laying for Structure & Fencing Grounding, At New Car Parking Area. As CAR PARKING 31-Dec-17 3:15 PM 1-Jan-18 9:00 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
per Attached Highlighted Drawing

Visual Inspection for Exothermite Cadwelding of Grounding Cable


1604 E-0102 120mm2 to 25mm2 for Structure & Fencing Grounding,At New Car CAR PARKING 31-Dec-17 3:20 PM 1-Jan-18 9:30 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
Parking Area

1605 E-0103 Visual Inspection of Sand Bedding Final Backfilling of LV Electrical Duck CAR PARKING 31-Dec-17 3:25 PM 1-Jan-18 8:30 AM RA-819460-002-00 NOLI ALI M. AL YASEEN
Bank,At New Parking Area

Visual Inspection of Excavation Trenching for MV Direct Buried PVC SHIPPING & RECEIVING
1606 E-0104 Conduit Pipes Between New Work shop Area and Shipping & Receiving 1-Jan-18 11:00 AM 2-Jan-18 11:30 AM RA-819460-002-00 NOLI DAMIAN ABAA
Area. As per Attached highlighted drawing. AREA

Visual Inspection of 6" Direct Buried PVC Conduit Pipes Installation for
1607 E-0105 MV Power Cable Between New Work shop Area and Shipping & Receiving SHIPPING & RECEIVING 1-Jan-18 11:05 AM 2-Jan-18 2:30 PM RA-819460-002-00 NOLI DAMIAN ABAA
Area. As per Attached highlighted drawing. AREA

Visual Inspection of Final Backfilling for 6" Direct Buried PVC Conduit
1608 E-0106 Pipes Installation for MV Power Cable Between New Work shop Area and SHIPPING & RECEIVING 1-Jan-18 11:10 AM 2-Jan-18 4:30 PM RA-819460-002-00 NOLI DAMIAN ABAA
Shipping & Receiving Area. As per Attached highlighted drawing. AREA

FDT, Compaction Inspection of Existing Sub Grade for Potable & Raw
1609 C-1286 Water Trench ( 36 LM ) South of Sub Station ,inforent of Backlog Storage BACK LOG 1-Jan-18 2:30 PM 2-Jan-18 9:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 3
Building ( RA-819439-01 Rev-0 ) @ Ju'Aymah, Shops Plant N- 26

Sand Placement of Potable & Raw Water Trench ( 36 LM ) South of Sub


1610 C-1287 Station Inforent of Backlog Storage Building ( RA-819439-01 Rev-0 ) @ BACK LOG 1-Jan-18 2:35 PM 2-Jan-18 9:30 AM RA-819438-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

Compaction Inspection of Placement of ( 15 cm ) Sand Beddingt of


1611 C-1288 Potable & Raw Water Trench ( 36 LM ) South of Sub Station inforent of BACK LOG 1-Jan-18 2:40 PM 2-Jan-18 10:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 3
Backlog Storage Building ( RA-819439-01 Rev-0 ) @ Ju'Aymah, Shops
Plant N- 26

FDT, Compaction Inspection of Existing Sub Grade for MV Direct Burried SHIPPING & RECEIVING
1612 C-1289 Conduits in Between Shipping Receiving & New Workshop Area @ AREA 1-Jan-18 2:45 PM 2-Jan-18 10:30 AM RA-819460-002-00 QUADRI ISHFAQ AHMED 2
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1613 C-1290 Material for Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between SHIPPING & RECEIVING 1-Jan-18 2:50 PM 2-Jan-18 10:45 AM RA-819283-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Shipping Receiving & New Work shop (RA-819460-02 Rev-0 @ J u'Aymah, AREA
Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material for
1614 C-1291 Electrical FDAS & LV Conduit Trench ( 11 LM ) In Between Shipping SHIPPING & RECEIVING 1-Jan-18 2:55 PM 2-Jan-18 11:00 AM RA-819283-001-0F1 QUADRI ISHFAQ AHMED 1
Receiving & New Work shop (RA-819460-02 Rev-0 @ Ju'Aymah, Shops AREA
Plant N- 26

Cement Based Non-S hrink Grout Surface Preparation for Pre-Cast


1615 C-1292 Foundation after Cutting Lifting Hook at Booster Pump Foundation (04 CAR PARKING 1-Jan-18 3:00 PM 2-Jan-18 3:30 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Nos ) Station-1 ( Shaded ) South side of New Car Parking Area @
ju'aymah shops plant N-26

1616 ST-0018 Inspection of Alignment during Erection for Shipping and Receiving S hed PLANT N-26 1-Jan-18 10:00 AM 2-Jan-18 7:30 AM RA-819990-001-0F1 OMAR ISHFAQ AHMED
@ S hipping and Receiving Area, Ju'aymah Shops, Plant N26.

Materials Receiving Visual Inspection of Unistrut Channel Slotted (HDG)


1617 E-0107 41 X 41 X2.5mm x 6 mtrs (50 EA.) and Unistrut Channel Clamp (HDG) 1" PLANT N-26 2-Jan-18 7:45 AM 3-Jan-18 9:30 AM RA-819293-013-00 NOLI ALI M. AL YASEEN
200 EA. At ETE Store Ju'aymah S hops Plant N26. As Attached Document.

Materials Receiving Visual Inspection for Cable Tray Accessories, Coupling


nut HDG 1 1/2" 500 EA. Spring nut HDG M12 500 EA. Hex. Nut HDG
1618 E-0108 DIN934 M12 1000 EA. Flat Washer DIN125 M12 1000 EA. And Spring PLANT N-26 2-Jan-18 8:00 AM 3-Jan-18 10:00 AM RA-819293-013-00 NOLI ALI M. AL YASEEN
Washer M12 1000 EA. At ETE Store Ju'aymah Shops Plant N26. As per
attached document.

Concrete Finishing & Curing Inspection of 9 Nos Columns at Grid Line (1)
1619 C-1293 (C) C16, (2) (C) C3, (3) (C) C1, (1) (D) C17, (2) (D) C4, (3) (D) C1, (3) (E) C8, ADMIN BUILDING 2-Jan-18 10:00 AM 3-Jan-18 7:00 AM RA-819721-001-0F2 ACIELO ISHFAQ AHMED Not in QMIS
(3) (F) C15 and (2) (F) C15 at Admin Building Area, Juaymah Shops N-26

Formwork Inspection for 4 Nos. Column (Upper Roof) at Grid Line (A') (6)
1620 C-1294 C12, (A') (7) C12, (A) (6) C11 and (A) (7) C11 at Admin Bldg Area,Juaymah ADMIN BUILDING 2-Jan-18 10:05 AM 3-Jan-18 9:30 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
Shops N-26

FBE Reinforcing Steel Inspection for 4 Nos. Column (Upper Roof) at Grid
1621 C-1295 Line (A') (6) C12, (A') (7) C12, (A) (6) C11 and (A) (7) C11 at Admin Bldg ADMIN BUILDING 2-Jan-18 10:10 AM 3-Jan-18 9:45 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
Area,Juaymah Shops N-26

1622 C-1296 FormworkInspection for Elevator Shear Wall (3rd Lift) (from Elev. 4.2 m to ADMIN BUILDING 2-Jan-18 10:15 AM 3-Jan-18 10:00 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Elev. 8.4 m) at Admin Building, Juaymah Shops N-26

1623 C-1297 FBE Reinforcing Steel Inspection for Elevator Shear Wall (3rd Lift) (from ADMIN BUILDING 2-Jan-18 10:20 AM 3-Jan-18 10:15 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Elev. 4.2 m to Elev. 8.4 m) at Admin Building, Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1624 C-1298 Inspection of 4000 PSi for Electrical Duct Bank (6.0 Meter Length) at New MAAZ LAB 2-Jan-18 11:00 AM 3-Jan-18 11:00 AM RA-819486-002-00 SALMAAN ISHFAQ AHMED
Car Parking Area, J u'Aymah, Shops Plant N- 26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1625 C-1299 Inspection of 4000 PSi for for New Mix Design of Screed Concrete 3/8 MAAZ LAB 2-Jan-18 11:05 AM 3-Jan-18 11:15 AM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED
Aggregate at Al-Marhoon Concrete Batch Plant, Rahima @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1626 C-1300 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-01, SS-WIG-13, SS- MAAZ LAB 2-Jan-18 11:10 AM 3-Jan-18 11:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
WIG-14, SS-WG-02 of New Sub Station Juaymah Shops Plant N-26 @
MAAZ LAB
Pre-cast & Pre-Stressed Pre Concreting Inspection (Bed and Pre-stressing
of stands) of Hollow Core Panels for Admin Building @ INCO Pre-Cast
Fabrication Yard (Panel Mark H1-702A, H1-702B, H1-706 (2 Nos.), H1-707,
1627 C-1301 H1-717 (5 Nos.) ,H1-717A, H1-718, H1-718H, H1-719 (2 Nos.), H1-720 (3 INCO 2-Jan-18 11:15 AM 3-Jan-18 8:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Nos.), H1-720H (2 Nos.), H1-720AH, H1-720A, H1-721, H1-722 (2 Nos.),
H1-723, H1-724, H1-725
Pre-cast & Pre-Stressed Concrete Testing, Sampling and Placement
Inspection of Hollow Core Panels for Admin Building @ INCO Pre-Cast
1628 C-1302 Fabrication Yard (Panel Mark H1-702A, H1-702B, H1-706 (2 Nos.), H1-707, INCO 2-Jan-18 11:20 AM 3-Jan-18 8:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
H1-717 (5 Nos.) ,H1-717A, H1-718, H1-718H, H1-719 (2 Nos.), H1-720 (3
Nos.), H1-720H (2 Nos.), H1-720AH, H1-720A, H1-721, H1-722 (2 Nos.),
H1-723, H1-724, H1-725
Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1629 C-1303 Material (21 LM ) for MV Direct Burried Conduit in Between sipping SHIPPING & RECEIVING 2-Jan-18 2:00 PM 3-Jan-18 10:15 AM RA-819460-002-00 QUADRI ISHFAQ AHMED Not in QMIS
AREA
Receiving & New Workshop Area @ J u'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material (21
1630 C-1304 LM ) for MV Direct Burried Conduit in Between sipping Receiving & New SHIPPINGAREA
& RECEIVING 2-Jan-18 2:05 PM 3-Jan-18 10:30 AM RA-819460-002-00 QUADRI ISHFAQ AHMED 2
Workshop Area @ Ju'Aymah, Shops Plant N- 26

Coating and Final Inspection of APS-3 Carboline for Fire Wall around &
1631 C-1305 Top of Foundation( 03 Nos ) At New Sub Station @ ju'aymah shops plant NEW SUB STATION 2-Jan-18 2:10 PM 3-Jan-18 3:30 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
N-26 ju'aymah shops plant N-26

Coating and Final Inspection of APS-3 Carboline for Around Fire Wall ( 03
1632 C-1306 Nos ) Upto FGL At New Sub Station @ ju'aymah shops plant N-26 NEW SUB STATION 2-Jan-18 2:15 PM 3-Jan-18 3:45 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
ju'aymah shops plant N-26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1633 C-1307 Material (21 LM ) for MV Direct Burried Conduit in Between sipping NEW SUB STATION 2-Jan-18 2:20 PM 3-Jan-18 4:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED Not in QMIS
Receiving & New Workshop Area @ J u'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1634 C-1308 (21 LM ) for MV Direct Burried Conduit in Between sipping Receiving & NEW SUB STATION 2-Jan-18 2:25 PM 3-Jan-18 4:15 PM RA-819460-002-00 QUADRI ISHFAQ AHMED 2
New Workshop Area @ J u'Aymah, Shops Plant N- 26

Coating and Final Inspection of APS-3 Carboline for Pre-Cast Foundation


1635 C-1309 after Cutting lifting hook area at Grid line 1,2 & 3 ( A To I ) and Grid line 4 ( CAR PARKING 2-Jan-18 2:30 PM 3-Jan-18 4:30 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
A,B,C, E,F,G,H,I ) and Grid line 1 Near Existing Fence total 36 Nos at New
Car Parking Area @ Ju'Aymah, Shops Plant N- 26

1636 C-1310 FDT, Compaction Inspection of Existing Sub Grade For Booster Pump BOOSTER PUMP 2-Jan-18 4:50 PM 3-Jan-18 11:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
station-2 ( Shaded ) @ Ju'Aymah, Shops Plant N- 26

Cement Based Non-S hrink Grout mixing, Testing, Sampling & Placement
1637 C-1311 of Pre-Cast Foundation after cutting Lifting Hook for Booster Pump CAR PARKING 2-Jan-18 4:55 PM 3-Jan-18 2:30 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Station-1 ( Shaded ) at South side of New Car Parking Area @ ju'aymah
shops plant N-26

Compaction Inspection of Placement of ( 15 cm ) Sand Beddingt of


1638 C-1288-A Potable & Raw Water Trench ( 36 LM ) South of Sub Station inforent of BACK LOG 2-Jan-18 5:00 PM 3-Jan-18 9:30 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 3
Backlog Storage Building ( RA-819439-01 Rev-0 ) @ Ju'Aymah, Shops
Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

CPVC Pipes, Fittings Installation and Inspection of 2" Diameter for Potable
1639 P-0123 Water line about 42M Outside New Substation Building [ South side] NEW SUB STATION 2-Jan-18 1:35 PM 3-Jan-18 8:00 AM RA-819439-004-00 FAHEEM SYED SHAFIULLAH
Towards Work Shop Area at Juaymah Shops Project Plant N-26

CPVC Pipes, Fittings Installation and Inspection of 2" Diameter for Raw
1640 P-0124 Water line about 42M Outside New Substation Building [ South side] NEW SUB STATION 2-Jan-18 1:40 PM 3-Jan-18 8:30 AM RA-819438-004-00 FAHEEM SYED SHAFIULLAH
Towards Work Shop Area at Juaymah Shops Project Plant N-26

Pre-Test Punch Listing for HT Package UJS-SSB-PW-003-00 (Potable


1641 P-0125 Water) Outside New SubStation Building Towards Work Shop Area @ NEW SUB STATION 3-Jan-18 9:00 AM 4-Jan-18 7:00 AM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-SSB-PW-003-00 (Potable


1642 P-0126 Water) Outside New SubStation Building Towards Work Shop Area @ NEW SUB STATION 3-Jan-18 9:05 AM 4-Jan-18 7:15 AM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-SSB-PW-003-00


1643 P-0127 (Potable Water) Outside New SubStation Building Towards Work Shop NEW SUB STATION 3-Jan-18 9:10 AM 4-Jan-18 7:20 AM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

Verification ot Test Preparation for HT Package UJS-S SB-PW-003-00


1644 P-0128 (Potable Water) Outside New SubStation Building Towards Work Shop NEW SUB STATION 3-Jan-18 9:15 AM 4-Jan-18 7:30 AM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-SSB-PW-003-00 (Potable


1645 P-0129 Water) Outside New SubStation Building Towards Work Shop Area @ NEW SUB STATION 3-Jan-18 9:20 AM 4-Jan-18 7:40 AM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-SSB- PW-003-00


1646 P-0130 (Potable Water) Outside New SubStation Building Towards Work Shop NEW SUB STATION 3-Jan-18 9:25 AM 4-Jan-18 8:00 AM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

De- Pressurization and Water Disposal for HT Package UJS-SSB-PW-003-00


1647 P-0131 (Potable Water) Outside New SubStation Building Towards Work Shop NEW SUB STATION 3-Jan-18 9:30 AM 4-Jan-18 1:00 PM RA819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-SSB-RW-003-00 (Raw Water)


1648 P-0132 Outside New SubStation Building Towards Work Shop Area @ Ju'aymah NEW SUB STATION 3-Jan-18 9:35 AM 4-Jan-18 8:15 AM RA819438-001-00 FAHEEM SYED SHAFIULLAH
Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-SSB-RW-003-00 (Raw


1649 P-0133 Water) Outside New SubStation Building Towards Work Shop Area @ NEW SUB STATION 3-Jan-18 9:40 AM 4-Jan-18 8:25 AM RA819438-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-SSB-RW-003-00


1650 P-0134 (Raw Water) Outside New SubStation Building Towards Work Shop Area NEW SUB STATION 3-Jan-18 9:45 AM 4-Jan-18 8:40 AM RA819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

Verification ot Test Preparation for HT Package UJS-S SB-RW-003- 00 (Raw


1651 P-0135 Water) Outside New SubStation Building Towards Work Shop Area @ NEW SUB STATION 3-Jan-18 9:50 AM 4-Jan-18 8:55 AM RA819438-001-00 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-SSB-RW-003-00 (Raw Water)


1652 P-0136 Outside New SubStation Building Towards Work Shop Area @ Ju'aymah NEW SUB STATION 3-Jan-18 9:55 AM 4-Jan-18 9:15 AM RA819438-001-00 FAHEEM SYED SHAFIULLAH
Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-SSB- RW-003-00


1653 P-0137 (Raw Water) Outside New SubStation Building Towards Work Shop Area NEW SUB STATION 3-Jan-18 10:00 AM 4-Jan-18 1:00 PM RA819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

De- Pressurization and Water Disposal for HT Package UJS-SSB-RW-003-00


1654 P-0138 (Raw Water) Outside New SubStation Building Towards Work Shop Area NEW SUB STATION 3-Jan-18 10:05 AM 4-Jan-18 5:15 PM RA819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

1655 C-1312 Concrete Finishing & Curing Inspection of Roof Beams at Grid Line (A'-F) ADMIN BUILDING 3-Jan-18 10:10 AM 4-Jan-18 7:00 AM RA-819726-001-0F2 ACIELO SYED SHAFIULLAH
(4-9) RB1, RB3 & RB4 at Admin Building Area, Juaymah Shops N-26

Form Closure Inspection for 4 Nos. Column (Upper Roof) at Grid Line (A')
1656 C-1313 (6) C12, (A') (7) C12, (A) (6) C11 and (A) (7) C11 at Admin Bldg ADMIN BUILDING 3-Jan-18 10:15 AM 4-Jan-18 10:00 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
Area,Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for 4 Nos. Column


1657 C-1314 (Upper Roof) at Grid Line (A') (6) C12, (A') (7) C12, (A) (6) C11 and (A) (7) ADMIN BUILDING 3-Jan-18 10:20 AM 4-Jan-18 3:30 PM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
C11 at Admin Bldg Area,Juaymah Shops N-26

1658 C-1315 Pre-Cast Concret Erection & Aligment Inspection of Foundation (04 Nos ) BOOSTER PUMP 3-Jan-18 2:00 PM 4-Jan-18 10:15 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
For Booster Pump station-2 @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1659 C-1316 Material (21 LM ) for MV Direct Burried Conduit in Between sipping NEW SUB STATION 3-Jan-18 2:05 PM 4-Jan-18 4:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED Not in QMIS
Receiving & New Workshop Area @ J u'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material (21
1660 C-1317 LM ) for MV Direct Burried Conduit in Between sipping Receiving & New NEW SUB STATION 3-Jan-18 2:10 PM 4-Jan-18 4:15 PM RA-819460-002-00 QUADRI ISHFAQ AHMED 2
Workshop Area @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1661 C-1318 Material Around Foundation (04 Nos ) at For Booster Pump station-2 @ CAR PARKING 3-Jan-18 2:15 PM 4-Jan-18 11:45 AM RA-819460-002-00 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material


1662 C-1319 Around Foundation (04 Nos ) at For Booster Pump station-2 @ Ju'Aymah, BOOSTER PUMP 3-Jan-18 2:20 PM 4-Jan-18 12:00 PM RA-819460-002-00 QUADRI ISHFAQ AHMED 4
Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1663 C-1320 Material Around Foundation (04 Nos ) at For Booster Pump station-2 @ CAR PARKING 3-Jan-18 2:25 PM 4-Jan-18 4:15 PM RA-819460-002-00 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1664 C-1321 Around Foundation (04 Nos ) at For Booster Pump station-2 @ Ju'Aymah, BOOSTER PUMP 3-Jan-18 2:30 PM 4-Jan-18 4:30 PM RA-819460-002-00 QUADRI ISHFAQ AHMED 4
Shops Plant N- 26

Material Receiving Inspection For Pre-Cast Concrete Panels (Panel Mark)


1665 C-1322 SS-WIG-14, SS-WIG-15, SS -WIG-01, SS-WIG-02B, SS-WIG-03, SS-WIG-04, PLANT N-26 3-Jan-18 2:35 PM 4-Jan-18 7:00 AM 0016-ER-001-10 BAQAR MAMDOOH
SS-WIG-02C, SS-WIG-05 New Sub Station Building Area @ J uaymah Shops
Plant N-26

Pre-Cast Concrete Panels Pre-Installation Inspection (Panel Mark)SS-WIG-


1666 C-1323 14,SS- WIG-15,SS-WIG-01,SS-WIG-02B,SS -WIG-03,SS-WIG-04,SS-WIG- NEW SUB STATION 3-Jan-18 2:40 PM 4-Jan-18 8:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
02C,SS-WIG-05,New Sub Station Building Area @ Juaymah Shops Plant N-
26

Pre-Cast Concrete Erection and Alignment Inspection For Panels (Panel


1667 C-1324 Mark)SS-WIG-14,SS-WIG-15,SS-WIG-01,SS-WIG- 02B,SS-WIG-03,SS-WIG- NEW SUB STATION 3-Jan-18 2:45 PM 4-Jan-18 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
04,SS- WIG-02C,SS-WIG-05,New Sub Station Building Area @ Juaymah
Shops Plant N-26

FDT, Compaction Inspection of Existing Sub Grade for Potable & Raw
1668 C-1325 Water Trench ( 75 LM ) at West side of New Car Parking Area @ CAR PARKING 3-Jan-18 2:50 PM 4-Jan-18 8:30 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 5
Ju'Aymah, Shops Plant N- 26

Sand Placement of Potable & Raw Water Trench ( 75 LM ) at West side of


1669 C-1326 New Car Parking Area @ J u'Aymah, Shops Plant N- 26 I ( RA- 819439-01 CAR PARKING 3-Jan-18 2:55 PM 4-Jan-18 9:15 AM RA-819438-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Rev-0 )

Compaction Inspection of Placement of ( 15 cm ) Sand Beddingt of


1670 C-1327 Potable & Raw Water Trench ( 75 LM ) West side Of New Carparking Area CAR PARKING 3-Jan-18 3:00 PM 4-Jan-18 10:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 5
( RA-819439-01 Rev-0 ) @ Ju'Aymah, S hops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 10 Nos. Columns at Grid Line (11) (A) C9, (11)
1671 C-1328 (B) C14, (11') (B') C6, (10) (B) C1, (12) (B) C15, (11) (D) C1, (11') (E) C1, (12) MAAZ LAB 3-Jan-18 4:30 PM 4-Jan-18 11:00 AM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
(E) C16, (11') (F) C16 and (12) (F) C15 at Admin Building Area, Juaymah
Shops N-26 @ MAAZ LAB

1672 E-0109 Visual Inspection of Copper 5/8/16mm Grounding ROD Installation,At CAR PARKING 3-Jan-18 1:15 PM 4-Jan-18 8:00 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
New Car Parking Area

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1673 C-1329 Material (21 LM ) for MV Direct Burried Conduit in Between sipping NEW SUB STATION 4-Jan-18 3:30 PM 6-Jan-18 11:00 AM RA-819460-002-00 QUADRI ISHFAQ AHMED Not in QMIS
Receiving & New Workshop Area @ J u'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material (21
1674 C-1330 LM ) for MV Direct Burried Conduit in Between sipping Receiving & New NEW SUB STATION 4-Jan-18 3:35 PM 6-Jan-18 11:30 AM RA-819460-002-00 QUADRI ISHFAQ AHMED 2
Workshop Area @ Ju'Aymah, Shops Plant N- 26

Cement Based Non-S hrink Grout Surface Preparation for Anchor Bolts SHIPPING & RECEIVING
1675 C-1331 Grid line 3 & 4 ( A to G ) 14 Nos at Shipping Receiving Area @ ju'aymah 4-Jan-18 3:40 PM 6-Jan-18 3:00 PM RA-819990-001-0F1 QUADRI ISHFAQ AHMED
shops plant N-26 AREA

Cement Based Non-S hrink Grout Mixing,Testing,Sampling & Placement of SHIPPING & RECEIVING
1676 C-1332 Anchor Bolts Grid line 3 & 4 ( A to G ) 14 Nos at Shipping Receiving Area 4-Jan-18 3:45 PM 6-Jan-18 3:30 PM RA-819990-001-0F1 QUADRI ISHFAQ AHMED
@ ju'aymah shops plant N-26 AREA

Cement Based Non-S hrink Grout Surface Preparation for Pre-Cast


1677 C-1333 Foundation after Cutting Lifting Hook at Booster Pump Foundation (04 CAR PARKING 4-Jan-18 3:50 PM 6-Jan-18 2:00 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Nos ) Station-2 ( Shaded ) @ ju'aymah shops plant N-26

Cement Based Non-S hrink Grout Mixing,Testing,Sampling & Placement of


1678 C-1334 Pre-Cast Foundation after Cutting Lifting Hook at Booster Pump CAR PARKING 4-Jan-18 3:55 PM 6-Jan-18 2:30 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Foundation (04 Nos ) Station- 2 ( Shaded ) @ ju'aymah shops plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1679 C-1335 Inspection of 4000 PSi for 7 Nos Column at Grid Line (11) (C) C7, (11') (C) MAAZ LAB 4-Jan-18 2:45 PM 6-Jan-18 11:00 AM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
C6, (10) (C) C1, (12) (C) C16, (10) (D) C1, (10) (E) C5 and (10) (F) C15 at
Admin Building Area, Juay mah Shops N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1680 C-1336 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-02A, SS-WIG-07, MAAZ LAB 4-Jan-18 2:50 PM 6-Jan-18 11:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WIG-19, SS-WG-03 of New Sub Station Juaymah Shops Plant N-26 @
MAAZ LAB

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


1681 C-1337 SS-WIG-06, SS-WIG-07, SS -WG-01-SS-WG-02, SS-WIG-02A, SS-WIG-02D, PLANT N-26 4-Jan-18 2:55 PM 6-Jan-18 8:00 AM 0016-ER-001-10 BAQAR MAMDOOH
SS-WG-08, SS-WG-09, SS-WIG-02, SS-WIG-08 @ New Sub Station Building
Area ,JaAymah,shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) SS-WIG-


1682 C-1338 06,SS- WIG-07,SS-WG-01-SS-WG-02,SS-WIG-02A,SS-WIG-02D,SS-WG- NEW SUB STATION 4-Jan-18 3:00 PM 6-Jan-18 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
08,SS- WG-09 SS-WIG-02,SS-WIG-08 @ New Sub Station Building Area
,JaAymah,shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


1683 C-1339 Mark) SS-WIG- 06,SS-WIG-07,SS-WG-01-SS-WG-02,SS-WIG-02A,SS-WIG- NEW SUB STATION 4-Jan-18 3:05 PM 6-Jan-18 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
02D,SS-WG-08,SS-WG-09 S S-WIG-02,SS-WIG-08 @ New Sub Station
Building Area ,JaAymah,shops Plant N-26

Pre-Installation Procedure Verification Testing of Calibration Wrench for SHIPPING & RECEIVING
1684 ST-0019 Shipping and Receiving Shed @ Shipping and Receiving Area, Ju'aymah 4-Jan-18 3:10 PM 6-Jan-18 9:30 AM RA-819990-001-0F1 OMAR M. HASSAN
Shops, Plant N26. AREA

1685 ST-0020 Bolt Tightening Inspection for Shipping and Receiving Shed @ Shipping SHIPPING & RECEIVING 4-Jan-18 2:15 PM 6-Jan-18 10:30 AM RA-819990-001-0F1 OMAR M. HASSAN
and Receiving Area, Ju'aymah Shops, Plant N26. AREA

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1686 P-0139 SCH-80 Fittings 1"X ½" REDUCER BUSH- 22Pcs from NEPRO (NAMAT) & PLANT N-26 4-Jan-18 10:55 AM 6-Jan-18 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
IPEX @ ETE @ ETE store Juaymah Shop Plant N- 26

CPVC Pipes, Fittings Installation and Inspection of 2" Diameter for Potable
1687 P-0140 Water line about 75 LM from New Admin Building [SOUTH SIDE] Towards ADMIN BUILDING 4-Jan-18 11:00 AM 6-Jan-18 7:30 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01[EAST SIDE] Area at Juaymah Shops Project Plant N-26

CPVC Pipes, Fittings Installation and Inspection of 2" and 3" Diameter for
1688 P-0141 Raw Water line about 75 LM from New Admin Building [SOUTH SIDE] ADMIN BUILDING 4-Jan-18 11:05 AM 6-Jan-18 8:00 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01[EAST SIDE] Area at Juaymah Shops Project
Plant N-26

Pre Test Punch Listing for Hydro Test Package UJS- ADMB-PW-003-00
1689 P-0142 [POTABLE WATER] about 75 LM from New Admin Building [SOUTH SIDE] ADMIN BUILDING 4-Jan-18 11:10 AM 6-Jan-18 1:03 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01 [EAST SIDE] Area at Juaymah Shops Project N-
26 SATIP-A-004-02 and SAIC-A-2010

Internal Cleanliness / Flushing for Hydro Test Package UJS-ADMB-PW-003-


1690 P-0143 00 [POTABLE WATER] about 75 LM from New Admin Building [SOUTH ADMIN BUILDING 4-Jan-18 11:15 AM 6-Jan-18 1:45 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
SIDE] Towards Booster Pump-01 [EAST SIDE] Area at J uaymah S hops
Project N-26 SATIP-A-004-02 and SAIC-L-2017

Verification of Testing Equipment for Hydro Test Package UJS-ADMB-PW-


1691 P-0144 003-00 [POTABLE WATER] about 75 LM from New Admin Building [South ADMIN BUILDING 4-Jan-18 11:20 AM 6-Jan-18 2:00 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Side] Towards Booster Pump-01 [East Side] Area at Juaymah Shops Project
N-26 SATIP-A-004-02 and SAIC-A-2009

Verification of Test Preparation for Hydro Test Package UJS-ADMB-PW-


1692 P-0145 003-00 [POTABLE WATER] about 75 LM from New Admin Building [South ADMIN BUILDING 4-Jan-18 11:25 AM 6-Jan-18 2:15 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Side] Towards Booster Pump-01 [East Side] Area at Juaymah Shops Project
N-26 SATIP-A-004-02 and SAIC-A-2011

Pre Test Punch Listing for Hydro Test Package UJS- ADMB-RW-003-00 [RAW
1693 P-0146 WATER] about 75 LM from New Admin Building [ South Side] Towards ADMIN BUILDING 4-Jan-18 11:30 AM 6-Jan-18 2:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 [East Side] Area at Juaymah Shops Project N-26 SATIP-A-
004-02 and SAIC-A-2010

Internal Cleanliness / Flushing for Hydro Test Package UJS-ADMB-RW-003-


1694 P-0147 00 [RAW WATER] about 75 LM from New Admin Building [South Side] ADMIN BUILDING 4-Jan-18 11:35 AM 6-Jan-18 2:45 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01 [East Side] Area at Juaymah Shops Project N-26
SATIP- A-004-02 and SAIC-L-2017

Verification of Testing Equipment for Hydro Test Package UJS-ADMB-RW-


1695 P-0148 003-00 [RAW WATER] about 75 LM from New Admin Building [South Side] ADMIN BUILDING 4-Jan-18 11:40 AM 6-Jan-18 3:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01 [East Side] Area at Juaymah Shops Project N-26
SATIP- A-004-02 and SAIC-A-2009

Verification of Test Preparation for Hydro Test Package UJS-ADMB-RW-


1696 P-0149 003-00 [RAW WATER] about 75 LM from New Admin Building [South Side] ADMIN BUILDING 4-Jan-18 11:45 AM 6-Jan-18 3:15 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01 [East Side] Area at Juaymah Shops Project N-26
SATIP- A-004-02 and SAIC-A-2011

Filling and Pressurization for HT Package UJS-ADMB-PW-003-00 (Potable


1697 P-0150 Water) about 75 LM from New Admin Building (South Side) Towards ADMIN BUILDING 6-Jan-18 8:00 AM 7-Jan-18 7:10 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01(East Side) Area @ Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-PW-003-00


1698 P-0151 (Potable Water) about 75 LM from New Admin Building (South Side) ADMIN BUILDING 6-Jan-18 8:05 AM 7-Jan-18 7:30 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01(East Side) Area @ J u'aymah Shop Plant N-26

De- Pressurization and Water Disposal for HT Package UJS-ADMB-PW-003-


1699 P-0152 00 (Potable Water) about 75 LM from New Admin Building (South Side) ADMIN BUILDING 6-Jan-18 8:10 AM 7-Jan-18 12:10 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01(East Side) Area @ J u'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-ADMB-RW-003-00 ( Raw


1700 P-0153 Water) about 75LM from New Admin Building (South Side) Towards ADMIN BUILDING 6-Jan-18 8:15 AM 7-Jan-18 12:15 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 (East Side) Area @ Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-RW-003-00


1701 P-0154 ( Raw Water) about 75LM from New Admin Building (South Side) Towards ADMIN BUILDING 6-Jan-18 8:20 AM 7-Jan-18 12:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 (East Side) Area @ Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJS-ADMB-RW-003-


1702 P-0155 00 ( Raw Water) about 75LM from New Admin Building (South Side) ADMIN BUILDING 6-Jan-18 8:25 AM 7-Jan-18 5:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Towards Booster Pump-01 (East Side) Area @ Ju'aymah Shop Plant N-26

Embedded items & Formclosure Inspection for Elevator Shear Wall (3rd
1703 C-1340 Lift) (from Elev. 4.2 m to Elev. 8.4 m) at Admin Building, Juaymah Shops N- ADMIN BUILDING 6-Jan-18 8:30 AM 7-Jan-18 10:00 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
26

1704 C-1341 Formwork inspection for Slab of Elevator Machine Room (Elev. 8.65 m) at ADMIN BUILDING 6-Jan-18 8:35 AM 7-Jan-18 10:15 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Admin Bldg.,Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for
1705 C-1342 Slab of Elevator Machine Room (Elev. 8.65 m) at Admin Bldg.,Juaymah ADMIN BUILDING 6-Jan-18 8:40 AM 7-Jan-18 10:30 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Elevator Shear


1706 C-1343 Wall (3rd Lift) (from Elev. 4.2 m to Elev. 8.4 m) and elevator shear wall ADMIN BUILDING 6-Jan-18 8:45 AM 7-Jan-18 1:00 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
(3rd lift) (from elev. 4.2m to elev. 8.4m) at Admin Building, J uaymah
Shops N-26

1707 C-1344 Formwork Inspection for Roof Beams at Grid Line (1-4) (A-F) RB1, RB1A, ADMIN BUILDING 6-Jan-18 8:50 AM 7-Jan-18 10:45 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
RB3 at Admin Building, Juaymah Shops N-26

FBE Reinforcing Steel,Embedded Items & Formclosure Inspection for Roof


1708 C-1345 Beams at Grid Line (1-4) (A-F) RB1, RB1A, RB3 at Admin Building, ADMIN BUILDING 6-Jan-18 8:55 AM 7-Jan-18 11:00 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Roof Beams at


1709 C-1346 Grid Line (1-4) (A-F) RB1, RB1A, RB3 at Admin Building, Juaymah Shops N- ADMIN BUILDING 6-Jan-18 9:00 AM 7-Jan-18 1:45 PM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
26

1710 C-1347 Formwork Inspection for Exit Staircase (2nd Floor) (2nd Lift) at Grid Line ADMIN BUILDING 6-Jan-18 9:05 AM 7-Jan-18 11:15 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
(B-C) (1-2) at Admin Building J uaymah S hops N-26

FBE Reinforcing Steel, Embedded Items & Form Closure Inspection for Exit
1711 C-1348 Staircase (2nd Floor) (2nd Lift) at Grid Line (B-C) (1-2) at Admin Building ADMIN BUILDING 6-Jan-18 9:10 AM 7-Jan-18 11:30 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Exit S taircase


1712 C-1349 (2nd Floor) (2nd Lift) at Grid Line (B-C) (1-2) at Admin Building Juaymah ADMIN BUILDING 6-Jan-18 9:15 AM 7-Jan-18 2:00 PM RA-819746-001-00 ACIELO ISHFAQ AHMED
Shops N-26

Material Receiving Visual Inspection for cable tiles red color size 400mm x
1713 E-0110 200mm x 50mm with P.O #. 29474 AT ETE Store , Ju'aymah shop plant N- PLANT N-26 6-Jan-18 9:20 AM 7-Jan-18 8:00 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
26 (QTY, 1323 PCS.) As per attached document.

Material Receiving Visual Inspection for LV POWER CABLE 3C X 4mm2,


1714 E-0111 ( 500 mtrs) from BAHRA Cable, AT ETE Laydown , Ju'aymah shop plant N- PLANT N-26 6-Jan-18 9:25 AM 7-Jan-18 9:30 AM RA-819936-001-00 NOLI ALI M. AL YASEEN
26. As per attached document.

Visual Inspection for LV POWER CABLE 3C X 4mm2, NON ARMOR


1715 E-0112 ,Continuity and Insulation testing ON Cable Reel, AT ETE Laydown , ADMIN BUILDING 6-Jan-18 9:30 AM 7-Jan-18 10:00 AM RA-819936-001-00 NOLI ALI M. AL YASEEN
Ju'aymah shop plant N-26. As per attached document.

1716 E-0113 Visual Inspection of Excavation Trenching for LV Direct Buried PVC Conduit ADMIN BUILDING 6-Jan-18 9:35 AM 7-Jan-18 10:30 AM RA-819460-002-00 NOLI ALI M. AL YASEEN
Pipes At Admi As per Attached highlighted drawing.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection of 4" Direct Buried PVC Conduit Pipes Installation for LV
1717 E-0114 Power Cable At Admin Area. As per Attached highlighted drawing. ADMIN BUILDING 6-Jan-18 12:00 AM 7-Jan-18 11:00 AM RA-819460-002-00 NOLI ALI M. AL YASEEN

Sand Covering 30 CM Around & Above the Pipe (42 LM) for Raw Potable
1718 C-1350 Water Trench at Infront of Backlog Building @J uAymah,Shops Plant N-26 BACK LOG 6-Jan-18 1:10 PM 7-Jan-18 10:00 AM RA-819439-001-00 QUADRI ISHFAQ AHMED Not in QMIS
(RA-819438-01 Rev-0)

Material, Receiving Inspection for pre-cast Concrete Panel (Panel Mark)SS-


1719 C-1351 WIG-09,SS-WIG-10,SS-WIG-11,SS-WIG-12,SS-WIG-16,SS-WIG-02G,SS-WG- NEW SUB STATION 6-Jan-18 1:15 PM 7-Jan-18 8:00 AM 0016-ER-001-10 BAQAR MAMDOOH
07,SS- WG-06,SS-WG-10,SS-WG-05, @ J uaymah S hops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark)SS-WIG-


09,SS- WIG-10,SS-WIG-11,SS-WIG-12,SS-WIG-16,SS-WIG-02G,S S-WG-
1720 C-1352 07,SS- WG-06,SS-WG-10,SS-WG-05,New Sub Station Building Area @ NEW SUB STATION 6-Jan-18 1:20 PM 7-Jan-18 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
Juaymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panel (Panel


Mark)SS-WIG-09,SS-WIG-10,SS-WIG-11,SS-WIG- 12,SS-WIG-16,SS-WIG-
1721 C-1353 02G,SS-WG-07,SS-WG-06,SS-WG-10,SS-WG-05,New Sub Station Building NEW SUB STATION 6-Jan-18 1:25 PM 7-Jan-18 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
Area @ J uaymah S hops Plant N-26

Sand Covering 30 CM Around & Above for Raw Potable Water Trench (75
1722 C-1354 LM) at West Side of New Car Parking Area @JuAymah,Shops Plant N-26 CAR PARKING 6-Jan-18 1:30 PM 7-Jan-18 10:15 AM RA-819439-001-00 QUADRI ISHFAQ AHMED Not in QMIS
(RA-819438-01 Rev-0)

FDT Inspection of Existing Sub Grade for Trench of Electrical Direct Buried
1723 C-1355 Conduit Pipe (20 m South Side) in Admin Building Area, Juaymah Shops ADMIN BUILDING 6-Jan-18 3:20 PM 7-Jan-18 9:00 AM RA-819460-002-00 ACIELO ISHFAQ AHMED 2
N26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 2000 Psi for telecom Duct Bank 78.0 M Length in Between
1724 C-1356 Sub station and Back Log Storage Room Juaymah Shops Plant N-26 @ MAAZ LAB 6-Jan-18 3:25 PM 7-Jan-18 11:00 AM RA-819517-001-00 SALMAAN ISHFAQ AHMED
Maaz Lab

FDT, Compaction Inspection of Existing Sub Grade for Electrical Duct Bank SHIPPING & RECEIVING
1725 C-1357 ( 22. 00 LM )for LV,FDAS &PSA at In Between Shipping Receiving and MTM 6-Jan-18 3:30 PM 7-Jan-18 11:30 AM RA-819460-001-0F1 QUADRI ISHFAQ AHMED 2
Building @ JuAyamh, Shops Plant - 26 ( RA-819283-02 Rev - 0FI ) AREA

Surface Preparation & Moisture Test Inspection for Pre- Cast Foundation
1726 C-1358 after cutting lifting hook area ( After Placement of Grout )04 Nos at CAR PARKING 6-Jan-18 3:35 PM 7-Jan-18 9:30 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Booster Pump Station - 1 ,South Side of New Car Parking Area @
Pre-cast
JuAyamh,&Shops
Pre-Stressed Pre Concreting Inspection (Bed and Pre-stressing
Plant -26
of stands) of Hollow Core Panels for Admin Building @ INCO Pre-Cast
Fabrication Yard (Panel Mark H1-503, H1-504, H1-505 (2 Nos), H1-505A,
H1-506, H1-506A, H1-506H, H1-507 (2 Nos), H1-508, H1-509 (2 NosH1-
1727 C-1359 510 (2NOS),H1-510H (2NOS), H1-511(3NOS),H1-512,H1-513,H1- 513A,H1- INCO 7-Jan-18 11:05 AM 8-Jan-18 11:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
514, H1-515,
Pre-cast H1-515A, H1-516
& Pre-Stressed (4 Nos),
Concrete H1-Sampling
Testing, 517, H1-517H, H1-518, H1-
and Placement
519, H1-520,
Inspection of H1-522,
Hollow H1-523,
Core H1-524,
Panels for H1-525,
Admin H1- 526,
Building H1-527,
@ INCO H1-528,
Pre-Cast
H1-529, H1-530,
Fabrication H1-531,
Yard (Panel H1-532,
Mark H1-533,
H1-503, H1-534,
H1-504, H1-505H1-535, H1-536,
(2 Nos), H1-
H1-505A,
537, H1-538,
H1-506, H1-539
H1-506A, H1-506H, H1-507 (2 Nos), H1-508, H1-509 (2 NosH1-
1728 C-1360 510 (2NOS),H1-510H (2NOS), H1-511(3NOS),H1-512,H1-513,H1- 513A,H1- INCO 7-Jan-18 11:10 AM 8-Jan-18 1:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
514, H1-515, H1-515A, H1-516 (4 Nos), H1- 517, H1-517H, H1-518, H1-
519, H1-520, H1-522, H1-523, H1-524, H1-525, H1- 526, H1-527, H1-528,
H1-529, H1-530, H1-531, H1-532, H1-533, H1-534, H1-535, H1-536, H1-
537, H1-538,
Pre-cast & Pre-Stressed
H1-539 Pre Concreting Inspection (Molding and
1729 C-1361 Formwork) of Double Tee Slab for Sub Station Building @ INCO Pre-Cast INCO 7-Jan-18 11:15 AM 8-Jan-18 8:30 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-01A and SS-DT- 02A (2 Nos.), Total 3
Nos.

Pre-cast & Pre-Stressed Pre Concreting Inspection of Rebar, Embedded


1730 C-1362 Items and Molding / Form Closure of Double Tee S lab for Sub Station INCO 7-Jan-18 11:20 AM 8-Jan-18 8:45 AM 0016-ER-002-9 SALMAAN MAMDOOH
Building @ INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-01A and SS-
DT-02A (2 Nos.), Total 3 Nos.

Pre-cast & Pre-Stressed Concrete Testing, Sampling and Placement


1731 C-1363 Inspection of Double Tee Slab for Sub S tation Building @ INCO Pre-Cast INCO 7-Jan-18 11:25 AM 8-Jan-18 9:00 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-01A and SS-DT- 02A (2 Nos.), Total 3
Nos.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1732 C-1364 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-08, SS-WIG-21, SS- MAAZ LAB 7-Jan-18 11:30 AM 8-Jan-18 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
WG-10, SS-WG-06 of New Sub Station Juaymah Shops Plant N-26 @
MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1733 C-1365 Inspection of 4000 PSi for 7 Nos Column at Grid Line (10) (A) C9, (9) (B) MAAZ LAB 7-Jan-18 11:35 AM 8-Jan-18 11:30 AM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
C1, (9) (C) C1, (9) (D) C1, (9') (E) C1, (9) (E) C3 and (9') (F) C8 at Admin
Building Area, Juaymah Shops N-26 @ MAAZ LAB
Pre-Cast & Pre-Stressed Concrete Curing Inspection of Hollow Core
Panels, (Panel Mark H1-701, H1-701A, H1-702, H1-702C, H1-703, H1-
1734 C-1366 703A, H1-703B, H1- 703C, H1-704, H1-705, (4 Nos), H1-707A, H1-708, H1- INCO 7-Jan-18 11:40 AM 8-Jan-18 9:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
708A, H1-709 (2 Nos) , H1-710, H1-710H, H1- 711 ,H1-711H, H1-712, H1-
712A, H1-713 (2 Nos) , H1-714, H1-715, H1-716, H1-717 (4 Nos) for
Admin Building at INCO Pre-Cast Fabrication Yard.
Pre-Cast & Pre-Stressed Concrete and Final Inspection of Panels (Panel
1735 C-1367 Mark) SS-WIG- 02E, SS-WIG-17, SS-WIG-18, SS-WIG-19, SS-WIG-20, SS- INCO 7-Jan-18 11:45 AM 8-Jan-18 10:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
WIG-20H, SS-WIG-21, S S-WIG-22, SS-WG-03, SS-WG-04 @ New Sub
Station Building Area ,JaAymah,shops Plant N-26

1736 E-0115 Visual Inspection of Excavation Trenching for LV Direct Buried PVC Conduit CAR PARKING 7-Jan-18 10:00 AM 8-Jan-18 9:00 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
Pipes At Parking Area, As per Attached highlighted drawing.

1737 E-0116 Visual Inspection of 4" Direct Buried PVC Conduit Pipes Installation for LV CAR PARKING 7-Jan-18 10:05 AM 8-Jan-18 9:15 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
Power Cable At Parking Area. As per Attached highlighted drawing.

1738 E-0117 Visual Inspection of Sand Bedding Final Backfilling of LV Electrical Duck CAR PARKING 7-Jan-18 10:10 AM 8-Jan-18 9:30 AM RA-819939-001-00 NOLI ALI M. AL YASEEN
Bank at New Car Parking Area As per highlighted Attached Drawing.

1739 E-0118 Visual Inspection of Sand Bedding Final Backfilling of LV Electrical Duck ADMIN BUILDING 7-Jan-18 10:15 AM 8-Jan-18 8:30 AM RA-819460-002-00 NOLI ALI M. AL YASEEN
Bank at Admin Bldg. Area As per highlighted Attached Drawing.

Material Receiving Inspection for Pre- Cast Concrete Panels (Panel Mark)
1740 C-1368 SS-WIG-18, SS-WIG-19, SS -WIG-20, SS-WIG-20H, SS-WIG-21, SS-WIG-22, NEW SUB STATION 8-Jan-18 12:40 PM 9-Jan-18 8:00 AM 0016-ER-001-10 BAQAR MAMDOOH
SS-WG-03, SS-WG-04, SS-WIG-17, SS-WIG-02E @ New Sub S tation
Building Area, JaAymah, Shops Plant N-26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1741 C-1369 Material for Around Fire Wall Foundation ( 03 N0s ) at New Sub S tation @ NEW SUB STATION 7-Jan-18 2:10 PM 8-Jan-18 2:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material for
1742 C-1370 Around F ire Wall Foundation (03 Nos ) at New Sub Station @ Ju'Aymah, NEW SUB STATION 7-Jan-18 2:15 PM 8-Jan-18 2:30 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED 3
Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1743 C-1371 Material for for Potable & Raw Water Trench ( 75 LM ) at West side of CAR PARKING 7-Jan-18 2:20 PM 8-Jan-18 2:15 PM RA-819438-001-00 QUADRI ISHFAQ AHMED Not in QMIS
New Car Parking Area (RA-819439-1 Rev-0 ) @ Ju'Aymah, Shops Plant N-
26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material for
1744 C-1372 for Potable & Raw Water Trench ( 75 LM ) at West side of New Car CAR PARKING 7-Jan-18 2:25 PM 8-Jan-18 2:45 PM RA-819438-001-00 QUADRI ISHFAQ AHMED 5
Parking Area (RA-819439-1 Rev-0 ) @ Ju'Aymah, Shops Plant N- 26

Concrete Finishing & Curing Inspection for Exit Staircase (2nd Floor) (1st
1745 C-1373 Lift) at Grid Line (B-C) (1-2) and 6 Nos. Columns (upper roof ) at Grid Line ADMIN BUILDING 8-Jan-18 9:15 AM 9-Jan-18 7:00 AM RA-819746-001-00 ACIELO ISHFAQ AHMED
(11) (C) C7, (12)(C)C16, (11)(D)C1, (12) (E) C16, (12) (D) PC1 and (11) (E)
PC1 at Admin Building, Juaymah Shops N26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1746 C-1374 Inspection of 4000 PSi for Firewall Foundation (03 N0s) at New Sub MAAZ LAB 8-Jan-18 9:20 AM 9-Jan-18 11:00 AM RA-819867-001-0F4 SALMAAN ISHFAQ AHMED
Station, Juaymah Shops N-26 @ MAAZ LAB

Coating and Final Inspection of APS-3 Carboline for Pre-Cast Foundation


1747 C-1375 after Cutting lifting hook area for Booster Pump Station -1 (Shade ) total CAR PARKING 8-Jan-18 1:05 PM 9-Jan-18 8:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
04 Nos at South Side of New Car Parking Area @ Ju'Aymah, Shops Plant
N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1748 C-1376 Material for Around Pre-Cast Foundation for Booster Pump Station -1 CAR PARKING 8-Jan-18 1:10 PM 9-Jan-18 8:45 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED Not in QMIS
(Shade ) total 04 Nos at South Side of New Car Parking Area @
Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Select Fill Material for
1749 C-1377 Around Pre-Cast Foundation for Booster Pump Station -1 (Shade ) total BOOSTER PUMP 8-Jan-18 1:15 PM 9-Jan-18 9:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
04 Nos at South Side of New Car Parking Area @ Ju'Aymah, Shops Plant
N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1750 C-1378 Material for Around Pre-Cast Foundation for Booster Pump Station -1 CAR PARKING 8-Jan-18 1:20 PM 9-Jan-18 10:45 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED Not in QMIS
(Shade ) total 04 Nos at South Side of New Car Parking Area @
Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Select Fill Material for
1751 C-1379 Around Pre-Cast Foundation for Booster Pump Station -1 (Shade ) total BOOSTER PUMP 8-Jan-18 1:25 PM 9-Jan-18 11:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
04 Nos at South Side of New Car Parking Area @ Ju'Aymah, Shops Plant
N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1752 C-1380 Material for Around Fire Wall Foundation ( 03 N0s ) at New Sub S tation @ NEW SUB STATION 8-Jan-18 1:30 PM 9-Jan-18 2:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1753 C-1381 for Around Fire Wall Foundation (03 Nos ) at New Sub Station @ NEW SUB STATION 8-Jan-18 1:35 PM 9-Jan-18 2:30 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED 3
Ju'Aymah, Shops Plant N- 26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) SS-WIG-


1754 C-1382 18, SS-WIG-19, SS-WIG-20, SS-WIG-20H, SS-WIG-21, SS-WIG-22, S S-WG- NEW SUB STATION 8-Jan-18 12:45 PM 9-Jan-18 8:30 AM 0016-ER-001-10 SALMAAN MAMDOOH
03, SS-WG-04, SS-WIG-17, S S-WIG-02E @ New Sub Station Building Area,
JaAymah, Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


1755 C-1383 Mark) SS-WIG- 18, SS-WIG-19, SS-WIG-20, SS-WIG-20H, SS-WIG-21, SS- NEW SUB STATION 8-Jan-18 12:50 PM 9-Jan-18 9:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
WIG-22, SS-WG-03, SS-WG-04, SS- WIG-17, SS-WIG-02E @ New Sub
Station Building Area, JaAymah, Shops Plant N-26
Pre-Cast & Pre-Stressed Concrete Curing & Final Inspection of Hollow
Core Panels, (Panel Mark H1-701, H1- 701A, H1-702, H1-702C, H1-703,
1756 C-1384 H1-703A, H1-703B, H1-703C, H1-704, H1-705 (4 Nos), H1-707A, H1-708, INCO 8-Jan-18 12:50 PM 9-Jan-18 9:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
H1-708A, H1-709 (2 Nos), H1-710, H1-710H, H1- 711, H1-711H, H1-712,
H1-712A, H1-713 (2 Nos), H1-714, H1-715, H1-716, H1-717 (4 Nos) for
Admin Building at INCO Pre-Cast Fabrication Yard
Fill Placement & compaction inspection of 1st layer(final layer) selectfill
1757 C-1385 material for trench of electrical direct buried conduit pipe (20m ADMIN BUILDING 8-Jan-18 2:15 PM 9-Jan-18 10:00 AM RA-819460-002-00 ACIELO ISHFAQ AHMED Not in QMIS
southside) in Admin building area,Juaymah Shops N26

FDT, Compaction inspection of 1st layer(final layer) selectf ill material for
1758 C-1386 trench of electrical direct buried conduit pipe (20m southside) in Admin ADMIN BUILDING 8-Jan-18 2:20 PM 9-Jan-18 10:15 AM RA-819460-002-00 ACIELO ISHFAQ AHMED 2
building area,Juaymah Shops N26

Cement Based Non-S hrink Grout Surface Preparation for Shim Plate at
1759 C-1387 Booster Pump Station-2 ( Shade ) 04 Nos at S outh Side of New Car CAR PARKING 8-Jan-18 3:10 PM 9-Jan-18 2:15 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Parking Area @ ju'aymah shops plant N-26

Cement Based Non-S hrink Grout Mixing,Testing,Sampling & Placement for


1760 C-1388 Shim Plate at Booster Pump Station-2 ( Shade ) 04 Nos at South Side of CAR PARKING 8-Jan-18 3:15 PM 9-Jan-18 2:30 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
New Car Parking Area @ ju'aymah shops plant N-26

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


1761 C-1389 SS-WIG-02F, SS-WIG-23, SS-WIG-12H, SS-WIG13 at New Sub Station NEW SUB STATION 8-Jan-18 3:20 PM 9-Jan-18 10:00 AM 0016-ER-001-010 BAQAR MAMDOOH
Building Area ,JaAymah,shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (panel Mark) SS-WIG-


1762 C-1390 02F, SS-WIG-23, SS-WIG-12H, SS-WIG13 at New Sub Station Building NEW SUB STATION 8-Jan-18 3:25 PM 9-Jan-18 10:30 AM 0016-ER-001-010 SALMAAN MAMDOOH
Area ,JaAymah,shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (panel


1763 C-1391 Mark) SS-WIG- 02F, SS-WIG-23, SS- WIG-12H, SS-WIG13 at New Sub Station NEW SUB STATION 8-Jan-18 3:30 PM 9-Jan-18 11:00 AM 0016-ER-001-010 SALMAAN MAMDOOH
Building Area ,JaAymah,shops Plant N-26

Material Receiving,Handling Storage and Preservation Inspection of Fire


1764 C-1392 Rated Cmu Block Size 200 x 200 x 400 (QTY= 2592 Pcs) From Al Kifah PLANT N-26 8-Jan-18 3:35 PM 9-Jan-18 9:00 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Readymix and block Factory At ETE S tore,JuAymah,Shops Plant N-26

1765 E-0120 Visual Inspection of Direct Buried Cable Trench Before Cable Laying, At CAR PARKING 8-Jan-18 9:00 AM 9-Jan-18 9:00 AM RA-819936-001-00 NOLI ALI M. AL YASEEN
New Parking Area. As Per Highlighted Attached Drawing.

1766 E-0121 Visual Inspection of Direct Buried Cable Laying for Lighting, At New CAR PARKING 8-Jan-18 9:05 AM 9-Jan-18 2:30 PM RA-819936-001-00 NOLI ALI M. AL YASEEN
Parking Area.As Per Highlighted Attached Drawing.

Visual Inspection of Below Grade Cable Laying and Warning Marker


1767 E-0122 Installation Final Backfilling At New Parking Area. As Per Highlighted CAR PARKING 8-Jan-18 9:10 AM 9-Jan-18 3:00 PM RA-819936-001-00 NOLI ALI M. AL YASEEN
Attached Drawing.

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1768 P-0156 SCH-80 Pipes & Fittings like Reducer, Tee,Elbows 45⁰ & 90⁰ & PVC SCH-80 PLANT N-26 8-Jan-18 2:00 PM 9-Jan-18 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH Not in QMIS
Fittings lilke Solid Flanges, V.Stone F langes from NEPRO & IPEX @ ETE
store Juaymah Shop Plant N-26
Pre-Cast Concrete Pre Installation Inspection for Hollow Core Slab (Second
Floor) at Grid Line (10 to 12) and (A to F) @ Admin Building, Juaymah
Shops N-26 Panel Mark H1-326, H1-327, H1-328, H1-329, H1-329A, H1-
1769 C-1393 327A, H1-328, H1-320, H1-316A, H1-321, H1-321A, H1-318B, H1-513, H1- ADMIN BUILDING 9-Jan-18 10:00 AM 10-Jan-18 9:00 AM 0016-A-ER-001-001-4 ACIELO MAMDOOH Due to No Permit
Pre-cast & Pre-Stressed
514, H1-515, Pre Concreting
H1-515A, H1-513A, Inspection
H1-330, H1-330B,(Bed and Pre-stressing
H1-331, H1-330A, H1-
332,
of stands)
H1-332B,
of Hollow
H1-332A,
CoreH1-333,
Panels for
H1-334,
AdminH1-334B,
BuildingH1-334A,
@ INCO Pre-Cast
H1-335, H1-
703B, H1-703A,
Fabrication Yard H1-702B,
Panel Mark H1-702A,
(H1-303,H1-703D,
H1-303A,H1-701A
H1-304, H1-304A, H1-
304B, H1-305, H1-305A, H1-308, H1-308A, H1-308B, H1-309 (5 Nos), H1-
1770 C-1394 309A, H1-309B, H1-310, H1-310A, H1-310B (2 Nos), H1-311 (2 Nos), H1- INCO 9-Jan-18 2:00 PM 10-Jan-18 8:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
312, H1-312A,
Pre-cast H1-313, H1-313A,
& Pre-Stressed ConcreteH1-314,
Testing, H1-314A,
SamplingH1-315 (2 Nos), H1-
and Placement
315A, H1-315H,
Inspection H1- 316
of Hollow Core(2 Panels
Nos), H1-316A,
for AdminH1- 317, H1-318,
Building @ INCOH1318A,
Pre-CastH1-
318B, H1-319,
Fabrication YardH1-319A,
Panel MarkH1-320, H1-321,
(H1-303, H1-321A,
H1-303A, H1-322,
H1-304, H1-322A,
H1-304A, H1- H1-
323,
304B,H1-324,
H1-305,H1-324A,
H1-305A,H1-325,
H1-308,H1-332, H1-332A,
H1-308A, H1-308B,H1-332B,
H1-309H1-333,
(5 Nos), H1-
H1-
334, H1-334A,
309A, H1-309B,H1-334B,
H1-310, H1-335.
H1-310A, H1-310B (2 Nos), H1-311 (2 Nos), H1-
1771 C-1395 312, H1-312A, H1-313, H1-313A, H1-314, H1-314A, H1-315 (2 Nos), H1- INCO 9-Jan-18 2:05 PM 10-Jan-18 8:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
315A, H1-315H, H1- 316 (2 Nos), H1-316A, H1- 317, H1-318, H1318A, H1-
318B, H1-319, H1-319A, H1-320, H1-321, H1-321A, H1-322, H1-322A, H1-
323, H1-324,
Concrete H1-324A,
28 Days H1-325, Strength
Compressive H1-332, H1-332A, H1-332B,
Testing & Final H1-333, H1-
Acceptance
334, H1-334A,
Inspection H1-334B,
of 5000 PSi forH1-335.
Pre-Cast Panel Mark SS-WIG-20, SS-WIG-23, SS-
1772 C-1396 WG-05 & SS-WG-07 of New Sub Station Juaymah Shops Plant N-26 @ MAAZ LAB 9-Jan-18 3:00 PM 10-Jan-18 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
MAAZ LAB

Materials Receiving Visual Inspection of Duct Seal Compound (5 LBS.)


1773 E-0123 sealers (3 Packs), from AL-Falak Line, At ETEStore Ju'aymah Shops Plant PLANT N-26 9-Jan-18 9:00 AM 10-Jan-18 8:30 AM RA-819936-001-00 NOLI ALI M. AL YASEEN
N26.

Visual Inspection of LV Electrical Duck Bank Excavation Trenching Near


1774 E-0124 New Sub- Station Area, As per attached highlighted drawing. Area, As per NEW SUB STATION 9-Jan-18 9:05 AM 10-Jan-18 1:00 PM RA-819460-002-00 NOLI ALI M. AL YASEEN
attached highlighted drawing.

Visual Inspection of Fire Alarm System (FAS) Duck Bank Excavation


1775 E-FA-0125 Trenching Near New Sub- Station Area, As per attached highlighted NEW SUB STATION 9-Jan-18 9:10 AM 10-Jan-18 1:15 PM RA-819283-002-0F1 NOLI ALI M. AL YASEEN
drawing.

Visual Inspection of LV Electrical Duck Bank 6" Conduit Pipe & Spacer
1776 E-0126 Installation Near New Sub- StationArea, As per attached highlighted NEW SUB STATION 9-Jan-18 9:15 AM 10-Jan-18 1:30 PM RA-819460-002-00 NOLI ALI M. AL YASEEN
drawing.

Visual Inspection of Fire Alarm System (FAS) Duck Bank 4" PVC Conduit
1777 E-FA-0127 Pipe & Spacer Installation Near New Sub- Station Area, As per attached NEW SUB STATION 9-Jan-18 9:20 AM 10-Jan-18 1:45 PM RA-819283-002-0F1 NOLI ALI M. AL YASEEN
highlighted drawing.

Surface Preparation & Moisture Test Inspection for Pre-Cast Foundation


1778 C-1397 ( 04 Nos) for Booster Pump Station -2 after Placement of Grout ( lifting BOOSTER PUMP 9-Jan-18 4:15 PM 10-Jan-18 9:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Hook cutting area ) @ J u'Aymah, Shops Plant N- 26

Site & Grade Preparation Inspection Of Electrical Duct Bank for LV (20.0
1779 C-1398 LM ), PSA (17.0 LM) & F DAS (17.0 LM) at Inbetween MTB Building & NEW SUB STATION 9-Jan-18 4:20 PM 10-Jan-18 2:15 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
New Sub Station @ Ju'Aymah, Shops Plant N- 26 ( 819283-02 Rev- 0F1 )

FBE Rebar,Embedded Items Inspection Of Electrical Duct Bank for LV


1780 C-1399 (20.0 LM) and FDAS (17.00LM ) at Inbetween MTB Building & New Sub NEW SUB STATION 9-Jan-18 4:25 PM 10-Jan-18 3:30 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
Station @ Ju'Aymah, Shops Plant N- 26 ( 819283-02 Rev-0F1 )

Concrete Sampling,Testing & Placement Of Electrical Duct Bank for LV


1781 C-1400 (20.0 LM ), PSA (17.0 LM) & FDAS (17.0 LM) at Inbetween MTB Building NEW SUB STATION 9-Jan-18 4:30 PM 10-Jan-18 4:00 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
& New Sub Station @ Ju'Aymah, Shops Plant N- 26 ( 819283-02 Rev-0F1 )

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1782 C-1401 Material for Around Fire Wall Foundation ( 03 N0s ) at New Sub S tation @ NEW SUB STATION 9-Jan-18 4:35 PM 10-Jan-18 2:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material for
1783 C-1402 Around F ire Wall Foundation ( 03 N0s ) at New Sub Station @ Ju'Aymah, NEW SUB STATION 9-Jan-18 4:40 PM 10-Jan-18 3:30 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED 3
Shops Plant N- 26

FDT, Compaction Inspection of Existing Sub Grade for Raw Water &
1784 C-1403 Potable Water Pipe Trench ( 54 LM ) At S outh Side of New Car Parking CAR PARKING 9-Jan-18 4:45 PM 10-Jan-18 10:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 4
Area @ J u'Aymah, Shops Plant N- 26 (819439-01 Rev-0 )

Sand Placement Inspection For Raw Water & Potable Water Pipe Trench (
1785 C-1404 54 LM ) At South Side of New Car Parking Area @ Ju'Aymah, Shops Plant CAR PARKING 9-Jan-18 4:50 PM 10-Jan-18 11:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED Not in QMIS
N- 26 (819439-01 Rev-0 )

FDT, Compaction Inspection for Raw Water & Potable Water Pipe Trench (
1786 C-1405 54 LM ) At South Side of New Car Parking Area @ Ju'Aymah, Shops Plant CAR PARKING 9-Jan-18 4:55 PM 10-Jan-18 3:40 PM RA-819438-001-00 QUADRI ISHFAQ AHMED 4
N- 26 (819439-01 Rev-0 )

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 10 Nos Column at Grid Line (8') (A) C9, (8) (A)
1787 C-1406 C10, (8) (B) C2, (8) (D) C1, (8) (E) C1, (8) (F) C1, (8) (F ') C15, (5) (D) C1, (5) MAAZ LAB 10-Jan-18 8:15 AM 11-Jan-18 11:00 AM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
(E) C1 and (5) (F) C1 at Admin Building Area, Juaymah Shops N-26 @
MAAZ LAB

Pre-cast & Pre-Stressed Pre Concreting Inspection (Molding and


1788 C-1407 Formwork) of Double Tee Slab for Sub Station Building @ INCO Pre-Cast INCO 10-Jan-18 8:20 AM 11-Jan-18 8:30 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-02A (3 Nos.), Total 3 Nos.

Pre-cast & Pre-Stressed Pre Concreting Inspection of Rebar, Embedded


1789 C-1408 Items and Molding / Form Closure of Double Tee S lab for Sub Station INCO 10-Jan-18 8:25 AM 11-Jan-18 8:45 AM 0016-ER-002-9 SALMAAN MAMDOOH
Building @ INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-02A (3 Nos.),
Total 3 Nos.

Pre-cast & Pre-Stressed Concrete Testing, Sampling and Placement


1790 C-1409 Inspection of Double Tee Slab for Sub S tation Building @ INCO Pre-Cast INCO 10-Jan-18 8:30 AM 11-Jan-18 9:00 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-02A (3 Nos.), Total 3 Nos.
Pre-Cast & Pre-Stressed Concrete Curing & Final Inspection of Hollow
Core Panels for Admin Building @ INCO Pre-Cast Fabrication Yard (Panel
1791 C-1410 Mark H1-702A, H1-702B, H1-706 (2 Nos.), H1-707, H1-717 (5 Nos.) ,H1- INCO 10-Jan-18 1:05 PM 11-Jan-18 9:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
717A, H1-718, H1-718H, H1-719 (2 Nos.), H1-720 (3 Nos.), H1-720H (2
Nos.), H1-720AH, H1-720A, H1-721, H1-722 (2 Nos.), H1-723, H1-724, H1-
725
Coating and Final Inspection of APS-3 Carboline for Pre-Cast Foundation
1792 C-1411 after Cutting lifting hook area for Booster Pump Station -2 (Shade ) total BOOSTER PUMP 10-Jan-18 1:45 PM 11-Jan-18 8:00 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
04 Nos at South Side of New Car Parking Area @ Ju'Aymah, Shops Plant
N- 26

FDT, Compaction Inspection of Existing Sub Grade for Potable & Raw
1793 C-1412 Water Trench ( 13 LM ) At South West Corner of New Car Parking Area @ CAR PARKING 10-Jan-18 1:50 PM 11-Jan-18 9:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 1
Ju'Aymah, Shops Plant N- 26 (819439-01 Rev-0 )

Sand Placement Inspection For Raw Water & Potable Water Pipe Trench
1794 C-1413 ( 13 LM ) At South West Corner of New Car Parking Area @ Ju'Aymah, CAR PARKING 10-Jan-18 1:55 PM 11-Jan-18 10:00 AM RA-819438-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Shops Plant N- 26 (819439-01 Rev-0 )
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FDT, Compaction Inspection of Sand Bedding for Potable & Raw Water
1795 C-1414 Trench ( 13 LM ) At South West Corner of New Car Parking Area @ CAR PARKING 10-Jan-18 2:00 PM 11-Jan-18 10:30 AM RA-819438-001-00 QUADRI ISHFAQ AHMED 1
Ju'Aymah, Shops Plant N- 26 (819439-01 Rev-0 )

FDT, Compaction Inspection of Existing Sub Grade for MV & PSA Duct
1796 C-1415 Bank ( 15 LM ) at In Between New Work Shop & Paint Shop @ Ju'Aymah, WORK SHOP 10-Jan-18 2:05 PM 11-Jan-18 9:30 AM RA-819460-001-0F1 QUADRI ISHFAQ AHMED 3
Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Select Fill
1797 C-1416 Material for Around Pre-Cast Foundation for Booster Pump Station -2 BOOSTER PUMP 10-Jan-18 2:10 PM 11-Jan-18 9:45 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED Not in QMIS
(Shade ) total 04 Nos @ Ju'Ay mah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 3rd Layer Select Fill Material for
1798 C-1417 Around Pre-Cast Foundation for Booster Pump Station -2 (Shade ) total BOOSTER PUMP 10-Jan-18 2:15 PM 11-Jan-18 10:15 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
04 Nos @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
1799 C-1418 Material for Around Pre-Cast Foundation for Booster Pump Station -2 BOOSTER PUMP 10-Jan-18 2:20 PM 11-Jan-18 11:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED Not in QMIS
(Shade ) total 04 Nos @ Ju'Ay mah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material for
1800 C-1419 Around Pre-Cast Foundation for Booster Pump Station -2 (Shade ) total BOOSTER PUMP 10-Jan-18 2:25 PM 11-Jan-18 1:00 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED 4
04 Nos @ Ju'Aymah, Shops Plant N- 26

Cement Based Non-S hrink Grout Surface Preparation for Shim Plate at
1801 C-1420 Booster Pump Station-1( Shade ) 04 Nos @ ju'aymah shops plant N-26 BOOSTER PUMP 10-Jan-18 2:30 PM 11-Jan-18 2:15 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED

Cement Based Non-S hrink Grout Mixing & Placement for Shim Plates at
1802 C-1421 Booster Pump Station-1 ( Shaded ) @ ju'aymah shops plant N-26 BOOSTER PUMP 10-Jan-18 2:35 PM 11-Jan-18 2:30 PM RA-819400-001-0F2 QUADRI ISHFAQ AHMED

FDT, Compaction Inspection of Existing Sub Grade for Potable & Raw
1803 C-1422 Water Trench ( 150 LM ) at West Side 0f Booster Pump Station -2 @ BOOSTER PUMP 10-Jan-18 2:40 PM 11-Jan-18 3:30 PM RA-819438-001-00 QUADRI ISHFAQ AHMED 10
Ju'Aymah, Shops Plant N- 26 (819439-01 Rev-0 )

Material Receiving, Handling Storage and Preservation Inspection of Fire


1804 C-1423 Rated CMU Block Size 200 x 200 x 400 MM (QTY=1296 Pcs) From Al Kifah PLANT N-26 10-Jan-18 2:45 PM 11-Jan-18 9:00 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Ready-mix and block factory at ETE Store Laydown Area @ Juaymah Shops
Plant N-26

Materials Receiving Visual Inspection of Electrical Bulk Materials Yellow


1805 E-0128 Warning Tape 500mm X 305 MTRS 10 Rolls. For Direct Buried Cable, At PLANT N-26 10-Jan-18 2:50 PM 11-Jan-18 8:30 AM RA-819936-001-00 NOLI ALI M. AL YASEEN Not in QMIS
ETE Store Ju'aymah Shops Plant N26. As per attached document.

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable


1806 E-0129 120mm2 to Copper Ground Rod 16mm X 2.4 mtrs. At New Car Parking CAR PARKING 10-Jan-18 2:55 PM 11-Jan-18 10:00 AM RA-819936-001-00 NOLI SYED SHAFIULLAH
Area, As per Attached highlighted Drawing,

CPVC Pipes, Fittings Installation and Inspection of 2" Diameter for Potable
1807 P-0157 Water line about 54 LM South side of New Parking Area Towards Booster BOOSTER PUMP 10-Jan-18 3:00 PM 11-Jan-18 7:30 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 [East Side] at Juaymah Shops Project Plant N-26

CPVC Pipes, Fittings Installation and Inspection of 3" Diameter for Raw
1808 P-0158 Water line about 54 LM South side of New Parking Area Towards Booster BOOSTER PUMP 10-Jan-18 15:005 11-Jan-18 8:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 [East Side] at Juaymah Shops Project Plant N-26

CPVC Pipes, Fittings Installation and Inspection of 2" Diameter for Potable
1809 P-0159 Water line about 13 LM South side of New Parking Area Towards Booster BOOSTER PUMP 10-Jan-18 3:10 PM 11-Jan-18 3:00 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 [East Side] at Juaymah Shops Project Plant N-26

CPVC Pipes, Fittings Installation and Inspection of 3" Diameter for Raw
1810 P-0160 Water line about 13 LM South side of New Parking Area Towards Booster BOOSTER PUMP 10-Jan-18 3:15 PM 11-Jan-18 3:30 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 [East Side] at Juaymah Shops Project Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1811 C-1424 Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-12, SS-WIG-20H, MAAZ LAB 11-Jan-18 9:20 AM 13-Jan-18 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
SS-WG-08, SS-WG-09 of New Sub S tation Juaymah Shops Plant N-26 @
MAAZ LAB

Fill Placement & Compaction Inspection of 7th Layer (Final Layer) Selectfill
1812 C-1425 Material at Grid Line (10-11) (A-B'), (10-12) (B'-C), (10-11) (C-E) & (11'-12) ADMIN BUILDING 11-Jan-18 10:45 AM 13-Jan-18 8:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
(E-F) (Including Thickening Area) in Admin Building Area, Juaymah Shops
N-26

FDT Compaction Inspection of 7th Layer (F inal Layer) Selectfill Material at


1813 C-1426 Grid Line (10-11) (A-B'), (10-12) (B'-C), (10-11) (C- E) & (11'-12) (E-F) ADMIN BUILDING 11-Jan-18 10:50 AM 13-Jan-18 8:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 7
(Including Thickening Area) in Admin Building Area, Juaymah Shops N-26

Curing Inspection for 4 Nos Column (upper roof) at Grid Line (A') (6) C12,
1814 C-1427 (A') (7) C12, (A) (6) C11 and (A) (7) C11 at Admin Bldg Area,Juaymah ADMIN BUILDING 11-Jan-18 10:55 AM 13-Jan-18 7:00 AM RA-819728-001-0F1 ACIELO ISHFAQ AHMED
Shops N-26

Preparation, Mixing and Application Inspection of Anti Termite for Slab on


1815 C-1428 Grade at Grid Line (10-11) (C- E) & (11'-12) (E-F) at Admin Bldg.Juaymah ADMIN BUILDING 11-Jan-18 11:00 AM 13-Jan-18 8:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Shops N-26

1816 C-1429 Site & Grade Preparation Inspection of Anti Termite for Slab on Grade at ADMIN BUILDING 11-Jan-18 11:05 AM 13-Jan-18 1:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Grid Line (10-11) (C-E) & (11'-12) (E-F) at Admin Bldg.Juaymah Shops N-26

1817 C-1430 Formwork Inspection of Anti Termite for Slab on Grade at Grid Line (10- ADMIN BUILDING 11-Jan-18 11:10 AM 13-Jan-18 1:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
11) (C-E) & (11'-12) (E-F) at Admin Bldg.Juay mah Shops N-26

FBE Reinforcing Steel, Embedded Items & Formclosure Inspection of Anti


1818 C-1431 Termite for Slab on Grade at Grid Line (10-11) (C-E) & (11'-12) (E-F) at ADMIN BUILDING 11-Jan-18 11:15 AM 13-Jan-18 1:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Admin Bldg.Juaymah Shops N-26

1819 C-1432 Sampling,Testing & Placement of concrete inspection for Slab on Grade at ADMIN BUILDING 11-Jan-18 11:20 AM 13-Jan-18 2:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Grid Line (10-11) (C-E) & (11'-12) (E-F) at Admin Bldg.Juaymah Shops N-26

Pre-Test Punch Listing for HT Package UJS-BP1-PW-001-00 (Potable Water)


1820 P-0161 about 67 LM South Side of New Parking Area Towards Booster Pump-01 BOOSTER PUMP 11-Jan-18 11:25 AM 13-Jan-18 8:30 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ Ju'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-BP1-PW-001-00 (Potable


1821 P-0162 Water) about 67 LM South Side of New Parking Area Towards Booster BOOSTER PUMP 11-Jan-18 11:30 AM 13-Jan-18 9:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 Area @ Ju'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-BP1-RW-001-00 (Raw Water)


1822 P-0163 about 67 LM South Side of New Parking Area Towards Booster Pump-01 BOOSTER PUMP 11-Jan-18 11:35 AM 13-Jan-18 9:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area @ Ju'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-BP1-RW-001-00 (Raw


1823 P-0164 Water) about 67 LM South Side of New Parking Area Towards Booster BOOSTER PUMP 11-Jan-18 11:40 AM 13-Jan-18 12:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 Area @ Ju'aymah Shop Plant N-26

FDT, Compaction Inspection of Existing Sub Grade for LV Direct Burried


1824 C-1433 Cable Conduits Trench ( 7.3 LM ) at In Between Sub Station and chemcical NEW SUB STATION 11-Jan-18 2:00 PM 13-Jan-18 2:00 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED 1
storage Area @ Ju'Aymah, Shops Plant N- 26

Site & Grade Preparation Inspection Of MV & PSA (foc) Duct Bank No (10
1825 C-1434 & 11) MV (10.5 LM), MV (10 LM ) FOC ( 14.8 LM ) In between New Work WORK SHOP 11-Jan-18 2:05 PM 13-Jan-18 2:30 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
Shop Area and Paint Shop @ Ju'Aymah, Shops Plant N- 26

FBE Rebar,Embedded Items Inspection of MV & PSA (foc) Duct Bank No


1826 C-1435 (10 & 11) MV (10.5 LM), MV (10 LM ) In between New Work S hop and WORK SHOP 11-Jan-18 2:10 PM 13-Jan-18 2:45 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
Paint Shop @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of MV & PSA (foc)


1827 C-1436 Duct Bank No (10 & 11) MV (10.5 LM), MV (10 LM ) FOC ( 14.8 LM ) In WORK SHOP 11-Jan-18 2:15 PM 13-Jan-18 3:00 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
between New Work Shop Area and Paint S hop @ Ju'Aymah, Shops Plant
N- 26

Visual Inspection of Compaction of (After Remove tempory Backfilling


1828 C-1437 Subjected To Close NCR No 10) at Grid Line 4(D) New Car Parking Area @ CAR PARKING 11-Jan-18 2:20 PM 13-Jan-18 9:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1829 C-1438 Material Around Foundation At Grid Line 4 (D) New Car Parking Area @ CAR PARKING 11-Jan-18 2:25 PM 13-Jan-18 10:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material


1830 C-1439 Around Foundation At Grid Line 4 (D) New Car Parking Area @ Ju'Aymah, CAR PARKING 11-Jan-18 2:30 PM 13-Jan-18 10:30 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 1
Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1831 C-1440 Material Around Foundation At Grid Line 4 (D) New Car Parking Area @ CAR PARKING 11-Jan-18 2:35 PM 13-Jan-18 11:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material


1832 C-1441 Around Foundation At Grid Line 4 (D) New Car Parking Area @ Ju'Aymah, CAR PARKING 11-Jan-18 2:40 PM 13-Jan-18 11:45 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 1
Shops Plant N- 26

Sand Placement Inspection For Raw Water & Potable Water Pipe Trench
1833 C-1442 ( 150 LM ) at West Side 0f Booster Pump S tation -2 @ Ju'Aymah, Shops WORK SHOP 11-Jan-18 2:45 PM 13-Jan-18 3:00 PM RA-819438-001-00 QUADRI ISHFAQ AHMED Not in QMIS
Plant N- 26 (819439-01 Rev-0 )

FDT Compaction Inspection For Raw Water & Potable Water Pipe Trench
1834 C-1443 ( 150 LM ) at West Side 0f Booster Pump S tation -2 @ Ju'Aymah, Shops BOOSTER PUMP 11-Jan-18 2:50 PM 13-Jan-18 4:00 PM RA-819438-001-00 QUADRI ISHFAQ AHMED 10
Plant N- 26 (819439-01 Rev-0 )

Visual Inspection of MV Electrical Duck Bank Excavation Trenching


1835 E-0130 Between Paintshop & New Workshop Area. As per highlighted Attached WORK SHOP 11-Jan-18 2:55 PM 13-Jan-18 1:15 PM RA-819460-002-0F1 NOLI DAMIAN ABAA
Drawing.

Visual Inspection of MV Electrical Duck Bank , conduit Pipe & spacers


1836 E-0131 Installation , and Embedded Hardware Prior to Concrete Placement, WORK SHOP 11-Jan-18 3:00 PM 13-Jan-18 1:30 PM RA-819460-002-0F1 NOLI DAMIAN ABAA
Between Paintshop & New Workshop Area. As per highlighted Attached
Drawing.

Visual Inspection of FOC Duct Bank Trench length 14.8 metres and width
1837 T-0034 600 mm Prior to Concrete Placement, Between Paintshop & New WORK SHOP 11-Jan-18 3:05 PM 13-Jan-18 11:00 AM RA-819460-002-0F1 AFZAL M. Z. NAVEED
Workshop Area. As per highlighted For the following location/equipment

Visual Inspection of PVC 3x4" conduits for FOC Duct Bank, length is 14.8
1838 T-0035 metres and width 600 mm between Paint shop and New work shop area. WORK SHOP 11-Jan-18 3:10 PM 13-Jan-18 11:30 AM RA-819460-002-0F1 AFZAL M. Z. NAVEED
@ Upgraded Ju'aymah Shops Plant N-26.

Materials Receiving Visual Inspection for EMT Conduit &Fittings


Accessories, EMT Compression Coupling 3/4" (150 EA),EMT
1839 E-0132 COMPRESSION CONNECTOR 3/4" (500 EA.), LOCK NUT 3/4" (1000 EA) PLANT N-26 13-Jan-18 8:30 AM 14-Jan-18 8:30 AM RA-819500-001-0F1 NOLI ALI M. AL YASEEN
from Tabalsa Arabia, At ETE Store J u'aymah Shop Plant N26. As per
attached highlighted Document.
Pre-cast & Pre-Stressed Pre Concreting Inspection (Molding and
1840 C-1444 Formwork) of Double Tee Slab for Sub Station Building @ INCO Pre-Cast INCO 13-Jan-18 8:35 AM 14-Jan-18 8:30 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-02B, SS-DT-03 and SS-DT-04, Total 3
Nos.

Pre-cast & Pre-Stressed Pre Concreting Inspection of Rebar, Embedded


1841 C-1445 Items and Molding / Form Closure of Double Tee S lab for Sub Station INCO 13-Jan-18 8:40 AM 14-Jan-18 8:45 AM 0016-ER-002-9 SALMAAN MAMDOOH
Building @ INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-02B, SS-DT-
03 and SS-DT-04, Total 3 Nos.

Pre-cast & Pre-Stressed Concrete Testing, Sampling and Placement


1842 C-1446 Inspection of Double Tee Slab for Sub S tation Building @ INCO Pre-Cast INCO 13-Jan-18 8:45 AM 14-Jan-18 9:00 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-02B, SS-DT-03 and SS-DT-04, Total 3
Nos.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1843 C-1447 Inspection of 4000 PSi for Exit S taircase (2nd Floor) at Grid Line (C-E) (11- MAAZ LAB 13-Jan-18 8:50 AM 14-Jan-18 11:00 AM RA-819726-001-0F2 SALMAAN ISHFAQ AHMED
12) (1st Lift) at Admin Building Juaymah Shops N-26 @ MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1844 C-1448 Inspection of 4000 PSi for 9 Nos Column at Grid Line (7) (A') C12, (7) (A) MAAZ LAB 13-Jan-18 8:55 AM 14-Jan-18 11:15 AM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
C11, (6) (A') C12, (6) (A) C11, (5) (A) C10, (5) (B) C2, (5) (C) C1, (8) (C) C1
and (5) (F') C15 at Admin Building Juaymah Shops N-26 @ MAAZ LAB

Pre-Cast Alignment Inspection for all Panels for New Sub-S tation Building
1845 C-1449 (Layout Mark 0016-ER-004, 0016-ER-003, 0016-ER-002, 0016-ER-001) @ NEW SUB STATION 13-Jan-18 9:00 AM 14-Jan-18 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
New Sub-Station Building Juaymah Shops N-26

Preparation, Mixing and Application Inspection of Anti Termite for Slab on


1846 C-1450 Grade at Grid Line (10-11) (B-C) & (10'-11) (A-B) at Admin Building ADMIN BUILDING 13-Jan-18 10:00 AM 14-Jan-18 7:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

1847 C-1451 Site & Grade Preparation Inspection for Slab on Grade at Grid Line (10-11) ADMIN BUILDING 13-Jan-18 10:05 AM 14-Jan-18 9:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
(B-C) & (10'-11) (A-B) at Admin Building Juaymah Shops N-26

1848 C-1452 Formwork Inspection for S lab on Grade at Grid Line (10-11) (B-C) & (10'- ADMIN BUILDING 13-Jan-18 10:10 AM 14-Jan-18 9:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
11) (A-B) at Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded Items & Formclosure Inspection for Slab
1849 C-1453 on Grade at Grid Line (10-11) (B-C) & (10'-11) (A-B) at Admin Building ADMIN BUILDING 13-Jan-18 10:15 AM 14-Jan-18 9:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

Sampling,Testing & Placement of Concrete Inspection for Slab on Grade at


1850 C-1454 Grid Line (10-11) (B-C) & (10'-11) (A-B) at Admin Building Juaymah Shops ADMIN BUILDING 13-Jan-18 10:20 AM 14-Jan-18 10:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
N-26

Verification of Testing Equipment for HT Package UJS-BP1-PW-001-00


1851 P-0165 (Potable Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:05 PM 14-Jan-18 7:15 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

Verification of Test Preparation for HT Package UJS-BP1-PW-001-00


1852 P-0166 (Potable Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:10 PM 14-Jan-18 7:30 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-BP1-PW-001-00 (Potable


1853 P-0167 Water) about 67 LM South Side of New Parking Area Towards Booster BOOSTER PUMP 13-Jan-18 1:15 PM 14-Jan-18 7:45 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 Area @ Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-BP1-PW-001-00


1854 P-0168 (Potable Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:20 PM 14-Jan-18 8:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJS-BP1- PW-001-00


1855 P-0169 (Potable Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:25 PM 14-Jan-18 12:10 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-BP1-RW-001-00


1856 P-0170 (Raw Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:30 PM 14-Jan-18 12:20 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

Verification of Test Preparation for HT Package UJS-BP1-RW-001-00 (Raw


1857 P-0171 Water) about 67 LM South Side of New Parking Area Towards Booster BOOSTER PUMP 13-Jan-18 1:35 PM 14-Jan-18 12:30 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Pump-01 Area @ Ju'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-BP1-RW-001-00 (Raw Water)


1858 P-0172 about 67 LM South Side of New Parking Area Towards Booster Pump-01 BOOSTER PUMP 13-Jan-18 1:40 PM 14-Jan-18 12:45 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area @ Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-BP1-RW-001-00


1859 P-0173 (Raw Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:45 PM 14-Jan-18 1:00 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJS-BP1- RW-001-00


1860 P-0174 (Raw Water) about 67 LM South Side of New Parking Area Towards BOOSTER PUMP 13-Jan-18 1:50 PM 14-Jan-18 5:15 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Booster Pump-01 Area @ Ju'aymah Shop Plant N-26

Visual Inspection of Excavation Trenching for 6" LV Direct Buried PVC


1861 E-0133 Conduit Pipes, Between New Sub-Station and Storage Area. As per NEW SUB STATION 13-Jan-18 3:35 PM 14-Jan-18 10:00 AM RA-819460-002-0F1 NOLI DAMIAN ABAA Not in QMIS
Attached highlighted drawing.

Visual Inspection of 6" Direct Buried PVC Conduit Pipes Installation for LV
1862 E-0134 Power Cable, Between New Sub-Station and Storage Area. As per NEW SUB STATION 13-Jan-18 3:40 PM 14-Jan-18 10:30 AM RA-819460-002-0F1 NOLI DAMIAN ABAA
Attached highlighted drawing.

Visual Inspection of Sand Bedding Red Tiles, and Underground Cable


1863 E-0135 Warning Tape Installation for Final Backfilling of 6" LV Electrical PVC NEW SUB STATION 13-Jan-18 3:45 PM 14-Jan-18 4:30 PM RA-819460-002-0F1 NOLI DAMIAN ABAA Not in QMIS
Conduit Pipe, Between New Sub- Station and Storage Area. As per
highlighted Attached Drawing.

Cement Based Non-S hrink Grout Surface Preparation for Pre-Cast


1864 C-1455 Foundation after Cutting Lifting Hook Grid Line 4(D) New Car Parking Area CAR PARKING 13-Jan-18 4:00 PM 14-Jan-18 9:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
@ J u'Aymah, Shops Plant N- 26

Cement Based Non-S hrink Grout Mixing,Testing,Sampling & Placement of


1865 C-1456 Pre-Cast Foundation after cutting Lifting HookGrid Line 4(D) New Car CAR PARKING 13-Jan-18 4:05 PM 14-Jan-18 10:00 AM RA-819945-001-0F1 QUADRI ISHFAQ AHMED
Parking Area @ Ju'Aymah, S hops Plant N- 26

Curing inspection for Exit Staircase (2nd flr)(2nd lift) at gridline (B-C)(1-
1866 C-1457 2),roof beams at gridline (1-4)(A-F)(RB1,RB1A,RB3) & slab of elevator ADMIN BUILDING 14-Jan-18 8:00 AM 15-Jan-18 7:00 AM RA-819726-001-0F2 ACIELO ISHFAQ AHMED
machine room and elevator shear wall (3rd lift) (from elev. 4.2m to elev.
8.4m) at Admin Building,J uaymah Shops N26

Pre-Cast Pre Concreting Inspection (Molding / Formworks) for Admin


1867 C-1458 Building (Panel Mark CG-A-01, CG-A-06, CG-A-09, CIG-A-10 and CIG-A-06) INCO 14-Jan-18 2:30 PM 15-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
at INCO Pre-Cast Fabrication Yard

Pre-Cast Pre Concreting Inspection (Rebars, Embedded Items &


1868 C-1459 Molding / Formwork Closure) for Admin Building (Panel Mark CG-A-01, INCO 14-Jan-18 2:35 PM 15-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
CG-A-06, CG-A-09, CIG-A-10 and CIG-A-06) at INCO Pre-Cast Fabrication
Yard

Pre-Cast Concrete Testing, Sampling and Placement Inspection of 1st


1869 C-1460 Layer for Admin Building (Panel Mark CG-A-01, CG-A-06, CG-A-09, CIG-A- INCO 14-Jan-18 2:40 PM 15-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
10 and CIG-A-06) at INCO Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing, Sampling and Placement Inspection of 2nd


1870 C-1461 Layer for Admin Building (Panel Mark CG-A-01, CG-A-06, CG-A-09, CIG-A- INCO 14-Jan-18 2:45 PM 15-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
10 and CIG-A-06)
Pre-Cast at INCO
& Pre-Stressed Pre-CastCuring
Concrete Fabrication Yard
& Final Inspection of Hollow
Core Panels, (Panel Mark H1-503, H1- 504, H1-505 (2 Nos), H1-505A, H1-
506, H1-506A, H1-506H, H1-507 (2 Nos), H1-508, H1-509 (2 NosH1-510
(2NOS),H1-510H (2NOS), H1-511(3NOS),H1-512,H1-513,H1- 513A, H1-
1871 C-1462 514, H1-515, H1-515A, H1-516 (4 Nos), H1- 517, H1-517H, H1-518, H1- INCO 14-Jan-18 2:50 PM 15-Jan-18 9:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
519, H1-520, H1-522, H1-523, H1-524, H1-525, H1- 526, H1-527, H1-528,
H1-529, H1-530, H1-531, H1-532, H1-533, H1-534, H1-535, H1-536, H1-
537, H1-538, H1-539 for Admin Building at INCO Pre-Cast Fabrication
Yard.
Pre-Cast & Pre-Stressed Concrete Curing & Final Inspection of Double Tee
1872 C-1463 Slab for Sub Station Building @ INCO Pre-Cast Fabrication Yard Panel Mark INCO 14-Jan-18 2:55 PM 15-Jan-18 9:30 AM 0016-ER-002-001-9 SALMAAN MAMDOOH
SS-DT-01A and SS-DT-02A (2 Nos.),
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for Pre-Cast Panel Mark SS-WIG-02F, SS-WIG-15
1873 C-1464 and SS-WIG-22 of New Sub Station Juaymah Shops Plant N-26 @ MAAZ MAAZ LAB 14-Jan-18 3:00 PM 15-Jan-18 11:00 AM 0016-ER-001-10 SALMAAN MAMDOOH
LAB

Bolt tightening inspection for shipping and receiving shed @ Shipping and
Receiving Area, Juaymah Shops, Plant N26. SHIPPING & RECEIVING
1874 ST-0020-A Exceptions: . AREA 8-Jan-18 8:00 AM 9-Jan-18 7:30 AM RA-819990-001-0F1 OMAR M. HASSAN

Pre-Installation verification testing of calibration wrench for Shipping and SHIPPING & RECEIVING
1875 ST-0021 receiving shed @ S hipping and Receiving Area, Juaymah Shops, Plant N26. AREA 8-Jan-18 8:05 AM 9-Jan-18 7:00 AM RA-819990-001-0F1 OMAR M. HASSAN

Inspection for LBE# 290 bolt tightening for gridline A(3,4) 2nd and 3rd SHIPPING & RECEIVING
1876 ST-0022 joints @ Shipping and Receiving Area, Juaymah Shops, Plant N26. AREA 8-Jan-18 8:10 AM 9-Jan-18 7:20 AM RA-819990-001-0F1 OMAR M. HASSAN

Inspection of Support Foundation Prior to Structural Installation for


1877 ST-0023 Booster Pump Shed 1 @ S outh Side of Car Parking Area, Juaymah Shops, CAR PARKING 13-Jan-18 8:00 AM 14-Jan-18 7:00 AM RA-820020-001-00 OMAR M. HASSAN
Plant N26.

Inspection of support foundation prior to installation for Bosster Pump


1878 ST-0024 Shed 2 @ Near Workshop Area, Juaymah Shops, Plant N26. CAR PARKING 13-Jan-18 8:05 AM 14-Jan-18 7:20 AM RA-820020-001-00 OMAR M. HASSAN

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
1879 C-1465 Material of LV Direct Burried Cable Conduit Trench At In-Between New NEW SUB STATION 14-Jan-18 2:05 PM 15-Jan-18 11:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station & Chemical Storage Area @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material of


1880 C-1466 LV Direct Burried Cable Conduit Trench At In-Between New Sub S tation & NEW SUB STATION 14-Jan-18 2:10 PM 15-Jan-18 11:30 AM RA-819460-002-0F2 QUADRI ISHFAQ AHMED 1
Chemical Storage Area @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd Layer Select Fill
1881 C-1467 Material of LV Direct Burried Cable Conduit Trench At In-Between New NEW SUB STATION 14-Jan-18 2:15 PM 15-Jan-18 2:45 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station & Chemical Storage Area @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 2nd Layer Select Fill Material of


1882 C-1468 LV Direct Burried Cable Conduit Trench At In-Between New Sub S tation & NEW SUB STATION 14-Jan-18 2:20 PM 15-Jan-18 3:30 PM RA-819460-002-0F2 QUADRI ISHFAQ AHMED 1
Chemical Storage Area @ Ju'Aymah, Shops Plant N- 26

1883 C-1469 Curing Inspection of Grout for Anchor Bolts ( 14 Nos ) At Shipping SHIPPING & RECEIVING 14-Jan-18 2:25 PM 15-Jan-18 9:00 AM RA-819990-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Receiving Area @ Ju'Aymah, Shops Plant N- 26 AREA

FDT, Compaction Inspection of Existing Sub Grade for Telecoml Duct Bank
1884 C-1470 (24 LM ) at West Side of New Substation Area @ Ju'Aymah, Shops Plant NEW SUB STATION 14-Jan-18 2:30 PM 15-Jan-18 3:15 PM RA-819517-001-0F2 QUADRI ISHFAQ AHMED 2
N- 26

1885 C-1471 FDT, Compaction Inspection of Sub-Base of New Car Parking Area @ CAR PARKING 14-Jan-18 2:35 PM 15-Jan-18 3:00 PM RA-819945-001-0F1 QUADRI ISHFAQ AHMED 18
Ju'Aymah, Shops Plant N- 26

Inspection of Alignment of columns, beams and rafters during erection for


1886 ST-0025 Booster Pump Shed 1, @ South side of New Car Parking, Juaymah Shops, BOOSTER PUMP 14-Jan-18 2:40 PM 15-Jan-18 9:30 AM RA-820020-001-00 OMAR M. HASSAN
Plant N26.

CPVC Pipes, Fittings Installation and Inspection of 2" Diameter for Potable
1887 P-0175 Water line about 150 LM from Booster Pump-02 Towards Work Shop BOOSTER PUMP 14-Jan-18 2:45 PM 15-Jan-18 8:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Building Area at Juaymah Shops Project Plant N-26

CPVC Pipes, Fittings Installation and Inspection of 3" Diameter for Raw
1888 P-0176 Water line about 150 LM from Booster Pump-02 Towards Work Shop BOOSTER PUMP 14-Jan-18 2:50 PM 15-Jan-18 8:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Building Area at Juaymah Shops Project Plant N-26

Pre-Test Punch Listing for HT Package UJS-BP2-PW-001-00 (Potable Water)


1889 P-0177 about 150 LM from Booster Pump-02 towards Work Shop Building Area BOOSTER PUMP 15-Jan-18 11:00 AM 16-Jan-18 7:15 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-BP2-PW-001-00 (Potable


1890 P-0178 Water) about 150 LM from Booster Pump-02 towards Work Shop Building BOOSTER PUMP 15-Jan-18 11:05 AM 16-Jan-18 7:30 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-BP2-PW-001-00


1891 P-0179 (Potable Water) about 150 LM from Booster Pump-02 towards Work Shop BOOSTER PUMP 15-Jan-18 11:10 AM 16-Jan-18 7:45 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Building Area @ Ju'aymah Shop Plant N-26

Verification of Test Preparation or HT Package UJS-BP2-PW-001-00


1892 P-0180 (Potable Water) about 150 LM from Booster Pump-02 towards Work Shop BOOSTER PUMP 15-Jan-18 11:15 AM 16-Jan-18 8:00 AM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Building Area @ Ju'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-BP2-RW-001-00 (Raw Water)


1893 P-0181 about 150 LM from Booster Pump-02 towards Work Shop Building Area BOOSTER PUMP 15-Jan-18 11:20 AM 16-Jan-18 8:15 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

Internal Cleaning / Flushing for HT Package UJS-BP2-RW-001-00 (Raw


1894 P-0182 Water) about 150 LM from Booster Pump-02 towards Work Shop Building BOOSTER PUMP 15-Jan-18 11:25 AM 16-Jan-18 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area @ Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-BP2-RW-001-00


1895 P-0183 (Raw Water) about 150 LM from Booster Pump-02 towards Work Shop BOOSTER PUMP 15-Jan-18 11:30 AM 16-Jan-18 8:45 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Building Area @ Ju'aymah Shop Plant N-26

Verification of Test Preparation for HT Package UJS-BP2-RW-001-00 (Raw


1896 P-0184 Water) about 150 LM from Booster Pump-02 towards Work Shop Building BOOSTER PUMP 15-Jan-18 11:35 AM 16-Jan-18 9:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Area @ Ju'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-BP2-PW-001-00 (Potable


1897 P-0185 Water) about 150 LM from Booster Pump-02 towards Work Shop Building BOOSTER PUMP 15-Jan-18 11:40 AM 16-Jan-18 12:30 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-BP2-PW-001-00


1898 P-0186 (Potable Water) about 150 LM from Booster Pump-02 towards Work BOOSTER PUMP 15-Jan-18 11:45 AM 16-Jan-18 1:00 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Shop Building Area @ Ju'aymah Shop Plant N- 26

De- Pressurization & Water Disposal for HT Package UJ S-BP2-PW-001-00


1899 P-0187 (Potable Water) about 150 LM from Booster Pump-02 towards Work BOOSTER PUMP 15-Jan-18 11:50 AM 16-Jan-18 3:15 PM RA-819439-001-00 FAHEEM SYED SHAFIULLAH
Shop Building Area @ Ju'aymah Shop Plant N- 26

Fill placement & compaction inspection of 7th layer(final layer) selectfill


1900 C-1472 material at gridline (8-10) (A-B) (including thickening area) in Admin ADMIN BUILDING 15-Jan-18 10:00 AM 16-Jan-18 8:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
building area,Juaymah Shops N26

FDT compaction inspection of 7th layer(final layer) selectfill material at


1901 C-1473 gridline (8-10) (A-B) (including thickening area) in Admin building ADMIN BUILDING 15-Jan-18 10:05 AM 16-Jan-18 8:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 2
area,Juaymah Shops N26

Preparation,Mixing and Application inspection of Anti Termite for Slab on


1902 C-1474 Grade at gridline (11-12)(B-C) & (8-10)(A-B) at Admin Bldg.Juaymah Shops ADMIN BUILDING 15-Jan-18 10:10 AM 16-Jan-18 8:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
N-26

1903 C-1475 Fill placement & compaction inspection of 4th layer selectfill material at ADMIN BUILDING 15-Jan-18 10:15 AM 16-Jan-18 8:45 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
gridline (9-11)(E-F) in Admin building area,Juaymah Shops N26

1904 C-1476 FDT compaction inspection of 4th layer selectfill material at gridline (9-11) ADMIN BUILDING 15-Jan-18 10:20 AM 16-Jan-18 9:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 2
(E-F) in Admin building area,Juaymah Shops N26

1905 C-1477 Fill placement & compaction inspection of 5th layer selectfill material at ADMIN BUILDING 15-Jan-18 10:25 AM 16-Jan-18 10:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
gridline (9-11)(E-F) in Admin building area,Juaymah Shops N26

1906 C-1478 FDT compaction inspection of 5th layer selectfill material at gridline (9-11) ADMIN BUILDING 15-Jan-18 10:30 AM 16-Jan-18 10:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 2
(E-F) in Admin building area,Juaymah Shops N26

1907 C-1479 Fill placement & compaction inspection of 6th layer selectfill material at ADMIN BUILDING 15-Jan-18 10:35 AM 16-Jan-18 1:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
gridline (9-11)(E-F) in Admin building area,Juaymah Shops N26

1908 C-1480 FDT compaction inspection of 6th layer selectfill material at gridline (9-11) ADMIN BUILDING 15-Jan-18 10:40 AM 16-Jan-18 1:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 2
(E-F) in Admin building area,Juaymah Shops N26

1909 C-1481 Site & Grade Preparation inspection for slab on grade at gridline (11- 12) ADMIN BUILDING 15-Jan-18 10:45 AM 16-Jan-18 1:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
(B-C) & (8-10)(A-B) at Admin Bldg.Juaymah Shops N-26

1910 C-1482 Formwork inspection for slab on grade at gridline (11-12)(B-C) & (8-10)(A- ADMIN BUILDING 15-Jan-18 10:50 AM 16-Jan-18 1:45 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
B) at Admin Bldg.J uaymah S hops N-26

FBE Reinforcing Steel,Embedded items & Formclosure inspection for slab


1911 C-1483 on grade at gridline (11-12)(B-C) & (8-10)(A-B) at Admin Bldg.Juaymah ADMIN BUILDING 15-Jan-18 10:55 AM 16-Jan-18 2:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Shops N-26

1912 C-1484 Sampling,Testing & Placement of concrete inspection for slab on grade at ADMIN BUILDING 15-Jan-18 11:00 AM 16-Jan-18 3:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
gridline (11-12)(B-C) & (8-10)(A-B) at Admin Bldg.Juaymah Shops N-26

Fill placement & compaction inspection of 7th layer (F inal Layer) selectfill
1913 C-1485 material at gridline (9-11)(E-F ) in Admin building area,Juaymah Shops ADMIN BUILDING 15-Jan-18 11:05 AM 16-Jan-18 3:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
N26

1914 C-1486 FDT compaction inspection of 7th layer (Final Layer) selectfill material at ADMIN BUILDING 15-Jan-18 11:10 AM 16-Jan-18 3:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 2
gridline (9-11)(E-F) in Admin building area,Juaymah Shops N26

1915 C-1487 Material Receiving Inspection of Base Course Class A Material From Al- PLANT N-26 15-Jan-18 4:00 PM 16-Jan-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
Osais (Qty=23 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Visual Inspection Material Receiving Handling Storage and preservation of


1916 C-1488 Filler Board Thickness 12MM Size 1.22 x 2.2 Meter (QTY=120 Sheets) PLANT N-26 15-Jan-18 4:05 PM 16-Jan-18 10:30 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
From A.A Turki Corporation @ ETE Laydown,JaAymah,shops Plant N-26

Visual Inspection Material Receiving Handling Storage and preservation of


1917 C-1489 Polythylene Sheet150 Micron Size 4 x 25 Meter(Qty=75 Rolls) From A.A PLANT N-26 15-Jan-18 4:10 PM 16-Jan-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
Turki Corporation ETE Laydown,JaAymah,shops Plant N-26

Visual Inspection Material Receiving Handling Storage and preservation of


1918 C-1490 BI-Axail Geogrid Type B30 Size Width 4.0 M x Length 75.0 M (QTY=3000 PLANT N-26 15-Jan-18 4:15 PM 16-Jan-18 11:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
M2) From Geosynthetics Technologies.co At ETE Laydown,JaAymah,shops
Plant N-26

sand covering Around & Above the Pipe 30 CM for Raw & Potable Water
1919 C-1491 Pipes (67.0 LM) South Side Of new Car Parking Area @ ETE CAR PARKING 15-Jan-18 4:20 PM 16-Jan-18 8:00 AM RA-819439-001-00 QUADRI ISHFAQ AHMED Not in QMIS
JaAymah,shops Plant N-26 (RA-819438-001 Rev 0)

Visual Inspection of 1" PVC Conduit Pipe Installation at grid line A,B
1920 E-0136 Column 8,9 & 10, and PVC Stub-up 2" for grounding inside Electrical ADMIN BUILDING 15-Jan-18 4:25 PM 16-Jan-18 9:30 AM RA-819712-001-0F3 NOLI ALI M. AL YASEEN
Room At Admin Bldg.

1921 T-0036 Visual Inspection of Telecom duct bank Trench Excavation, length 24 NEW SUB STATION 15-Jan-18 4:30 PM 16-Jan-18 9:00 AM RA-819517-001-0F2 AFZAL M. Z. NAVEED
meters near to substation area @Upgraded Juaymah Plant N-26.

1922 T-0037 Visual Inspection of PVC 4*4" conduits for Telecom duct bank , length 23 NEW SUB STATION 15-Jan-18 4:35 PM 16-Jan-18 3:40 PM RA-819517-001-0F2 AFZAL M. Z. NAVEED
meters near to substation area @Upgraded Juaymah Plant N-26.

Pre-Installation Procedure Verification Testing of Calibration Wrench for


1923 ST-0026 Booster Pump Shed @ South side of New Car Parking Area, Juaymah BOOSTER PUMP 15-Jan-18 4:40 PM 16-Jan-18 7:00 AM RA-820020-001-00 OMAR M. HASSAN
Shops, Plant N26.

Bolt Tightening Inspection for columns, beams and rafters of Booster


1924 ST-0027 Pump Shed 1, bolt size 16mm and 20mm, @ South side of New Car BOOSTER PUMP 15-Jan-18 4:45 PM 16-Jan-18 7:30 AM RA-820020-001-00 OMAR M. HASSAN
Parking Area, Juaymah Shops, Plant N26.

Pre-Cast Pre Concreting Inspection (Molding / Formworks) for Admin


1925 C-1492 Building (Panel Mark CG-A-08, CG-A-01H, CG-A-07, CG-A--02A, CIG-A- 06H, INCO 16-Jan-18 7:15 AM 17-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
CIG-A-02 and CIG-A-04) at INCO Pre-Cast Fabrication Yard

Pre-Cast Pre Concreting Inspection (Rebars, Embedded Items &


1926 C-1493 Molding / Formwork Closure) for Admin Building (Panel Mark CG-A-08, INCO 16-Jan-18 7:20 AM 17-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
CG-A-01H, CG-A-07, CG- A--02A, CIG-A-06H, CIG-A-02 and CIG-A-04) at
INCO Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing, Sampling and Placement Inspection of 1st


1927 C-1494 Layer for Admin Building (Panel Mark CG-A-08, CG-A-01H, CG-A-07, CG- INCO 16-Jan-18 7:25 AM 17-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A--02A, CIG-A-06H, CIG-A-02 and CIG-A-04) at INCO Pre-Cast Fabrication
Yard

Pre-Cast Concrete Testing, Sampling and Placement Inspection of 2nd


1928 C-1495 Layer for Admin Building (Panel Mark CG-A-08, CG-A-01H, CG-A-07, CG- INCO 16-Jan-18 7:30 AM 17-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A--02A, CIG-A-06H, CIG-A-02 and CIG-A-04) at INCO Pre-Cast Fabrication
Yard

Pre-cast & Pre-Stressed Pre Concreting Inspection (Molding and


1929 C-1496 Formwork) of Double Tee Slab for Sub Station Building @ INCO Pre-Cast INCO 16-Jan-18 7:35 AM 17-Jan-18 8:30 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-02A (3 Nos.), Total 3 Nos.

Pre-cast & Pre-Stressed Pre Concreting Inspection of Rebar, Embedded


1930 C-1497 Items and Molding / Form Closure of Double Tee S lab for Sub Station INCO 16-Jan-18 7:40 AM 17-Jan-18 8:45 AM 0016-ER-002-9 SALMAAN MAMDOOH
Building @ INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-02A (3 Nos.),
Total 3 Nos.

Pre-cast & Pre-Stressed Concrete Testing, Sampling and Placement


1931 C-1498 Inspection of Double Tee Slab for Sub S tation Building @ INCO Pre-Cast INCO 16-Jan-18 7:45 AM 17-Jan-18 9:00 AM 0016-ER-002-9 SALMAAN MAMDOOH
Fabrication Yard Panel Mark SS-DT-02A (3 Nos.), Total 3 Nos.

Fill placement & compaction inspection of 7th layer(final layer) selectfill


1932 C-1499 material at gridline (5-10) (B-E) and (8-9')(E-F) (including thickening area) ADMIN BUILDING 16-Jan-18 10:50 AM 17-Jan-18 8:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED Not in QMIS
in Admin building area,Juaymah Shops N26

FDT compaction inspection of 7th layer(final layer) selectfill material at


1933 C-1500 gridline (5-10) (B-E) and (8-9')(E-F) (including thickening area) in Admin ADMIN BUILDING 16-Jan-18 10:55 AM 17-Jan-18 8:15 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED 4
building area,Juaymah Shops N26

Preparation, Mixing and Application Inspection of Anti Termite for Slab on


1934 C-1501 Grade at Grid Line (5-10) (B-E) (Panel # 1 and # 3) at Admin Building ADMIN BUILDING 16-Jan-18 11:00 AM 17-Jan-18 8:30 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

1935 C-1502 Site & Grade Preparation Inspection for Slab on Grade at Grid Line (5-10) ADMIN BUILDING 16-Jan-18 11:05 AM 17-Jan-18 1:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
(B-E) (Panel # 1 and # 3) at Admin Building Juaymah Shops N-26

1936 C-1503 Formwork Inspection for S lab on Grade at Grid Line (5-10) (B-E) (Panel # 1 ADMIN BUILDING 16-Jan-18 11:10 AM 17-Jan-18 1:45 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
and # 3) at Admin Building Juaymah Shops N-26

FBE Reinforcing Steel, Embedded items & Formclosure Inspection for Slab
1937 C-1504 on Grade at Grid Line (5-10) (B-E) (Panel # 1 and # 3) at Admin Building ADMIN BUILDING 16-Jan-18 11:15 AM 17-Jan-18 2:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Juaymah Shops N-26

1938 C-1505 Inspection for Slab on Grade at Grid Line (5-10) (B-E) (Panel # 1 and # 3) ADMIN BUILDING 16-Jan-18 11:20 AM 17-Jan-18 3:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
at Admin Building Juaymah Shops N-26

1939 C-1506 Review of Test Result For Base Course Class -A Material From Al-Osais At PLANT N-26 16-Jan-18 1:05 PM 17-Jan-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
ETE Laydown Area,JuAymah,Shops Plant N- 26

1940 C-1507 Site & Grade Preparation Inspection of Telecom Duct Bank ( 23 LM ) at NEW SUB STATION 16-Jan-18 3:10 PM 17-Jan-18 9:45 AM RA-819517-001-0F2 QUADRI ISHFAQ AHMED
West side of New Sub Station @ J u'Aymah, Shops Plant N- 26

1941 C-1508 Concrete Sampling,Testing & Placement Inspection of Telecom Duct Bank ( NEW SUB STATION 16-Jan-18 3:15 PM 17-Jan-18 10:00 AM RA-819517-001-0F2 QUADRI ISHFAQ AHMED
23 LM ) at West side of New Sub Station @ Ju'Aymah, Shops Plant N- 26

1942 C-1509 FBE Rebar, Embedded Items Inspection of Fire Wall (01 N0 ) above FGL NEW SUB STATION 16-Jan-18 3:20 PM 17-Jan-18 9:00 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
First Wall From North at New Substation @ Ju'Aymah, Shops Plant N- 26

FDT,Compaction of Existing Sub Grade for Direct Buried LV Cable Conduit


1943 C-1510 (10.6 LM) At West Side Admin Building Area , @ JuAymah,Shops Plant N- ADMIN BUILDING 16-Jan-18 3:30 PM 17-Jan-18 8:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED 1
26

1944 C-1511 Material Receiving Inspection of Base Course Class A Material From Al- PLANT N-26 16-Jan-18 3:35 PM 17-Jan-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
Osais (Qty=55 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Filling and Pressurization for HT Package UJS-BP2-RW-001-00 (Raw Water)


1945 P-0188 about 150 LM from Booster Pump-02 towards Work Shop Building Area NEW SUB STATION 16-Jan-18 3:40 PM 17-Jan-18 8:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
@ J u'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-BP2-RW-001-00


1946 P-0189 (Raw Water) about 150 LM from Booster Pump-02 towards Work Shop NEW SUB STATION 16-Jan-18 3:45 PM 17-Jan-18 10:00 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Building Area @ Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJ S-BP2-RW-001-00


1947 P-0190 (Raw Water) about 150 LM from Booster Pump-02 towards Work Shop NEW SUB STATION 16-Jan-18 3:50 PM 17-Jan-18 3:00 PM RA-819438-001-00 FAHEEM SYED SHAFIULLAH
Building Area @ Ju'aymah Shop Plant N-26

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


1948 P-0191 SCH-80 Pipes of 4" Dia(7Pcs) & Fittings with RED TEE 3"X2" (8Pcs) & PLANT N-26 16-Jan-18 3:55 PM 17-Jan-18 8:30 AM RA-819438-001-00 FAHEEM SYED SHAFIULLAH Not in QMIS
1½"X1" (16Pcs), ELB- 90⁰-4" (6Pcs), TEE-4" (2Pcs) from NEPRO @ ETE
store Juaymah Shop Plant N-26

Inspection of alignment for columns, beams and rafters during erection


1949 ST-0028 for Booster Pump Shed 2 @ Near New Workshop Area, Juaymah Shops, BOOSTER PUMP 16-Jan-18 4:00 PM 17-Jan-18 7:30 AM RA-820020-001-00 OMAR M. HASSAN
Plant N26. (SATIP M-100-03 / SAIC M-1070, )

Pre-installation procedure verification testing of calibration wrench for


1950 ST-0029 Booster Pump Shed 2 @ Near New Workshop Area, Juaymah Shops, Plant BOOSTER PUMP 16-Jan-18 4:05 PM 17-Jan-18 1:00 PM RA-820020-001-00 OMAR M. HASSAN
N26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Bolt tightening inspection for columns, beams and rafters for booster
1951 ST-0030 pump shed 2, bolt size 16mm and Curing
20mm & Final Inspection of Hollow BOOSTER PUMP 16-Jan-18 12:00 AM 17-Jan-18 1:30 PM RA-820020-001-00 OMAR M. HASSAN
Pre-Cast & Pre-Stressed Concrete
Core Panels, (Panel Mark H1-303, H1- 303A, H1-304, H1-304A, H1-304B,
H1-305, H1-305A, H1-308, H1-308A, H1-308B, H1-309 (5 Nos), H1-309A,
H1-309B, H1-310, H1-310A, H1-310B (2 Nos), H1-311 (2 Nos), H1- 312, H1-
312A, H1-313, H1-313A, H1-314, H1-314A, H1-315 (2 Nos), H1-315A, H1-
1952 C-1512 315H, H1-316 (2 Nos), H1-316A, H1-317, H1-318, H1318A, H1-318B, H1- INCO 17-Jan-18 7:10 AM 18-Jan-18 9:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
319, H1-319A, H1-320, H1-321, H1-321A, H1-322, H1-322A, H1-323, H1-
324, H1-324A, H1-325, H1-332, H1-332A, H1-332B, H1-333, H1-334, H1-
334A, H1-334B, H1-335. for Admin Building at INCO Pre-Cast Fabrication
Pre-Cast Pre Concreting Inspection (Molding / Formworks) for Admin
Yard.
1953 C-1513 Building (Panel Mark CG-A-05, CG-A-01AH, CG-A-02, CIG-A-08, CIG-A-03 INCO 17-Jan-18 7:15 AM 18-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
and CIG-A-09) at INCO Pre-Cast Fabrication Yard

Pre-Cast Pre Concreting Inspection (Rebars, Embedded Items &


Molding / Formwork Closure) for Admin Building (Panel Mark CG-A-05,
1954 C-1514 CG-A-01AH, CG-A-02, CIG-A-08, CIG-A-03 and CIG-A-09) at INCO Pre-Cast INCO 17-Jan-18 7:20 AM 18-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication Yard

Pre-Cast Concrete Testing, Sampling and Placement Inspection of 1st


1955 C-1515 Layer for Admin Building (Panel Mark CG-A-05, CG-A-01AH, CG-A- 02, CIG- INCO 17-Jan-18 7:25 AM 18-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A-08, CIG-A-03 and CIG-A-09) at INCO Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing, Sampling and Placement Inspection of 2nd


1956 C-1516 Layer for Admin Building (Panel Mark CG-A-05, CG-A-01AH, CG-A- 02, CIG- INCO 17-Jan-18 7:30 AM 18-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A-08, CIG-A-03 and CIG-A-09) at INCO Pre-Cast Fabrication Yard

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 11 Nos. Column at Grid Line (4') (A) C9, (4) (B)
1957 C-1517 C1, (3') (A) C9, (3) (B) C1, (2) (A) C9, (2) (B) C16, (1) (B) C13, (4) (C) C1, (4) GULF 17-Jan-18 8:00 AM 18-Jan-18 2:00 PM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
(D) C1, (4') (E) C1 and (4') (F) C8 at Admin Building Area, J u'Aymah, Shops
Plant N-26 @ Gulf Consult, Jubail
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for Exit S taircase (2nd Floor) at Grid Line (C-E) (11-
1958 C-1518 12) (2nd Lift) and Roof Beam at Grid Line (A-F) (9-12) RB1, RB1A, RB2 & GULF 17-Jan-18 8:05 AM 18-Jan-18 2:15 PM RA-819726-001-0F2 SALMAAN ISHFAQ AHMED
RB3 at Admin Building Area, Ju'Aymah, S hops Plant N-26 @ Gulf Consult,
Jubail

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1959 C-1519 Inspection of 4000 PSi for Fire Wall (3 NOS ) upto FGL at New Substation GULF 17-Jan-18 8:10 AM 18-Jan-18 2:30 PM RA-819767-001-0F4 SALMAAN ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26 @ Gulf Consult, Jubail

Preparation, Mixing and Application inspection of anti termite for slab on


1960 C-1520 grade at gridline (5-10)(B-E)(panel #2) and (8-11)(E- F) at New Admin ADMIN BUILDING 17-Jan-18 9:00 AM 18-Jan-18 8:00 AM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Building, Juaymah Shops N26

Grade and Site preparation inspection for slab on grade at gridline (5-10)
1961 C-1521 (B-E)(panel #2) and (8-11)(E-F) at New Admin Building, Juaymah Shops ADMIN BUILDING 17-Jan-18 9:05 AM 18-Jan-18 1:15 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
N26

1962 C-1522 Formwork inspection for slab on grade at gridline (5-10)(B-E)(panel #2) ADMIN BUILDING 17-Jan-18 9:10 AM 18-Jan-18 1:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
and (8-11)(E-F) at New Admin Building, Juay mah Shops N26

Installation of Epoxy Coated Steel Bars, Embedded items and Formclosure


1963 C-1523 inspection for slab on grade at gridline (5-10)(B-E)(panel #2) and (8-11)(E- ADMIN BUILDING 17-Jan-18 9:15 AM 18-Jan-18 2:00 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
F) at New Admin Building, Juaymah Shops N26

Concrete sampling,Testing and placement inspection for slab on grade at


1964 C-1524 gridline (5-10)(B-E)(panel #2) and (8-11)(E-F) at New Admin Building, ADMIN BUILDING 17-Jan-18 9:20 AM 18-Jan-18 3:30 PM RA-819722-001-0F4 ACIELO ISHFAQ AHMED
Juaymah Shops N26

Curing Inspection of Electrical Duct Bank for LV (20.0 LM ), PSA (17.0


1965 C-1525 LM) & FDAS (17.0 LM) at Inbetween MTB Building & New Sub Station @ NEW SUB STATION 17-Jan-18 9:25 AM 18-Jan-18 7:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Ju'Aymah, Shops Plant N- 26 ( 819283-02 Rev- 0F1 )

Cement Based N0n-Shrink grout Surface Preparation for Anchor Bolt of


1966 C-1526 Booster Pump Station-1 At South Side of New Car Parking Area @ BOOSTER PUMP 17-Jan-18 10:00 AM 18-Jan-18 9:30 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Juaymah Shops Plant N-26

1967 C-1527 Cement Based N0n-Shrink grout Surface Preparation for Anchor Bolt of BOOSTER PUMP 17-Jan-18 10:05 AM 18-Jan-18 9:45 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Booster Pump Station-2 @ Juaymah Shops Plant N-26

Cement Based N0n-Shrink grout Mixing Testing Sampling & Placement for
1968 C-1528 Anchor Bolt of Booster Pump Station- 1 at south Side of New Car Parking BOOSTER PUMP 17-Jan-18 10:10 AM 18-Jan-18 10:00 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
Area @ J uaymah S hops Plant N-26

1969 C-1529 Cement Based Non-S hrink Grout Mixing, Testing, Sampling and Placement BOOSTER PUMP 17-Jan-18 10:15 AM 18-Jan-18 10:15 AM RA-819400-001-0F2 QUADRI ISHFAQ AHMED
for Anchor Bolts of Booster Pump-02 at Juaymah Shops Project N-26

1970 C-1530 Formwork Closure Inspection of Fire Wall (01 no) Above FGL First wall NEW SUB STATION 17-Jan-18 10:20 AM 18-Jan-18 3:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
From North At New Sub Station @ Juaymah Shops Plant N-26

Concrete Sampling Testing & Placement Inspection of Fire Wall (01 no)
1971 C-1531 Above FGL First wall From North At New Sub S tation @ Juaymah Shops NEW SUB STATION 17-Jan-18 10:25 AM 18-Jan-18 3:15 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
Plant N-26

1972 C-1532 FBE Rebar Embedded Item Inspection of Fire Wall (01 no) Above FGL 2nd NEW SUB STATION 17-Jan-18 10:30 AM 18-Jan-18 3:30 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
wall From North At New Sub Station @ J uaymah S hops Plant N-26

FDT, Compaction Inspection of Existing Sub Grade for LV Direct Buried


1973 C-1533 Conduit Trench (10.20 LM) at North Side of Shipping Receiving Area @ NEW SUB STATION 17-Jan-18 10:35 AM 18-Jan-18 9:30 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED 1
Juaymah Shops Plnt N-26

1974 E-0137 Visual Inspection of Excavation Trenching for 6" LV Direct Buried Conduit ADMIN BUILDING 17-Jan-18 11:00 AM 18-Jan-18 8:00 AM RA-819460-002-0F1 NOLI ALI M. AL YASEEN
Pipe, At Admin Bldg. Area.

1975 E-0138 Visual Inspection of 6" Direct Buried PVC Conduit Pipe Installation for LV ADMIN BUILDING 17-Jan-18 11:05 AM 18-Jan-18 8:15 AM RA-819460-002-0F1 NOLI ALI M. AL YASEEN
Power Cable At Admin Bldg. Area.

Visual Inspection of Sand Bedding, Red Tiles and underground cable


1976 E-0139 Warning Tape ( Yellow) Installation for Final Backfilling of 6" LV Electrical ADMIN BUILDING 17-Jan-18 11:10 AM 18-Jan-18 8:20 AM RA-819460-002-0F1 NOLI ALI M. AL YASEEN
PVC Conduit Pipe At Admin Bldg. Area

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


1977 C-1534 Building (Panel Mark CG-A-01A,CG-A-05,CIG-A-05,CIG-A-15,CIG-A- INCO 18-Jan-18 8:00 AM 20-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
19H,and CIG-A-11,At Inco Pre-Cast Fabrication Yard

Pre-Cast & Pre Concreting inspection (Rebar, Embedded Item & Molding /
1978 C-1535 Formwork) Closure) for Admin Building (Panel Mark CG-A-01A,CG-A- INCO 18-Jan-18 8:05 AM 20-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
05,CIG-A-05,CIG-A-15,CIG-A-19H,and CIG-A-11,At Inco Pre-Cast
Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 1st layer


1979 C-1536 for Admin Building (Panel Mark CG-A-01A,CG- A-05,CIG-A-05,CIG-A- INCO 18-Jan-18 8:10 AM 20-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
15,CIG-A-19H,and CIG-A-11,At Inco Pre- Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 2nd layer


1980 C-1537 for Admin Building (Panel Mark CG-A-01A,CG- A-05,CIG-A-05,CIG-A- INCO 18-Jan-18 8:15 AM 20-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
15,CIG-A-19H,and CIG-A-11,At Inco Pre- Cast Fabrication Yard

Fill Placement Inspection of 7th Layer[Final Layer] Select fill material


1981 C-1538 placement at Gridline [ 5-8],[E-F] including thickening area, Mechanical ADMIN BUILDING 18-Jan-18 8:20 AM 20-Jan-18 8:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
Room in New Admin Building Area, Juaymah Shops Project N-26

FDT Inspection of 7th Layer[Final Layer] Select fill material placement at


1982 C-1539 Gridline [5-8],[E-F] including thickening area, Mechanical Room in New ADMIN BUILDING 18-Jan-18 8:25 AM 20-Jan-18 8:15 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1
Admin Building Area, Juay mah Shops Project N-26

Preparation , Mixing and Application Inspection of Anti-Termite for Slab


1983 C-1540 on Grade at Gridline [5-8] ,[E-F], Mechanical Room at New Admin Building ADMIN BUILDING 18-Jan-18 8:30 AM 20-Jan-18 8:30 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Area , Juaymah Shops Projects N-26

Site and Grade Preparation inspection for slab on grade at gridline [5-8],
1984 C-1541 [E-F], Mechanical room in New Admin Building Area, Juaymah Shops ADMIN BUILDING 18-Jan-18 8:35 AM 20-Jan-18 1:30 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Project N-26

1985 C-1542 Form Work Inspection for slab on Grade at Gridline [5-8],[E-F ], Mechanical ADMIN BUILDING 18-Jan-18 8:40 AM 20-Jan-18 1:45 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Room in New Admin Building Area, Juaymah Shops Project N-26

FBE Reinforcing Steel, Embedded items and Form Closure Inspection for
1986 C-1543 Slab on Grade at Gridline [5-8],[E-F],Mechanical Room at New Admin ADMIN BUILDING 18-Jan-18 8:45 AM 20-Jan-18 2:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Building Area, Juaymah Shops Project N-26

Sampling, Testing and Placement of Concrete Inspection for Slab on Grade


1987 C-1544 at Gridline [5-8],[E-F] Mechanical Room at New Admin Building Area, ADMIN BUILDING 18-Jan-18 8:50 AM 20-Jan-18 3:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Juaymah Shops Project N-26

1988 C-1545 Site and Grade Preparation Inspection of Electrical LV Duct Bank at North SHIPPING & RECEIVING 18-Jan-18 8:55 AM 20-Jan-18 9:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
Side of Shipping Receiving Area at Juaymah Shops Project N-26 AREA

1989 C-1546 FBE Rebar, Embedded Items Inspection of Electrical LV Duct Bank at North SHIPPING & RECEIVING 18-Jan-18 9:00 AM 20-Jan-18 9:30 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
Side of Shipping Receiving Area at Juaymah Shops Project N-26 AREA

Concrete Sampling, Testing and Placement Inspection of Electrical LV Duct SHIPPING & RECEIVING
1990 C-1547 Bank at North Side of Shipping Receiving Area at Juaymah Shops Project 18-Jan-18 9:05 AM 20-Jan-18 10:15 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
N-26 AREA

Curing Inspection of Concrete of Electrical Duct Bank PSA, FDAS, & LV at


1991 C-1548 In- Between New Sub Station & MTB Building @ Ju'Aymah, Shops Plant NEW SUB STATION 18-Jan-18 9:10 AM 20-Jan-18 7:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1992 C-1549 Inspection of 4000 PSi for Electrical Duct Bank (9.4 LM ) at West Side of MAAZ LAB 20-Jan-18 1:30 PM 21-Jan-18 11:00 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED
New Car Parking Area @ Ju'Aymah, Shops Plant N- 26

Pre-Cast & Pre-Stressed Concrete Curing & Final Inspection of Double Tee
1993 C-1550 Slab for Sub Station Building @ INCO Pre-Cast Fabrication Yard Panel Mark INCO 20-Jan-18 1:35 PM 21-Jan-18 9:00 AM 0016-ER-002-9 SALMAAN MAMDOOH
SS-DT-02A (3 Nos.), Total 3 Nos. at INCO Pre-Cast Fabrication Yard.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


1994 C-1551 Inspection of 4000 PSi for 9 Nos. Column at Grid Line (1) (C) C16, (2) (C) MAAZ LAB 21-Jan-18 4:15 PM 22-Jan-18 11:00 AM RA-819721-001-0F2 SALMAAN ISHFAQ AHMED
C3, (3) (C) C1, (1) (D) C17, (2) (D) C4, (3) (D) C1, (3) (E) C8, (3) (F) C15 and
(2) (F) C15 at Admin Building Area, Juaymah Shops N-26 @ MAAZ LAB

Material Receiving for Type2 Anchor Bolt M24 x 1016 GR 36 With nuts &
1995 C-1552 Washer all HDG Total QTY=388 For Lighting Pole From Al- Rashed PLANT N-26 18-Jan-18 9:30 AM 20-Jan-18 10:00 AM RA-819460-006-00 BAQAR ISHFAQ AHMED
Fasteners @ ETE Laydown Area @ Juaymah Shops Plant N-26

Visual Inspection of Copper Grounding Rod Installation 5/8 16mm x 2.4 SHIPPING & RECEIVING
1996 E-0140 mtrs, At Shipping and Receiving Area. As per Attached Highlighted 18-Jan-18 9:35 AM 20-Jan-18 8:30 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Drawing AREA

Visual Inspection of 25mm Copper Insulated Grounding Conductor SHIPPING & RECEIVING
1997 E-0141 Installation for Structural Grounding, At Shipping and Receiving Area. As 18-Jan-18 9:40 AM 20-Jan-18 9:00 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
per Attached Highlighted Drawing AREA

Visual Inspection of Exothermite Cad Welding for Grounding Conductor SHIPPING & RECEIVING
1998 E-0142 120mm2 to 25mm2 for Structure Grounding, At Shipping and Receiving 18-Jan-18 9:45 AM 20-Jan-18 9:30 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Area. As per Attached Highlighted Drawing. AREA

Visual Inspection for Exothermite Cad Welding OF Grounding Cable SHIPPING & RECEIVING
1999 E-0143 120mm2 to Copper Ground Rod 16mm X 2.4mtrs, At Shipping and 18-Jan-18 9:50 AM 20-Jan-18 10:30 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Receiving Area. As per Attached Highlighted Drawing. AREA

2000 E-0144 Visual Inspection of LV electrical Duck Bank Excavation Trenching, At SHIPPING & RECEIVING 18-Jan-18 9:55 AM 20-Jan-18 11:00 AM RA-819460-002-0F1 NOLI ALI M. AL YASEEN
Shipping and Receiving Area, As per Attached Highlighted Drawing AREA

Visual Inspection of LV electrical Duck Bank 6" Conduit Pipe & Spacer SHIPPING & RECEIVING
2001 E-0145 Installation, and embedded Hardware prior to Concrete Placement, At AREA 18-Jan-18 10:00 AM 20-Jan-18 1:00 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Shipping and Receiving Area, As per Attached Highlighted Drawing

Visual Inspection of Sand Bedding Final Backfilling of LV Electrical, PSA &


2002 E-0146 FDAS Duck Bank at New Sub Station Area. As per attached Highlighted NEW SUB STATION 18-Jan-18 10:05 AM 20-Jan-18 10:45 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Drawing.

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


2003 P-0192 SCH-80 Fittings with Coupling 3" (15Pcs) from NEPRO @ ETE store PLANT N-26 18-Jan-18 10:10 AM 20-Jan-18 8:30 AM RA-819770-001-00 FAHEEM SYED SHAFIULLAH
Juaymah Shop Plant N-26

2004 ST-0030-A Bolt tightening inspection for columns, beams and rafters for booster BOOSTER PUMP 18-Jan-18 10:15 AM 20-Jan-18 10:00 AM RA-820020-001-00 OMAR M. HASSAN
pump shed 2, bolt size 16mm and 20mm

Inspection for Roof Panel and Side Panel Installation, excluding gutter and SHIPPING & RECEIVING
2005 ST-0031 downspout for Shipping and Receiving Area @ Shipping and Receiving AREA 18-Jan-18 10:20 AM 20-Jan-18 9:30 AM RA-819990-001-0F1 OMAR M. HASSAN
Area, Juaymah Shops, Plant N26.

Inspection for roof panel, wall panel, gutter and downspout installation
2006 ST-0032 and water test for booster pump shed 1 @ South Side of New Car Parking BOOSTER PUMP 18-Jan-18 10:25 AM 20-Jan-18 2:30 PM RA-820020-001-00 OMAR M. HASSAN
Area, Juaymah Shops, Plant N26.

FDT, Compaction Inspection of Existing Sub Grade for Potable Water &
2007 C-1553 Raw Water Trench ( 115 LM ) At East side of New Work Shop @ WORK SHOP 20-Jan-18 2:00 PM 21-Jan-18 9:30 AM RA-819438-001-0F1 QUADRI ISHFAQ AHMED 8
Ju'Aymah, Shops Plant N- 26 ( RA-819439-01 Rev-0F1 )

Sand Bedding Inspection of Potable Water & Raw Water Trench ( 115 LM )
2008 C-1554 At East side of New Work Shop @ Ju'Aymah, Shops Plant N- 26 RA- WORK SHOP 20-Jan-18 2:05 PM 21-Jan-18 3:00 PM RA-819438-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
819439-01 Rev-0F 1 )

FDT, Compaction Inspection of Sand Bedding for Potable Water & Raw
2009 C-1555 Water Trench ( 115 LM ) At East side of New Work Shop @ Ju'Aymah, WORK SHOP 20-Jan-18 2:10 PM 21-Jan-18 4:00 PM RA-819438-001-0F1 QUADRI ISHFAQ AHMED 8
Shops Plant N- 26 ( RA-819439-01 Rev-0F1 )

Fill Placement & Compaction Inspection of Backfilling 1st Layer Select Fill
2010 C-1556 Material For FDAS & PSA Duct Bank at In-Between New Sub Station & NEW SUB STATION 20-Jan-18 2:15 PM 21-Jan-18 1:30 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
MTM Building @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st Layer Select Fill Material For
2011 C-1557 FDAS & PSA Duct Bank at In-Between New Sub Station & MTM Building NEW SUB STATION 20-Jan-18 2:20 PM 21-Jan-18 1:45 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED 2
@ J u'Aymah, Shops Plant N- 26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2012 C-1558 Building (Panel Mark CIG-A-05H, CIG-A-29, CIG-A- 11A and CIG-A-28 at INCO 20-Jan-18 2:25 PM 21-Jan-18 9:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Inco Pre-Cast Fabrication Yard

Pre-Cast & Pre Concreting inspection (Rebar, Embedded Item & Molding /
2013 C-1559 Formwork) Closure) for Admin Building (Panel Mark CIG-A-05H, CIG-A-29, INCO 20-Jan-18 2:30 PM 21-Jan-18 9:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
CIG-A-11A and CIG-A-28 at Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 1st layer


2014 C-1560 for Admin Building (Panel Mark CIG-A-05H, CIG-A-29, CIG-A-11A and CIG- INCO 20-Jan-18 2:35 PM 21-Jan-18 9:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A-28 at Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 2nd layer


2015 C-1561 for Admin Building (Panel Mark CIG-A-05H, CIG-A-29, CIG-A-11A and CIG- INCO 20-Jan-18 2:40 PM 21-Jan-18 9:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A-28 at Inco Pre-Cast Fabrication Yard

CPVC Pipes, Fittings Installation and Assembly Inspection of 2" Diameter


2016 P-0193 for Potable Water line about 115 LM at East Side New Work Shop Area, WORK SHOP 20-Jan-18 2:45 PM 21-Jan-18 9:30 AM RA-819439-001-F1 FAHEEM ISHFAQ AHMED
Juaymah Shops Project N-26

CPVC Pipes, Fittings Installation and Assembly Inspection of 3" Diameter


2017 P-0194 for Raw Water line about 115 LM at East Side New Work Shop Area, WORK SHOP 20-Jan-18 2:50 PM 21-Jan-18 9:30 AM RA-819438-001-0F1 FAHEEM ISHFAQ AHMED
Juaymah Shops Project N-26.

Inspection for Roof Panel, Wall Panel, Gutter and Downspout installation
2018 ST-0033 and Water Test for Booster Pump Shed 2 @ New Workshop Area, BOOSTER PUMP 20-Jan-18 2:55 PM 21-Jan-18 2:30 PM RA-820020-001-00 OMAR ISHFAQ AHMED
Juaymah Shops, Plant N26.

Visual Inspection to close INCR-ST-0001 for Booster Pump Shed 1 and 2


2019 ST-0034 for bent flange correction @ South side of New Car Parking Area and New BOOSTER PUMP 20-Jan-18 3:00 PM 21-Jan-18 7:30 AM RA-820020-001-00 OMAR ISHFAQ AHMED
Workshop Area, J uaymah Shops, Plant N26.

Visual Inspection of orange color dye and Final Mandrel test for the PVC
2020 T-0038 4*4" conduits for Telecom Duct Bank, TDB length in 18 meters @ NEW SUB STATION 20-Jan-18 3:05 PM 21-Jan-18 9:30 AM RA-819517-001-0F2 AFZAL M. Z. NAVEED
Upgraded Juaymah shops Plant N- 26.

Visual Inspection of orange color tape installation above the sand back
2021 T-0039 filling on top of the Telecom Duct Bank, TDB length in 18 meters @ NEW SUB STATION 20-Jan-18 3:10 PM 21-Jan-18 10:30 AM RA-819517-001-0F2 AFZAL M. Z. NAVEED
Upgraded Juaymah shops Plant N- 26.

Sand Covering around and Above the Pipe 30 CM for Raw Water and
2022 C-1562 Potable Water Pipe (150 LM) at South Side of Booster Pump Station - 2 @ BOOSTER PUMP 20-Jan-18 3:15 PM 21-Jan-18 8:00 AM RA-819438-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Upgraded Juaymah shops Plant N- 26. (RA-819439-001-0F 1)

Material Receiving Inspection of Base Course Class "A" Material from Al-
2023 C-1563 Osais (QTY=55 M3) @ ETE Laydown, Upgraded Juaymah shops Plant N- PLANT N-26 20-Jan-18 3:20 PM 21-Jan-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
26.

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2024 C-1564 Building (Panel Mark CIG-A-26, CIG-A-30, CIG- A-16 and CIG-A-24 at Inco INCO 21-Jan-18 4:00 PM 22-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

Pre-Cast & Pre Concreting inspection (Rebar, Embedded Item & Molding /
2025 C-1565 Formwork) Closure) for Admin Building (Panel Mark CIG-A-26, CIG-A-30, INCO 21-Jan-18 4:05 PM 22-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
CIG-A-16 and CIG-A-24 at Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 1st layer


2026 C-1566 for Admin Building (Panel Mark CIG-A-26, CIG-A-30, CIG-A-16 and CIG-A- INCO 21-Jan-18 4:10 PM 22-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
24 at Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 2nd layer


2027 C-1567 for Admin Building (Panel Mark CIG-A-26, CIG-A-30, CIG-A-16 and CIG-A- INCO 21-Jan-18 4:15 PM 22-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
24 at Inco Pre-Cast Fabrication Yard

2028 C-1568 Formwork Closure Inspection of Fire Wall (01 N0 ) above FGL 2nd Wall NEW SUB STATION 21-Jan-18 2:30 PM 22-Jan-18 10:00 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
From North at New Substation @ Ju'Aymah, Shops Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Concrete Sampling,Testing & Placement Inspection of Fire Wall (01 N0 )


2029 C-1569 above FGL 2nd Wall From North at New Substation @ Ju'Aymah, Shops NEW SUB STATION 21-Jan-18 2:35 PM 22-Jan-18 2:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 2nd ( Final ) Layer


2030 C-1570 Select Fill Material For FDAS,LV & PSA Duct Bank at In-Between New Sub NEW SUB STATION 21-Jan-18 2:40 PM 22-Jan-18 10:45 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Station & MTM Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd ( Final ) Layer Select Fill


2031 C-1571 Material For FDAS,LV & PSA Duct Bank at In-Between New Sub Station & NEW SUB STATION 21-Jan-18 2:45 PM 22-Jan-18 11:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED 2
MTM Building @ Ju'Aymah, Shops Plant N- 26

Curing Inspection of Concrete of Electrical Duct Bank LV at in-Between


2032 C-1572 New Work Shop & Paint Shop @ Ju'Aymah, Shops Plant N- 26 WORK SHOP 21-Jan-18 2:50 PM 22-Jan-18 8:00 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS

FDT, Compaction Inspection of Existing Sub Grade for Telecom Duct Bank (
2033 C-1573 51 LM ) AT West Side of Admin Building @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 21-Jan-18 2:55 PM 22-Jan-18 8:30 AM RA-819517-001-0F2 QUADRI ISHFAQ AHMED 4

Site & Grade Preparation Inspection for Telecom Duct Bank ( 51 LM ) AT


2034 C-1574 West Side of Admin Building @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 21-Jan-18 3:00 PM 22-Jan-18 3:30 PM RA-819517-001-0F2 QUADRI ISHFAQ AHMED

Concrete Sampling,Testing & Placement Inspection for Telecom Duct Bank


2035 C-1575 ( 51 LM ) AT West Side of Admin Building @ Ju'Aymah, S hops Plant N- 26 ADMIN BUILDING 21-Jan-18 3:05 PM 22-Jan-18 4:00 PM RA-819517-001-0F2 QUADRI ISHFAQ AHMED

Pre-Stress Concrete Pre-installation Inspection of Adim Building for HCS At


2036 C-1576 grid line ( 10-12 ) ( A - F ) @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 21-Jan-18 3:10 PM 22-Jan-18 9:00 AM 0016-ER-A-006-01-4 QUADRI MAMDOOH

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection of Double
2037 C-1577 Tee Slab for Sub Station Building @ Inco Pre-Cast Fabrication Yard (Panel INCO 21-Jan-18 3:55 PM 22-Jan-18 9:00 AM 0016-ER-002-001-4 SALMAAN MAMDOOH
Mark SS-DT-02B, SS-DT-03 and S S-DT-04 Total 3 Nos.

Pre-Test Punch Listing for HT Package UJS-WS-PW-001-00 (Potable Water)


2038 P-0195 about 115 LM at East Side of New Work Shop Area @ Ju'aymah Shop WORK SHOP 21-Jan-18 10:00 AM 22-Jan-18 1:30 PM RA-819439-001-0F1 FAHEEM ISHFAQ AHMED
Plant N-26

Internal Cleaning / Flushing for HT Package UJS-WS-PW-001-00 (Potable


2039 P-0196 Water) about 115 LM at East Side of New Work Shop Area @ Ju'aymah WORK SHOP 21-Jan-18 10:15 AM 22-Jan-18 1:45 PM RA-819439-001-0F1 FAHEEM ISHFAQ AHMED
Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-WS-PW-001-00


2040 P-0197 (Potable Water) about 115 LM at East Side of New Work Shop Area @ WORK SHOP 21-Jan-18 10:10 AM 22-Jan-18 2:00 PM RA-819439-001-0F1 FAHEEM ISHFAQ AHMED
Ju'aymah Shop Plant N-26

Verification of Test Preparation for HT Package UJS-WS-PW-001-00


2041 P-0198 (Potable Water) about 115 LM at East Side of New Work Shop Area @ WORK SHOP 21-Jan-18 10:15 AM 22-Jan-18 2:15 PM RA-819439-001-0F1 FAHEEM ISHFAQ AHMED
Ju'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-WS-RW-001-00 (Raw Water)


2042 P-0199 about 115 LM at East Side of New Work Shop Area @ Ju'aymah Shop WORK SHOP 21-Jan-18 10:20 AM 22-Jan-18 2:30 PM RA-819438-001-0F1 FAHEEM ISHFAQ AHMED
Plant N-26

Internal Cleaning / Flushing for HT Package UJS-WS-RW-001-00 (Raw


2043 P-0200 Water) about 115 LM at East Side of New Work Shop Area @ Ju'aymah WORK SHOP 21-Jan-18 10:25 AM 22-Jan-18 2:45 PM RA-819438-001-0F1 FAHEEM ISHFAQ AHMED
Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-WS-RW-001-00 (Raw


2044 P-0201 Water) about 115 LM at East Side of New Work Shop Area @ Ju'aymah WORK SHOP 21-Jan-18 10:30 AM 22-Jan-18 3:00 PM RA-819438-001-0F1 FAHEEM ISHFAQ AHMED
Shop Plant N-26

Verification of Test Preparation for HT Package UJS-WS-RW-001-00 (Raw


2045 P-0202 Water) about 115 LM at East Side of New Work Shop Area @ Ju'aymah WORK SHOP 21-Jan-18 10:35 AM 22-Jan-18 3:15 PM RA-819438-001-0F1 FAHEEM ISHFAQ AHMED
Shop Plant N-26

Visual Inspection of Sand Bedding Final Backfilling of MV Duck Bank


2046 E-0147 Between New Workshop and Paint Shop Area. As per attached highlighted WORK SHOP 21-Jan-18 10:40 AM 22-Jan-18 10:30 AM RA-819460-002-0F1 NOLI ISHFAQ AHMED
drawing

Visual Inspection of orange tape installation above final back filling on top
2047 T-0040 of the FOC duct bank, length in 14.8 meters in between paint shop and WORK SHOP 21-Jan-18 3:00 PM 22-Jan-18 1:00 PM RA-819460-002-0F1 AFZAL ISHFAQ AHMED
new work shop area @ Upgrade Juaymah shops plant N-26.

Visual Inspection of Telecom duct bank trench excavation, length in 50


2048 T-0041 meters at Admin building west side @ Upgrade J uaymah shops plant N- ADMIN BUILDING 21-Jan-18 3:05 PM 22-Jan-18 4:08 PM RA-819517-001-0F2 AFZAL ISHFAQ AHMED
26.

Visual Inspection of 4*4" PVC Conduit installation and Initial Mandrel test
2049 T-0042 for Telecom duct bank, length in 50 meters at Admin building west side @ ADMIN BUILDING 21-Jan-18 3:10 PM 22-Jan-18 2:00 PM RA-819517-001-0F2 AFZAL ISHFAQ AHMED
Upgrade Juaymah shops plant N-26.

2050 C-1578 Material Receiving Inspection of Base Course Class A Material From Al- PLANT N-26 22-Jan-18 10:00 AM 23-Jan-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
Osais (Qty=110 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2051 C-1579 Building (Panel Mark CIG-A-25, CIG-A-23 and CG-A-04 at Inco Pre-Cast INCO 22-Jan-18 10:10 AM 23-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication Yard

Pre-Cast & Pre Concreting inspection (Rebar, Embedded Item & Molding /
2052 C-1580 Formwork) Closure) for Admin Building (Panel Mark CIG-A-25, CIG-A-23 INCO 22-Jan-18 10:15 AM 23-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
and CG-A-04 at Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 1st layer


2053 C-1581 for Admin Building (Panel Mark CIG-A-25, CIG-A-23 and CG-A-04 at Inco INCO 22-Jan-18 10:20 AM 23-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 2nd layer


2054 C-1582 for Admin Building (Panel Mark CIG-A-25, CIG-A-23 and CG-A-04 at Inco INCO 22-Jan-18 10:25 AM 23-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2055 C-1583 Building (Panel Mark CG-A-01, CG-A-06, CG-A-09, CIG-A-10 and CIG-A-06) INCO 22-Jan-18 10:30 AM 23-Jan-18 9:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
at INCO Pre-Cast Fabrication Yard

2056 C-1584 FBE Rebar,Embedded Items Inspection of Fire Wall (01 N0 ) above FGL NEW SUB STATION 22-Jan-18 3:40 PM 23-Jan-18 10:00 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
3rd Wall From North at New Substation @ Ju'Aymah, S hops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 1st ( Final ) Layer


2057 C-1585 Select Fill Material For MV & PSA Duct Bank at In-Between New Work WORK SHOP 23-Jan-18 3:45 PM 24-Jan-18 8:30 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Shop & Paint Shop @ Ju'Aymah, Shops Plant N- 26
Material Receiving Inspection for Pre Cast Concrete Members Hollow Core
Slab for Admin Building @ Ju'aymah Shops Plant N-26 (HCS Mark H1-
701A, H1-533, H1-534, H1-702A, H1-702B, H1703A, H1-703B, H1-333, H1-
2058 C-1586 334, H1-334B, H1-335, H1-332, H1- 332B, H1-518, H1-520, H1-522, H1- PLANT N-26 22-Jan-18 3:50 PM 23-Jan-18 8:00 AM 0016-A-ER-006-1-4 BAQAR MAMDOOH
519, H1-513, H1-514, H1-515, H1-515A, H1-513A, H1-320, H1-316A, H1-
321, H1-321A,
Pre-cast ConcreteH1-318B, H1-528, H1-527,
Pre-Installation H1-526,
Inspection H1-524,
CoreH1-523,
S lab forH1-
525,
Admin H1-529, H1-334A
Building and H1-332A
@ Ju'aymah (Total
Shops Plant 36of
N-26
Hollow
Nos.)
(HCS Mark H1-701A, H1-
533, H1-534, H1-702A, H1-702B, H1703A, H1-703B, H1-333, H1-334, H1-
2059 C-1587 334B, H1-335, H1-332, H1-332B, H1-518, H1-520, H1-522, H1-519, H1- ADMIN BUILDING 22-Jan-18 3:55 PM 23-Jan-18 9:00 AM 0016-A-ER-006-1-4 SALMAAN MAMDOOH
513, H1-514, H1-515, H1-515A, H1-513A, H1-320, H1-316A, H1-321, H1-
321A, H1-318B,
Pre-cast Concrete H1-528, H1-527, H1-526, H1-524, H1-523, H1-525,
CoreH1-
529,
for H1-334A
Admin and Erection
Building H1-332A and Alignment
(Total
@ Ju'aymah 36 Nos.)
Shops
Inspection of Hollow
Plant N-26 (HCS Mark H1-701A, H1-
Slab
533, H1-534, H1-702A, H1-702B, H1703A, H1-703B, H1-333, H1-334, H1-
2060 C-1588 334B, H1-335, H1-332, H1-332B, H1-518, H1-520, H1-522, H1-519, H1- ADMIN BUILDING 22-Jan-18 4:00 PM 23-Jan-18 9:30 AM 0016-A-ER-006-1-4 SALMAAN MAMDOOH
513, H1-514, H1-515, H1-515A, H1-513A, H1-320, H1-316A, H1-321, H1-
321A, H1-318B, H1-528, H1-527, H1-526, H1-524, H1-523, H1-525, H1-
529, H1-334A and H1-332A (Total 36 Nos.)
FDT Compaction Inspection of Backfilling 1st ( Final ) Layer Select Fill
2061 C-1589 Material For MV & PSA Duct Bank at In-Between New Work Shop & Paint WORK SHOP 23-Jan-18 4:05 PM 24-Jan-18 8:45 AM RA-819460-002-0F1 QUADRI ISHFAQ AHMED 2
Shop @ Ju'Aymah, Shops Plant N- 26

Visual Inspection of 2" & 1" PVC Conduit Pipe S tup-up Installation for
2062 E-0148 Lighting pool Foundation Prior to Concrete, (19 SET), Beside Admin Area, ADMIN BUILDING 23-Jan-18 3:00 PM 24-Jan-18 8:30 AM RA-819293-006-00 NOLI ALI M. AL YASEEN
As per highlighted Attached Drawing.

Filling and Pressurization for HT Package UJS-WS-PW-001-00 (Potable


2063 P-0203 Water) about 115 LM at East Side of New Work Shop Area , Juaymah WORK SHOP 22-Jan-18 3:10 PM 23-Jan-18 7:30 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
Shops Project N-26

Visual Inspection at Test Pressure for HT Package UJS-WS-PW-001-00


2064 P-0204 (Potable Water) about 115 LM at East Side of New Work Shop Area , WORK SHOP 22-Jan-18 3:15 PM 23-Jan-18 8:00 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
Juaymah Shops Project N-26

De- Pressurization & Water Disposal for HT Package UJS-WS-PW-001-00


2065 P-0205 (Potable Water) about 115 LM at East Side of New Work Shop Area , WORK SHOP 22-Jan-18 3:20 PM 23-Jan-18 12:15 PM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
Juaymah Shops Project N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2066 C-1590 Building (Panel Mark CIG-A-23H, CIG-A-13 and CG-A-04H at Inco Pre-Cast INCO 23-Jan-18 10:10 AM 24-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication Yard

Pre-Cast & Pre Concreting inspection (Rebar, Embedded Item & Molding /
2067 C-1591 Formwork) Closure) for Admin Building (Panel Mark CIG-A-23H, CIG-A-13 INCO 23-Jan-18 10:15 AM 24-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
and CG-A-04H at Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 1st layer


2068 C-1592 for Admin Building (Panel Mark CIG-A-23H, CIG-A-13 and CG-A-04H at INCO 23-Jan-18 10:20 AM 24-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Inco Pre-Cast Fabrication Yard

Pre-Cast Concrete Testing Sampling and Placement inspection of 2nd layer


2069 C-1593 for Admin Building (Panel Mark CIG-A-23H, CIG-A-13 and CG-A-04H at INCO 23-Jan-18 10:25 AM 24-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Inco Pre-Cast Fabrication Yard
Pre-cast & Pre-Stressed Pre Concreting Inspection (Bed and Pre-stressing
of stands) of Hollow Core Panels for Admin Building @ INCO Pre-Cast
Fabrication Yard Panel Mark(HCS Mark HR-701A (2 Nos.), HR-702A, HR-
2070 C-1594 702B, HR-703A, HR-703B, HR-704A, HR-705, HR-705C, HR-708B, HR- 706 INCO 23-Jan-18 10:30 AM 24-Jan-18 11:30 AM 0016-A-ER-007-1-4 SALMAAN MAMDOOH
(3 Nos.), HR-714A (4 Nos.), HR-710, HR-719 (2 Nos.), HR-716 (2 Nos.), HR-
720 (2 Nos.),
Pre-cast HR-721, HR-722,
& Pre-Stressed HR-723,
Concrete HR-721A,
Testing, HR-724,
Sampling HR-725, HR-
and Placement
726, HR-725A,
Inspection HR-705D
of Hollow Core(2Panels
Nos.) (Total 34 Nos.)
for Admin Building @ INCO Pre-Cast
Fabrication Yard Panel Mark(HCS Mark HR-701A (2 Nos.), HR-702A, HR-
2071 C-1595 702B, HR-703A, HR-703B, HR-704A, HR-705, HR-705C, HR-708B, HR- 706 INCO 23-Jan-18 10:35 AM 24-Jan-18 1:00 PM 0016-A-ER-007-1-4 SALMAAN MAMDOOH
(3 Nos.), HR-714A (4 Nos.), HR-710, HR-719 (2 Nos.), HR-716 (2 Nos.), HR-
720 (2 Nos.), HR-721, HR-722, HR-723, HR-721A, HR-724, HR-725, HR-
726, HR-725A, HR-705D (2 Nos.) (Total 34 Nos.)
Concrete 28 Days Compressive Strength Testing & Final Acceptance
2072 C-1596 Inspection of 2000 PSi forTelecom Duct Bank k ( 58 LM ) inforent of Back GULF 23-Jan-18 11:00 AM 24-Jan-18 2:00 PM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED
log Storage Building, Juaymah Shops Plant N-26 @ GULF Consult, Jubail

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2073 C-1597 Inspection of 2000 PSi for Electrical ( FOC ) Duct Bank Trench ( 21 LM ) in GULF 23-Jan-18 11:05 AM 24-Jan-18 2:15 PM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED
Between Shipping Receiving & New Work Shop Area , Juaymah Shops
Plant N-26 @ GULF Consult, Jubail

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2074 C-1598 Inspection of 4000 PSi for Roof Beams at Grid Line (A'-F ) (4-9) RB1, RB3 & MAAZ LAB 23-Jan-18 11:10 AM 24-Jan-18 11:00 AM RA-819726-001-0F2 SALMAAN ISHFAQ AHMED
RB4 at Admin Building Area, Juaymah Shops Plant N-26 @ MAAZ LAB
Material,Receiving Inspection of Pre-Cast Concrete Members Hollow
Core Slab For Admin Building (HCS MARK H1-705,H1-706,H1-707A,H1-
708A,H1-709,H1-705,H1-710H,H1-711H,H1-720A,H1-717A H1-723,H1-
2075 C-1599 720AH,H1-720,H1-717,H1-722,H1-717,H1-722,H1-720H,H1-510H,H1- PLANT N-26 23-Jan-18 11:15 AM 24-Jan-18 8:00 AM 0016-A-ER-006-1-4 BAQAR MAMDOOH
511,H1-512,H1-510 H1-510H,H1-511,H1-509,H1- 511,H1-509,H1-510,H1-
318A,H1-316,H1-319A,H1-319,H1-318,H1-317
Pre-cast Concrete Pre-Installation Inspection ofH1-315A,H1-316,H1-
Hollow Core S lab For
314A,H1-314,H1-325,H1-324A,H1-324,H1-323,H1-322A,H1-322
Admin (Total 44
NOS) AtBuilding
Ju'aymah(HCS MARK
Shops H1-705,H1-706,H1-707A,H1-708A,H1-709,H1-
Plant N-26
705,H1-710H,H1-711H,H1-720A,H1-717A H1-723,H1-720AH,H1-720,H1-
2076 C-1600 717,H1-722,H1-717,H1-722,H1-720H,H1-510H,H1-511,H1-512,H1-510 ADMIN BUILDING 23-Jan-18 11:20 AM 24-Jan-18 9:00 AM 0016-A-ER-006-1-4 QUADRI MAMDOOH
H1-510H,H1-511,H1-509,H1-511,H1-509,H1-510,H1-318A,H1-316,H1-
319A,H1-319,H1-318,H1-317
Pre-cast Concrete Erection andH1-315A,H1-316,H1-314A,H1-314,H1-
Alignment Inspection of Hollow Core Slab
325,H1-324A,H1-324,H1-323,H1-322A,H1-322
For Admin (Total 44 NOS) At Ju'aymah
Shops PlantBuilding
N-26 (HCS MARK H1-705,H1- 706,H1-707A,H1-708A,H1-
709,H1-705,H1-710H,H1-711H,H1-720A,H1-717A H1-723,H1-720AH,H1-
2077 C-1601 720,H1-717,H1-722,H1-717,H1-722,H1-720H,H1-510H,H1-511,H1- ADMIN BUILDING 23-Jan-18 11:25 AM 24-Jan-18 10:00 AM 0016-A-ER-006-1-4 BAQAR MAMDOOH
512,H1-510 H1-510H,H1-511,H1-509,H1-511,H1- 509,H1-510,H1-
318A,H1-316,H1-319A,H1-319,H1-318,H1-317 H1-315A,H1-316,H1-
314A,H1-314,H1-325,H1-324A,H1-324,H1-323,H1-322A,H1-322 (Total 44
NOS) At Ju'aymah Shops Plant N-26
Formwork Inspection of Pre-Cast Lighting Poles Foundation ( 19 Nos ) at
2078 C-1602 Pre- Cast Area Near North Side of New Admin Building @ Ju'Aymah, ADMIN BUILDING 23-Jan-18 11:30 AM 24-Jan-18 9:00 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
Shops Plant N- 26

FBE Rebar,Embedded Items & Formwork Closure Inspection of Pre-Cast


2079 C-1603 Lighting Poles Foundation ( 19 Nos ) at Pre- Cast Area Near North Side of ADMIN BUILDING 23-Jan-18 11:35 AM 24-Jan-18 10:30 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
New Admin Building @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Pre-Cast Lighting


2080 C-1604 Poles Foundation ( 19 Nos at Pre- Cast Area Near North Side of New ADMIN BUILDING 23-Jan-18 11:40 AM 24-Jan-18 11:00 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
Admin Building @ Ju'Aymah, Shops Plant N- 26

Material Receiving,Handling Storage and Preservation Inspection of


Ladder Mesh Size (50 MM x 3 Meter QTY=108 )(100MM x 3 Meter
2081 C-1605 QTY=440 Pcs)(150MM x 3 Meter QTY=688 Pcs) And Corrugated Angle PLANT N-26 23-Jan-18 11:45 AM 24-Jan-18 11:00 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Bead (QTY=1250) From A.A Turki Corporation (ATCO) At ETE
Store,JuAymah,Shops Plant N-26

Visual Inspection Material Receiving Handling Storage and preservation of


2082 C-1606 Filler Board Thickness 12MM Size 1.22 x 2.2 Meter (QTY=30 Sheets) From PLANT N-26 23-Jan-18 11:50 AM 24-Jan-18 11:30 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED Not in QMIS
A.A Turki Corporation @ ETE Laydown,JaAymah,shops Plant N-26

Visual Inspection of Material Receiving, Handling, Storage and


2083 C-1607 Preservation of Hydrated Lime 20 Kg Bag (QTY=125 Bags) from A.Al-Turki PLANT N-26 23-Jan-18 11:55 AM 24-Jan-18 11:45 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED Not in QMIS
Corporation (ATCO) P.O. No. 4756 @ ETE Store, J u’Aymah Shops Plant N-26

Filling and Pressurization for HT Package UJS-WS-RW-001-00 (Raw


2084 P-0206 Water) about 115 LM at East Side of New Work Shop Area @ Ju'aymah WORK SHOP 23-Jan-18 12:00 PM 24-Jan-18 8:00 AM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-WS-RW-001-00


2085 P-0207 (Raw Water) about 115 LM at East S ide of New Work Shop Area @ WORK SHOP 23-Jan-18 12:05 PM 24-Jan-18 10:00 AM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJ S-WS-RW-001-00


2086 P-0208 (Raw Water) about 115 LM at East S ide of New Work Shop Area @ WORK SHOP 23-Jan-18 12:10 PM 24-Jan-18 2:15 PM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
Ju'aymah Shop Plant N-26

Material Receiving Visual Inspection for cable tiles red color size 400mm x
2087 E-0149 200mm x 50mm with P.O #. 2947 AT ETE S tore , Ju'aymah shop plant N-26 PLANT N-26 24-Jan-18 10:00 AM 25-Jan-18 8:30 AM RA-819293-06-00 NOLI ALI M. AL YASEEN
(QTY,2025 PCS.) As per attached document.

Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin


2088 C-1608 Building Panel Mark CIG-A-14,CIG-A-31,CIG-A-17,At INCO Pre-Cast INCO 24-Jan-18 10:05 AM 25-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication Yard

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2089 C-1609 Formwork Closure) for Admin Building Panel Mark CIG-A-14,CIG- A-31,CIG- INCO 24-Jan-18 10:10 AM 25-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
A-17,At INCO Pre-Cast Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2090 C-1610 Layer for Admin Building Panel Mark CIG-A-14,CIG-A-31,CIG-A-17, At INCO INCO 24-Jan-18 10:15 AM 25-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2091 C-1611 Layer for Admin Building Panel Mark CIG-A-14,CIG-A-31,CIG-A-17, At INCO INCO 24-Jan-18 10:20 AM 25-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard
Pre-Casst & Pre-Stressed Pe Concreting Inspection (Bed and Pre-stressing
of stand) of Hollow Core Panel For Admin Building At INCO Pre-Cast
Fabrication Yard Panel Mark (HCS Mark HR-707(02 nos),HR-708(02
2092 C-1612 nos),HR-708A,HR-709,HR-705A(02 NOS),HR-705E,HR-706A, ,HR-716(06 INCO 24-Jan-18 10:25 AM 25-Jan-18 11:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
NOS),HR-714A(04 NOS),HR-718,HR-702(02 NOS),HR-703(02 NOS),HR-
704(02 NOS)
Pre-Casst ,HR-705B,HR-711,HR-711A,HR-712,HR-717(02
& Pre-Stressed NOS) (Total
Concreting Testing Sampling and Placement
33 NOS) of Hollow Core Panel For Admin Building At INCO Pre-Cast
Inspection
Fabrication Yard Panel Mark (HCS Mark HR-707(02 nos),HR-708(02
2093 C-1613 nos),HR-708A,HR-709,HR-705A(02 NOS),HR-705E,HR-706A, ,HR-716(06 INCO 24-Jan-18 10:30 AM 25-Jan-18 1:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
NOS),HR-714A(04 NOS),HR-718,HR-702(02 NOS),HR-703(02 NOS),HR-
704(02 NOS) ,HR-705B,HR-711,HR-711A,HR-712,HR-717(02 NOS) (Total
33 NOS)
Fill Placement & Compaction Inspection of Backfilling 1st ( Final ) Layer
2094 C-1614 Select Fill Material for Telecom Duct Bank (18 LM ) at West side of New NEW SUB STATION 24-Jan-18 10:05 AM 25-Jan-18 9:00 AM RA-819517-001-0F1 QUADRI ISHFAQ AHMED Not in QMIS
Sub Station building @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of Backfilling 1st ( Final ) Layer Select Fill


2095 C-1615 Material or Telecom Duct Bank (18 LM ) at West side of New Sub Station NEW SUB STATION 24-Jan-18 10:10 AM 25-Jan-18 9:00 AM RA-819517-001-0F1 QUADRI ISHFAQ AHMED 1
building @ Ju'Aymah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 4th Layer Select Fill
2096 C-1616 Material at Gridline ( E-F ) (3-4 ) in Admin building @ Ju'Aymah, Shops ADMIN BUILDING 24-Jan-18 10:15 AM 25-Jan-18 8:30 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
Plant N- 26

Fill Placement & Compaction Inspection of 7th layer (final layer) Select
2097 C-1617 Fill Material at gridline ( 3-5 ) (B-E ) for Panel 4 & 5 in Admin building aera ADMIN BUILDING 24-Jan-18 10:20 AM 25-Jan-18 8:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
@ J u'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of 7th layer (final layer) Select Fill Material
2098 C-1618 at gridline ( 3-5 ) (B-E ) for Panel 4 & 5 in Admin building aera @ ADMIN BUILDING 24-Jan-18 10:25 AM 25-Jan-18 8:15 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 2
Ju'Aymah, Shops Plant N- 26

Preparation / Mixing and Application Inspection of Anti Termite Material


2099 C-1619 for Slab on Grade at gridline ( 3-5 ) (B-E ) for Panel 4 & 5 in Admin ADMIN BUILDING 24-Jan-18 10:30 AM 25-Jan-18 8:45 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
building aera @ Ju'Aymah, Shops Plant N- 26

Site & Grade Preparation Inspection for Slab on Grade at gridline ( 3-5 )
2100 C-1620 (B-E ) for Panel 4 & 5 in Admin building aera @ Ju'Aymah, Shops Plant N- ADMIN BUILDING 24-Jan-18 10:35 AM 25-Jan-18 2:15 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
26

2101 C-1621 Formwork Inspection for Slab on Grade at gridline ( 3-5 ) (B-E ) for Panel ADMIN BUILDING 24-Jan-18 10:40 AM 25-Jan-18 3:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
4 & 5 in Admin building aera @ Ju'Aymah, Shops Plant N- 26

FBE Reinforced Steel Embedded Items & Formwork Closure Inspection for
2102 C-1622 Slab on Grade at gridline ( 3-5 ) (B-E ) for Panel 4 & 5 at Admin building ADMIN BUILDING 24-Jan-18 10:45 AM 25-Jan-18 3:30 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
aera @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspectionfor Slab on Grade at


2103 C-1623 gridline ( 3-5 ) (B-E ) for Panel 4 & 5 at Admin building aera @ Ju'Aymah, ADMIN BUILDING 24-Jan-18 10:50 AM 25-Jan-18 10:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Shops Plant N- 26

2104 C-1624 Formwork Closure Inspection of Fire Wall (01 N0 ) above FGL 3rd Wall NEW SUB STATION 24-Jan-18 10:55 AM 25-Jan-18 9:30 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
From North at New Substation @ Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Fire Wall (01 N0 )


2105 C-1625 above FGL 3nd Wall From North at New Substation @ Ju'Aymah, Shops NEW SUB STATION 24-Jan-18 11:00 AM 25-Jan-18 3:15 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
Plant N- 26

2106 C-1626 FDT, Compaction Inspection of Backfilling 4th Layer Select Fill Material at ADMIN BUILDING 24-Jan-18 11:05 AM 25-Jan-18 9:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1
Gridline ( E-F ) (3-4 ) in Admin building @ Ju'Aymah, Shops Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Fill Placement & Compaction Inspection of Backfilling 5th Layer Select Fill
2107 C-1627 Material at Gridline ( E-F ) (3-4 ) in Admin building @ Ju'Aymah, Shops ADMIN BUILDING 24-Jan-18 11:10 AM 25-Jan-18 9:30 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS
Plant N- 26

FDT, Compaction Inspection of Backfilling 5th Layer Select Fill Material at


2108 C-1628 Gridline ( E-F ) (3-4 ) in Admin building @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 24-Jan-18 11:15 AM 25-Jan-18 11:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1

FDT, Compaction Inspection of Backfilling 6th Layer Select Fill Material at


2109 C-1629 Gridline ( E-F ) (3-4 ) in Admin building @ Ju'Aymah, Shops ADMIN BUILDING 24-Jan-18 11:20 AM 25-Jan-18 11:30 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1

Fill Placement & Compaction Inspection of Backfilling 6th Layer Select Fill
2110 C-1630 Material at Gridline ( E-F ) (3-4 ) in Admin building @ J u'Aymah, Shops ADMIN BUILDING 24-Jan-18 11:20 AM 25-Jan-18 11:30 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED Not in QMIS

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


SCH-80 Pipe 2"-9Pcs Fittings with Couplings 2"(140Pcs) & CPVC Cement
2111 P-0209 Weld-On 714 1Kg 11208- 24 Cans ,Primer Weld-On 1Ltr 11244-24 Cans PLANT N-26 24-Jan-18 11:25 AM 25-Jan-18 8:30 AM RA-819770-001-00 FAHEEM SYED SHAFIULLAH
Solvent Cement Grey Weld-On 717 1Kg-11220-36 Cans & Cleaner Weld-
On Quart C-65 11242 36 Cans rom NEPRO @ ETE store, Plant N- 26

Visual Inspection of orange color Telecom Duct Bank and Final Mandrel
2112 T-0043 test for TDB length in 50 metres at Admin building west side area @ ADMIN BUILDING 25-Jan-18 1:50 PM 27-Jan-18 9:00 AM RA-819517-01-0F2 AFZAL M. Z. NAVEED
Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of Sand covering back filling and Orange tape


2113 T-0044 installation upon TDB length in 50 metres at Admin building west side @ ADMIN BUILDING 25-Jan-18 1:55 PM 27-Jan-18 2:00 PM RA-819517-01-0F2 AFZAL M. Z. NAVEED
Upgraded Ju'aymah Shops Plant N-26.
Material,Receiving Inspection of Pre-Cast Concrete Members Hollow
Core Slab For Admin Building (HCS MARK H1-720,H1-717(04 nos),H1-
721,H1-720H,H1-720,H1-717,H1-719,H1-717,H1-719, H1-718H,H1-
711,H1-710,H1-705,H1-709,H1-708,H1-707,H1- 706,H1-705,H1-718,H1-
2114 C-1631 717,H1-716 H1-715,H1-517,H1-516(04 NOS),H1- 508,H1-517H,H1- PLANT N-26 25-Jan-18 2:00 PM 27-Jan-18 8:00 AM 0016-A-ER-006-1-4 BAQAR MAMDOOH
506,H1-505,H1-507,H1-505,H1-507,H1-506H, H1-506A,H1-505A,H1-
504,H1-503,H1-308,H1-308B,H1-
Pre-cast Concrete Pre-Installation309B,H1-308A,(T
Inspection of Hollow
otal 46
Core
NOS)
S lab
AtFor
Admin
Ju'aymahBuilding
Shops(HCS
PlantMARK
N-26 H1-720,H1-717(04 nos),H1-721,H1- 720H,H1-
720,H1-717,H1-719,H1-717,H1-719, H1-718H,H1-711,H1-710,H1-705,H1-
2115 C-1632 709,H1-708,H1-707,H1-706,H1-705,H1-718,H1- 717,H1-716 H1-715,H1- ADMIN BUILDING 25-Jan-18 2:05 PM 27-Jan-18 9:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
517,H1-516(04 NOS),H1-508,H1-517H,H1-506,H1-505,H1-507,H1-505,H1-
507,H1-506H,
Pre-cast Concrete
H1-506A,H1-505A,H1-504,H1-503,H1-308,H1-308B,H1-
Erection and Alignment Inspection of Hollow Core Slab
309B,H1-308A,(Total
For Admin Building (HCS
46 NOS)
MARK AtH1-720,H1-717(04
J u'aymah Shops Plant
nos),H1-721,H1-
N-26
720H,H1-720,H1-717,H1-719,H1-717,H1-719, H1-718H,H1-711,H1-
2116 C-1633 710,H1-705,H1-709,H1-708,H1-707,H1-706,H1- 705,H1-718,H1-717,H1- ADMIN BUILDING 25-Jan-18 2:10 PM 27-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
716 H1-715,H1-517,H1-516(04 NOS),H1-508,H1-517H,H1-506,H1-505,H1-
507,H1-505,H1-507,H1-506H, H1-506A,H1-505A,H1-504,H1-503,H1-
308,H1-308B,H1-309B,H1-308A,(Total 46 NOS) At Ju'aymah Shops Plant
N-26
2117 C-1634 Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin ADMIN BUILDING 25-Jan-18 2:15 PM 27-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Building Panel Mark CIG-A-27,At INCO Pre-Cast Fabrication Yard

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2118 C-1635 Formwork Closure) for Admin Building Panel Mark CIG-A-27,,At INCO ADMIN BUILDING 25-Jan-18 2:20 PM 27-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

2119 C-1636 Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st INCO 25-Jan-18 2:22 PM 27-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Layer for Admin Building Panel Mark CIG-A-27,

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2120 C-1637 Layer for Admin Building Panel Mark CIG-A-27, At INCO Pre-Cast INCO 25-Jan-18 2:23 PM 27-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication
Pre-Casst & Yard
Pre-Stressed Pe Concreting Inspection (Bed and Pre-stressing
of Hollow Core Panel For Admin Building At INCO Pre-Cast Fabrication
Yard Panel Mark (HCS Mark HR-503(04 NOS ),HR-505,HR-506(04NOS),HR-
507(02 NOS),HR-508(03 NOS),HR-509,HR-510, HR-510A,HR-511,HR- RFI # C-1638
2121 C-1638 511A,HR-512,HR-527,HR-317,HR-318(02 NOS),HR-317B,HR-317A, HR- ADMIN BUILDING 25-Jan-18 2:25 PM 27-Jan-18 11:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH Cancelled and
304(04 NOS),HR-305(06
Pre-Casst & Pre-StressedNOS),HR-305A(02
Concreting TestingNOS),HR-305B,HR-306(05
Sampling and Placement Cover this Actiity in
NOS)HR- 306A
Inspection (02 NOS),HR-307(04
of Hollow Core Panel For NOS),HR-307A,HR-307B,HR-307C,HR-
Admin Building At INCO Pre-Cast RFI C-1700
307D,HR-308,HR-308A,HR-308B,
Fabrication Yard Panel Mark (HCSHR-311B,HR-311C,HR-311D(02
Mark HR-503(04 NOS),HR-505,HR- NOS),HR-
311E(02 NOS),HR-311F(02
506(04NOS NOS),HR-312A,HR-312B, HR-312C,HR-313,HR-
),HR-507(02 NOS),HR-508(03
312D,HR-312E,HR-312F (Total 72 NOS) NOS),HR-509,HR-510,
510A,HR-511,HR-511A,HR-512,HR-527,HR-317,HR-318(02
HR-
NOS),HR-
RFI # C-1639
Cancelled and
2122 C-1639 INCO 25-Jan-18 2:30 PM 27-Jan-18 1:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
317B,HR-317A, HR-304(04 NOS),HR-305(06 NOS),HR-305A(02 NOS),HR- Cover this Actiity in
305B,HR-306(05 NOS)HR-306A (02 NOS),HR-307(04 NOS),HR-307A,HR- RFI C-1701
307B,HR-307C,HR-307D,HR-308,HR-308A,HR-308B, HR-311B,HR-311C,HR-
311D(02 NOS),HR- 311E(02 NOS),HR-311F(02 NOS),HR- 312A,HR-312B, HR-
312C,HR-313,HR-
Material Receiving312D,HR-312E,HR-312F (TotalClass
Inspection of Base Course 72 NOS )
A Material From Al-
2123 C-1640 PLANT N-26 25-Jan-18 2:35 PM 27-Jan-18 10:00 AM 0016-A-ER-001-001-4 BAQAR MAMDOOH
Osais (Qty=165 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Fill Placement & Compaction Inspection of 7th layer (final layer) Select
2124 C-1641 Fill Material at gridline ( 2-5) (A-B ) & (2-3) (B-C) for in Admin building ADMIN BUILDING 25-Jan-18 2:40 PM 27-Jan-18 8:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
aera @ Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of 7th layer (final layer) Select Fill Material
2125 C-1642 at gridline ( 2-5) (A-B ) & (2-3) (B-C) for in Admin building aera @ ADMIN BUILDING 25-Jan-18 2:45 PM 27-Jan-18 8:15 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 3
Ju'Aymah, Shops Plant N- 26

Preparation / Mixing and Application Inspection of Anti Termite Material


2126 C-1643 for Slab on Grade at gridline ( 2-5) (A-B ) & (2-3) (B-C) for in Admin ADMIN BUILDING 25-Jan-18 2:50 PM 27-Jan-18 8:45 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
building aera @ Ju'Aymah, Shops Plant N- 26

Site & Grade Preparation Inspection for Slab on Grade at gridline gridline
2127 C-1644 ( 2-5) (A-B ) & (2-3) (B-C) for in Admin building aera @ Ju'Aymah, Shops ADMIN BUILDING 25-Jan-18 2:45 PM 27-Jan-18 2:15 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Plant N- 26

2128 C-1645 Formwork Inspection for Slab on Grade at gridline gridline ( 2-5) (A-B ) & ADMIN BUILDING 25-Jan-18 2:50 PM 27-Jan-18 3:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
(2-3) (B-C) in Admin building aera @ Ju'Aymah, Shops Plant N- 26

FBE Reinforced Steel Embedded Items & Formwork Closure Inspection for
2129 C-1646 Slab on Grade at gridline gridline ( 2-5) (A-B ) & (2-3) (B-C) ) for Admin ADMIN BUILDING 25-Jan-18 2:52 PM 27-Jan-18 3:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
building aera @ Ju'Aymah, Shops Plant N- 26 A14

2130 C-1647 FDT, Compaction Test of Sub Grade for Sewer Trench In Toilet-116 First ADMIN BUILDING 25-Jan-18 12:32 PM 27-Jan-18 10:00 AM RA-819745-001-00 QUADRI ISHFAQ AHMED 3
Floor , New Admin Building At ,JuAymah,Shops Plant N-26

2131 C-1648 Sand Placement for Sewer Trench In Toilet-116 First floor New Admin ADMIN BUILDING 25-Jan-18 12:35 PM 27-Jan-18 10:30 AM RA-819745-001-00 QUADRI ISHFAQ AHMED
Building At ,JuAymah,Shops Plant N-26

2132 C-1649 FDT, Compaction of 15 CM Sand Bedding In Sewer Trench In Toilet-116 ADMIN BUILDING 25-Jan-18 12:40 PM 27-Jan-18 3:00 PM RA-819745-001-00 QUADRI ISHFAQ AHMED 3
First Floor , New Admin Building At ,J uAymah,Shops Plant N-26

Sand Covering Around and Above the 30 CM for Potable Water Raw
2133 C-1650 Water Pipe (115 LM ) at West of Work Shop Area @ Ju'aymah Shops Plant WORK SHOP 25-Jan-18 12:45 PM 27-Jan-18 10:30 AM RA-819431-001-0F1 QUADRI ISHFAQ AHMED
N-26(RA- 819438 -001 Rev-0F1)

Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin


2134 C-1651 Building Panel Mark CIG-A-07,CIG-A-22,CIG-A-22A ,(Total 03 Nos)At INCO ADMIN BUILDING 25-Jan-18 12:50 PM 27-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2135 C-1652 Formwork Closure) for Admin Building Panel Mark CIG-A-07,CIG-A- ADMIN BUILDING 25-Jan-18 12:55 PM 27-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
22,CIG-A-22A, (Total 03 Nos) At INCO Pre-Cast Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2136 C-1653 Layer for Admin Building Panel Mark CIG-A-07,CIG-A-22,CIG-A-22A (Total INCO 25-Jan-18 12:55 PM 27-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
03 Nos) At INCO Pre-Cast Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2137 C-1654 Layer for Admin Building Panel Mark CIG-A-07,CIG-A-22,CIG-A-22A (Total INCO 25-Jan-18 12:57 PM 27-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
03 Nos) At INCO Pre-Cast Fabrication Yard

Concrete Sampling,Testing & Placement Inspectionfor Slab on Grade at


2138 C-1655 gridline ( 2-5) (A-B ) & (2-3) (B-C) for Admin building aera @ Ju'Aymah, ADMIN BUILDING 25-Jan-18 1:00 PM 27-Jan-18 3:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Shops Plant N- 26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2139 C-1656 Building (Panel Mark CG-A-05, CG-A-01AH, CG-A-02, CIG-A-08, CIG-A-03 ADMIN BUILDING 25-Jan-18 1:05 PM 27-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
and CIG-A-09) at INCO Pre-Cast Fabrication Yard

Fill Placement & Compaction Inspection of 7th layer (final layer) Select
2140 C-1657 Fill Material at gridline ( E-F ) ( 3-5 ) for in Admin building aera @ ADMIN BUILDING 25-Jan-18 1:04 PM 27-Jan-18 10:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

FDT, Compaction Inspection of 7th layer (final layer) Select Fill Material
2141 C-1658 at gridline ( E-F ) (3- 5 ) for in Admin building aera @ Ju'Aymah, Shops ADMIN BUILDING 25-Jan-18 1:10 PM 27-Jan-18 10:15 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1
Plant N- 26

2142 C-1659 FDT, Compaction Inspection of Sub Grade for Switch Rack Foundation at SHIPPING & RECEIVING 25-Jan-18 1:15 PM 27-Jan-18 10:30 AM RA-819992-001-0F3 QUADRI ISHFAQ AHMED 1
Shipping Receiving area @ Ju'Aymah, Shops Plant N- 26 AREA

2143 C-1660 Site & Grade Preparation Inspection for Switch Rack Foundation at SHIPPING & RECEIVING 25-Jan-18 1:15 PM 27-Jan-18 1:30 PM RA-819992-001-0F3 QUADRI ISHFAQ AHMED
Shipping Receiving area @ Ju'Aymah, Shops Plant N- 26 AREA

2144 C-1661 Formwork Inspection of Switch Rack Foundation for Lean Concrete at SHIPPING & RECEIVING 25-Jan-18 1:20 PM 27-Jan-18 1:45 PM RA-819992-001-0F3 QUADRI ISHFAQ AHMED
Shipping Receiving area @ Ju'Aymah, Shops Plant N- 26 AREA

2145 C-1662 Lean Concrete Sampling,Testing & Placement Inspection of Switch Rack SHIPPING & RECEIVING 25-Jan-18 1:20 PM 27-Jan-18 1:50 PM RA-819992-001-0F3 QUADRI ISHFAQ AHMED
Foundation at Shipping Receiving area @ Ju'Aymah, Shops Plant N- 26 AREA

2146 C-1663 Curing Inspection of Concrete of Fire Wall (01 no ) above FGL 1st Wall NEW SUB STATION 25-Jan-18 1:25 PM 27-Jan-18 7:30 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
from North Side of New Substation @ Ju'Aymah, Shops Plant N- 26
Pre-Casst & Pre-Stressed Pe Concreting Inspection (Bed and Pre-stressing
of stand) of Hollow Core Panel For Admin Building At INCO Pre-Cast
Fabrication Yard Panel Mark (HCS Mark HR-712A,HR-713,HR-
2147 C-1664 714(02NOS ),HR-715,HR-716A,HR-727,HR-727A,HR- 727B,HR- 727C, HR- INCO 27-Jan-18 1:30 PM 28-Jan-18 11:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
728,HR-729,HR-730,HR- 729A,HR-701,(02 NOS),HR-501(04 NOS),HR-
501A(02 NOS),
Pre-Casst HR-502,HR-503(02
& Pre-Stressed ConcretingNOS),HR-503A,HR-504(02
Testing SamplingNOS) NOS),HR-
and Placement
310B,HR-311(02
Inspection NOS),Core
of Hollow HR-311A(02
Panel For NOS),HR-312(02 (Total
Admin Building At INCO 35 NOS)
Pre-Cast
Fabrication Yard Panel Mark (HCS Mark HR-712A,HR-713,HR-
2148 C-1665 714(02NOS ),HR-715,HR-716A,HR-727,HR-727A,HR- 727B,HR- 727C, HR- INCO 27-Jan-18 1:32 PM 28-Jan-18 1:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
728,HR-729,HR-730,HR- 729A,HR-701,(02 NOS),HR-501(04 NOS),HR-
501A(02 NOS), HR-502,HR-503(02 NOS),HR-503A,HR-504(02 NOS),HR-
310B,HR-311(02 NOS), HR-311A(02 NOS),HR-312(02 NOS) (Total 35 NOS)
Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin
2149 C-1666 Building Panel Mark CG-A- 03,CIG-A-20,CIG-A-20H (Total 03 NOS) At INCO INCO 27-Jan-18 1:35 PM 28-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Pre-Cast Fabrication Yard

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2150 C-1667 Formwork Closure) Panel Mark CG-A-03,CIG-A-20,CIG-A-20H (Total 03 INCO 27-Jan-18 1:38 PM 28-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
NOS) At INCO Pre-Cast Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2151 C-1668 Layer for Admin Building Panel Mark CG-A-03,CIG-A-20,CIG-A-20H (Total INCO 27-Jan-18 1:40 PM 28-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
03 NOS) At INCO Pre-Cast Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2152 C-1669 Layer for Admin Building Panel Mark CG-A-03,CIG-A-20,CIG-A-20H (Total INCO 27-Jan-18 1:42 PM 28-Jan-18 3:00 PM 0016-A-ER-006-001-4 SALMAAN MAMDOOH
03 NOS) At INCO Pre-Cast Fabrication Yard
Material,Receiving Inspection of Pre-Cast Concrete Members Hollow
Core Slab For Admin Building (HCS MARK H1-312,H1-312A,H1-313,H1-
313A,H1-309,H1-315,H1-315H,H1-309A,H1-309,(04 NOS) H1-315,H1-
2153 C-1670 537,H1-538,H1-535,H1-536,H1-539,H1-303,H1- 303A,H1-310,H1-310B(02 PLANT N-26 27-Jan-18 1:45 PM 28-Jan-18 8:00 AM 0016-A-ER-001-001-4 BAQAR MAMDOOH
NOS),H1-311, (02 NOS ),H1-310A,H1-530,H1-531,H1-532,H1-724,H1-
725,H1-304,H1-304B,H1-305,H1-
Pre-cast Concrete Pre-Installation305A, H1-304A,H1-712,H1-713(02
Inspection of Hollow Core S lab For
NOS),H1-714,H1-712A,H1-701,H1-702,H1-703,H1-702C
Admin Building (HCSJu'aymah , H1-703C,H1-
MARK H1-312,H1-312A,H1-313,H1-313A,H1-
704(Total 47 NOS)At Shops Plant NOS)
309,H1-315,H1-315H,H1-309A,H1-309,(04 N-26 H1-315,H1-537,H1-
2154 C-1671 538,H1-535,H1-536,H1-539,H1-303,H1-303A,H1-310,H1-310B(02 ADMIN BUILDING 27-Jan-18 1:48 PM 28-Jan-18 9:00 AM 0016-A-ER-006-001-4 SALMAAN MAMDOOH
NOS),H1-311, (02 NOS ),H1-310A,H1-530,H1-531,H1-532,H1-724,H1-
725,H1-304,H1-304B,H1-305,H1-
Pre-cast 305A, H1-304A,H1-712,H1-713(02
Concrete Erection and Alignment Inspection of Hollow Core Slab
NOS),H1-714,H1-712A,H1-701,H1-702,H1-703,H1-702C,
For Admin47 Building H1-703C,H1-
704(Total NOS)At(HCS MARKShops
Ju'aymah H1-312,H1-312A,H1-313,H1-313A,H1-
309,H1-315,H1-315H,H1-309A,H1-309,(04 Plant NOS)
N-26 H1-315,H1-537,H1-
2155 C-1672 538,H1-535,H1-536,H1-539,H1-303,H1-303A,H1-310,H1-310B(02 ADMIN BUILDING 27-Jan-18 1:50 PM 28-Jan-18 12:00 AM 0016-A-ER-006-001-4 SALMAAN MAMDOOH
NOS),H1-311, (02 NOS ),H1-310A,H1-530,H1-531,H1-532,H1-724,H1-
725,H1-304,H1-304B,H1-305,H1- 305A, H1-304A,H1-712,H1-713(02
NOS),H1-714,H1-712A,H1-701,H1-702,H1-703,H1-702C, H1-703C,H1-
704(Total 47 NOS)At Ju'aymah Shops Plant N-26
Fill Placement & Compaction Inspection of Backfilling 7th Layer Select Fill
2156 C-1673 Material at Gridline ( E-F ) (2-3 ) in Admin building @ J u'Aymah, Shops ADMIN BUILDING 27-Jan-18 1:55 PM 28-Jan-18 8:00 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Plant N- 26

FDT, Compaction Inspection of 7th layer (final layer) Select Fill Material
2157 C-1674 at gridline ( E-F ) (2-3 ) for in Admin building aera @ Ju'Aymah, Shops ADMIN BUILDING 27-Jan-18 2:00 PM 28-Jan-18 8:15 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1
Plant N- 26

Preparation / Mixing and Application Inspection of Anti Termite Material


2158 C-1675 for Slab on Grade at gridline ( E-F) (2-5) for Admin building aera @ ADMIN BUILDING 27-Jan-18 2:05 PM 28-Jan-18 8:45 AM RA-819722-001-0F5 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

2159 C-1676 Site & Grade Preparation Inspection for Slab on Grade at gridline ( 2-5 ) ADMIN BUILDING 27-Jan-18 2:10 PM 28-Jan-18 2:15 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
(E-F ) at Admin building aera @ Ju'Aymah, Shops Plant N- 26

2160 C-1677 Formwork Inspection for Slab on Grade at gridline ( 2-5 ) (E-F ) at Admin ADMIN BUILDING 27-Jan-18 2:15 PM 28-Jan-18 3:00 PM RA-819722-001-0F6 QUADRI ISHFAQ AHMED
building aera @ Ju'Aymah, S hops Plant N- 26

FBE Reinforced Steel Embedded Items & Formwork Closure Inspection for
2161 C-1678 Slab on Grade at gridline ( 2-5 ) (E-F) at Admin building aera @ ADMIN BUILDING 27-Jan-18 2:20 PM 28-Jan-18 3:15 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspectionfor Slab on Grade at


2162 C-1679 gridline ( 2-5 ) (E-F ) at Admin building aera @ Ju'Aymah, Shops Plant N- ADMIN BUILDING 27-Jan-18 2:25 PM 28-Jan-18 3:30 PM RA-819722-001-0F7 QUADRI ISHFAQ AHMED
26

2163 C-1680 Curing Inspection of Concrete LV Duct Bank at Shipping Receiving Area @ SHIPPING & RECEIVING 27-Jan-18 2:20 PM 28-Jan-18 7:45 AM RA-819460-002-0F2 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26 AREA

Fill Placement & Compaction Inspection of 1st layer (final layer) Select SHIPPING & RECEIVING
2164 C-1681 Fill Material of LV Duct Bank at Shipping Receiving Area @ Ju'Aymah, AREA 27-Jan-18 2:15 PM 28-Jan-18 2:00 PM RA-819460-002-0F2 QUADRI ISHFAQ AHMED
Shops Plant N- 26

FDT, Compaction Inspection of 1st layer (final layer) Select Fill Material SHIPPING & RECEIVING
2165 C-1682 of LV Duct Bank at Shipping Receiving Area @ Ju'Aymah, Shops Plant N- AREA 27-Jan-18 2:20 PM 28-Jan-18 2:30 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED 1
26

Fill Placement & Compaction Inspection of 1st layer Select Fill Material of
2166 C-1683 Telecom Duct Bank (51LM) at West side of New Admin Building @ ADMIN BUILDING 27-Jan-18 2:25 PM 28-Jan-18 3:45 PM RA-819460-002-0F2 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

FDT and Compaction Inspection of 1st layer Select Fill Material of


2167 C-1684 Telecom Duct Bank (51LM) at West side of New Admin Building @ ADMIN BUILDING 27-Jan-18 2:30 PM 28-Jan-18 4:00 PM RA-819460-002-0F2 QUADRI ISHFAQ AHMED 4
Ju'Aymah, Shops Plant N- 26

Pre-Casst & Pre Concreting Inspection of Panel for Substation Building


2168 C-1685 Panel Mark SS-SB-01( 03 NOS) and SS-SC-01(03 NOS) At INCO Pre-Cast INCO 27-Jan-18 1:32 PM 28-Jan-18 10:30 AM RA-819460-002-0F2 SALMAAN MAMDOOH
Fabrication Yard

Pre-Cast & Concrete Testing, Sampling and Placement Inspection of Panel


2169 C-1686 for Sub Station Building Panel Mark SS-SB-01(03 NOS) and SS-SC-01(03 INCO 27-Jan-18 1:35 PM 28-Jan-18 1:30 PM 0016-A-ER-001-001-11 SALMAAN MAMDOOH
NOS) At INCO Pre-Cast Fabrication Yard

Visual Inspection of Excavation Trenching Before Cable Laying of 120mm2


2170 E-0150 tined Bare Copper Conductor. at Booster Pump Station # 1. As per BOOSTER PUMP 27-Jan-18 3:05 PM 28-Jan-18 9:00 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
attached Highlighted Drawing.

Visual Inspection of 120 mm² Copper Bare tinned Grounding Conductor


2171 E-0151 Laying for Main Grounding Grid at Booster Pump Station #. 1. As per BOOSTER PUMP 27-Jan-18 3:10 PM 28-Jan-18 9:15 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
Attached highlighted Drawing,

Visual Inspection of Copper Grounding Rod Installation 5/8 16mm X 2.4


2172 E-0152 mtrs, (4 Nos.)At Booster Pump Station # 1, As per attached Highlighted BOOSTER PUMP 27-Jan-18 3:15 PM 28-Jan-18 9:30 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
Drawing.

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable


2173 E-0153 120mm2 to Copper Ground Rod 16mm X 2.4 mtrs (3 N0s.). At Booster BOOSTER PUMP 27-Jan-18 3:10 PM 28-Jan-18 10:00 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
Pump Station #. 1. As per Attached highlighted Drawing,

2174 E-0154 Visual Inspection of Sand Bedding Final Backfilling of LV Electrical Duck SHIPPING & RECEIVING 27-Jan-18 3:00 PM 28-Jan-18 10:30 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
Bank at Shipping & Receiving Area. As per highlighted Attached Drawing. AREA

Visual Inspection of Reinforced detectable warning tape (FOR


2175 T-0045 TELECOMMUNICATION), 6" WIDE * 305 MTR Long, 8 MILS thick.color- PLANT N-26 27-Jan-18 3:10 PM 28-Jan-18 10:00 AM RA-819517-001-00 AFZAL M. Z. NAVEED
Orange, Total in numbers 46. P.O.NO#29872,

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for 6 Nos. Column (Upper Roof) at Grid Line (11)
2176 C-1687 (C) C7, (12) (C) C16 (11) (D) C1, (12) (E) C16, (12) (D) PC1 and (11) (E) PC1 ADMIN BUILDING 28-Jan-18 11:00 AM 29-Jan-18 10:15 AM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED
at Admin Building Area, Juaymah Shops N- 26 for Admin Building @
MAAZ LAB

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2177 C-1688 Inspection of 4000 PSi for for Exit Staircase (2nd Floor) (1st Lift) at Grid ADMIN BUILDING 28-Jan-18 11:05 29-Jan-18 10:15 AM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED
Line (B-C) (1-2) at Admin Building Juaymah Shops N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for of Hollow Core Panels, (Panel Mark H1-701,H1-
2178 C-1689 701A,H1-702,H1-702C,H1-703,H1-703A,H1-703B, H1-703C, H1-704, H1- ADMIN BUILDING 28-Jan-18 11:10 AM 29-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
705 (4NOS) ,H1-707A,H1-708,H1-708A,H1-709 (2NOS) ,H1-710,H1-710H,
H1-711,H1-711H,H1-712, H1-712A,H1-713(2NOS) ,H1-714,H1-715,H1-
716,H1-717(4NOS) for Admin Building @ MAAZ LAB
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2179 C-1690 Building (Panel Mark CIG-A-05H, CIG-A-29, CIG-A-11A and CIG-A-28 at INCO 28-Jan-18 11:15 AM 29-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Inco Pre-Cast Fabrication Yard

2180 C-1691 Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin INCO 28-Jan-18 11:20 AM 29-Jan-18 10:00 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Building Panel Mark CIG-A-12, At INCO Pre-Cast Fabrication Yard

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2181 C-1692 Formwork Closure) Panel Mark CIG-A-12, At INCO Pre-Cast Fabrication INCO 28-Jan-18 11:22 AM 29-Jan-18 10:15 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2182 C-1693 Layer for Admin Building Panel Mark CIG-A-12,At INCO Pre-Cast INCO 28-Jan-18 11:25 AM 29-Jan-18 10:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2183 C-1694 Layer for Admin Building Panel Mark CIG-A-12,At INCO Pre-Cast INCO 28-Jan-18 11:28 AM 29-Jan-18 3:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH
Fabrication Yard

PVC DWV Pipes Installation & Assembly Inspection of 4",3" & 2" Dia for
2184 P-0210 Sanitary Sewer Water Line at First Floor Male Toilet No. 116 in New ADMIN BUILDING 28-Jan-18 11:30 AM 29-Jan-18 4:00 PM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
Admin Building Area @ Ju'Aymah Shops Plant N- 26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FDT, Compaction Inspection of Sub Grade of Raw water & Potable water
2185 C-1695 Trench in Toilet- 116 First F loor at New Admin Building @ Juaymah, Shops ADMIN BUILDING 28-Jan-18 11:32 AM 29-Jan-18 9:00 AM RA-819745-001-00 QUADRI ISHFAQ AHMED
Plant N- 26

FDT, Compaction Inspection of 15 CM Sand Bedding for Raw water &


2186 C-1696 Potable water Trench in Toilet- 116 First Floor at New Admin Building @ ADMIN BUILDING 28-Jan-18 11:34 AM 29-Jan-18 11:00 AM RA-819745-01-00 QUADRI ISHFAQ AHMED
Juaymah, Shops Plant N- 26

Formwork Inspection of Switch Rack Foundation at North side of Shipping SHIPPING & RECEIVING
2187 C-1697 Receiving area @ Juaymah, Shops Plant N- 26 AREA 28-Jan-18 11:36 AM 29-Jan-18 9:45 AM RA-819992-001-0F3 QUADRI ISHFAQ AHMED

FBE Rebar,Embedded Items & Formwork Closure Inspection of Switch SHIPPING & RECEIVING
2188 C-1698 Rack Foundation at North side of Shipping Receiving area@ Juaymah, AREA 28-Jan-18 11:38 AM 29-Jan-18 10:30 AM RA-819460-002-00 QUADRI ISHFAQ AHMED
Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Switch Rack SHIPPING & RECEIVING
2189 C-1699 Foundation at North side of Shipping Receiving area @ Juaymah, Shops AREA 28-Jan-18 11:40 AM 29-Jan-18 11:30 AM RA-819992-001-0F3 QUADRI ISHFAQ AHMED
Plant N- 26

Pre-Casst & Pre-Stressed Pe Concreting Inspection (Bed and Pre-stressing


of stand) of Hollow Core Panel For Admin Building At INCO Pre-Cast
2190 C-1700 Fabrication Yard Panel Mark (HCS Mark ,HR-503(04 NOS),HR-505,HR- INCO 28-Jan-18 11:42 AM 29-Jan-18 11:30 AM 0016-A-ER-001-001-4 SALMAAN MAMDOOH Cover from 1638
506(04 NOS),HR-507(02 NOS),HR-508(03 NOS),HR-509,HR-510, ,HR-
510A,HR-511,HR-511A,HR-512,HR-527(21 NOS)
Pre-Casst & Pre-Stressed Concreting Testing Sampling and Placement
Inspection of Hollow Core Panel For Admin Building At INCO Pre-Cast
2191 C-1701 Fabrication Yard Panel Mark (HCS Mark ,HR-503(04 NOS),HR-505,HR- INCO 28-Jan-18 11:44 AM 29-Jan-18 1:00 PM 0016-A-ER-001-001-4 SALMAAN MAMDOOH Cover from 1639
506(04 NOS),HR-507(02 NOS),HR-508(03 NOS),HR-509,HR-510, ,HR-
510A,HR-511,HR-511A,HR-512,HR-527(21 N

28 Days Compressive Strength Testing Inspection and Test Result Review


2192 C-1702 for CMU Grout and Mortar at Third Party Labrotry @ Gulf Consult GULF 28-Jan-18 11:46 AM 29-Jan-18 5:00 PM 0016-A-ER-001-001-4 SALMAAN ISHFAQ AHMED

Visual Inspection of 2" & 1" PVC Conduit Pipe S tup-up Installation for
2193 E-0155 Lighting pool Foundation Prior to Concrete,Beside Admin Area, As per ADMIN BUILDING 29-Jan-18 10:00 AM 30-Jan-18 8:30 AM RA-819293-06-00 NOLI ALI M. AL YASEEN
highlighted Attached Drawing.

2194 E-0156 Material Receiving Visual Inspection of PVC Conduit Fitting, PVC Bell End PLANT N-26 29-Jan-18 10:05 AM 30-Jan-18 9:30 AM RA-819843-001-0F1 NOLI ALI M. AL YASEEN
TC9/DB-120 Size 2" (17 EA.), At ETE Store Ju'aymah Shop Project.

Sand Placement Inspection of Raw water & Potable water Trench in


2195 C-1703 Toilet- 116 First F loor at New Admin Building @ Juaymah, Shops Plant N- ADMIN BUILDING 29-Jan-18 11:30 AM 30-Jan-18 9:30 AM RA-819745-01-00 QUADRI ISHFAQ AHMED
26

Formwork Inspection of Pre-Cast Lighting Poles Foundation ( 18 Nos ) at


2196 C-1704 Pre- Cast Area Near North Side of New Admin Building @ Ju'Aymah, ADMIN BUILDING 29-Jan-18 11:35 AM 30-Jan-18 9:00 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
Shops Plant N- 26

FBE Rebar,Embedded Items & Formwork Closure Inspection of Pre-Cast


2197 C-1705 Lighting Poles Foundation ( 19 Nos ) at Pre- Cast Area Near North Side of ADMIN BUILDING 29-Jan-18 11:37 AM 30-Jan-18 10:30 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
New Admin Building @ J u'Aymah, Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Pre-Cast Lighting


2198 C-1706 Poles Foundation ( 19 Nos ) at Pre- Cast Area Near North Side of New ADMIN BUILDING 29-Jan-18 11:40 AM 30-Jan-18 11:00 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
Admin Building @ Ju'Aymah, Shops Plant N- 26

2199 C-1707 Curing Inspection of Concrete of Fire Wall (01 N0 ) above FGL 2nd Wall NEW SUB STATION 29-Jan-18 11:42 AM 30-Jan-18 8:00 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
From North at New Substation @ Juaymah, Shops Plant N- 26

2200 C-1708 FDT, Compaction Inspection of Sub Grade for Transformer Foundation at NEW SUB STATION 29-Jan-18 11:45 AM 30-Jan-18 9:15 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED 1
West side of New Sub Station @ Juaymah, Shops Plant N- 26

Sanitary Sewer Line Gravity Test for PVC DWV Pipes of 4",3" & 2" Dia at
2201 P-0211 First Floor Male Toilet No. 116 in New Admin Building Area @ Juaymah ADMIN BUILDING 29-Jan-18 2:00 PM 30-Jan-18 1:00 PM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
Shops Plant N- 26.

Pre-Cast & Pre Stressed Concrete Curing and Final Inspection for Admin
2202 C-1709 Building (Panel Mark CIG-A-26, CIG-A-30, CIG-A-16 and CIG-A-24 at Inco INCO 29-Jan-18 3:00 PM 30-Jan-18 10:00 AM 0016-A-EI-00-04 WILFREDO MAMDOOH
Pre-Cast Fabrication Yard

Material Receiving,Handling Storage and Preservation Inspection of 1


2203 C-1710 Hours Fire Rated Cmu Block Size 200 x 200 x 400 (QTY=2438 Pcs) From Al PLANT N-26 29-Jan-18 3:02 PM 30-Jan-18 10:00 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

Material Receiving,Handling Storage and Preservation Inspection of 2


2204 C-1711 Hours Fire Rated Cmu BlockSize 200 x 200 x 400 (QTY=245 Pcs) , From Al PLANT N-26 29-Jan-18 3:05 PM 30-Jan-18 10:15 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

Material Receiving,Handling Storage and Preservation Inspection of 0


2205 C-1712 Hours Fire Rated Cmu Block Size 200 x 200 x 400 (QTY=1296 Pcs) From Al PLANT N-26 29-Jan-18 3:10 PM 30-Jan-18 10:30 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

2206 C-1713 Visual Inspection of Rebound to Hammer Test to Close the Standrad INCO 29-Jan-18 3:15 PM 30-Jan-18 9:30 AM SALMAAN MAMDOOH
Violation of Pre-Cast Panel LBE # 322 at Inco Pre-Cast Fabrication Yard

Pre-Cast & Pre Stressed Concrete Curing and Final Inspection for Admin
2207 C-1714 Building (Panel Mark ) CIG-A-06, CIG-A-06H, CG-A-02A,CIG-A-05H,CG-A- INCO 29-Jan-18 3:20 PM 30-Jan-18 10:00 AM 0016-A-ER-01-04 SALMAAN MAMDOOH
01AH,CIG-A-08,CG-A-01A,CIG-A-05 (Total 08 NOS) at Inco Pre-Cast
Fabrication Yard

Pre-Cast & Pre Stressed Concrete Curing and Final Inspection for Admin
2208 C-1715 Building (Panel Mark ) CG-A-01H,CG-A-07,CIG-A-02,CIG-A-04,CIG-A-03,CG- INCO 29-Jan-18 1:22 AM 30-Jan-18 10:15 AM 0016-A-ER-01-04 SALMAAN MAMDOOH
A-02 (Total 06 NOS) at Inco Pre-Cast Fabrication Yard

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


2209 C-1716 CG-A-01,CG-A-06,CG-A-01H,CG-A-07,CIG-A-02,CIG-A-04,CIG-A-03,CG-A- ADMIN BUILDING 29-Jan-18 3:25 PM 30-Jan-18 10:00 AM 0016-A-ER-01-04 BAQAR ISHFAQ AHMED
02(Total 08 Nos) at Admin Building Area ,JaAymah,shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) CG-A-


2210 C-1717 01,CG-A-06,CG-A-01H,CG-A-07,CIG-A-02,CIG-A-04,CIG- A-03,CG-A-02(Total ADMIN BUILDING 29-Jan-18 3:30 PM 30-Jan-18 10:30 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
08 Nos) AT Admin Building Area ,JaAymah,shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


2211 C-1718 Mark) CG-A-01,CG-A-06,CG-A-01H,CG-A-07,CIG-A-02,CIG-A-04,CIG-A- ADMIN BUILDING 29-Jan-18 3:35 PM 30-Jan-18 11:00 AM 0016-ER-01-04 SALMAAN MAMDOOH
03,CG-A-02(Total 08 Nos) at Admin Building Area ,JaAymah,shops Plant N-
26

Concrete and CMU Surface Preparation and Protection Inspection (Tele


2212 C-1719 Com. Room Internal wall 200X200X400 and between Gridline B to C & 12 PLANT N-26 31-Jan-18 10:00 AM 1-Feb-18 8:00 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
to 10 150X200X400) Groun floor Admin Building, @ ju'aymah shops,
plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Hollow Core Panels (Panel Mark H1-702A, H1-
2213 C-1720 702B, H1-706 (2 Nos.), H1-707, H1-717 (5 Nos.) H1- 717A, H1-718,H1- ADMIN BUILDING 30-Jan-18 2:00 PM 31-Jan-18 12:00 AM 0016-A-ER-01-04 QUADRI MAMDOOH
718H,H1-719 (2 Nos.), H1- 720 (3 Nos.), H1-720H (2 Nos.), H1-720AH, H1-
720A, H1-721, H1-722 (2 Nos.), H1-723, H1-724, H1-725 for Admin
Building @ Gulf Consult
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2214 C-1721 Building (Panel Mark CIG-A-25, CIG-A-23 and CG-A-04 at Inco Pre-Cast INCO 30-Jan-18 2:05 PM 31-Jan-18 10:30 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
Fabrication Yard

Compaction Testing (FDT) Inspection of Subgrade for Granty Crane SHIPPING & RECEIVING
2215 C-1722 Foundations G/L 31 & around A to G.Shipping and Receiving area @ 30-Jan-18 2:10 PM 31-Jan-18 8:30 AM RA-81991-02-02 SALMAAN ISHFAQ AHMED 4
ju'aymah shops, plant N-26 AREA

Grade and site preparation Inspection for Granty Crane Foundations G/L SHIPPING & RECEIVING
2216 C-1723 1 and around A to G. Shipping and Receiving area @ ju'aymah shops, 30-Jan-18 2:12 PM 31-Jan-18 1:30 PM RA-819991-20-0F2 SALMAAN ISHFAQ AHMED
plant N-26 AREA

Lean Concrete testing sampling and casting Inspection for Granty Crane SHIPPING & RECEIVING
2217 C-1724 Foundations G/L 1 and around A to G. Shipping and Receiving area @ 30-Jan-18 2:15 PM 31-Jan-18 1:30 PM RA-81991-02-02 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26 AREA

Pre-Cast & Pre Stressed Concrete Curing and Final Inspection for Admin
2218 C-1725 Building (Panel Mark ) CG-A-09, CIG-A-10, CG- A-08,CIG-A-09,CIG-A- INCO 30-Jan-18 2:20 PM 31-Jan-18 1:00 PM 0016-A-ER-001-04 WILFREDO MAMDOOH
15,CIG-A-11,CIG-A-11A, at Inco Pre-Cast Fabrication Yard

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


2219 C-1726 CIG-A-06,CIG-A-06H,CG-A-02A,CG-A-01AH,CIG-A-08,CG-A-01A,CIG-A- ADMIN BUILDING 30-Jan-18 2:20 PM 31-Jan-18 7:00 AM 0016-A-ER-001-04 BAQAR ISHFAQ AHMED
05,CIG-A-05H (Total 08 Nos) at Admin Building Area ,JaAymah,shops Plant
N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) CIG-A-


2220 C-1727 06,CIG-A-06H,CG-A-02A,CG-A-01AH,CIG-A-08,CG-A-01A,CIG-A-05,CIG-A- ADMIN BUILDING 30-Jan-18 2:25 PM 31-Jan-18 7:30 AM 0016-A-ER-001-04 SALMAAN ISHFAQ AHMED
05H (Total 08 Nos) at Admin Building Area ,JaAymah,shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


2221 C-1728 Mark) CIG-A-06,CIG-A-06H,CG-A-02A,CG-A-01AH,CIG-A-08,CG-A-01A,CIG- ADMIN BUILDING 30-Jan-18 2:30 PM 31-Jan-18 11:00 AM 0016-A-ER-001-04 SALMAAN ISHFAQ AHMED
A-05,CIG-A-05H (Total 08 Nos) at Admin Building Area ,JaAymah,shops
Plant N-26

Compaction Testing (FDT) Inspection of Subgrade for Tele Com. Duct bank
2222 C-1729 trench west side of Admin Building (43 Linear Meter) @ ju'aymah shops, ADMIN BUILDING 30-Jan-18 2:32 PM 31-Jan-18 9:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED 3
plant N-26

Sit and Garade preparation inspection for Tele Com. Duct bank trench
2223 C-1730 west side of Admin Buildin g (43 Linear Meter) @ ju'aymah shops, plant ADMIN BUILDING 30-Jan-18 2:35 PM 31-Jan-18 10:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED
N-26

Visual Inspection of Excavation Trenching for 120 mm2 Tined Bare


2224 E-0157 Copper Conductor (Before Conductor Laying) in Transformer Area at NEW SUB STATION 30-Jan-18 1:00 PM 31-Jan-18 2:00 PM RA-819840-01-0F1 NOLI DAMIAN ABAA
new sub station building @ Ju'aymah shops plant N-26

Visual inspection of 120 mm² bare tinned grounding conductor laying for
2225 E-0158 Transfomer Area-2118 grid grounding at new sub station building @ NEW SUB STATION 30-Jan-18 1:05 PM 31-Jan-18 1:45 PM RA-819840-01-0F1 NOLI DAMIAN ABAA
Ju'aymah shops plant N-26

Visual Inspection of Copper Grounding Rod Installation 19mm X 3 mtrs, in


2226 E-0159 Transformer Area at New Sub-Station Building @ Ju'aymah S hops plant N- NEW SUB STATION 30-Jan-18 1:10 PM 31-Jan-18 2:00 PM RA-819840-01-0F1 NOLI DAMIAN ABAA
26, As per attached Highlighted Drawing.

Visual Inspection of Grounding Rod to 120mm2 Tined Bare Copper


2227 E-0160 Conductor Exothermic Cad welding, in Transformer Area At New Sub- NEW SUB STATION 30-Jan-18 1:15 PM 31-Jan-18 2:30 PM RA-819840-01-0F1 NOLI DAMIAN ABAA
Station Building @ Ju'aymah Shops plant N-26, As per attached
Highlighted Drawing.

Visual Inspection of Telecom Duct Bank Trench excavation, length in 43


2228 T-0046 metres at Admin building west side @ Upgraded Ju'aymah Shops Plant N- ADMIN BUILDING 30-Jan-18 1:20 PM 31-Jan-18 10:00 AM RA-819517-01-0F2 AFZAL M. Z. NAVEED
26.

Visual Inspection of 4x4" PVC conduit installation and Initial Mandrel test
2229 T-0047 for Telecom Duct Bank length in 43 metres at Admin building west side ADMIN BUILDING 30-Jan-18 1:25 PM 31-Jan-18 3:00 PM RA-819517 AFZAL M. Z. NAVEED
area@ Upgraded Ju'aymah Shops Plant N-26.

Material Receiving Insopection for SMAW Electrictrodes (7018) dia 204


2230 ST-W-0001 mm (1*22k g) and 3.2mm 2*22.7kg) @ Substation Building J u'aymah NEW SUB STATION 26-Jan-18 11:00 AM 27-Jan-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Shops Plant N26

Verification of calibration Record for Welding Equipment (i) welding


2231 ST-W-0002 power source (ii) portable ovens @ Substation Building Ju'aymah Shops NEW SUB STATION 26-Jan-18 11:02 AM 27-Jan-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
Plant N26

Visual Inspection before welding for 11 joints on 2 panels S S-WIG-14 and


2232 ST-W-0003 SS-WIG-15 (check attached drawing) @ Substation Building Ju'aymah NEW SUB STATION 26-Jan-18 11:10 AM 27-Jan-18 8:00 AM RA-819885-001-00 OMAR M. HASSAN
Shops Plant N26

Visual Inspection before welding for 34 joints on 7 panels S S-WIG-13,12H


2233 ST-W-0004 23, 02F, 22, 21 & 20H (check attached drawing) @ Substation Building NEW SUB STATION 27-Jan-18 11:15 AM 28-Jan-18 8:00 AM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops Plant N26

Review of Corrective action carried out to close out INCR -ST-W-0001


2234 ST-W-0005 (check attached drawing) @ Substation Building Ju'aymah Shops Plant NEW SUB STATION 27-Jan-18 11:20 AM 29-Jan-18 10:00 AM RA-819885-001-00 OMAR M. HASSAN
N26

Visual Inspection before welding for 21 joints on 3 panels S S-WIG-18, 19


2235 ST-W-0006 & 20 (check attached drawing) @ Substation Building, Ju'aymah S hops, NEW SUB STATION 30-Jan-18 4:00 PM 31-Jan-18 8:00 AM RA-819885-001-00 OMAR M. HASSAN
Plant N26.

2236 ST-W-0007 Material Receiving Inspection for SMAW Electrodes (7018) 3.2mm (4*3kg NEW SUB STATION 30-Jan-18 4:05 PM 31-Jan-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
& 4*2.8kg) @ Substation Building, Ju'aymah Shops, Plant N26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2237 C-1731 Inspection of 4000 PSi for '4 Nos. Column (Upper Roof) at Grid Line (A') ADMIN BUILDING 31-Jan-18 11:00 AM 1-Feb-18 2:00 PM RA-819728-001-0F1 QUADRI ISHFAQ AHMED
(6) C12, (A') (7) C12, (A) (6) C11 and (A) (7) C11 at Admin Bldg
Area,Juaymah Shops N-26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2238 C-1732 Building (Panel Mark CIG-A-23H, CIG-A-13 and CG-A-04H,CG-A-05, CIG-A- INCO 31-Jan-18 11:05 AM 1-Feb-18 10:30 AM 0016-A-ER-001-04 WILFREDO MAMDOOH
16,CIG-A-23,CG-A-04 CIG-A-14,CIG-A-17,CIG-A-18,CIG-A-19
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building of Hollow Core Panels for Admin Building @ INCO Pre-Cast
Fabrication Yard Panel Mark(HCS Mark HR-701A (2 Nos.), HR-702A, HR-
2239 C-1733 702B, HR-703A, HR-703B, HR-704A, HR-705, HR-705C, HR-708B, HR- 706 INCO 31-Jan-18 11:10 AM 1-Feb-18 10:30 AM 0016-A-ER-001-04 WILFREDO MAMDOOH
(3 Nos.),HR-714A (4 Nos.), HR-710, HR-719 (2 Nos.), HR-716 (2 Nos.),HR-
720 (2 Nos.), HR-721, HR-722, HR-723, HR-721A, HR-724, HR-725, HR-
726, HR-725A, HR-705D (2 Nos.) (Total 34 Nos.)
Material Receiving,Handling Storage and Preservation Inspection of 0
2240 C-1734 Hours Fire Rated Cmu Block Size 150 x 200 x 400 (QTY=1700 Pcs) From Al PLANT N-26 31-Jan-18 11:12 AM 1-Feb-18 10:30 AM RA819723-04-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


2241 C-1735 CG-A-09, CIG-A-10, CG-A-08,CIG-A- 09,CIG-A-15,CIG-A-11,CIG-A-11A, At ADMIN BUILDING 31-Jan-18 11:15 AM 1-Feb-18 7:00 AM 0016-A-ER-04-0F2 BAQAR ISHFAQ AHMED
Admin Building Area @ Ju'aymah Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) CG-A-09,


2242 C-1736 CIG-A-10, CG-A-08,CIG-A-09,CIG-A-15,CIG-A-11,CIG-A-11A, At Admin ADMIN BUILDING 31-Jan-18 11:15 AM 1-Feb-18 7:30 AM 0016-A-ER-04-0F2 BAQAR ISHFAQ AHMED
Building Area @ Ju'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


2243 C-1737 Mark) CG-A-09, CIG-A-10, CG-A- 08,CIG-A-09,CIG-A-15,CIG-A-11,CIG-A- ADMIN BUILDING 31-Jan-18 11:17 AM 1-Feb-18 7:40 AM 0016-A-ER-04-0F2 BAQAR ISHFAQ AHMED
11A, At Admin Building Area @ Ju'aymah Shops Plant N-26

2244 C-1738 Material Receiving Inspection of Base Course Class A Material From Al- PLANT N-26 31-Jan-18 11:19 AM 1-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
Osais (Qty=165 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Concrete (2000 PSI) Testing sampling and casting for Tele Com. Duct bank
2245 C-1739 trench west side of Admin Building (42 Linear Meter) @ ju'aymah shops, ADMIN BUILDING 31-Jan-18 11:22 AM 1-Feb-18 10:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED
plant N-26

Compaction Testing (FDT) Inspection of Subgrade for Granty Crane


2246 C-1740 Foundations G/L 2 & and around A to G, Shipping and Receiving area @ SHIPPING & RECEIVING 31-Jan-18 11:25 AM 1-Feb-18 3:30 PM RA-819991-02-02 BAQAR ISHFAQ AHMED 4
AREA
ju'aymah shops, plant N-26

2247 C-1741 Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin INCO 31-Jan-18 11:28 AM 1-Feb-18 10:00 AM 0016-A-ER-01-04 SALMAAN MAMDOOH
Building Panel Mark CIG-A-21, At INCO Pre-Cast Fabrication Yard

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2248 C-1742 Formwork Closure) Panel Mark CIG-A-21, At INCO Pre-Cast Fabrication INCO 31-Jan-18 11:30 AM 1-Feb-18 10:15 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2249 C-1743 Layer for Admin Building Panel Mark CIG-A-21,At INCO Pre-Cast INCO 31-Jan-18 11:32 AM 1-Feb-18 10:30 AM 0016-A-ER-01-04 SALMAAN MAMDOOH
Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2250 C-1744 Layer for Admin Building Panel Mark CIG-A-21,At INCO Pre-Cast INCO 31-Jan-18 11:35 AM 1-Feb-18 3:00 PM 0016-A-ER-01-04 SALMAAN MAMDOOH
Fabrication Yard

Materials Receiving Visual Inspection of Cable Tray Accessories, Flat


Washer HDG M12(100 EA), Lock Washer HDG M6(100 EA), Lock Washer
2251 E-0161 HDG M8(100 EA) Lock Washer HDG M10(100 EA) Lock Washer HDG PLANT N-26 31-Jan-18 11:00 AM 1-Feb-18 1:30 PM RA-819323-06-00 NOLI DAMIAN ABAA
M12(100 EA), Square Washer HDG M10(50 EA) Square Washer HDG
M12(100 EA)
Materials Receiving
At ETE Visual
Store Ju'aymah
InspectionShop
of Cable
N26.Tray
Ju'aymah
Accessories,
Shop N26.
Spring nut
HDG M6 (100 EA), Spring nut HDG M8 (100 EA),Spring nut HDG M10 (50
EA), Spring nut HDG M12 (100 EA), Hex. Nut HDG M6 (100 EA) Hex. Nut
2252 E-0162 HDG M8 (100 EA), Hex. Nut HDG M10 (50 EA), Hex nut HDG M12(100 EA), PLANT N-26 31-Jan-18 11:00 AM 1-Feb-18 1:45 PM RA-819323-06-00 NOLI DAMIAN ABAA
Hex. Bolt HDG M6 x 1-1/2" (50 EA), Hex. Bolt HDG M8 x 1-1/2" (100
EA),Hex. Bolt HDG M10 x 1-1/2"(50 EA) Hex. Bolt HDG M12 x 1- 1/2" (100
EA) Flat washer HDG M6(100 EA) Flat washer HDG M8 & M10 (150 EA) At
ETE Store Ju'aymah Shop N26.
Materials Receiving Visual Inspection of Cable Tray Accessories, Threaded
2253 E-0163 Rod GR- 4.8 HDG M12 X 3 MTRS.(200 EA) At ETE Store Ju'aymah Shop PLANT N-26 31-Jan-18 11:10 AM 1-Feb-18 2:00 PM RA-819323-06-00 NOLI DAMIAN ABAA
Plant N26.

Visual Inspection of 25 mm² Copper Insulated Grounding Conductor


2254 E-0164 Laying for Structure Grounding at Booster Pump Station #. 1. As per BOOSTER PUMP 31-Jan-18 11:15 AM 1-Feb-18 9:20 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
Attached highlighted Drawing,

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable


2255 E-0165 120mm2 to 25mm2 for Structure Grounding at Booster Pump Station # 1. BOOSTER PUMP 31-Jan-18 11:20 AM 1-Feb-18 8:45 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
As per Attached highlighted Drawing,

Visual Inspection for Exothermic Thermite Cadwelding of Grounding cable


2256 E-0166 120mm2 to 120mm2 for Main GRID Grounding to Exisiing Grounding.At BOOSTER PUMP 31-Jan-18 11:25 AM 1-Feb-18 8:45 AM RA-820013-001-00 NOLI ALI M. AL YASEEN
Booster Pump Station #. 1. As per Attached highlighted Drawing,

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2257 C-1745 Building Admin Building Panel Mark CIG-A-14,CIG-A-31,CIG-A-17, At INCO INCO 1-Feb-18 11:20 AM 3-Feb-18 10:00 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
Pre-Cast Fabrication Yard

2258 C-1746 Curing Inspection of Concrete of Fire Wall (01 N0 ) above FGL 2nd Wall NEW SUB STATION 1-Feb-18 10:00 AM 3-Feb-18 8:00 AM RA-819864-01-04 QUADRI ISHFAQ AHMED
From North at New Substation @ Juaymah, Shops Plant N- 26

Curing Inspection of Concrete of Pre-Cast Lighting Poles Foundation ( 19


2259 C-1747 Nos ) at Pre- Cast Area Near North Side of New Admin Building @ ADMIN BUILDING 1-Feb-18 10:05 AM 3-Feb-18 8:00 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building re Panel For Admin Building At INCO Pre-Cast Fabrication Yard
2260 C-1748 Panel Mark (HCS Mark HR-707(02 nos),HR-708(02 nos),HR-708A,HR- INCO 1-Feb-18 10:10 AM 3-Feb-18 10:30 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
709,HR-705A(02 NOS) HR-705E,HR-706A, ,HR-716(06 NOS),HR-714A(04
NOS),HR-718,HR-702(02 NOS),HR-703(02 NOS) ,HR-704(02 NOS) ,HR-
705B,HR-711,HR- 711A,HR-712,HR-717(02 NOS) (Total 33 NOS)
Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)
2261 C-1749 CIG-A-13, CG-A-05, CIG-A-16,CIG-A-23,CG-A-04,CIG-A-23H,CIG-A-14,CIG- ADMIN BUILDING 1-Feb-18 10:12 AM 3-Feb-18 7:00 AM 0016-A-ER-01-04 BAQAR ISHFAQ AHMED
A-17,CIG-A-18 CIG-A-19 (Total 10 NOS) At Admin Building Area @
Ju'aymah Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) CIG-A-13,


2262 C-1750 CG-A-05, CIG-A-16,CIG-A-23,CG-A-04,CIG-A-23H,CIG-A-14,CIG-A-17,CIG-A- ADMIN BUILDING 1-Feb-18 10:15 AM 3-Feb-18 7:30 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
1 8 CIG-A- 19 (Total 10 NOS) At Admin Building Area @ Ju'aymah Shops
Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


Mark) CIG-A-13, CG-A-05, CIG-A-16,CIG- A-23,CG-A-04,CIG-A-23H,CIG-A-
2263 C-1751 14,CIG-A-17,CIG-A-18 CIG-A-19 (Total 10 NOS) At Admin Building Area @ ADMIN BUILDING 1-Feb-18 10:18 AM 3-Feb-18 7:40 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
Ju'aymah Shops Plant N-26

Concrete and CMU Installation for (Tele Com. Room Internal wall and
2264 C-1752 between Gridline B to C & 12 to10) Groun floor Admin Building, (In ADMIN BUILDING 1-Feb-18 10:20 AM 3-Feb-18 8:00 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
Process) @ ju'aymah shops, plant N-26

Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin


2265 C-1753 Building Panel Mark CIG-A-21H, At INCO Pre-Cast Fabrication Yard INCO 1-Feb-18 10:22 AM 3-Feb-18 10:00 AM 0016-A-ER-04-0F2 WILFREDO MAMDOOH

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2266 C-1754 Formwork Closure) Panel Mark CIG-A-21H, At INCO Pre-Cast Fabrication INCO 1-Feb-18 10:25 AM 3-Feb-18 10:15 AM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2267 C-1755 Layer for Admin Building Panel Mark CIG-A-21H,At INCO Pre-Cast INCO 1-Feb-18 10:30 AM 3-Feb-18 10:30 AM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
Fabrication Yard

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2268 C-1756 Layer for Admin Building Panel Mark CIG-A-21H,At INCO Pre-Cast INCO 1-Feb-18 10:35 AM 3-Feb-18 3:00 PM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
Fabrication Yard

Compaction Testing (FDT) Inspection of Subgrade for Fire Alaram System


2269 C-1757 Duct bank trench, West side of New Sub Station Building (12 Linear NEW SUB STATION 1-Feb-18 11:00 AM 3-Feb-18 9:00 AM RA-819460-02-0F2 SALMAAN ISHFAQ AHMED 1
Meter long)
Pre-Casst @ ju'aymah shops,
& Pre-Stressed plant N-26
Pe Concreting Inspection (Bed and Pre-stressing
of stand) of Hollow Core Panel For Admin Building At INCO Pre-Cast
Fabrication Yard Panel Mark (HCS Mark HR-501(4NOS),HR-
501A(2NOS),HR-502,HR-503(2NOS),HR-503A, HR-504(2NOS)HR-310B,HR-
2270 C-1758 311(2NOS),HR-311A(2NOS ),HR-312(2NOS) HR-313A,HR-313B,HR-314,HR- INCO 1-Feb-18 11:05 AM 3-Feb-18 11:30 AM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
314A,HR-314B,HR-315(2NOS),HR-315A,HR-316(4NOS),
Pre-Casst & Pre-Stressed Concreting Testing Sampling and HR-
Placement
319(3NOS),HR-320(3NOS),HR-321,HR-322,HR-323,HR-
Inspection Hollow Core Panel For Admin Building At301,HR-301A,HR-
302(2NOS) of
Fabrication Yard
INCO Pre-Cast
HR-302A,HR-303,HR-304B(2NOS),HR-304A,HR-305C,HR-
Panel Mark (HCS Mark for Admin Building HR-
309A,HR-309,HR-310,HR-310A
501(4NOS),HR-501A(2NOS (Total 54 NOS) ),HR-503A, HR-
),HR-502,HR-503(2NOS
2271 C-1759 504(2NOS)HR-310B,HR-311(2NOS),HR-311A(2NOS),HR-312(2NOS) HR- INCO 1-Feb-18 11:10 AM 3-Feb-18 1:00 PM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
313A,HR-313B,HR-314,HR-314A,HR-314B,HR-315(2NOS),HR-315A,HR-
316(4NOS),
Pre-Cast HR-319(3NOS),HR-320(3NOS),HR-321,HR-322,HR-
& Pre Stressed Concreting Curing and F inal Inspection 323,HR-
for Admin
301,HR-301A,HR-302(2NOS)
Building HR-302A,HR-303,HR-304B(2NOS),HR-
Hollow Core Panel For Admin Building At INCO Pre-Cast
304A,HR-305C,HR-309A,HR-309,HR-310,HR-310A
Fabrication (Total 54 NOS)
Yard HCS Mark HR-719,HR- 716,HR-719,HR-714A,HR-
2272 C-1760 714A,HR-716,HR-510,HR-511A,HR-512,HR-511, ,HR-510,HR-506,HR- INCO 1-Feb-18 11:05 AM 3-Feb-18 11:10 AM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
508,HR-509,HR-506,HR- 506,HR-508,HR-507,HR-508,HR-506,HR-507, HR-
503(4NOS)HR-505,HR-716(3NOS),HR-718,HR-703,HR-702,HR-711,HR-
712(Total 34 NOS)
Grade and site preparation Inspection for Granty Crane Foundations G/L SHIPPING & RECEIVING
2273 C-1761 2 and around A to G. Shipping and Receiving area @ ju'aymah shops, 1-Feb-18 11:10 AM 3-Feb-18 10:00 AM RA-819991-02-0F2 SALMAAN ISHFAQ AHMED
plant N-26 AREA

Lean Concrete testing sampling and casting Inspection for Granty Crane SHIPPING & RECEIVING
2274 C-1762 Foundations G/L 2 and around A to G. Shipping and Receiving area @ 1-Feb-18 11:15 AM 3-Feb-18 3:00 PM RA-819991-02-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26 AREA

Concrete and CMU Surface Preparation and Protection Inspection


2275 C-1763 200X200X400 between Gridline C to D @ Grid line 11 and G/L E towrd ADMIN BUILDING 1-Feb-18 2:00 PM 3-Feb-18 8:00 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
10 Groun floor Admin Building, @ ju'aymah shops, plant N-26

CPVC Pipes and fittings Installation & Assembly Inspection of 2"ø for
2276 P-0212 Portable Water line about 6 LM from Outside New Admin Building (North ADMIN BUILDING 1-Feb-18 2:00 PM 3-Feb-18 7:30 AM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26.

CPVC Pipes and fittings Installation & Assembly Inspection of 2"ø for Raw
2277 P-0213 Water line about 6 LM from Outside New Admin Building (North Side) To ADMIN BUILDING 1-Feb-18 2:05 PM 3-Feb-18 8:00 AM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Inside New Admin Building Area @ Ju'aymah Shop Plant N-26.

Pre-Test Punch Listing for HT Package UJS-ADMB-PW-004- 00 (Potable


2278 P-0214 Water) about 6 LM from Outside New Admin Building (North Side) To ADMIN BUILDING 1-Feb-18 2:08 PM 3-Feb-18 1:30 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Inside New Admin Building Area @ J u'aymah Shop Plant N-26

Internal Cleanliness / Flushing for HT Package UJS-ADMB-PW-004-00


2279 P-0215 (Potable Water) about 6 LM from Outside New Admin Building (North ADMIN BUILDING 1-Feb-18 2:10 PM 3-Feb-18 1:45 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-ADMB-PW-004-00


2280 P-0216 (Potable Water) about 6 LM from Outside New Admin Building (North ADMIN BUILDING 1-Feb-18 2:15 PM 3-Feb-18 2:00 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Verification of Test Preparation for HT Package UJS-ADMB-PW-004-00


2281 P-0217 (Potable Water) about 6 LM from Outside New Admin Building (North ADMIN BUILDING 1-Feb-18 2:15 PM 3-Feb-18 2:15 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-ADMB-RW- 004-00 (Raw Water)


2282 P-0218 about 6 LM from Outside New Admin Building (North Side) To Inside New ADMIN BUILDING 1-Feb-18 2:20 PM 3-Feb-18 2:30 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Admin Building Area @ Ju'aymah Shop Plant N-26

Internal Cleanliness / Flushing for HT Package UJS-ADMB-RW-004-00


2283 P-0219 (Raw Water) about 6 LM f rom Outside New Admin Building (North Side) ADMIN BUILDING 1-Feb-18 2:22 PM 3-Feb-18 2:45 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Verification of Testing Equipment for HT Package UJS-ADMB-RW-004-00


2284 P-0220 (Raw Water) about 6 LM from Outside New Admin Building (North Side) ADMIN BUILDING 1-Feb-18 2:30 PM 3-Feb-18 3:00 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Verification of Test Preparation for HT Package UJS-ADMB-RW-004-00


2285 P-0221 (Raw Water) about 6 LM f rom Outside New Admin Building (North Side) ADMIN BUILDING 1-Feb-18 2:35 PM 3-Feb-18 3:15 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

2286 C-1764 Sand back Filling around and above sewer pipe in the toilet 116 first floor ADMIN BUILDING 1-Feb-18 3:00 PM 3-Feb-18 1:00 PM RA-819774-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Admin Building @ Ju'aymah Shop Plant N-26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building Hollow Core Panel For Admin Building At INCO Pre-Cast
2287 C-1765 Fabrication Yard Panel Mark (HCS Mark ,HR-503(04 NOS),HR-505,HR- INCO 3-Feb-18 11:00 AM 4-Feb-18 10:30 AM 0016-A-ER-001-04 WILFREDO MAMDOOH
506(04 NOS),HR-507(02 NOS), HR-508(03 NOS),HR-509,HR-510, ,HR-
510A,HR-511,HR-511A,HR-512,HR-527(21 NOS)

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2288 C-1766 Building Admin Building Panel Mark CIG-A-07,CIG-A-22,CIG-A-22A (Total INCO 3-Feb-18 11:02 AM 4-Feb-18 10:00 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
03 Nos , At INCO Pre-Cast Fabrication Yard

2289 C-1767 Curing Inspection of Concrete of Slab on Grade at gridline ( 2-5) (A-B ) & ADMIN BUILDING 3-Feb-18 11:05 AM 4-Feb-18 10:00 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
(2-3) (B-C) for Admin building aera @ Ju'Ay mah, Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2290 C-1768 Inspection of 4000 PSi for 'Elevator Shear Wall (3rd Lift) (from Elev. 4.2 m ADMIN BUILDING 3-Feb-18 11:08 AM 4-Feb-18 2:30 PM RA-819726-01-0F2 QUADRI ISHFAQ AHMED
to Elev. 8.4 m) and elevator shear wall (3rd lift) (from elev. 4.2m to elev.
8.4m) at Admin Building, Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2291 C-1769 Inspection of 4000 PSi for 'Roof Beams at Grid Line (1-4) (A-F) RB1, RB1A, ADMIN BUILDING 3-Feb-18 11:10 AM 4-Feb-18 2:45 PM RA-819726-01-0F2 QUADRI ISHFAQ AHMED
RB3 at Admin Building, Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2292 C-1770 Inspection of 4000 PSi for Exit Staircase (2nd Floor) (2nd Lift) at Grid Line GULF 3-Feb-18 11:12 AM 4-Feb-18 3:00 PM RA-819746-001-00 QUADRI ISHFAQ AHMED
Pre-Casst
(B-C) (1-2)& Pre-Stressed
' at Admin Building
Pe Concreting
Juaymah Inspection
Shops N-26(Bed
@ Gulf
andconsult
Pre-stressing
of stand) of Hollow Core Panel For Admin Building At INCO Pre-Cast
Fabrication Yard Panel Mark (HCS Mark) HR-317,HR-318(2NOS),HR-
317B,HR-317A,HR-304(4NOS),HR-305(6NOS),HR-305A(2NOS) HR-
2293 C-1771 305B,HR-306(5NOS),HR-306A(2NOS),HR-307(4NOS),HR-307A,HR- INCO 3-Feb-18 11:15 AM 4-Feb-18 11:30 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
307B,HR-307C,
Pre-Casst HR-307D,HR-308,,HR-308A,,HR-308B,HR-311B,,HR-
& Pre-Stressed Concreting Testing Sampling and Placement
311C,HR-311D(2NOS),HR-311E(2NOS)
Inspection of Hollow Core Panel For AdminHR-311F(2NOS),HR-312A,HR-
Building At INCO Pre-Cast
312B,HR-312C,HR-313,HR-312D,HR-312E,HR-312F,HR-712A
Fabrication Yard Panel Mark (HCS Mark) HR-317,HR-318(2NOS),HR- HR-713,HR-
714(2NOS),HR-715,HR-716A,HR-727,HR-727A,HR-727B,HR-727C,HR-728,
317B,HR-317A,HR-304(4NOS),HR-305(6NOS),HR-305A(2NOS) HR-
HR-729,HR-730,HR-729A,HR-701(2NOS)(Total 67 NOS)
305B,HR-306(5NOS),HR-306A(2NOS),HR-307(4NOS),HR-307A,HR-
2294 C-1772 INCO 3-Feb-18 11:18 AM 4-Feb-18 1:00 PM 0016-A-ER-01-04 WILFREDO MAMDOOH
307B,HR-307C, HR-307D,HR-308,,HR-308A,,HR-308B,HR-311B,,HR-
311C,HR-311D(2NOS),HR-311E(2NOS) HR-311F(2NOS),HR-312A,HR-
312B,HR-312C,HR-313,HR-312D,HR-312E,HR-312F,HR-712A
Material,Receiving Inspection of Pre-Cast Concrete MembersHR-713,HR-
Hollow
714(2NOS),HR-715,HR-716A,HR-727,HR-727A,HR-727B,HR-727C,HR-728,
Core Slab For Admin Building HCS (HCS mark 67NOSHR-719,HR-716,HR-
HR-729,HR-730,HR-729A,HR-701(2NOS)(Total
719,HR-714A,HR-714A,HR-716,HR-510,HR-511A )
HR-512,HR-511,HR-
2295 C-1773 PLANT N-26 3-Feb-18 11:20 AM 4-Feb-18 7:00 AM 0016-A-ER-01-04 BAQAR ISHFAQ AHMED
510,HR-506,HR-508,HR- 509,HR-506,HR-506,HR-508,HR-507,HR-508 HR-
506,HR-507,HR-503(4NOS),HR- 505,HR-716(3NOS),HR- 718,HR-703,HR-
702,HR-711,HR-712
Pre-cast Concrete Pre-Installation
(Total 34 NOS)At
Inspection
Ju'aymah
of Hollow
Shops Plant
Core SN-26
lab For
Admin Building (HCS MARK) HR-719,HR-716,HR-719,HR-714A,HR-
714A,HR-716,HR-510,HR-511A HR-512,HR- 511,HR-510,HR-506,HR-
2296 C-1774 508,HR-509,HR-506,HR- 506,HR-508,HR-507,HR-508C HR-506,HR-507,HR- ADMIN BUILDING 3-Feb-18 11:22 AM 4-Feb-18 7:30 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
503(4NOS),HR-505,HR-716(3NOS),HR-718,HR-703,HR- 702,HR-711,HR-712
(Total 34Concrete
Pre-cast NOS)At Ju'aymah Shops Plant N-26 (Total 47 NOS)At Ju'aymah
Shops
For N-26 Erection and Alignment Inspection of Hollow Core Slab
PlantBuilding
Admin
(HCS MARK)HR-719,HR-716,HR- 719,HR-714A,HR-714A,HR-716,HR-
2297 C-1775 510,HR-511A HR-512,HR-511,HR-510,HR-506,HR-508,HR-509,HR-506,HR- ADMIN BUILDING 3-Feb-18 11:25 AM 4-Feb-18 8:00 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
506,HR-508,HR-507,HR- 508 HR-506,HR-507,HR-503(4NOS),HR-505,HR-
716(3NOS),HR-718,HR-703,HR- 702,HR-711,HR-712 (Total 34 NOS)At
Ju'aymah Shops Plant N-26 (Total 47 NOS)At Ju'aymah Shops Plant N-26
Concrete and CMU Installation Inspection 200X200X400 between
2298 C-1776 Gridline C to D @ Grid line 11, and G/L E towrd 10 Groun floor Admin ADMIN BUILDING 3-Feb-18 11:30 AM 4-Feb-18 8:00 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
Building, (in Process) @ ju'aymah shops, plant N-26

Concrete and CMU Surface Preparation and Protection Inspection For


2299 C-1777 Room # WH 134 (150X200X400), Room # MT 135 (200X200X400) and ADMIN BUILDING 3-Feb-18 11:32 AM 4-Feb-18 8:00 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
Stare Case Room # 130 (200X200X400) Groun floor Admin Building,

Concrete and CMU Installation Inspection For Room # WH 134


2300 C-1778 (150X200X400), Room # MT 135 (200X200X400) and Stare Case Room # ADMIN BUILDING 3-Feb-18 11:35 AM 4-Feb-18 8:30 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
130 (200X200X400) Groun floor Admin Building, @ ju'aymah shops,
plant N-26

2301 C-1779 Curing Inspection of Concrete of Fire Wall (01 N0 ) above FGL 3nd Wall NEW SUB STATION 3-Feb-18 11;34 4-Feb-18 8:15 AM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
From North at n New Substation @ Ju'Aymah, Shops Plant N- 26

Curing Inspection of Concrete of Slab on Grade at gridline ( 3-5 ) (B-E )


2302 C-1780 for Panel 4 & 5 at Admin building aera @ Ju'Aymah, Shops Plant N- 26 ADMIN BUILDING 3-Feb-18 11:38 AM 4-Feb-18 8:00 AM RA-819722-01-04 QUADRI ISHFAQ AHMED

Filling and Pressurization for HT Package UJS-ADMB-PW-004-00 (Potable


2303 P-0222 Water) about 6 LM from Outside New Admin Building (North Side) To ADMIN BUILDING 3-Feb-18 11:00 AM 4-Feb-18 7:15 AM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Inside New Admin Building Area @ J u'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-PW-004-00


2304 P-0223 (Potable Water) about 6 LM from Outside New Admin Building (North ADMIN BUILDING 3-Feb-18 11:02 AM 4-Feb-18 8:00 AM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJS-ADMB-PW-004-


2305 P-0224 00(Potable Water) about 6 LM from Outside New Admin Building (North ADMIN BUILDING 3-Feb-18 11:05 AM 4-Feb-18 12:30 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Filling and Pressurization for HT Package UJS-ADMB-RW-004-00 (Raw


2306 P-0225 Water) about 6 LM from Outside New Admin Building (North Side) To ADMIN BUILDING 3-Feb-18 11:08 AM 4-Feb-18 1:00 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Visual Inspection at Test Pressure for HT Package UJS-ADMB-RW-004-00


2307 P-0226 (Raw Water) about 6 LM f rom Outside New Admin Building (North Side) ADMIN BUILDING 3-Feb-18 11:10 AM 4-Feb-18 1:30 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

De- Pressurization & Water Disposal for HT Package UJ S-ADMB-RW-004-00


2308 P-0227 (Raw Water) about 6 LM f rom Outside New Admin Building (North Side) ADMIN BUILDING 3-Feb-18 11:12 AM 4-Feb-18 5:45 PM RA-819771-01-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Visual Inspection of Excavation Trenching for 120 mm2 Tined Bare


2309 E-0167 Copper Conductor (Before Conductor Laying) in Transformer Area at NEW SUB STATION 3-Feb-18 11:00 AM 4-Feb-18 10:00 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
new sub station building @ Ju'aymah shops plant N-26

Visual inspection of 120 mm² bare tinned grounding conductor laying for
2310 E-0168 Transfomer Area-2118 Main Grounding Grid, at new sub station NEW SUB STATION 3-Feb-18 11:05 AM 4-Feb-18 10:15 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
building @ Ju'aymah shops plant N-26

Visual Inspection of Copper Grounding Rod Installation 19mm X 3 mtrs, in


2311 E-0169 Transformer Area at New Sub-Station Building @ Ju'aymah Shops plant NEW SUB STATION 3-Feb-18 11:10 AM 4-Feb-18 10:30 AM RA-819840-01-F2 NOLI DAMIAN ABAA
N-26, As per attached Highlighted Drawing.

Visual Inspection of Grounding Rod to 120mm2 Tined Bare Copper


2312 E-0170 Conductor Exothermic Cad welding, in Transformer Area At New Sub- NEW SUB STATION 3-Feb-18 11:15 AM 4-Feb-18 11:00 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
Station Building @ Ju'aymah Shops plant N-26, As per attached
Highlighted Drawing.

Visual Inspection of Excavation Trenching (Before Cable Laying) of Main


2313 E-0171 Grid Grounding Cable Installation at new Admin building @ Ju'aymah ADMIN BUILDING 3-Feb-18 11:20 AM 4-Feb-18 8:30 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
shops plant N-26, As per attached Highlighted Drawing.

Visual inspection of 120 mm² Insulated grounding Cable laying for Main
2314 E-0172 Grid Grounding, At New Admin Bldg. Ju'aymah shops plant N-26, As per ADMIN BUILDING 3-Feb-18 11:22 AM 4-Feb-18 8:45 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
attached Highlighted Drawing.

Visual Inspection of Copper Grounding Rod Installation 16mm X 2.4 mtrs,


2315 E-0173 (3 Nos.) At New Admin Building Ju'aymah Shops plant N-26, As per ADMIN BUILDING 3-Feb-18 11:25 AM 4-Feb-18 9:00 AM RA-819714-01-02 NOLI ALI M. AL YASEEN
attached Highlighted Drawing.

2316 ST-W-0008 Material Receiving Inspecion for SMAW Electrods (7018) 3.2mm and ADMIN BUILDING 2-Feb-18 11:00 AM 3-Feb-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
(5*3kg & 4*2.8kg) @ Substation Building Ju'aymah Shops plant N-26

Compaction Testing (FDT) Inspection of Subgrade for Electrical Duct Bank


2317 C-1781 (DB-5) North side of Existing Welding Shop @ ju'aymah shops, plant N- WELDING SHOP 4-Feb-18 11:00 AM 5-Feb-18 3:30 PM RA-819460-02-01 SALMAAN ISHFAQ AHMED 1+1
26

2318 C-1782 Site and Grade preparation for Electrical Duct bank (DB-5), North side of WELDING SHOP 4-Feb-18 11:02 AM 5-Feb-18 11:00 AM RA-819460-02-01 SALMAAN ISHFAQ AHMED
Existing Welding Shop @ ju'aymah shops, plant N-26

2319 C-1783 Concrete Testing, Sampling and Casting for Electrical Duct bank (DB-5), WELDING SHOP 4-Feb-18 11:08 AM 5-Feb-18 2:00 PM RA-819460-02-01 SALMAAN ISHFAQ AHMED
North side of Existing Welding S hop @ ju'aymah shops, plant N-26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2320 C-1784 Building Panel Mark CG-A-03,CIG-A-20,CIG-A-20H (Total 03 NOS) At INCO INCO 4-Feb-18 11:10 AM 5-Feb-18 10:30 AM 0016-A-ER-04-0F2 WILFREDO MAMDOOH
Pre-Cast Fabrication Yard

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Sub
2321 C-1785 Station Building anel Mark SS-SB-01(03 NOS) and SS-SC-01(03 NOS ) At INCO 4-Feb-18 11:11 AM 5-Feb-18 10:40 AM 0016-A-ER-01-0F4 WILFREDO MAMDOOH
INCO Pre-Cast Fabrication Yard

2322 C-1786 Curing Inspection of Concrete of Slab on Grade at gridline ( 2-5 ) (E-F ) ADMIN BUILDING 4-Feb-18 11:15 AM 5-Feb-18 10:00 AM RA-819722-01-0F7 SALMAAN ISHFAQ AHMED not in QMIS
at Admin building aera @ Ju'Aymah, Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2323 C-1787 Inspection of 5000 PSi for ' Doulbe Tee Slab for Sub S tation Building @ GULF 4-Feb-18 11:16 AM 5-Feb-18 2:30 PM 0016-A-ER-01-0F10 QUADRI MAMDOOH
INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-01A and SS-DT-02A (2
Concrete
Nos.), Total
283Days
Nos.@
Compressive
Gulf consultStrength Testing & Final Acceptance
Inspection of 5000 PSi for 'Hollow Core Panels for Admin Building @ INCO
Pre-Cast Fabrication Yard (Panel Mark 'H1-503, H1-504, H1-505 (2 Nos),
H1-505A, H1-506, H1-506A, H1- 506H, H1-507 (2 Nos), H1-508 ' H1-509
2324 C-1788 (2 NosH1-510 (2NOS),H1- 510H (2NOS), H1-511(3NOS),H1-512,H1- GULF 4-Feb-18 11:17 AM 5-Feb-18 2:50 PM 0016-A-ER-01-0F4 QUADRI MAMDOOH
513,H1- 513A,H1-514 H1- 515, H1-515A, H1-516 (4 Nos), H1-517, H1-
517H, H1-518, H1-519, H1-520, H1-522, H1-523, H1-524, H1-525, H1-
526, H1-527, H1-528, H1-529, H1-530, H1-531, H1- 532, H1-533, H1-534,
H1-535,
Visual Inspection
H1-536, H1-537,
MaterialH1-538,
ReceivingH1-539
Handling Storage and preservation of
2325 C-1789 Thioflex 600 Gun Grade Joint Sealant Grey 4 Liter Can (QTY=20 Can ) PLANT N-26 4-Feb-18 11:18 AM 5-Feb-18 8:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
From Fosam company Limited (Fosroc) @ ETE Laydown,JaAymah,shops
Plant N-26

Concrete and CMU Surface Preparation and Protection Inspection For


2326 C-1790 (200X200X400), Mechenical Room -124, Electrical Room -125 and Tele ADMIN BUILDING 4-Feb-18 11:20 AM 5-Feb-18 7:00 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
Com Room - 123 Groun floor Admin Building, @ ju'aymah shops, plant N-
26

Concrete and CMU Installation Inspection ( In process) For


2327 C-1791 (200X200X400), Mechenical Room -124, Electrical Room -125 and Tele ADMIN BUILDING 4-Feb-18 11;22 5-Feb-18 9:00 AM RA-819745-03-00 SALMAAN ISHFAQ AHMED
Com Room - 123 Groun floor Admin Building, @ ju'aymah shops, plant N-
26

Site and Grade preparation for Fire Alaram System Duct bank, West side
2328 C-1792 of New Sub Station Building (12 Linear Meter long) @ ju'aymah shops, NEW SUB STATION 4-Feb-18 11:23 AM 5-Feb-18 10:00 AM RA-819283-002-0F1 SALMAAN ISHFAQ AHMED
plant N-26

FBE Rebars and Embedded Items inspecton for Fire Alaram System Duct
2329 C-1793 bank, West side of New Sub Station Building (12 Linear Meter long) @ NEW SUB STATION 4-Feb-18 11:25 AM 5-Feb-18 10:15 AM RA-819283-002-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Concret Testing Sampling and Casting Inspection for Fire Alaram System
2330 C-1794 Duct bank, West side of New Sub Station Building (12 Linear Meter long) NEW SUB STATION 4-Feb-18 11:26 AM 5-Feb-18 10:15 AM RA-819283-02-0F1 SALMAAN ISHFAQ AHMED
@ ju'aymah shops, plant N-26
Material,Receiving Inspection of Pre-Cast Concrete Members Hollow
Core Slab For Admin Building HCS Mark HR-701A,HR-702A,HR-
703A,HR-702B,HR-703B,HR-701A,HR-710,HR-705C,HR-705D ,HR-
2331 C-1795 705D,HR-705,HR-704A,HR-706,HR-706,HR-707,HR-708B,HR-726,HR- PLANT N-26 4-Feb-18 11:28 AM 5-Feb-18 7:00 AM 0016-A-ER-01-04 BAQAR ISHFAQ AHMED
725,HR-725A,HR-724, HR-721A,HR-723,HR-722,HR-721A,HR-714A,HR-
720,HR-714A,HR-714A,HR-716,HR-720 (Total 30 NOS)At J u'aymah Shops
Plant N-26
Pre-cast Concrete Pre-Installation Inspection of Hollow Core S lab For
Admin Building HCS Mark HR-701A,HR-702A,HR-703A,HR-702B,HR-
2332 C-1796 703B,HR-701A,HR-710,HR-705C,HR-705D HR-721A,HR-723,HR- 722,HR- ADMIN BUILDING 4-Feb-18 11:30 AM 5-Feb-18 7:30 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
721A,HR-714A,HR-720,HR-714A,HR- 714A,HR-716,HR-720 (Total 30
NOS)At Ju'aymah Shops Plant N-26
Pre-cast Concrete Erection and Alignment Inspection of Hollow Core Slab
For Admin Building HCS Mark HR-701A,HR-702A,HR-703A,HR-702B,HR-
2333 C-1797 703B,HR-701A,HR-710,HR-705C,HR-705D ,HR-705D,HR-705,HR-704A,HR- ADMIN BUILDING 4-Feb-18 11:31 AM 5-Feb-18 8:00 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
706,HR-706,HR-707,HR- 708B,HR-726,HR-725,HR-725A,HR-724, HR-
721A,HR-723,HR-722,HR-721A,HR-714A,HR-720,HR-714A,HR-714A,HR-
716,HR-720 (Total 30 NOS)At Ju'aymah Shops Plant N-26
Visual Inspection of 4x4" PVC conduit installation and Final Mandrel test
2334 T-0048 for Telecom Duct Bank length in 43 metres at Admin building west side ADMIN BUILDING 4-Feb-18 2:00 PM 5-Feb-18 11:00 AM RA-819517-01-0F2 AFZAL M. Z. NAVEED
area @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of Telecom Duct Bank Sand bedding and orange color
2335 T-0049 tape installation length in 43 metres at Admin building west side @ ADMIN BUILDING 4-Feb-18 2:02 PM 5-Feb-18 1:30 PM RA-819517-01-0F2 AFZAL M. Z. NAVEED
Upgraded Ju'aymah Shops Plant N-26.

2336 T-0050 Visual Inspection of Telecom Duct Bank Trench excavation, length in 8 PLANT N-26 4-Feb-18 2:05 PM 5-Feb-18 10:30 AM RA-819460-02-0F1 AFZAL M. Z. NAVEED
metres at New Machine shops @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of 3x4" PVC conduit installation and Initial Mandrel test
2337 T-0051 for Telecom Duct Bank length in 8 meters at New Machine shops @ PLANT N-26 4-Feb-18 2:06 PM 5-Feb-18 3:00 PM RA-819460-02-0F1 AFZAL M. Z. NAVEED
Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of trench for installationof grounding cable 4 AWG


2338 T-0052 tinned bare copper ground wire New substation area @ Upgraded NEW SUB STATION 4-Feb-18 2:08 PM 5-Feb-18 2:00 PM RA-819840-01-0F2 AFZAL M. Z. NAVEED
Ju'aymah Shops Plant N-26.

Visual Inspection for Grounding cable installation of 4 AWG 2 RUN tinned


2339 T-0053 bare copper ground wire New substation area @ Upgraded J u'aymah NEW SUB STATION 4-Feb-18 2:10 PM 5-Feb-18 2:45 PM RA-819840-01-0F2 AFZAL M. Z. NAVEED
Shops Plant N-26.(RA-819906-001-00)

Visual Inspection for CAD WELDING of Grounding cable installation 4


2340 T-0054 AWG 2 RUN tinned bare copper ground wire New substation area @ NEW SUB STATION 4-Feb-18 2:12 PM 5-Feb-18 3:00 PM RA-819840-01-0F2 AFZAL M. Z. NAVEED
Upgraded Ju'aymah Shops Plant N-26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection of Excavation Trenching for 120 mm2 Tined Bare


2341 E-0174 Copper Conductor (Before Conductor Laying) in Transformer Area at NEW SUB STATION 4-Feb-18 2:15 PM 5-Feb-18 3:00 PM RA-819840-01-0F2 NOLI DAMIAN ABAA
new sub station building @ Ju'aymah shops plant N-26

Visual inspection of 120 mm² bare tinned grounding conductor laying for
2342 E-0175 Transfomer Area-2118 Main Grounding Grid, at new sub station building NEW SUB STATION 4-Feb-18 3:00 PM 5-Feb-18 3:15 PM RA-819840-01-0F2 NOLI DAMIAN ABAA
@ J u'aymah shops plant N-26

Visual Inspection of 120mm2 to 120mm2 Tined Bare Copper Conductor


2343 E-0176 Exothermic Cad welding, in Transformer Area At New Sub-S tation NEW SUB STATION 4-Feb-18 3:10 PM 5-Feb-18 3:30 PM RA-819840-01-0F2 NOLI DAMIAN ABAA
Building @ Ju'aymah Shops plant N-26, As per attached Highlighted

Visual Inspection of FDAS Duck Bank Excavation Trenching at Near New


2344 E-0177 Sub Station Area, As per attached highlighted drawing. NEW SUB STATION 4-Feb-18 3:12 PM 5-Feb-18 3:30 PM RA-819840-01-0F2 NOLI DAMIAN ABAA

Visual Inspection of FDAS Duck Bank , 4" Conduit Pipe & spacers
2345 E-0178 Installation , and Embedded Hardware Prior to Concrete Placement, NEW SUB STATION 4-Feb-18 3:16 PM 5-Feb-18 10:30 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
Near Sub Station Area. As per highlighted Attached Drawing.

Visual Inspection of Excavation Trenching (Before Cable Laying) of Main


2346 E-0179 Grid Grounding Cable Installation at new Admin building @ Ju'aymah ADMIN BUILDING 4-Feb-18 3:18 PM 5-Feb-18 8:00 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
shops plant N-26, As per attached Highlighted Drawing.

Visual Inspection of 120mm2 to Rod Isulated Copper Conductor


2347 E-0180 Exothermic Cad welding, At New Admin Building @ Ju'aymah Shops ADMIN BUILDING 4-Feb-18 3:20 PM 5-Feb-18 8:00 AM RA-819840-01-F2 NOLI DAMIAN ABAA
plant N-26, As per attached Highlighted Attached Drawing.

Fill placement of Sweet Sand 30cm thick above and around,for Raw
2348 C-1798 Water and Potable Water Line New Admin Building Toilet - 116 @ ADMIN BUILDING 4-Feb-18 1:00 PM 5-Feb-18 9:00 AM RA-819770-01-0F0 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26

2349 C-1799 Fill placement of Select fill Material (Final Layer) from Grid line 1 to 3 and ADMIN BUILDING 5-Feb-18 11:00 AM 6-Feb-18 7:15 AM RA-819722-01-00F4 SALMAAN ISHFAQ AHMED not in QMIS
C to E Ground Floor at New Admin Building ju'aymah shops, plant N-26

Compaction Testing (FDT) inspection of Select fill Material (Final Layer)


2350 C-1800 from Grid line 1 to 3 and C to E Ground Floor at New Admin Building ADMIN BUILDING 5-Feb-18 11:02 AM 6-Feb-18 8:00 AM RA-819722-01-0F4 SALMAAN ISHFAQ AHMED 3
ju'aymah shops, plant N-26

Anti Termite Material Preparation / Mixing and application from Grid line
2351 C-1801 1 to 3 and C to E, Ground Floor at New Admin Building, ju'aymah shops, ADMIN BUILDING 5-Feb-18 11:05 AM 6-Feb-18 9:00 AM RA-819722-01-0F4 SALMAAN ISHFAQ AHMED
plant N-26

2352 C-1802 Form work inspection for Slab on Grade from Grid line 1 to 3 and C to E, ADMIN BUILDING 5-Feb-18 11:08 AM 6-Feb-18 1:00 PM RA-819722-01-0F4 SALMAAN ISHFAQ AHMED
Ground Floor at New Admin Building, ju'aymah shops, plant N-26

2353 C-1803 FBE Rebar (Wire Mesh) for Slab on Grade from Grid line 1 to 3 and C to E, ADMIN BUILDING 5-Feb-18 11:10 AM 6-Feb-18 1:30 PM RA-819722-01-0F4 SALMAAN ISHFAQ AHMED
Ground Floor at New Admin Building, ju'aymah shops, plant N-26

Concrete Testing, Sampling and Casting for Slab on Grade from Grid line 1
2354 C-1804 to 3 and C to E, Ground Floor at New Admin Building, ju'aymah shops, ADMIN BUILDING 5-Feb-18 11:12 AM 6-Feb-18 2:00 PM RA-819722-01-F4 SALMAAN ISHFAQ AHMED
plant N-26

2355 C-1805 Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin INCO 5-Feb-18 11:15 AM 6-Feb-18 10:30 AM 0016-A-ER-001-04 WILFREDO MAMDOOH
Building Panel Mark CIG-A-12, At INCO Pre-Cast Fabrication Yard

2356 C-1806 Curing Inspection of Concrete of Switch Rack Foundation at North side of SHIPPING & RECEIVING 5-Feb-18 11:16 AM 6-Feb-18 10:00 AM RA-819992-001-0F3 SALMAAN ISHFAQ AHMED not in QMIS
Shipping Receiving area @ Juaymah, Shops Plant N- 26 AREA

2357 C-1807 Material Receiving Inspection of Base Course Class A Material From Al- PLANT N-26 5-Feb-18 11:18 AM 6-Feb-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
Osais (Qty=165 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Material Receiving,Handling Storage and Preservation Inspection of 0


2358 C-1808 Hours Fire Rated Cmu Block Size 100 x 200 x 400 (QTY=1538 Pcs) From Al PLANT N-26 5-Feb-18 11:20 AM 6-Feb-18 10:30 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for
2359 C-1809 Footing of Gantry Crain foundation @ Grid line 2. Shipping & Receiving PLANT N-26 5-Feb-18 11:22 AM 6-Feb-18 10:00 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
area, ju'aymah shops, plant N-26

Concreting Testing, Sampling and Casting Inspection for Footing of Gantry SHIPPING & RECEIVING
2360 C-1810 Crain foundation @ Grid line 2. Shipping & Receiving area, ju'aymah 5-Feb-18 11:23 AM 6-Feb-18 1:30 PM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
shops, plant N-26 AREA

Fill placement of first layer Selectfill Material above Tele Com. Duct bank
2361 C-1811 trench west side of Admin Building (42 Linear Meter) @ ju'aymah shops, ADMIN BUILDING 5-Feb-18 11:24 AM 6-Feb-18 9:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26

Compaction Testing (FDT) inspection of first layer Selectfill Material above


2362 C-1812 Tele Com. Duct bank trench west side of side of Admin Building (42 ADMIN BUILDING 5-Feb-18 11:30 AM 6-Feb-18 9:30 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED 3
Linear Meter) @ ju'aymah shops, plant N-26

Visual inspection of 120 mm² Insulated grounding conductor laying for


2363 E-0181 Main Grounding Grid at New Admin building @ Ju'aymah shops plant N- ADMIN BUILDING 5-Feb-18 11:00 AM 6-Feb-18 8:00 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
26, As per attached drawing.

Visual inspection of Individual Grounding Rod Resistance Testing (3 Nos.)


2364 E-0182 of Main Grounding Grid at New Admin building @ Ju'aymah shops plant ADMIN BUILDING 5-Feb-18 11:10 AM 6-Feb-18 8:30 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
N-26, As per attached drawing. Attached Drawing.

Material Receiving Visual Inspection of PVC Conduit Fitting, Fab. Conduit


2365 E-0183 Coupling TC8/DB Bend 1 Inch. 45 Deg. (30 EA). Long bend 90 deg 1inch PLANT N-26 5-Feb-18 11:12 AM 6-Feb-18 8:45 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
(100 EA) neproplast, At ETE Store Ju'aymah Shops. N26. as per attached
highlighted document.

Visual Inspection of LV Electrical Duck Bank Excavation Trenching at


2366 E-0184 Northern side of welding shop near at New Admin Bldg. As per attached ADMIN BUILDING 5-Feb-18 11:15 AM 6-Feb-18 2:00 PM RA-819460-02-0F2 NOLI ALI M. AL YASEEN
highlighted drawing.

Visual Inspection of LV Electrical Duck Bank , 6" Conduit Pipe & spacers
2367 E-0185 Installation , and Embedded Hardware Prior to Concrete Placement, NEW SUB STATION 5-Feb-18 11:18 AM 6-Feb-18 2:15 PM RA-819460-02-0F2 NOLI ALI M. AL YASEEN
Near Sub Station Area. As per highlighted Attached Drawing.

Visual Inspection of FDAS Duck Bank , 4" Conduit Pipe & spacers
2368 E-0186 Installation , and Embedded Hardware Prior to Concrete Placement, NEW SUB STATION 5-Feb-18 11:20 AM 6-Feb-18 2:30 PM RA-819460-02-0F2 NOLI ALI M. AL YASEEN
Near Sub Station Area. As per highlighted Attached Drawing.

Visual Inspection of 2" & 1" PVC Conduit Pipe S tup-up Installation for
2369 E-0187 Lighting pool Foundation Prior to Concrete,Beside Admin Area, As per ADMIN BUILDING 6-Feb-18 11:00 AM 6-Feb-18 9:30 AM RA-819283-06-00 NOLI ALI M. AL YASEEN
highlighted Attached Drawing.

Visual Inspection before welding for 60 on 8 panels SS-WIG-


2370 ST-W-0009 01,02B,03,04,02C,05,06, & 07 (Check attached Drawing) @ Substation NEW SUB STATION 4-Feb-18 11:00 AM 5-Feb-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Building Ju'aymah Shops Plant |N26

Visual Inspection before welding for 55 on 9 panels SS-WIG-


2371 ST-W-0011 16,12,11,10,09,07,06,05, & SS-W-10 (Check attched Drawing) @ NEW SUB STATION 5-Feb-18 11:00 AM 6-Feb-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Substation Building Ju'aymah Shops Plant |N26

Visual Inspection before welding for 53 on 7 panels SS-WIG- 03,02,01, SS-


2372 ST-W-0012 W-02A, 02D, 02 & (Check attached Drawing) @ Substation Building NEW SUB STATION 5-Feb-18 11:05 AM 6-Feb-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah 28
Concrete Shops
DaysPlant |N26 Strength Testing & Final Acceptance
Compressive
Inspection of 5000 PSi for ' Panel Mark (H1-303, H1-303A, H1-304, H1-
304A, H1-304B, H1-305, H1-305A, H1-308, H1-308A H1-308B, H1-309 (5
Nos), H1-309A, H1-309B, H1-310, H1-310A, H1-310B (2 Nos), H1-311 (2
2373 C-1813 Nos) H1-312, H1-312A, H1-313, H1-313A, H1-314, H1-314A, H1-315 (2 GULF 6-Feb-18 11:00 AM 7-Feb-18 2:30 PM 0016-A-ER-01-04 QUADRI MAMDOOH
Nos), H1-315A, H1-315H H1-316 (2 Nos), H1-316A, H1-317, H1-318,
H1318A, H1-318B, H1-319, H1-319A, H1-320, H1-321, H1-321A, H1-322,
H1-322A, H1-323, H1-324, H1-324A, H1-325, H1-332, H1-332A, H1-332B
Concrete 28 DaysH1-334A,
H1-333, H1-334, Compressive Strength
H1-334B, Testing & Final Acceptance
H1-335.
2374 C-1814 Inspection of 4000 PSi for ' Electrical Duct Bank for LV (20.0 LM ), PSA GULF 6-Feb-18 11:05 AM 7-Feb-18 2:45 PM RA-819460-02-01 QUADRI ISHFAQ AHMED
(17.0 LM) & FDAS (17.0 LM) at Inbetween MTB Building & New Sub
Station @ Ju'Aymah, Shops Plant N- 26 ( 819283-02 Rev-0F1 )

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2375 C-1815 Building of Pre-Cast Lighting Poles Foundation ( 19 Nos ) at Pre- Cast ADMIN BUILDING 6-Feb-18 11:08 AM 7-Feb-18 10:00 AM RA-819463-001-00 WILFREDO ISHFAQ AHMED
Area Near North Side of New Admin Building @ Ju'Aymah, Shops Plant
N- 26

Cast-In-Place Concrete Formwork Inspection for Pre-Casst Light pols


2376 C-1816 Foundations (21 Nos) @ Pre-Cast Yard, North Side of New Admin ADMIN BUILDING 6-Feb-18 11:10 AM 7-Feb-18 9:00 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops, plant N-26

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for
2377 C-1817 Pre-Casst Light pols Foundations (21Nos) @ Pre-Cast Yard, North Side of ADMIN BUILDING 6-Feb-18 11:15 AM 7-Feb-18 9:15 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
New Admin Building, ju'aymah shops, plant N-26

Concrete Testing Sampling and Casting Inspection for Pre-Casst Light pols
2378 C-1818 Foundations (21 Nos), at Pre- Cast Yard, North Side of New Admin ADMIN BUILDING 6-Feb-18 11:18 AM 7-Feb-18 1:30 PM RA-819463-001-00 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops, plant N-26

2nd Fill placement of layer Selectfill Material above Tele Com. Duct bank
2379 C-1819 trench west side of Admin Building (42 Linear Meter) @ ju'aymah shops, ADMIN BUILDING 6-Feb-18 11:20 AM 7-Feb-18 8:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26

2nd layer Compaction Testing (FDT) inspection of Selectfill Material above


2380 C-1820 Tele Com. Duct bank trench west side of side of Admin Building (42 ADMIN BUILDING 6-Feb-18 11:22 AM 7-Feb-18 8:15 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED 3
Linear Meter) @ ju'aymah shops, plant N-26

Compaction Testing Inspection of Subgrade for Transformer Foundation


2381 C-1821 # XFR-2, XFR-3 and XFR-4 (3Nos) at New Substation Building @ ju'aymah NEW SUB STATION 6-Feb-18 11:25 AM 7-Feb-18 9:00 AM RA-819867-001-0F4 SALMAAN ISHFAQ AHMED 3
shops, plant N-26.

2382 C-1822 Surface preparation and Moisture Test Inspection of Switch Rack Footing, SHIPPING & RECEIVING 6-Feb-18 11:30 AM 7-Feb-18 10:00 AM RA-819992-001-0F3 SALMAAN ISHFAQ AHMED
at Shipping and Receiving Area @ ju'aymah shops, plant N-26. AREA

Visual inspection of Individual Grounding Rod Resistance Testing of Main


2383 E-0188 Grounding Grid at New Transformer Area, @ Ju'aymah shops plant N- PLANT N-26 6-Feb-18 11:06 AM 7-Feb-18 9:30 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
26, As per attached drawing. Attached Drawing.

Visual inspection of Individual Grounding Rod Resistance Testing of Main


2384 E-0189 Grounding Grid at New Sub Station Area, @ Ju'aymah shops plant N- NEW SUB STATION 6-Feb-18 11:10 AM 7-Feb-18 9:45 AM RA-819840-01-0F2 NOLI DAMIAN ABAA
26, As per attached drawing.

2385 ST-W-0010 Marerial Receiving Inspection for SMAW Electrodes (7018) 3.2mm & NEW SUB STATION 5-Feb-18 11:00 AM 6-Feb-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
2.5mm (6*kg & 4*2kg) @ Substation Building Ju'aymah Shops, Plant N26.

Varification of Calibration Records for Welding Equipment (i) Welding


2386 ST-W-0013 Power S ource, and (ii) Portable Ovens @ Substation Building Ju'aymah NEW SUB STATION 6-Feb-18 11:12 AM 7-Feb-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
Shops, Plant N26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2387 C-1823 Inspection of 5000 PSi for Panel Mark SS-DT-02A (3 Nos.), Total 3 Nos. @ GULF 7-Feb-18 11:10 AM 8-Feb-18 2:30 PM 0016-A-ER-002-02-04 QUADRI MAMDOOH
Gulf Consult

2388 C-1824 Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin INCO 7-Feb-18 11:12 AM 8-Feb-18 9:00 AM 0016-A-ER-002-02-04 WILFREDO MAMDOOH
Building panels mark (CIG-A-19H At INCO Pre-Cast Fabrication Yard

Material Receiving,Handling Storage and Preservation Inspection of 0


2389 C-1825 Hours Fire Rated Cmu Block Size 150 x 200 x 400 (QTY=1728 Pcs) From Al PLANT N-26 7-Feb-18 11:15 AM 8-Feb-18 10:30 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

Pre-Cast & Pre-Stressed Installation And Final Inspection For Second


2390 C-1826 Floor Hollow Core Slab For Grid Line (1 to 12) and Grid Line (A to E) ADMIN BUILDING 7-Feb-18 11:20 AM 8-Feb-18 9:00 AM 0016-A-ER-002-02-04 WILFREDO MAMDOOH
ADMIN BUILDING LAY OUT MARK (0016-A-ER-006)

Final Backfilling of LV Electrical & FDAS Trench Visual Inspection at


2391 E-0190 Northern side of welding shop Ju'aymah shops plant N-26, As per PLANT N-26 7-Feb-18 2:00 PM 8-Feb-18 2:00 PM RA-819840-01-0F1 NOLI ALI M. AL YASEEN
attached highlighted drawing.

PVC DWV Pipes Installation & Assembly Inspection of 2" Dia for Sanitary
2392 P-0228 Sewer Water Line at First Floor Male Toilet No. 135 in New Admin ADMIN BUILDING 8-Feb-18 10:00 AM 10-Feb-18 8:00 AM RA-819775-01-00 FAHEEM SYED SHAFIULLAH
Building Area @ Ju'Aymah

Visual Inspection for Concrete Incase PVC DB 120 6" & 4" PVC Conduit
2393 E-0191 Pipe Stub-up Installation for MV & LV Cable in Transformer Foundation NEW SUB STATION 8-Feb-18 11:00 AM 10-Feb-18 9:00 AM RA-819844-01-0F2 NOLI DAMIAN ABAA
at New Sub Station # 2118@Ju'Aymah Shops Plant N-26

Visual Inspection of Excavation Trenching (Before Cable Laying) of Main


2394 E-0192 Grid Grounding Cable Installation at new Admin building @ Ju'aymah ADMIN BUILDING 8-Feb-18 11:02 AM 10-Feb-18 8:00 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
shops plant N-26, As per attached Highlighted Drawing.

Visual inspection of 120 mm² Insulated grounding conductor laying for


2395 E-0193 Main Grounding Grid at New Admin building @ Ju'aymah shops plant N- ADMIN BUILDING 8-Feb-18 11:05 AM 10-Feb-18 8:15 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
26, As per attached drawing.

Visual Inspection of Copper Grounding Rod Installation 16mm X 2.4 mtrs,


2396 E-0194 (2 Nos.) At New Admin Building Ju'aymah Shops plant N-26, As per ADMIN BUILDING 8-Feb-18 11:08 AM 10-Feb-18 8:30 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
attached Highlighted Drawing.

Visual inspection of (3 Nos.) Individual Grounding Rod Resistance Testing


2397 E-0195 of Main Grounding Grid at New Admin Building Area, @ Ju'aymah ADMIN BUILDING 8-Feb-18 11:09 AM 10-Feb-18 8:45 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
shops plant N-26, As per attached drawing.

Visual Inspection of Rod to 120mm2 Isulated Copper Conductor


2398 E-0196 Exothermic Cad welding, At New Admin Building @ Ju'aymah Shops ADMIN BUILDING 8-Feb-18 11:12 AM 10-Feb-18 9:30 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
plant N-26, As per attached Highlighted

Visual Inspection of 120mm2 to 120mm2 Isulated Copper Conductor


2399 E-0197 Exothermic Cad welding, At New Admin Building @ Ju'aymah Shops ADMIN BUILDING 8-Feb-18 11:15 AM 10-Feb-18 9:45 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
plant N-26, As per attached Highlighted

2400 E-0198 Visual Inspection of Final Backfilling of Electrical Groung trench at New ADMIN BUILDING 8-Feb-18 11:16 AM 10-Feb-18 10:00 AM RA-819714-01-0F2 NOLI ALI M. AL YASEEN
Admin Building
Pre-Cast Area. Concreting Curing and F inal Inspection for Hollow
& Pre Stressed
Core Panel For Admin Building At INCO Pre-Cast Fabrication Yard Panel
Mark (HCS Mark) HR-317,HR-318(2NOS),HR-317B,HR-317A,HR-
304(4NOS),HR-305(6NOS),HR-305A(2NOS) HR-305B,HR-306(5NOS),HR-
2401 C-1827 306A(2NOS),HR-307(4NOS ),HR-307A,HR-307B,HR-307C, HR-307D HR- INCO 8-Feb-18 11:16 AM 10-Feb-18 10:00 AM 0016-A-ER-01-04 WILFREDO MAMDOOH
308,,HR-308A,,HR-308B,HR-311B,,HR-311C,HR-311D(2NOS),HR-
311E(2NOS) HR-311F(2NOS) HR-312A,HR-312B,HR-312C,HR-313,HR-
312D,HR-312E,HR-312F,HR-712A HR-713 HR-714(2NOS),HR-715,HR-
716A,HR-727,HR-727A,HR-727B,HR-727C,HR-728, HR-729,HR-730 HR-
729A,HR-701(2NOS
Pre-Cast )(Total
& Pre Stressed 67NOS) Curing and F inal Inspection for Admin
Concreting
2402 C-1828 Building Panel Mark CIG-A-21,CIG-A-27,At INCO Pre-Cast Fabrication Yard INCO 8-Feb-18 11:17 AM 10-Feb-18 10:30 AM RA-819460-02-01 WILFREDO MAMDOOH

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2403 C-1829 Inspection of 4000 PSi for ' MV & PSA (foc) Duct Bank No (10 & 11) MV GULF 8-Feb-18 11:20 AM 10-Feb-18 2:30 PM RA-819460-02-01 QUADRI ISHFAQ AHMED
(10.5 LM), MV (10 LM ) FOC ( 14.8 LM ) In between New Work Shop
Area and Paint Shop @ Ju'Aymah, Shops Plant N- 26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2404 C-1830 Inspection of 4000 PSi for 'Slab on Grade at Grid Line (10-11) (C-E) & (11'- ADMIN BUILDING 8-Feb-18 11:21 AM 10-Feb-18 2:30 PM RA-819722-01-04 QUADRI ISHFAQ AHMED
12) (E-F) @ Admin Bldg.Juaymah Shops N-26

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


2405 C-1831 (CIG-A-07,CIG-A-12,CG-A-03,CIG-A-20,CIG-A-19H,CIG-A-22,CIG-A-22A, ADMIN BUILDING 8-Feb-18 11:22 AM 10-Feb-18 7:00 AM 0016-A-ER-01-04 BAQAR ISHFAQ AHMED
CG-A-04H,CG-A- 05,CIG-A-20H) At Admin Building Area @ J u'aymah Shops
Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) (CIG-A-


2406 C-1832 07,CIG-A-12,CG-A-03,CIG-A-20,CIG-A-19H,CIG-A-22,CIG-A-22A, CG-A- ADMIN BUILDING 8-Feb-18 11:23 AM 10-Feb-18 7:30 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
04H,CG-A-05,CIG-A-20H) At Admin Building Area @ Ju'aymah Shops Plant
N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


2407 C-1833 Mark) (CIG-A-07,CIG-A-12,CG-A-03,CIG-A-20,CIG-A-19H,CIG-A-22,CIG-A- ADMIN BUILDING 8-Feb-18 11:24 AM 10-Feb-18 7:40 AM 0016-A-ER-01-04 SALMAAN ISHFAQ AHMED
22A, CG-A-04H,CG-A-05,CIG-A-20H) At Admin Building Area @ Ju'aymah
Shops Plant N-26

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


2408 C-1834 Screed upon hollow Core Slab, 2nd Floor, from Grid Line 2 to 5 and A - B ADMIN BUILDING 8-Feb-18 11:25 AM 10-Feb-18 9:00 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
New Admin Building, ju'aymah shops, plant N-26

FBE Reinforcing Steel, (+Wire Mesh) Embedded Items, Inspection prior to


2409 C-1835 Cast Screed upon hollow Core Slab, 2nd Floor, from Grid Line 2 to 5 and ADMIN BUILDING 8-Feb-18 11:26 AM 10-Feb-18 9:15 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
A to B New Admin Building, ju'aymah shops, plant N-26

Screed (Concrete) Testing, Sampling and Casting upon hollow Core Slab,
2410 C-1836 2nd Floor, from Grid Line 2 to 5 and A to B, New Admin Building, ADMIN BUILDING 8-Feb-18 11:28 AM 10-Feb-18 9:15 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Site and Grade Preparation For transformer Foundation # XFR-1, XFR-2,


2411 C-1837 XF R-3 and XFR-4 (4Nos) at New Substation Building @ ju'aymah shops, NEW SUB STATION 8-Feb-18 11:30 AM 10-Feb-18 9:00 AM RA-819867-001-0F4 SALMAAN ISHFAQ AHMED
plant N-26.

Lean Concrete Testing Sampling and Casting For transformer Foundation'


2412 C-1838 # XFR-1, XFR-2, XFR-3 and XFR-4 (4Nos) at New Substation Building @ NEW SUB STATION 8-Feb-18 11:31 AM 15-Feb-18 9:15 AM RA-819867-001-0F4 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

2413 C-1839 Coating and Final Installation Inspection of Switch Rack Footing, at SHIPPING & RECEIVING 8-Feb-18 11:32 AM 10-Feb-18 7:00 AM RA-819993-01-0F3 SALMAAN ISHFAQ AHMED
Shipping and Receiving Area @ ju'aymah shops, plant N-26 (DFT) AREA

2414 C-1840 Fill placement of Select fill material above the Electrical Duct Bank (DB-5) WELDING SHOP 8-Feb-18 11:33 AM 10-Feb-18 7:30 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED not in QMIS
North side of Existing Welding S hop @ ju'aymah shops, plant N-26

1st layer Select fill material Compaction Testing (F DT) above the Electrical
2415 C-1841 Duct Bank (DB-5) North side of Existing Welding Shop @ ju'aymah WELDING SHOP 8-Feb-18 11:34 AM 10-Feb-18 7:45 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED 1
shops, plant N-26

Fill placement of Select fill material 2nd layer above the Electrical Duct
2416 C-1842 Bank (DB-5) North side of Existing Welding Shop @ ju'aymah shops, WELDING SHOP 8-Feb-18 11:35 AM 10-Feb-18 1:00 PM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26

2nd layer Select fill material Compaction Testing (FDT) above the
2417 C-1843 Electrical Duct Bank (DB-5) North sid of Existing Welding Shop @ WELDING SHOP 8-Feb-18 11:36 AM 10-Feb-18 1:30 PM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED 1
ju'aymah shops, plant N-26

2418 C-1844 FDT Compection test Inspection of Sub Grade for (MV) DB 10,11 and FOC PAINT SHOP 8-Feb-18 11:45 AM 10-Feb-18 9:00 AM RA-81460-02-0F2 SALMAAN ISHFAQ AHMED 3
Extension at Near East side of Paint Shop @ ju'aymah shops, plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Site and Grade Preparation of sub Grade for (MV) DB 10, 11 and FOC
2419 C-1845 Extension at Near East Side of Paint Shop @ ju'aymah shops, plant N-26 PAINT SHOP 8-Feb-18 11:50 AM 10-Feb-18 10:00 AM RA-81460-02-0F2 SALMAAN ISHFAQ AHMED

Concrete Testing Sampling and Casting Inspection for Pre-Casst Light pols
2420 C-1818-A Foundations (21Nos), at Pre-Cast Yard, North Side of New Admin ADMIN BUILDING 7-Feb-18 1:00 PM 8-Feb-18 10:00 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops, plant N-26

Material Receiving Visual Inspection of LV Cables as follows: 1)


Cu/XLPE/SWA/PVC(F R-OR) 1KV 3X35mm2 (1,005m) 2)
2421 E-0199 Cu/XLPE/SWA/PVC(F R-OR) 1KV 3X35mm2 (501m) 3) PLANT N-26 10-Feb-18 11:00 AM 11-Feb-18 9:00 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
Cu/XLPE/SWA/PVC(F R-OR) 1KV 3X4mm2 (1,010m) 4)
Cu/XLPE/SWA/PVC(F R-OR) 1KV 3X4mm2 (1,015m)
Material Receiving Visual Inspection of Gounding Cables as follows: 1)
Cu/PVC 450/750V H07V2R90oC 16mm2 (153m) 2) Cu/PVC 450/750V
2422 E-0200 H07V2R90oC 16mm2 (1,050m) 3) Cu/PVC 450/750V H07V2R90oC PLANT N-26 10-Feb-18 11:05 AM 11-Feb-18 9:15 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
16mm2 (1,020m)

1st layer Fill Placement of Select fill material aroun Switch Rack Footing, SHIPPING & RECEIVING
2423 C-1846 at Shipping and Receiving Area @ ju'aymah shops, plant N-26. AREA 10-Feb-18 11:00 AM 11-Feb-18 7:00 AM RA-819992-001-0F3 SALMAAN ISHFAQ AHMED not in QMIS

1st layer Compaction Testing (FDT) of Select fill material aroun Switch SHIPPING & RECEIVING
2424 C-1847 Rack Footing, at Shipping and Receiving Area @ ju'aymah shops, plant N- AREA 10-Feb-18 11:05 AM 11-Feb-18 7:30 AM RA-819992-001-0F3 SALMAAN ISHFAQ AHMED 1
26.

2nd layer Fill Placement of Select fill material aroun Switch Rack Footing, SHIPPING & RECEIVING
2425 C-1848 at Shipping and Receiving Area @ ju'aymah shops, plant N-26. AREA 10-Feb-18 11:08 AM 11-Feb-18 1:00 PM RA-819992-001-0F3 SALMAAN ISHFAQ AHMED not in QMIS

2nd layer FDT of Select fill material aroun Switch Rack Footing, at SHIPPING & RECEIVING
2426 C-1849 Shipping and Receiving Area @ ju'aymah shops, plant N-26. AREA 10-Feb-18 11:10 AM 11-Feb-18 1:00 PM RA-819992-001-0F3 SALMAAN ISHFAQ AHMED 1

2427 C-1850 Concrete and CMU Surface Preparation and Protection Inspection for ADMIN BUILDING 10-Feb-18 11:12 AM 11-Feb-18 8:00 AM RA-819745-01-00 SALMAAN ISHFAQ AHMED
Male Toilet Room - MT 135,- 100X200X400 Groun floor Admin Building,

Concrete and CMU installation Inspection for Male Toilet Room - MT 135,
2428 C-1851 100X200X400 Groun floor, Admin Building, @ ju'aymah shops, plant N- ADMIN BUILDING 10-Feb-18 11;13 11-Feb-18 8:30 AM RA-819745-01-00 SALMAAN ISHFAQ AHMED
26.

Material,Receiving Inspection for Pre- Cast Concrete Panels (panel Mark)


2429 C-1852 CG-A-21H,CIG-A-24,CIG-A-25,CG-A-26,CIG-A-27,CIG-A-28,CG-A-29,CIG-A- ADMIN BUILDING 10-Feb-18 11:15 AM 11-Feb-18 7:00 AM 0016-A-ER-001--01-04 BAQAR ISHFAQ AHMED
30,CIG-A-31 CG-A-21, At Admin Building Area @ Ju'aymah Shops Plant N-
26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) CG-A-


2430 C-1853 21H,CIG-A-24,CIG- A-25,CG-A-26,CIG-A-27,CIG-A-28,CG-A-29,CIG-A- ADMIN BUILDING 10-Feb-18 11:18 AM 11-Feb-18 7:30 AM 0016-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
30,CIG-A-31 CG-A-21, At Admin Building Area @ Ju'aymah Shops Plant N-
26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


2431 C-1854 Mark) CG-A-21H,CIG- A-24,CIG-A-25,CG-A-26,CIG-A-27,CIG-A-28,CG-A- ADMIN BUILDING 10-Feb-18 11:22 AM 11-Feb-18 7:40 AM 0016-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
29,CIG-A-30,CIG-A-31 CG-A-21, At Admin Building Area @ Ju'aymah
Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2432 C-1855 Inspection of 5000 PSi for 'Double Tee Slab for Sub S tation Building @ INCO 10-Feb-18 11:25 AM 11-Feb-18 2:30 PM 0016-ER-009-02-04 QUADRI MAMDOOH
INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-02B, S S-DT-03 and SS-
DT-04, Total 3 Nos.@ Gulf consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2433 C-1856 Inspection of 4000 PSi for 'Slab on Grade at Grid Line (10-11) (B-C) & GULF 10-Feb-18 11:28 AM 11-Feb-18 2:45 PM RA-819722-02-0F4 QUADRI ISHFAQ AHMED
(10'-11) (A-B) at Admin Building Juaymah Shops N-26

2434 C-1857 Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin INCO 10-Feb-18 11:30 AM 11-Feb-18 6:00 AM 0016-A-ER-001-01-04 WILFREDO MAMDOOH
Building Panel Mark CIG-A-21H,At INCO Pre-Cast Fabrication Yard
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Hollow
Core Panel For Admin Building At INCO Pre-Cast Fabrication Yard Panel
Mark (HCS Mark) HR-501(4NOS),HR-501A(2NOS),HR-502,HR-
503(2NOS),HR-503A, HR-504(2NOS)HR-310B ,HR-311(2NOS),HR-
2435 C-1858 311A(2NOS),HR-312(2NOS ) HR-313A,HR-313B,HR-314,HR-314A,HR-314B INCO 10-Feb-18 11:35 AM 11-Feb-18 10:00 AM 0016-A-ER-07-01-04 WILFREDO MAMDOOH
,HR-315(2NOS),HR-315A,HR-316(4NOS), HR-319(3NOS),HR-
320(3NOS),HR-321,HR-322,HR- 323 ,HR-301,HR-301A,HR-302(2NOS) HR-
302A,HR-303,HR-304B(2NOS),HR-304A,HR-305C,HR-309A, HR-309,HR-
310,HR-310A
On Reel Test of
(Total
LV Cables
54 NOS)
as follows: 1) Cu/XLPE/SWA/PVC(F R-OR) 1KV
2436 E-0201 3X35mm2 (1,005m) 2) Cu/XLPE/SWA/PVC(FR-OR) 1KV 3X35mm2 (501m) PLANT N-26 10-Feb-18 11:40 AM 11-Feb-18 9:30 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
3) Cu/XLPE/SWA/PVC(FR-OR) 1KV 3X4mm2 (1,010m) 4)
Cu/XLPE/SWA/PVC(F R-OR) 1KV 3X4mm2 (1,015m)

Visual Inspection of PVC Conduits Pipe 1' Dia. Installation for Underfloor
2437 E-0202 Outlet at 2nd Floor of New Admin Bldg. as per Attached Highlighted IFC ADMIN BUILDING 10-Feb-18 11:45 AM 11-Feb-18 8:00 AM RA-819712-002-0F1 FILBERT ALI M. AL YASEEN
Drawing.

2438 E-0203 Materials Receiving Visual Inspection of Double RCD Socket Receptacle 13 PLANT N-26 11-Feb-18 11:00 AM 12-Feb-18 8:00 AM RA-819982-01-0F1 FILBERT ALI M. AL YASEEN
Amps, IP66 (5 EA Total) at ETE Laydown Yard, Ju’Aymah Shop Plant N26

Materials Receiving Visual Inspection of C-Channel 1000mm X 50mm X


2439 E-0204 5mm Hot Dip Galvanized (73 LM) for Levelling Steel Channel of PLANT N-26 11-Feb-18 11:02 AM 12-Feb-18 9:30 AM RA-819822-01-0F2 FILBERT DAMIAN ABAA
Switchgear at ETE Laydown Yard, J u’Aymah Shop Plant N26

Visual Inspection of 6" & 4" DIA. PVC CONDUIT PIPE STUB-UP
2440 E-0205 INSTALLATION FOR TRANSFORMER FOUNDATION at Sub Station Area As NEW SUB STATION 11-Feb-18 11:05 AM 12-Feb-18 9:00 AM RA-819822-01-0F2 FILBERT DAMIAN ABAA
per highlighted Attached Drawing.

Visual Inspection of Excavation and Trenching for Electrical Duct Bank


2441 E-0206 (ELE-DB-010/011) Near New Workshop Area as per highlighted Attached WELDING SHOP 11-Feb-18 11:08 AM 12-Feb-18 1:00 PM RA-819460-02-0F1 FILBERT DAMIAN ABAA
Drawing.

Visual Inspection of Electrical Duct Bank Conduit Pipes & Spacer


2442 E-0207 Installation (ELE-DB-010/011) AT Near New Workshop Area as per WELDING SHOP 11-Feb-18 11:10 AM 12-Feb-18 1:45 PM RA-819460-02-0F1 FILBERT DAMIAN ABAA
highlighted Attached Drawing.

2443 E-0208 Visual Inspection of LV Electrical Duck Bank PVC Conduit Pipe Mandrill CAR PARKING 11-Feb-18 11:12 AM 12-Feb-18 2:30 PM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Test AT New Parking Area as per highlighted Attached Drawing.

Visual inspection and Material receiving of Register coupling TC9


2444 T-0055 DB4"(QTY=47 Pcs) Namco duct base spacer 4*2" black(QTY=872 PLANT N-26 5-Feb-18 11:00 AM 6-Feb-18 10:00 AM RA-819517-01-0F2 AFZAL M. Z. NAVEED
pcs),Namcoduct Inter spacer 4*2(QTY= 378 pcs) as per P.O. 25223,
@ETE Juaymah Shops plant N-26.

Visual inspection and Materaial receiving of Register coupling 4"(QTY=52


2445 T-0056 pcs), Namco duct base spacer 4*2" black(QTY=872 pcs),Namcoduct Inter PLANT N-26 5-Feb-18 11:02 AM 6-Feb-18 10:00 AM RA-819517-01-0F2 AFZAL M. Z. NAVEED
spacer 4*2(QTY= 378 pcs) Registered coupling TC9 DB4"(QTY=47 Pcs) as
per P.O. 4258 and P.O.4257. @ETE J uaymah Shops plant N-26.

Visual Inspection of orange color layer on concreted duct bank and Final l
2446 T-0057 Mandrel test for TDB FOC length in 8 meters at DB-5 area New Machine PLANT N-26 11-Feb-18 11:10 AM 12-Feb-18 7:00 AM RA-819460-02-0F2 AFZAL M. Z. NAVEED
shops @ Upgraded J u'aymah Shops PlantN-26.

Visual Inspection of Telecom Duct Bank FOC back filling layer and orange
2447 T-0058 color tape installation, length in 8 metres at DB-5 area New Machine PLANT N-26 11-Feb-18 11:12 AM 12-Feb-18 7:30 AM RA-819460-02-0F2 AFZAL M. Z. NAVEED
shops @ Upgraded J u'aymah Shops Plant N-26.

Visual Inspection of Telecom Duct Bank Trench excavation, length in 2


2448 T-0059 metres between work shop an paint ahop area @ Upgraded Ju'aymah PLANT N-26 11-Feb-18 11:15 AM 12-Feb-18 10:00 AM RA-819460-02-0F2 AFZAL M. Z. NAVEED
Shops Plant N-26.

Visual Inspection of 3x4" PVC conduit installation and Initial Mandrel test
2449 T-0060 for Telecom Duct Bank length in 8 meters at New Machine shops @ PLANT N-26 11-Feb-18 11:18 AM 12-Feb-18 1:30 PM RA-819460-02-0F2 AFZAL M. Z. NAVEED
Upgraded Ju'aymah Shops Plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2450 C-1859 Inspection of 5000 PSi for '1st Layer for Admin Building (Panel Mark CG- INCO 11-Feb-18 11:20 AM 12-Feb-18 2:30 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-01, CG-A-06, CG-A-09, CIG-A-10 and CIG-A-06) at INCO Pre-Cast
Fabrication Yard

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2451 C-1860 Inspection of 5000 PSi for '2nd Layer for Admin Building (Panel Mark CG- INCO 11-Feb-18 11:21 AM 12-Feb-18 2:30 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-01, CG-A-06, CG-A-09, CIG-A-10 and CIG-A-06) at INCO Pre-Cast
Fabrication Yard

2452 C-1861 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 11-Feb-18 11:22 AM 12-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
Osais (Qty=236 M3) at ETE Laydown Area @ Ju'aymah Shops Plant N-26

Grade and Site preparation inspection (Reinstatment) of Beam and Slab


2453 C-1862 on Duct Bank DB - 5 North side of Existing Welding Shop, @ ju'aymah PLANT N-26 11-Feb-18 11:23 AM 12-Feb-18 8:00 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED
shops, plant N-26

2454 C-1863 FBE Rebar inspection (Reinstatment) of Beam and Slab on Duct Bank DB - WELDING SHOP 11-Feb-18 11:25 AM 12-Feb-18 8:30 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED
5 North side of Existing Welding Shop, @ ju'aymah shops, plant N-26.

Concrete Testing Sampling and Casting inspection (Reinstatment) of Beam


2455 C-1864 and Slab on Duct Bank DB-5 North side of Existing Welding Shop, @ PLANT N-26 11-Feb-18 11:26 AM 12-Feb-18 10:00 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Visual Inspection of Grove/Surface prior to apply Joint Sealant (Thioflex


2456 C-1865 Fosam/Fosroc) Grid line A to F and 8 to 12 Ground floor, Admin Building ADMIN BUILDING 11-Feb-18 11:28 AM 12-Feb-18 9:45 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED not in QMIS
@ ju'aymah shops, plant N-26.

Visual Inspection of Joint Sealant material application (Thioflex


2457 C-1866 Fosam/Fosroc) Grid line A to F and 8 to 12 Ground floor, Admin Building ADMIN BUILDING 11-Feb-18 11:29 AM 12-Feb-18 10:00 AM RA-819460-02-0F1 SALMAAN ISHFAQ AHMED not in QMIS
@ ju'aymah shops, plant N-26.

2458 C-1867 Form work inspection of Existing MV Duct Bank 10, 11 and FOC PLANT N-26 11-Feb-18 11:30 AM 12-Feb-18 1:00 PM RA-819460-02-0F2 SALMAAN ISHFAQ AHMED
Extension (2 mtr) East side of Paint Shop @ ju'aymah shops, plant N-26

FBE Rebar Embedded item and Formwork closour inspection of Existing


2459 C-1868 MV Duct Bank 10, 11 and FOC Extension (2 mtr) East side of Paint Shop PLANT N-26 11-Feb-18 11:32 AM 12-Feb-18 1:30 PM RA-819460-02-0F2 SALMAAN ISHFAQ AHMED
@ ju'aymah shops, plant N-26

Concrete Testing, Sampling and Casting inspection of Existing MV Duct


2460 C-1869 Bank 10, 11 and FOC Extension (2 mtr) East side of Paint Shop @ PLANT N-26 11-Feb-18 11:33 AM 12-Feb-18 2:00 PM RA-819460-02-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Cast-In-Place Concrete Formwork Inspection for Footing of Gantry Crain SHIPPING & RECEIVING
2461 C-1870 foundation @ Grid line 1. Shipping & Receiving area, ju'aymah shops, 11-Feb-18 11:34 AM 12-Feb-18 11:00 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
plant N-26 AREA

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for SHIPPING & RECEIVING
2462 C-1871 Footing of Gantry Crain foundation @ Grid line 1.Shipping & Receiving 11-Feb-18 11:35 AM 12-Feb-18 11:15 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
area, ju'aymah shops, plant N-26 AREA

2463 C-1872 Compaction Testing (FDT) inspection of Sub grade of Electrical LV Cable ADMIN BUILDING 11-Feb-18 11:36 AM 12-Feb-18 11:30 AM RA-819460-02-0F2 SALMAAN ISHFAQ AHMED 6
Trench East side New Admin Building @ ju'aymah shops, plant N-26

Visual Inspection of Trench for Telecom Duct Bank length in 48 Meters


2464 T-0061 beside the fence of chemical storage area @ Upgraded Ju'aymah Shops STORAGE AREA 12-Feb-18 11:00 AM 13-Feb-18 8:30 AM RA-819460-02-0F3 AFZAL M. Z. NAVEED
Plant N-26.

Visual Inspection of Direct Buried Cable Trench Prior to Cable Laying


2465 E-0209 from New Admin Bldg. to New Parking Area & Booster Pump Area As Per CAR PARKING 12-Feb-18 11:01 AM 13-Feb-18 8:00 AM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Highlighted Attached Drawing.

Visual Inspection of Below Grade Cable Laying of Direct Buried Cables


2466 E-0210 from New Admin Bldg. to New Parking Area & Booster Pump Area As Per CAR PARKING 12-Feb-18 11:02 AM 13-Feb-18 2:00 PM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Highlighted Attached Drawing.

Visual Inspection of Below Grade Cable Laying of Direct Buried Cables


2467 E-0211 from New Admin Bldg. to New Parking Area & Booster Pump Area As Per CAR PARKING 12-Feb-18 11:03 AM 13-Feb-18 3:00 PM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Highlighted Attached Drawing.

Material Receiving Inspection for SMAW Electrodes (7018) 3.2mm (and


2468 ST-W-0014 2.5mm 28*3kg & 12*2.8kg) @ Substation Building, Ju'aymah Shops, Plant NEW SUB STATION 7-Feb-18 11:00 AM 8-Feb-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
N26.

Visual Inspection before welding for 30 Joints on SS-WIG-02E,, 17, 02 & 04


2469 ST-W-0015 Check attached Drawing @ Substation Building, Ju'aymah Shops, Plant NEW SUB STATION 7-Feb-18 11:00 AM 8-Feb-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
N26.

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


2470 C-1873 Screed upon hollow Core Slab, 2nd Floor, from Grid Line 2 to 5 and B - F. ADMIN BUILDING 12-Feb-18 11:00 AM 13-Feb-18 7:30 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
and GL. D to E & 1 to 2.

FBE Rebar, Wire Mesh and Embedded Items Inspection prior to Cast
2471 C-1874 Screed upon hollow Core Slab, 2nd Floor,from Grid Line 2 to 5 and B - F. ADMIN BUILDING 12-Feb-18 11:02 AM 13-Feb-18 8:00 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
and GL. D to E & 1 to 2. New Admin Building, ju'aymah shops,

Screed Concrete Testing, Sampling and Casting inspection upon hollow


2472 C-1875 Core Slab, 2nd Floor,from Grid Line 2 to 5 and B - F. and GL. D to E & 1 to ADMIN BUILDING 12-Feb-18 11:03 AM 13-Feb-18 9:00 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
2. New Admin Building, ju'aymah shops,

Concrete Testing, Sampling and Casting Inspection for the Footing of SHIPPING & RECEIVING
2473 C-1876 Gantry Crain foundation @ Grid line 1. Shipping & Receiving area, AREA 12-Feb-18 11:04 AM 13-Feb-18 12:15 PM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Compaction Testing (FDT) inspection of Sub grade of Tele Com Duct Bank
2474 C-1877 48 Linear meter beside the fence of Chemecal storage area Building @ STORAGE AREA 12-Feb-18 11:05 AM 13-Feb-18 9:00 AM RA-819517-01-0F3 SALMAAN ISHFAQ AHMED 4
ju'aymah shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2475 C-1878 Inspection of 4000 PSi for 'slab on grade at gridline (11-12)(B-C) & (8-10) ADMIN BUILDING 12-Feb-18 11:06 AM 13-Feb-18 2:30 PM RA-819722-01-0F4 QUADRI ISHFAQ AHMED
(A-B) at Admin Bldg.Juaymah Shops N-26

Curing Inspection of Concrete of Fire Alaram System Duct bank, West


2476 C-1879 side of New Sub Station Building (12 Linear Meter long) @ ju'aymah NEW SUB STATION 12-Feb-18 11:08 AM 13-Feb-18 10:00 AM RA-819283-02-0F1 SALMAAN ISHFAQ AHMED not in QMIS
shops, plant N-26

2477 C-1880 Curing Inspection of Concrete for Electrical Duct bank (DB-5), North side WELDING SHOP 12-Feb-18 11:09 AM 13-Feb-18 10:30 AM RA-819460-01-2-0F1 SALMAAN ISHFAQ AHMED not in QMIS
of Existing Welding Shop @ ju'aymah shops, plant N-26

Material,Receiving Inspection of Pre-Cast Concrete Members Hollow


Core Slab For Admin Building HCS (HCS mark HR-701,HR-701,HR-
2478 C-1881 713,HR-712A,HR-714,HR-715,HR-716A,HR-714,HR-716 HR-727C,HR- ADMIN BUILDING 12-Feb-18 11:10 AM 13-Feb-18 7:00 AM 0016-A-ER-007-1-4 BAQAR ISHFAQ AHMED
728,HR-727A,HR-727B,HR-729A,HR-729,HR-730,HR-727,HR-501A,HR-
502,HR-503A HR-501A,HR-501,HR-503,HR- 504,HR-503,HR-504,HR-
501,HR-501,HR-301,HR-
Pre-cast 301A,HR-501)
Concrete Pre-Installation Inspection of Hollow Core S lab For
Admin Building HCS (HCS mark HR-701,HR-701,HR-713,HR-712A,HR-
2479 C-1882 714,HR-715,HR-716A,HR-714,HR-716 HR-727C,HR-728,HR-727A,HR- ADMIN BUILDING 12-Feb-18 11:12 AM 13-Feb-18 7:30 AM 0016-A-ER-007-1-4 SALMAAN ISHFAQ AHMED
727B,HR-729A,HR-729,HR-730,HR-727,HR-501A,HR-502,HR-503A HR-
501A,HR-501,HR-503,HR-504,HR-503,HR-504,HR-501,HR-501,HR-301,HR-
301A,HR-501)
Pre-cast Concrete Erection and Alignment Inspection of Hollow Core Slab
For Admin Building HCS (HCS mark HR-701,HR-701,HR-713,HR-712A,HR-
2480 C-1883 714,HR-715,HR-716A,HR-714,HR-716 HR-727C,HR-728,HR-727A,HR- ADMIN BUILDING 12-Feb-18 11:15 AM 13-Feb-18 8:00 AM 0016-A-ER-007-1-4 SALMAAN ISHFAQ AHMED
727B,HR-729A,HR-729,HR-730,HR-727,HR-501A,HR-502,HR-503A HR-
501A,HR-501,HR-503,HR-504,HR-503,HR-504,HR-501,HR-501,HR-301,HR-
301A,HR-501)
Visual Inspection of Material Receiving Handling storage and preservation
2481 C-1884 of Dia PVC Pipes SCH 80 (QTY=50 Pipe) 6.0 Meter length Using as PLANT N-26 12-Feb-18 11:16 AM 13-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Reinforcement Spacer From New Product Industries (Nepro)@ ETE
Laydown Area Ju'aymah Shops Plant N-26
Material Receiving, Handling ,Storage & preservation Inspection of PVC
DWV SCH-40 pipe 2"-17Pcs, 3"-34 Pcs Fittings with Couplings 2"(300Pcs) ,
2482 P-0229 3" (100 Pcs) P-Trap-3"- 90⁰ (10 Pcs), RED BUSH DMV 4"X3" (2 Pcs), TEE 2" PLANT N-26 13-Feb-18 11:00 AM 14-Feb-18 8:30 AM RA-819774-01-00 FAHEEM SYED SHAFIULLAH
(100 Pcs), ELB-45⁰ 2" (9 Pcs), ELB- 45⁰ 3" (4Pcs), REDUCER 3"X2" (8 Pcs),
WYE 4"X3" (2 Pcs)

2483 E-0212 Visual Inspection of Sand Bedding Final Backfilling for FDAS Duck Bank NEW SUB STATION 13-Feb-18 11:02 AM 14-Feb-18 10:00 AM RA-819283-02-0F1 FILBERT DAMIAN ABAA
Near Sub Station Area as per Highlighted Attached Drawing.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2483 C-1885 Inspection of 4000 PSi for Inspection for Slab on Grade at Grid Line (5- ADMIN BUILDING 13-Feb-18 11:05 AM 14-Feb-18 2:30 PM RA-819722-01-0F4 QUADRI ISHFAQ AHMED
10) (B-E) (Panel # 1 and # 3) at 'at Admin Building Juaymah Shops N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2485 C-1886 Inspection of 5000 PSi for '1st Layer for Admin Building (Panel Mark CG- ADMIN BUILDING 13-Feb-18 11:06 AM 14-Feb-18 2:40 PM 0016-ER-01-01-04 QUADRI MAMDOOH
A-08, CG-A-01H, CG-A-07, CG-A--02A, CIG-A-06H, CIG-A-02 and CIG-A-04)
at INCO Pre-Cast Fabrication Yard. @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2486 C-1887 Inspection of 5000 PSi for '2nd Layer for Admin Building (Panel Mark CG- INCO 13-Feb-18 11:08 AM 14-Feb-18 12:00 AM 0016-ER-01-01-04 QUADRI MAMDOOH
A-08, CG-A-01H, CG-A-07, CG-A--02A, CIG-A-06H, CIG-A-02 and CIG-A-04)
at INCO Pre-Cast Fabrication Yard. @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2487 C-1888 Inspection of 5000 PSi for 'Double Tee Slab for Sub Station Building @ INCO 13-Feb-18 11:10 AM 14-Feb-18 3:00 PM 0016-ER-01-01-04 QUADRI MAMDOOH
INCO Pre-Cast Fabrication Yard Panel Mark SS-DT-02A (3 Nos.), Total 3
Nos.at INCO Pre-Cast Fabrication Yard. @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2488 C-1889 Inspection of 4000 PSi for Telecom Duct Bank ( 23 LM ) at West side of NEW SUB STATION 13-Feb-18 11:00 AM 14-Feb-18 3:10 PM RA-819517-01-0F2 QUADRI ISHFAQ AHMED
New Sub Station @ Ju'Aymah, Shops Plant N- 26

2489 C-1890 Curing Inspection of Concrete for Footing of Gantry Crain foundation @ SHIPPING & RECEIVING 13-Feb-18 11:12 AM 14-Feb-18 10:00 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
Grid line 2. Shipping & Receiving area, ju'aymah shops, plant N-26 AREA

Curing Inspection of Concrete for Slab on Grade from Grid line 1 to 3 and
2490 C-1891 C to E, Ground Floor at New Admin Building, ju'aymah shops, plant N- ADMIN BUILDING 13-Feb-18 11:15 AM 14-Feb-18 10:30 AM RA-819722-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
26

Visual Inspection of 4x4" PVC conduit installation and Initial Mandrel test
2491 T-0062 for Telecom Duct Bank length in 48 meters at beside the fence of STORAGE AREA 14-Feb-18 11:00 AM 15-Feb-18 9:00 AM RA-819517-01-0F2 AFZAL M. Z. NAVEED
chemical storage area .

2492 C-1892 Pre-cast Concrete Installation Final Inspection For First Floor All Panels For ADMIN BUILDING 14-Feb-18 11:10 AM 15-Feb-18 9:00 AM 0016-A-ER-001-04 SALMAAN ISHFAQ AHMED
Admin Building

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2493 C-1893 Inspection of 5000 PSi for 1st Layer for Admin Building (Panel Mark CG-A- INCO 14-Feb-18 11:11 AM 15-Feb-18 2:30 PM 0016-A-ER-001-04 QUADRI MAMDOOH
05, CG-A-01AH, CG-A-02, CIG-A-08, CIG-A-03 and CIG-A-09) at INCO Pre-
Cast Fabrication Yard @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2494 C-1894 Inspection of 5000 PSi for 2nd Layer for Admin Building (Panel Mark CG- INCO 14-Feb-18 11:12 AM 15-Feb-18 2:40 PM 0016-A-ER-001-04 QUADRI MAMDOOH
A-05, CG-A-01AH, CG-A- 02, CIG-A-08, CIG-A-03 and CIG-A-09) at INCO
Pre-Cast Fabrication Yard @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2495 C-1895 Inspection of 4000 PSi for ' Fire Wall (01 no) Above FGL First wall From NEW SUB STATION 14-Feb-18 11:13 AM 15-Feb-18 3:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
North At New Sub Station At Juaymah Shops Plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2496 C-1896 Inspection of 4000 PSi for 'slab on grade at gridline (5-10)(B-E)(panel #2) GULF 14-Feb-18 11:14 AM 15-Feb-18 3:15 PM RA-819722-01-0F4 QUADRI ISHFAQ AHMED
and (8-11)(E-F) at New Admin Building, At Juaymah Shops Plant N-26 @
Gulf Consult
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Cement Based NON Shrink Grout 28 Days Compressive Strength Testing &
Final Acceptance I 'Inspection of 5000 PSi for Anchor Bolt of Booster
2497 C-1897 Pump Station-1 at south S ide of ' New Car Parking Area @ Juaymah GULF 14-Feb-18 11:15 AM 15-Feb-18 3:30 PM RA-819400-01-0F2 QUADRI ISHFAQ AHMED
Shops Plant N-26 @ Gulf Consult

Cement Based NON Shrink Grout 28 Days Compressive Strength Testing &
Final Acceptance I ' 'Inspection of 5000 PSi for Anchor Bolt of Booster
2498 C-1898 Pump Station-2 at south S ide of ' New Car Parking Area @ Juaymah GULF 14-Feb-18 11:16 AM 15-Feb-18 3:45 PM RA-819400-01-0F2 QUADRI ISHFAQ AHMED
Shops Plant N-26 @ Gulf Consult

Material Receiving,Handling Storage and Preservation Inspection of 0


Hours Fire Rated Cmu Block Size 150 x 200 x 400 (QTY=1510 Pcs) From Al
2499 C-1899 Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N- PLANT N-26 14-Feb-18 11:17 AM 15-Feb-18 10:30 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
26
Materials Receiving Visual Inspection of 1) S ELF TAPPING SCREW 1"
(100EA), ) SELF TAPPING SCREW
Material Receiving,Handling 1-1/4"
Storage (100EA), 3) PVC FISHER 6MM
(100EA), 4) SELF TAPPING SCREW 1" and Preservation
(SUITABLE Inspection
FOR 6MM FISHER) of 0
2500 C-1900 Hours Fire5)Rated
(100EA), Cmu Block
PVC FISHER 8MM Size 200 x6)200
(50EA), SELFx 400 (QTY=144
TAPPING SCREWPcs)1"From Al PLANT N-26 14-Feb-18 11:18 AM 15-Feb-18 10:00 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix
(SUITABLE and block
FOR 8MM Factory
FISHER) At ETE
(50EA), Store,JuAymah,Shops
7) PVC FISHER 4MM (100EA), Plant
8) N-2
SELF TAPPING SCREW 1" (S UITABLE FOR 4MM FIS HER) (100EA), 9) DROP
IN ANCHOR HDG M6 (100EA), 10) HEX BOLT HDG M6 X 30MM (100EA),
11) HEX NUT HDG M6 (100EA), 12) FLAT WASHER HDG M6 (100EA), 13)
2501 E-0213 SPRING WASHER HDG M6 (100EA), 14) EXPANSION BOLT HDG M8 X 100 PLANT N-26 14-Feb-18 11:20 AM 15-Feb-18 8:00 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
(50EA), 15) TOGGLE SCREW FOR HOLLOW MAS ONRY UNITS HDG 4MM X
30MM L (50EA), 16) TOGGLE SCREW FOR HOLLOW MASONRY UNITS HDG
6MM X 30MM L (50EA), 17) DROP IN ANCHOR HDG M8 (100EA), 18) HEX
BOLT HDGTesting,
Concrete M8 X 30MM (100EA),
Sampling 19) HEX
and Casting NUT HDGfor
Inspection M8 (100EA),
the Footing20)of FLAT SHIPPING & RECEIVING RFI C-1876
2502 C-1876-A WASHER
Gantry HDGfoundation
Crain M8 (100EA), 21) SPRING
@ Grid line WASHER&HDG
1. Shipping M8 (100EA),
Receiving area, 22) 15-Feb-18 11:00 AM 17-Feb-18 12:15 PM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED Accepted and
EXPANSION
ju'aymah BOLTplant
shops, HDGN-26
M10 X 110 (50EA), 23) EXPANSION BOLT HDG M12 AREA Closed
X 120 (50EA), 24) EXPANSION BOLT HDG M16 X 150 (50EA) At ETE S tore
Ju'aymah Shop N26.
Concrete and CMU Surface Preparation and Protection Inspection for
Male Toilet Room - MT 116, (100X200X400, 150X200X400,
2503 C-1901 200X200X400), Room # 147, 114 and 145 (150X200X400), Room # 111, ADMIN BUILDING 15-Feb-18 11:01 AM 17-Feb-18 11:00 AM RA-819745-01-00 SALMAAN ISHFAQ AHMED
(200X200X400) Groun floor Admin Building, @ ju'aymah shops, plant N-
26
Concrete and CMU Installation Inspection for Male Toilet Room - MT 116,
(100X200X400, 150X200X400 , 200X200X400), Room # 147, 114 and 145(
2504 C-1902 150X200X400), Room # 111,(200X200X400), Groun floor Admin Building, ADMIN BUILDING 15-Feb-18 11:02 AM 17-Feb-18 1:00 PM RA-819745-01-00 SALMAAN ISHFAQ AHMED
@ ju'aymah shops, plant N-26

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


2505 C-1903 Screed upon hollow Core Slab, 2nd Floor, from Grid Line 5 to 11 and A - C. ADMIN BUILDING 15-Feb-18 11:03 AM 17-Feb-18 7:30 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
New Admin Building, ju'aymah shops, plant N-26.

FBE Rebar Embedded items and Formwork Closure Inspection prior to


2506 C-1904 Cast Screed upon hollow Core Slab, 2nd Floor, from Grid Line 5 to 11 and ADMIN BUILDING 15-Feb-18 11:04 AM 17-Feb-18 8:00 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
A - C @ New Admin Building, ju'aymah shops, plant N-26.

Screed (Concrete) Testing, Sampling and Casting Inspection upon hollow


2507 C-1905 Core Slab, 2nd Floor, from Grid Line 5 to 11 and A - C @ New Admin ADMIN BUILDING 15-Feb-18 11:05 AM 17-Feb-18 7:30 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops, plant N-26.

Grade and site preparation inspection of Tele Com Duct Bank 48 Linear
2508 C-1906 meter beside the fence of Chemecal storage area Building @ ju'aymah STORAGE AREA 15-Feb-18 11:06 AM 17-Feb-18 10:00 AM RA-819517-01-0F3 SALMAAN ISHFAQ AHMED
shops, plant N-26

Lean Concrete Sampling, Testing and Casting inspection of Tele Com Duct
2509 C-1907 Bank 48 Linear meter beside the fence of Chemecal storage area @ New ADMIN BUILDING 15-Feb-18 11:07 AM 17-Feb-18 11:00 AM RA-819517-01-0F3 SALMAAN ISHFAQ AHMED
Admin Building @ ju'aymah shops, plant N-26

Compaction Testing (FDT) inspection of Sub grade of Electrical LV Cble


2510 C-1908 Trench 28 Linear meter, West Side of New Admin Building @ ju'aymah ADMIN BUILDING 15-Feb-18 11:08 AM 17-Feb-18 11:00 AM RA-819460-01-2-0F1 SALMAAN ISHFAQ AHMED 2
shops, plant N-26

Curing Inspection of Concrete for Pre-Cast Light pols Foundations


2511 C-1909 (21Nos), at Pre-Cast Yard, North Side of New Admin Building, ju'aymah ADMIN BUILDING 15-Feb-18 11:09 AM 17-Feb-18 10:00 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2512 C-1910 Inspection of 4000 PSi for 'Electrical LV Duct Bank at North Side of GULF 15-Feb-18 11:10 AM 17-Feb-18 3:15 PM RA-819460-01-2-0F1 QUADRI ISHFAQ AHMED
Shipping Receiving Area At Juaymah Shops Plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2513 C-1911 Inspection of 4000 PSi for 'Slab on Grade at Gridline [5-8],[E-F] GULF 15-Feb-18 11:11 AM 17-Feb-18 3:15 PM RA-819722-*01-0F4 QUADRI ISHFAQ AHMED
Mechanical Room at New Admin Building Area, At Juaymah Shops Plant
N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2514 C-1912 Inspection of 5000 PS 1st layer for Admin Building (Panel Mark CG-A- GULF 15-Feb-18 11:12 AM 17-Feb-18 2:40 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
01A,CG-A-05,CIG-A-05,CIG-A-15,CIG-A-19H,and CIG-A-11 at INCO Pre-
Cast Fabrication Yard @ Gulf Con

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2515 C-1913 Inspection of 5000 PSi for 2nd layer for Admin Building (Panel Mark CG-A- INCO 15-Feb-18 11:13 AM 17-Feb-18 2:50 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
01A,CG-A-05,CIG-A-05,CIG-A-15,CIG-A-19H,and CIG-A-11 at INCO Pre-
Cast Fabrication Yard @ Gulf Consult

Visual Inspection for Installation of PVC Conduit Pipes 1" Dia. for Floor
2516 E-0214 Mounted Receptacle Outlets at 2nd Floor of New Admin Bldg. as per ADMIN BUILDING 15-Feb-18 11:14 AM 17-Feb-18 8:00 AM RA-819712-02-0F1 FILBERT ALI M. AL YASEEN
Attached Highlighted IFC Drawing.

Visual Inspection for Excavation & Trenching Prior to Cable Laying of 120
2517 E-0215 mm² Bare Tinned Copper Grounding Conductors for Main Grounding CAR PARKING 15-Feb-18 11:15 AM 17-Feb-18 8:30 AM RA-819939-01-00 FILBERT ALI M. AL YASEEN
Grid to Existing Main Grid at New Parking Area as per Attached
Highlighted IFC Drawing.

Visual Inspection for Cable Laying of 120 mm² Bare Tinned Copper
2518 E-0216 Grounding Conductors for Main Grounding Grid to Existing Main Grid at CAR PARKING 15-Feb-18 11:16 AM 17-Feb-18 8:45 AM RA-819939-01-00 FILBERT ALI M. AL YASEEN
New Parking Area as per Attached Highlighted IFC Drawing.

Visual Inspection of Below Grade Exothermic Cadwelding Connections to


2519 E-0217 120 mm² Main Grounding Grid Conductors to Existing Main Grid CAR PARKING 15-Feb-18 11:17 AM 17-Feb-18 9:00 AM RA-819939-01-00 FILBERT ALI M. AL YASEEN
Grounding Conductors at New Parking Area as per Attached Highlighted
IFC Drawing.

Visual Inspection of Trench Backfilling for 120 mm² Bare Tinned Copper
2520 E-0218 Grounding Conductors for Main Grounding Grid to Existing Main Grid at CAR PARKING 15-Feb-18 11:18 AM 17-Feb-18 9:15 AM RA-819939-01-00 FILBERT ALI M. AL YASEEN
New Parking Area as per Attached Highlighted IFC Drawing.

2521 P-0230 Material Receiving, Handling ,Storage & preservation Inspection of CPVC PLANT N-26 17-Feb-18 11:10 AM 18-Feb-18 8:30 AM RA-819770-01-00 FAHEEM SYED SHAFIULLAH
SCH-80 Coupling with 3" -179 Pcs from NEPRO @ ETE store, Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2522 C-1914 Inspection of 5000 PSi for 1st layer for Admin Building (Panel Mark CIG- INCO 17-Feb-18 11:11 AM 18-Feb-18 2:50 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-05H, CIG-A-29, CIG-A-11A and CIG-A-28 at INCO Pre-Cast Fabrication
Yard @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2523 C-1915 Inspection of 5000 PSi for 2nd layer for Admin Building (Panel Mark CIG- GULF 17-Feb-18 11:15 AM 18-Feb-18 3:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-05H, CIG-A-29, CIG-A-11A and CIG-A-28 at INCO Pre-Cast Fabrication
Yard @ Gulf Consult

Curing Inspection of Concrete for upon hollow Core Slab, 2nd Floor, from
2524 C-1916 Grid Line 2 to 5 and A to B,of New Admin Building, ju'aymah shops, ADMIN BUILDING 17-Feb-18 11:16 AM 18-Feb-18 10:00 AM RA-819724-01-0F4 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26

2525 C-1917 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 17-Feb-18 11:18 AM 18-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=220 M3) at ETE Laydown Area @ J u'aymah Shops Plant N-26

Visual Inspection Material Receiving of Gravel.Size 3/8" Material From Al-


2526 C-1918 Osais (Qty=16 M3) P.O 25145 at ETE Laydown Area @ Ju'aymah Shops PLANT N-26 17-Feb-18 11:19 AM 18-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Plant N-26

Material Receiving for Type 2 Anchor Bolts with Nuts & Washer All HDG
ASTM A36M (Type 2 Size M20 x 500 QTY=35 PCS) And (Type 2 Size M24 x
2527 C-1919 550 QTY=20 PCS) for Power Transformer & Switch rack.From Al - Rashed PLANT N-26 17-Feb-18 11:20 AM 18-Feb-18 10:00 AM RA-819868-01-0F2 BAQAR ISHFAQ AHMED
fasteners P.O (25222) At ETE Laydown Store Area,JaAymah,shops Plant N-
26

Material Receiving Visual Inspection of LV Cable Armored Type with


2528 E-0219 Cable Drum No. 13213463 - Cu/XLPE/SWA/PVC (FR-OR) 1KV 3C X 4mm2 PLANT N-26 17-Feb-18 11:01 AM 18-Feb-18 8:00 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
(525 Meters) at ETE Laydown Yard

On Reel Test (Cable Continuity & Insulation Resistance Test) for LV Cable
2529 E-0220 with Cable Drum No. 13213463 - Cu/XLPE/SWA/PVC (FR-OR) 1KV 3C X PLANT N-26 17-Feb-18 11:02 AM 18-Feb-18 8:15 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
4mm2 (525 Meters) at ETE Laydown Yard

Visual Inspection of Cable Trench for LV Direct Buried Cables Prior to


2530 E-0221 Cable Laying at West Side of New Admin Bldg. As Per Attached ADMIN BUILDING 17-Feb-18 11:02 AM 18-Feb-18 11:00 AM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Highlighted Drawing.

Visual Inspection of Mandrel Test for LV Electrical Duct Bank with 6" Dia.
2531 E-0222 PVC Conduit Pipes at West Side of New Admin Bldg. As Per Attached ADMIN BUILDING 17-Feb-18 11:03 AM 18-Feb-18 11:15 AM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Highlighted Drawing.

2532 E-0223 Visual Inspection of Below Grade Cable Laying of LV Direct Buried Cables ADMIN BUILDING 17-Feb-18 11:05 AM 18-Feb-18 3:30 PM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
at West Side of New Admin Bldg. As Per Attached Highlighted Drawing.

MATERIAL RECEIVING INSPECTION OF FIBER GLASS INSULATION FOR


2532 HV-0001 METAL DUCT FROM FAWAZ REFRIGERATION AND AIR CONDITIONING PLANT N-26 13-Feb-18 11:00 AM 14-Feb-18 2:00 PM RA-819297-001-00 FAISAL ZIAULLAH
(QTY=10PCS) AT ETE STORAGE LAYDOWN AREA @ JUAYMAH SHOPS
PLANT N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2534 C-1920 Inspection of 5000 PSi for 1st layer for Admin Building (Panel Mark CIG- GULF 18-Feb-18 11:00 AM 19-Feb-18 3:00 PM 0016-A-AE-001-001-04 QUADRI MAMDOOH
A-26, CIG-A-30, CIG-A-16 and CIG-A-24 at INCO Pre-Cast Fabrication Yard
@ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2535 C-1921 Inspection of 5000 PSi for 2nd layer for Admin Building (Panel Mark CIG- INCO 18-Feb-18 11:02 AM 19-Feb-18 3:15 PM 0016-A-AE-001-001-04 QUADRI MAMDOOH
A-26, CIG-A-30, CIG-A-16 and CIG-A-24 at INCO Pre-Cast Fabrication Yard
@ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2536 C-1922 Inspection of 4000 PSi for 'Fire Wall (01 N0 ) above FGL 2nd Wall From GULF 18-Feb-18 11:03 AM 19-Feb-18 3:20 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
North at New Substation At Juaymah Shops Plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2537 C-1923 Inspection of 2000 Psi 'Telecom Duct Bank ( 51 LM ) AT West Side of GULF 18-Feb-18 11:04 AM 19-Feb-18 3:30 PM RA-819517-01-0F2 QUADRI ISHFAQ AHMED
Admin Building @ Ju'Aymah, S hops Plant N- 26 at Gulf Consult

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


2538 C-1924 Screed upon hollow Core Slab, 2nd Floor, from Grid Line 5 to 12 and C To ADMIN BUILDING 18-Feb-18 11:05 AM 19-Feb-18 7:30 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
F. New Admin Building, ju'aymah shops, plant N-26.

FBE Rebar (Wire mesh) Imbedded Items and Formwork Closure


2539 C-1925 Inspection prior to Cast Screed upon hollow Core Slab, 2nd Floor, from ADMIN BUILDING 18-Feb-18 11:06 AM 19-Feb-18 8:00 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
Grid Line 5 to 12 and C To F. New Admin Building, ju'aymah shops,

Screed (Concrete) Testing Sampling and Casting Inspection upon hollow


2540 C-1926 Core Slab, 2nd Floor, from Grid Line 5 to 12 and C To F. New Admin ADMIN BUILDING 18-Feb-18 11:07 AM 19-Feb-18 8:30 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops, Plant N-26.

Material Receiving for Type 2 Anchor Bolts with Nuts & Washer All HDG
2541 C-1927 ASTM A36M (Type 2 Size M20 x 450 QTY=324 PCS) For Gantry Crane From PLANT N-26 18-Feb-18 11:08 AM 19-Feb-18 11:00 AM RA-/819991-001-0F1 BAQAR ISHFAQ AHMED
Eastern Morris Cranes Company P.O(29993) At ETE Store Laydown @
ju'aymah Shops Plant N-26
Visual Inspection for Final Backfilling & Installation of Protective Red
Concrete Tiles & Safety Warning Tape for LV Direct Buried Cables of
2542 E-0224 Booster Pumps (With No. PC-1722, PC-1723, PC-1724, PC-1725), Booster PLANT N-26 18-Feb-18 11:11 AM 19-Feb-18 8:00 AM RA-819460-02-0F1 FILBERT ALI M. AL YASEEN
Pump Station Lightings/Power Outlet & Parking Area Lightings at West
Side of New Admin Bldg. As Per Attached Highlighted Drawing.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
2543 C-1928 Inspection of 5000 PSi for 1st layer for Admin Building (Panel Mark CIG-A- GULF 19-Feb-18 11:00 AM 20-Feb-18 3:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
25, CIG-A-23 and CG-A-04 at INCO Pre-Cast Fabrication Yard @ Gulf
Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2544 C-1929 Inspection of 5000 PSi for 2nd layer for Admin Building (Panel Mark CIG- GULF 19-Feb-18 11:01 AM 20-Feb-18 3:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-25, CIG-A-23 and CG-A-04 at INCO Pre- Cast Fabrication Yard @ Gulf
Consult

2545 C-1930 Curing Inspection of Concrete for Existing MV Duct Bank 10, 11 and FOC PLANT N-26 19-Feb-18 11:00 AM 20-Feb-18 10:00 AM RA-819460-01-2-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Extension (2 mtr) East side of Paint S hop @ ju'aymah shops, plant N-26

Pre-Casst & Pre Concreting Inspection (Molding / Formwork) for Admin


2546 C-1931 Building First floor panels (Panel Mark C1-A-02BH,C1-A-03,CI1-A- 02,CI1- INCO 19-Feb-18 11:03 AM 20-Feb-18 9:00 AM 0016-A-ER-001-01-05 WILFREDO MAMDOOH
A-04,CI1-A-06,CI1-A-10) At Inco Pre-Cast fabricartion Yard @ Ju'aymah
Shops Plant N-26

Pre-Casst & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2547 C-1932 Formwork Closure) First floor panels (Panel Mark C1-A-02BH,C1-A- INCO 19-Feb-18 11:04 AM 20-Feb-18 9:15 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
03,CI1-A-02,CI1-A-04,CI1-A-06,CI1-A-10) At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 1st


2548 C-1933 Layer for Admin Building First floor panels (Panel Mark C1-A-02BH,C1-A- INCO 19-Feb-18 11:05 AM 20-Feb-18 9:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
03,CI1-A-02,CI1-A-04,CI1-A-06,CI1-A-10) At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Casst & Concrete Testing, S ampling and Placement Inspection 2nd


2549 C-1934 Layer for Admin Building First floor panels (Panel Mark C1-A-02BH,C1-A- INCO 19-Feb-18 11:06 AM 20-Feb-18 1:30 PM 0016-A-ER-002-01-0 WILFREDO MAMDOOH
03,CI1-A-02,CI1-A-04,CI1-A-06,CI1-A-10) At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Material Receiving Inspection of Non Shrink Grout Cemtec 25/Kg Bags for
2550 C-1935 Admin Building & Sub Station Pre-Cast Panel. From (CMCI) QTY= 285 Bags ADMIN BUILDING 19-Feb-18 11:07 AM 20-Feb-18 9:00 AM 0016-A-ER-001-01-0 BAQAR ISHFAQ AHMED
P.O # L2018-75 At ETE Admin Building Substation Area @ Ju'aymah
Shops Plant N-26

Compaction Testing (FDT) inspection of Sub grade of Raw water and


2551 C-1936 Potable water Line Trench 13 Linear meter, South S ide of New Admin ADMIN BUILDING 19-Feb-18 11:07 AM 20-Feb-18 9:00 AM RA-819439-002-00 SALMAAN ISHFAQ AHMED 1
Building @ ju'aymah shops, plant N-26

Fill placement of (Sweet) Sand Bedding for Raw water and Potable water
2552 C-1937 Line Trench,13 Linear meter, South Side of New Admin Building @ ADMIN BUILDING 19-Feb-18 11:09 AM 20-Feb-18 9:30 AM RA-819439-002-00 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26.

Compaction Testing (FDT) of (Sweet) Sand Bedding for Raw water and
2553 C-1938 Potable water Line Trench, 13 Linear meter, South Side of New Admin ADMIN BUILDING 19-Feb-18 11:10 AM 20-Feb-18 10:00 AM RA-819439-002-00 SALMAAN ISHFAQ AHMED 1
Building @ ju'aymah shops, plant N-26.

For Cement Based Non-Shrink Grout, Surface Preparation, Soaking &


2554 C-1939 Form work Inspection for Admin Building Building First Floor for All Pre- ADMIN BUILDING 19-Feb-18 11:11 AM 20-Feb-18 9:00 AM 001-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
Cast Wall Panels @ ju'aymah shops, plant N-26.

Cement Based Non-Shrink Grout Mixing, Testing, Sampling and Placing


2555 C-1940 Inspection for Admin Building First Floor for All Pre-Cast Wall Panels @ ADMIN BUILDING 19-Feb-18 11:12 AM 20-Feb-18 9:30 AM 001-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Placement and Compaction of Aggregate Base Course Materials


2556 C-1941 Inspection Grid Line A to I and 1 to 4. New Car Parking Shad @ ju'aymah PLANT N-26 19-Feb-18 11:13 AM 20-Feb-18 9:00 AM RA-819946-001-00 SALMAAN ISHFAQ AHMED 3 Not in QMIS
shops, plant N-26

Compaction Testing (FDT)of Aggregate Base Course Materials Inspection


2557 C-1942 Grid Line A to I and 1 to 4. New Car Parking Shad @ ju'aymah shops, PLANT N-26 19-Feb-18 11:14 AM 20-Feb-18 4:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED 3
plant N-26
Materials Receiving Visual Inspection of Channel & Strut Materials for
Above Ground Conduits as follows: 1) Unistrut Channel PVC Coated -
2558 E-0225 41mm X 21mm X 2.5mm X 3 m (25 EA), 2) Unistrut Channel PVC Coated - PLANT N-26 19-Feb-18 11:00 AM 20-Feb-18 8:00 AM RA-819843-001-0F1 FILBERT DAMIAN ABAA
41mm X 41mm X 2.5mm X 3 m (10 EA), 3) Unistrut Clamp PVC Coated 1"
(100 EA) 4) Unistrut Clamp PVC Coated 3/4" (100 EA) at ETE Laydown
Yard, Ju’Aymah Shop Plant N26
CPVC Pipes and fittings Installation & Assembly Inspection of 2"ø for
2559 P-0231 Portable Water line about 13 LM from Outside New Admin Building ADMIN BUILDING 19-Feb-18 11:05 AM 20-Feb-18 10:30 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
(South Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant
N-26.

CPVC Pipes and fittings Installation & Assembly Inspection of 2"ø for Raw
2560 P-0232 Water line about 13 LM from Outside New Admin Building (South Side) ADMIN BUILDING 19-Feb-18 11:09 AM 20-Feb-18 11:00 AM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26.

Pre-Test Punch Listing for HT Package UJS-ADMB-PW-005- 00 (Potable


2561 P-0233 Water) about 13 LM from Outside New Admin Building (South Side) To ADMIN BUILDING 19-Feb-18 11:10 AM 20-Feb-18 3:00 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Inside New Admin Building Area @ J u'aymah Shop Plant N-26

Internal Cleanliness / Flushing for HT Package UJS-ADMB-PW-005-00


2562 P-0234 (Potable Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 19-Feb-18 11:00 AM 20-Feb-18 3:15 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Pre-Test Punch Listing for HT Package UJS-ADMB-RW- 005-00 (Raw Water)


2563 P-0235 about 13 LM from Outside New Admin Building (South Side) To Inside ADMIN BUILDING 19-Feb-18 11:12 AM 20-Feb-18 3:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
New Admin Building Area @ J u'aymah Shop Plant N-26

Internal Cleanliness / Flushing for HT Package UJS-ADMB-RW-005-00


2564 P-0236 (Raw Water) about 13 LM from Outside New Admin Building (South Side) ADMIN BUILDING 19-Feb-18 11:15 AM 20-Feb-18 3:45 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
To Inside New Admin Building Area @ Ju'aymah Shop Plant N-26

Formwork Inspection for Pre-Cast Light pols Foundations (24Nos), at Pre-


2565 C-1943 Cast Yard, North Side of New Admin Building, ju'aymah shops, plant N- ADMIN BUILDING 20-Feb-18 11:00 AM 21-Feb-18 9:30 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
26.

FBE Rebar Embedded Items and Formwork Closure Inspection for Pre-Cast
2566 C-1944 Light pols Foundations (24Nos), at Pre-Cast Yard, North Side of New ADMIN BUILDING 20-Feb-18 11:01 AM 21-Feb-18 10:00 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
Admin Building, ju'aymah shops, plant N-26

Concrete Testing Sampling and Casting Inspection for Pre-Cast Light pols
2567 C-1945 Foundations (24Nos), at Pre-Cast Yard, North Side of New Admin ADMIN BUILDING 20-Feb-18 11:02 AM 21-Feb-18 2:00 PM RA-819463-001-00 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops, plant N-26

FBE Reinforcing Steel Inspection, prior to Form Closure for Wall


2568 C-1946 Foundation of Gantry Crain foundation @ Grid line 2.Shipping & SHIPPING & RECEIVING 20-Feb-18 11:03 AM 21-Feb-18 9:00 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
AREA
Receiving area, ju'ay mah shops, plant N-26

For Cement Based Non-Shrink Grout, Surface Preparation, Soaking &


2569 C-1947 Form work Inspection for New Substation Building, All Pre-Cast Wall NEW SUB STATION 20-Feb-18 11:04 AM 21-Feb-18 9:00 AM 0016-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
Panels @ ju'aymah shops, plant N-26.

Cement Based Non-Shrink Grout Mixing, Testing, Sampling and Placing


2570 C-1948 Inspection for New Substation Building, All Pre-Cast Wall Panels @ NEW SUB STATION 20-Feb-18 11:05 AM 21-Feb-18 9:30 AM 0016-A-ER-001-01-10 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Curing Inspection of Concrete for upon hollow Core Slab, 2nd Floor,from
2571 C-1949 Grid Line 2 to 5 and B - F. and GL. D to E & 1 to 2. New Admin Building, ADMIN BUILDING 20-Feb-18 11:06 AM 21-Feb-18 10:00 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops,

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2572 C-1950 Inspection of 5000 PSi for 'Pre-Cast Lighting Poles Foundation ( 19 Nos at GULF 20-Feb-18 11:07 AM 21-Feb-18 2:00 PM RA-819463-001-00 QUADRI ISHFAQ AHMED
Pre- Cast Area Near North Side of New Admin Building @ Ju'Aymah,
Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2573 C-1951 Inspection of 5000 PSi for 1st layer for Admin Building (Panel Mark CIG-A- INCO 20-Feb-18 11:08 AM 21-Feb-18 2:45 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
23H, CIG-A-13 and CG-A-04H at INCO Pre-Cast Fabrication Yard @ Gulf
Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2574 C-1952 Inspection of 5000 PSi for 2nd layer for Admin Building (Panel Mark CIG- INCO 20-Feb-18 11:09 AM 21-Feb-18 2:50 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-23H, CIG-A-13 and CG-A-04H at INCO Pre-Cast Fabrication Yard @ Gulf
Consult
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Hollow Core Panels for Admin Building @
INCO Pre-Cast Fabrication Yard Panel Mark(HCS Mark (HCS Mark HR-
701A (2 Nos.), HR-702A, HR-702B, HR- 703A, HR-703B, HR-704A, HR-705,
2575 C-1953 HR-705C, HR-708B, HR-706 (3 Nos.), HR-714A (4 Nos.), HR-710, HR-719 (2 INCO 20-Feb-18 11:10 AM 21-Feb-18 3:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
Nos.) HR-716 (2 Nos.), HR-720 (2 Nos.), HR-721, HR-722, HR-723, HR-
721A, HR-724, HR-725, HR-726 HR-725A, HR- 705D (2 Nos.) (Total 34
Nos.) at INCO
Pre-Cast & PrePre-Cast Fabrication
Concreting Yard
Inspection @ Gulf /Consult
(Molding Formwork) for Admin
Building First floor panels (Panel Mark C1-A-02A,CI1-A-29,CI1-A-03,CI1-
2576 C-1954 A-08,CI1-A-26,C1-A-01, C1-A-01AH, At Inco Pre-Cast fabricartion Yard @ INCO 20-Feb-18 11:11 AM 21-Feb-18 9:00 AM 0016-A-ER-001-01-04 WILFREDO MAMDOOH
Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


Formwork Closure) Second floor panels (Panel Mark C1-A-02A,CI1-A-
2577 C-1955 29,CI1-A-03, CI1-A-08,CI1-A-26,C1-A-01, C1-A-01AH, At Inco Pre-Cast INCO 20-Feb-18 11:12 AM 21-Feb-18 9:15 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


Layer for Admin Building Second floor panels (Panel Mark 1-A-02A,CI1-A-
2578 C-1956 29,CI1-A-03,CI1-A-08,CI1-A-26,C1-A- 01 C1-A-01AH, At Inco Pre-Cast INCO 20-Feb-18 11:13 AM 21-Feb-18 9:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


Layer for Admin Building Second floor panels (Panel Mark 1-A-02A,CI1-A-
2579 C-1957 29,CI1-A-03,CI1-A-08,CI1-A-26,C1-A- 01 C1-A-01AH, At Inco Pre-Cast INCO 20-Feb-18 11:14 AM 21-Feb-18 9:35 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
Material,Receiving
fabricartion Yard @ Inspection of Pre-Cast
Ju'aymah Shops Concrete Members Hollow
Plant N-26
Core Slab For Admin Building HCS mark HR-308,HR-308B,HR-308A,HR-
313,HR-314,HR-313A,HR-313B,HR-307D,HR-307C HR-307,HR-307B,HR-
306,HR-323,HR-322,HR- 321,HR-306,HR-307,HR-307A,HR-306,HR-306,HR-
2580 C-1958 307 HR-306,HR-307,HR-306A,HR-306,HR-311F,HR-320,HR-320,HR- PLANT N-26 20-Feb-18 11:15 AM 21-Feb-18 7:00 AM 0016-A-ER-007-01-06 BAQAR ISHFAQ AHMED
320,HR-312D,HR-311F,HR-311E
Pre-cast Concrete Pre-Installation,HR- 527,HR-312C,HR-311E,HR-304,HR-
Inspection of Hollow Core S lab For
305(4NOS),HR-305B,HR-304,HR-311B,HR-312E
Admin HR-319(3NOS),HR-
Building HCS mark HR-308,HR-308B,HR-308A,HR-313,HR-314,HR-
312B,HR-311C,HR-315,HR-316(4NOS),HR-315A,HR-315,HR-304,HR-305
313A,HR-313B,HR-307D,HR-307C HR-307,HR-307B,HR-306,HR-323,HR-
HR-305A,HR-305A,HR-304,HR-305
322,HR-321,HR-306,HR- 307,HR-307A,HR-306,HR-306,HR-307 HR-
2581 C-1959 306,HR-307,HR-306A,HR-306,HR-311F,HR-320,HR-320,HR-320,HR- ADMIN BUILDING 20-Feb-18 11:16 AM 21-Feb-18 7:30 AM 0016-A-ER-007-01-06 SALMAAN ISHFAQ AHMED
312D,HR-311F,HR-311E ,HR-527,HR- 312C,HR- 311E,HR-304,HR-
305(4NOS),HR-305B,HR-304,HR-311B,HR-312E
Pre-cast Concrete Erection and Alignment Inspection
HR-319(3NOS),HR-
of Hollow Core Slab
312B,HR-311C,HR-315,HR-316(4NOS),HR-315A,HR-315,HR-304,HR-305
For Admin Building HCS mark HR-308,HR-308B,HR-308A,HR-313,HR-
HR-305A,HR-305A,HR-304,HR-305
314,HR-313A,HR-313B,HR-307D,HR-307C HR-307,HR-307B,HR-306,HR-
323,HR-322,HR-321,HR- 306,HR-307,HR-307A,HR-306,HR-306,HR-307
2582 C-1960 HR-306,HR-307,HR-306A,HR-306,HR-311F,HR- 320,HR-320,HR-320,HR- ADMIN BUILDING 20-Feb-18 11:17 AM 21-Feb-18 8:00 AM 0016-A-ER-007-01-06 SALMAAN ISHFAQ AHMED
312D,HR-311F,HR-311E ,HR-527,HR-312C,HR-311E,HR-304,HR-
305(4NOS),HR-305B,HR-304,HR-311B,HR-312E HR-319(3NOS),HR-
312B,HR-311C,HR-315,HR-316(4NOS),HR-315A,HR-315,HR-304,HR-305
Visual Inspection of 2" Dia. & 1" Dia. PVC Conduit Pipe Stup-up
2583 E-0226 Installation for Lighting Pole Foundation Prior to Concrete (24 Sets) Near ADMIN BUILDING 20-Feb-18 11:00 AM 21-Feb-18 9:35 AM RA-819293-06-00 FILBERT ALI M. AL YASEEN
North Side of New Admin Bldg. As per highlighted Attached Drawing.

Visual Inspection of 4X4" PVC Conduit Installation and Final Mandrel Test
2584 T-0063 for Telecom Duct Bank Length in 48 meters beside the fence of Chemical PLANT N-26 20-Feb-18 11:02 AM 21-Feb-18 9:00 AM RA-819517-01-0F2 FILBERT M. Z. NAVEED
Storage Area @ Upgrade Ju'aymah Shops Pant N-26.

Visual Inspection of Telecom Duct Bank Sand Bedding and Orange Color
2585 T-0064 Tape Installation Length in 48 meters beside the fence of Chemical PLANT N-26 20-Feb-18 11:03 AM 21-Feb-18 2:30 PM RA-819517-01-0F2 FILBERT M. Z. NAVEED
Storage Area @ Upgrade Ju'aymah Shops Pant N-26.

Compaction Testing (FDT)of Aggregate Base Course Materials Inspection


C-1942-A Grid Line A to I and 1 to 4. New Car Parking Shad @ ju'aymah shops, PLANT N-26 21-Feb-18 11:00 AM 22-Feb-18 2:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED 24
plant N-26

Visual Inspection Material Receiving Handling Storage and preservation of


2587 C-1961 Thioflex 600 Gun Grade Joint Sealant Grey 4 Liter Can (QTY=20 Can ) PLANT N-26 21-Feb-18 11:01 AM 22-Feb-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
From Fosam company Limited (Fosroc) @ ETE Laydown,JaAymah,shops
Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2588 C-1962 Inspection of 4000 PSi for Switch Rack Foundation at Shipping Receiving GULF 22-Feb-18 11:00 AM 24-Feb-18 2:30 PM RA-819722-01-0F4 QUADRI ISHFAQ AHMED
area At Ju'Aymah, Shops Plant N- 26 @ Gulf Consult

2589 C-1963 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 21-Feb-18 11:02 AM 22-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=92 M3) at ETE Laydown Area @ Ju'aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2590 C-1964 Inspection of 5000 PSi for '1st Layer for Admin Building Panel Mark CIG- INCO 21-Feb-18 11:03 AM 22-Feb-18 2:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-14,CIG-A-31,CIG-A-17, At INCO Pre-Cast Fabrication Yard @ gulf
Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2591 C-1965 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CIG- INCO 21-Feb-18 11:04 AM 22-Feb-18 2:10 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-14,CIG-A-31,CIG-A-17, At INCO Pre-Cast Fabrication Yard @ gulf
Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Hollow Core Panel For Admin Building At INCO
Pre-Cast Fabrication Yard Panel Mark (HCS Mark HR-707(02 nos),HR-
2592 C-1966 708(02 nos),HR-708A,HR-709,HR-705A(02 NOS),HR-705E,HR-706A, ',HR- GULF 21-Feb-18 11:05 AM 22-Feb-18 2:20 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
716(06 NOS),HR-714A(04 NOS),HR-718,HR-702(02 NOS),HR-703(02
NOS),HR-704(02 NOS) HR-705B,HR-711,HR-711A,HR-712,HR-717(02
NOS) (Total 33 NOS) @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
2593 C-1967 Inspection of 4000 PSi for Slab on Grade at gridline ( 3-5 ) (B-E ) for GULF 21-Feb-18 11:06 AM 22-Feb-18 2:30 PM RA-819722-01-0F4 QUADRI ISHFAQ AHMED
Panel 4 & 5 at Admin building aera At Ju'Aymah, Shops Plant N- 26 @
Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2594 C-1968 Inspection of 4000 PSi for Fire Wall (01 N0 ) above FGL 3nd Wall From GULF 21-Feb-18 11:07 AM 22-Feb-18 2:40 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
North at New Substation At Ju'Aymah, Shops Plant N- 26 @ gulf Consult

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2595 C-1969 Building First floor panels (Panel Mark C1-A-02,CI1-A-16,CI1-A-14,C1-A- INCO 21-Feb-18 11:08 AM 22-Feb-18 9:00 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
06,CI1-A-06H,CI1-A-09 At Inco Pre-Cast fabricartion Yard @ Ju'aymah
Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2596 C-1970 Formwork Closure) First floor panels (Panel Mark C1-A-02,CI1- A-16,CI1- INCO 21-Feb-18 11:09 AM 22-Feb-18 9:15 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
A-14,C1-A-06,CI1-A-06H,CI1-A-09 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2597 C-1971 Layer for Admin Building First floor panels(Panel Mark C1-A-02,CI1-A- INCO 21-Feb-18 11:10 AM 22-Feb-18 9:30 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
16,CI1-A-14,C1-A-06,CI1-A-06H,CI1-A-09 At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2598 C-1972 Layer for Admin Building First floor panels(Panel Mark C1-A-02,CI1-A- INCO 21-Feb-18 11:11 AM 22-Feb-18 3:30 PM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
16,CI1-A-14,C1-A-06,CI1-A-06H,CI1-A-09 At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Compaction Testing (FDT) inspection of Sub grade of (continuation) Tele


2599 C-1973 Com Duct Bank 72 Linear meter between Existing Admin Building and ADMIN BUILDING 21-Feb-18 11:12 AM 22-Feb-18 8:00 AM RA-819517-01-0F2 SALMAAN MAMDOOH 5
Existing Confrence Hall @ ju'aymah shops, plant N-26

Site and Grade preparation inspection of (continuation) Tele Com. Duct


2600 C-1974 Bank 72 Linear meter between, Existing Admin Building and Existing ADMIN BUILDING 21-Feb-18 11:12 AM 22-Feb-18 9:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED
Confrence Hall @ ju'aymah shops, plant N-26

2601 C-1975 Cast in Place Concrete Formwork Inspection for Switch Rack Foundation's SHIPPING & RECEIVING 21-Feb-18 11:13 AM 22-Feb-18 9:15 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED
Pedestal at Shipping and Receiving area @ ju'aymah shops, plant N-26. AREA

2602 C-1976 FBE Rebar Inspection of Switch Rack Foundation's Pedestal, at Shipping, SHIPPING & RECEIVING 21-Feb-18 11:14 AM 22-Feb-18 9:15 AM RA-819992-001-0F0 SALMAAN ISHFAQ AHMED
and Receiving area, @ ju'aymah shops, plant N-26. AREA

Material Receiving,Handling Storage and Preservation Inspection of 0


2603 C-1977 Hours Fire Rated Cmu Block Size 200 x 200 x 400 (QTY=300 Pcs) From Al PLANT N-26 21-Feb-18 11:15 AM 22-Feb-18 9:30 AM RA-819723-004-0F2 BAQAR ISHFAQ AHMED
Kifah Readymix and block Factory At ETE Store,JuAymah,Shops Plant N-
26

1st layer Select Fill Mateterial Fill Placment inspection above Tele Com
2604 C-1978 Duct Bank 48 Linear meter, beside the fence of Chemecal storage area @ PLANT N-26 21-Feb-18 11:16 AM 22-Feb-18 10:00 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26

1st layer Select Fill Mateterial FDT inspection above Tele Com Duct Bank
2605 C-1979 48 Linear meter, beside the fence of Chemecal storage area @ ju'aymah PLANT N-26 21-Feb-18 11:18 AM 22-Feb-18 10:15 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED 4
shops, plant N-26

2nd layer Select Fill Mateterial Fill Placment inspection above Tele Com
2606 C-1980 Duct Bank 48 Linear meter, beside the fence of Chemecal storage area @ PLANT N-26 21-Feb-18 11:19 AM 22-Feb-18 2:15 PM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26

2nd layer Select Fill Mateterial FDT inspection above Tele Com Duct Bank
2607 C-1981 48 Linear meter, beside the fence of Chemecal storage area @ ju'aymah PLANT N-26 21-Feb-18 11:20 AM 22-Feb-18 10:15 AM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED 4+1
shops, plant N-26.
Material,Receiving Inspection of Pre-Cast Concrete Members Hollow
Core Slab For Admin Building (HCS mark HR-304B,HR-305C,HR-
2608 C-1982 304A,HR-304B,HR-311D,HR-312F,HR-311D,HR-311,HR-312, HR-311A,HR- PLANT N-26 21-Feb-18 11:21 AM 22-Feb-18 10:00 AM 0016-A-EA-07-01-07 BAQAR ISHFAQ AHMED
312,HR-311A,HR-311,HR-314A,HR-302,HR-302A,HR-303,HR-302A,HR-
302,HR-309A HR-310B,HR-310,HR-310A,HR- 309,HR-317A,HR-317B,HR-
318,HR-318,HR-317
Pre-cast Concrete Pre-Installation Inspection of Hollow Core S lab For
Admin Building (HCS mark HR-304B,HR-305C,HR-304A,HR-304B,HR-
2609 C-1983 311D,HR-312F,HR-311D,HR-311,HR-312, HR-311A,HR-312,HR-311A,HR- PLANT N-26 21-Feb-18 11:22 AM 22-Feb-18 10:30 AM 0016-A-EA-07-01-07 SALMAAN ISHFAQ AHMED
311,HR-314A,HR-302,HR-302A,HR-303,HR-302A,HR-302,HR-309A HR-
310B,HR-310,HR- 310A,HR-309,HR-317A,HR-317B,HR-318,HR-318,HR-317
Pre-cast Concrete Erection and Alignment Inspection of Hollow Core Slab
For Admin Building (HCS mark HR-304B,HR-305C,HR-304A,HR- 304B,HR-
2610 C-1984 311D,HR-312F,HR-311D,HR-311,HR-312, HR-311A,HR-312,HR-311A,HR- PLANT N-26 21-Feb-18 11:23 AM 22-Feb-18 11:00 AM 0016-A-EA-07-01-06 SALMAAN ISHFAQ AHMED
311,HR-314A,HR-302,HR-302A,HR-303,HR-302A,HR-302,HR-309A HR-
310B,HR-310,HR- 310A,HR-309,HR-317A,HR-317B,HR-318,HR-318,HR-317

Visual Inspection of Trench for Telecom Duct Bank, Length in 72 meters at


2611 T-0065 West Side of Old Admin Bldg., Upgrade Ju'aymah Shops Pant N-26 As per PLANT N-26 21-Feb-18 11:12 AM 22-Feb-18 10:00 AM RA-819517-01-0F2 FILBERT M. Z. NAVEED
highlighted Attached Drawing.

Visual Inspection of 4X4" PVC Conduit Installation and Initial Mandrel Test
2612 T-0066 for Telecom Duct Bank, Length in 72 meters at West Side of Old Admin PLANT N-26 21-Feb-18 11:13 AM 22-Feb-18 3:30 PM RA-819517-01-0F2 FILBERT M. Z. NAVEED
Bldg., Upgrade Ju'aymah S hops Pant N-26

MATERIAL RECEIVING INSPECTION OF FIBER GLASS INSULATION FOR


2613 HV-0002 METAL DUCT FROM FAWAZ REFRIGERATION AND AIR CONDITIONING PLANT N-26 22-Feb-18 11:00 AM 24-Feb-18 9:30 AM RA-819227-01-00 FAISAL ZIAULLAH
(QTY=95PCS) AT ETE STORAGE LAYDOWN AREA @ JUAYMAH SHOPS
PLANT N-26.
Material,Receiving Inspection of Pre-Cast Concrete Members Hollow
Core Slab For Admin Building (HCS mark HR-708,HR-708,HR-709,HR-
2614 C-1985 708A,HR-707,HR-706A,HR-706,HR-704,HR-705A HR-705A,HR-705E,HR- ADMIN BUILDING 22-Feb-18 11:00 AM 24-Feb-18 7:00 AM 0016-A-ER-07-01-06 BAQAR ISHFAQ AHMED
705B,HR-704,HR- 702,HR-703,HR-711A,HR-714A,HR-714A,HR-716 HR-
717,HR-717,HR-714A,HR-314B
Pre-cast Concrete Pre-Installation Inspection of Hollow Core S lab For
Admin Building (HCS mark HR-708,HR-708,HR- 709,HR-708A,HR-707,HR-
2615 C-1986 706A,HR-706,HR-704,HR-705A HR-705A,HR-705E,HR-705B,HR-704,HR- ADMIN BUILDING 22-Feb-18 11:02 AM 24-Feb-18 8:00 AM 0016-A-ER-07-01-06 SALMAAN ISHFAQ AHMED
702,HR-703,HR-711A,HR-714A,HR-714A,HR-716 HR-717,HR-717,HR-
714A,HR-314B
Pre-cast Concrete Erection and Alignment Inspection of Hollow Core Slab
For Admin Building (HCS mark HR-708,HR-708,HR-709,HR-708A,HR-
2616 C-1987 707,HR-706A,HR-706,HR-704,HR-705A HR-705A,HR-705E,HR-705B,HR- ADMIN BUILDING 22-Feb-18 11:03 AM 24-Feb-18 8:30 AM 0016-A-ER-07-01-06 SALMAAN ISHFAQ AHMED
704,HR-702,HR-703,HR- 711A,HR-714A,HR-714A,HR-716 HR-717,HR-
717,HR-714A,HR-314B
Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin
2617 C-1988 Building Second Floor panel (Panel Mark C1-A-02B,CI1-A-25,CI1-A- INCO 22-Feb-18 11:05 AM 24-Feb-18 9:00 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
11,CI1-A-21,C1-A-01A, C1-A-01H At INCO Pre-Cast Fabrication Yard @ gulf
Consult

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2618 C-1989 Formwork Closure) Second F loor panel (Panel Mark C1-A-02B,CI1-A- INCO 22-Feb-18 11:06 AM 24-Feb-18 9:15 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
25,CI1-A-11,CI1-A-21,C1-A-01A, C1-A-01H At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2619 C-1990 Layer for Admin Building Second Floor panel (Panel Mark C1-A-02B,CI1- INCO 22-Feb-18 11:07 AM 24-Feb-18 9:30 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
A-25,CI1-A-11,CI1-A-21,C1-A-01A, C1-A-01H At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2620 C-1991 Layer for Admin Building Second Floor panel (Panel Mark C1-A- 02B,CI1- INCO 22-Feb-18 11:08 AM 24-Feb-18 1:30 PM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
A-25,CI1-A-11,CI1-A-21,C1-A-01A, C1-A-01H At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2621 C-1992 Inspection of 5000 PSi for '1st Layer for Admin Building Panel Mark CIG- GULF 22-Feb-18 11:09 AM 24-Feb-18 2:00 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
A-07,CIG-A-22,CIG-A-22A (Total 03 Nos) At INCO Pre-Cast Fabrication Yard
@ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2622 C-1993 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CIG- INCO 22-Feb-18 11:10 AM 24-Feb-18 2:10 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
A-07,CIG-A-22,CIG-A-22A (Total 03 Nos) At INCO Pre-Cast Fabrication
Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2623 C-1994 Inspection of 5000 PSi for ' 1st Layer for Admin Building Panel Mark CIG- INCO 22-Feb-18 11:11 AM 24-Feb-18 2:15 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
A-27, At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2624 C-1995 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CIG- INCO 22-Feb-18 11:13 AM 24-Feb-18 2:20 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
A-27, At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2625 C-1996 Inspection of 4000 PSi for Slab on Grade at gridline ( 2-5) (A-B ) & (2-3) GULF 22-Feb-18 11:14 AM 24-Feb-18 2:30 PM RA-819722-01-0F4 QUADRI ISHFAQ AHMED
(B-C) for Admin building aera At Ju'Aymah, Shops Plant N- 26 @ Gulf
Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Hollow Core Panel For Admin Building At INCO
2626 C-1997 Pre-Cast Fabrication Yard Panel Mar (HCS Mark ,HR-503(04 NOS),HR- INCO 22-Feb-18 11:15 AM 24-Feb-18 2:25 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
505,HR-506(04 NOS ),HR-507(02 NOS),HR-508(03 NOS) ,HR-509,HR-
510, ,HR-510A,HR-511,HR-511A,HR-512,HR-527 At INCO Pre-Cast
Fabrication Yard @ gulf Consult
Concrete (Lean) Testing, Sampling and Casting for (continuation) Tele
2627 C-1998 Com. Duct Bank 72 Linear meter between, Existing Admin Building and ADMIN BUILDING 22-Feb-18 11:16 AM 24-Feb-18 2:00 PM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED
Existing Confrence Hall @ ju'aymah shops, plant N-26

3rd layer Select Fill Mateterial Placing inspection above Tele Com Duct
2628 C-1999 Bank, 48 Linear meter, beside the fence of Chemecal storage area @ PLANT N-26 22-Feb-18 11:18 AM 24-Feb-18 1:00 PM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26.

3rd layer Select Fill Mateterial FDT inspection above Tele Com Duct Bank,
2629 C-2000 48 Linear meter, beside the fence of Chemecal storage area @ ju'aymah PLANT N-26 22-Feb-18 11:19 AM 24-Feb-18 1:15 PM RA-819517-01-0F2 SALMAAN ISHFAQ AHMED 4
shops, plant N-26.

2630 C-2001 Visual Inspection of Expansion/Contraction Joints prior to apply Sealant at ADMIN BUILDING 22-Feb-18 11:20 AM 24-Feb-18 3:00 PM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED not in QMIS
First Floor of New Amin Building @ ju'aymah shops, plant N-26.

Compaction Testing FDT inspection of Existing Subgrade 832 Linear


2631 C-2002 meter of Electrical Trench, from Duct Bank 10 and 11 to HDPE side @ PLANT N-26 22-Feb-18 11:22 AM 24-Feb-18 1:15 PM RA-819460-1&2-0F2 SALMAAN ISHFAQ AHMED 52
ju'aymah shops, plant N-26.
Materials Receiving Visual Inspection of Galvanized Rigid Steel (GRS) -
PVC Coated Conduit Fittings & Accessories as follows: 1) PVC COATED 1
HOLE CLAMP - 1 1/2" (100 EA), 2) PVC COATED BUSHING WG - 1" (100
2632 E-0227 EA), 3) PVC COATED 1 HOLE CLAMP - 1" (100 EA), 4) PVC COATED PLANT N-26 22-Feb-18 11:23 AM 24-Feb-18 8:00 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
LOCKNUT - 1" (100 EA), 5) PVC COATED CONDULET BODY LB - 1" (25 EA),
6) PVC COATED CONDULET BODY LR - 1" (25 EA) & 7) PVC COATED
CONDULET BODY LL - 1" (25 EA) at ETE Laydown Yard, Ju’Aymah S hop
Plant N2628 Days Compressive Strength Testing & Final Acceptance
Concrete
2633 C-2003 Inspection of 5000 PSi for ' 1st Layer for Admin Building Panel Mark CG- INCO 24-Feb-18 11:00 AM 25-Feb-18 2:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-03,CIG-A-20,CIG-A-20H (Total 03 NOS) At INCO Pre-Cast Fabrication
Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2634 C-2004 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CG- INCO 24-Feb-18 11:01 AM 25-Feb-18 2:10 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-03,CIG-A-20,CIG-A-20H (Total 03 NOS At INCO Pre-Cast Fabrication Yard
@ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2635 C-2005 Inspection of 5000 PSi for 'Panel for Sub Station Building Panel Mark SS- INCO 24-Feb-18 11:02 AM 25-Feb-18 2:20 PM 0016-A-ER-001-01-11 QUADRI MAMDOOH
SB-01(03 NOS) and SS-SC-01(03 NOS) At INCO Pre-Cast Fabrication Yard
@ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2636 C-2006 Inspection of 4000 PSi for ' Slab on Grade at gridline ( 2-5 ) (E-F ) at GULF 4-Feb-18 11:03 AM 25-Feb-18 2:30 PM RA-819722-01-0F7 QUADRI ISHFAQ AHMED
Admin building aera @ Ju'Aymah, Shops Plant N- 26 gulf Consult

Curing Inspection of Concrete for upon hollow Core Slab, 2nd Floor, from
2637 C-2007 Grid Line 5 to 11 and A - C @ New Admin Building, ju'aymah shops, ADMIN BUILDING 24-Feb-18 11:04 AM 25-Feb-18 10:00 AM RA-819724-01-0F1 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26.

2638 C-2008 Curing Inspection of Concrete for Footing of Gantry Crain foundation @ SHIPPING & RECEIVING 24-Feb-18 11:05 AM 25-Feb-18 10:30 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Grid line 1 Shipping & Receiving area, ju'aymah shops, plant N-26 AREA

Curing Inspection of Concrete for Tele Com Duct Bank 48 Linear meter
2639 C-2009 beside the fence of Chemecal storage area @ New Admin Building @ ADMIN BUILDING 24-Feb-18 11:07 AM 25-Feb-18 11:00 AM RA-819517-01-0F3 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2640 C-2010 Building Second Floor panel (Panel Mark CI1-A-30,CI1-A-11A,CI1-A- ADMIN BUILDING 24-Feb-18 11:08 AM 25-Feb-18 9:00 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
28,CI1-A-23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2641 C-2011 Formwork Closure) Second F loor panel (Panel Mark CI1-A-30,CI1-A- PLANT N-26 24-Feb-18 11:09 AM 25-Feb-18 9:15 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
11A,CI1-A-28,CI1-A-23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2642 C-2012 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-30,CI1- ADMIN BUILDING 24-Feb-18 11:10 AM 25-Feb-18 9:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
A-11A,CI1-A- 28,CI1-A-23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2643 C-2013 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-30,CI1-A- ADMIN BUILDING 24-Feb-18 11:11 AM 25-Feb-18 1:30 PM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
11A,CI1-A-28,CI1-A-23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Cast in Place Concrete Formwork Inspection for Wall of Gantry Crain


2644 C-2014 foundation at Grid line 2, Shipping & Receiving area, ju'aymah shops, SHIPPING & RECEIVING 24-Feb-18 11:12 AM 25-Feb-18 1:00 PM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
AREA
plant N-26

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for
2645 C-2015 Wall of Gantry Crain foundation @ Grid line 2.Shipping & Receiving area, SHIPPINGAREA
& RECEIVING 24-Feb-18 11:13 AM 25-Feb-18 2:00 PM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Concrete Testing, Sampling and Casting Inspection for Wall of Gantry Crain
2646 C-2016 foundation at Grid line 2, Shipping & Receiving area, ju'aymah shops, SHIPPING & RECEIVING 24-Feb-18 11:14 AM 25-Feb-18 3:00 PM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
AREA
plant N-26

FBE Rebars, Embeedded Items and Form work Closure Inspection for
2647 C-2017 Transformer Foundations # XRF-X01, XRF-X02, XRF-X03, XRF-X04, PLANT N-26 24-Feb-18 11:15 AM 25-Feb-18 2:30 PM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Transformer Yard @ ju'aymah shops, plant N-26.

Concrete Testing, Sampling and Casting Inspection for Transformer


2648 C-2018 Foundations # XRF-X01, XRF-X02 XRF-X03, XRF-X04, Transformer Yard @ PLANT N-26 24-Feb-18 11:16 AM 25-Feb-18 3:30 PM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Visual Inspection of Material Receiving Handling storage and preservation


2649 C-2019 of Dia PVC Pipes SCH 80 (QTY=50 Pipe) 6.0 Meter length Using as PLANT N-26 24-Feb-18 11:17 AM 25-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Reinforcement Spacer From New Produc Industries (Nepro)@ ETE
Laydown Area Ju'aymah Shops Plant N-26

2650 P-0237 Material Receiving, Handling ,Storage & preservation Inspection of PVC PLANT N-26 24-Feb-18 11:18 AM 25-Feb-18 8:30 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
DWV SCH-40 Pipe 4" [6M]- 17Pcs from NEPRO @ ETE store, Plant N-26

FBE Rebar, Embedded Items and Formwork Closure Inspection of Switch


2651 C-2020 Rack Foundation's Pedestal, at Shipping, and Receiving area, @ ju'aymah PLANT N-26 24-Feb-18 2:00 PM 25-Feb-18 2:00 PM RA-819992-01-0F3 SALMAAN ISHFAQ AHMED
shops, plant N-26.

Concrete Testing, Sampling and Casting Inspection of Switch Rack


2652 C-2021 Foundation's Pedestal, at Shipping, and Receiving area, @ ju'aymah SHIPPING & RECEIVING 24-Feb-18 2:02 PM 25-Feb-18 3:30 PM RA-819992-01-0F3 SALMAAN ISHFAQ AHMED
shops, plant N-26. AREA
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Materials Receiving Visual Inspection of Vacuum Circuit Breaker 1200A,


15KV, 37Kaic, 60 Hz, VR Series, Type 150DHP-VR1000 for Existing 13.2 KV
2653 E-0228 Switchgear No. R82-P- 321 (Cubicle Section No. 6A & 6B) at ETE Laydown PLANT N-26 24-Feb-18 2:00 PM 25-Feb-18 9:00 AM RA-819843-001-0F1 FILBERT DAMIAN ABAA
Yard, Ju’Aymah Shop Plant N26

Cast in Place Concrete Formwork Inspection for Wall of Gantry Crain SHIPPING & RECEIVING
2654 C-2014-A foundation at Grid line 2, Shipping & Receiving area, ju'aymah shops, AREA 25-Feb-18 11:00 AM 26-Feb-18 8:00 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
plant N-26

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for SHIPPING & RECEIVING
2655 C-2015-A Wall of Gantry Crain foundation @ Grid line 2.Shipping & Receiving area, AREA 25-Feb-18 11:01 AM 26-Feb-18 8:45 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

FBE Rebar, Embedded Items and Formwork Closure Inspection of Switch SHIPPING & RECEIVING
2656 C-2020-A Rack Foundation's Pedestal, at Shipping, and Receiving area, @ ju'aymah AREA 25-Feb-18 11:02 AM 26-Feb-18 8:30 AM RA-819992-01-0F3 SALMAAN ISHFAQ AHMED
shops, plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2657 C-2022 Inspection of 5000 PSi for '1st Layer for Admin Building Panel Mark CIG- GULF 25-Feb-18 11:03 AM 26-Feb-18 2:10 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-12, At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2658 C-2023 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CIG- GULF 25-Feb-18 11:04 AM 26-Feb-18 2:20 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-12, At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2659 C-2024 Inspection of 4000 PSi for 'Rack Foundation at North side of Shipping GULF 25-Feb-18 11:05 AM 26-Feb-18 2:30 PM RA-819992-01-0F3 QUADRI ISHFAQ AHMED
Receiving area @ Juaymah, Shops Plant N- 26 gulf Consult

Material,Receiving Inspection of Pre-Cast Concrete ,double Tee Slab for


2660 C-2025 Substation building (DTS Marks DT-01A,DT-02A(5NOS) at Sub Station @ NEW SUB STATION 25-Feb-18 11:06 AM 26-Feb-18 7:00 AM 0016-A-ER-002-01-07 BAQAR ISHFAQ AHMED
Ju'aymah Shops Plant N-26

Pre-cast Concrete Pre-Installation Inspection of Substation building for


2661 C-2026 double Tee Slab (DTS Marks DT-01A,DT-02A(5NOS) at Sub S tation @ NEW SUB STATION 25-Feb-18 11:07 AM 26-Feb-18 7:30 AM 0016-A-ER-002-01-0 SALMAAN ISHFAQ AHMED
Ju'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection of Substation


2662 C-2027 building for double Tee Slab (DTS Marks DT-01A,DT-02A(5NOS) at Sub NEW SUB STATION 25-Feb-18 11:08 AM 26-Feb-18 8:00 AM 0016-A-ER-002-01-07 SALMAAN ISHFAQ AHMED
Station @ Ju'aymah Shops Plant N-26

Compaction Testing (FDT) inspection of Sub grade of Raw Water and


2663 C-2028 Potable water line in f ront of Bank log Building Toward Workshop, 100 PLANT N-26 25-Feb-18 11:09 AM 26-Feb-18 8:00 AM RA-819439-002-0F1 SALMAAN ISHFAQ AHMED 7
linear meter. @ ju'aymah shops, plant N-26
Concrete and CMU Surface Preparation and Protection Inspection All
CMU Wall, and Tele Com. Room # 219 and 232 (CMU 200X200X400)
2664 C-2029 Male Toilet MT # 231 and 212 (CMU 150X200X400), Stair Case Room # ADMIN BUILDING 25-Feb-18 11:10 AM 26-Feb-18 8:00 AM RA-819745-01-00 SALMAAN ISHFAQ AHMED
226, 201 and 208 (CMU 200X200X400), Janitor Room # 230 Mechinical
Room 220, Electrical Room # 221, Corridor # 213. 2nd floor Admin
Building, @
Concrete ju'aymah
and shops, plant
CMU Installation N-26 Inspection All CMU Wall, and
(in process)
Tele Com. Room # 219 and 232 (CMU 200X200X400) Male Toilet MT #
2665 C-2030 231 and 212 (CMU 150X200X400), Stair Case Room # 226, 201 and 208 ADMIN BUILDING 25-Feb-18 11:11 AM 26-Feb-18 9:00 AM RA-819745-01-00 SALMAAN ISHFAQ AHMED
(CMU 200X200X400), Janitor Room # 230 Mechinical Room 220, Electrical
Room # 221, Corridor # 213. 2nd floor Admin Building, @ ju'aymah
shops, plant N-26
Sweet Sand placement inspection for Raw Water and Potable water line
2666 C-2031 in front of Bank log Building Toward Workshop, 100 linear meter. @ PLANT N-26 25-Feb-18 11:12 AM 26-Feb-18 8:45 AM RA-819439-01-0F1 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26

Sweet Sand FDT inspection for Raw Water and Potable water line in front
2667 C-2032 of Bank log Building Toward Workshop, 100 linear meter. @ ju'aymah PLANT N-26 25-Feb-18 11:13 AM 26-Feb-18 11:00 AM RA-819439-01-0F1 SALMAAN ISHFAQ AHMED
shops, plant N-26

Requesting for closure of INCR-P-002 : After Concrete Placement of Slab


2668 P-0238 at Second Floor at Admin Building There is no Opening provided in Slab ADMIN BUILDING 25-Feb-18 11:11 AM 26-Feb-18 7:30 AM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
as for S anitary Sewer Pipeline of Floor Drain (FD), Eastern Water Closet
(EWC) and Western Water Closet (WWC)

PVC DWV Pipes Installation & Assembly Inspection of 2" Dia for Sanitary
2669 P-0239 Sewer Vent Line at First Floor Male Toilet No. 116 in New Admin Building ADMIN BUILDING 25-Feb-18 11:12 AM 26-Feb-18 8:00 AM RA-819775-01-00 FAHEEM SYED SHAFIULLAH
Area @ J u'aymah Shops Plant N- 26.

Visual Inspection of Excavation &Trenching prior to Installation of 6" Dia.


2670 E-0229 & 4" Dia. Direct Buried PVC Conduits for Direct Buried MV Cables & PSA PLANT N-26 25-Feb-18 11:00 AM 26-Feb-18 9:00 AM RA-819460-02-0F1 FILBERT DAMIAN ABAA
Cables at Inside Fence Berm Area As per Attached Highlighted Drawing

Visual Inspection for Installation of 6" Dia. & 4" Dia. Direct Buried PVC
2671 E-0230 Conduits for Direct Buried MV Cables & PSA Cables at Inside Fence Berm PLANT N-26 25-Feb-18 11:01 AM 26-Feb-18 9:30 AM RA-819460-02-0F1 FILBERT DAMIAN ABAA
Area As per Attached Highlighted Drawing

Visual Inspection of Sand Bedding, Red Tiles and Underground Cable


2672 E-0231 Warning Tape Installation for 6" Dia. & 4" Dia. Direct Buried PVC PLANT N-26 25-Feb-18 11:02 AM 26-Feb-18 10:30 AM RA-819460-02-0F1 FILBERT DAMIAN ABAA
Conduits for Direct Buried MV Cables & PS at Inside Fence Berm Area As
per Attached Highlighted Drawing

Visual Inspectoion before Welding for 12 Joint on 12 Panels SS-WIG-


2673 ST-W-0016 12,13,14,15,01,02B, 03, 04, 02C,05,06 & 07 (Check the attached Drawing) NEW SUB STATION 18-Feb-18 11:00 AM 19-Feb-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
@ S ubstation Building Ju'Aymah Shops, Plant N26.

Visual Inspection Before for 8 Joints on 8 Panels SS-WIG-18,19,20H, 21,22,


2674 ST-W-0017 02F, & 23. (Check the attached Drawing) @ Substation J u'Aymah Shops, NEW SUB STATION 18-Feb-18 11:11 AM 19-Feb-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Plant N26.

Visual Inspection after for welding 39 joints on 11 Panels SS-WIG-


2675 ST-W-0020 02A,02D, 02E, 02G, SS-WG-09, 08, 01,02,03,04, & 05 (Check the attached NEW SUB STATION 21-Feb-18 11:22 AM 22-Feb-18 2:00 PM RA-819885-001-00 OMAR M. HASSAN
Drawing) @ Substation Building Ju'Aymah Shops, Plant N26.

Visual Inspection after for Welding 36 Joints on Panels SS-WIG-09- 08,


2676 ST-W-0021 10,11,14,15,16,17, SS-WG-07, 10, & 12 (Check the attached Drawing) @ NEW SUB STATION 22-Feb-18 11:00 AM 23-Feb-18 10:30 AM RA-819885-001-00 OMAR M. HASSAN
Substation Building Ju'Aymah Shops, Plant N26.

Visual Inspection before for 158 Joints on 17 Panels SS-WIG-06, 07, 02A,
2677 ST-W-0022 02D, 02, 08, 09, 10, 11, 12, 16, 02G, 17, 02E, SS-WG-09, 08, & 01. (Check NEW SUB STATION 22-Feb-18 11:15 AM 24-Feb-18 8:30 AM RA-819885-001-00 OMAR M. HASSAN
the attached Drawing) @ S ubstation Building Ju'Aymah S hops, Plant N26.

CPVC Pipes and fittings Installation & Assembly Inspection of 2"ø for
2678 P-0240 Portable Water line about 100 LM from Back Log yard towards North PLANT N-26 26-Feb-18 11:00 AM 27-Feb-18 3:30 PM RA-819439-01-0F1 FAHEEM SYED SHAFIULLAH
Side of Work Shop Area @ Ju'aymah Shop Plant N-26.

CPVC Pipes and fittings Installation & Assembly Inspection of 2"ø for Raw
2679 P-0241 Water lineReceiving
Material about 100
Visual
LM Inspection
from Back of
LogMetallic
yard towards
Cable Tray
North& Fittings
Side of as
Work PLANT N-26 26-Feb-18 11:02 AM 27-Feb-18 4:00 PM RA-819438-01-0F1 FAHEEM SYED SHAFIULLAH
Shop Area
follows: 1) SL5DA-36ST9-12,
@ Ju'aymah Shop Plant
Straight
N-26.
Cable Ladder: Steel (HDGAF),
3.66m/12" Long, 900mm Wide, 19mm Flange Width (95 EA), 2) AL5G-
36ST9-12, Straight Cable Ladder: Aluminum 6063-T6, 3.66m/12" L,
900mm Wide, 45mm Flange Width, (40 EA), 3) SL5BA-12ST9-12, Straight
2680 E-0232 Cable Ladder: Steel (HDGAF), 3.66m/12" Long, 300mm Wide, 19mm PLANT N-26 26-Feb-18 11:02 AM 28-Feb-18 9:00 AM RA-819843-01-0F1 FILBERT DAMIAN ABAA
Flange Width, (30 EA), 4) AL5D-36V190-66, Vertical Inside Bend Cable
Ladder: Aluminum 6063-T6 Extrusion, 90 Deg., 900mm Wide, 1676mm
Radius, 19mm Flange Width (4EA) 5) AL5D-36VO90-66, Vertical Outside
Bend Cable
Visual Ladder:
Inspection of Aluminum
Below 6063-T6
Grade Extrusion,
Exothermic 90 Deg.,Connections
900mm Wide,
1676mm
120 mm² Radius, 19mm
Main Grounding Flange
Grid Width atCadwelding
(4EA) to
Conductors ETE Laydown
Nearest Yard, Grid to
Grounding
2681 E-0233 Ju’Aymah S at
hop Plant N26 BOOSTER PUMP 26-Feb-18 11:03 AM 28-Feb-18 8:00 AM RA-820013-001-00 FILBERT ALI M. AL YASEEN
Conductor Booster Pump Station No. 2 Area, Ju’Aymah S hop Plant N26
as per Attached Highlighted IFC Drawing.

Visual Inspection of Trench Backfilling for 120 mm² Bare Tinned Copper
2682 E-0234 Grounding Conductors for Main Grounding Grid to Nearest Grounding BOOSTER PUMP 26-Feb-18 11:05 AM 28-Feb-18 8:15 AM RA-820013-001-00 FILBERT ALI M. AL YASEEN
Grid Conductor at Booster Pump Station No. 2 Area, Ju’Aymah Shop Plant
N26 as per Attached Highlighted IFC Drawing.

Visual Inspection of 4X4" PVC Conduit Installation and Final Mandrel Test
2683 T-0067 for Telecom Duct Bank Length in 72 meters at West Side of Old Admin ADMIN BUILDING 28-Feb-18 11:00 AM 1-Mar-18 2:30 PM RA-819517-01-0F2 FILBERT M. Z. NAVEED
Bldg., Upgrade Ju'aymah S hops Pant N-26 As per highlighted Attached
Drawing.

Visual Inspection of trench for Telecom Duct Bank, Length in 72 meters at


2684 T-0068 South Side of New Admin Bldg.,, Upgrade Ju'aymah S hops Pant N-26 As ADMIN BUILDING 1-Mar-18 11:00 AM 3-Mar-18 10:00 AM RA-819517-01-0F2 FILBERT M. Z. NAVEED
per highlighted Attached Drawing.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2685 C-2033 Inspection of 5000 PSi for 'Pre-Cast Lighting Poles Foundation ( 19 Nos ) at ADMIN BUILDING 26-Feb-18 11:00 AM 27-Feb-18 2:30 PM RA-8199912-01-0F3 QUADRI ISHFAQ AHMED
Pre- Cast Area Near North Side New Admin Building @ Ju'Aymah, Shops
Plant N- 26 gulf Consult

Material,Receiving Inspection of Pre-Cast Concrete ,double Tee Slab for


2686 C-2034 Substation building DTS MARKS SS-DT-02B,SS-DT-03,SS-DT-04,SS-DT- NEW SUB STATION 26-Feb-18 11:06 AM 27-Feb-18 7:00 AM 0016-A-ER-002-01-11 BAQAR ISHFAQ AHMED
05,SS- DT-06,SS-DT-01B) at Sub S tation @ Ju'aymah Shops Plant N-26

Pre-cast Concrete Pre-Installation Inspection of Substation building for


2687 C-2035 double Tee Slab DTS MARKS S S-DT-02B,SS-DT-03,SS-DT-04,SS-DT-05,S S- NEW SUB STATION 26-Feb-18 11:09 AM 27-Feb-18 7:30 AM 0016-A-ER-002-01-11 SALMAAN ISHFAQ AHMED
DT-06,SS-DT-01B) at Sub Station @ Ju'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection of Substation


2688 C-2036 building for double Tee Slab DTS MARKS SS-DT-02B,SS-DT-03,SS-DT- NEW SUB STATION 26-Feb-18 11:11 AM 27-Feb-18 8:00 AM 0016-A-ER-002-01-11 SALMAAN ISHFAQ AHMED
04,SS- DT-05,SS-DT-06,SS-DT-01B) at Sub Station @ Ju'aymah Shops Plant
N-26

Pre-Cast Concreting Curing and Final Inspection for Pre-Cast Lighting


2689 C-2037 Poles Foundation ( 19 Nos ) at Pre- Cast Area Near North Side of New ADMIN BUILDING 26-Feb-18 11:13 AM 27-Feb-18 10:00 AM RA-819463-001-00 WILFREDO ISHFAQ AHMED
Admin Building @ Ju'Aymah, Shops Plant N- 26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2690 C-2038 Building Second Floor panel (Panel Mark CI1-A-05H,CI1-A-27,CI1-A- ADMIN BUILDING 26-Feb-18 11:00 AM 27-Feb-18 9:00 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
20,C1-A-07,CI1-A-24,CI1-A-31, CI1-A- 17 At Inco Pre-Cast fabricartion Yard
@ J u'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2691 C-2039 Formwork Closure) Second Floor panel (Panel Mark CI1-A-05H,CI1- A- PLANT N-26 26-Feb-18 11:11 AM 27-Feb-18 9:15 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
27,CI1-A-20,C1-A-07,CI1-A-24,CI1-A- 31, CI1-A-17 At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2692 C-2040 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-05H,CI1- ADMIN BUILDING 26-Feb-18 11:15 AM 27-Feb-18 9:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
A-27,CI1-A-20,C1-A-07,CI1-A-24,CI1- A-31, CI1-A-17 At Inco Pre- Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2693 C-2041 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-05H,CI1- ADMIN BUILDING 26-Feb-18 11:20 AM 27-Feb-18 1:30 PM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
A-27,CI1-A-20,C1-A-07,CI1-A-24,CI1- A-31, CI1-A-17 At Inco Pre- Cast
fabricartion Yard @ Ju'aymah Shops Pla

2694 C-2042 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 26-Feb-18 11:22 AM 27-Feb-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=92 M3) at ETE Laydown Area @ Ju'aymah Shops Plant N- 26

Concrete 28 Days Compressive Strength Testing & Final Acceptance SHIPPING & RECEIVING
2695 C-2043 Inspection of 2000 PSi for 'Granty Crane Foundations G/L 1 and around 27-Feb-18 11:02 AM 28-Feb-18 2:00 PM RA-819728-001-0F1 QUADRI ISHFAQ AHMED
A to G. Shipping and Receiving area at ju'aymah shops, plant N-26 AREA

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
2696 C-2044 Building (Panel Mark C1-A-02BH,C1-A-03,CI1-A-02,CI1-A-04,CI1-A- ADMIN BUILDING 27-Feb-18 11:11 AM 28-Feb-18 10:30 AM 0016-A-ER-001-01-04 WILFREDO ISHFAQ AHMED
06,CI1-A-10) At Inco Pre-Cast Fabrication Yard @ Ju'aymah Shops Plant N-
26

Site and Grade Preparation for Lean Concrete prior to Curb stones
2697 C-2045 installation . @ Grid line 3 (A to I) New Car Parking Shad @ ju'aymah PLANT N-26 27-Feb-18 11:10 AM 28-Feb-18 2:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

Lean Concrete, Testing, Sampling and Casting prior to Curb stones


2698 C-2046 installation . @ Grid line 3 (A to I) New Car Parking Shad @ ju'aymah PLANT N-26 27-Feb-18 11:11 AM 28-Feb-18 2:15 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2699 C-2047 Building Second Floor panel (Panel Mark C1-A-05,CI1- A-22,C1-A-05A,C1- ADMIN BUILDING 27-Feb-18 11:13 AM 28-Feb-18 9:00 AM 016-A-ER-002-01-05 WILFREDO MAMDOOH
A-05AH At Inco Pre-Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2700 C-2048 Formwork Closure) Second Floor panel (Panel Mark C1-A-05,CI1-A- PLANT N-26 27-Feb-18 9:15 AM 28-Feb-18 9:15 AM 016-A-ER-002-01-05 WILFREDO MAMDOOH
22,C1-A-05A,C1-A-05AH CI1-A-17 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2701 C-2049 Layer for Admin Building Second Floor panel (Panel Mark C1-A-05,CI1-A- ADMIN BUILDING 27-Feb-18 9:30 AM 28-Feb-18 9:30 AM 016-A-ER-002-01-05 WILFREDO MAMDOOH
22,C1-A-05A,C1-A-05AH CI1-A-17 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2702 C-2050 Layer for Admin Building Second Floor panel (Panel Mark C1-A- 05,CI1-A- ADMIN BUILDING 27-Feb-18 11:26 AM 28-Feb-18 1:30 PM 016-A-ER-002-01-05 WILFREDO MAMDOOH
22,C1-A-05A,C1-A-05AH CI1-A-17 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Visual Inspection of Material Receiving Handling storage and preservation


2703 C-2051 of Concrete Curb Stone Single Edge Size 500 x 200 x 450 MM (QTY=240 PLANT N-26 27-Feb-18 11:30 AM 28-Feb-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED
Pcs) From Khonaini International Company LTD ETE Laydown Area
Ju'aymah Shops Plant N-26

Visual Inspection after Welding for 34 Joints on 8 Panels SS-WIG-18, 19,


2704 ST-W-0018 20, 22, 02F, & 23. (Check the attached Drawing) @ Substation Building NEW SUB STATION 20-Feb-18 11:00 AM 21-Feb-18 9:00 AM RA-819885-001-00 OMAR M. HASSAN
Ju'Aymah Shops, Plant N26.

Visual Inspaction after Welding for 54 Joints on 12 Panels SS-WIG-12H,


2705 ST-W-0019 13,14,15,01, 02B, 03, 04, 02C, 05, 06 & 07 . (Check the attached Drawing) NEW SUB STATION 19-Feb-18 11:00 AM 20-Feb-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
@ S ubstation Building Ju'Aymah Shops, Plant N26.

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2706 C-2052 Second floor panels (Panel Mark 1-A-02A,CI1-A-29,CI1-A-03,CI1-A-08,CI1- ADMIN BUILDING 28-Feb-18 11:01 AM 1-Mar-18 10:30 AM 016-A-ER-002-01-05 WILFREDO MAMDOOH
A-26,C1-A-01 C1-A-01AH, At Inco Pre-Cast Fabrication Yard @ Ju'aymah
Shops Plant N-26

Curing Inspection of Concrete for Pre-Cast Light pols Foundations


2707 C-2053 (24Nos), at Pre-Cast Yard, North Side of New Admin Building, ju'aymah ADMIN BUILDING 28-Feb-18 11:02 AM 1-Mar-18 10:00 AM RA-819724-001-0F1 SALMAAN ISHFAQ AHMED
shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2708 C-2054 Inspection of 2000 PSi for 'for Tele Com. Duct bank trench west side of GULF 28-Feb-18 11:03 AM 1-Mar-18 2:00 PM RA-819517-01-0F2 QUADRI ISHFAQ AHMED
Admin Building (42 Linear Meter) at ju'aymah shops, plant N-26 @ Gulf
Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2709 C-2055 Inspection of 5000 PSi for ' 1st Layer for Admin Building Panel Mark CIG- GULF 28-Feb-18 11:05 AM 1-Mar-18 2:10 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
A-21, At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2710 C-2056 Inspection
Concrete 28ofDays
5000Compressive
PSi for ' '2ndStrength
Layer forTesting
Admin&Building Panel Mark CIG-
Final Acceptance GULF 28-Feb-18 11:06 AM 1-Mar-18 2:20 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
A-21, At INCO
Inspection Pre-Cast
of 5000 Fabrication
PSi for YardPanel
Hollow Core @ gulf ForConsult
Admin Building At INCO
Pre-Cast Fabrication Yard Panel Mark (HCS Mark) HR-317,HR-
318(2NOS),HR-317B,HR-317A,HR-304(4NOS),HR-305(6NOS),HR-
305A(2NOS) HR-305B,HR-306(5NOS),HR-306A(2NOS),HR- 307(4NOS),HR-
2711 C-2057 307A,HR-307B,HR-307C, HR-307D HR-308,,HR-308A,,HR-308B,HR- GULF 28-Feb-18 11:07 AM 1-Mar-18 2:30 PM 0016-A-ER-01-01-04 QUADRI MAMDOOH
311B,,HR-311C,HR-311D(2NOS),HR-311E(2NOS) HR-311F(2NOS ),HR-
312A,HR-312B,HR-312C,HR-313,HR-312D,HR-312E,HR-312F,HR-712A HR-
713,HR-714(2NOS),HR-715,HR- 716A,HR-727,HR-727A,HR-727B,HR-
727C,HR-728, HR- 729 HR-730,HR-729A,HR-701(2NOS)(Total 67NOS)
2712 C-2058 at INCO Pre-Cast
Material ReceivingFabrication
InspectionYard
of Clean
@ Gulf
SandConsult
l From Al-Osais (Qty= 192 PLANT N-26 28-Feb-18 11:08 AM 1-Mar-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
M3) @ ETE Laydown,JaAymah,shops Plant N-26

2713 C-2059 Material Receiving Inspection of Select Fill Material From Al-Osais (Qty= PLANT N-26 28-Feb-18 11:09 AM 1-Mar-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
192 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2714 C-2060 Building Second Floor panel (Panel Mark CI1-A-23,CI1-A-19,CI1-A- INCO 28-Feb-18 11:10 AM 1-Mar-18 9:00 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
23H,CI1-A-18,CI1-A-13 At Inco Pre-Cast fabricartion Yard @ Ju'aymah
Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2715 C-2061 Formwork Closure) Second F loor panel (Panel Mark CI1-A-23,CI1-A- INCO 28-Feb-18 11:11 AM 1-Mar-18 9:15 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
19,CI1-A-23H,CI1-A-18,CI1-A-13 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2716 C-2062 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-23,CI1- INCO 28-Feb-18 11:12 AM 1-Mar-18 9:30 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
A-19,CI1-A-23H,CI1-A-18,CI1-A-13 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2717 C-2063 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-23,CI1-A- INCO 28-Feb-18 11:13 AM 1-Mar-18 1:30 PM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
19,CI1-A-23H,CI1-A-18,CI1-A-13 At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

FBE Reinforcing Steel, Inspection for the Wall of Gantry Crain foundation
2718 C-2064 Prior to install Embedded Item, and Form Closure @ Grid line 1.Shipping SHIPPINGAREA
& RECEIVING 28-Feb-18 11:14 AM 1-Mar-18 2:00 PM RA-81991-01-02 SALMAAN ISHFAQ AHMED
& Receiving area, ju'aymah shops, plant N-26

Pre-cast Concrete Installation Final Inspection for Substation Building all


2719 C-2065 double Tee Slabs at New Substation Building, ju'aymah shops, plant N- NEW SUB STATION 28-Feb-18 11:15 AM 1-Mar-18 10:00 AM 0016-A-ER-002-009 SALMAAN ISHFAQ AHMED
26

Cast in Place Concrete Formwork Inspection for Door Lintel Beam 1st
2720 C-2066 Floor, Door # D4 3nos, D5 2nos D4A 1nos, D8 2nos and D6 1nos, total 9 ADMIN BUILDING 28-Feb-18 11:16 AM 1-Mar-18 1:00 PM RA-819745-01-00 SALMAAN ISHFAQ AHMED
Doors. @ New Admin Building, ju'aymah shops, plant N-26

FBE Rebar, Embedded item and Formwork Closure Inspection for Door
2721 C-2067 Lintel Beam 1st F loor, Door # D4 3nos, D5 2nos, D4A 1nos, D8 2nos and ADMIN BUILDING 28-Feb-18 11:17 AM 1-Mar-18 1:30 PM RA-819745-01-00 SALMAAN ISHFAQ AHMED
D6 1nos, total 9 Doors. @ New Admin Building, ju'aymah shops, plant N-
26

Visual Inspection of Material Receiving Handling storage and preservation


2722 C-2068 of Concrete Curb Stone Single Edge Size 500 x 200 x 450 MM (QTY=240 PLANT N-26 28-Feb-18 11:18 AM 1-Mar-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED
Pcs) From Khonaini International Company LTD At New Car Parking Area
@ J u'aymah Shops Plant N-26

Pre-Test Punch Listing for HT Package UJS-WS-PW-002-00 (Potable Water)


2723 P-0242 about 100 LM from Back Log Storage Building towards North Side of WORK SHOP 1-Mar-18 11:00 AM 3-Mar-18 9:00 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
Work Shop Area at Ju'aymah Shop Plant N-26.

Internal Cleaning / Flushing for HT Package UJS-WS-PW-002-00 (Potable


2724 P-0243 Water) about 100 LM from Back Log Storage Building towards North Side WORK SHOP 1-Mar-18 11:02 AM 3-Mar-18 9:15 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
of Work Shop Area at Ju'aymah Shop Plant N-26.

Verification of Testing Equipment for HT Package UJS-WS-PW-002-00


2725 P-0244 (Potable Water) about 100 LM from Back Log Storage Building towards WORK SHOP 1-Mar-18 11:03 AM 3-Mar-18 9:30 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
North Side of Work Shop Area at Ju'aymah Shop Plant N-26.

Verification of Test Preparation for HT Package UJS-WS-PW-002-00


2726 P-0245 (Potable Water) about 100 LM from Back Log Storage Building towards WORK SHOP 1-Mar-18 11:03 AM 3-Mar-18 10:00 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
North Side of Work Shop Area at Ju'aymah Shop Plant N-26.

Pre-Test Punch Listing for HT Package UJS-WS-RW-002-00 (Raw Water)


2727 P-0246 about 100 LM from Back Log Storage Building towards North Side of WORK SHOP 1-Mar-18 11:05 AM 3-Mar-18 10:15 AM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
Work Shop Area at Ju'aymah Shop Plant N-26.

Internal Cleaning / Flushing for HT Package UJS-WS-RW-002-00 (Raw


2728 P-0247 Water) about 100 LM from Back Log Storage Building towards North Side WORK SHOP 1-Mar-18 11:05 AM 3-Mar-18 10:30 AM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
of Work Shop Area at Ju'aymah Shop Plant N-26.

Verification of Testing Equipment for HT Package UJS-WS-RW-002-00 (Raw


2729 P-0248 Water) about 100 LM from Back Log Storage Building towards North Side WORK SHOP 1-Mar-18 11:06 AM 3-Mar-18 10:45 AM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
of Work Shop Area at Ju'aymah Shop Plant N-26.

Verification of Test Preparation for HT Package UJS-WS-RW-002-00 (Raw


2730 P-0249 Water) about 100 LM from Back Log Storage Building towards North Side WORK SHOP 1-Mar-18 11:07 AM 3-Mar-18 11:00 AM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
of Work Shop Area at Ju'aymah Shop Plant N-26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Verification of Testing Equipment for HT Package UJS-ADMB-PW-005-00


2731 P-0250 (Potable Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:08 AM 3-Mar-18 7:30 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ J u'aymah Shop Plant N-26.

Verification of Test Preparation for HT Package UJS-ADMB-PW-005-00


2732 P-0251 (Potable Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:09 AM 3-Mar-18 7:45 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ J u'aymah Shop Plant N-26.

Filling & Pressurization for HT Package UJ S-ADMB-PW-005-00 (Potable


2733 P-0252 Water) about 13 LM from Outside New Admin Building (South Side) To ADMIN BUILDING 1-Mar-18 11:10 AM 3-Mar-18 8:00 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Inside New Admin Building @ Ju'aymah Shop Plant N-26.

Visual Inspection at Test Pressure for HT Package UJS-ADMB-PW-005-00


2734 P-0253 (Potable Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:11 AM 3-Mar-18 8:30 AM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ J u'aymah Shop Plant N-26.

De- Pressurization & Water Disposal for HT Package UJ S-ADMB-PW-005-00


2735 P-0254 (Potable Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:12 AM 3-Mar-18 12:45 PM RA-819439-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ Ju'aymah Shop Plant N-26.

Verification of Testing Equipment for HT Package UJS-ADMB-RW-005-00


2736 P-0255 (Raw Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:13 AM 3-Mar-18 1:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ Ju'aymah Shop Plant N-26.

Verification of Test Preparation for HT Package UJS-ADMB-RW-005-00


2737 P-0256 (Raw Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:14 AM 3-Mar-18 1:15 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ J u'aymah Shop Plant N-26.

Filling & Pressurization for HT Package UJ S-ADMB-RW-005-00 (Raw Water)


2738 P-0257 about 13 LM from Outside New Admin Building (South Side) To Inside ADMIN BUILDING 1-Mar-18 11:15 AM 3-Mar-18 1:30 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
New Admin Building @ J u'aymah Shop Plant N-26.

Visual Inspection at Test Pressure for HT Package UJS-ADMB-RW-005-00


2739 P-0258 (Raw Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:16 AM 3-Mar-18 2:00 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ J u'aymah Shop Plant N-26.

De- Pressurization & Water Disposal for HT Package UJ S-ADMB-RW-005-00


2740 P-0259 (Raw Water) about 13 LM from Outside New Admin Building (South ADMIN BUILDING 1-Mar-18 11:17 AM 3-Mar-18 6:15 PM RA-819438-002-00 FAHEEM SYED SHAFIULLAH
Side) To Inside New Admin Building @ J u'aymah Shop Plant N-26.

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2741 C-2069 Second floor panels (Panel Mar C1-A-02,CI1-A-16,CI1-A-14,C1-A-06,CI1- A- INCO 1-Mar-18 11:03 AM 3-Mar-18 10:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
06H,CI1-A-09 At Inco Pre-Cast Fabrication Yard @ Ju'aymah S hops Plant
N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2742 C-2070 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CIG- GULF 1-Mar-18 11:04 AM 3-Mar-18 2:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-21H, At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2743 C-2071 Inspection of 5000 PSi for '2nd Layer for Admin Building Panel Mark CIG- GULF 1-Mar-18 11:05 AM 3-Mar-18 2:00 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
A-21H, At28
Concrete INCO
DaysPre-Cast
Compressive
Fabrication
Strength
YardTesting
@ gulf&Consult
Final Acceptance
Inspection of 5000 PSi for Hollow Core Panel For Admin Building At INCO
Pre-Cast Fabrication Yard Panel Mark (HCS Mark) HR-501(4NOS),HR-
501A(2NOS),HR-502,HR-503(2NOS),HR-503A, HR-504(2NOS)HR-310B
2744 C-2072 HR-311(2NOS),HR-311A(2NOS),HR-312(2NOS) HR-313A,HR-313B,HR- GULF 1-Mar-18 11:06 AM 3-Mar-18 2:30 PM 0016-A-ER-001-01-04 QUADRI MAMDOOH
314,HR-314A,HR-314B ,HR-315(2NOS),HR-315A,HR-316(4NOS), HR-
319(3NOS),HR-320(3NOS),HR-321,HR-322,HR-323 HR-301,HR-301A,HR-
302(2NOS) HR-302A,HR-303,HR-304B(2NOS),HR-304A,HR-305C,HR-309A
HR-309,HR-310,HR-310A
Concrete 28 Consult (TotalStrength
Days Compressive 54 NOS )Testing
at INCO&Pre-Cast Fabrication
Final Acceptance
Yard @ Gulf
Inspection of 2000 PSi for 'Lean Concrete for Granty Crane Foundations
2745 C-2073 GULF 1-Mar-18 11:09 AM 3-Mar-18 2:40 PM RA-819991-02-0F2 QUADRI ISHFAQ AHMED
G/L 2 and around A to G. S hipping and Receiving area at ju'aymah
shops, plant N-26 @ Gulf Consult

2746 C-2074 Formwork and Surface Inspection prior to Cast Screed at 1st floor of New ADMIN BUILDING 1-Mar-18 11:10 AM 3-Mar-18 9:00 AM RA-819722-01-04 SALMAAN ISHFAQ AHMED
Admin Building @ G.L 8 to12 and A to C @ ju'aymah shops, plant N- 26.

Screed Concrete Testing, Sampling and Casting Inspection prior to Cast


2747 C-2075 Screed at 1st floor of New Admin Building @ G.L 8 to12 and A to C @ ADMIN BUILDING 1-Mar-18 11:11 AM 3-Mar-18 9:30 AM RA-819722-01-04 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


2748 C-2076 Building Second Floor panel (Panel Mark CI1-A-21H,CI1-A-22A,CI1-A- INCO 1-Mar-18 11:13 AM 3-Mar-18 9:00 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
23AH,CI1-A-19H,CI1-A-20H, C1-A-05H,CI1-A-07 At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


2749 C-2077 Formwork Closure) Second F loor panel (Panel Mark CI1-A-21H,CI1-A- INCO 1-Mar-18 11:14 AM 3-Mar-18 9:15 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
22A,CI1-A-23AH,CI1-A-19H,CI1-A-20H, C1-A-05H,CI1-A-07 At Inco Pre-
Cast fabricartion Yard @ Ju'aymah Shops Plant N- 26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


2750 C-2078 Layer for Admin Building Second Floor panel (Panel Mark CI1-A- INCO 1-Mar-18 11:15 AM 3-Mar-18 9:30 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
21H,CI1-A-22A,CI1-A-23AH,CI1-A-19H,CI1-A-20H, C1-A-05H,CI1-A-07 At
Inco Pre-Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


2751 C-2079 Layer for Admin Building Second Floor panel (Panel Mark CI1-A-21H,CI1- INCO 1-Mar-18 1:30 PM 3-Mar-18 1:30 PM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
A-22A,CI1-A- 23AH,CI1-A-19H,CI1-A-20H, C1-A-05H,CI1-A-07 At Inco Pre-
Cast fabricartion Yard @ Ju'aymah Shops Plant N- 26

Compaction Testing (FDT) inspection of Sub grade of Tele Com. Duct Bank
2752 C-2080 Trench @ Pipe Side 72 LM, South Side of New Admin Building @ ADMIN BUILDING 1-Mar-18 11:00 AM 3-Mar-18 9:30 AM RA-819715-001-0F3 SALMAAN ISHFAQ AHMED 5
ju'aymahReceiving
Material shops, plant N-26 storage and preservation Inspection of
Handling
Gypsum Board Asscescries For Admin Building (Stud 92MMx0.9MMx3.0
Meter QTY=800)(Runner 92MMx0.9MMx3.0 Meter QTY=320) (SLF Drill
Scrw Z inc PLT 35MM 1000/Box QTY=5)(Fab Tabe 1-A Fiber Glass Tape
2753 C-2081 50MMx90 Meter QTY=50) (UGS Sheet Rock Joint Compound 28 KG PLANT N-26 1-Mar-18 11:00 AM 3-Mar-18 11:00 AM RA-819746-01-00 BAQAR ISHFAQ AHMED
QTY=14)(Modtruss Screw 13 x4MM,1000 Pcs/Box TW QTY=13) (Stud
63MMx0.9MMx3.0 Meter QTY=400)(Runner 63MMx0.9MMx3.0 Meter
QTY=200) From International Co.LTD (Binex) At ETE Laydown Area @
Ju'aymah
Visual Inspection
Shops Plant
Material
N-26Receiving Handling Storage and preservation of
2754 C-2082 Cico Joint PS 600 Gun Grade PolySulfide Joint Sealant Grey 4 Liter PLANT N-26 1-Mar-18 11:13 AM 3-Mar-18 10:30 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
Kit(QTY=20 Can ) From CIC @ ETE Laydown Store,JaAymah,shops Plant
N-26

FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection for SHIPPING & RECEIVING
2755 C-1871-A Footing of Gantry Crain foundation @ Grid line 1.Shipping & Receiving 13-Feb-18 11:03 AM 14-Feb-18 10:00 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
area, ju'aymah shops, plant N-26 AREA

Visual Inspection of Material Receiving Handling storage and preservation


2756 C-2083 of Concrete Curb Stone Single Edge Size 500 x 200 x 450 MM (QTY=240 PLANT N-26 3-Mar-18 11:00 AM 4-Mar-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED
Pcs) From Khonaini International Company LTD At New Car Parking Area
@ J u'aymah Shops Plant N-26

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2757 C-2084 Second floor panels (Panel Mar C1-A-02B,CI1-A-25,CI1-A-11,CI1-A-21,C1- ADMIN BUILDING 3-Mar-18 11:00 AM 4-Mar-18 10:30 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
A-01A, C1- A-01H At Inco Pre-Cast Fabrication Yard @ Ju'aymah Shops
Plant N-26

Visual Inspection of 3X4" PVC Conduit Installation and Initial Mandrel Test
2758 T-0069 for Telecom Duct Bank, Length in 72 meters at South Side of New Admin ADMIN BUILDING 3-Mar-18 11:00 AM 4-Mar-18 9:15 AM RA-819517-01-0F2 FILBERT M. Z. NAVEED
Bldg., Upgrade Ju'aymah S hops Pant N-26 As per highlighted Attached
Drawing.

Visual Inspection for the Installation of Grounding Test Well (1 EA) for
2759 E-0235 16mm Dia.x 2.4 Meters Grounding Rod Electrode at Booster Pump BOOSTER PUMP 3-Mar-18 11:00 AM 4-Mar-18 10:00 AM RA-820013-001-00 FILBERT M. Z. NAVEED
Station No. 2 Area, Ju’Aymah Shop Plant N26 as per Attached Highlighted
IFC Drawing.

Pre-Stress all Hollow Core Slabe final allingement inspection of Roop Deck
2760 C-2085 for Admin Building South Side of New Admin Building @ ju'aymah ADMIN BUILDING 4-Mar-18 11:00 AM 5-Mar-18 10:00 AM 0016-A-ER-007-01-04 SALMAAN ISHFAQ AHMED
shops, plant N-26

2761 C-2086 Visual Inspection of Curb Stone installation @ Grid line 3, A to I @ New PLANT N-26 3-Mar-18 4:40 PM 4-Mar-18 4:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Car Parking Shad. at ju'aymah shops, plant N-26

Lean Concrete Testing, Sampling and Casting for Tele Com. Duct Bank @
2762 C-2087 72 LM, South Side from Pedestal J Y-347 to Exiisting Manhole New Admin ADMIN BUILDING 3-Mar-18 4:45 PM 4-Mar-18 1:00 PM RA-819517-01-0F3 SALMAAN ISHFAQ AHMED
Building @ ju'aymah shops, Plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2763 C-2088 Inspection of 4000 PSi for 'Fire Alaram System Duct bank, West side of NEW SUB STATION 4-Mar-18 11:00 AM 5-Mar-18 2:15 PM RA-819283-002-001 QUADRI ISHFAQ AHMED
New Sub Station Building (12 Linear Meter long) ' at ju'aymah shops,
plant N-26

Site and Grade Preparation for Lean Concrete prior to Curb stones
2764 C-2089 installation . @ Grid line 2 (A to I) New Car Parking Shad @ ju'aymah PLANT N-26 4-Mar-18 11:02 AM 5-Mar-18 2:30 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

2765 C-2090 Lean Concrete Testing, Sampling and Casting prior to install Curb stones. PLANT N-26 4-Mar-18 11:03 AM 5-Mar-18 3:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
@ Grid line 2 (A to I) New Car Park ing Shad @ ju'aymah shops, plant N-26

2766 C-2091 Formwork and Surface Inspection prior to Cast Screed at 1st floor of New ADMIN BUILDING 4-Mar-18 11:06 AM 5-Mar-18 8:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Admin Building @ G.L 8 to12 and C to F @ ju'aymah shops, plant N-26.

2767 C-2092 Concete (Screed) Testing, Sampling and Casting at 1st floor of New Admin ADMIN BUILDING 4-Mar-18 11:07 AM 5-Mar-18 8:30 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Building @ Grid Line 8 to12 and C to F @ ju'aymah shops, plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2768 C-2093 Inspection of 4000 PSi for 'Electrical Duct bank (DB-5), North side of PLANT N-26 4-Mar-18 11:08 AM 5-Mar-18 2:00 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
Existing Welding Shop @ ju'aymah shops, plant N-26

Material Receiving, Handling ,Storage & preservation Inspection of Pipe


2769 P-0260 Hangers With adjustable Swivel with Rubber type-Clevis & Ring Hot Dip PLANT N-26 5-Mar-18 11:11 AM 5-Mar-18 8:30 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
Galvanized & C-Clamps (As attached List) from Arab Bolts @ ETE store,
Juaymah Shops Project, Plant N-26.

Filling and Pressurization for Hydro Test Package UJS-WS-PW-002-00


2770 P-0261 (Potable Water) about 100 LM from Back Log Storage Building towards WORK SHOP 4-Mar-18 11:12 AM 5-Mar-18 9:30 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
North Side of Work Shop Area @ Ju'aymah Shop Plant N-26.

Visual Inspection at Test Pressure for Hydro Test Package UJS-WS-PW- 002-
2771 P-0262 00 (Potable Water) about 100 LM from Back Log Storage Building towards WORK SHOP 4-Mar-18 11:13 AM 5-Mar-18 10:30 AM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
North Side of Work Shop Area @ Ju'aymah Shop Plant N-26.

De- Pressurization & Water Disposal for Hydro Test Package UJS-WS-PW-
2772 P-0263 002-00 (Potable Water) about 100 LM from Back Log Storage Building WORK SHOP 4-Mar-18 11:14 AM 5-Mar-18 2:30 PM RA-819439-001-0F1 FAHEEM SYED SHAFIULLAH
towards North Side of Work Shop Area @ Ju'aymah Shop Plant N-26.

Materials Receiving Visual Inspection of C-Channel 100mm X 50mm X


2773 E-0236 5mm Hot Dip Galvanized (73 LM) for Cable Tray Accessories at ETE PLANT N-26 4-Mar-18 11:16 AM 5-Mar-18 9:00 AM RA-819843-01-0F1 FILBERT DAMIAN ABAA
Laydown Yard, Ju’Ay mah Shop Plant N26

Visual Inspection for the Installation of Grounding Test Well (2 EA) for
2774 E-0237 16mm Dia.x 2.4 Meters Grounding Rod Electrode at New Parking Area, PLANT N-26 4-Mar-18 11:17 AM 5-Mar-18 2:00 PM RA-819939-001-00 FILBERT ALI M. AL YASEEN
Ju’Aymah S hop Plant N26 as per Attached Highlighted IFC Drawing.

Material Receiving Inspection for SMAW Electrods (7018 ESAB VacPac)


2775 ST-W-0024 3.2mm (84kg) and 2.5mm (33.60kg) @ Substation Building Ju’Aymah NEW SUB STATION 28-Feb-18 4:00 PM 1-Mar-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Shop Plant N26

2776 ST-W-0025 Visual Inspection after Welding for 9 Joints 1 Panel SS-WIG-18 (Check the NEW SUB STATION 2-Mar-18 4:03 PM 3-Mar-18 9:30 AM RA-819885-001-00 OMAR M. HASSAN
attached Drawing) @ Substation Building Ju'Aymah Shops, Plant N26

2777 ST-W-0026 Visual Inspection after Welding for 9 Joints 1 Panel SS-WIG-19 (Check the NEW SUB STATION 2-Mar-18 4:06 PM 3-Mar-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
attached Drawing) @ Substation Building Ju'Aymah Shops, Plant N26

2778 ST-W-0027 Visual Inspection after Welding for 13 Joints 1 Panel SS-WIG-20 (Check NEW SUB STATION 3-Mar-18 4:06 PM 4-Mar-18 9:00 AM RA-819885-001-00 OMAR M. HASSAN
the attached Drawing) @ S ubstation Building Ju'Aymah S hops, Plant N26

2779 ST-W-0028 Visual Inspection after Welding for 13 Joints 1 Panel SS-WIG-20H (Check NEW SUB STATION 3-Mar-18 4:15 PM 4-Mar-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
the attached Drawing) @ S ubstation Building Ju'Aymah S hops, Plant N26

Visual Inspection after Welding for Joints on 2 slabs SS-DTS-01A & 02A (1
2779 ST-W-0029 of 5), (Check the attached Drawing) @ Substation Building Ju'Aymah NEW SUB STATION 3-Mar-18 4:18 PM 4-Mar-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Shops, Plant N26

Visual Inspection after Welding for Joints on 2 slabs SS-DTS-02A (2 of 5) &


2781 ST-W-0030 & 02A (3 of 5), (Check the attached Drawing) @ Substation Building NEW SUB STATION 3-Mar-18 4:20 PM 4-Mar-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
Ju'Aymah Shops, Plant N26

Concrete 28 Days Compressive Strength Testing & Final Acceptance SHIPPING & RECEIVING
2782 C-2094 Inspection of 4000 PSi for 'Footing of Gantry Crain foundation @ Grid AREA 5-Mar-18 11:20 AM 6-Mar-18 2:15 PM RA-819991-001-0F2 QUADRI ISHFAQ AHMED
line 2. Shipping & Receiving area, ' at ju'aymah shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2783 C-2095 Inspection of 4000 PSi for 'Grid line 1 to 3 and C to E, Ground Floor at ADMIN BUILDING 5-Mar-18 11:21 AM 6-Mar-18 2:00 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
New Admin Building,

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2784 C-2096 Second floor panels (Panel Mar CI1-A-30,CI1-A-11A,CI1-A- 28,CI1-A- INCO 5-Mar-18 11:22 AM 6-Mar-18 10:30 AM 0016-A-ER-02-01-05 WILFREDO MAMDOOH
23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast Fabrication Yard @
Ju'aymah Shops Plant N-26

2785 C-2097 Curing Inspection of Concrete for Switch Rack Foundation's Pedestal, at SHIPPING & RECEIVING 5-Mar-18 11:23 AM 6-Mar-18 10:00 AM RA-819992-01-0F3 SALMAAN ISHFAQ AHMED not in QMIS
Shipping, and Receiving area, @ ju'aymah shops, plant N-26. AREA

Compaction Testing (FDT) inspection of Sub grade for LV and FDAS Direct
2786 C-2098 Buried Cable Trench 22X4 meter between MTM Buildig and Welding WORK SHOP 5-Mar-18 11:25 AM 6-Mar-18 10:00 AM RA-819460-02-0F2 SALMAAN ISHFAQ AHMED 5
workshop @ ju'aymah shops, plant N-26

2787 C-2099 Formwork and Surface Inspection prior to Cast Screed at 1st floor of New ADMIN BUILDING 5-Mar-18 11:26 AM 6-Mar-18 8:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Admin Building @ G.L 8 to 5 and B to E @ ju'aymah shops, plant N-26.

2788 C-2100 Concete (Screed) Testing, Sampling and Casting at 1st floor of New Admin ADMIN BUILDING 5-Mar-18 11:18 AM 6-Mar-18 9:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Building @ G.L 8 to 5 and B to E @ ju'aymah shops, plant N-26.

2789 C-2101 Curing Inspection of Concrete for , Wall of Gantry Crain foundation at SHIPPING & RECEIVING 5-Mar-18 11:29 AM 6-Mar-18 10:15 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Grid line 2, Shipping & Receiving area, ju'aymah shops, plant N-26 AREA

Visual Inspection of Excavation & Trenching (Before Cable Laying) for


2790 E-0238 Main Grounding Grid Conductor (120 mm² Insulated Grounding ADMIN BUILDING 5-Mar-18 11:00 AM 6-Mar-18 1:30 PM RA-819714-01-0F2 FILBERT ALI M. AL YASEEN
Conductor) at West Side of New Admin Building (Near Grid Line 3 to 8),
Ju'aymah Shops Plant N-26, As per attached Highlighted Drawing.

Visual inspection for Laying of 120 mm² Insulated Grounding Conductor


2791 E-0239 for Main Grounding Grid at West Side of New Admin Building (Near Grid ADMIN BUILDING 5-Mar-18 11:03 AM 6-Mar-18 1:45 PM RA-819714-01-0F2 FILBERT ALI M. AL YASEEN
Line 3 to 8), Ju'aymah S hops Plant N-26, As per attached Highlighted
Drawing.

Visual Inspection for Installation of 16mm Dia. X 2.4 mtrs Copper


2792 E-0240 Grounding Rod (2 EA) at West Side of New Admin Building (Near Grid ADMIN BUILDING 5-Mar-18 11:06 AM 6-Mar-18 2:00 PM RA-819714-01-0F2 FILBERT ALI M. AL YASEEN
Line 3 & 8), Ju'aymah Shops Plant N-26, As per attached Highlighted
Drawing.

Visual Inspection of (2 EA) Individual Grounding Rod Resistance Testing for


2793 E-0241 Main Grounding Grid at West S ide of New Admin Building (Near Grid Line ADMIN BUILDING 5-Mar-18 11:08 AM 6-Mar-18 2:15 PM RA-819714-01-0F2 FILBERT ALI M. AL YASEEN
3 & 8), Ju'aymah Shops Plant N-26, As per attached Highlighted Drawing.

Filling and Pressurization for Hydro Test Package UJS-WS-RW-002-00 (Raw


2794 P-0264 Water) about 100 LM from Back Log Storage Building towards North Side WORK SHOP 5-Mar-18 11:10 AM 6-Mar-18 12:30 PM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
of Work Shop Area @ Ju'aymah Shop Plant N-26.

Visual Inspection at Test Pressure for Hydro Test Package UJS-WS-RW-002-


2795 P-0265 00 (Raw Water) about 100 LM from Back Log Storage Building towards WORK SHOP 5-Mar-18 11:12 AM 6-Mar-18 1:00 PM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
North Side of Work Shop Area @ Ju'aymah Shop Plant N-26.

De- Pressurization & Water Disposal for Hydro Test Package UJS-WS-RW-
2796 P-0266 002-00 (Raw Water) about 100 LM from Back Log S torage Building WORK SHOP 5-Mar-18 11:15 AM 6-Mar-18 5:15 PM RA-819438-001-0F1 FAHEEM SYED SHAFIULLAH
towards North Side of Work Shop Area @ Ju'aymah Shop Plant N-26.

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2797 C-2102 Second floor panels (Panel Mar CI1-A-05H,CI1-A- 27,CI1-A-20,C1-A-07,CI1- ADMIN BUILDING 6-Mar-18 11:00 AM 7-Mar-18 10:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
A-24,CI1-A-31, CI1-A-17 At Inco Pre-Cast Fabrication Yard @ J u'aymah
Shops Plant N-26

Visual Inspection of Material Receiving Handling storage and preservation


2798 C-2103 of Concrete Curb Stone Single Edge Size 500 x 200 x 450 MM (QTY=240 PLANT N-26 6-Mar-18 11:02 AM 7-Mar-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED
Pcs) From Khonaini International Company LTD At New Car Parking Area
@ J u'aymah Shops Plant N-26

2799 C-2104 Formwork and Surface Inspection prior to Cast Screed at 1st floor of New ADMIN BUILDING 6-Mar-18 11:03 AM 7-Mar-18 8:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Admin Building @ G.L 1 to 5 and A to F @ ju'aymah shops, plant N-26.

2800 C-2105 Concete (Screed) Testing, Sampling and Casting at 1st floor of New Admin ADMIN BUILDING 6-Mar-18 11:05 AM 7-Mar-18 9:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Building @ G.L 1 to 5 and A to F @ ju'aymah shops, plant N-26.

Site and Grade preparation inspection for PSA Duct Bank 21 linerar meter
2801 C-2106 between MTM Buildig and Welding workshop @ ju'aymah shops, plant WORK SHOP 6-Mar-18 11:06 AM 7-Mar-18 10:00 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED
N-26

Lean Concrete Testing Sampling and Casting inspection for PSA Duct Bank,
2802 C-2107 21 linerar meter between MTM Buildig and Welding workshop @ WORK SHOP 6-Mar-18 11:08 AM 7-Mar-18 10:00 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Site and Grade Preparation for Lean Concrete prior to Curb stones
2803 C-2108 installation . @ Grid line 1 (A to I) New Car Parking Shad @ ju'aymah PLANT N-26 6-Mar-18 11:09 AM 7-Mar-18 2:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

Lean Concrete Testing, Sampling and Casting prior to install Curb stones.
2804 C-2109 @ Grid line. @ Grid line 1 (A to I) New Car Parking Shad @ ju'aymah PLANT N-26 6-Mar-18 11:10 AM 7-Mar-18 2:30 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

1st Layer Select fill Material FDT inspection above Telecomm Duct Bank
2805 C-2110 @ 72 LM, South Side from Pedestal JY-347 to Exiisting Manhole New ADMIN BUILDING 6-Mar-18 11:11 AM 7-Mar-18 1:00 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED 5
Admin Building @ ju'aymah shops,

Visual Inspection Material Receiving Handling Storage and preservation of


2806 C-2111 Cico Joint PS 600 Gun Grade PolySulfide Joint Sealant Grey 4 Liter PLANT N-26 6-Mar-18 2:00 PM 7-Mar-18 10:30 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
Kit(QTY=330 Can ) From CIC @ ETE Laydown Store,JaAymah,shops Plant
N-26
Materials Receiving Visual Inspection of LV Building Wires as follows: 1)
CU/PVC 450/750 V H07V2-R 90oC 4MM2 RM RED (11 Rolls) 2) CU/PVC
2807 E-0242 450/750 V H07V2-R 90oC 4MM2 RM BLUE (11 Rolls) 3) CU/PVC 450/750 PLANT N-26 6-Mar-18 2:00 PM 7-Mar-18 10:30 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
V H07V2-R 90oC 4MM2 RM WHITE (22 Rolls) 4) CU/PVC 450/750 V
H07V2-R 90oC 4MM2 RM G/Y (22 Rolls) at ETE Laydown Yard, Ju’Aymah
Shop Plant N26
Visual Inspection of Excavation & Trenching prior to Installation of 6" Dia.
& 4" Dia. Direct Buried PVC Conduits (ELE-DB-004) for Direct Buried LV
2808 E-0243 Cables & FDAS Cables Between Existing Maintenance Bldg. (2110) & PLANT N-26 6-Mar-18 2:02 PM 7-Mar-18 8:00 AM RA-819460-001-0F1 FILBERT DAMIAN ABAA
Existing Welding Shop Bldg. (2104) at Ju’Aymah Shop Plant N26 as per
Attached Highlighted Drawing.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
Visual Inspection for Installation of 6" Dia. & 4" Dia. Direct Buried PVC
Conduits (ELE-DB-004) for Direct Buried LV Cables & FDAS Cables
2809 E-0244 Between Existing Maintenance Bldg. (2110) & Existing Welding Shop PLANT N-26 6-Mar-18 2:06 PM 7-Mar-18 8:30 AM RA-819460-002-0F1 FILBERT DAMIAN ABAA
Bldg. (2104) at Ju’Aymah Shop Plant N26 as per Attached Highlighted
Drawing.
Visual Inspection of Trench for PSA Duct Bank, Length in 20 meters
Between Existing Maintenance Bldg. (2110) & Existing Welding Shop
2810 T-0070 Bldg. (2104) at Ju’Aymah Shop Plant N26 as per Attached Highlighted PLANT N-26 6-Mar-18 2:06 PM 7-Mar-18 8:15 AM RA-819460-002-0F1 FILBERT M. Z. NAVEED
Drawing.

Visual Inspection of 3X4" PVC Conduit Installation and Initial Mandrel Test
for PSA Duct Bank, Length in 20 meters Between Existing Maintenance
2811 T-0071 Bldg. (2110) & Existing Welding Shop Bldg. (2104) at Ju’Aymah Shop Plant PLANT N-26 6-Mar-18 2:08 PM 7-Mar-18 8:45 AM RA-819460-002-0F1 FILBERT M. Z. NAVEED
N26 as per Attached Highlighted Drawing.

Visual Inspection of 3X4" PVC Conduit Installation and Final Mandrel Test
for Telecom Duct Bank Length in 72 meters at South Side of New Admin
2812 T-0072 Bldg., Upgrade Ju'aymah S hops Pant N-26 As per highlighted Attached ADMIN BUILDING 6-Mar-18 2:09 PM 7-Mar-18 2:00 PM RA-819517-001-0F2 FILBERT M. Z. NAVEED
Drawing.

Visual Inspection of Telecom Duct Bank Sand Bedding and Orange Color
Tape Installation for Telecom Duct Bank Length in 72 meters at South Side
2813 T-0073 of New Admin Bldg., Upgrade Ju'aymah Shops Pant N-26 As per ADMIN BUILDING 6-Mar-18 2:00 PM 7-Mar-18 3:00 PM RA-819517-001-0F2 FILBERT M. Z. NAVEED
highlighted Attached Drawing.
Visual Inspection of Material Receiving Handling storage and preservation
of Concrete Curb Stone Single Edge Size 500 x 200 x 450 MM (QTY=240
2814 C-2112 Pcs) From Khonaini International Company LTD At New Car Parking Area PLANT N-26 7-Mar-18 11:00 AM 8-Mar-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED
@ J u'aymah Shops Plant N-26 At New Car Parking Area @ J u'aymah Shops
Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for 'for Pre-Casst Light pols Foundations (21Nos),
2815 C-2113 at Pre-Cast Yard, North Side of 'New Admin Building, ju'aymah shops, ADMIN BUILDING 7-Mar-18 11:02 AM 8-Mar-18 2:15 PM RA-819463-001-00 QUADRI ISHFAQ AHMED
plant N-26 @ Gulf Consult

Material,Receiving Inspection for Pre- Cast Concrete Panels Second Floor


(panel Mark) CI1-A-11,CI1-A-10,CI1-A-09,CI1- A-08,CI1-A-05H,CI1-A-
2816 C-2114 06H,C1-A-01AH,C1-A-02A,C1- A-01A, C11-A-02BH,At Admin Building Area ADMIN BUILDING 7-Mar-18 11:03 AM 8-Mar-18 7:00 AM 0016-A-ER-001-01-04 BAQAR ISHFAQ AHMED
@ J u'aymah Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection Second F lloor Panel


2817 C-2115 (Panel Mark) CI1-A-11,CI1-A-10,CI1- A-09,CI1-A-08,CI1-A-05H,CI1-A- ADMIN BUILDING 7-Mar-18 11:04 AM 8-Mar-18 7:30 AM 0016-A-ER-001-01-00 SALMAAN ISHFAQ AHMED
06H,C1-A-01AH,C1-A-02A,C1- A-01A, C11-A-02BH,At Admin Building Area
@ J u'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Second


2818 C-2116 Floor(Panel Mark) CI1-A-11,CI1-A-10,CI1-A-09,CI1-A-08,CI1-A-05H,CI1-A- ADMIN BUILDING 7-Mar-18 11:05 AM 8-Mar-18 7:40 AM 0016-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
06H,C1-A-01AH,C1-A-02A,C1- A-01A, C11-A-02BH,At Admin Building Area
@ J u'aymah Shops Plant N-26

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2819 C-2117 Second floor panels (Panel Mar C1-A-05,CI1-A-22,C1-A-05A,C1-A-05AH ADMIN BUILDING 7-Mar-18 11:06 AM 8-Mar-18 10:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
At Inco Pre-Cast Fabrication Yard @ Ju'aymah Shops Plant N-26

Cast in Place Concrete Formwork Inspection for 6 nos of Column at Grid


2820 C-2118 line, 1 to 2 and B to D, New Admin Building , @ ju'aymah shops, plant N- ADMIN BUILDING 7-Mar-18 11:09 AM 8-Mar-18 10:00 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
26

2821 C-2119 FBE Rebars Inspection for 6 nos of Column at Grid line, 1 to 2 and B to D, ADMIN BUILDING 7-Mar-18 11:10 AM 8-Mar-18 11:30 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
New Admin Building. , @ ju'aymah shops, plant N-26

Cast in Place Concrete Formwork Inspection for Wall of Gantry Crain SHIPPING & RECEIVING
2822 C-2120 foundation at Grid line 1, Shipping & Receiving area, ju'aymah shops, 7-Mar-18 11:11 AM 8-Mar-18 9:00 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
plant N-26 AREA

FBE Rebar Embedded Items and Formwork Closure Inspection for Wall of SHIPPING & RECEIVING
2823 C-2121 Gantry Crain foundation at Grid line 1, S hipping & Receiving area, 7-Mar-18 11:12 AM 8-Mar-18 11:00 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26 AREA

Site and Grade Preparation for Lean Concrete prior to Curb stones
2824 C-2122 installation . @ Grid line 4 (A to I) New Car Parking Shad @ ju'aymah PLANT N-26 7-Mar-18 11:13 AM 8-Mar-18 2:00 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
shops, plant N-26

Lean Concrete Testing, Sampling and Casting prior to install Curb stones.
2825 C-2123 @ Grid line 4 (A to I) New Car Parking Shad @ ju'aymah shops, plant N- PLANT N-26 7-Mar-18 11:14 AM 8-Mar-18 2:30 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
26

Visual Inspection of Sand Bedding, Red Tiles and Underground Cable


Warning Tape Installation for 6" Dia. & 4" Dia. Direct Buried PVC
2826 E-0245 Conduits (ELE-DB-004) for Direct Buried LV Cables & FDAS Cables PLANT N-26 8-Mar-18 11:15 AM 10-Mar-18 2:00 PM RA-819460-002-0F1 FILBERT ALI M. AL YASEEN
Between Existing Maintenance Bldg. (2110) & Existing Welding Shop Bldg.
(2104) at Ju’Aymah Shop Plant N26 as per Attached Highlighted Drawing.
Material,Receiving Inspection for Pre- Cast Concrete Panels Second Floor
2827 C-2124 (panel Mark) CI1-A-06,CI1-A-05,CI1-A-04,C1-A-01H,C1-A-02,C1-A-02B,C1- PLANT N-26 8-Mar-18 11:20 AM 10-Mar-18 7:00 AM 0016-A-ER-001-01-04 BAQAR ISHFAQ AHMED
A-01,CI1-A-03,CI1-A-02,C1-A-07, C1-A-06, At Admin Building Area @
Ju'aymah Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection Second F lloor Panel


2828 C-2125 (Panel Mark) CI1-A-06,CI1-A-05,CI1- A-04,C1-A-01H,C1-A-02,C1-A-02B,C1- ADMIN BUILDING 8-Mar-18 11:22 AM 10-Mar-18 7:30 AM 0016-A-ER-001-01-0 SALMAAN ISHFAQ AHMED
A-01,CI1-A-03,CI1-A-02,C1-A-07, C1-A-06, At Admin Building Area @
Ju'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Second


2829 C-2126 Floor(Panel Mark) CI1-A-06,CI1-A-05,CI1-A-04,C1-A-01H,C1-A-02,C1-A- ADMIN BUILDING 8-Mar-18 11:23 AM 10-Mar-18 7:40 AM 0016-A-ER-001-01-04 SALMAAN ISHFAQ AHMED
02B,C1-A-01,CI1-A-03,CI1-A-02,C1- A-07, C1-A-06, At Admin Building Area
@ J u'aymah Shops Plant N-26

Pre-Cast Concreting Curing and Final Inspection for Admin Building


2830 C-2127 Second Floor Panel Panel Mark CI1-A-23,CI1-A-19,CI1-A-23H,CI1-A- ADMIN BUILDING 8-Mar-18 11:24 AM 10-Mar-18 10:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
18,CI1-A-13 At Inco Pre-Cast Fabrication Yard @ J u'aymah Shops Plant N-
26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2831 C-2128 Inspection of 4000 PSi for 'Screed (Concrete) upon hollow Core Slab, 2nd ADMIN BUILDING 8-Mar-18 11:25 AM 10-Mar-18 2:45 PM RA-8149724-001-0F1 QUADRI ISHFAQ AHMED
Floor, from Grid Line 2 to 5 and A to B, New Admin Building, ju'aymah
shops, plant N-26

Visual Inspection of Material Receiving Handling storage and preservation


2832 C-2129 of Concrete Curb Stone Single Edge Size 500 x 200 x 450 MM (QTY=240 PLANT N-26 8-Mar-18 11:26 AM 10-Mar-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED
Pcs) From Khonaini International Company LTD At New Car Parking Area
@ J u'aymah Shops Plant N-26

FBE Rebars Embedded items and Formwork Closure Inspection for 6 nos
2833 C-2130 of Column at Grid line, 1 to 2 and B to D, New Admin Building., @ ADMIN BUILDING 8-Mar-18 11:27 AM 10-Mar-18 10:30 AM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26

Concrete Testing Sampling and Casting Inspection for 6 nos of Column at


2834 C-2131 Grid line, 1 to 2 and B to D, New Admin Building., @ ju'aymah shops, ADMIN BUILDING 8-Mar-18 11:28 AM 10-Mar-18 11:00 AM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED
plant N-26

Concrete Testing, Sampling and Casting for Wall of Gantry Crain SHIPPING & RECEIVING
2835 C-2132 foundation at Grid line 1, Shipping & Receiving area, ju'aymah shops, 8-Mar-18 11:30 AM 10-Mar-18 11:30 AM RA-819991-01-0F2 SALMAAN ISHFAQ AHMED
plant N-26 AREA

Concrete Testing, Sampling and Casting Inspection for Door Lintel Beam
2836 C-2133 1st Floor, Door # D4 3nos, D5 2nos, D4A 1nos, D8 2nos and D6 1nos, total ADMIN BUILDING 8-Mar-18 11:31 AM 10-Mar-18 1:30 PM RA-819745-01-00 SALMAAN ISHFAQ AHMED
9 Doors. @ New Admin Building, ju'aymah shops, plant N-26

Sand Covering 30 CM Around & Above the Pipe (100 LM) for Raw Water
2837 C-2134 Potable Water Pipe Trench from Backlog to Workshop @ Building WORK SHOP 8-Mar-18 11:32 AM 10-Mar-18 10:00 AM RA-819439-01-0F1 SALMAAN ISHFAQ AHMED not in QMIS
@JuAymah,Shops Plant N-26 (RA-819438-01 Rev-0F1)
Material Receiving Visual Inspection of Metallic Cable Tray & Fittings as
Material Receiving
follows: 1) Visual Inspection
SL5D-36HE45-36, Horizontalof Metallic Cable
Bend Cable Tray &Steel
Ladder: Fittings as
(HDGAF),
follows:
Material 1)45SB-3/8X3/4-304,
Deg., 900mm
Receiving, Handling Wide,
SPLINE 914mm
,Storage BOLT Radius,
- 3/8" X 3/4"
& preservation 19mm SSFlange
304 (8,850EA)
Inspection Width,
of CPVC
2838 P-0267 SCH-80
127mm
2) FN-3/8-304,
Fittings
Load Depth,
FLANGED
with 152mm
½" Brass
NUTTotal
-INS
3/8".90⁰
Side
SSELB-70
Rail
304Height,
(8,850EA)
Pcs, ½X½"
2.0mm3)BRASS
HDC-W
Thickness
INS.(W/SS PLANT N-26 8-Mar-18 11:03 AM 10-Mar-18 8:00 AM RA-819770-001-00 FAHEEM SYED SHAFIULLAH
(10EA)
SPRING
FEMALENUT),
2) SL5D-36HE90-36,
ADPTR- SINGLE
30 Pcs,HOLD DOWN
Horizontal
2" UNION-15 CLAMP:
Pcs,Bend STEEL
Cable
1x½" (HDGAF)
Ladder:Pcs,
UNION-12 FOR
Steel FLANGED
1"UNION-
15 Pcs
(HDGAF),
OUT CABLE
& ¾"UNION-10
90LADDERS/TROUGH
Deg., 900mm Pcs from
Wide,NEPRO
(550EA)
914mm at4)Radius,
ETE
HHCS-M10X40-304,
Store,
19mm
PlantFlange
N-26 HEX
Width,
HEAD
BOLT
127mm M10LoadX 40 SS 304
Depth, (770EA)
152mm Total 5) Side
FW-M10-304,
Rail Height,FLAT WASHER
2.0mm M10 SS
Thickness
(15EA)
304 (990EA)
3) AC2A-36VI90FV-36,
6) S N-10TG-304, Vertical
SPRING Inside
NUT M10 BendSS304
Cover:(770EA)
Aluminum,7) AL5D-
90
Deg. For 900mm
36VI90-36, VERTICAL
Wide,INSIDE
19mm BENDFlange
CABLEOut,LADDER:
914mm ALUMINUM,
Radius, 1.0mm 90o,
2839 E-0246 Thickness,
900MM WIDE,
Flat 914MM
Flanged Louvered
RADIUS, 19MM (25EA) FLANGE
4) AC2A-36VO90FV-36
WIDTH, 152MM(6H), TOTAL PLANT N-26 10-Mar-18 11:00 AM 11-Mar-18 9:00 AM RA-819843-001-0F1 FILBERT DAMIAN ABAA
Vertical
SIDE RAIL
Outside
HEIGHTBend(12EA)
Cover:8) AL5D-36VO90-36,
Aluminum, 90 Deg. VERTICAL
For 900mm OUTSIDE
Wide,BEND
CABLE
152mmLADDER: ALUMINUM,
Height Ladder , 19mm90o,Flange 900MM WIDE, 8)
Out, 914mm AL5D-36VO90-36,
Radius, 1.0mm
Thickness,OUTSIDE
VERTICAL Flat Flanged
BEND Louvered
CABLE LADDER:
(25 EA) ALUMINUM,
5) SL5D-12HE45-24,
90o, 900MMHorizontal
Bend Cable
WIDE, 914MMLadder:
RADIUS,
Steel 19MM
(HDGAF), FLANGE
45 Deg.,WIDTH,
300mm 152MM
Wide,TOTAL
610mm SIDE RAIL
2840 E-0247 Radius, (12EA)
HEIGHT 19mm Flange
9) SCCB/SCCB-C-316
Width, 127mm (36"W),
Load Depth,
BANDING 152mmKIT FOR
Total36"
Side Rail PLANT N-26 10-Mar-18 11:01 AM 11-Mar-18 9:30 AM RA-819843-001-0F1 FILBERT DAMIAN ABAA
Height, LADDER
WIDTH 2.0mm Thickness
CONSIST OF (10EA)
STAINLES
6) SL5D-12HE90-24,
S STEEL 316 BANDING Horizontal
STRAP:Bend
12.7MM WIDESteel
Cable Ladder: X 0.5MM THICK
(HDGAF), 90XDeg.,
4.5M,300mm
1 EACHWide,
BANDING
610mm CLIPS (150 KIT)
Radius,
19mm
10) ATS-M2
FlangeW/SS
Width,
HW,127mm
UNIVERSALLoadCONNECTOR:
Depth, 152mm ALUMINUM,
Total Side Rail
FORHeight,
2.0mm Thickness
120/127MM LOAD(15EA)
DEPTHAT CABLE
ETE Laydown
LADDERS/TROUGH/TRAYS
Yard (175 PAIR)
11) AAC-V6
Material Receiving,
W/304 HW, Handling
VERTICAL
,StorageADJUST& preservation
ABLE CONNECTOR:InspectionALUMINUM,
of
2841 P-0268 Threaded Rods With
FOR 120/127MM LOAD HotDEPTH
Dip Galvanized (10mmX3Mtrs) from Arab
CABLE LADDERS/TROUGH/TRAYS (10Bolts PLANT N-26 10-Mar-18 11:03 AM 11-Mar-18 8:30 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
PAIR)
@ ETE12)
store,
AAC-H6
Juaymah
W/304 Shops
HW,Project
HORIZONTAL
Plant N-26.
ADJUSTABLE CONNECTOR:
ALUMINUM, FOR 120/127MM LOAD DEPTH CABLE
LADDERS/TROUGH/TRAYS (10 PAIR) 13) ABE-36-6 W/304 HW, BLIND END
Pre-Cast Concreting FOR
PLATE: ALUMINUM, Curing and Final
900MM WIDE, Inspection
127MMfor LOADAdmin
DEPTH Building
CABLE
2842 C-2135 Second Floor Panel (20EA)
LADDERS/TROUGH Panel Mark CI1-A-21H,CI1-A-22A,CI1-A-23AH,CI1-A-
14) AHDC-W (W/SS SPRING NUT), SINGLE ADMIN BUILDING 10-Mar-18 11:04 AM 11-Mar-18 10:30 AM 0016-A-ER-002-01-05 WILFREDO MAMDOOH
HOLD DOWN CLAMP:
19H,CI1-A-20H, C1-A-05H,CI1-A-07
ALUMINUM, FOR At Inco
FLANGED
Pre-Cast
OUTFabrication
LADDERS (220EA)
Yard @
Ju'aymah Shops Plant
15) LW-M10-304, LOCKN-26WASHER M 10 SS 304 (220EA) AT ETE Laydown
Yard

2843 C-2136 Concete (Screed) Curing Inspection of at 1st floor of New Admin Building ADMIN BUILDING 10-Mar-18 11:05 AM 11-Mar-18 10:00 AM RA-819722-01-0F4 SALMAAN ISHFAQ AHMED
@ G.L 8 to12 and A to C @ ju'aymah shops, plant N-26.

Material,Receiving Inspection for Pre- Cast Concrete Panels Second Floor


2844 C-2137 (panel Mark) CI1-A-30,CI1-A-29, CI1-A-12,CI1-A-13,CI1-A-14,CI1-A-15,CI1- PLANT N-26 10-Mar-18 11:06 AM 11-Mar-18 7:00 AM 0016-A-ER-002-01-05 BAQAR ISHFAQ AHMED
A-16,C1-A-03,CI1-A-17,CI1-A-18, CI1- A-19,CI1-A-20 At Admin Building
Area @ J u'aymah Shops Plant N-2

Pre-cast Concrete Panel Pre-Installation Inspection Second F loor Panel


2845 C-2138 (Panel Mark) CI1-A-30,CI1-A-29, CI1-A-12,CI1-A-13,CI1-A-14,CI1-A-15,CI1- ADMIN BUILDING 10-Mar-18 11:08 AM 11-Mar-18 7:30 AM 0016-A-ER-002-01-05 SALMAAN ISHFAQ AHMED
A-16,C1-A-03,CI1-A-17,CI1-A-18, CI1- A-19,CI1-A-20 At Admin Building
Area @ J u'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Second


2846 C-2139 Floor(Panel Mark) CI1-A-30,CI1-A-29, CI1-A-12,CI1-A-13,CI1-A-14,CI1-A- ADMIN BUILDING 10-Mar-18 11:09 AM 11-Mar-18 7:40 AM 0016-A-ER-002-01-05 SALMAAN ISHFAQ AHMED
15,CI1-A-16,C1-A-03,CI1-A-17,CI1-A- 18, CI1-A-19,CI1-A-20 At Admin
Building Area @ Ju'aymah Shops Plant N-26

2847 C-2140 Compaction Testing (FDT) inspection of Sub grade for Electrical Cable PLANT N-26 10-Mar-18 11:10 AM 11-Mar-18 9:00 AM RA-819460-001-0F2 SALMAAN ISHFAQ AHMED 5
Trench 52 Linear meter Rig Sied HDD Area @ ju'aymah shops, plant N-26

2nd Layer Select fill Material FDT inspection above Telecomm Duct Bank
2848 C-2141 @ 72 LM, South Side from Pedestal JY-347 to Exiisting Manhole New ADMIN BUILDING 10-Mar-18 11:11 AM 11-Mar-18 2:00 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED 6
Admin Building @ ju'aymah shops, Plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2849 C-2142 Inspection of 4000 PSi for Existing MV Duct Bank 10, 11 and FOC GULF 11-Mar-18 3:05 PM 12-Mar-18 2:30 PM RA-819460-002-0F2 QUADRI ISHFAQ AHMED
Extension (2 mtr) East side of Paint Shop @ ju'aymah shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2850 C-2143 Inspection of 4000 PSi for (Reinstatment) of Beam and Slab on Duct Bank GULF 11-Mar-18 3:10 PM 12-Mar-18 2:00 PM RA-819460-002-0F2 QUADRI ISHFAQ AHMED
DB-5 North side of Existing Welding Shop, @ ju'aymah shops, plant N-26.

Material,Receiving Inspection for Pre- Cast Concrete Panels Second Floor


2851 C-2144 (panel Mark) C1-A-05AH,C1-A-05H,CI1-A-22,CI1-A-23,CI1-A-23A,CI1-A- PLANT N-26 11-Mar-18 3:15 PM 12-Mar-18 7:00 AM 0016-A-ER-002-1-5 BAQAR ISHFAQ AHMED
23AH,CI1-A-23H,C1-A-05A At Admin Building Area @ Ju'aymah Shops
Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection Second F loor Panel


2852 C-2145 (Panel Mark) C1-A-05AH,C1-A-05H,CI1-A-22,CI1-A-23,CI1-A-23A,CI1-A- ADMIN BUILDING 11-Mar-18 3:20 PM 12-Mar-18 7:30 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
23AH,CI1-A-23H,C1-A-05A At Admin Building Area @ Ju'aymah Shops
Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Second


2853 C-2146 Floor(Panel Mark) C1-A-05AH,C1-A-05H,CI1-A-22,CI1-A-23,CI1-A-23A,CI1- ADMIN BUILDING 11-Mar-18 3:25 PM 12-Mar-18 7:40 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
A-23AH,CI1-A-23H,C1-A-05A At Admin Building Area @ Ju'aymah Shops
Plant N-26

1st Layer of Select Fill Material Compaction Testing (FDT) inspection for
2854 C-2147 PSA Duct Bank 21 linerar meter between MTM Buildig and Welding WORK SHOP 11-Mar-18 3:30 PM 12-Mar-18 10:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED 4
workshop @ ju'aymah shops, plant N-26.

Gypsum Board (Type A2 and 5B) Framing and Pre- Installation Inspection
2855 C-2148 Room # 126, 127, 128 and 129 1st Floor at New Admin Building @ ADMIN BUILDING 11-Mar-18 3:35 PM 12-Mar-18 10:15 AM RA-819745-01-00 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Materials Receiving Visual Inspection of Accessories for Channel & Strut


Materials as follows: 1) Hex Nut HDG M4 (100 EA), 2) Hex Bolt HDG M4 X
2856 E-0248 1/2" (100 EA), 3) Flat Washer HDG M4 (100 EA), 4) Lock Washer HDG M4 PLANT N-26 11-Mar-18 3:40 PM 12-Mar-18 9:00 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
(100 EA), 5) U Beam for Channel HDG (25 EA), 6) Strut Beam Clamp for I
Beam HDG (50 EA) AT ETE Laydown Yard

Materials Receiving Visual Inspection of Accessories for Channel & Strut


2857 E-0249 Materials: 1) PVC Coated U Beam Clamp For Channel HDG (25 EA) AT ETE PLANT N-26 11-Mar-18 3:45 PM 12-Mar-18 9:30 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
Laydown Yard

Materials Receiving Visual Inspection of PVC Conduits & Fittings as


follows: 1) PVC Conduit Pipe 1 1/2" Dia. X 6M NEMA TC8-DB-120 (25 PCS),
2858 E-0250 2) PVC Bell End 1 1/2" Dia. NEMA TC9/DB-120 (25 PCS), 3) PVC Conduit PLANT N-26 11-Mar-18 3:50 PM 12-Mar-18 10:00 AM RA-819843-001-0F1 FILBERT ALI M. AL YASEEN
Coupling (Register) 1 1/2" Dia. TC8-DB-120 (50 PCS) AT ETE Laydown Yard,
Ju’Aymah S hop Plant N26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
2859 C-2149 Inspection of 4000 PSi for Screed Concrete upon hollow Core Slab, 2nd GULF 12-Mar-18 2:00 PM 13-Mar-18 2:15 PM RA-819724-001-0F1 QUADRI ISHFAQ AHMED
Floor,from Grid Line 2 to 5 and B - F. and GL. D to E & 1 to 2. New Admin
Building, ju'aymah shops,@ Gulf Consult

2860 C-2150 Screed Concrete Curing Inspection of 1st floor of New Admin Building @ ADMIN BUILDING 12-Mar-18 2:05 PM 13-Mar-18 10:15 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED not in QMIS
Grid Line 8 to12 and C to F @ ju'aymah shops, plant N- 26.

Material, Receiving Inspection for Pre- Cast Concrete Panels Second


2861 C-2151 Floor (panel Mark) CI1-A-21,CI1-A-22A,CI1-A-21H,C1-A-05,CI1-A-20H,CI1- PLANT N-26 12-Mar-18 2:10 PM 13-Mar-18 7:00 AM 0016-A-ER-002-1-5 BAQAR ISHFAQ AHMED
A-19H,CI1-A-24,CI1-A-25,CI1-A-07, CI1-A-31,CI1-A-28,CI1-A-27,CI1-A-
26,At Admin Building Area @ Ju'aymah Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection Second F loor Panel


2862 C-2152 (Panel Mark) CI1-A-21,CI1-A-22A,CI1-A-21H,C1-A-05,CI1-A-20H,CI1-A- ADMIN BUILDING 12-Mar-18 2:15 PM 13-Mar-18 7:30 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
19H,CI1-A-24,CI1-A-25,CI1-A-07, CI1-A-31,CI1-A-28,CI1-A-27,CI1-A-26,At
Admin Building Area @ Ju'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Second


2863 C-2153 Floor(Panel Mark) CI1-A-21,CI1-A-22A,CI1-A-21H,C1-A-05,CI1-A- 20H,CI1- ADMIN BUILDING 12-Mar-18 2:20 PM 13-Mar-18 7:40 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
A-19H,CI1-A-24,CI1-A-25,CI1-A-07, CI1-A-31,CI1-A-28,CI1-A-27,CI1-A-
26,At Admin Building Area @ Ju'aymah Shops Plant N-26

2nd Layer of Select Fill Material Compaction Testing (F DT) inspection


2864 C-2154 above PSA Duct Bank 21 linerar meter between MTM Buildig and WORK SHOP 12-Mar-18 2:25 PM 13-Mar-18 9:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED 4
Welding workshop @ ju'aymah shops, plant N-26.

3rd Layer of Select Fill Material Compaction Testing (FDT) inspection


2865 C-2155 above PSA Duct Bank 21 linerar meter between MTM Buildig and WORK SHOP 12-Mar-18 2:30 PM 13-Mar-18 3:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED 4
Welding workshop @ ju'aymah shops, plant N-26.

2866 C-2156 Material Receiving Inspection of Select Fill Material From Al-Osais (Qty= PLANT N-26 12-Mar-18 2:35 PM 13-Mar-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
160 M3) @ ETE Laydown,JaAymah,shops Plant N-26

2867 C-2157 Material Receiving Inspection of Clean Sand l From Al-Osais (Qty= 320 PLANT N-26 12-Mar-18 2:40 PM 13-Mar-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
M3) @ ETE Laydown,JaAymah,shops Plant N-26

Materials Receiving Visual Inspection of Accessories for EMT Conduits: 1)


2868 E-0251 EMT TWO HOLE STRAP 3/4" (CAT. # TSP-075), Electro Galvanized, UL PLANT N-26 12-Mar-18 2:45 PM 13-Mar-18 8:00 AM RA-819293-002-00 FILBERT ALI M. AL YASEEN
(1,000 PCS) AT ETE Laydown Yard Area, Ju’Aymah Shop Plant N26

Visual Inspection of Direct Buried Cable Trench Prior to Cable Laying of LV


2869 E-0252 Direct Buried Cables for Power/Lighting System at Sunshade Shipping & SHIPPING & RECEIVING 12-Mar-18 2:50 PM 13-Mar-18 8:30 AM RA-819982-01-0F1 FILBERT ALI M. AL YASEEN
Receiving Area, Ju’aymah Shop Plant N26 as per Attached Highlighted AREA
Drawing.

Visual Inspection of Direct Buried Cable Trench Prior to Cable Laying of


2870 E-0253 Direct Buried MV Power Cables & Control Cables at HDD Rig Side Near PLANT N-26 12-Mar-18 2:55 PM 13-Mar-18 9:30 AM RA-819460-001-0F1 FILBERT DAMIAN ABAA
Security Fence Outside Plant As per Attached Highlighted Drawing.

Visual Inspection before welding for joints on 2 slabs SS-DTS-03 and 02B,
2871 ST-W-0031 (1 OF 5) (check attached drawing). @ Substation Building, Ju'aymah NEW SUB STATION 6-Mar-18 11:00 AM 7-Mar-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Shops, Plant N26.

Visual Inspection before welding for joints on 2 slabs SS-DTS-02A (4 of 5)


2872 ST-W-0032 & 02A (5 of 5), (check attached drawing). @ Substation Building, NEW SUB STATION 6-Mar-18 11:05 AM 7-Mar-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Material Receiving Inspection for Coating Repair Material APCS-1C,


2873 ST-W-0033 Galvacoat 16380 2 cans, Hempadur Z inc 17360 2 kits, thinner 08080 2 NEW SUB STATION 7-Mar-18 11:00 AM 8-Mar-18 7:30 AM RA-819885-001-00 OMAR M. HASSAN
cans and thinner 08450 2 cans @ S ubstation Building, Ju'aymah Shops,
Plant N26.

Visual Inspection before welding for joints on 2 slabs SS-DT-04 and 05,
2874 ST-W-0034 (check attached drawing). @ S ubstation Building, Ju'aymah S hops, Plant NEW SUB STATION 7-Mar-18 11:05 AM 8-Mar-18 8:00 AM RA-819885-001-00 OMAR M. HASSAN
N26.

Visual Inspection before welding for joints on 2 slabs SS-DTS-01B & SS-DT-
2875 ST-W-0035 06, (check attached drawing). @ Substation Building, Ju'aymah Shops, NEW SUB STATION 7-Mar-18 11:10 AM 8-Mar-18 8:30 AM RA-819885-001-00 OMAR M. HASSAN
Plant N26.

2876 ST-W-0027-A Visual Inspection after welding for 13 joints on 1 panel SS-WIG-20 (check NEW SUB STATION 10-Mar-18 11:00 AM 11-Mar-18 9:00 AM RA-819885-001-00 OMAR M. HASSAN
attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26.

2877 ST-W-0028-A Visual Inspection after welding for 13 joints on 1 panel SS-WIG-20H (check NEW SUB STATION 10-Mar-18 11:05 AM 11-Mar-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26.

Material Receiving Inspection for SMAW Electrodes (7018 ESAB VacPac)


2878 ST-W-0036 3.2mm (84 kg) and 2.5mm (33.60 kg) @ Substation Building, Ju'aymah NEW SUB STATION 10-Mar-18 11:10 AM 11-Mar-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
Shops, Plant N26.

2879 ST-W-0037 Visual Inspection after welding for 12 joints on 1 panel SS-WIG-23 (check NEW SUB STATION 11-Mar-18 11:00 AM 12-Mar-18 9:00 AM RA-819885-001-00 OMAR M. HASSAN
attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26.

2880 ST-W-0038 Visual Inspection after welding for 9 joints on 1 panel SS-WIG-02F (check NEW SUB STATION 11-Mar-18 11:05 AM 12-Mar-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26.

2881 ST-W-0039 Visual Inspection after welding for 13 joints on 1 panel SS-WIG-20 (check NEW SUB STATION 13-Mar-18 11:00 AM 14-Mar-18 9:00 AM RA-819885-001-00 OMAR M. HASSAN
attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26.

2882 ST-W-0040 Visual Inspection after welding for 13 joints on 1 panel SS-WIG-20H (check NEW SUB STATION 13-Mar-18 11:05 AM 14-Mar-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26

2883 C-2158 Screed Concrete Curing Inspection of 1st floor of New Admin Building at ADMIN BUILDING 13-Mar-18 2:00 PM 14-Mar-18 10:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED not in QMIS
G.L 8 to 5 and B to E @ ju'aymah shops, plant N- 26.

Cast in Place Concrete Form work Inspection for Elevator Machin Room
2884 C-2159 above Roof Slab, Grid line D to F and 1 to 2, New Admin Building @ ADMIN BUILDING 13-Mar-18 2:05 PM 14-Mar-18 1:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

FBE Rebar inspecton prior to Formwork Closure for Elevator Machin Room
2885 C-2160 above Roof Slab, Grid line D to F and 1 to 2, New Admin Building @ ADMIN BUILDING 13-Mar-18 2:10 PM 14-Mar-18 3:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

4th Layer of Select Fill Material Compaction Testing (FDT) inspection


2886 C-2161 above PSA Duct Bank 21 linerar meter between MTM Buildig and ADMIN BUILDING 13-Mar-18 2:15 PM 14-Mar-18 1:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED 4
Welding workshop @ ju'aymah shops, plant N-26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection after welding for 13 joints on 1 panel SS-WIG-14 (check


2887 ST-W-0041 attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26. NEW SUB STATION 14-Jan-18 11:00 AM 15-Jan-18 9:00 AM RA-819885-001-00 OMAR M. HASSAN

Visual Inspection after welding for 13 joints on 1 panel SS-WIG-14 (check


2888 ST-W-0042 attached drawing) @ Substation Building, Ju'aymah Shops, Plant N26. NEW SUB STATION 14-Jan-18 11:05 AM 15-Jan-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN

Visual Inspection of Installation of 2" Dia.& 1" Dia. Direct Buried PVC
Conduits Prior to Cable Pulling of LV Direct Buried Cables for SHIPPING & RECEIVING
2889 E-0254 Power/Lighting System at Sunshade Shipping & Receiving Area, Ju’aymah AREA 14-Mar-18 11:10 AM 15-Mar-18 8:00 AM RA-819982-01-0F1 FILBERT ALI M. AL YASEEN
Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection of Below Grade Cable Laying of LV Direct Buried Cables
with the following Cable Nos.: PC-1734, PC-1735 (for Receptacle Outlets); SHIPPING & RECEIVING
2890 E-0255 PC-1739 & PC- 1740 (For Interior Lightings); and PC-1745 (for Exterior AREA 14-Mar-18 11:15 AM 15-Mar-18 8:30 AM RA-819982-01-0F1 FILBERT ALI M. AL YASEEN
Lightings) at Sunshade S hipping & Receiving Area, Ju’aymah Shop Plant
N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed Mounted & Surface Mounted Normal/Emergency
2891 E-0256 Lightings at Conference Room 1, Buffet Room, Telecom Room & Office ADMIN BUILDING 14-Mar-18 11:20 AM 15-Mar-18 9:00 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
Room (Retiring Room) Inside 1st Floor of New Admin Bldg., Ju’aymah
Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed Mounted & Surface Mounted Normal/Emergency Lightings at
2892 E-0257 Conference Room 1, Buffet Room, Telecom Room & Office Room (Retiring ADMIN BUILDING 14-Mar-18 11:25 AM 15-Mar-18 9:00 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
Room) Inside 1st Floor of New Admin Bldg., Ju’aymah Shop Plant N26 as
per Attached Highlighted Drawing.
Visual Inspection of Final Backfilling & Installation of Protective Red
Concrete Tiles & Safety Warning Tape forLV Direct Buried Cables with the
following Cable Nos.: PC-1734, PC-1735 (for Receptacle Outlets); PC-1739 SHIPPING & RECEIVING
2893 E-0258 & PC-1740 (For Interior Lightings); and PC-1745 (for Exterior Lightings) at AREA 14-Mar-18 11:30 AM 15-Mar-18 10:00 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Sunshade Shipping & Receiving Area, Ju’aymah Shop Plant N26 as per
Attached Highlighted Drawing.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 2000 PSi for Lean Concrete For transformer Foundation' #
2894 C-2162 XF R-1, XFR-2, XFR-3 and XFR- 4 (4Nos) at New Substation Building @ GULF 14-Mar-18 11:35 AM 15-Mar-18 2:00 PM RA-819867-001-0F4 QUADRI ISHFAQ AHMED
ju'aymah shops, plant N-26.

2895 C-2163 Screed Concrete Curing Inspection of at 1st floor of New Admin Building ADMIN BUILDING 14-Mar-18 11:40 AM 15-Mar-18 10:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
at G.L 1 to 5 and A to F @ ju'aymah shops, plant N-26.

FBE Rebar, Embedded Items and Formwork Closure inspection for


2896 C-2164 Elevator Machin Room (Wall, Top Slab and Beams) above Roof Slab Grid ADMIN BUILDING 14-Mar-18 11:45 AM 15-Mar-18 1:30 PM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED
line, D to F and 1 to 2, New Admin Building @ ju'aymah shops. Plant N-
26.

Concrete Testing, Sampling and Casting inspection for Elevator Machin


2897 C-2165 Room above Roof Slab, Grid line D to F and 1 to 2, New Admin Building @ ADMIN BUILDING 14-Mar-18 11:50 AM 15-Mar-18 2:00 PM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Visual inspection of Geogrid installation above PSA Duct Bank 21 linerar


2898 C-2166 meter between MTM Buildig and Welding workshop @ ju'aymah shops, WORK SHOP 14-Mar-18 11:55 AM 15-Mar-18 2:15 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
plant N-26.

Fill placement of Base course material above PSA Duct Bank 21 linerar
2899 C-2167 meter between MTM Buildig and Welding workshop @ ju'aymah shops, WORK SHOP 14-Mar-18 1:05 PM 15-Mar-18 3:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
plant N-26.

Compaction Testing (FDT) inspection of Base course material above PSA


2900 C-2168 Duct Bank 21 linerar meter between MTM Buildig and Welding workshop WORK SHOP 14-Mar-18 1:10 PM 15-Mar-18 3:15 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
@ ju'aymah shops, plant N-26.

Visuall inspection Geogrid Installation above Telecomm Duct Bank @ 72


2901 C-2169 LM, South Side from Pedestal JY-347 to Exiisting Manhole New Admin ADMIN BUILDING 14-Mar-18 1:05 PM 15-Mar-18 2:30 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
Building @ ju'aymah shops, Plant N-26.

Fill placement of Base course Material above Telecomm Duct Bank @


2902 C-2170 72 LM, South Side from Pedestal JY-347 to Exiisting Manhole New Admin ADMIN BUILDING 14-Mar-18 1:10 PM 15-Mar-18 2:40 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
Building @ ju'aymah shops, Plant N-26.

Compaction Testing (FDT) inspection of Base course Material above


2903 C-2171 Telecomm Duct Bank @ 72 LM, South Side from Pedestal JY-347 to ADMIN BUILDING 14-Mar-18 1:15 PM 15-Mar-18 2:45 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
Exiisting Manhole, New Admin Building @ ju'aymah shops, Plant N- 26.

Compaction Testing FDT inspection of Existing Subgrade 15 Linear meter


2904 C-2172 of Electrical Trench, from Duct Bank 10 and 11 to HDPE side @ ju'aymah PLANT N-26 14-Mar-18 1:20 PM 15-Mar-18 1:15 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
shops, plant N-26.

2905 C-2173 Visual inspection of Curb stone installation of New Car parking Area, Grid CAR PARKING 14-Mar-18 1:25 PM 15-Mar-18 11:30 AM RA-819946-001-00 SALMAAN ISHFAQ AHMED
line 1 to 4 and A to E. @ ju'ay mah shops, plant N-26.

Materail Receiving Inspection of Base Plate 16 x 290 x 1680 (QTY=02 PCS)


Base Plate 16 x 290 x 2780 (QTY=34 PCS) Threaded Screw16 MM x 80
2906 C-2174 MM Grade 8.8 (QTY=216 PCS) for Gantry Crane, From Eastern Morris PLANT N-26 15-Mar-18 9:30 AM 17-Mar-18 10:00 AM RA-819991-002-0F1 BAQAR ISHFAQ AHMED
Cranes Company Ltd (P.O # 29993) at ETE Laydown S toge Area @
ju'aymah shops, plant N-26.

Prime Coat Testing, Application and Sampling on Aggrigate Base Course Due to Material
2907 C-2175 above PSA Duct Bank 21 linerar meter between MTM Buildig and WORK SHOP 15-Mar-18 2:00 PM 17-Mar-18 3:15 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Welding workshop @ ju'aymah shops, plant N-26. not available

Prime Coat Testing, Application and Sampling on Aggrigate Base Course Due to Material
2908 C-2176 above Telecomm Duct Bank 72 LM, S outh Side from Pedestal JY- 347 to ADMIN BUILDING 15-Mar-18 2:05 PM 17-Mar-18 3:30 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
Existing Manhole New Admin Building @ ju'aymah shops, Plant N-26. not available

Prime Coat Testing, Application and Sampling on Aggrigate Base Course of Due to Material
2909 C-2177 New Car parking Area, Grid line 1 to 4 and A to E. @ ju'aymah shops, plant CAR PARKING 15-Mar-18 2:10 PM 17-Mar-18 4:30 PM RA-819946-001-00 SALMAAN ISHFAQ AHMED
N-26. not available

Surface preparation after corbel cutting ,CEBOND application and


2910 C-2178 concrete repairing finishing work for Admin Building First floor panels INCO 15-Mar-18 3:00 PM 17-Mar-18 10:00 AM 0016-A-ER-002-1-5 WILFREDO MAMDOOH
(Panel Mark CI1-A-02,CI1-A-03,CI1-A-11,CI1-A-11A) at INCO Pre-Cast
Fabrication Yard

Visual Inspection of Final Mandrel Test for PSA Duct Bank, Length in 20
2911 T-0074 meters Between Existing Maintenance Bldg. (2110) & Existing Welding WORK SHOP 11-Mar-18 11:00 AM 12-Mar-18 3:00 PM RA-819460-002-0F1 AFREEN M. Z. NAVEED
Shop Bldg. (2104) at Ju’Aymah Shop Plant N26 as per Attached
Highlighted Drawing.

Visual Inspection of Sand Bedding and Orange Color Tape Installation for
2912 T-0075 PSA Duct Bank, Length in 20 meters Between Existing Maintenance Bldg. WORK SHOP 11-Mar-18 11:05 AM 12-Mar-18 3:30 PM RA-819460-002-0F1 AFREEN M. Z. NAVEED
(2110) & Existing Welding Shop Bldg. (2104) at Ju’Aymah Shop Plant N26
as per Attached Highlighted Drawing.
Material Receiving Visual Inspection of PVC Conduit, PVC 90° bend 4"
NEMA TC9-DB-120 radius 6m length=9.42m (11pcs), PVC conduit 155°
2913 T-0076 bend 4" NEMA TC9-DB-120 radius 9m length=10.2m (4pcs) & pvc register PLANT N-26 13-Mar-18 3:00 PM 14-Mar-18 8:00 AM RA-819517-001-0F2 AFREEN M. Z. NAVEED
coupling 4" tc9-db(190pcs) from NEPROPLAST. @ ETE Site Store,
Ju'Aymah Shops Plant N-26

Materials Receiving Visual Inspection of LV Building Wires: CU/PVC


2914 E-0259 450/750 V H07V2-R 90oC 4MM2 RM YELLOW (11 Rolls) at ETE Laydown PLANT N-26 15-Mar-18 2:30 PM 17-Mar-18 9:00 AM RA-819500-001-0F1 FILBERT ALI M. AL YASEEN
Storage Area, Ju’Aymah Shop Plant N26

Materials Receiving Visual Inspection of Fittings for Galvanized Rigid Steel


2915 E-0260 (GRS) - PVC Coated Conduit: HUB 3/4" Dia. With Grounding - PVC COATED PLANT N-26 15-Mar-18 2:35 PM 17-Mar-18 9:30 AM RA-819500-001-0F1 FILBERT ALI M. AL YASEEN
(10EA) at ETE Laydown S torage Area, Ju’Aymah Shop Plant N26

Materials Receiving Visual Inspection of Fittings for PVC Conduits:


2916 E-0261 TERMINAL ADAPTER MALE 1" DIA. PVC MALE THREADED END & SOCKET PLANT N-26 15-Mar-18 2:40 PM 17-Mar-18 9:45 AM RA-819500-001-0F1 FILBERT ALI M. AL YASEEN
END (100 EA) at ETE Laydown Storage Area, Ju’Aymah Shop Plant N26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2917 C-2179 Inspection of 2000 PSi for Lean Concrete of Tele Com Duct Bank 48 Linear GULF 17-Mar-18 7:30 AM 17-Mar-18 2:00 PM RA-819517-001-0F3 QUADRI ISHFAQ AHMED
meter beside the fence of Chemecal storage area @ New Admin Building
@ ju'aymah shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2918 C-2180 Inspection of 4000 PSi for 'for the Footing of Gantry Crain foundation @ GULF 17-Mar-18 7:35 AM 17-Mar-18 2:15 PM RA-819991-001-0F2 QUADRI ISHFAQ AHMED
Grid line 1. Shipping & Receiving area, ju'aymah shops, plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2919 C-2181 Inspection of 4000 PSi for Screed (Concrete) upon hollow Core Slab, 2nd GULF 17-Mar-18 7:40 AM 17-Mar-18 2:30 PM RA-819724-001-0F1 QUADRI ISHFAQ AHMED
Floor, from Grid Line 5 to 11 and A - C @ New Admin Building, ju'aymah
shops, plant N-26.

2920 C-2182 Curing Inspection of Concrete for 6 nos of Column at Grid line, 1 to 2 ADMIN BUILDING 17-Mar-18 3:00 PM 18-Mar-18 10:00 AM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED not in QMIS
and B to D, New Admin Building., @ ju'aymah shops, plant N-26

2921 C-2183 Curing Inspection of Concrete for Wall of Gantry Crain foundation at Grid ADMIN BUILDING 17-Mar-18 3:05 PM 18-Mar-18 10:30 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
line 1, Shipping & Receiving area, ju'aymah shops, plant N-26

Curing Inspection of Concrete for Door Lintel Beam 1st Floor, Door # D4
2922 C-2184 3nos, D5 2nos,D4A 1nos D8 2nos and D6 1nos, total 9 Doors. @ New ADMIN BUILDING 17-Mar-18 3:10 PM 18-Mar-18 10:45 AM RA-819745-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Admin Building, ju'aymah shops, plant N-26

2923 C-2185 Cast in place Concrete Formwork inspection for Cable Drum Pit at SHIPPING & RECEIVING 17-Mar-18 3:15 PM 18-Mar-18 9:00 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
Shipping and Receiving area. @ ju'aymah shops. Plant N-26. AREA

2924 C-2186 FBE Rebar inspection for Cable Drum Pit at Shipping and Receiving area. SHIPPING & RECEIVING 17-Mar-18 3:20 PM 18-Mar-18 9:40 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
@ ju'aymah shops. Plant N-26. AREA

Surface preparation and Moisture Test Inspection for Switch Rack SHIPPING & RECEIVING
2925 C-2187 Foundation (Pedestal) at Shipping and Receiving area @ ju'aymah shops, 14-Mar-18 3:25 PM 18-Mar-18 8:30 AM RA-819992-001-0F1 SALMAAN ISHFAQ AHMED
plant N-26. AREA

2926 C-2188 Surface preparation and Moisture Test Inspection for Gantry Crain ADMIN BUILDING 17-Mar-18 3:30 PM 18-Mar-18 9:15 AM RA-819991-001-0F2 SALMAAN ISHFAQ AHMED
Foundation at Shipping and Receiving area @ ju'aymah shops, plant N-26.

Visual Inspection of Material Receiving Handling storage and preservation


2927 C-2189 of Concrete Curb Stone Single Edge Size 100 x 300 x 500 MM (QTY=100 PLANT N-26 17-Mar-18 4:45 PM 18-Mar-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED not in QMIS
Pcs) From Khonaini International Company LTD At New Car Parking Area
@ J u'aymah Shops Plant N-26
Material Receiving Inspection of Angle Frame Hot dip Galvanized
L50x50x6 MM Thickness Angle With 12 MM Dia 150 MM Long Anchor Bar
2928 C-2190 @ 600 MM C/C (QTY=117 LM) Checkered Plate Removable Cover With PLANT N-26 17-Mar-18 4:50 PM 18-Mar-18 10:45 AM RA-819499-001-00 BAQAR ISHFAQ AHMED Material Return
Handle Hot dip galvanized 470 x 470 MM 12 Thickness (QTY=04 Pcs)
From Wolouf Trading Est (P.O 4619) @ Ete S tore,JuAymah,Shops Plant N-
26
Cast in place Concrete Formwork inspection for Parapet Wall of Elevator
2929 C-2191 Machin Room Grid line D to F and 1 to 2, and Beams for Stare Case Room ADMIN BUILDING 18-Mar-18 11:00 AM 19-Mar-18 8:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Grid line 1 to 2 & B to C upper Roof, New Admin Building

FBE Rebar, Embedded Item and Formwork closure inspection for Parapet
2930 C-2192 Wall of Elevator Machin Room Grid line D to F and 1 to 2, and Beams for ADMIN BUILDING 18-Mar-18 11:05 AM 19-Mar-18 9:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Stare Case Room Grid line 1 to 2 & B to C upper Roof, New Admin Building
@ ju'aymah shops. Plant N-26.

Concrete Testing, Sampling and Casting inspection for Parapet Wall of


2931 C-2193 Elevator Machin Room Grid line D to F and 1 to 2, and Beams for Stare ADMIN BUILDING 18-Mar-18 11:10 AM 19-Mar-18 9:30 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Case Room Grid line 1 to 2 & B to C upper Roof, New Admin Building @
ju'aymah shops. Plant N-26.

Visual inspection of geogrid installation for RW and PW trench near new


2932 C-2194 workshop building(north side) (73 m length) @ ju'aymah shops. Plant N- WORK SHOP 18-Mar-18 1:10 PM 19-Mar-18 7:30 AM RA-8198438-001-0F1 QUADRI ISHFAQ AHMED not in QMIS
26.

2933 C-2195 Embedded Items and Formclosure inspection for Cable Drum Pit at SHIPPING & RECEIVING 18-Mar-18 1:15 PM 19-Mar-18 2:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shipping and Receiving area @ ju'aymah shops. Plant N-26. AREA

2934 C-2196 Sampling,Testing & Placement of concrete inspection for Cable Drum Pit SHIPPING & RECEIVING 18-Mar-18 1:20 PM 19-Mar-18 3:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
at Shipping and Receiving area @ ju'aymah shops. Plant N-26. AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2935 C-2197 Inspection of 4000 PSi for Screed (Concrete) upon hollow Core Slab, 2nd GULF 18-Mar-18 3:40 PM 19-Mar-18 2:15 PM RA-819724-001-0F1 QUADRI ISHFAQ AHMED
Floor, from Grid Line 5 to 12 and C To F. New Admin Building, ju'aymah
shops, Plant N-26 @ Gulf Consult

1st Layer of Select Fill Material placement inspection above Tele Comm
2936 C-2198 Duct Bank 50 linerar between Existing Admin Building and Existing ADMIN BUILDING 18-Mar-18 2:45 PM 19-Mar-18 9:00 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED
Confrence Hall @ ju'aymah shops, plant N-26

1st Layer of Select Fill Material Compaction Testing FDT inspection above
2937 C-2199 Tele Comm Duct Bank 50 linerar between Existing Admin Building and ADMIN BUILDING 18-Mar-18 2:50 PM 19-Mar-18 9:15 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED 3
Existing Confrence Hall @ ju'aymah shops, plant N-26

2nd Layer of Select Fill Material Compaction Testing FDT inspection above
2938 C-2200 Tele Comm Duct Bank 50 linerar between Existing Admin Building and ADMIN BUILDING 18-Mar-18 2:55 PM 19-Mar-18 2:30 PM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED 3
Existing Confrence Hall @ ju'aymah shops, plant N-26

Visual Inspection of Rebound Hammer Test after concrete repairing


2939 C-2201 finishing work for Admin Building F irst floor panels (Panel Mark CI1-A-02, INCO 18-Mar-18 3:00 PM 19-Mar-18 8:30 AM 0016-A-ER-002-1-5 WILFREDO MAMDOOH
CI1-A- 03, CI1-A-11, CI1-A-11A) at INCO Pre-Cast Fabrication Yard

Material Receiving, Handling , Storage & preservation Inspection of C-


2940 P-0269 Clamps (HDG) with 2"Ø (85 Pcs), 1½"Ø (85-Pcs), 1"Ø (85-Pcs), ¾"Ø (85- PLANT N-26 18-Mar-18 1:55 PM 19-Mar-18 8:30 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
Pcs), ½"Ø (85- Pcs), 4"Ø (20-Pcs) & 6"Ø (20-Pcs) from WOLOUF TRADING
EST ( Arab Bolts) @ ETE store, Juaymah Shops Project, Plant N-26.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed Mounted Normal / Emergency Lightings with Circuit
2941 E-0262 Nos. 19, 25 & 26 (N26-2118-LP-031) at Workstations-2 & Corridor Inside ADMIN BUILDING 18-Mar-18 3:05 PM 19-Mar-18 9:30 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
1st Floor of New Admin Bldg., Ju’aymah Shop Plant N26 as per Attached
Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed Mounted Normal / Emergency Lightings with Circuit Nos. 19, 25
2942 E-0263 & 26 (N26-2118-LP-031) at Workstations-2 & Corridor Inside 1st Floor of ADMIN BUILDING 18-Mar-18 3:10 PM 19-Mar-18 10:00 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
New Admin Bldg., Ju’aymah Shop Plant N26 as per Attached Highlighted
Drawing.
Material Receiving Inspection of Galv.Threaded rod 8mm x 3m - QTY
100pcs, GI nut 8mm - QTY 2000pcs, GI Washer 8mm-QTY 4000pcs, GI Bolt
2943 HV-0003 8mm x25mm - QTY 1000 pcs, Drop in Anchor 8mm - QTY 1000 Pcs, From PLANT N-26 18-Mar-18 4:10 PM 19-Mar-18 10:00 AM RA-819287-001-00 FAISAL ZIAULLAH
Maryam Trading Company At ETE Storage Laydown Area @ Juaymah shop
plant N-26.

Material Receiving Inspection of EQUAL ANGLE GALV 25X25X3MMX6M -


2944 HV-0004 QTY 10 Pcs & 40X40X3MMX6M - QTY-20Pcs From Pan Gulf Steel CO. At PLANT N-26 18-Mar-18 4:15 PM 19-Mar-18 10:15 AM RA-819287-001-00 FAISAL ZIAULLAH
ETE Storage Laydown Area @ Juaymah shop plant N-26.

3rd Layer of Select Fill Material Fill Placement Inspection above Tele
2945 C-2202 Comm Duct Bank 50 linerar between Existing Admin Building and Existing ADMIN BUILDING 19-Mar-18 2:00 PM 20-Mar-18 9:00 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Confrence Hall @ ju'aymah shops, plant N-26

3rd Layer of Select Fill Material Compaction Testing FDT inspection above
2946 C-2203 Tele Comm Duct Bank 50 linerar between Existing Admin Building and ADMIN BUILDING 19-Mar-18 2:05 PM 20-Mar-18 9:15 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED
Existing Confrence Hall @ ju'aymah shops, plant N-26

2947 C-2204 Coating and Final inspection for Gantry Crane Foundation at gridline 2 SHIPPING & RECEIVING 19-Mar-18 2:10 PM 20-Mar-18 9:05 AM RA-819991-001-0F1 ACIELO ISHFAQ AHMED
Shipping and receiving area Juaymah Shops Plant N-26 (DFT) AREA

2948 C-2205 Coating and Final inspection for Switch Rack Foundation (Pedestal) at SHIPPING & RECEIVING 19-Mar-18 2:15 PM 20-Mar-18 9:15 AM RA-819992-001-0F1 ACIELO ISHFAQ AHMED
Shipping and receiving area Juaymah Shops Plant N-26 (DFT) AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


2949 C-2206 Inspection of 5000 PSi for Pre-Cast Concrete 1st Layer for Admin Building GULF 19-Mar-18 2:20 PM 20-Mar-18 2:30 PM 0016-ER-A-002-01-5 QUADRI ISHFAQ AHMED
(Panel Mark ) C1-A-02BH,C1-A-03,CI1-A-02,CI1-A- 04,CI1-A-06,CI1-A-10) At
Inco Pre-Cast fabricartion Yard Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast Concrete 2nd Layer for Admin Building
2950 C-2207 (Panel Mark ) C1-A-02BH,C1-A-03,CI1-A-02,CI1-A-04,CI1-A-06,CI1-A-10) GULF 19-Mar-18 2:25 PM 20-Mar-18 2:45 PM 0016-ER-A-002-01-5 QUADRI ISHFAQ AHMED
At Inco Pre-Cast fabricartion Yard Ju'aymah Shops Plant N-26 @ Gulf
Consult
1st Layer And (Final Layer ) Fill Placement and Compaction Inspection of
2951 C-2208 Base Course For Raw & Portable Water Line Trench (73 LM) at In between WORK SHOP 19-Mar-18 2:30 PM 20-Mar-18 3:00 PM RA-819438-001-0F1 QUADRI ISHFAQ AHMED not in QMIS
Work shop building To Chemical Storage Area @ Ju'aymah Shops Plant N-
26

FDT Compaction Test Inspection 1st Layer And (Final Layer ) of Base
2952 C-2209 Course For Raw & Portable Water Line Trench (73 LM) at In between Work WORK SHOP 19-Mar-18 2:35 PM 20-Mar-18 3:15 PM RA-819438-001-0F1 QUADRI ISHFAQ AHMED 4
shop building To Chemical Storage Area @ Ju'aymah Shops Plant N-26

2953 C-2210 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 19-Mar-18 2:40 PM 20-Mar-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=85 M3) at ETE Laydown Area @ Ju'aymah Shops Plant N- 26

Gypsum Board (Type A2 and 5B) Framing and Pre- Installation Inspection
2954 C-2211 for Room # 119, 120, 121 and 122 1st Floor at New Admin Building @ ADMIN BUILDING 19-Mar-18 2:45 PM 20-Mar-18 10:15 AM RA-819745-001-00 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Materials Receiving Visual Inspection for Boxes & Accessories as follows:


2955 E-0264 1) PVC COATED GUAT - 1" DIA. (10 EA) 2) PVC COATED GUAX - 1" DIA. (5 PLANT N-26 19-Mar-18 3:00 PM 20-Mar-18 8:30 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
EA) 3) SS JUNCTION BOX 6" X 6" X 4" (2 EA) at ETE Laydown Storage Area,
Ju’Aymah S hop Plant N26 as per attached documents.

Materials Receiving Visual Inspection of Fittings for Galvanized Rigid Steel


2956 E-0265 (GRS) - PVC Coated Conduit: PVC COATED UNION - 1" DIA. (20 EA) at ETE PLANT N-26 19-Mar-18 3:05 PM 20-Mar-18 9:00 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
Laydown Storage Area, Ju’Aymah Shop Plant N26 as per attached
documents.
Materials Receiving Visual Inspection for MV Cables (On Cable Reel) as
follows: 1) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC-FROR
(DRUM NO. 13180830 @ 1,015 Mtrs) 2) 1C X 240 mm2 20KV Cu/TR-
2957 E-0266 XLPE/LAT/AAWA/PVC-FROR (DRUM NO. 13186036 @ 1,011 Mtrs) 3) 1C X PLANT N-26 19-Mar-18 3:10 PM 20-Mar-18 9:30 AM RA-819294-001-0F1 FILBERT ALI M. AL YASEEN
240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC-FROR (DRUM NO. 13187116
@ 1,010 Mtrs) 4) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC-FROR
(DRUM NO. 13181813 @ 1,018 Mtrs ) at ETE Laydown Yard Area,
Ju’Aymah
Visual S hop Plant
Inspection N26 as per&attached
for Continuity documents.
Insulation Resistance Testing (On Cable
2958 E-0267 Reel) of MV Cables 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- PLANT N-26 19-Mar-18 3:15 PM 20-Mar-18 10:00 AM RA-819294-001-0F1 FILBERT ALI M. AL YASEEN
FROR (4EA Drums) at ETE Laydown Yard Area, Ju’Aymah Shop Plant N26
as per attached documents.

Prime Coat Testing, Application on Aggrigate Base Course above PSA Duct
2959 C-2175-A Bank 21 linerar meter between MTM Buildig and Welding workshop @ WORK SHOP 20-Mar-18 11:00 AM 21-Mar-18 8:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Prime Coat Testing, Application on Aggrigate Base Course above


2960 C-2176-A Telecomm Duct Bank 72 LM, South S ide from Pedestal JY-347 to Existing ADMIN BUILDING 20-Mar-18 11:05 AM 21-Mar-18 8:15 AM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
Manhole New Admin Building @ ju'aymah shops, Plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for 1st Layer for Admin Building Second floor
2961 C-2212 panels (Panel Mark C1-A-02A,CI1-A-29,CI1-A-03,CI1-A-08,CI1-A-26,C1-A- GULF 20-Mar-18 9:30 AM 21-Mar-18 11:00 AM 0016-A-ER-002-1-5 QUADRI MAMDOOH
01 C1-A-01AH, At Inco Pre-Cast fabricartion Yard Ju'aymah Shops Plant
N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for 2nd Layer for Admin Building S econd floor
2962 C-2213 panels (Panel Mark C1-A-02A,CI1-A-29,CI1-A-03,CI1-A-08,CI1-A-26,C1-A- GULF 20-Mar-18 9:35 AM 21-Mar-18 11:15 AM 0016-A-ER-002-1-5 QUADRI MAMDOOH
01 C1-A-01AH, At Inco Pre-Cast fabricartion Yard Ju'aymah Shops Plant
N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
2963 C-2214 Inspection of 4000 PSi for Pre-Cast Concrete Light pools Foundations GULF 20-Mar-18 9:40 AM 21-Mar-18 11:30 AM RA-819460-001-00 QUADRI ISHFAQ AHMED
(24Nos), at Pre-Cast Yard, North Side of New Admin Building Ju'aymah
Shops Plant N-26 @ Gulf Consult

2964 C-2177-A Asphalt Pavement Prime coating inspection in New Parking area at CAR PARKING 20-Mar-18 10:00 AM 21-Mar-18 7:30 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
gridline (1 to 4 ) and (A to I ) at J uaymah Shops Plant N- 26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Fill Placement inspection of 1st Layer Select Fill Material above Electrical
2965 C-2215 LV Cable Trench East side of New Admin Building @ ju'aymah shops, plant ADMIN BUILDING 20-Mar-18 10:05 AM 21-Mar-18 7:15 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
N-26

FDT Compaction Inspection of 1st Layer S elect Fill Material above


2966 C-2216 Electrical LV Cable Trench East side of New Admin Building @ ju'aymah ADMIN BUILDING 20-Mar-18 10:10 AM 21-Mar-18 7:20 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
shops, plant N-26

Fill placement & compaction inspection of 1st layer selectfill material SHIPPING & RECEIVING
2967 C-2217 around gantry crane foundation at gridline 2,Shipping and Receiving area AREA 20-Mar-18 10:15 AM 21-Mar-18 8:15 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
Juaymah Shops plant N-26

FDT inspection of 1st layer selectfill material around gantry crane SHIPPING & RECEIVING
2968 C-2218 foundation at gridline 2,S hipping and Receiving area Juaymah Shops plant AREA 20-Mar-18 10:20 AM 21-Mar-18 8:30 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
N-26

Fill placement & compaction inspection of 2nd layer selectfill material SHIPPING & RECEIVING
2969 C-2219 around gantry crane foundation at gridline 2,Shipping and Receiving area AREA 20-Mar-18 10:30 AM 21-Mar-18 2:15 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
Juaymah Shops plant N-26

FDT inspection of 2nd layer selectfill material around gantry crane SHIPPING & RECEIVING
2970 C-2220 foundation at gridline 2,S hipping and Receiving area Juaymah Shops plant AREA 20-Mar-18 10:35 AM 21-Mar-18 2:30 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
N-26

Prime Coat Testing, Application and Sampling on Aggrigate Base Course


2971 C-2221 above For Raw & Portable Water Line Trench (73 LM) at In between Work WORK SHOP 20-Mar-18 10:40 AM 21-Mar-18 8:00 AM RA-819438-001-0F1 QUADRI ISHFAQ AHMED
shop building To Chemical Storage Area @ Ju'aymah Shops Plant N-26

Visual Inspection before welding for 6 joints on 2 wall panels of elevator


2972 ST-W-0043 shaft 016-CG-A-06 & 07, (check attached drawing). @ Admin Building, ADMIN BUILDING 20-Mar-18 1:15 PM 21-Mar-18 8:00 AM RA-819722-001-0F4 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Visual Inspection of Sand Bedding and Orange Color Tape Installation for
2973 T-0077 Duct Bank, Length is 50 meters Between Admin Bldg(2111) and Function ADMIN BUILDING 18-Mar-18 4:30 PM 19-Mar-18 8:00 AM RA-819517-001-0F2 AFREEN M. Z. NAVEED
Hall (2108) at Ju’Aymah S hop Plant N26 as per Attached Highlighted
Drawing.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
2974 C-2222 Building Second Floor panels(Panel Mark) C1-A-02,CI1-A-16,CI1-A-14,C1- GULF 21-Mar-18 8:00 AM 22-Mar-18 10:30 AM 0016-A-ER-002-1-5 QUADRI MAMDOOH
A-06,CI1-A-06H,CI1-A-09, At Inco Pre-Cast fabricartion Yard Ju'aymah
Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
2975 C-2223 Building Second Floor panels(Panel Mark) C1-A-02,CI1-A-16,CI1-A-14,C1- GULF 21-Mar-18 8:05 AM 22-Mar-18 10:45 AM 0016-A-ER-002-1-5 QUADRI MAMDOOH
A-06,CI1-A-06H,CI1-A-09, At Inco Pre-Cast fabricartion Yard Ju'aymah
Shops Plant N-26 @ Gulf Consult

FDT inspection of 3rd layer selectfill material around gantry crane SHIPPING & RECEIVING
2976 C-2224 foundation at gridline 2,S hipping and Receiving area Juaymah Shops plant 21-Mar-18 1:30 PM 22-Mar-18 10:30 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
N-26 AREA

Geo Grid installation inspection above Raw & Potable Water Line and
2977 C-2225 Telecom Duct Bank Trench (37 LM) at Infront of Back Log Building @ BACK LOG 21-Mar-18 1:35 PM 22-Mar-18 4:00 PM RA-819991-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Ju'aymah Shops Plant N-26

2978 ST-W-0044 Material Receiving Inspection for SMAW Electrodes (7018 ESAB VacPac) PLANT N-26 21-Mar-18 1:40 PM 22-Mar-18 7:00 AM RA-819885-001-00 OMAR M. HASSAN
3.2mm (123 kg) @ Substation Building, Ju'aymah Shops, Plant N26.

Geo Grid installation inspection above Tele Comm Duct Bank 50 linerar
2979 C-2226 between Existing Admin Building and Existing Confrence Hall @ ju'aymah ADMIN BUILDING 21-Mar-18 3:00 PM 22-Mar-18 7:30 AM RA-819517-002-0F1 SALMAAN ISHFAQ AHMED not in QMIS
shops,

Base Course Material Fill Placement above Tele Comm Duct Bank 50
2980 C-2227 linerar between Existing Admin Building and Existing Confrence Hall @ ADMIN BUILDING 21-Mar-18 3:05 PM 22-Mar-18 7:45 AM RA-819517-002-0F1 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops,

Base Course FDT inspection above Tele Comm. Duct Bank 50 linerar
2981 C-2228 between Existing Admin Building and Existing Confrence Hall @ ju'aymah ADMIN BUILDING 21-Mar-18 3:10 PM 22-Mar-18 8:00 AM RA-819517-002-0F1 SALMAAN ISHFAQ AHMED
shops,

2982 C-2229 Geo Grid installation inspection above Electrical LV Cable Trench 60 linear ADMIN BUILDING 21-Mar-18 3:15 PM 22-Mar-18 8:15 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED not in QMIS
mtr, East side of New Admin Building @ ju'aymah shops, plant N-26

2983 C-2230 Base Course Material Fill Placement above Electrical LV Cable Trench 60 ADMIN BUILDING 21-Mar-18 3:20 PM 22-Mar-18 8:30 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED not in QMIS
linear mtr, East side of New Admin Building @ ju'aymah shops, plant N-26

2984 C-2231 Base Course Material FDT inspection above Electrical LV Cable Trench 60 ADMIN BUILDING 21-Mar-18 3:25 PM 22-Mar-18 8:45 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED
linear mtr, East side of New Admin Building @ ju'aymah shops, plant N-26

Cast in place Concrete Formwork inspection for Beams of Upper Roof of


2985 C-2232 Stair Case Area (East and South Sides) Grid line 6 to 7 @ GL. A (East side ADMIN BUILDING 21-Mar-18 3:30 PM 22-Mar-18 9:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Stare Case) & C to E & 11 to 12, (south side) upper Roof, New Admin
Building.

FBE Rebar, Imbedded items and Formwork Closure inspection for Beams
2986 C-2233 of Upper Roof for Stair Case Area (East and South Sides) Grid line 6 to 7 ADMIN BUILDING 21-Mar-18 3:35 PM 22-Mar-18 9:15 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
@ GL. A (East side Stare Case) & C to E & 11 to 12, (south side) upper
Roof, New Admin Building.

Concrete Testing, Sampling and Casting inspection for Beams of Upper


2987 C-2234 Roof Slab for Stair Case Area (East and South Sides) Grid line 6 to 7 @ GL. ADMIN BUILDING 21-Mar-18 3:40 PM 22-Mar-18 10:30 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
A (East side Stare Case) & C to E & 11 to 12, (south side) upper Roof, New
Admin Building.

Fill Placement Inspection of 1st layer Selectf ill Material above Tele Comm.
2988 C-2235 Duct Bank 20 L.mtr, South S ide of New Admin Building @ ju'aymah ADMIN BUILDING 21-Mar-18 3:45 PM 22-Mar-18 10:45 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
shops, plant N-26

FDT Inspection of 1st layer Selectfill Material above Tele Comm. Duct
2989 C-2236 Bank 20 L.mtr, South Side of New Admin Building @ ju'aymah shops, ADMIN BUILDING 21-Mar-18 3:50 PM 22-Mar-18 11:00 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED
plant N-26

FDT Inspection of 2nd layer Selectfill Material above Tele Comm. Duct
2990 C-2237 Bank 20 L.mtr, South Side of New Admin Building @ ju'aymah shops, ADMIN BUILDING 21-Mar-18 3:55 PM 22-Mar-18 3:00 PM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED
plant N-26

Materials Receiving Visual Inspection for MV Cables (On Cable Reel) as


2991 E-0268 follows: 1) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC-FROR PLANT N-26 21-Mar-18 4:05 PM 22-Mar-18 9:30 AM RA-819294-001-0F1 FILBERT DAMIAN ABAA
(DRUM NO. 13198758 @ 505 Mtrs) at ETE Laydown Yard Area, Ju’Aymah
Shop Plant N26 as per attached documents.

Materials Receiving Visual Inspection for Boxes & Accessories as follows:


2992 E-0269 1) PVC COATED GUAT - 1" DIA. (10 EA) at ETE Laydown Storage Area, PLANT N-26 21-Mar-18 4:10 PM 22-Mar-18 9:00 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
Ju’Aymah S hop Plant N26 as per attached documents.

Materials Receiving Visual Inspection for Conduit F ittings, 2 hole strap


2993 E-0119 steel, 1" pvc coated UL Listed 50 EA. At ETE Store Ju'aymah Shop PLANT PLANT N-26 8-Jan-18 8:00 AM 9-Jan-18 9:00 AM RA-819323-003-00 NOLI DAMIAN ABAA
N26. As per attached document.

Visual Inspection of Sand Bedding and Orange Color Tape Installation for
2994 T-0078 Duct Bank, Length is 22 meters Between New Mosque and Machine Shop PLANT N-26 21-Mar-18 4:15 PM 22-Mar-18 3:00 PM RA-819517-001-0F2 AFREEN M. Z. NAVEED
@ J u’Aymah Shop Plant N26 as per Attached Highlighted Drawing.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for Pre- Cast Concrete 1st Layer for Admin
2995 C-2238 Building Second Floor panel (Panel Mark C1-A-02B,CI1- A-25,CI1-A- GULF 22-Mar-18 12:50 PM 24-Mar-18 11:00 AM 0016-A-ER-02-01-05 QUADRI MAMDOOH
11,CI1-A-21,C1-A-01A, C1-A-01H At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre- Cast Concrete 2nd Layer for Admin
2996 C-2239 Building Second Floor panel (Panel Mark C1-A-02B,CI1- A-25,CI1-A- GULF 22-Mar-18 12:55 PM 24-Mar-18 11:15 AM 0016-A-ER-02-01-05 QUADRI MAMDOOH
11,CI1-A-21,C1-A-01A, C1-A-01H At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed Mounted Normal/Emergency Lightings with Circuit
2997 E-0270 Nos. 11, 12 & 14 (N26-2118-LP-031) at Room Nos. 126, 127, 128, 128A, ADMIN BUILDING 22-Mar-18 11:00 AM 24-Mar-18 9:00 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
129, 129A, 141, 131 & 132 Inside 1st Floor of New Admin Bldg., Ju’aymah
Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed Mounted Normal/Emergency Lightings with Circuit Nos. 11, 12
2998 E-0271 & 14 (N26-2118-LP-031) at Room Nos. 126, 127, 128, 128A, 129, 129A, ADMIN BUILDING 22-Mar-18 11:05 AM 24-Mar-18 9:15 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
141, 131 & 132 Inside 1st Floor of New Admin Bldg., Ju’aymah Shop Plant
N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed Mounted Normal / Emergency Lightings with Circuit
2999 E-0272 Nos. 08 & 09 (N26-2118-LP-031) at Room Nos. 119, 120, 121 & 122 Inside ADMIN BUILDING 22-Mar-18 11:10 AM 24-Mar-18 10:00 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
1st Floor of New Admin Bldg., Ju’aymah Shop Plant N26 as per Attached
Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed Mounted Normal / Emergency Lightings with Circuit Nos. 08 &
3000 E-0273 09 (N26-2118-LP-031) at Room Nos. 119, 120, 121 & 122 Inside 1st Floor ADMIN BUILDING 22-Mar-18 11:15 AM 24-Mar-18 10:15 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
of New Admin Bldg., J u’aymah Shop Plant N26 as per Attached
Highlighted Drawing.

FDT inspection of 4th layer selectfill material around gantry crane


3001 C-2240 foundation at gridline 2,S hipping and Receiving area Juaymah Shops plant SHIPPING & RECEIVING 22-Mar-18 2:00 PM 24-Mar-18 2:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
N-26 Receiving Handling storage and preservation Inspection of
Material AREA
Gypsum Board Asscescries for Admin Building (Stud 92MMx0.9MMx3.0
Meter QTY=800)(Runner 92MMx0.9MMx3.0 Meter QTY=180), 35MM S LF
Drill S crw Galv (1000/Pcs Box QTY=21), UGS Sheet Rock Joint Compound
3002 C-2241 28 KG QTY=38, Stud 63MMx0.9MMx3.0 Meter QTY=400)(Runner PLANT N-26 22-Mar-18 2:05 PM 24-Mar-18 10:00 AM RA-819746-01-00 BAQAR ISHFAQ AHMED
63MMx0.9MMx3.0 Meter QTY=200, 35MM SLF Drill Scrw Galv (1000/Pcs
Box QTY=13), (Fab Tabe 1-A Fiber Glass Tape 50MMx90 Meter QTY=27,
UGS Sheet Rock Joint Compound 28 KG QTY=03, Modtruss Screw 13
x4MM,1000
Concrete 28 Pcs/Box TW QTY=13,
days Compressive (P.O 25105)
Strength TestingFrom International
& Final AcceptanceCo.LTD
(Binex) At ETE
Inspection Laydown
of 2000 Area
PSI for @ Ju'aymah)Shops
( Continuation Plant
Tele Com N-26
Duct Bank 72 LM
3003 C-2242 GULF 24-Mar-18 10:00 AM 25-Mar-18 2:15 PM RA-819517-001-0F2 QUADRI ISHFAQ AHMED
between Existing Admin Building and Existing Conference Hall Ju'Aymah,
Shops Plant N- 26 @ Gulf Consult

FDT inspection of 5th layer selectfill material around gantry crane


3004 C-2243 foundation at gridline 2,S hipping and Receiving area Juaymah Shops plant SHIPPING & RECEIVING 24-Mar-18 1:05 PM 25-Mar-18 2:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
N-26 AREA

Geo Grid installation below Base Course at Tele Comm. Duct Bank 20
3005 C-2244 linear between Existing Admin Building and Existing Conference Hall ADMIN BUILDING 24-Mar-18 1:10 PM 25-Mar-18 7:30 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
(Continuation) @ ju'aymah shops, plant N-26

Fill Placement Inspection of Base Course Material above Tele Comm Duct
3006 C-2245 Bank 20 linear between Existing Admin Building and Existing Conference ADMIN BUILDING 24-Mar-18 1:15 PM 25-Mar-18 7:45 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Hall (Continuation) @ ju'aymah shops, plant N-26

FDT Compaction Inspection of Base Course Material above Tele Comm


3007 C-2246 Duct Bank 20 linear between Existing Admin Building and Existing ADMIN BUILDING 24-Mar-18 1:20 PM 25-Mar-18 9:00 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED
Conference Hall (Continuation) @ ju'aymah shops, plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


3008 C-2247 Building Roof Floor panel (Panel Mark CIR- A-02,CR-A-03,PM-A-26,PM-A- INCO 24-Mar-18 1:25 PM 25-Mar-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
27,PM- A-27A,CR-A- 02,CIR-A- 01) At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


3009 C-2248 Formwork Closure) for Admin Building Roof Floor panel (Panel Mark CIR- INCO 24-Mar-18 1:30 PM 25-Mar-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-02,CR-A-03,PM-A- 26,PM-A-27,PM-A-27A,CR-A-02,CIR-A-01) At Inco Pre-
Cast fabricartion Yard @ Ju'aymah Shops Plant N- 26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


3010 C-2249 Layer for Admin Building Roof Floor panel (Panel Mark CIR-A-02,CR-A- INCO 24-Mar-18 1:35 PM 25-Mar-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
03,PM- A-26,PM-A-27,PM-A-27A,CR-A-02,CIR-A-01) At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


3011 C-2250 Layer for Admin Building Roof Floor panel (Panel Mark CIR-A-02,CR-A- INCO 24-Mar-18 1:40 PM 25-Mar-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
03,PM- A-26,PM-A-27,PM-A-27A,CR-A-02,CIR-A-01) At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

Fill Placement and Compaction Inspection of Base Course for Raw


3012 C-2251 water,potable water,Sewer line and Telecom Duct Bank at infront of BACK LOG 24-Mar-18 1:45 PM 25-Mar-18 10:00 AM RA-819438-001-0F1 QUADRI ISHFAQ AHMED not in QMIS
Backlog Building @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Base Course for Raw water,potable


3013 C-2252 water,S ewer line and Telecom Duct Bank at infront of Backlog Building @ BACK LOG 24-Mar-18 1:50 PM 25-Mar-18 10:30 AM RA-819438-001-0F1 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

Sub Grade FDT inspection for F DAS direct buried Conduit Trench 11 linear
3014 C-2253 mtr North side of New Admin Building @ ju'aymah shops, Plant N-26 ADMIN BUILDING 24-Mar-18 1:55 PM 25-Mar-18 9:15 AM RA-819283-002-0F1 SALMAAN ISHFAQ AHMED

FDT inspection of 3rd layer selectfill material around switch rack SHIPPING & RECEIVING
3015 C-2254 foundation at Shipping and Receiving area Juaymah Shops plant N-26 AREA 24-Mar-18 2:00 PM 25-Mar-18 2:30 PM RA-819992-002-0F1 ACIELO ISHFAQ AHMED

Asphalt Concrete Receiving,Placement and Testing inspection of Binder


3016 C-2255 course in New Parking area at gridline (1-3)(A-I) at Juaymah Shops Plant CAR PARKING 24-Mar-18 3:20 PM 25-Mar-18 10:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
N-26

Materials Receiving Visual Inspection for Boxes & Accessories as follows:


3017 E-0274 1) PVC COATED GUAT - 1" DIA. (20 EA), 2) PVC COATED GUAX - 1" DIA. (5 PLANT N-26 24-Mar-18 2:05 PM 25-Mar-18 9:00 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
EA) at ETE Laydown Storage Area, Ju’Aymah Shop Plant N26 as per
attached documents.

Materials Receiving Visual Inspection of Fittings for Galvanized Rigid Steel


3018 E-0275 (GRS) - PVC Coated Conduit: 1) PVC COATED UNION - 1" DIA. (30 EA) at PLANT N-26 24-Mar-18 2:10 PM 25-Mar-18 9:30 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
ETE Laydown Storage Area, J u’Aymah Shop Plant N26 as per attached
documents.

Visual Inspection of Excavation & Trenching prior to Installation of 4" Dia.


3019 E-0276 Direct Buried PVC Conduits for Direct Buried FDAS Cables at Northwest PLANT N-26 24-Mar-18 2:15 PM 25-Mar-18 10:00 AM RA-819283-001-00 FILBERT ALI M. AL YASEEN
Side of New Admin Bldg., Ju’aymah Shop Plant N26 as per Attached
Highlighted Drawing.

Visual Inspection for Installation of 4" Dia. Direct Buried PVC Conduits for
3020 E-0277 Direct Buried FDAS Cables at Northwest Side of New Admin Bldg., PLANT N-26 24-Mar-18 2:20 PM 25-Mar-18 2:00 PM RA-819283-001-00 FILBERT ALI M. AL YASEEN
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.

Concrete 28 days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSI for Pre-Cast concrete 1st Layer for Admin Building
3021 C-2256 Second Floor panel (Panel Mark CI1-A-30,CI1-A-11A,CI1-A-28,CI1-A- GULF 25-Mar-18 11:00 AM 26-Mar-18 2:00 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast fabricartion Yard @
Ju'Aymah, Shops Plant N- 26 @ Gulf Consult
Concrete 28 days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSI for Pre-Cast concrete 2nd Layer for Admin Building
3022 C-2257 Second Floor panel (Panel Mark CI1-A-30,CI1-A-11A,CI1-A-28,CI1-A- GULF 25-Mar-18 11:05 AM 26-Mar-18 2:10 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
23A,CI1-A-15,CI1-A-05, CI1-A-12 At Inco Pre-Cast fabricartion Yard @
Ju'Aymah, Shops Plant N- 26 @ Gulf Consult

Concrete 28 days Compressive Strength Testing & Final Acceptance


3023 C-2258 Inspection of 4000 PSI for Switch Rack Foundation's Pedestal, at Shipping, GULF 25-Mar-18 11:10 AM 26-Mar-18 2:15 PM RA-819992-001-0F3 QUADRI ISHFAQ AHMED
and Receiving area, @ ju'aymah shops, plant N-26.

Concrete 28 days Compressive Strength Testing & Final Acceptance


3024 C-2259 Inspection of 4000 PSI for Wall of Gantry Crain foundation at Grid line 2, GULF 25-Mar-18 11:15 AM 26-Mar-18 2:30 PM RA-819991-001-0F2 QUADRI ISHFAQ AHMED
Shipping & Receiving area, @ ju'aymah shops, plant N-26.
Cement Based Non-S hrink Grout Surface Preparation, Soaking & Final
Formwork Inspection Prior to Grouting for New Substation Building
bottom side of Pre-Cast Wall Panels. Panels Mark SS-WIG-01, SS-WIG-
3025 C-2260 02B, SS-WIG-03, SS-WIG-04, SS-WIG-02C, SS-WIG-05, SS-WIG-06, SS-WIG- NEW SUB STATION 25-Mar-18 2:00 PM 26-Mar-18 8:00 AM 0016-ER-002-1-10 SALMAAN ISHFAQ AHMED
07, SS-WIG-15, SS-WIG-14, SS-WIG-13, SS-WIG-12H, SS-WIG-23, S S-WIG-
02F, SS-WIG-22,
Cement SS-WIG-21,
Based Non-S SS-WIG-
hrink Grout 20H, Testing,
Mixing, S S-WIG-20, SS-WIG-19,
Sampling, SS-WIG-
Placement,
18 (20 and
Curing panels).
FinalatInspection
ju'aymah for
shops,
Newplant N-26 Building bottom side of
Substation
Pre-Cast Wall Panels. Panels Mark SS-WIG-01, SS-WIG-02B, SS-WIG-03,
3026 C-2261 SS-WIG-04, SS-WIG-02C, SS-WIG-05, SS-WIG-06, SS-WIG-07, SS-WIG-15, NEW SUB STATION 25-Mar-18 2:05 PM 26-Mar-18 8:15 AM 0016-ER-002-1-10 SALMAAN ISHFAQ AHMED
SS-WIG-14, SS-WIG-13, SS -WIG-12H, SS-WIG-23, SS-WIG-02F, SS-WIG-22,
SS-WIG-21, SS-WIG-20H, SS-WIG-20, SS-WIG-19, SS-WIG-18 (20 panels).
at ju'aymah shops, plant N-26
Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin
3027 C-2262 Building Roof Floor Panel, (Panel Mark PR-A-05H,PM-A-28,PM-A-27B,PM- INCO 25-Mar-18 2:45 PM 26-Mar-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-26A,CR-A-04,CIR-A-01A,CY-A- 01A, CY-A-02,CY-A-01(3NOS) At Inco Pre-
Cast fabricartion Yard @ Ju'aymah Shops Plant N- 26
Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /
Formwork Closure) for Admin Building Roof Floor Panel, (Panel Mark PR-
3028 C-2263 A-05H,PM-A-28,PM-A-27B,PM-A-26A,CR-A-04,CIR-A-01A,CY-A-01A, CY-A- INCO 25-Mar-18 2:50 PM 26-Mar-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
02,CY-A-01(3NOS) At Inco Pre-Cast fabricartion Yard @ Ju'aymah Shops
Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st
3029 C-2264 Layer for Admin Building Roof Floor Panel (Panel Mark PR-A-05H,PM-A- INCO 25-Mar-18 2:55 PM 26-Mar-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
28,PM- A-27B,PM-A-26A,CR-A-04,CIR-A-01A,CY-A-01A, CY-A-02,CY-A-
01(3NOS) At Inco Pre- Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


3030 C-2265 Layer for Admin Building Roof Floor Panel (Panel Mark PR-A-05H,PM-A- INCO 25-Mar-18 3:00 PM 26-Mar-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
28,PM- A-27B,PM-A-26A,CR-A-04,CIR-A-01A,CY-A-01A, CY-A-02,CY-A-
01(3NOS) At Inco Pre- Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Visual Inspection of Final Backfilling & Installation of Protective Red


3031 E-0278 Concrete Tiles & Safety Warning Tape for 4" Dia. Direct Buried PVC ADMIN BUILDING 25-Mar-18 3:45 PM 26-Mar-18 9:00 AM RA-819283-002-0F1 FILBERT ALI M. AL YASEEN
Conduits for Direct Buried FDAS Cables at Northwest Side of New Admin
Bldg., Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.

Visual Inspection for Cable Laying of 120mm2 Insulated Grounding


3032 E-0279 Conductor for Connection from Main Grounding Grid to Existing ADMIN BUILDING 25-Mar-18 3:50 PM 26-Mar-18 9:15 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
Grounding Grid at Northwest Side of New Admin Bldg., Ju’aymah Shop
Plant N26 as per Attached Highlighted Drawing.

Visual Inspection of Below Grade Exothermic Cadwelding Connections for


3033 E-0280 120 mm² Main Grounding Grid Conductor to 70 mm2 Existing Grounding ADMIN BUILDING 25-Mar-18 3:55 PM 26-Mar-18 9:30 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
Grid Conductor at Northwest Side of New Admin Bldg., Ju’aymah Shop
Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of Outdoor Type Junction Box
(Guat/Guax) for Pendant Mounted Normal Lightings & Wall Mounted
3034 E-0281 Emergency Lightings with Circuit Nos. 08 & 10 (N26-2118-LP-041) at SHIPPING & RECEIVING 25-Mar-18 4:05 PM 26-Mar-18 10:00 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
AREA
Sunshade Shipping & Receiving Area, Ju’aymah S hop Plant N26 as per
Attached Highlighted Drawing.
Visual Inspection for Installation of Above Ground PVC Coated GRS
Conduits & Fittings for Pendant Mounted Normal Lightings & Wall
3035 E-0282 Mounted Emergency Lightings with Circuit Nos. 08 & 10 (N26-2118-LP- SHIPPING & RECEIVING 25-Mar-18 4:10 PM 26-Mar-18 10:15 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
AREA
041) at Sunshade Shipping & Receiving Area, Ju’aymah Shop Plant N26 as
per Attached Highlighted Drawing.

Prime Coat Testing, Application and Sampling on Aggrigate Base Course


3036 C-2266 above for Raw water,potable water,Sewer line and Telecom Duct Bank at BACK LOG 25-Mar-18 4:45 PM 26-Mar-18 9:00 AM RA-819438-001-0F1 SALMAAN ISHFAQ AHMED
infront of Backlog Building At u'Aymah, Shops Plant N- 26

Prime Coat Testing, Application and Sampling on Aggrigate Base Course


above Tele Comm Duct Bank 70 linear between Existing Admin Building
3037 C-2267 and Existing Conference Hall (Continuation) AND above Electrical LV Cable ADMIN BUILDING 25-Mar-18 4:50 PM 26-Mar-18 9:30 AM RA-819460-002-0F1 SALMAAN ISHFAQ AHMED
Trench 60 Liner Meter East side of New Admin Building @ ju'aymah
shops, plant N-26

FDT inspection of 6th layer selectfill material around gantry crane


3038 C-2268 foundation at gridline 2,S hipping and Receiving area Juaymah Shops plant SHIPPINGAREA
& RECEIVING 26-Mar-18 8:00 AM 27-Mar-18 2:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
N-26

3039 C-2269 FDT inspection of 4th Layer (Final) selectfill material around switch rack SHIPPING & RECEIVING 26-Mar-18 8:05 AM 27-Mar-18 2:30 PM RA-819992-001-0F1 ACIELO ISHFAQ AHMED
foundation at Shipping and Receiving area Juaymah Shops plant N-26 AREA

3040 C-2270 Concrete Finishing & Curing Inspection for Cable Drum Pit (Wall) at SHIPPING & RECEIVING 26-Mar-18 8:10 AM 27-Mar-18 7:00 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
Shipping & Receivin Area @ J uaymah Shops Plant N-26 AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3041 C-2271 Inspection of 5000 PSi for 1st Layer for Admin Building Second Floor GULF 26-Mar-18 8:15 AM 27-Mar-18 10:00 AM 0016-A-ER-002-1-5 QUADRI ISHFAQ AHMED
panel (Panel Mark CI1-A-05H,CI1-A-27,CI1-A-20, C1-A- 07,CI1-A-24,CI1-A-
31, CI1-A-17 At INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3042 C-2272 Inspection of 5000 PSi for 2nd Layer for Admin Building S econd Floor GULF 26-Mar-18 8:20 AM 27-Mar-18 10:15 AM 0016-A-ER-002-1-5 QUADRI ISHFAQ AHMED
panel (Panel Mark CI1-A-05H,CI1-A-27,CI1-A-20, C1-A- 07,CI1-A-24,CI1-A-
31, CI1-A-17 At INCO Pre-Cast Fabrication Yard @ gulf Consult

3043 C-2273 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 26-Mar-18 10:00 AM 27-Mar-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=115 M3) at ETE Laydown Area @ J u'aymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Material Receiving Inspection of Steel Grating Hot dip Galvanized 32 MM


3044 C-2274 Thickness (QTY=30 M2) From Wolouf Trading Est (P.O 4619) @ Ete PLANT N-26 26-Mar-18 2:00 PM 27-Mar-18 11:00 AM RA-819868-01-0F2 BAQAR ISHFAQ AHMED
Store,JuAymah,Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


Building Roof Floor pane (Panel Mark PM-A-07A,PM-A-06,CR-A- 01A,PM-
3045 C-2275 A-04A,PR-A-02,CIR-A-04A,CR-A-01B,CR-A-07 SB-A-01(4NOS),SC-A- INCO 26-Mar-18 2:05 PM 27-Mar-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01(4NOS)At Inco Pre-Cast fabricartion Yard @ Ju'aymah S hops Plant N-26
Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /
Formwork Closure) for Admin Building Roof Floor pane (Panel Mark PM-A-
3046 C-2276 07A,PM-A-06,CR-A- 01A,PM-A-04A,PR-A-02,CIR-A-04A,CR-A-01B,CR-A-07 INCO 26-Mar-18 2:10 PM 27-Mar-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
SB-A-01(4NOS),SC-A-01(4NOS)At Inco Pre-Cast fabricartion Yard @
Ju'aymah Shops Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st
Layer for Admin Building Roof Floor pane (Panel Mark PM-A-07A,PM-A-
3047 C-2277 06,CR-A-01A,PM-A- 04A,PR-A-02,CIR-A-04A,CR-A-01B,CR-A-07 SB- A- INCO 26-Mar-18 2:15 PM 27-Mar-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01(4NOS),S C-A-01(4NOS)At Inco Pre-Cast fabricartion Yard @ Ju'aymah
Shops Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd
Layer for Admin Building Roof Floor pane (Panel Mark PM-A-07A,PM-A-
3048 C-2278 06,CR-A-01A,PM-A- 04A,PR-A-02,CIR-A-04A,CR-A-01B,CR-A-07 SB- A- INCO 26-Mar-18 2:18 PM 27-Mar-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01(4NOS),S C-A-01(4NOS)At Inco Pre-Cast fabricartion Yard @ Ju'aymah
Shops Plant N-26

Pre-Cast & Pre Stressed Concreting Final Inspection for Second Floor
3049 C-2279 Panel Admin Building (Panel Mark CI1-A-02,CI1-A- 03,CI1-A-11A,CI1-A-11) PLANT N-26 26-Mar-18 2:20 PM 27-Mar-18 6:30 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
At Admin Building Area @ Ju'aymah Shops Plant N- 26

Material,Receiving Inspection for Pre- Cast Concrete Panels Second Floor


3050 C-2280 Panel Admin Building (Panel Mark CI1-A-02,CI1-A- 03,CI1-A-11A,CI1-A-11) PLANT N-26 26-Mar-18 2:22 PM 27-Mar-18 7:00 AM 0016-A-ER-002-1-5 BAQAR ISHFAQ AHMED
At Admin Building Area @ Ju'aymah Shops Plant N- 26

Pre-cast Concrete Panel Pre-Installation Inspection Second F loor Panel


3051 C-2281 (Panel Mark CI1-A-02,CI1-A-03,CI1-A-11A,CI1-A-11) At Admin Building ADMIN BUILDING 26-Mar-18 2:25 PM 27-Mar-18 7:30 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
Area @ J u'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Second


3052 C-2282 Floor (Panel Mark CI1-A-02,CI1-A-03,CI1-A-11A,CI1-A-11) At Admin ADMIN BUILDING 26-Mar-18 2:28 PM 27-Mar-18 7:40 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
Building Area @ Ju'aymah Shops Plant N-26

Concrete Finishing & Curing Inspection of Concrete for Elevator Machin


3053 C-2283 Room above Roof Slab, Grid line D to F and 1 to 2, New Admin Building ADMIN BUILDING 26-Mar-18 2:30 PM 27-Mar-18 10:00 AM RA-819728-001-0F1 SALMAAN ISHFAQ AHMED not in QMIS
@ ju'aymah shops, plant N-26.

Curing Inspection of Concrete for Parapet Wall of Elevator Machin Room


3054 C-2284 Grid line D to F and 1 to 2, and Beams for Stare Case Room Grid line 1 to ADMIN BUILDING 26-Mar-18 2:32 PM 27-Mar-18 10:30 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED not in QMIS
2 & B to C upper Roof, New Admin Building at ju'aymah shops. Plant N-
26.

Material,Receiving Inspection for Pre- Cast Concrete Panels (Panel mark)


3055 C-2285 SS-SB-01 (3NOS),SS-SC-01(3NOS) for Substation building @ Ju'aymah PLANT N-26 26-Mar-18 2:35 PM 27-Mar-18 7:15 AM 0016-ER-001-1-11 BAQAR ISHFAQ AHMED
Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection (Panel Mark) SS-SB-


3056 C-2286 01 (3NOS),SS-SC-01(3NOS) for Substation building @ Ju'aymah Shops NEW SUB STATION 26-Mar-18 2:38 PM 27-Mar-18 7:35 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels (Panel


3057 C-2287 mark) SS-SB-01 (3NOS),SS-SC-01(3NOS) for Substation building @ NEW SUB STATION 26-Mar-18 2:40 PM 27-Mar-18 8:00 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
Ju'aymah Shops Plant N-26

Formwork Inspection for Pre-Cast Light pols Foundations (15 Nos), at Pre-
3058 C-2288 Cast Yard, North Side of New Admin Building, ju'aymah shops. Plant # N- ADMIN BUILDING 26-Mar-18 3:05 PM 27-Mar-18 8:15 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
26.

FBE Rebars, Embedded Item and formwork Closure inspection for Pre-
3059 C-2289 Cast Light pols Foundations (15 Nos), at Pre-Cast Yard, North Side of ADMIN BUILDING 26-Mar-18 3:10 PM 27-Mar-18 8:30 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
New Admin Building, ju'aymah shops. Plant # N-26.

Concrete Testing, Sampling and Casting inspection for Pre-Cast Light pols
3060 C-2290 Foundations (15 Nos), at Pre-Cast Yard, North Side of New Admin ADMIN BUILDING 26-Mar-18 3:15 PM 27-Mar-18 9:30 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED
Building, ju'aymah shops. Plant # N-26.

Geo grid installation inspection above Tele Com. Duct bank trench west
3061 C-2291 side of side of Admin Building Continuation (42 Linear Meter) @ ADMIN BUILDING 26-Mar-18 3:18 PM 27-Mar-18 9:00 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26

Fill placement of Base Course Material inspection above Tele Com.


3062 C-2292 Duct bank trench west side of side of Admin Building Continuation (42 ADMIN BUILDING 26-Mar-18 3:20 PM 27-Mar-18 9:10 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Linear Meter) @ ju'aymah shops, plant N-26

Base Course Material Compaction Testing (FDT) inspection of above


3063 C-2293 Tele Com. Duct bank trench west side of side of Admin Building ADMIN BUILDING 26-Mar-18 3:25 PM 27-Mar-18 9:30 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED
Continuation (42 Linear Meter) @ ju'aymah shops, plant N-26

Visual Inspection of 2" Dia. & 1" Dia. PVC Conduit Pipe Stub-up
3064 E-0283 Installation for Lighting Pole Foundation Prior to Concrete (15 Sets) Near ADMIN BUILDING 26-Mar-18 4:00 PM 27-Mar-18 9:00 AM RA-819293-006-00 FILBERT ALI M. AL YASEEN
North Side of New Admin Bldg. As per highlighted Attached Drawing.
Material Receiving Visual Inspection of Metallic Cable Tray & Fittings as
follows: 1) SL5D-36HT-36, HORIZONTAL TEE (90o) CABLE LADDER: STEEL
3065 E-0284 (HDGAF), 900mm WIDE, 914mm RADIUS, 19MM FLANGE WIDTH, 152MM ADMIN BUILDING 26-Mar-18 4:05 PM 27-Mar-18 9:30 AM RA-819843-001-0F1 FILBERT DAMIAN ABAA
TOTAL SIDE RAIL HEIGHT (15 EA) 2) STS-M2 W/SS HW, UNIVERSAL
CONNECTOR: STEEL (HDGAF ), FOR 150/159mm HEIGHT CABLE LADDERS
(INCLUDING 20 PAIR EPOXY COATED) (300 PAIR)
Asphalt Concrete Receiving, Placement and Testing inspection of Binder
3066 C-2294 course in New Parking area at gridline (3-4)(A-I) at Juaymah Shops Plant CAR PARKING 26-Mar-18 5:30 PM 27-Mar-18 11:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
N-26

Formwork Inspection for Transformer Foundations # XRF-X01, XRF-X02,


3067 C-2295 XRF-X03, XRF -X04, Transformer Yard, New Sub Station @ ju'aymah shops, NEW SUB STATION 27-Mar-18 10:05 AM 28-Mar-18 9:00 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
plant N-26.

FBE Rebars, Embeedded Items and Form work Closure Inspection for
3068 C-2017-A Transformer Foundations # XRF-X01, XRF-X02, XRF-X03, XRF-X04, NEW SUB STATION 27-Mar-18 10:10 AM 28-Mar-18 9:15 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Transformer Yard, New Sub Station @ ju'aymah shops, plant N-26.

Concrete Testing, Sampling and Casting Inspection for Transformer


3069 C-2018-A Foundations # XRF-X01, XRF-X02 XRF-X03, XRF-X04, Transformer Yard, NEW SUB STATION 27-Mar-18 10:15 AM 28-Mar-18 10:00 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
New Sub Station @ ju'aymah shops, plant N-26.

3070 C-2296 Sub Grade FDT inspection for Neutralization Tank, East Side of New ADMIN BUILDING 27-Mar-18 10:20 AM 28-Mar-18 9:15 AM RA-819486-001-00 SALMAAN ISHFAQ AHMED
Substation Building at ju'aymah shops. Plant # N-26.

3071 C-2297 Sit and Grade Preparaton inspection for Neutralization Tank, East S ide of ADMIN BUILDING 27-Mar-18 10:22 AM 28-Mar-18 9:30 AM RA-819486-001-00 SALMAAN ISHFAQ AHMED
New Substation Building. at ju'aymah shops. Plant # N-26.

Lean Concrete Testing, Sampling and Casting inspection for Neutralization


3072 C-2298 Tank, East Side of New Substation Building. at ju'aymah shops. Plant # N- ADMIN BUILDING 27-Mar-18 10:25 AM 28-Mar-18 9:45 AM RA-819486-001-00 SALMAAN ISHFAQ AHMED
26.

Asphalt Concrete (Binder Course) Receiving Testing, S ampling Placing,


3073 C-2299 Leviling and Compacting Inspection at above PSA Duct Bank 21 linerar WORK SHOP 27-Mar-18 10:28 AM 28-Mar-18 1:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
meter between MTM Buildig and Welding workshop ju'aymah shops.
Plant # N-26.

Asphalt Concrete (Binder Course) Receiving Testing, S ampling Placing,


3074 C-2300 Leviling and Compacting Inspection at above Raw water,potable BACK LOG 27-Mar-18 10:30 AM 28-Mar-18 1:15 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
water,S ewer line and Telecom Duct Bank infront of Backlog Building
ju'aymah shops. Plant # N-26.

Asphalt Concrete (Binder Course) Receiving Testing, S ampling Placing,


3075 C-2301 Leviling and Compacting Inspection above Raw & Portable Water Line WORK SHOP 27-Mar-18 10:32 AM 28-Mar-18 1:30 PM RA-819438-001-0F1 SALMAAN ISHFAQ AHMED
Trench (73 LM) In between Work shop building To Chemical Storage Area
at ju'aymah shops. Plant # N-26.

Asphalt Concrete (Binder Course) Receiving Testing, S ampling Placing,


3076 C-2302 Leviling and Compacting Inspection above Telecomm Duct Bank 72 LM, ADMIN BUILDING 27-Mar-18 10:35 AM 28-Mar-18 1:45 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
South Side from Pedestal JY-347 to Existing Manhole South side of New
Admin Building at ju'aymah shops. Plant # N-26.

Asphalt Concrete (Binder Course) Receiving Testing, S ampling Placing,


3077 C-2303 Leviling and Compacting Inspection above Tele Comm Duct Bank 70 ADMIN BUILDING 27-Mar-18 10:40 AM 28-Mar-18 2:00 PM RA-819517-001-0F3 SALMAAN ISHFAQ AHMED
linear meter between Existing Admin Building and Existing Conference
Hall South side of New Admin Building at ju'aymah shops. Plant # N-26.

Asphalt Concrete (Binder Course) Receiving Testing, S ampling Placing,


3078 C-2304 Leviling and Compacting Inspection above Electrical LV Cable Trench 60 ADMIN BUILDING 27-Mar-18 10:45 AM 28-Mar-18 2:15 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Liner Meter South East side of New Admin Building at ju'aymah shops.
Plant # N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3079 C-2305 Inspection of 5000 PSi for 1st Layer for Admin Building Second Floor GULF 27-Mar-18 10:48 AM 28-Mar-18 2:00 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
panel (Panel Mark C1-A-05,CI1- A-22,C1-A-05A, C1-A-05AH CI1-A- 17,At
INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3080 C-2306 Inspection of 5000 PSi for 2nd Layer for Admin Building S econd Floor GULF 27-Mar-18 10:50 AM 28-Mar-18 2:15 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
panel (Panel Mark C1-A-05,CI1- A-22,C1-A-05A, C1-A-05AH CI1-A- 17,At
INCO Pre-Cast Fabrication Yard @ gulf Consult

Surface preparation and moisture test inspection for Gantry Crane


3081 C-2307 Foundation and cable drum pit at gridline 1, Shipping and Receiving SHIPPING & RECEIVING 27-Mar-18 11:00 AM 28-Mar-18 8:00 AM RA-819991-001-0f2 ACIELO ISHFAQ AHMED
area ,Juaymah Shops Plant N-26 AREA

Material Receiving Inspection of Fence Type 4 Chainlink, Post & Brace


3082 C-2308 Rails, Tension Wire Tie Wire And Accessories For New Car Parking and Sub PLANT N-26 27-Mar-18 2:50 PM 28-Mar-18 11:00 AM RA-819478-002-0F3 BAQAR ISHFAQ AHMED
Station (P.O # 25101) From BRC At ETE Laydown Area @ Ju'Aymah Shops
Plant N-26

Material Receiving Inspection of Fence Type 3 Chainlink, Post & Brace


3083 C-2309 Rails, Tension Wire Tie Wire And Accessories For Shipping and Receiving PLANT N-26 27-Mar-18 2:55 PM 28-Mar-18 10:00 AM RA-819473-001-0F1 BAQAR ISHFAQ AHMED
Area (P.O # 25101) From BRC At ETE Laydown Area @ J u'Aymah Shops
Plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


3084 C-2310 Building Roof Floor pane (Panel Mark PM-A-04,PM-A-07,CR-A-07A,PM- INCO 27-Mar-18 4:30 PM 28-Mar-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-06A,CR-A-01H,CR-A-01AH,CY-A-01(3NOS) At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


Formwork Closure) for Admin Building Roof Floor pane (Panel Mark PM-
3085 C-2311 A-04,PM-A-07,CR-A- 07A,PM-A-06A,CR-A-01H,CR-A-01AH,CY-A-01(3NOS ) INCO 27-Mar-18 4:35 PM 28-Mar-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
At Inco Pre-Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


Layer for Admin Building Roof Floor pane (Panel Mark PM-A-04,PM-A-
3086 C-2312 07,CR-A-07A,PM-A- 06A,CR-A-01H,CR-A-01AH,CY-A-01(3NOS) At Inco Pre- INCO 27-Mar-18 4:38 PM 28-Mar-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Cast fabricartion Yard @ Ju'aymah Shops Plant N- 26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


Layer for Admin Building Roof Floor pane (Panel Mark PM-A-04,PM-A-
3087 C-2313 07,CR-A-07A,PM-A- 06A,CR-A-01H,CR-A-01AH,CY-A-01(3NOS) At Inco Pre- INCO 27-Mar-18 4:40 PM 28-Mar-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Cast fabricartion Yard @ Ju'aymah Shops Plant N- 26

Visual Inspection of Installation for Duplex Receptacle (230V, 13A, 2P, 3W,
3088 E-0285 RCD & Weather Proof Type) With Circuit Nos. 01 & 03 (N26-2118-LP-041) SHIPPING & RECEIVING 27-Mar-18 3:30 PM 28-Mar-18 9:30 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
at Sunshade Shipping & Receiving Area, Ju’aymah Shop Plant N26 as per AREA
Attached Highlighted Drawing.

Visual Inspection of Installation for PVC Coated GRS Conduits Above


Ground for Duplex Receptacles With Circuit Nos. 01 & 03 (N26-2118-LP- SHIPPING & RECEIVING
3089 E-0286 041) Prior to Cable Pullling at S unshade Shipping & Receiving Area, AREA 27-Mar-18 3:35 PM 28-Mar-18 9:45 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.

Visual Inspection for Excavation & Trenching Prior to Cable Laying of 25


3090 E-0287 mm² Insulated Grounding Conductors for Fence Grounding at East Side of SHIPPING & RECEIVING 27-Mar-18 3:40 PM 28-Mar-18 10:00 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Sunshade Shipping & Receiving Area, Ju’aymah Shop Plant N26 as per AREA
Attached Highlighted Drawing.

Visual Inspection for Below Grade Cable Laying of 25 mm² Insulated


3091 E-0288 Grounding Conductors for Fence Grounding at East Side of Sunshade SHIPPING & RECEIVING 27-Mar-18 3:42 PM 28-Mar-18 10:15 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Shipping & Receiving Area, Ju’aymah S hop Plant N26 as per Attached AREA
Highlighted Drawing

Visual Inspection for Below Grade Exothermic (Thermite) Welding


3092 E-0289 Connections of 120mm2 to 25 mm² Insulated Grounding Conductors for SHIPPING & RECEIVING 27-Mar-18 3:45 PM 28-Mar-18 10:30 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Fence Grounding at East S ide of Sunshade Shipping & Receiving Area, AREA
Ju’aymah Shop Plant N26 as per Attached Highlighted IFC Drawing.
Visual Inspection for Cable Pulling of LV Building Wires (Excluding Circuit
Homeruns & Going to Lighting Fixtures) for Pendant Mounted Normal SHIPPING & RECEIVING
3093 E-0290 Lightings & Wall Mounted Emergency Lightings (Interior Lighting) with AREA 27-Mar-18 3:50 PM 28-Mar-18 2:00 PM RA819981-001-00 FILBERT ALI M. AL YASEEN
Circuit Nos. 08 & 10 (N26-2118-LP-041) at Sunshade Shipping & Receiving
Area, Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Materials Receiving Visual Inspection for MV Cables (On Cable Reel -
25EA) as follows: 1) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC-
3094 E-0291 FROR (DRUM NO. 13180626 @ 1,010 Mtrs), 2) 1C X 240 mm2 20KV PLANT N-26 27-Mar-18 3:55 PM 28-Mar-18 9:00 AM RA-819294-001-0F1 FILBERT DAMIAN ABAA
Cu/TR-XLPE/LAT/AAWA/PVC-FROR (DRUM NO. 13180831 @ 1,010 Mtrs)
3) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- FROR (DRUM NO.
13180963 @ 1,019 Mtrs)
Visual Inspection after welding for 39 joints on 11 panels SS-WIG-02A,
3095 ST-W-0020-A 02D, 02E, 02G, SS-WG-09, 08, 01, 02, 03, 04 & 05. (check attached NEW SUB STATION 27-Mar-18 4:05 PM 28-Mar-18 9:30 AM RA-819885-001-00 OMAR M. HASSAN
drawing) @ S ubstation Building, Ju'aymah S hops, Plant N26.

Visual Inspection after welding for 36 joints on 11 panels SS-WIG-09, 08,


3096 ST-W-0021-A 10, 11, 14, 15, 16, 17, SS-WG-07, 10 & 12 (check attached drawing) @ NEW SUB STATION 27-Mar-18 4:10 PM 28-Mar-18 2:00 PM RA-819885-001-00 OMAR M. HASSAN
Substation Building, Ju'aymah Shops, Plant N26.

Fill Placement & compaction inspection of 7th layer(final layer) selectfill SHIPPING & RECEIVING
3097 C-2314 material around gantry crane foundation at gridline 2,Shipping and AREA 28-Mar-18 11:15 AM 29-Mar-18 2:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Receiving area Juaymah Shops plant N-26

FDT inspection of 7th layer (final layer) selectfill material around gantry
3098 C-2315 crane foundation at gridline 2,Shipping and Receiving area Juaymah Shops SHIPPINGAREA
& RECEIVING 28-Mar-18 11:20 AM 29-Mar-18 2:15 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3099 C-2316 Inspection of 5000 PSi for 1st Layer for Admin Building Second Floor GULF 28-Mar-18 11:25 AM 29-Mar-18 2:00 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
panel (Panel Mark CI1-A-23,CI1-A- 19,CI1-A-23H, CI1-A-18,CI1-A-13, At
INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3100 C-2317 Inspection of 5000 PSi for 2nd Layer for Admin Building S econd Floor GULF 28-Mar-18 11:30 AM 29-Mar-18 2:15 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
panel (Panel Mark CI1-A-23,CI1-A- 19,CI1-A-23H, CI1-A-18,CI1-A-13, At
INCO Pre-Cast Fabrication Yard @ gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3101 C-2318 Inspection of 2000 PSi for Lean Concrete, prior to Curb stones GULF 28-Mar-18 11:35 AM 29-Mar-18 2:30 PM RA-819946-001-00 QUADRI ISHFAQ AHMED
installation.@ Grid line 3 (A to I) New Car Parking Shad At Ju'aymah
Shops Plant N-26 @ gulf Consult

Compaction Testing (FDT) inspection of Sub Grade for MV Electrical Cable


3102 C-2319 Trench 87.0 Linear Meter (Direct Buried) between Back Log Building and BACK LOG 28-Mar-18 2:30 PM 29-Mar-18 2:30 PM RA-819460-001-0F2 SALMAAN ISHFAQ AHMED
Shipping & Receiving Area @ Ju'aymah Shops Plant N- 26

Pre-cast Pre Concreting Inspection (Molding/Formworks) for Admin


3103 C-2320 Building Roof Floor Panels (Panel Mark PM-A-12, PR-A-02A, PM-A-13, CR- INCO 28-Mar-18 2:45 PM 29-Mar-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-02B, CR-A-02A, SB-A-01 (4 Nos.), SC-A-01 (4 Nos.), CIR-A-13 and CIR-A-
03 at INCO Pre-Cast Fabrication Yard
Pre-cast Pre Concreting Inspection (Rebars, Embedded Items &
Molding/Formwork Closure) for Admin Building Roof Floor Panels (Panel
3104 C-2321 Mark PM-A-12, PR-A-02A, PM-A-13, CR-A-02B, CR-A-02A, SB-A-01 (4 INCO 28-Mar-18 2:48 PM 29-Mar-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Nos.), SC-A-01 (4 Nos.), CIR-A-13 and CIR-A-03 at INCO Pre-Cast
Fabrication Yard
Pre-cast 1st Layer Concrete Placement, Sampling, and Testing Inspection
3105 C-2322 for Admin Building Roof Floor Panels (Panel Mark PM-A-12, PR- A-02A, INCO 28-Mar-18 2:50 PM 29-Mar-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
PM-A-13, CR-A-02B, CR-A-02A, SB- A-01 (4 Nos.), SC-A-01 (4 Nos.), CIR-A-
13 and CIR-A-03 at INCO Pre-Cast Fabrication Yard

Pre-cast 2nd Layer Concrete Placement, Sampling, and Testing Inspection


3106 C-2323 for Admin Building Roof Floor Panels (Panel Mark PM-A-12, PR- A-02A, INCO 28-Mar-18 2:55 PM 29-Mar-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
PM-A-13, CR-A-02B, CR-A-02A, SB- A-01 (4 Nos.), SC-A-01 (4 Nos.), CIR-A-
13 and CIR-A-03 at INCO Pre-Cast Fabrication Yard

Pre-cast Pre Concreting Inspection (Molding/Formworks) for Admin


3107 C-2324 Building Roof floor panels (Panel Mark PR-A-01) at INCO Pre-Cast INCO 28-Mar-18 3:00 PM 29-Mar-18 2:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Fabrication Yard

Pre-cast Pre Concreting Inspection (Rebars, Embedded Items &


3108 C-2325 Molding/Formwork Closure) for Admin Building Roof floor panels (Panel INCO 28-Mar-18 3:05 PM 29-Mar-18 2:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Mark PR-A-01) at INCO Pre-Cast Fabrication Yard

Pre-cast 1st Layer Concrete Placement, Sampling, and Testing Inspection


3109 C-2326 for Admin Building Roof floor panels (Panel Mark PR-A-01) at INCO Pre- INCO 28-Mar-18 3:10 PM 31-Mar-18 2:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Cast Fabrication Yard

Pre-cast 2nd Layer Concrete Placement, Sampling, and Testing Inspection


3110 C-2327 for Admin Building Roof floor panels (Panel Mark PR-A-01) at INCO Pre- INCO 28-Mar-18 3:15 PM 31-Mar-18 4:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Cast Fabrication Yard

Cast in place Concrete Formwork Inspection for Parapet Wall of Stare Case
3111 C-2328 Room Grid line 1 to 2 & B to C, upper Roof, New Admin Building @ ADMIN BUILDING 28-Mar-18 4:15 PM 29-Mar-18 8:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
ju'aymah shops. Plant N-26.

FBE Rebar, Embedded Item and Formclosure Inspection for Parapet Wall
3112 C-2329 of Stare Case Room Grid line 1 to 2 & B to C, upper Roof, New Admin ADMIN BUILDING 28-Mar-18 4:20 PM 29-Mar-18 9:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Building @ ju'aymah shops. Plant N-26.

Material Receiving ,handling S torage and Preservation Inspection of


3113 C-2330 Cemtec A1 Black PU 20 Leter Pail (Qty=04 Can ) From CMCI From Admin PLANT N-26 28-Mar-18 4:25 PM 29-Mar-18 10:00 AM RA-819760-001-00 BAQAR ISHFAQ AHMED
Building @ ETE Laydown Area At ju'aymah Shops Plant N-26

Materials Receiving Visual Inspection for MV Cables (On Cable Reel -


3114 E-0292 27EA) as follows: 1) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- PLANT N-26 28-Mar-18 4:10 PM 29-Mar-18 9:00 AM RA-819924-001-0F1 FILBERT DAMIAN ABAA
FROR (QTY= 20.746 Mtrs) at ETE Laydown Yard Area, Ju’Aymah Shop
Plant N26 as per attached documents.

Visual Inspection for Continuity & Insulation Resistance Testing (On Cable
3115 E-0293 Reel) of MV Cables 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- PLANT N-26 28-Mar-18 4:15 PM 29-Mar-18 10:00 AM RA-819924-001-0F1 FILBERT DAMIAN ABAA
FROR (26EA Drums) at ETE Laydown Yard Area, Ju’Aymah Shop Plant N26
as per attached documents.
Materials Receiving Visual Inspection for LV Cables Armored Type (On
Cable Reel - 6 EA) as follows: 1) Cu/XLPE/SWA/PVC(FR-OR) 1KV 3CX400
3116 E-0294 mm2 RM (DRUM NO. 13258324 @ 608 Mtrs), 2) Cu/XLPE/SWA/PVC(FR- PLANT N-26 28-Mar-18 4:20 PM 29-Mar-18 9:15 AM RA-819924-001-0F1 FILBERT ALI M. AL YASEEN
OR) 1KV 3CX500 mm2 SM (QTY= 2717 Mtrs ) at ETE Laydown Yard Area,
Ju’Aymah SReceiving
Materials hop PlantVisual
N26 as
Inspection
per attached
for LV
documents.
Cables Unarmored Type (On
Cable Reel - 4 EA) as follows: 1) Cu/XLPE/PVC(FR-OR) 1KV 3CX150 mm2
RM (DRUM NO. 13217929 @ 202 Mtrs), 2) Cu/XLPE/PVC(FR-OR) 1KV
3117 E-0295 3CX240 mm2 RM (DRUM NO. 13218319 @ 150 Mtrs ), 3) PLANT N-26 28-Mar-18 4:25 PM 29-Mar-18 9:30 AM RA-819924-001-0F1 FILBERT ALI M. AL YASEEN
Cu/XLPE/PVC(FR-OR) 1KV 4CX240 mm2 SM (DRUM NO. 13204097 @ 155
Mtrs ), 4) Cu/XLPE/PVC(FR-OR) 1KV 4CX150 mm2 SM (DRUM NO.
13200675 @ 150 Mtrs ) at ETE Laydown Yard Area, J u’Aymah Shop Plant
N26 as perReceiving
Materials attached Visual
documents.
Inspection for Grounding Cables (On Cable Reel
- 2 EA) as follows: 1) Cu/PVC 450/750V H07V2-R90oC 240 mm2 RM
3118 E-0296 (DRUM NO. 13174134 @ 1,006 Mtrs), 2) Cu/PVC 450/750V H07V2-R90oC PLANT N-26 28-Mar-18 4:30 PM 29-Mar-18 9:45 AM RA-819924-001-0F1 FILBERT ALI M. AL YASEEN
120 mm2 RM (DRUM NO. 13176642 @ 1,013 Mtrs) at ETE Laydown Yard
Area, Ju’Aymah Shop Plant N26 as per attached documents.

Curing Inspection of Concrete for Beams of Upper Roof Slab for Stare
3119 C-2331 Case Area (East and South S ides) Grid Line 6 to 7 @ GL. A (East side Stare ADMIN BUILDING 29-Mar-18 11:00 AM 31-Mar-18 7:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Case) & C to E & 11 to 12, (south side) upper Roof, New Admin Building

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for 1st Layer for Admin Building Second Floor
3120 C-2332 panel (Panel Mark CI1-A-21H, CI1-A-22A, CI1-A-23AH, CI1-A-19H, CI1-A- GULF 29-Mar-18 11:05 AM 31-Mar-18 2:00 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
20H, C1- A-05H, CI1-A-07 At INCO Pre-Cast Fabrication Yard @ gulf
Consult
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for 2nd Layer for Admin Building S econd Floor
3121 C-2333 panel (Panel Mark CI1-A-21H, CI1-A-22A, CI1-A-23AH, CI1-A-19H, CI1-A- GULF 29-Mar-18 11:10 AM 31-Mar-18 2:15 PM 0016-A-ER-002-1-5 QUADRI MAMDOOH
20H, C1- A-05H, CI1-A-07 At INCO Pre-Cast Fabrication Yard @ gulf
Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for Screed Concrete prior to Cast Screed at 1st floor
3122 C-2334 of New Admin Building G.L 8 to12 and A to C @ ju'aymah shops, plant N- GULF 29-Mar-18 11:15 AM 31-Mar-18 2:30 PM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
26 @ gulf Consult.

Pre-cast Pre Concreting Inspection (Molding/Formworks) for Admin


3123 C-2335 Building Roof Floor Panels (PM-A-03A, PM-A-03, PM-A- 13A, CIR-A-12, CR- INCO 29-Mar-18 11:20 AM 31-Mar-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-05H, CY-A-01 (03 Nos.) Total 8 Nos.) at INCO Pre-Cast Fabrication Yard

Pre-cast Pre Concreting Inspection (Rebars, Embedded Items &


Molding/Formwork Closure) for Admin Building Roof Floor Panels (PM-A-
3124 C-2336 03A, PM-A-03, PM-A-13A, CIR-A-12, CR-A-05H, CY-A-01 (03 Nos.) Total 8 INCO 29-Mar-18 11:25 AM 31-Mar-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Nos.) at INCO Pre-Cast Fabrication Yard

Pre-cast 1st Layer Concrete Placement, Sampling, and Testing Inspection


for Admin Building Roof Floor Panels (PM- A-03A, PM-A-03, PM-A-13A,
3125 C-2337 CIR-A-12, CR-A-05H, CY-A-01 (03 Nos.) Total 8 Nos.) at INCO Pre-Cast INCO 29-Mar-18 11:28 AM 31-Mar-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Fabrication Yard

Pre-cast 2nd Layer Concrete Placement, Sampling, and Testing Inspection


for Admin Building Roof Floor Panels (PM- A-03A, PM-A-03, PM-A-13A,
3126 C-2338 CIR-A-12, CR-A-05H, CY-A-01 (03 Nos.) Total 8 Nos.) at INCO Pre-Cast INCO 29-Mar-18 11:30 AM 31-Mar-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Fabrication Yard

Final Alignment Inspection for Admin Building Second Floor Panels Layout
3127 C-2339 (0016-A-ER-002) at Juaymah Site ADMIN BUILDING 29-Mar-18 12:40 PM 31-Mar-18 9:00 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED

Coating and Final Inspection of APS-3 Carboline for Gantry Crane SHIPPING & RECEIVING
3128 C-2340 Foundation and Cable Drum Pit at Grid Line 1, Shipping & Receiving Area, AREA 29-Mar-18 1:05 PM 31-Mar-18 8:00 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Juaymah Shops Plant N-26 (DFT)

FDT Inspection of Subgrade for Electrical Direct Buried PVC Conduit of SHIPPING & RECEIVING
3129 C-2341 Lighting Pole (48 m length) South Side of Shipping & Receiving Area 29-Mar-18 1:10 PM 31-Mar-18 2:00 PM RA-819463-001-00 ACIELO ISHFAQ AHMED
Juaymah Shops Plant N-26 AREA

Gypsum Board (Type A2 and 5B) Framing and Pre- Installation Inspection
3130 C-2342 for Room # 108, 105, 106,142 143 and 145, 2nd Grid Line Floor at New ADMIN BUILDING 29-Mar-18 2:00 PM 31-Mar-18 10:15 AM RA-819745-002-00 SALMAAN ISHFAQ AHMED
Admin Building @ ju'aymah shops, plant N-26.

Geo Grid installation below Base Course above Tele Comm. Duct Bank 25
3131 C-2343 linear west side of New Admin Building (Continuation) @ ju'aymah shops, ADMIN BUILDING 29-Mar-18 2:05 PM 31-Mar-18 7:30 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26.

Base Course Material Fill Placement above Tele Comm Duct Bank 25
3132 C-2344 linear west side of New Admin Building (Continuation) @ ju'aymah shops, ADMIN BUILDING 29-Mar-18 10:10 AM 31-Mar-18 8:45 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26.

Base Course Material FDT inspection above Tele Comm. Duct Bank 25
3133 C-2345 linear west side of New Admin Building (Continuation) @ ju'aymah shops, ADMIN BUILDING 29-Mar-18 2:15 PM 31-Mar-18 9:00 AM RA-819517-002-0F2 SALMAAN ISHFAQ AHMED
plant N-26.

Concrete Testing, Sampling and Casting inspection for Parapet Wall of


3134 C-2346 Stair Case Room Grid line 1 to 2 & B to C, upper Roof, New Admin Building ADMIN BUILDING 29-Mar-18 10:20 AM 1-Apr-18 9:15 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
@ ju'aymah shops. Plant N-26.

Compaction Testing (FDT) inspection of Sub grade for MV Electrical Cable


3135 C-2347 Trench 152.0 Linear Meter (Direct Buried) S tarting from New Substation ADMIN BUILDING 29-Mar-18 2:25 PM 31-Mar-18 2:30 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Building to Point # 18 @ Ju'aymah shops. Plant N-26.

3136 C-2348 Asphalt Pavement Tack Coating Inspection in New Parking Area at Grid CAR PARKING 29-Mar-18 12:50 PM 31-Mar-18 2:15 PM RA-819946-001-00 ACIELO ISHFAQ AHMED
Line (1 to 4 ) and (A to I ) at Juaymah Shops Plant N-26

Materials Receiving Visual Inspection for MV Cables - 1C X 240 mm2 20KV


3137 E-0297 Cu/TR-XLPE/LAT/AAWA/PVC-FROR (On Cable Reel - 43EA 37,458 Mtrs; at PLANT N-26 29-Mar-18 2:30 PM 31-Mar-18 10:00 AM RA-819924-001-0F1 FILBERT DAMIAN ABAA
ETE Laydown Yard Area, Ju’aymah Shop Plant N26 as per attached
documents

Visual Inspection for Continuity & Insulation Resistance Testing (On Cable
3138 E-0298 Reel) of MV Cables 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- PLANT N-26 29-Mar-18 2:35 PM 31-Mar-18 1:00 PM RA-819924-001-0F1 FILBERT DAMIAN ABAA
FROR (27EA Drums) at ETE Laydown Yard Area, Ju’aymah Shop Plant N26
as per attached documents.
Materials Receiving Visual Inspection for LV Cables Armored Type (On
Cable Reel - 2 EA) as follows: 1) Cu/XLPE/SWA/PVC(FR-OR) 1KV 3CX500
3139 E-0299 mm2 SM (DRUM NO. 13255839 @ 508 Mtrs ); and 2) PLANT N-26 29-Mar-18 2:40 PM 31-Mar-18 9:00 AM RA-819924-001-0F1 FILBERT ALI M. AL YASEEN
Cu/XLPE/SWA/PVC(F R-OR) 1KV 3CX500 mm2 SM (DRUM NO. 13256115
@ 505 Mtrs ) at ETE Laydown Yard Area, Ju’aymah Shop Plant N26 as per
attached documents.
Tack Coat Receiving Testing and application for Trenches (Reinstatement)
(1)above Raw & Portable Water Line Trench (73 LM) from Work shop
3140 C-2349 building To Chemical Storage Area.(2) above Raw water, potable water, BACK LOG 29-Mar-18 4:00 PM 31-Mar-18 8:30 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Sewer line and Telecom Duct Bank (all 3 in one trench) in front of Backlog
Building Ju'Aymah shops. Plant # N-26.
Tack Coat Receiving Testing and application for Trenches (Reinstatement)
(1) Telecomm Duct Bank 72 LM, South Side from Pedestal JY-347 to
3141 C-2350 Existing Manhole S outh side of New Admin Building.(2) above Tele Comm ADMIN BUILDING 29-Mar-18 4:05 PM 31-Mar-18 8:45 AM RA-819439-001-00 SALMAAN ISHFAQ AHMED
Duct Bank 70 linear meter between Existing Admin Building and Existing
Conference Hall South side of New Admin Building Ju'Aymah shops. Plant
# N-26.
Tack Coat Receiving Testing and application for Trenches (Reinstatement)
3142 C-2351 (1) above PSA Duct Bank 21 linear meter between MTM Building and ADMIN BUILDING 29-Mar-18 4:08 PM 31-Mar-18 9:30 AM RA-819439-001-00 SALMAAN ISHFAQ AHMED
Welding workshop. (2) above Electrical LV Cable Trench 60 Liner Meter
South East side of New Admin Building Ju'Aymah shops. Plant # N-26.
Asphalt Concrete (Wearing Course) Receiving Testing, Sampling Placing,
Leveling and Compacting for Trenches (Reinstatement) (1)above Raw &
3143 C-2352 Portable Water Line Trench (73 LM) from Work shop building To Chemical BACK LOG 29-Mar-18 4:10 PM 31-Mar-18 1:00 PM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Storage Area.(2) above Raw water, potable water, Sewer line and Telecom
Duct Bank (all 3 in one trench) in front of Back log Building Ju'Aymah
shops. Plant
Asphalt # N-26.
Concrete (Wearing Course) Receiving Testing, Sampling Placing,
Leveling and Compacting for Trenches (Reinstatement) (1) Telecomm
3144 C-2353 Duct Bank 72 LM, South Side from Pedestal JY-347 to Existing Manhole ADMIN BUILDING 29-Mar-18 4:12 PM 31-Mar-18 1:30 PM RA-819439-001-00 SALMAAN ISHFAQ AHMED
South side of New Admin Building.(2) above Tele Comm Duct Bank 70
linear meter between Existing Admin Building and Existing Conference
Hall South side of New Admin Building J u'Aymah shops. Plant # N-26.
Asphalt Concrete (Wearing Course) Receiving Testing, Sampling Placing,
Leveling and Compacting for Trenches (Reinstatement) (1) above PSA
3145 C-2354 Duct Bank 21 linear meter between MTM Building and Welding ADMIN BUILDING 29-Mar-18 4:15 PM 31-Mar-18 2:00 PM RA-819439-001-00 SALMAAN ISHFAQ AHMED
workshop. (2) above Electrical LV Cable Trench 60 Liner Meter South East
side of New Admin Building Ju'Aymah shops. Plant # N-26.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3146 C-2355 Inspection of 2000 PSi for Tele Com. Duct Bank 72 LM, South Side f rom GULF 31-Mar-18 11:30 AM 1-Apr-18 2:00 PM RA-819517-01-0F3 QUADRI ISHFAQ AHMED
Pedestal JY-347 to Exiisting Manhole New Admin Building at Ju'Aymah
Shops, Plant N-26 @ Gulf Consult
Cement Based Non-S hrink Grout Surface Preparation, Soaking & Final
Formwork Inspection Prior to Grouting for New Substation Building
bottom side of Pre-Cast Wall Panels. Panels Mark SS-WIG-02E, SS-WIG-
3147 C-2356 17, SS-WIG-02G, SS-WIG-16, SS- WIG-12, SS-WIG-11, SS-WIG-10, S S-WIG- NEW SUB STATION 31-Mar-18 1:30 PM 1-Apr-18 8:15 AM 0016-ER-002-1-10 SALMAAN ISHFAQ AHMED
09,SS- WIG-08, SS-WIG-02, SS-WIG-02D, SS-WG-01, SS-WG-02, SS-WG-08,
SS-WG-04,
Cement SS-WG-05,
Based Non-S SS-WG-10, SS-WG-06, SS-WG-07, S S-WIG-02A, SS-
WG-08,
Curing SS-WG-09
and (22hrink
Final Inspection
Grout
panels). at Mixing,
for NewJu'AymahTesting,
Shops,
Substation
Sampling,
Plant N-
Building
Placement,
26
bottom side of
Pre-Cast Wall Panels. Panels Mark SS-WIG-02E, S S-WIG-17, SS-WIG-02G,
3148 C-2357 SS-WIG-16, SS-WIG-12, SS -WIG-11, SS-WIG-10, SS-WIG-09,SS-WIG-08, SS- NEW SUB STATION 31-Mar-18 1:35 PM 1-Apr-18 8:30 AM 0016-ER-002-1-10 SALMAAN ISHFAQ AHMED
WIG-02, SS-WIG- 02D, SS-WG-01, SS-WG-02, SS-WG-08, SS-WG-04, SS-
WG-05, SS-WG-10, SS-WG-06, SS-WG-07, S S-WIG-02A, SS-WG-08, SS-WG-
09 (22 panels). at Ju'Aymah Shops, Plant N-26
Fill Placement & Compaction Inspection of 1st Layer Selectfill Material
3149 C-2358 around Gantry Crane Foundation at Grid Line 1, Shipping & Receiving Area SHIPPING & RECEIVING 31-Mar-18 1:40 PM 1-Apr-18 9:30 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
Ju'Aymah Shops Plant N-26 AREA

FDT Compaction Inspection of 1st Layer S electfill Material around Gantry SHIPPING & RECEIVING
3150 C-2359 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah 31-Mar-18 1:45 PM 1-Apr-18 9:45 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26 AREA

FDT Compaction Inspection of 2nd Layer Selectfill Material around Gantry SHIPPING & RECEIVING
3151 C-2360 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah 31-Mar-18 1:50 PM 1-Apr-18 3:30 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26 AREA

Pre-cast Pre Concreting Inspection (Molding/Formworks) for Admin


3152 C-2361 Building Roof Floor Panels PM-A-12B, CIR-A-04, PM-A-23, CM-A-02A, CIR- INCO 31-Mar-18 3:00 PM 1-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-05, CR-A-05AH, CR-A-05A, SC-A-01A, SC-A-01 (2Nos.), S B-A-01 (Total 11
Nos.) at INCO Pre-Cast Fabrication Yard
Pre-cast Pre Concreting Inspection (Rebars, Embedded Items &
Molding/Formwork Closure) for Admin Building Roof Floor Panels PM-A-
3153 C-2362 12B, CIR-A-04, PM-A-23, CM-A-02A, CIR-A-05, CR-A-05AH, CR-A-05A, SC- INCO 31-Mar-18 3:05 PM 1-Apr-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-01A, SC-A-01 (2Nos.), SB-A-01 (Total 11 Nos.) at INCO Pre- Cast
Fabrication Yard
Pre-cast 1st Layer Concrete Placement, Sampling, and Testing Inspection
3154 C-2363 for Admin Building Roof Floor Panels PM-A-12B, CIR-A-04, PM-A-23, CM- INCO 31-Mar-18 3:10 PM 1-Apr-18 11:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-02A, CIR-A-05, CR-A-05AH, CR-A-05A, SC-A-01A, SC-A-01 (2Nos.), SB-A-
01 (Total 11 Nos.) at INCO Pre-Cast Fabrication Yard

Pre-cast 2nd Layer Concrete Placement, Sampling, and Testing Inspection


3155 C-2364 for Admin Building Roof Floor Panels PM-A-12B, CIR-A-04, PM-A-23, CM- INCO 31-Mar-18 3:15 PM 1-Apr-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-02A, CIR-A-05, CR-A-05AH, CR-A-05A, SC-A-01A, SC-A-01 (2Nos.), SB-A-
01 (Total 11 Nos.) at INCO Pre-Cast Fabrication Yard

Pre-cast Pre Concreting Inspection (Molding/Formworks) for Admin


3156 C-2365 Building Roof Floor Panels Mark PR-A-05 (Total 1 No.) at INCO Pre-Cast INCO 31-Mar-18 3:20 PM 1-Apr-18 2:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Fabrication Yard

Pre-cast Pre Concreting Inspection (Rebars, Embedded Items &


3157 C-2366 Molding/Formwork Closure) for Admin Building Roof Floor Panels Mark INCO 31-Mar-18 3:17 PM 1-Apr-18 2:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
PR-A-05 (Total 1 No.) at INCO Pre-Cast Fabrication Yard

Pre-cast 1st Layer Concrete Placement, Sampling, and Testing Inspection


3158 C-2367 for Admin Building Roof Floor Panels Mark PR-A-05 (Total 1 No.) at INCO INCO 31-Mar-18 3:20 PM 1-Apr-18 2:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Pre-Cast Fabrication Yard

Pre-cast 2nd Layer Concrete Placement, Sampling, and Testing Inspection


3159 C-2368 for Admin Building Roof Floor Panels Mark PR-A-05 (Total 1 No.) at INCO INCO 31-Mar-18 3:25 PM 1-Apr-18 4:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Pre-Cast Fabrication Yard

Inspection Level: Contractor-I, Saudi Aramco-S . ETE-ITP- ST-01 / S AIC M-


3160 ST-W-0045 2012. Visual Inspection after Welding for joints on 4 panels and 2 T-Slabs NEW SUB STATION 31-Mar-18 3:30 PM 1-Apr-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
SS-DTS-01A, 02A, SS-WIG-02B, 02F, 13 & 15 (check attached drawings). @
Substation building, Juaymah Shops, Plant N26

Visual Inspection of Direct Buried Cable Trench (125 Linear Meters) Prior
3161 E-0300 to Cable Laying of Direct Buried MV Power Cables & Control Cables from NEW SUB STATION 31-Mar-18 3:35 PM 1-Apr-18 9:30 AM RA-819460-002-0F2 FILBERT DAMIAN ABAA
South Side of New Substation Bldg. to Point # 18 at Ju’Aymah Shop Plant
N26 As per Attached Highlighted Drawing.

Visual Inspection for Continuity & Insulation Resistance Testing (On Cable
3162 E-0301 Reel) of MV Cables 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- PLANT N-26 31-Mar-18 3:37 PM 1-Apr-18 11:00 AM RA-819294-001-0F1 FILBERT DAMIAN ABAA
FROR (21 EA Drums) at ETE Laydown Yard Area, Ju’Aymah Shop Plant
N26 as per attached documents

Visual Inspection of Excavation & Trenching for Conduit Trench (LPDB-1 &
3163 E-0302 LPDB-2) prior to Installation of 4" Dia. Direct Buried PVC Conduits for SHIPPING & RECEIVING 31-Mar-18 3:40 PM 1-Apr-18 8:00 AM RA-819463-001-00 FILBERT ALI M. AL YASEEN
Area/Road Lighting at South Side of S unshade Shipping & Receiving Area, AREA
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection of Installation of 4" Dia. Direct Buried PVC Conduits Prior
to Cable Pulling of LV Direct Buried Cables at Conduit Trench (LPDB-1 & SHIPPING & RECEIVING
3164 E-303 LPDB-2) for Area/Road Lighting at South Side of Sunshade Shipping & 31-Mar-18 3:42 PM 1-Apr-18 2:30 PM RA-819463-001-00 FILBERT ALI M. AL YASEEN
Receiving Area, Ju’aymah Shop Plant N26 as per Attached Highlighted AREA
Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed Mounted Normal/Emergency Lightings with Circuit
3165 E-304 Nos. 01, 04, 05, 13, 20, 21 & 22 (N26-2118-LP-031) at Room/Area Nos. ADMIN BUILDING 31-Mar-18 3:45 PM 1-Apr-18 3:00 PM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
117, 112, 108, 109, 110, 146 & 141 Inside 1st Floor of New Admin Bldg.,
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed Mounted Normal/Emergency Lightings with Circuit Nos. 01, 04,
3166 E-305 05, 13, 20, 21 & 22 (N26-2118- LP-031) at Room/Area Nos. 117, 112, 108, ADMIN BUILDING 31-Mar-18 3:50 PM 1-Apr-18 3:15 PM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
109, 110, 146 & 141 Inside 1st Floor of New Admin Bldg., Ju’aymah S hop
Plant N26 as per Attached Highlighted Drawing.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3167 C-2369 Inspection of 2000 PSi for Lean Concrete Prior to Curb Stone at Grid Line 2 GULF 1-Apr-18 11:00 AM 2-Apr-18 10:30 AM RA-819946-001-00 QUADRI ISHFAQ AHMED
(A to I) New Car Parking Area at J u'Aymah Shops, Plant N-26 @ Gulf
Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3168 C-2370 Inspection of 4000 PSi for Screed Concete at 1st F loor of New Admin GULF 1-Apr-18 11:05 AM 2-Apr-18 10:45 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Building , Grid Line 8 to12 and C to F at Ju'Aymah Shops Plant N-26 @
Gulf Consult
Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin
Building Roof Floor Panels (Panel Mark SB-A-01(2 Nos.), PM-A-23A, PR-A-
3169 C-2371 06, PM- A-23H, SS-A-01A, CM-A-01A, CM-A-02 (2 Nos.), CY-A-02 (2 Nos.), INCO 1-Apr-18 11:10 AM 2-Apr-18 1:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
CY-A-04 (2 Nos.) (Total 13 Nos.) at Inco Pre- Cast Fabricartion Yard @
Ju'aymah Shops Plant N-26
Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /
Formwork Closure) for Admin Building Roof Floor Panels (Panel Mark SB-
3170 C-2372 A-01(2 Nos.), PM-A-23A, PR-A-06, PM-A-23H, SS-A-01A, CM-A-01A, CM- INCO 1-Apr-18 11:15 AM 2-Apr-18 1:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-02 (2 Nos.), CY-A-02 (2 Nos.), CY-A-04 (2 Nos.) (Total 13 Nos.) at Inco
Pre-Cast Fabricartion Yard @ Ju'aymah S hops Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st
Layer for Admin Building Roof Floor Panels (Panel Mark S B-A-01(2 Nos.),
3171 C-2373 PM-A-23A, PR-A-06, PM-A-23H, SS-A-01A, CM-A-01A, CM-A-02 (2 Nos.), INCO 1-Apr-18 11:18 AM 2-Apr-18 1:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
CY-A-02 (2 Nos.), CY-A-04 (2 Nos.) (Total 13 Nos.) at Inco Pre-Cast
Fabricartion Yard @ Ju'aymah Shops Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd
Layer for Admin Building Roof Floor Panels (Panel Mark S B-A-01(2 Nos.),
3172 C-2374 PM-A-23A, PR-A-06, PM-A-23H, SS-A-01A, CM-A-01A, CM-A-02 (2 Nos.), INCO 1-Apr-18 11:20 AM 2-Apr-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
CY-A-02 (2 Nos.), CY-A-04 (2 Nos.) (Total 13 Nos.) at Inco Pre-Cast
Fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


3173 C-2375 Building Roof Floor Panels (Panel Mark PR-A-05A, CM-A-03) (Total 2 Nos.) INCO 1-Apr-18 11:25 AM 2-Apr-18 4:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


3174 C-2376 Formwork Closure) for Admin Building Roof Floor Panels (Panel Mark PR- INCO 1-Apr-18 11:27 AM 2-Apr-18 4:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-05A, CM-A-03) (Total 2 Nos.) at Inco Pre-Cast Fabricartion Yard @
Ju'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


3175 C-2377 Layer for Admin Building Roof Floor Panels (Panel Mark PR-A-05A, CM-A- INCO 1-Apr-18 11:30 AM 2-Apr-18 4:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
03) (Total 2 Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops
Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


3176 C-2378 Layer for Admin Building Roof Floor Panels (Panel Mark PR-A-05A, CM-A- INCO 1-Apr-18 11:35 AM 2-Apr-18 5:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
03) (Total 2 Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops
Plant N-26

Asphalt Concrete Receiving,Placement and Testing inspection of Wearing


3177 C-2379 course in New Parking area at gridline (1-4)(A-I) at Juaymah Shops Plant CAR PARKING 1-Apr-18 4:00 PM 2-Apr-18 11:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
N-26

Visual Inspection after welding for joints on 2 Wall Panels S S-WIG-02B &
3178 ST-W-0046 01. (check attached drawing) @ Substation Building, Ju'aymah Shops, NEW SUB STATION 1-Apr-18 4:05 PM 2-Apr-18 11:00 AM RA-819885-001-00 OMAR M. HASSAN
Plant N26.

Visual Inspection after welding for joints on 4 Wall Panels S S-WIG-02C, 04,
3179 ST-W-0047 21 & 20, 3 T-Slabs SS-DT-02A-2, 02A-3 & 02A-4 (check attached drawing) NEW SUB STATION 1-Apr-18 4:07 PM 2-Apr-18 1:00 PM RA-819885-001-00 OMAR M. HASSAN
@ S ubstation Building, Ju'aymah S hops, Plant N26.

Visual Inspection after welding for joints on 6 Wall Panels S S-WIG-03, 04,
3180 ST-W-0048 02C,05, 06, & 07.(check attached drawing) @ Substation Building, NEW SUB STATION 1-Apr-18 4:10 PM 2-Apr-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Visual Inspection for Continuity & Insulation Resistance Testing (On Cable
3181 E-0306 Reel) of MV Cables 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC- PLANT N-26 1-Apr-18 4:00 PM 2-Apr-18 10:00 AM RA-819294-001-0F1 FILBERT DAMIAN ABAA
FROR (27 EA Drums) at ETE Laydown Yard Area, Ju’Aymah Shop Plant N26
as per attached documents.
Visual Inspection of Final Backfilling & Installation of Protective Red
Concrete Tiles & Safety Warning Tape for 4" Dia. Direct Buried PVC
3182 E-0307 Conduits Prior to Cable Pulling at Conduit Trench (LPDB-1 & LPDB- 2) for SHIPPING & RECEIVING 1-Apr-18 4:02 PM 2-Apr-18 9:30 AM RA-819460-001-00 FILBERT ALI M. AL YASEEN
AREA
Area/Road Lighting at South Side of S unshade Shipping & Receiving Area,
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection of Excavation & Trenching (Before Cable Laying) for Main
3183 E-0308 Grounding Grid Conductor (120 mm² Insulated Grounding Conductor) at ADMIN BUILDING 1-Apr-18 4:05 PM 2-Apr-18 2:00 PM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
West Side of New Admin Building (Near Grid Line 8 to 12), Ju'aymah
Shops Plant N-26, As per attached Highlighted Drawing.

Visual inspection for Laying of 120 mm² Insulated Grounding Conductor


3184 E-0309 for Main Grounding Grid at West Side of New Admin Building (Near Grid ADMIN BUILDING 1-Apr-18 4:07 PM 2-Apr-18 2:15 PM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
Line 8 to 12), As per attached Highlighted Drawing.

Visual Inspection for Installation of 16mm Dia. X 2.4 mtrs Copper


3185 E-0310 Grounding Rod (1 EA) at West Side of New Admin Building (Near Grid Line ADMIN BUILDING 1-Apr-18 4:10 PM 2-Apr-18 2:30 PM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
12), Ju'aymah Shops Plant N-26, As per attached Highlighted Drawing.

Visual Inspection of (1 EA) Individual Grounding Rod Resistance Testing for


3186 E-0311 Main Grounding Grid at West Side of New Admin Building (Near Grid Line ADMIN BUILDING 1-Apr-18 4:12 PM 2-Apr-18 2:45 PM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
12), Ju'aymah Shops Plant N-26, As per attached Highlighted Drawing.

Visual Inspection for Below Grade Exothermic (Thermite) Welding


3187 E-0312 Connections of 120mm2 to 120 mm² Insulated Grounding Conductors at ADMIN BUILDING 1-Apr-18 4:15 PM 2-Apr-18 3:00 PM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
West Side of New Admin Building (Near Grid Line 8 to 9), Ju'aymah Shops
Plant N-26, as per Attached Highlighted Drawing.

Formwork Inspection for Transformer Foundations (2 nos), # XFR-1 &


3188 C-2380 XF R-2 at Transformer Yard, New Substation Building at ju'aymah shops. NEW SUB STATION 2-Apr-18 8:30 AM 3-Apr-18 8:00 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Plant # N-26.

FBE Rebars, Embedd Items and Formwork Closure for Transformer


3189 C-2381 Foundations (2 nos), # XFR-1 & XFR-2 at Transformer Yard, New NEW SUB STATION 2-Apr-18 8:35 AM 3-Apr-18 9:30 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Substation Building at ju'aymah shops. Plant # N-26.

Concrete Testing, sampling and casting inspection for Transformer


3190 C-2382 Foundations (2 nos), # XFR-1 & XFR-2 at Transformer Yard, New NEW SUB STATION 2-Apr-18 8:40 AM 3-Apr-18 1:00 PM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Substation Building at ju'aymah shops. Plant # N-26.

FDT Compaction Inspection of 3rd Layer Selectfill Material around Gantry


3191 C-2383 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah SHIPPING & RECEIVING 2-Apr-18 10:00 AM 3-Apr-18 8:30 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
AREA
Shops Plant N-26

FDT Compaction Inspection of 4th Layer Selectfill Material around Gantry


3192 C-2384 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah SHIPPING & RECEIVING 2-Apr-18 10:05 AM 3-Apr-18 3:30 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
AREA
Shops Plant N-26

Cast in place Concrete Formwork inspection for Parapet of Upper Roof of


3193 C-2385 Stair Case Rooms (East and South Sides) Grid lne 6 to 7 @ GL. A (East side ADMIN BUILDING 2-Apr-18 1:45 PM 3-Apr-18 9:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Stair Case) & C to E & 11 to 12, (south side) upper Roof, New Admin
Building.

FBE Rebars Embedded items and formwork closure inspection for Parapet
3194 C-2386 of Upper Roof of Stair Case Rooms (East and South Sides) Grid lne 6 to 7 ADMIN BUILDING 2-Apr-18 1:50 PM 3-Apr-18 2:00 PM RA-819729-001-00 SALMAAN ISHFAQ AHMED
@ GL. A (East side Stair Case) & C to E & 11 to 12, (south side) upper Roof,
New Admin Building.

Concrete Testing, Sampling and Casting inspection for Parapet of Upper


3195 C-2387 Roof of Stair Case Rooms (East and South Sides) Grid lne 6 to 7 @ GL. A ADMIN BUILDING 3-Apr-18 1:55 PM 4-Apr-18 8:00 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
(East side Stair Case) & C to E & 11 to 12, (south side) upper Roof, New
Admin Building.

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
3196 C-2388 Building Building Roof Floor panel (Panel Mark CIR-A- 02,CR-A-03,PM-A- INCO 2-Apr-18 3:05 PM 3-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
26,PM- A-27,PM-A-27A,CR-A-02, CIR-A-01) At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3197 C-2389 Inspection of 4000 PSi for Concete (Screed) at 1st floor of New Admin INCO 2-Apr-18 3:10 PM 3-Apr-18 10:45 AM RA-819722-001-0F4 QUADRI MAMDOOH
Building @ G.L 8 to 5 and B to E ju'aymah 'Shops, Plant N-26 @ Gulf
Consult

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


3198 C-2390 Building Roof Floor Panels (Panel Mark PR-A-05AH, CM-A-04,CM-A-01, INCO 3-Apr-18 3:12 PM 4-Apr-18 3:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
CM-A-01, PR-A-06A, CY-A-01A, CY-A-01A, CY-A-01A, SS-A-01 (Total 09
Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /
Formwork Closure) for Admin Building Roof Floor Panels (Panel Mark PR-
3199 C-2391 A-05AH, CM-A-04,CM-A-01, CM-A-01, PR-A-06A, CY-A-01A, CY-A-01A, CY- INCO 3-Apr-18 3:15 PM 4-Apr-18 3:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-01A, SS-A-01 (Total 09 Nos.) at Inco Pre-Cast Fabricartion Yard @
Ju'aymah Shops Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st
Layer for Admin Building Roof Floor Panels (Panel Mark PR-A-05AH, CM-
3200 C-2392 A-04,CM-A-01, CM-A-01, PR-A-06A, CY-A-01A, CY-A-01A, CY-A-01A, SS-A- INCO 3-Apr-18 3:20 PM 4-Apr-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01 (Total 09 Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah S hops
Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd
Layer for Admin Building Roof Floor Panels (Panel Mark PR-A-05AH, CM-
3201 C-2393 A-04,CM-A-01, CM-A-01, PR-A-06A, CY-A-01A, CY-A-01A, CY-A-01A, SS-A- INCO 3-Apr-18 3:22 PM 4-Apr-18 5:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01 (Total 09 Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah S hops
Plant N-26
Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin
Building Roof Floor Panels (Panel Mark CM-A-02(2NOS),CM-A-01,CY-A-
3202 C-2394 01B, CY-A-06,CY-A-06A,CR-A-05,CIR-A-06 (Total 08 Nos.) at Inco Pre-Cast INCO 2-Apr-18 3:25 PM 3-Apr-18 1:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /


Formwork Closure for Admin Building Roof Floor Panels (Panel Mark CM-
3203 C-2395 A-02(2NOS),CM-A-01,CY-A-01B, CY-A-06,CY-A-06A,CR-A-05,CIR-A-06 (Total INCO 2-Apr-18 3:27 PM 3-Apr-18 1:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
08 Nos.) at Inco Pre-Cast Fabricartion Yard @ J u'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st


Layer for Admin Building Roof Floor Panels (Panel Mark CM-A-
3204 C-2396 02(2NOS),CM-A-01,CY-A-01B, CY-A-06,CY-A-06A,CR- A-05,CIR- A-06 (Total INCO 2-Apr-18 3:30 PM 3-Apr-18 1:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
08 Nos.) at Inco Pre-Cast Fabricartion Yard @ J u'aymah Shops Plant N-26

Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd


Layer for Admin Building Roof Floor Panels (Panel Mark CM-A-
3205 C-2397 02(2NOS),CM-A-01,CY-A-01B, CY-A-06,CY-A-06A,CR- A-05,CIR- A-06 (Total INCO 2-Apr-18 3:32 PM 3-Apr-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
08 Nos.) at Inco Pre-Cast Fabricartion Yard @ J u'aymah Shops Plant N-26
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed Mounted Normal/Emergency Lightings with Circuit
3206 E-0313 Nos. 02, 03, 06, 23 & 24 (N26-2118-LP-031) at Room/Area Nos. 105, 144, ADMIN BUILDING 2-Apr-18 4:10 PM 3-Apr-18 2:00 PM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
145, 104, 106, 142, 143 & 141, Inside 1st Floor of New Admin Bldg.,
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed Mounted Normal/Emergency Lightings with Circuit Nos. 02, 03,
3207 E-0314 06, 23 & 24 (N26-2118-LP-031) at Room/Area Nos. 105, 144, 145, 104, ADMIN BUILDING 2-Apr-18 4:15 PM 3-Apr-18 2:30 PM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
106, 142, 143 & 141, Inside 1st Floor of New Admin Bldg., Ju’aymah Shop
Plant N26 as per Attached Highlighted Drawing.

Visual Inspection after welding for joints on 4 Wall Panels S S-WIG-19, 18,
3208 ST-W-0049 06 & 07, 3 T-Slabs SS-DT-02A-5, 02A-6 & 03 (check attached drawing) @ NEW SUB STATION 2-Apr-18 4:10 PM 3-Apr-18 2:00 PM RA-819885-001-00 OMAR M. HASSAN
Substation Building, Ju'aymah Shops, Plant N26.

Visual Inspection after welding for joints on 8 Wall Panels S S-WIG-23, 02F,
3209 ST-W-0050 22, 21, 20H, 20, 19 & 18 (check attached drawing) @ Substation Building, NEW SUB STATION 2-Apr-18 4:15 PM 3-Apr-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

FDT Compaction Inspection of 5th Layer Selectfill Material around Gantry SHIPPING & RECEIVING
3210 C-2398 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah 3-Apr-18 11:00 AM 4-Apr-18 11:30 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26 AREA

Fill placement and compaction inspection of 1st & final layer selectfill
3211 C-2399 material for Electrical Direct buried pvc conduit of lighting pole (48m SHIPPING & RECEIVING 3-Apr-18 11:05 AM 4-Apr-18 8:30 AM RA-819463-001-00 ACIELO ISHFAQ AHMED not in QMIS
length) southside of Shipping and Receiving area Juaymah Shops plant N- AREA
26

FDT Compaction Inspection of 1st & final layer selectfill material for SHIPPING & RECEIVING
3212 C-2400 Electrical Direct buried pvc conduit of lighting pole (48m length) southside 3-Apr-18 11:10 AM 4-Apr-18 8:45 AM RA-819463-001-00 ACIELO ISHFAQ AHMED
of Shipping and Receiving area Juaymah Shops plant N-26 AREA

Compaction Testing (FDT) inspection of Sub grade for MV Electrical Cable


3213 C-2401 Trench 100.0 Linear Meter (Direct Buried) between Duct Banks 9 and 11 WORK SHOP 3-Apr-18 1:05 PM 4-Apr-18 8:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
west side of New Workshop Area @ Ju'aymah' Shops Plant N-26
Material Receiving,Handling Storage and Preservation Inspection of
Plastering Accessories 1. Plaster Stop 16MM x 3.0 Meter(QTY=160 PCS) ,
2.Control Joint Bead 13 MM x 3.0 Meter(QTY=228 PCS), 3.Metal Lath 0.6 x
3214 C-2402 2.5 Meter 0.61 KG/M2 (QTY=1025 Sheets), 4. Angle Bead 70 x 70 MM x PLANT N-26 3-Apr-18 1:10 PM 4-Apr-18 9:00 AM RA-819745-001-00 BAQAR ISHFAQ AHMED
3.0 Meter (QTY=160 PCS) for Admin Building (P.O # 25121)From A.A Turki
Corporation (ATCO) At ETE Store,Laydown Area @ JuAymah,Shops Plant
N-26
Material Receiving Inspection of Non-Shrink Grout 25 Kg Packing
3215 C-2403 (QTY=200 = Bags ) for Granty Crane Foundations Shipping and Receiving PLANT N-26 3-Apr-18 1:15 PM 4-Apr-18 10:00 AM RA-819991-002-0F2 BAQAR ISHFAQ AHMED
area From CIC (P.O # 31335) At ETE Store Laydown Area @ Ju'aymah
Shops Plant N-26

Gypsum Board (Type A2 and 5B) Framing and Pre- Installation Inspection
3216 C-2404 for 6nos. False Column @ Grid Line 3 to 10 and along with G/L B toward C, ADMIN BUILDING 3-Apr-18 1:20 PM 4-Apr-18 10:15 AM RA-819745-002-00 SALMAAN ISHFAQ AHMED
First Floor at New Admin Building @ ju'aymah shops, plant N- 26.

Cast in place Concrete Formwork Inspection for 8nos. Lental Beams for
3217 C-2405 (Doors) Room # 208 D5, Room # 212 D4A & D4, Room # 219 D5, Room # ADMIN BUILDING 3-Apr-18 1:25 PM 4-Apr-18 8:00 AM RA-819746-001-00 SALMAAN ISHFAQ AHMED
220 D7, Room # 221 D5, Room # 226 D5 and Room # 230 D4 Second
Floor, New Admin Building.

FBE Rebars, Embedded Items and Formwork inspection for 8nos. Lental
3218 C-2406 Beams for (Doors) Room # 208 D5, Room # 212 D4A & D4 Room # 219 ADMIN BUILDING 3-Apr-18 1:30 PM 4-Apr-18 8:15 AM RA-819746-001-00 SALMAAN ISHFAQ AHMED
D5, Room # 220 D7, Room # 221 D5, Room # 226 D5 and Room # 230 D4
Second Floor, New Admin Building.

Concrete Testing, Sampling and Casting inspection for 8nos. Lental Beams
3219 C-2407 for (Doors) Room # 208 D5, Room # 212 D4A & D4 Room # 219 D5, Room ADMIN BUILDING 3-Apr-18 1:35 PM 4-Apr-18 9:30 AM RA-819746-001-00 SALMAAN ISHFAQ AHMED
# 220 D7, Room # 221 D5, Room # 226 D5 and Room # 230 D4 Second
Floor, New Admin Building.

Cement Based Non-S hrink Grout Surface Preparation, Soaking & Final
3220 C-2408 Formwork Inspection Prior to Grouting for New Admin Building bottom ADMIN BUILDING 3-Apr-18 1:40 PM 4-Apr-18 8:00 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
sides, Plates of Pre-Cast Wall Panels. (All Panels) 2nd Floor. at ju'aymah
shops, plant N-26

Cement Based Non-S hrink Grout Mixing, Testing, Sampling and Placing
3221 C-2409 Inspection for New Admin Building bottom sides, Plates of Pre-Cast Wall ADMIN BUILDING 3-Apr-18 1:45 PM 4-Apr-18 9:00 AM 0016-A-ER-002-1-5 SALMAAN ISHFAQ AHMED
Panels. (All Panels) 2nd Floor. at ju'aymah shops, plant N-26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
3222 C-2410 Building Building Roof Floor panel (Panel Mark PR-A-05H,PM-A-28,PM-A- INCO 3-Apr-18 1:50 PM 4-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
27B,PM-A-26A,CR-A-04, CIR-A- 01A,CY-A-01A, CY-A-02,CY-A-01(3NOS) At
Inco Pre-Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3223 C-2411 Inspection of 2000 PSi for Lean Concrete prior to install Curb stones. @ GULF 3-Apr-18 1:55 PM 4-Apr-18 10:45 AM RA-819946-001-00 QUADRI ISHFAQ AHMED
Grid line. @ Grid line 1 (A to I) New Car Parking S had at, ju'aymah shops,
plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3224 C-2412 Inspection of 2000 PSi for PSA Duct Bank, 21 linerar meter between GULF 3-Apr-18 2:00 PM 4-Apr-18 11:00 AM RA-819460-002-0F2 QUADRI ISHFAQ AHMED
MTM Buildig and Welding workshop at, ju'aymah shops, plant N-26 @
Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3225 C-2413 Inspection of 4000 PSi for Concete (Screed) at 1st floor of New Admin GULF 3-Apr-18 2:05 PM 4-Apr-18 11:15 AM RA-819722-001-0F4 QUADRI ISHFAQ AHMED
Building @ G.L 1 to 5 and A to F at, ju'ay mah shops, plant N-26 @ Gulf
Consult

Visual Inspection for Installation of Outdoor Type Junction Box


3226 E-0315 (Guat/Guax) for Wall Mounted Outdoor Lightings with Circuit Nos. 02 & SHIPPING & RECEIVING 3-Apr-18 2:10 PM 4-Apr-18 9:00 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
04 (N26-2118-LP-041) at Sunshade Shipping & Receiving Area, Ju’aymah AREA
Shop Plant N26 as per Attached Highlighted Drawing.

Visual Inspection for Installation of Above Ground PVC Coated GRS


3227 E-0316 Conduits & Fittings for Wall Mounted Outdoor Lightings with Circuit Nos. SHIPPING & RECEIVING 3-Apr-18 2:15 PM 4-Apr-18 9:15 AM RA-819981-001-00 FILBERT ALI M. AL YASEEN
02 & 04 (N26- 2118-LP-041) at Sunshade Shipping & Receiving Area, AREA
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Cable Pulling of LV Building Wires (Excluding Circuit
Homeruns & Going to Lighting Fixtures) for for Wall Mounted Outdoor SHIPPING & RECEIVING
3228 E-0317 Lightings with Circuit Nos. 02 & 04 (N26-2118-LP-041) at Sunshade 3-Apr-18 2:20 PM 4-Apr-18 2:00 PM RA-819981-001-00 FILBERT ALI M. AL YASEEN
Shipping & Receiving Area, Ju’aymah S hop Plant N26 as per Attached AREA
Highlighted Drawing.
Visual Inspection of Direct Buried Cable Trench Prior to Cable Laying of
Direct Buried MV Power Cables Direct Buried MV Power Cables & Control
3229 E-0318 Cables from East Side of New Substation Bldg. to West Side of Existing NEW SUB STATION 3-Apr-18 2:25 PM 4-Apr-18 9:30 AM RA-819460-003-0F1 FILBERT DAMIAN ABAA
Bldg. No. 2112 at Ju’Aymah Shop Plant N26 As per Attached Highlighted
Drawing.
Materials Receiving Visual Inspection of Accessories for EMT Conduits: 1)
EMT COMPRESSION COUPLING 3/4" (200 PCS); 2) EMT COMPRESSION
3230 E-0319 CONNECTOR 3/4" (1,000 PCS); 3) EMT ONE HOLE STRAP 3/4" (100 PCS); PLANT N-26 3-Apr-18 2:30 PM 4-Apr-18 2:15 PM RA-819924-001-0F1 FILBERT ALI M. AL YASEEN
4) EMT TWO HOLE STRAP 3/4" (1,500 PCS); 5) LOCK NUT 3/4" (1,500
PCS) AT ETE Laydown Yard Area, Ju’Aymah Shop Plant N26, As per
Attached Documents.
Visual Inspection of Excavation and Trenching for the Telecom Equipment
3231 T-0079 room(TER-123) Grounding sleeves Administration Building @ Upgraded Administration Building 3-Apr-18 3:00 PM 4-Apr-18 2:00 PM RA-819787-001-00 AFREEN M. Z. NAVEED
Ju'aymah Shops Plant N-26. As per Attached Highlighted Drawing.

Visual Inspection of 2-2” grounding sleeve installation for the Telecom


3232 T-0080 Equipment room(TER-123) Admin Building @ Upgraded Ju'aymah Shops Administration Building 3-Apr-18 3:00 PM 4-Apr-18 3:00 PM RA-819787-001-00 AFREEN M. Z. NAVEED
Plant N-26 as per Attached Highlighted Drawing.

Visual Inspection for Grounding cable installation of 4 AWG 2 RUN tinned


3233 T-0081 bare copper ground wire for the Telecom Equipment room(TER-123) Administration Building 3-Apr-18 3:00 PM 4-Apr-18 3:30 PM RA-819787-001-00 AFREEN M. Z. NAVEED
Administration Building @ Upgraded Ju'aymah Shops Plant N- 26. As per
Attached Highlighted Drawing.
Visual Inspection for Below Grade Exothermic (Thermite) Welding
Connections of 4AWG 2RUN tinned bare copper ground wire 120mm2 to
3234 T-0082 building grounding grid for the Telecom Equipment room(TER-123) Administration Building 3-Apr-18 3:00 PM 4-Apr-18 4:00 PM RA-819787-001-00 AFREEN M. Z. NAVEED
Administration Building @ Upgraded Ju'aymah Shops Plant N- 26. as per
Attached Highlighted Drawing.
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building Building Roof Floor panel (Panel Mark: PM-A-07A, PM-A-06, CR-
3235 C-2414 A-01A, PM-A-04A, PR-A-02, CIR-A-04A, CR-A-01B, CR-A-07 SB-A-01 (4 INCO 4-Apr-18 10:00 AM 5-Apr-18 10:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Nos.), SC-A-01 (4 Nos.) At Inco Pre-Cast fabricartion Yard @ Ju'aymah
Shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3236 C-2415 Inspection of 2000 PSi for Lean Concrete prior to install Curb stones. @ GULF 4-Apr-18 10:05 AM 5-Apr-18 11:00 AM RA-819946-001-00 QUADRI ISHFAQ AHMED
Grid line 4 (A to I) New Car Parking Shad @ ju'aymah shops, plant N-26 @
Gulf Consult

Pre-Cast & Pre Concreting Inspection (Molding / Formwork) for Admin


3237 C-2416 Building Roof Floor Panels (Panel Mark CR-A-01, CR-A-06A, CM-A-04A, INCO 4-Apr-18 10:08 AM 5-Apr-18 3:00 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
SS-A-01, SS-A-01, CR-A-06, CY-A-05, CY-A-05, SB-A-01, SC-A-01 (Total 10
Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops Plant N-26
Pre-Cast & Pre Concreting Inspection (Rebar,Embedded Item & Molding /
Formwork Closure) for Admin Building Roof Floor Panels (Panel Mark CR-
3238 C-2417 A-01, CR-A-06A, CM-A-04A, SS-A-01, SS-A-01, CR-A-06, CY-A-05, CY-A-05, INCO 4-Apr-18 10:10 AM 5-Apr-18 3:15 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
SB-A-01, SC-A-01 (Total 10 Nos.) at Inco Pre-Cast Fabricartion Yard @
Ju'aymah Shops Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 1st
Layer for Admin Building Roof Floor Panels (Panel Mark CR-A-01, CR-A-
3239 C-2418 06A, CM-A-04A, S S-A-01, SS-A-01, CR-A-06, CY-A-05, CY-A-05, SB-A-01, SC- INCO 4-Apr-18 10:15 AM 5-Apr-18 3:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-01 (Total 10 Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops
Plant N-26
Pre-Cast & Concrete Testing, Sampling and Placement Inspection 2nd
Layer for Admin Building Roof Floor Panels (Panel Mark CR-A-01, CR-A-
3240 C-2419 06A, CM-A-04A, S S-A-01, SS-A-01, CR-A-06, CY-A-05, CY-A-05, SB-A-01, SC- INCO 4-Apr-18 10:18 AM 5-Apr-18 4:30 PM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
A-01 (Total 10 Nos.) at Inco Pre-Cast Fabricartion Yard @ Ju'aymah Shops
Plant N-26

FDT Compaction Inspection of 6th Layer Selectfill Material around Gantry SHIPPING & RECEIVING
3241 C-2420 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah 4-Apr-18 11:15 AM 5-Apr-18 8:30 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26 AREA

FDT Compaction Inspection of 7th Layer Selectfill Material around Gantry SHIPPING & RECEIVING
3242 C-2421 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah 4-Apr-18 11:20 AM 5-Apr-18 3:30 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26 Visual Inspection of Inner subduct ,1” diameter as AREA
Materials Receiving
follow:
1) Subduct,1” Dia,ASTM D 3035,SDR11,Qty in meter 2500,Color Orange
2) Subduct,1” Dia,ASTM D 3035,SDR11,Qty in meter 2500,Color Green
3243 T-0083 3) Subduct,1” Dia,ASTM D 3035,SDR11,Qty in meter 2500,Color White PLANT N-26 4-Apr-18 2:00 PM 5-Apr-18 8:00 AM RA-819517-001 Rev-0F2 AFREEN M. Z. NAVEED
4) Visual
1) Subduct,1” Dia,ASTM
Inspection D 3035,SDR11,Qty
for Conduit Mandrel Testin for
meter
MV 2500,ColorDuct
BlueBank
From Al Falakline
(ELE-DB-001, Trading Est.Aswith
ELE-DB-010/011) per P.O#0260318
6" @ Electrical
Dia. PVC ConduitETEPipes
Site Store,
and 6" Dia.
Ju'Aymah
DB Shops Plant
PVC Conduits N-26 Prior to Cable Pulling Located Between
(ELE-DB-009)
West Side of New Substation Bldg. & Existing Storage Area, Between
3244 E-0320 Shaded Shipping/Receiving Area & New Workshop Bldg. and Between WORK SHOP 4-Apr-18 4:15 PM 5-Apr-18 1:15 PM RA-819460-002 0F1 FILBERT DAMIAN ABAA
New Workshop Bldg. and Existing Paint Shop Area, Ju’aymah Shop Plant
N26 As per Attached Highlighted Drawing.

Visual Inspection after welding for joints on 2 wall panels SS-WIG- 17, 02D,
3245 ST-W-0051 2 T-Slab SS- DT-04 & 05 (check attached drawing) @ Substation Building, NEW SUB STATION 4-Apr-18 4:20 PM 5-Apr-18 3:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Materials Receiving Visual Inspection for MV Cables (On Cable Reel) as


3246 E-0268-A follows: 1) 1C X 240 mm2 20KV Cu/TR-XLPE/LAT/AAWA/PVC-FROR PLANT N-26 5-Apr-18 4:05 PM 5-Apr-18 9:30 AM RA-819294-001-0F1 FILBERT DAMIAN ABAA
(DRUM NO. 13198758 @ 505 Mtrs) at ETE Laydown Yard Area, Ju’Aymah
Shop Plant N26 as per attached documents.

Concreting Curing Inspection for Pre-Cast Light pols Foundations (15 Nos),
3247 C-2422 at Pre-Cast Yard, North Side of New Admin Building, ju'aymah shops. ADMIN BUILDING 5-Apr-18 1:05 PM 7-Apr-18 10:30 AM RA-819463-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Plant # N-26.

Concreting Curing Inspection for Transformer Foundations # XRF -X01,


3248 C-2423 XRF-X02 XRF-X03, XRF-X04, Transformer Yard, New Sub Station @ NEW SUB STATION 5-Apr-18 1:08 PM 7-Apr-18 10:45 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED not in QMIS
ju'aymah shops, plant N-26.
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building Building Roof Floor panel (Panel Mark: PM-A-04, PM-A-07, CR-A-
3249 C-2424 07A, PM-A-06A, CR- A-01H, CR- A-01AH, CY-A-01 (3 Nos.), PM-A-12, PR-A- INCO 5-Apr-18 1:10 PM 7-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
02A, PM-A-13, CR-A- 02B, CR-A-02A, SB-A-01 (4 Nos.), SC-A-01 (4 Nos.),
CIR-A-13 and CIR-A-03 At Inco Pre-Cast Fabricartion Yard @ Ju'aymah
Shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3250 C-2425 Inspection of 4000 PSi for 6 Nos of Column at Grid line, 1 to 2 and B to D, GULF 5-Apr-18 1:15 PM 7-Apr-18 11:00 AM RA-819728-001-0F1 QUADRI ISHFAQ AHMED
New Admin Building At ju'aymah shops, plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3251 C-2426 Inspection of 4000 PSi for Wall of Gantry Crain foundation at Grid line 1, GULF 5-Apr-18 1:18 PM 7-Apr-18 11:15 AM RA-819991-001-0F2 QUADRI ISHFAQ AHMED
Shipping & Receiving area, ju'aymah shops, plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3252 C2427 Inspection of 4000 PSi for Door Lintel Beam 1st Floor, Door # D4 3 Nos, GULF 5-Apr-18 1:20 PM 7-Apr-18 11:30 AM RA-819745-001-00 QUADRI ISHFAQ AHMED
D5 2 Nos, D4A 1 No, D8 2 Nos and D6 1 No, Total 9 Doors at New Admin
Building, ju'aymah shops, plant N-26 @ Gulf Consult

FDT Compaction Inspection of 8th Layer Selectfill Material around Gantry SHIPPING & RECEIVING
3253 C-2428 Crane Foundation at Grid Line 1, Shipping & Receiving Area J u'Aymah AREA 5-Apr-18 11:20 AM 7-Apr-18 10:00 AM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26

Fill Placement & Compaction Inspection of 9th (Fianl Layer) (Selectfill SHIPPING & RECEIVING
3254 C-2429 Material around Gantry Crane Foundation at Grid Line 1, Shipping & AREA 5-Apr-18 1:24 PM 7-Apr-18 4:00 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
Receiving Area Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of 9th (Fianl Layer) (Selectfill Material around SHIPPING & RECEIVING
3255 C-2430 Gantry Crane Foundation at Grid Line 1, Shipping & Receiving Area AREA 5-Apr-18 1:25 PM 7-Apr-18 4:15 PM RA-819991-001-0F2 ACIELO ISHFAQ AHMED
Ju'Aymah Shops Plant N-26

3256 C-2431 Material Receiving Inspection of Clean Sand l From Al-Osais (Qty= 110 PLANT N-26 5-Apr-18 1:40 PM 7-Apr-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
M3) @ ETE Laydown,JaAymah,shops Plant N-26

CMU Surface Preparation and Protection Inspection of Grid Line 5 And


3257 C-2432 Grid Line A-B Inside Room No. 142 & 143 South Face ) At Admin Building ADMIN BUILDING 5-Apr-18 1:55 PM 7-Apr-18 10:00 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
@ J a'Aymah,shops Plant N-26

Masonry Units 1st Layer Plaster Installation Inspection of Grid Line 5 And
3258 C-2433 Grid Line A-B Inside Room No. 142 & 143 South Face ) At Admin Building ADMIN BUILDING 5-Apr-18 2:00 PM 7-Apr-18 3:15 PM RA-819745-003-00 SALMAAN ISHFAQ AHMED
@ J a'Aymah,shops Plant N-26

CMU Surface Preparation and Protection Inspection of Grid Line 10-12


3259 C-2434 And Grid Line E Inside Room No 129 A East Face ) At Admin Building @ ADMIN BUILDING 5-Apr-18 2:05 PM 7-Apr-18 10:15 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
Ja'Aymah,shops Plant N-26

Masonry Units 1st Layer Plaster Installation Inspection of Grid Line 10- 12
3260 C-2435 And Grid Line E Inside Room No 129 A East Face ) At Admin Building @ ADMIN BUILDING 5-Apr-18 2:10 PM 7-Apr-18 3:30 PM RA-819745-003-00 SALMAAN ISHFAQ AHMED
Ja'Aymah,shops Plant N-26

Material Receiving Visual Inspection of Metallic Wireways Boxes &


Accessories as follows: 1) Square Box 4" X 4" 2 1/8" DP with 3/4" KO's
3261 E-0321 RACO # 231 (1,000 EA); 2) Square Box 4" X 4" 2 1/8" DP with 1" KO's RACO PLANT N-26 5-Apr-18 3:40 PM 7-Apr-18 9:00 AM RA-819294-001-0F1 FILBERT ALI M. AL YASEEN
# 233 (100 EA); 3) Cover 4" F lat RACO # 753 (1,000 EA) AT ETE Laydown
Yard Area, Ju’Aymah Shop Plant N26, As per Attached Documents.
Visual Inspection of Direct Buried Cable Trench Prior to Cable Laying of
Direct Buried MV Power Cables Direct Buried MV Power Cables &
3262 E-0322 Control Cables from Point # 16 Near West Side of New Workshop Bldg. to WORK SHOP 5-Apr-18 3:45 PM 7-Apr-18 3:00 PM RA-819460-002-0F1 FILBERT DAMIAN ABAA
Point # 13 Near HDPE Pipes at Ju’Aymah Shop Plant N26 As per Attached
Highlighted Drawing.
Visual Inspection of Direct Buried Cable Trench Prior to Cable Laying of
Direct Buried MV Power Cables Direct Buried MV Power Cables & Control
3263 E-0323 Cables from West Side of New Workshop Bldg. to Point # 17 Near East WORK SHOP 5-Apr-18 3:42 PM 7-Apr-18 2:00 PM RA-819460-002-0F1 FILBERT DAMIAN ABAA
Side of Existing Paint Shop at Ju’Aymah Shop Plant N26 As per Attached
Highlighted Drawing.
Cast-In-Place Concrete Formwork and Surface Inspection Prior to Cast
3264 C-2436 Screed upon hollow Core Panels, at Roof Floor from Grid Line (1 to 4 / A - ADMIN BUILDING 7-Apr-18 11:00 AM 8-Apr-18 7:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
C) and GL.( C to F / 4 to 6) New Admin Building, Ju'Aymah Shops Plant N-
26.

FBE Reinforcement (Wire Mesh) and Embedded Items Inspection Prior to


3265 C-2437 Cast Screed upon hollow Core Panels, at Roof Floor from Grid Line (1 to ADMIN BUILDING 7-Apr-18 11:05 AM 8-Apr-18 9:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
4 / A - C) and GL.( C to F / 4 to 6) New Admin Building, Ju'Aymah Shops
Plant N-26.

Screed Concrete Testing, Sampling and Casting Inspection upon Hollow


3266 C-2438 Core Panels at Roof Floor from Grid Line (1 to 4 / A - C) and GL.( C to F / 4 ADMIN BUILDING 7-Apr-18 11:10 AM 8-Apr-18 10:00 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
to 6) New Admin Building, Ju'Aymah Shops Plant N-26.

Compaction Testing (FDT) inspection of Sub grade for LV Electrical Cable


3267 C-2439 Trench 152.0 Linear Meter (Direct Buried) S tarting from New Substation NEW SUB STATION 7-Apr-18 11:25 AM 8-Apr-18 10:15 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Building to Point # 35 (DB-4) @ Ju'aymah Shops Plant N- 26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
3268 C-2440 Building Building Roof Floor panel (Panel Mark: PR-A-01), PM-A-03A, PM- INCO 7-Apr-18 11:30 AM 8-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO ISHFAQ AHMED
A-03, PM-A-13A, CIR-A-12, CR-A-05A, CY-A-01 (03 Nos.) At Inco Pre-Cast
fabricartion Yard @ Ju'aymah Shops Plant N-26

3269 C-2441 Asphalt Core Density Testing Inspection of Binder and Wearing course in CAR PARKING 7-Apr-18 1:10 PM 8-Apr-18 9:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
New Parking area at gridline (1-4)(A-I) at Juaymah Shops Plant N-26

CMU Surface Preparation, Protection and Plaster accessory Inspection


3270 C-2442 (Grid Line 8 / E-F Room # 125 South Face) and (Grid Line 11 / E-F ROOM ADMIN BUILDING 7-Apr-18 2:40 PM 8-Apr-18 9:30 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
no 148 & 141 North Face) First F loor At Admin Building @
Ja'Aymah,shops Plant N-26

Material Receiving Visual Inspection for Cable Tiles Red Color with size
3271 E-0324 20cm x 40cm x 5cm (Total Quantity: 5,552 PCS) at ETE Laydown Yard Area, PLANT N-26 7-Apr-18 4:15 PM 8-Apr-18 9:00 AM RA-819294-001-0F1 FILBERT ALI M. AL YASEEN
Ju’Aymah S hop Plant N26 as per attached documents.

Visual Inspection for Installation of PVC Conduits (Prior to Mortar Plaster


Concealment) for Wall Mounted Receptacle Outelts with Circuit Nos. 15,
3272 E-0325 16, 17 & 27 (N26-2118-PP-033) at Room Nos. 126, 128A, 129A & 141, ADMIN BUILDING 7-Apr-18 4:20 PM 8-Apr-18 2:00 PM RA-819712-001-0F3 FILBERT ALI M. AL YASEEN
Inside 1st Floor of New Admin Bldg., Ju’aymah Shop Plant N26 as per
Attached Highlighted Drawing.

Visual Inspection after welding for joints on 2 wall panels SS-WIG- 17, 02D,
3273 ST-W-0051-A 2 T-Slab SS- DT-04 & 05 (check attached drawing) @ Substation Building, NEW SUB STATION 7-Apr-18 4:00 PM 8-Apr-18 4:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Visual Inspection after welding for joints on 4 wall panels SS-WG-06, 10,
3274 ST-W-0052 05 & 04, (check attached drawing) @ Substation Building, Ju'aymah NEW SUB STATION 7-Apr-18 4:05 PM 8-Apr-18 4:30 PM RA-819885-001-00 OMAR M. HASSAN
Shops, Plant N26.

Visual Inspection after welding for joints on 3 wall panels SS-WIG- 16, 12 &
3275 ST-W-0053 SS-WG-07, (check attached drawing) @ Substation Building, Ju'aymah NEW SUB STATION 7-Apr-18 4:10 PM 9-Apr-18 4:00 PM RA-819885-001-00 OMAR M. HASSAN
Shops, Plant N26.

Visual Inspection after welding for joints on 3 wall panels SS-WIG- 02E, 17
3276 ST-W-0054 & 02G. (check attached drawing) @ Substation Building, Ju'aymah Shops, NEW SUB STATION 7-Apr-18 4:15 PM 9-Apr-18 4:30 PM RA-819885-001-00 OMAR M. HASSAN
Plant N26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection after welding for joints on 3 T-Slab SS-DT-06, 018 & 02
3277 ST-W-0055 (check attached drawing) @ Substation Building, Ju'aymah Shops, Plant NEW SUB STATION 7-Apr-18 4:20 PM 10-Apr-18 4:00 PM RA-819885-001-00 OMAR M. HASSAN
N26.

Visual Inspection after welding for joints on 3 wall panels SS-WIG- 09, 11 &
3278 ST-W-0056 02G, (check attached drawing) @ Substation Building, Ju'aymah Shops, NEW SUB STATION 7-Apr-18 4:25 PM 10-Apr-18 4:30 PM RA-819885-001-00 OMAR M. HASSAN
Plant N26.

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


Screed upon hollow Core Panels, at Roof Floor from Grid Line (4 to 6 / A -
3279 C-2443 C) and GL.( C to F / 1 to 4) New Admin Building, ju'aymah shops, plant N- ADMIN BUILDING 8-Apr-18 3:00 PM 9-Apr-18 7:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
26

FBE Rebar (Wire Mesh) Embedded Item and Formwork Closur Inspection
prior to Cast Screed upon hollow Core Panels, at Roof Floor from Grid Line
3280 C-2444 (4 to 6 / A - C) and GL.( C to F / 1 to 4) New Admin Building, ju'aymah ADMIN BUILDING 8-Apr-18 3:02 PM 9-Apr-18 9:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
shops, plant N-26

Concret (Screed) Testing, Sampling and Casting Inspection upon hollow


3281 C-2445 Core Panels, at Roof Floor from Grid Line (4 to 6 / A - C) and GL.( C to F / 1 ADMIN BUILDING 8-Apr-18 3:05 PM 9-Apr-18 10:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
to 4) New Admin Building, ju'aymah shops, plant N-26

Compaction Testing (FDT) inspection of Sub grade for Electrical (LV) Duct
3282 C-2446 Bank Between Point 21 and 22 North side of Existing Chemical Building @ ADMIN BUILDING 8-Apr-18 3:08 PM 9-Apr-18 10:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Compaction Testing (FDT) inspection of Sub grade for Potable and Raw
3283 C-2447 Water Line, West Side of Existing Chemical Building 5.7 x 45.0 meter @ ADMIN BUILDING 8-Apr-18 3:10 PM 9-Apr-18 10:15 AM RA-819439-001-00 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed/Surface Mounted Normal/Emergency Lightings with
3284 E-0326 Circuit Nos. 01, 06, 10, 15 & 20 (N26-2118-LP-031) at Room/Area Nos. ADMIN BUILDING 8-Apr-18 3:15 PM 9-Apr-18 9:00 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
112, 107, 147, 123, 132, 133, 134 & 135 Inside 1st F loor of New Admin
Bldg., Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal/Emergency Lightings with Circuit Nos.
3285 E-0327 01, 06, 10, 15 & 20 (N26-2118- LP-031) at Room/Area Nos. 112, 107, 147, ADMIN BUILDING 8-Apr-18 3:17 PM 9-Apr-18 9:30 AM RA-819711-001-0F1 FILBERT ALI M. AL YASEEN
123, 132, 133, 134 & 135 Inside 1st Floor of New Admin Bldg., Ju’aymah
Shop Plant N26 as per Attached Highlighted Drawing.

FDT Compaction Inspection of Subgrade for Electrical Duct Bank ( 12 LM


3286 C-2448 & 24 LM ), & Telecome Duct Bank (8 LM ) at West side of Substation -03 JNGL 9-Aug-18 4:20 PM 9-Apr-18 4:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Inside JNGL @ Ju'Aymah Shops Plant N-26

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


3287 C-2449 Screed upon hollow Core Panels, at Roof Floor from Grid Line (6 to 9 / A - ADMIN BUILDING 9-Apr-18 10:00 AM 10-Apr-18 8:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
C) and GL.( B to F / 9 to 12) New Admin Building, ju'aymah shops, plant N-
26.

FBE Rebar (Wire Mesh) Embedded Item and Formwork Closure Inspection
3288 C-2450 prior to Cast Screed upon hollow Core Panels, at Roof Floor from Grid Line ADMIN BUILDING 9-Apr-18 10:05 AM 10-Apr-18 9:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
(6 to 9 / A - C) and GL.( B to F / 9 to 12) New Admin Building, ju'aymah
shops, plant N-26.

Concret (Screed) Testing, Sampling and Casting Inspection upon hollow


3289 C-2451 Core Panels, at Roof Floor from Grid Line (6 to 9 / A - C) and GL.( B to F / 9 ADMIN BUILDING 9-Apr-18 10:10 AM 10-Apr-18 10:00 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
to 12) New Admin Building, ju'aymah shops, plant N-26.

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building Building Roof Floor panel (Panel Mark: PM-A-12B, CIR-A-04, PM-
3290 C-2452 A-23, CM-A-02A, CIR-A-05, CR-A-05AH, CR-A-05A, S C-A-01A, SC-A-01 INCO 9-Apr-18 11:05 AM 10-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
(2Nos.), SB-A-01 (Total 11 Nos.) At Inco Pre- Cast fabricartion Yard @
Ju'aymah Shops Plant N-26

Concreting Curing Inspection for Parapet Wall of Stair Case Room Grid
3291 C-2453 line 1 to 2 & B to C, upper Roof, New Admin Building @ ju'aymah shops. ADMIN BUILDING 9-Apr-18 11:10 AM 10-Apr-18 10:45 AM RA-819729-001-00 SALMAAN ISHFAQ AHMED
Plant N-26.

Visual inspection for surface preparation of concrete joint prior to sealant SHIPPING & RECEIVING
3292 C-2454 application for slab on grade at Shipping and Receiving area,Juaymah 9-Apr-18 3:15 PM 10-Apr-18 2:00 PM RA-819992-001-0F1 ACIELO ISHFAQ AHMED not in QMIS
Shops Plant N/26 AREA
Visual Inspection of Excavation and Trenching for the PSA duct bank
between new workshop building and paint shop area, length is 10meter.
As per attached highlighted drawing @ Upgraded Ju'aymah Shops Plant
3293 T-0084 N-26. WORK SHOP 9-Apr-18 3:00 PM 10-Apr-18 8:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED

Visual Inspection of Excavation and Trenching for the PSA duct bank near
3294 T-0085 new Substation (2118) area, length is 10meter. As per attached NEW SUB STATION 9-Apr-18 3:02 PM 10-Apr-18 8:15 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of Excavation and Trenching for the PSA duct bank near
3295 T-0086 new workshop area, length is 13meter. As per attached highlighted WORK SHOP 9-Apr-18 3:05 PM 10-Apr-18 8:30 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
drawing @ Upgraded Ju'aymah Shops Plant N-26.
Visual Inspection of installation & Initial Mandrel test of 3-4” pvc conduit
for the PSA duct bank between new workshop building and paint shop
3296 T-0087 area, length is 10meter. As per attached highlighted drawing @ Upgraded WORK SHOP 9-Apr-18 3:07 PM 10-Apr-18 10:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
Ju'aymah Shops Plant N-26.

Visual Inspection of installation & Initial Mandrel test of 3-4” pvc conduit
3297 T-0088 for the PSA duct bank near new Substation (2118) area, length is 10meter. NEW SUB STATION 9-Apr-18 3:10 PM 10-Apr-18 11:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
As per attached highlighted drawing @ Upgraded Ju'aymah Shops Plant
N-26.

Visual Inspection of installation & Initial Mandrel test of 3-4” pvc conduit
3298 T-0089 for the PSA duct bank near new workshop area, length is 13meter. As per WORK SHOP 9-Apr-18 3:12 PM 10-Apr-18 11:30 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of Excavation & Trenching for Cable Trench prior to


3299 E-0328 Cable Laying of Direct Buried LV Cables Between South Side of New NEW SUB STATION 9-Apr-18 2:00 PM 10-Apr-18 9:00 AM RA-819460-002-0F1 FILBERT ALI M. AL YASEEN
Substation Bldg. and Existing Maintenance Bldg. (2110) at Ju’Aymah Shop
Plant N26 as per Attached Highlighted Drawing.

Visual Inspection of Excavation & Trenching (Before Cable Laying) for Main
3300 E-0329 Grounding Grid Conductor (120 mm² Insulated Grounding Conductor) at ADMIN BUILDING 9-Apr-18 2:05 PM 10-Apr-18 9:15 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
West Side of New Admin Building (Near Grid Line 1 to 3), Ju'aymah Shops
Plant N-26, As per attached Highlighted Drawing.

Visual inspection for Laying of 120 mm² Insulated Grounding Conductor


3301 E-0330 for Main Grounding Grid & Equipment Grounding for Chiller at West Side ADMIN BUILDING 9-Apr-18 2:10 PM 10-Apr-18 9:30 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
of New Admin Building (Near Grid Line 1 to 3), As per attached
Highlighted Drawing.

Visual Inspection for Installation of 16mm Dia. X 2.4 mtrs Copper


3302 E-0331 Grounding Rod (1 EA) at West Side of New Admin Building (Near Grid Line ADMIN BUILDING 9-Apr-18 3:12 PM 10-Apr-18 9:40 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
1), Ju'aymah Shops Plant N-26, As per attached Highlighted Drawing.

Visual Inspection of (1 EA) Individual Grounding Rod Resistance Testing for


3303 E-0332 Main Grounding Grid at West Side of New Admin Building (Near Grid Line ADMIN BUILDING 9-Apr-18 2:15 PM 10-Apr-18 9:50 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
1), Ju'aymah Shops Plant N-26, As per attached Highlighted Drawing.

Visual Inspection for Below Grade Exothermic (Thermite) Welding


Connections of 120mm2 to 120 mm² Insulated Grounding Conductors &
3304 E-0333 Rod to 120mm2 Isulated Copper Conductors at West Side of New Admin ADMIN BUILDING 9-Apr-18 2:20 PM 10-Apr-18 10:00 AM RA-819714-001-0F2 FILBERT ALI M. AL YASEEN
Building (Near Grid Line 1 to 8), Ju'aymah Shops Plant N-26, as per
Attached Highlighted Drawing.
Visual Inspection for Cable Pulling of LV Building Wires for Duplex
3305 E-0334 Receptacles With Circuit Nos. 01 & 03 (N26-2118-LP-041) at Sunshade SHIPPING & RECEIVING 9-Apr-18 2:22 PM 10-Apr-18 2:00 PM RA819981-001-00 FILBERT ALI M. AL YASEEN
Shipping & Receiving Area, Ju’aymah S hop Plant N26 as per Attached AREA
Highlighted Drawing.

Visual Inspection of Excavation & Trenching Before Cable Laying of 120


3306 E-0335 mm² Copper Bare Tinned Grounding Conductor for Connection to Existing SHIPPING & RECEIVING 9-Apr-18 2:25 PM 10-Apr-18 10:10 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Grounding Grid at East Side of Sunshade S hipping & Receiving Area, AREA
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing
Visual Inspection for Below Grade Cable Laying of 120 mm² Copper Bare
Tinned Grounding Conductor for Connection to Existing Grounding Grid SHIPPING & RECEIVING
3307 E-0336 & 25 mm² Insulated Grounding Conductors for Fence Grounding at East 9-Apr-18 2:28 PM 10-Apr-18 10:20 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Side of Sunshade S hipping & Receiving Area, Ju’aymah Shop Plant N26 as AREA
per Attached Highlighted Drawing
Visual Inspection for Below Grade Exothermic (Thermite) Welding
Connections of 120mm2 to 120 mm² Insulated Grounding Conductors & SHIPPING & RECEIVING
3308 E-0337 120mm2 to 25mm2 Insulated Copper Conductors at East Side of 9-Apr-18 2:30 PM 10-Apr-18 10:30 AM RA-819982-001-0F1 FILBERT ALI M. AL YASEEN
Sunshade Shipping & Receiving Area, Ju’aymah Shop Plant N26 as per AREA
Attached Highlighted Drawing

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
3309 C-2455 Building Building Roof Floor panel (Panel Mark: PR-A-05 (Total 1 No.) At INCO 9-Apr-18 3:55 PM 10-Apr-18 10:40 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
Inco Pre-Cast fabricartion Yard @ Ju'aymah Shops Plant N-26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building Building Roof Floor panel (Panel Mark: SB-A-01(2 Nos.), PM-A-
3310 C-2456 23A, PR-A-06, PM-A-23H, SS-A-01A, CM-A- 01A, CM-A-02 (2 Nos.), CY-A- INCO 9-Apr-18 3:58 PM 10-Apr-18 10:45 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
02 (2 Nos.), CY-A-04 (2 Nos.) (Total 13 Nos.) At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
3311 C-2457 Building Building Roof Floor panel (Panel Mark: PR-A-05A, CM-A-03) INCO 9-Apr-18 4:00 PM 10-Apr-18 10:50 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
(Total 2 Nos.) At Inco Pre-Cast fabricartion Yard @ Ju'aymah S hops Plant
N-26

Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
3312 C-2458 Building Building Roof Floor panel (Panel Mark: CM-A-02(2NOS),CM-A- INCO 10-Apr-18 9:10 AM 11-Apr-18 10:30 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01,CY-A-01B, CY-A-06,CY-A-06A, CR-A-05,CIR-A-06 (Total 08 Nos.) At Inco
Pre-Cast fabricartion Yard @ Ju'aymah S hops Plant N-26

Material Receiving, Handling ,Storage & Preservation Inspection of CPVC


3313 P-0270 SCH-80 Fittings like UNIONS , ELBOWS & MALE ADAPTERS from AL PLANT N-26 10-Apr-18 9:15 AM 11-Apr-18 8:30 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH
HODACO (ZENITH & NIBCO FITTINGS) @ ETE store,Juaymah Shops
Project, Plant N-26.(As Attached List)
Material Receiving Handling storage and preservation Inspection of
Gypsum Board Asscescries For Admin Building (Stud 63MMx0.9MMx3.0
3314 C-2459 Meter QTY=793)(Runner 63MMx0.9MMx3.0 Meter QTY=200) (UGS Sheet PLANT N-26 10-Apr-18 9:55 AM 11-Apr-18 10:00 AM RA-819746-001-00 BAQAR ISHFAQ AHMED
Rock Joint Compound 28 KG QTY=25) (P.O 25105) From International
Co.LTD (Binex) At ETE Laydown Area @ Ju'aymah Shops Plant N-26
Cast-In-Place Concrete Formwork and surface Inspection prior to Cast
3315 C-2460 Screed upon hollow Core Panels, at Roof Floor from Grid Line (9 to 12 / A - ADMIN BUILDING 10-Apr-18 2:00 PM 11-Apr-18 7:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
D) and GL.( C to F / 6 to 9) New Admin Building, ju'aymah shops, plant N-
26.

FBE Rebar (Wire Mesh) Embedded Item and Formwork Closure Inspection
3316 C2461 prior to Cast Screed upon hollow Core Panels, at Roof Floor from Grid Line ADMIN BUILDING 10-Apr-18 2:02 PM 11-Apr-18 8:00 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
(9 to 12 / A - D) and GL.( C to F / 6 to 9) New Admin Building, ju'aymah
shops, plant N-26

Concret (Screed) Testing, Sampling and Casting Inspection upon hollow


3317 C2462 Core Panels, at Roof Floor from Grid Line (9 to 12 / A - D) and GL.( C to F / ADMIN BUILDING 10-Apr-18 2:05 PM 11-Apr-18 8:30 AM RA-819747-001-0F1 SALMAAN ISHFAQ AHMED
6 to 9) New Admin Building, ju'aymah shops, plant N-26

Material,Receiving Inspection for Pre- Cast Concrete Panels Roof F loor


3318 C-2463 (panel Mark) CR-A-01B, CR-A-02, CR-A-02B, CR-A-02A, CR-A-05H, CR-A- PLANT N-26 10-Apr-18 2:20 PM 11-Apr-18 7:00 AM 0016-A-ER-003-1-9 BAQAR ISHFAQ AHMED
05A, CR-A-05AH, CY-A-01, CY-A-01A) (Total =09) At Admin Building Area @
Ju'aymah Shops Plant N-26

Pre-cast Concrete Panel Pre-Installation Inspection Roof Floor Panel (Panel


3319 C-2464 Mark) CR-A-01B, CR-A-02, CR-A-02B, CR-A-02A, CR- A-05H, CR-A-05A, CR- ADMIN BUILDING 10-Apr-18 2:22 PM 11-Apr-18 7:30 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
A-05AH, CY-A-01, CY-A-01A) (Total =09) At Admin Building Area @
Ju'aymah Shops Plant N-26

Pre-cast Concrete Erection and Alignment Inspection for Panels Roof


3320 C-2465 Floor(Panel Mark) CR-A-01B, CR-A-02, CR-A-02B, CR-A-02A, CR-A-05H, CR- ADMIN BUILDING 10-Apr-18 2:25 PM 11-Apr-18 7:40 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
A-05A, CR-A-05AH, CY-A-01, CY-A-01A) (Total =09) At Admin Building Area
@ J u'aymah Shops Plant N-26

Material Receiving Visual Inspection of Electrical Yellow Warning Tape 12"


3321 E-0338 Wide X 305 Meters (90 Rolls) For Direct Buried Cables at ETE Laydown PLANT N-26 10-Apr-18 2:30 PM 11-Apr-18 9:00 AM RA-819294-001-0F1 NOLI ALI M. AL YASEEN
Store Area, Ju’aymah Shop Plant N26 as per attached documents.

Materials Receiving Visual Inspection of EMT Conduits 3/4" Dia. (100EA)


3322 E-0339 at ETE Laydown Store Area, Ju’aymah Shop Plant N26, As per Attached PLANT N-26 10-Apr-18 2:35 PM 11-Apr-18 9:30 AM RA-819294-001-0F1 NOLI ALI M. AL YASEEN
Documents.
Materials Receiving Visual Inspection for Cable Tray Accessories as
follows: 1) SCREW 4MM X 1" LENGTH SS316 (100EA); 2) SCREW 4MM X
1-1/4" LENGTH SS316 (100EA); 3) SCREW 6MM X 1" LENGTH S S316
3323 E-0340 (100EA); 4) SCREW 6MM X 1-1/4" LENGTH SS316 (100EA); 5) SCREW PLANT N-26 10-Apr-18 2:40 PM 11-Apr-18 10:00 AM RA-819294-001-0F1 NOLI ALI M. AL YASEEN
6MM X 1-1/2" LENGTH SS316 (100EA); 6) DROP IN ANCHOR HDG M6
(500EA); 7) DROP IN ANCHOR HDG M12 (500EA); and 8) DROP IN
ANCHOR HDG M10 (100EA) at ETE Laydown Store Area, Ju’aymah Shop
Plant N26,
Repair As per
and/or Attached
Touch-Up Documents.
of Coatings (Surface Preparation & Coating
3324 H-0001 Application) for Weld Joints of Galvanized Plates/Bracket of Pre-Cast Panel NEW SUB STATION 10-Apr-18 3:10 PM 11-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN
& Slab @ New Substation Bldg. # 2118 (Roof Top) GL: 1-3/A-C. APCS-1C
(Primer)
Visual Inspection of Excavation and Trenching for the PSA duct bank at
new Substation area, Length is 18meter. As per attached highlighted
3325 T-0090 drawing @ Upgraded Ju'aymah Shops Plant N-26. NEW SUB STATION 10-Apr-18 3:00 PM 11-Apr-18 8:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED

Visual Inspection of installation & Initial Mandrel test of 3-4” pvc conduit
3326 T-0091 for the PSA duct bank at new Substation area, Length is 18meter. As per NEW SUB STATION 10-Apr-18 3:05 PM 11-Apr-18 11:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.
Visual Inspection of Final Mandrel test of 3-4” pvc conduit for the PSA
duct bank between new workshop building and paint shop area, Length is
3327 T-0092 13meter. As per attached highlighted drawing @ Upgraded Ju'aymah WORK SHOP 10-Apr-18 3:10 PM 11-Apr-18 8:30 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
Shops Plant N-26.

Visual Inspection of Final Mandrel test of 4-4” pvc conduit for the PSA
3328 T-0093 duct bank at near new Substation (2118) area, Length is 10meter. As per NEW SUB STATION 10-Apr-18 3:15 PM 11-Apr-18 9:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of Final Mandrel test of 4-4” pvc conduit for the PSA
3329 T-0094 duct bank at near new workshop area, Length is 10meter. As per attached WORK SHOP 10-Apr-18 3:20 PM 11-Apr-18 9:30 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.

Material Receiving, Handling ,Storage & preservation Inspection of Pipe


3330 P-0271 Hangers With Rubber Type Clevis 4" (40- Pcs), THREADED ROD M14X3M PLANT N-26 10-Apr-18 4:35 PM 11-Apr-18 9:30 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
(80-Pcs) & DROP IN ANCHOR M10(80-Pcs) from WOLOUF TRADING EST
(Arab Bolts), ETE store, J uaymahShops Project, Plant N-26

Compaction Testing (FDT) inspection of Existing Sub grade for Electrical


3331 C-2466 Cable Tray Foundations (7 No's) @ Transformer Yard with new Substation NEW SUB STATION 11-Apr-18 2:45 PM 12-Apr-18 2:00 PM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Building @ ju'aymah shops, plant N-26.

3rd layer Selectfill material Compaction Testing (FDT) inspection above


3332 C-2467 sewer line 30x1.8 Meter at South side of new Substation Building @ NEW SUB STATION 11-Apr-18 2:50 PM 12-Apr-18 3:15 PM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Gypsum Board (Type A2 and 5B) Framing and Pre- Installation Inspection
3333 C-2468 for Tele Comm. Room # 139 (East & South side wall) and Stare Case Room ADMIN BUILDING 11-Apr-18 2:55 PM 12-Apr-18 10:15 AM RA-819745-002-00 SALMAAN MAMDOOH
# 111, (East & North side wall) First Floor at New Admin Building @
ju'aymah shops, plant N-26.

Formwork Inspection for Drain Channel out side wall of Transformer


3334 C-2469 Foundations (4 no's), # XFR-x01 XFR-x02, XFR-x03 & XFR-x04 at NEW SUB STATION 11-Apr-18 3:00 PM 12-Apr-18 8:00 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
Transformer Yard,New Substation Building at ju'aymah shops. Plant # N-
26.

FBE Rs Rebar, Embedded Items and formwork Closure inspection for Drain
3335 C-2470 Channel out side wall of Transformer Foundations (4 no's), # XFR-x01 NEW SUB STATION 11-Apr-18 3:05 PM 12-Apr-18 9:30 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
XF R-x02, XFR-x03 & XFR-x04 at Transformer Yard, New Substation
Building at ju'aymah shops. Plant # N-26.

Concrete Testing Sampling and Casting inspection for Drain Channel out
3336 C-2471 side wall of Transformer Foundations (4 no's), # XFR-x01 XFR-x02, XFR- NEW SUB STATION 11-Apr-18 3:10 PM 12-Apr-18 10:30 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
x03 & XFR-x04 at Transformer Yard, New S ubstation Building at ju'aymah
shops. Plant # N-26.

Visual Inspection of the sand bedding and orange tape installation for the
3337 T-0095 PSA duct bank between new workshop building and paint shop area, PLANT N-26 11-Apr-18 8:30AM 12-Apr-18 2:00 PM RA-819460-002-0F1 AFREEN M. Z. NAVEED
Length is 13meter. As per attached highlighted drawing @ Upgraded
Ju'aymah Shops Plant N-26.

Visual Inspection of the sand bedding and orange tape installation for the
3338 T-0096 PSA duct bank at near new S ubstation (2118) area, Length is 10meter. As PLANT N-26 11-Apr-18 8:35 AM 12-Apr-18 2:15 PM RA-819460-002-0F1 AFREEN M. Z. NAVEED
per attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-
26.

Visual Inspection of the sand bedding and orange tape installation for the
3339 T-0097 PSA duct bank at near new workshop area, Length is 10meter. As per PLANT N-26 11-Apr-18 8:40 AM 12-Apr-18 2:30 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection and installation of pulling 4- 1” sub ducts in conduit


3340 T-0098 number 1 and 2 for the PSA duct bank between new workshop building PLANT N-26 11-Apr-18 8:45 AM 12-Apr-18 8:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
and paint shop area, Length is 13meter. As per attached highlighted
drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection and installation of pulling 4-1” sub ducts in conduit


3341 T-0099 number 1 and 2 for the PSA duct bank at near new Substation (2118) PLANT N-26 11-Apr-18 8:50 AM 12-Apr-18 8:30 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
area, Length is 10meter. As per attached highlighted drawing @ Upgraded
Ju'aymah Shops Plant N-26.

Visual Inspection and installation of pulling 4- 1” sub ducts in conduit


3342 T-0100 number 1 and 2 for the PSA duct bank at near new workshop area, Length PLANT N-26 11-Apr-18 8:55 AM 12-Apr-18 9:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
is 10meter. As per attached highlighted drawing @ Upgraded Ju'aymah
Shops Plant N-26.

Site & Grade Preparation Inspection Of Electrical Duct Bank Trench ( 12


3343 C-2472 LM & 24 LM ) at West Side of Substation -03 in side JNGL @ Ju'Aymah, JNGL 11-Apr-18 4:05 PM 12-Apr-18 3:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Shops Plant N- 26

Site & Grade Preparation Inspection Of Telecom Duct Bank Trench ( 08


3344 C-2473 LM ) at West Side of Substation -03 in side JNGL @ Ju'Aymah, Shops Plant JNGL 11-Apr-18 4:10 PM 12-Apr-18 3:15 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
N- 26

3345 C-2474 Formwork Inspection of Electrical Duct Bank Trench ( 12 LM ) at West JNGL 11-Apr-18 4:15 PM 12-Apr-18 3:30 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Side of Substation -03 in side JNGL @ Ju'Aymah, Shops Plant N- 26

FBE Rebar, Embedded Items Inspection of Electrical Duct Bank Trench


3346 C-2475 ( 12 LM & 24 LM ) at West Side of Substation -03 in side JNGL @ JNGL 11-Apr-18 4:20 PM 12-Apr-18 3:45 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Ju'Aymah, Shops Plant N- 26

Visual Inspection of Excavation &Trenching prior to Installation of 6" Dia.


3347 E-0341 PVC CONDUIT Pipe for MV Duct Bank Inside the Exesting Sub- Station JNGL 11-Apr-18 4:25 PM 12-Apr-18 1:45 PM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
Area As per Attached Highlighted Drawing

Visual Inspection of MV Electrical Duck Bank , conduit Pipe & spacers


3348 E-0342 Installation , and Embedded Hardware Prior to Concrete Placement, JNGL 11-Apr-18 4:30 PM 12-Apr-18 2:00 PM RA-819460-001-0F2 NOLI DAMIAN ABAA
Inside the Exesting Sub- Station Area As per Attached Highlighted
Drawing
Materials Receiving Visual Inspection of plugs as follow:
1) 1” Blank End Plug(10D104U) : TYCO,QTY 80.
3349 T-0101 2) 4” Quadplex Duct Plug(40Q136S) : TYCO,QTY 20. PLANT N-26 11-Apr-18 1:30PM 12-Apr-18 3:30 PM RA-819517-001-0F2 AFREEN M. Z. NAVEED
From Al Falakline Trading Est.As per P.O#10042018 @ ETE Site Store,
Ju'Aymah Shops Plant N-26

Visual Inspection of Final Mandrel test of 3-4” pvc conduit for the PSA
3350 T-0102 duct bank at new Substation area, Length is 18meter. As per attached PLANT N-26 11-Apr-18 11:30AM 12-Apr-18 4:00 PM RA-819460-002-0F1 AFREEN M. Z. NAVEED
highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection and installation of pulling 4- 1” sub ducts in conduit


3351 T-0103 number 1 and 2 for the PSA duct bank at new Substation area, Length is PLANT N-26 11-Apr-18 9:30AM 12-Apr-18 4:30 PM RA-819460-002-0F1 AFREEN M. Z. NAVEED
18meter. As per attached highlighted drawing @ Upgraded Ju'aymah
Shops Plant N-26.

Visual Inspection of Excavation and Trenching for the PSA duct bank
3352 T-0104 between near Existing Substation 3 area, length is 8meter. As per attached JNGL 11-Apr-18 4:05 PM 12-Apr-18 2:45 PM RA-819460-001-0F2 NOLI M. Z. NAVEED
highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26

Visual Inspection and installation of 3-4" PVC conduit for the PSA duct
3353 T-0105 bank near Existing Substation 3 area, length is 8 meter. As per attached JNGL 11-Apr-18 4:10 PM 12-Apr-18 3:15 PM RA-819460-001-0F2 NOLI M. Z. NAVEED
highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26

Visual Inspection after welding for joints on 6 wall panels SS-WIG- 02A,
3354 ST-W-0057 02D, 02, 08, 09 & 10 (check attached drawing) @ Substation Building, NEW SUB STATION 11-Apr-18 3:30 PM 12-Apr-18 4:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Visual Inspection after welding for joints on 7 wall panels SS-WIG- 11, SS-
3355 ST-W-0058 WG-07, 06, 10, 05, 03 & 02 (check attached drawing) @ Substation NEW SUB STATION 11-Apr-18 3:35 PM 12-Apr-18 4:30 PM RA-819885-001-00 OMAR M. HASSAN
Building, Ju'aymah Shops, Plant N26.
Repair and/or Touch-Up of Coatings (Surface Preparation & Coating
Application) for Weld Joints of Galvanized Plates/Bracket of Pre-Cast Panel
@ New Substation Bldg. # 2118 (Switchgear Room-101) GL: 1-2/A-C. ITP #
3356 H-0002 (ETE-ITP-ST-01) ; Inspection Checklist (SAIC-H-2032) ; Activity # 3.5 & NEW SUB STATION 11-Apr-18 3:40 PM 12-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN
Inspection Responsibility Assignment: Saudi Aramco (W) / Contractor (H).
APCS-1C (Primer)
Concrete Sampling,Testing & Placement Inspection of Telecom Duct Bank
3357 C-2476 Trench ( 08 LM ) at West Side of Substation -03 in side JNGL @ Ju'Aymah, JNGL 12-Apr-18 1:20 PM 14-Apr-18 1:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Shops Plant N- 26

Concrete Sampling,Testing & Placement Inspection of Electrical Duct


3358 C-2477 Bank Trench ( 12 LM & 24 LM ) at West Side of Substation -03 in side JNGL 12-Apr-18 1:25 PM 14-Apr-18 1:30 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
JNGL @ Ju'Aymah, S hops Plant N- 26

FDT inspection for sub grade of concrete slab for Gantry Crane (between SHIPPING & RECEIVING
3359 C-2478 foundations) Shipping and Receiving area Juaymah Shops, Plant N-26 AREA 12-Apr-18 1:50 PM 14-Apr-18 9:30 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED

RECEIVING INS PECTION FOR COATING REPAIR MATERIALS : HEMPADUR


3360 H-0003 ZINC 17360 10 LTR. (02 nos.) & HEMPEL'S THINNER 08450 5 LTR. (02 nos.) NEW SUB STATION 12-Apr-18 1:05 PM 14-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN

REPAIR AND/OR TOUCH-UP 0F COATINGS (SURFACE PREPARATION &


COATING APPLICATION) FOR WELD JOINTS OF GALVANIZED
3361 H-0004 PLATES/BRACKET OF PRE- CAST PANEL @ SUBSTATION BLDG. # 2118 NEW SUB STATION 12-Apr-18 1:10 PM 14-Apr-18 11:00 AM RA-819885-001-00 LESLIE ABDUL REHMAN
(BATTERY ROOM-103) GL: 2-3/A-B. APCS-1C (PRIMER COAT)

Visual inspection of sealant application for concrete joint prior to epoxy SHIPPING & RECEIVING
3362 C-2479 floor screed application for slab on grade at Shipping and Receiving AREA 12-Apr-18 2:10 PM 14-Apr-18 8:00 AM RA-819992-001-0F1 ACIELO ISHFAQ AHMED not in QMIS
area,Juaymah Shops Plant N/26

Material Receiving, Handling ,Storage & preservation Inspection of WATER


3363 P-0272 HAMMER ARRESTOR with ¾" (1-11) 75001A (8-Pcs) & 1" (12-32) 75002B PLANT N-26 12-Apr-18 3:45 PM 14-Apr-18 9:30 AM RA-819779-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
(6-Pcs) from JOSAM (BINEX), ETE store, JuaymahShops Project, Plant N-26

Material Receiving, Handling ,Storage & Preservation Inspection of PIPE


3364 P-0273 SUPPORT CLAM RUBBER PADDING HDG & ADJUSTABLE CLEVIS HANGERS PLANT N-26 12-Apr-18 3:50 PM 14-Apr-18 10:00 AM RA-819774-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
WITH RUBBER PADDING from WOLOUF TRADING EST (ARAB BOLTS) @
ETE store,J uaymah S hops Project, Plant N-26.

Visual Inspection after welding for joints on 6 wall panels SS-WIG- 02A,
3365 ST-W-0059 02D, 02, 08, 09 & 10, (check attached drawing) @ Substation Building, NEW SUB STATION 12-Apr-18 4:10 PM 14-Apr-18 4:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Visual Inspection after welding for joints on 7 wall panels SS-WIG- 11, SS-
3366 ST-W-0060 WG-07, 06, 10, 05, 03 & 02, (check attached drawing) @ Substation NEW SUB STATION 12-Apr-18 4:15 PM 14-Apr-18 4:30 PM RA-819885-001-00 OMAR M. HASSAN
Building, Ju'aymah Shops, Plant N26.

Geo Grid Installation above Electrical (LV) Duct Bank Between Point 21
3367 C-2480 and 22 North side of Existing Chemical Building (South Side of New Sub NEW SUB STATION 14-Apr-18 1:10 PM 15-Apr-18 10:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
station Building) @ ju'aymah shops, plant N-26.

Fill Placement of Base Course Material above Electrical (LV) Duct Bank
3368 C-2481 Between Point 21 and 22 North side of Existing Chemical Building (South NEW SUB STATION 14-Apr-18 1:15 PM 15-Apr-18 10:15 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED not in QMIS
Side of New Sub station Building) @ ju'aymah shops, plant N-26.

FDT Inspection of Base Course Material above Electrical (LV) Duct Bank
3369 C-2482 Between Point 21 and 22 North side of Existing Chemical Building (South NEW SUB STATION 14-Apr-18 1:17 PM 15-Apr-18 10:30 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
Side of New Sub station Building) @ ju'aymah shops, plant N-26.

Geo Grid Installation above Potable and Raw Water Line, West Side of
3370 C-2483 Existing Chemical Building South Side of New Substation 46.0 meter @ NEW SUB STATION 14-Apr-18 1:20 PM 15-Apr-18 7:15 AM RA-819439-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Ju'Aymah Shops Plant N-26.

Fill Placement of Base Course Material above Potable and Raw Water
3371 C-2484 Line, West Side of Existing Chemical Building South Side of New NEW SUB STATION 14-Apr-18 1:25 PM 15-Apr-18 7:30 AM RA-819439-001-00 SALMAAN ISHFAQ AHMED not in QMIS
Substation 46.0 meter @ Ju'Aymah Shops Plant N-26.

FDT Inspection of Base Course Material above Potable and Raw Water
3372 C-2485 Line, West Side of Existing Chemical Building South Side of New NEW SUB STATION 14-Apr-18 1:28 PM 15-Apr-18 8:00 AM RA-819439-001-00 SALMAAN ISHFAQ AHMED
Substation 46.0 meter @ Ju'Aymah Shops Plant N-26.

3373 C-2486 Geo Grid Installation above Sewer Line 30 Linear Meter at South Side of NEW SUB STATION 14-Apr-18 1:30 PM 15-Apr-18 7:45 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED not in QMIS
New Substation Building @ Ju'Aymah Shops, Plant N-26.

3374 C-2487 Fill Placement of Base Course Material above Sewer Line 30 Linear Meter NEW SUB STATION 14-Apr-18 1:35 PM 15-Apr-18 10:45 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED not in QMIS
at South Side of New Substation Building @ Ju'Aymah Shops, Plant N-26.

3375 C-2488 FDT Inspection of Base Course Material above Sewer Line 30 Linear Meter NEW SUB STATION 14-Apr-18 1:40 PM 15-Apr-18 11:00 AM RA-819867-001-0F5 SALMAAN ISHFAQ AHMED
at South Side of New Substation Building @ Ju'Aymah Shops, Plant N-26.

Location,Boreholes and elevations inspection for Type 3 Fence (Line post) SHIPPING & RECEIVING
3376 C-2489 20 nos. north side and 8 nos.north- east side of Shipping and Receiving 14-Apr-18 1:45 PM 15-Apr-18 1:30 PM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Area,Juaymah Shops ,Plant N-26 AREA

Pre-pour inspection for Type 3 Fence (Line post) 20 nos. north side & 8 SHIPPING & RECEIVING
3377 C-2490 nos.north-east side of Shipping and Receiving Area,Juaymah Shops ,Plant 14-Apr-18 1:48 PM 15-Apr-18 1:45 PM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
N-26 AREA

Concrete placement,sampling & Testing inspection for Type 3 Fence (Line SHIPPING & RECEIVING
3378 C-2491 post) 20 nos. north side & 8 nos.north-east side Shipping and Receiving 14-Apr-18 1:50 PM 15-Apr-18 2:30 PM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Area,Juaymah Shops ,Plant N-26 AREA

Repair and/or Touch-Up of Coatings (Surface Preparation & Coating


Application) for Weld Joints of Galvanized Plates/Bracket of Pre-Cast Panel
3379 H-0005 @ New Substation Bldg. # 2118 (Mechanical Room- 102) GL: 2-3/B-C. ITP # NEW SUB STATION 14-Apr-18 1:55 PM 15-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN
(ETE-ITP-ST-01) ; Inspection Checklist (SAIC-H-2032) ; Activity # 3.5 &
Inspection Responsibility Assignment: Saudi Aramco (W) / Contractor (H).
APCS-1C (Primer)
Final Inspection (Visual/Dry/D.F.T.) for Weld J oints of Galvanized
Plates/Bracket of Pre-Cast Panel & Slab @ New Substation Bldg. # 2118
3380 H-0006 (Roof Top) GL: 1-3/A-C. ITP # (ETE-ITP-ST-01) ; Inspection Checklist (SAIC- NEW SUB STATION 14-Apr-18 2:00 PM 15-Apr-18 11:00 AM RA-819885-001-00 LESLIE ABDUL REHMAN
H-2032) ; Activity # 3.6 & Inspection Responsibility Assignment: Saudi
Aramco (W) / Contractor (I). APCS-1C (Primer)

FDT Inspection for Sub Grade for Direct Buried Conduit below Inner
3381 C-2492 Security Fence near Existing Sub Station Area Length 2.0 LM at Inner JNGL 14-Apr-18 4:50 PM 15-Apr-18 4:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Patrol Road, JNGL Juaymah Shops, Plant N-26

Fill Placement Inspection of 1st Layer Select F ill Material at Direct Buried
3382 C-2493 Conduit below Inner Security Fence near Existing Sub Station Area Length JNGL 14-Apr-18 4:55 PM 15-Apr-18 4:10 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26

FDT Compaction Inspection of 1st Layer Select Fill Material at Direct


3383 C-2494 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 14-Apr-18 5:00 PM 15-Apr-18 4:15 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26

FDT Compaction Inspection of 2nd Layer Select Fill Material at Direct


3384 C-2495 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 14-Apr-18 5:05 PM 15-Apr-18 4:30 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26

Fill Placement Inspection of 3rd Layer (Final) Select Fill Material at Direct
3385 C-2496 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 14-Apr-18 5:10 PM 15-Apr-18 4:35 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26

FDT Compaction Inspection of 3rd Layer (Final) Select Fill Material at


3386 C-2497 Direct Buried Conduit below Inner Security Fence near Existing Sub JNGL 14-Apr-18 5:15 PM 15-Apr-18 4:45 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Station Area Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops,
Plant N-26

Visual Inspection of Excavation & Trenching Before Installation of 6" direct


3387 E-0343 Buried PVC Conduit Pipe at Security fence inside Existing Sub-Station Plant JNGL 14-Apr-18 5:20 PM 15-Apr-18 2:00 PM RA-819460-001-0F2 NOLI DAMIAN ABAA
Area, Ju’aymah Shop Plant N26. As per Attached Highlighted Drawing
Security Fence Inside Existing Sub-Station Plant Area

Visual Inspection of 6" MV Electrical Direct Buried Conduit Pipe & spacers
3388 E-0344 Installation (17 EA.), Prior to final Back Filling, at S ecurity fence inside JNGL 14-Apr-18 5:22 PM 15-Apr-18 2:15 PM RA-819460-001-0F2 NOLI DAMIAN ABAA
Existing Sub-Station Plant Area, Ju’aymah Shop Plant N26. As per Attached
Highlighted Drawing Security Fence Inside Existing Sub-Station Plant Area.
Visual Inspection of Final Backfilling of MV Electrical Trecnhing of
installation the protective Red Concrete Tiles & Safety Yellow Warning
3389 E-0345 Tape for 6" Dia PVC CONDUIT PIPE.at Security fence inside Existing Sub- JNGL 14-Apr-18 5:25 PM 15-Apr-18 3:00 PM RA-819460-001-0F2 NOLI DAMIAN ABAA
Staion Plant Area, Ju’aymah Shop Plant N26. As per Attached Highlighted
Drawing Security Fence Inside Existing Sub-Station Plant Area.
Pre-Cast & Pre Stressed Concreting Curing and F inal Inspection for Admin
Building PR-A-05AH, CM-A-04,CM- A-01,CM-A-01,PR-A-06A,CY- A-01A,CY-
3390 C-2498 A-01A,CY-A-01A,S S-A-01, CR-A-01,CR-A-06A,CM-A-04A,SS-A-01,SS-A- INCO 15-Apr-18 2:00 PM 16-Apr-18 10:00 AM 0016-A-ER-003-1-9 WILFREDO MAMDOOH
01,CR-A-06,CY-A-05,CY-A- 05,SB-A-01,SC-A-01 At Inco Pre-Cast fabricartion
Yard @ Ju'aymah Shops Plant N-26

Concreting Curing Inspection for upon Hollow Core Panels at Roof Floor
3391 C-2499 from Grid Line (1 to 4 / A - C) and GL.( C to F / 4 to 6) New Admin Building, ADMIN BUILDING 15-Apr-18 2:05 PM 16-Apr-18 10:45 AM RA-819847-001-0F1 SALMAAN ISHFAQ AHMED not in QMIS
Ju'Aymah Shops Plant N-26.

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3392 C-2500 Inspection of 4000 PSi for Cable Drum Pit at Shipping and Receiving area GULF 15-Apr-18 2:10 PM 16-Apr-18 10:30 AM RA-819991-001-0F2 QUADRI ISHFAQ AHMED
At ju'aymah shops, plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for Parapet Wall of Elevator Machin Room Grid line
3393 C-2501 D to F and 1 to 2, and Beams for Stare Case Room Grid line 1 to 2 & B to C GULF 15-Apr-18 2:12 PM 16-Apr-18 11:00 AM RA-819729-001-00 QUADRI ISHFAQ AHMED
upper Roof, New Admin Building At ju'aymah shops. Plant N-26.@ Gulf
Consult

Formwork Inspection for Valve Box Footing (Pre-Cast) Type-3, VB-0001,


3394 C-2502 VB-0002 and VB0010, in Pre-Cast Yard North side of New Admin Building ADMIN BUILDING 15-Apr-18 2:15 PM 16-Apr-18 8:00 AM RA-819438-001-0F1 SALMAAN ISHFAQ AHMED
at ju'aymah shops. Plant # N-26.

FBE Rebar, Form work and Embedded Items Inspection for Valve Box
3395 C-2503 Footing (Pre-Cast) Type-3, VB-0001, VB-0002 and VB0010, in Pre-Cast Yard ADMIN BUILDING 15-Apr-18 2:18 PM 16-Apr-18 9:30 AM RA-819438-001-0F1 SALMAAN ISHFAQ AHMED
North side of New Admin Building at ju'aymah shops. Plant # N-26.

Concrete Testing, Sampling and Casting for Valve Box Footing (Pre-Cast)
3396 C-2504 Type-3, VB-0001, VB-0002 and VB0010, in Pre-Cast Yard North side of ADMIN BUILDING 15-Apr-18 2:20 PM 16-Apr-18 10:00 AM RA-819438-001-0F1 SALMAAN ISHFAQ AHMED
New Admin Building at ju'aymah shops. Plant # N-26.

3397 C-2505 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 15-Apr-18 2:25 PM 16-Apr-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=124 M3) at ETE Laydown Area @ J u'aymah Shops Plant N-26

Compaction Testing (FDT) inspection of 4th layer Select fill Inspection out
3398 C-2506 side of New Admin Building Grid Line 1 to 9 / F and B to F / 1 @ ju'aymah ADMIN BUILDING 15-Apr-18 2:30 PM 16-Apr-18 8:45 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
shops, plant N-26.

Compaction Testing (FDT) inspection of 5th layer Select fill Inspection out
3399 C-2507 side of New Admin Building Grid Line 1 to 9 / F and B to F / 1 @ ju'aymah ADMIN BUILDING 15-Apr-18 2:35 PM 16-Apr-18 3:00 PM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
shops, plant N-26.

PVC DWV Pipes Installation & Assembly Inspection of 4",3" & 2" Dia for
3400 P-0274 Sanitary Sewer Water Line at Second Floor Male Toilet No.212 in New ADMIN BUILDING 15-Apr-18 2:45 PM 16-Apr-18 8:00 AM RA-819779-004-00 FAHEEM SYED SHAFIULLAH
Admin Building Area @ Ju'Aymah Shops Plant N- 26.

Pipe Hangers and Supports Installation Inspection for PVC DWV Pipes
3401 P-0275 Installation of 4",3" & 2" Dia for Sanitary S ewer Water Line at Second ADMIN BUILDING 15-Apr-18 2:47 PM 16-Apr-18 8:30 AM RA-819779-004-00 FAHEEM SYED SHAFIULLAH
Floor Male Toilet No.212 in New Admin Building Area @ J u'AymahShops
Plant N- 26.

PVC DWV Pipes Installation & Assembly Inspection of 4",3" & 2" Dia for
3402 P-0276 Sanitary Sewer Water Line at Second Floor Male Toilet No.231 in New ADMIN BUILDING 15-Apr-18 2:50 PM 16-Apr-18 9:00 AM RA-819779-004-00 FAHEEM SYED SHAFIULLAH
Admin Building Area @ Ju'Aymah Shops Plant N- 26.

Pipe Hangers and Supports Installation Inspection for PVC DWV Pipes
3403 P-0277 Installation of 4",3" & 2" Dia for Sanitary S ewer Water Line at Second ADMIN BUILDING 15-Apr-18 2:55 PM 16-Apr-18 9:30 AM RA-819779-004-00 FAHEEM SYED SHAFIULLAH
Floor Male Toilet No.231 in New Admin Building Area @ J u'Aymah Shops
Plant N- 26.
Repair and/or Touch-Up of Coatings (Surface Preparation & Coating
Application) for Weld Joints of Galvanized Plates/Bracket of Pre-Cast Panel
3404 H-0007 @ New Substation Bldg. # 2118 (Telecom Room-104) GL: 2-3/B-C. ITP # NEW SUB STATION 15-Apr-18 1:30 PM 16-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN
(ETE-ITP-ST-01) ; Inspection Checklist (SAIC-H-2032) ; Activity # 3.5 &
Inspection Responsibility Assignment: Saudi Aramco (W) / Contractor (H).
APCS-1C (Primer)
Final Inspection (Visual/Dry/D.F.T.) for Weld J oints of Galvanized
Plates/Bracket of Pre-Cast Panel @ New Substation Bldg. # 2118
3405 H-0008 (Switchgear Room-101) GL: 1-2/A-C. ITP # (ETE-ITP-ST-01) ; Inspection NEW SUB STATION 15-Apr-18 1:35 PM 16-Apr-18 11:00 AM RA-819885-001-00 LESLIE ABDUL REHMAN
Checklist (SAIC-H-2032) ; Activity # 3.6 & Inspection Responsibility
Assignment: Saudi Aramco (W) / Contractor (I). APCS-1C (Primer)

Visual Inspection after welding for joints on 6 wall panels SS-WIG- 02A,
3406 ST-W-0059-A 02D, 02, 08, 09 & 10, (check attached drawing) @ Substation Building, NEW SUB STATION 15-Apr-18 2:20 PM 16-Apr-18 4:00 PM RA-819885-001-00 OMAR M. HASSAN
Ju'aymah Shops, Plant N26.

Visual Inspection after welding for joints on 7 wall panels SS-WIG- 11, SS-
3407 ST-W-0060-A WG-07, 06, 10, 05, 03 & 02, (check attached drawing) @ Substation NEW SUB STATION 15-Apr-18 2:25 PM 16-Apr-18 4:30 PM RA-819885-001-00 OMAR M. HASSAN
Building, Ju'aymah Shops, Plant N26.

Location, Boreholes and Elevations Inspection for Type 4 Fence (Line Post
3408 C-2508 20 Nos.) (End Post 1 No.) South Side and (Line Post 21 Nos) (End Post 1 CAR PARKING 16-Apr-18 1:10 PM 17-Apr-18 10:30 AM RA-819478-002-0F3 ACIELO ISHFAQ AHMED
No.) West Side of New Parking Area Juay mah Shops Plant N-26

Pre-pour Inspection for Type 4 Fence (Line Post 20 Nos.) (End Post 1 No.)
3409 C-2509 South Side and (Line Post 21 Nos) (End Post 1 No.) West Side of New CAR PARKING 16-Apr-18 1:15 PM 17-Apr-18 10:45 AM RA-819478-002-0F3 ACIELO ISHFAQ AHMED
Parking Area Juaymah Shops Plant N-26

Concrete Placement, Sampling & Testing Inspection for Type 4 Fence (Line
3410 C-2510 Post 20 Nos.) (End Post 1 No.) South Side and (Line Post 21 Nos) (End Post CAR PARKING 16-Apr-18 1:20 PM 17-Apr-18 1:00 PM RA-819478-002-0F3 ACIELO ISHFAQ AHMED
1 No.) West Side of New Parking Area Juaymah Shops Plant N-26

Material, Receiving Inspection for Pre- Cast Concrete Parapet wall Panels
Roof Floor (panel Mark) PR-A-05H, CR-A-01A, PM-A-26, PM-A- 27, PM-A-
3411 C-2511 28, PM-A-26A, CIR-A-02, CIR-A-01A, PM- A-27B, CIR- A-01, PM-A-27A, PM- ADMIN BUILDING 16-Apr-18 1:25 PM 17-Apr-18 7:00 AM 0016-A-ER-003-1-7 BAQAR ISHFAQ AHMED
A-07A, CR-A-03, PM- A-06, PM-A-06A) at Admin Building Area @ Ju'aymah
Shops Plant N-26
Pre-cast Concre Parapet Wall Panels Pre-installation inspection for admin
building Roof Floor PR-A-05H, CR-A-01A, PM-A-26, PM-A-27, PM-A-28,
3412 C-2512 PM-A-26A, CIR-A-02, CIR-A-01A, PM-A-27B, CIR-A-01, PM-A-27A, PM-A- ADMIN BUILDING 16-Apr-18 1:30 PM 17-Apr-18 7:30 AM 0016-A-ER-003-1-7 SALMAAN ISHFAQ AHMED
07A, CR-A-03, PM-A- 06, PM-A-06A) at Admin Building Area @ Ju'aymah
Shops Plant N-26
Pre-cast Concre Parapet Wall Panels Erection and Alignment Inspection
for admin building Roof Floor PR-A-05H, CR-A-01A, PM- A-26, PM-A-27,
3413 C-2513 PM-A-28, PM-A-26A, CIR-A-02, CIR-A-01A, PM-A-27B, CIR-A-01, PM-A- ADMIN BUILDING 16-Apr-18 1:35 PM 17-Apr-18 7:45 AM 0016-A-ER-003-1-7 SALMAAN ISHFAQ AHMED
27A, PM-A-07A, CR- A-03, PM-A-06, PM-A-06A) at Admin Building Area @
Ju'aymah Shops Plant N-26
Final Inspection (Visual/Dry/D.F.T.) for Weld J oints of Galvanized
Plates/Bracket of Pre-Cast Panel @ New Substation Bldg. # 2118 (Battery
3414 H-0009 Room-103) GL: 2-3/A-B. ITP # (ETE-ITP- ST-01) ; Inspection Checklist (SAIC- NEW SUB STATION 16-Apr-18 11:55 AM 17-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN
H-2032) ; Activity # 3.6 & Inspection Responsibility Assignment: Saudi
Aramco (W) / Contractor (I). APCS-1C (Primer)
Pre-Casst & Pre-Stressed Pe Concreting Inspection (Bed and Pre-stressing
of stand) of Hollow Core Panel For Admin Building At INCO Pre-Cast
3415 C-2514 Fabrication Yard Panel Mark HCS MARK- HUR-701 (2 Nos), HUR-702, HUR- INCO 16-Apr-18 3:10 PM 17-Apr-18 10:00 AM 0016-A-ER-008-1-4 WILFREDO MAMDOOH
702A, HUR-703, HUR-704, HUR-501 (2 Nos), HUR- 502( 2 Nos) (Total 10
Nos.)
Pre-Casst & Pre-Stressed Concreting Testing Sampling and Placement
Inspection of Hollow Core Panel For Admin Building At INCO Pre-Cast
3416 C-2515 Fabrication Yard Panel Mark HCS MARK- HUR-701 (2 Nos), HUR-702, HUR- INCO 16-Apr-18 3:15 PM 17-Apr-18 10:30 AM 0016-A-ER-008-1-4 WILFREDO MAMDOOH
702A, HUR-703, HUR-704, HUR-501 (2 Nos), HUR- 502( 2 Nos) (Total 10
Nos.)

Materials Receiving Visual Inspection of 72 x 132 x47 DP BS BOX


3417 E-0346 ASSEMBLY 1.1mm (100 EA), AT ETE Laydown Yard Area, Ju’Aymah Shop PLANT N-26 16-Apr-18 1:50 PM 17-Apr-18 9:30 AM RA-819 NOLI ALI M. AL YASEEN
Plant N26, As per Attached Documents.

FDT Inspection for Sub Grade for Direct Buried Conduit below Inner
3418 C-2516 Security Fence near Existing Sub Station Area Length 2.0 LM at Inner JNGL 16-Apr-18 3:40 PM 17-Apr-18 4:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Patrol Road, JNGL Juaymah Shops, Plant N-26 (East Side Feeder)

Fill Placement Inspection of 1st Layer Select F ill Material at Direct Buried
3419 C-2517 Conduit below Inner Security Fence near Existing Sub Station Area Length JNGL 16-Apr-18 3:45 PM 17-Apr-18 4:10 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26 (East Side
Feeder)

FDT Compaction Inspection of 1st Layer Select Fill Material at Direct


3420 C-2518 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 16-Apr-18 3:50 PM 17-Apr-18 4:15 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26 (East
Side Feeder)

FDT Compaction Inspection of 2nd Layer Select Fill Material at Direct


3421 C-2519 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 16-Apr-18 3:52 PM 17-Apr-18 4:30 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26 (East
Side Feeder)

Fill Placement Inspection of 3rd Layer (Final) Select Fill Material at Direct
3422 C-2520 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 16-Apr-18 3:55 PM 17-Apr-18 4:35 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26 (East
Side Feeder)

FDT Compaction Inspection of 3rd Layer (Final) Select Fill Material at


3423 C-2521 Direct Buried Conduit below Inner Security Fence near Existing Sub JNGL 16-Apr-18 3:57 PM 17-Apr-18 4:45 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Station Area Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops,
Plant N-26 (East Side Feeder)

Visual Inspection after welding for joints on 3 wall panels SS-WG-01, 08 &
3424 ST-W-0061 09 (check attached drawings) @ Substation Building, Juaymah Shops, NEW SUB STATION 16-Apr-18 10:00 AM 17-Apr-18 4:15 PM RA-819885-001-00 OMAR M. HASSAN
Plant N26.

3425 C-2522 Formwouk Inspection for Neutralization Tank Footing, East Side of New NEW SUB STATION 17-Apr-18 10:00 AM 18-Apr-18 8:45 AM RA-819486-001-00 SALMAAN ISHFAQ AHMED
Substation Building at Ju'Aymah Shops Plant # N-26.

FBE Rebar Embedded Items and Formwork Closure Inspection for


3426 C2523 Neutralization Tank Footing, East Side of New Substation Building at NEW SUB STATION 17-Apr-18 10:05 AM 18-Apr-18 9:00 AM RA-819486-001-00 SALMAAN ISHFAQ AHMED
Ju'Aymah Shops Plant # N-26.

Concrete Testing Sampling and Casting Inspection for Neutralization Tank


3427 C-2524 Footing, East Side of New Substation Building at Ju'Aymah Shops Plant # NEW SUB STATION 17-Apr-18 10:10 AM 18-Apr-18 10:00 AM RA-819486-001-00 SALMAAN ISHFAQ AHMED
N-2

Material Receiving, Handling Storage and Preservation Inspection of


Plastering Accessories 1.Control Joint Bead 13 MM x 3.0 Meter(QTY=300
3428 C-2525 PCS), 2.Metal Lath 0.6 x 2.5 Meter 0.61 KG/M2 (QTY=1000 Sheets) for PLANT N-26 17-Apr-18 10:45 AM 18-Apr-18 10:00 AM RA-819745-001-00 BAQAR MAMDOOH
Admin Building (P.O # 25121)From A.A Turki Corporation (ATCO) At ETE
Store,Laydown Area @ J uAymah,Shops Plant N-26
Material Receiving Inspection of Sika Grout 114 SA Cementitous Non
3429 C-2526 Shrink Grout 25/Kg Bags for Admin Building & S ub Station Pre-Cast Panel. PLANT N-26 17-Apr-18 10:50 AM 18-Apr-18 7:30 AM 0016-ER-002-1-9 BAQAR ISHFAQ AHMED
From Sika Saudi Arabia Co.Ltd (QTY=320 Bags), P.O # L2018-120 At ETE
Admin Building & Substation Area @ Ju'aymah Shops Plant N-26

Cement Based Non-S hrink Grout Surface Preparation, Soaking & Final
3430 C-2527 Formwork Inspection Prior to Grouting for New Substation Building NEW SUB STATION 17-Apr-18 11:00 AM 18-Apr-18 8:00 AM 0016-ER-002-1-9 SALMAAN ISHFAQ AHMED
Above Double Tee Pre-Cast Slab Panels Grid Line A to C and 1 to 3 at
Ju'aymah shops. Plant N-26

Cement Based Non-S hrink Grout Mixing, Testing, Sampling and Placing
3431 C-2528 Inspection for New Substation Building Above Double Tee Pre-Cast Slab NEW SUB STATION 17-Apr-18 11:05 AM 18-Apr-18 8:30 AM 0016-ER-002-1-9 SALMAAN ISHFAQ AHMED
Panels Grid Line A to C and 1 to 3. at Ju'aymah shops. Plant N-26

Material Receiving Inspection for Pre- Cast Concrete Parapet Wall Panels
3432 C-2529 Roof Floor (Panel Mark) PM-A-07, PM-A-04, PR-A-02, PR-A-02A, CR-A-04, PLANT N-26 17-Apr-18 11:10 AM 18-Apr-18 7:00 AM 0016-A-ER-003-1-9 BAQAR ISHFAQ AHMED
CIR-A-05, CIR-A-12, CIR-A-13 At Admin Building Area @ Ju'aymah S hops
Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

Pre-cast Concre Pre-installation of Parapet Wall Panels Roof Floor (Panel


3433 C-2530 Mark) PM-A-07, PM- A-04, PR-A-02, PR-A-02A, CR-A-04, CIR-A-05, CIR-A- ADMIN BUILDING 17-Apr-18 11:15 AM 18-Apr-18 7:15 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
12, CIR-A-13 At Admin Building Area @ Ju'aymah Shops Plant N-26

Pre-cast Concre Erection and Alignment Inspection of Parapet Wall Panels


Roof Floor (Panel Mark) PM-A-07, PM-A-04, PR-A-02, PR-A-02A, CR-A-04,
3434 C-2531 CIR-A-05, CIR-A-12, CIR-A-13 At Admin Building Area @ Ju'aymah S hops ADMIN BUILDING 17-Apr-18 11:20 AM 18-Apr-18 7:30 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
Plant N-26

Materials Receiving Visual Inspection of EMT Conduits 3/4" Dia. X 3 Mtrs.


3435 E-0347 (200EA)at ETE Laydown Store Area, Ju’Ay mah Shop Plant N26, As per PLANT N-26 17-Apr-18 8:00 AM 18-Apr-18 9:00 AM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
Attached Documents.

Cast-In-Place Concrete Formwork and Surface Inspection prior to Cast


3436 C-2532 Screed First Floor in Tele Comm Equipment Room # 123 and Stair Case ADMIN BUILDING 17-Apr-18 3:45 PM 18-Apr-18 8:30 AM RA-819745-001-00 SALMAAN ISHFAQ AHMED
Room 111 and 130 New Admin Building Ju'Aymah Shops Plant N-26.

Screed Concret Testing, Sampling and Casting Inspection prior to Cast


3437 C-2533 Screed First Floor in Tele Comm Equipment Room # 123 and Stair Case ADMIN BUILDING 17-Apr-18 3:50 PM 18-Apr-18 RA-819745-001-00 SALMAAN ISHFAQ AHMED
Room 111 and 130 New Admin Building Ju'Aymah Shops Plant N-26.

FDT Inspection for Sub Grade for Direct Buried Conduit below Inner
3438 C-2534 Security Fence near Existing Sub Station Area Length 2.0 LM at Inner JNGL 17-Apr-18 4:20 PM 18-Apr-18 4:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED 1
Patrol Road, JNGL Juaymah Shops, Plant N-26 (West Side Feeder)

Fill Placement Inspection of 1st Layer Select F ill Material at Direct Buried
Conduit below Inner Security Fence near Existing Sub Station Area Length
3439 C-2535 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26 (West Side JNGL 17-Apr-18 4:25 PM 18-Apr-18 4:10 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Feeder)

FDT Compaction Inspection of 1st Layer Select Fill Material at Direct


Buried Conduit below Inner Security Fence near Existing Sub Station Area
3440 C-2536 Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26 JNGL 17-Apr-18 4:30 PM 18-Apr-18 4:15 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED 1
(West Side Feeder)

FDT Compaction Inspection of 2nd Layer Select Fill Material at Direct


3441 C-2537 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 17-Apr-18 4:35 PM 18-Apr-18 4:30 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED 1
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26
(West Side Feeder)

Fill Placement Inspection of 3rd Layer (Final) Select Fill Material at Direct
3442 C-2538 Buried Conduit below Inner Security Fence near Existing Sub Station Area JNGL 17-Apr-18 4:40 PM 18-Apr-18 4:35 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops, Plant N-26
(West Side Feeder)

FDT Compaction Inspection of 3rd Layer (Final) Select Fill Material at


3443 C-2539 Direct Buried Conduit below Inner Security Fence near Existing Sub JNGL 17-Apr-18 4:45 PM 18-Apr-18 4:45 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED 1
Station Area Length 2.0 LM at Inner Patrol Road, JNGL Juaymah Shops,
Plant N-26 (West Side Feeder)

Visual Inspection of Excavation and Trenching for the FOC direct buried
3444 T-0106 pvc conduits at below security fence and inner road near existing JNGL 17-Apr-18 4:30 PM 18-Apr-18 2:00 PM RA-819460-001-0F2 AFREEN M. Z. NAVEED
substation area, length is 2meter. As per attached highlighted drawing @
Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of installation & Initial Mandrel test of 3-4” pvc conduits
3445 T-0107 for the FOC direct buried below security fence and inner roads near JNGL 17-Apr-18 4:35 PM 18-Apr-18 2:15 PM RA-819460-001-0F2 AFREEN M. Z. NAVEED
existing substation area, length is 2meter. As per attached highlighted
drawing @ Upgraded Ju'aymah Shops Plant N-26.

Visual Inspection of Orange Tape installation and sand bedding for the
3446 T-0108 FOC direct buried below security fence and inner roads near existing JNGL 17-Apr-18 4:40 PM 18-Apr-18 2:30 PM RA-819460-001-0F2 AFREEN M. Z. NAVEED
substation area, length is 2meter. As per attached highlighted drawing @
Upgraded Ju'aymah Shops Plant N-26.

Material Receiving Visual Inspection of Electrical Yellow Warning Tape 12"


3447 E-0348 Wide X 305 Meters (60 Rolls) For Direct Buried Cables at ETE Laydown PLANT N-26 18-Apr-18 7:30 AM 19-Apr-18 9:00 AM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
Store Area, Ju’Aymah Shop Plant N26 as per attached documents.

Visual Inspection for Installation of 1" PVC Conduits (Prior to Mortar


Plaster Concealment) for Concealment Wall Receptacle Outelts with
3448 E-0349 Circuit Nos. 36, 16, 17, 27, 12 & 25 Inside 1st. Floor of New Admin Bldg. ADMIN BUILDING 18-Apr-18 7:35 AM 19-Apr-18 9:30 AM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
(before cable pulling) At Ju’aymah Shop Plant N26. as per Attached
Highlighted Drawing.
Visual Inspection for Installation of 2 x 4 utility box for wall concealed
3449 E-0350 receptacle outlet with circuit No.36, 16, 17, 12, & 25 (N26-2118-PP-033) ADMIN BUILDING 18-Apr-18 7:40 AM 19-Apr-18 9:45 AM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
Inside 1st Floor of New Admin Bldg.(Before Cable Pulling) , Ju’aymah Shop
Plant N26 as per Attached Highlighted Drawing.

Pulling Visual Inspection of 4-1” sub ducts in conduit for the PSA duct
3450 T-0109 bank(ELE-DB-04), Length is 20 meters Between Existing Maintenance JNGL 18-Apr-18 1:30 PM 19-Apr-18 8:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
Bldg. (2110) & Existing Welding Shop Bldg. (2104) at Ju’Aymah Shop Plant
N26 as per Attached Highlighted Drawing.

Visual Inspection of Orange Tape installation and sand bedding for the
3451 T-0110 PSA duct bank(ELE-DB-03) at new Substation area, Length is 18meter. As JNGL 18-Apr-18 1:33 PM 19-Apr-18 9:00 AM RA-819460-002-0F1 AFREEN M. Z. NAVEED
per attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-
26.

Visual Inspection of Final Mandrel test for the PSA duct bank near Existing
3452 T-0111 Substation 3 area, length is 8 meter. As per attached highlighted drawing JNGL 18-Apr-18 1:35 PM 19-Apr-18 10:00 AM RA-819460-001-0F2 AFREEN M. Z. NAVEED
@ Upgraded Ju'aymah Shops Plant N-26

Visual Inspection of Orange Tape installation and sand bedding for the
3453 T-0112 PSA duct bank near Existing Substation 3 area, length is 8 meter. As per JNGL 18-Apr-18 1:40 PM 19-Apr-18 11:00 AM RA-819460-001-0F2 AFREEN M. Z. NAVEED
attached highlighted drawing @ Upgraded Ju'aymah Shops Plant N-26

Gypsum Board (Type A2) Framing and Pre-Installation Inspection for


3454 C-2540 12nos. Column @ Grid Line C / 3 to 10 (6 Column) and Grid Line D / 3 to ADMIN BUILDING 18-Apr-18 2:00 PM 19-Apr-18 10:30 AM RA-819745-001-00 SALMAAN MAMDOOH
10 (6 Column) First Floor at New Admin Building @ Ju'aymah shops,
plant N-26.
Material Receiving ,handling S torage and Preservation Inspection of
Parking Shade, 1.Column Square Tube 200 x 200 x 10MM (Qty=42), 2.Box
Connections 300 x 230 x 12 MM (Qty=42), 3.Box Connections 200 x 230 x
3455 C-2541 12 MM (Qty=42), 4.Support Square Tube 80 x 80 x 5MM x 675 MM PLANT N-26 18-Apr-18 2:05 PM 19-Apr-18 10:00 AM RA-819946-001-00 BAQAR ISHFAQ AHMED not in QMIS
(Qty=60) And Accessories For Car Parking Area .P.O # 29875 From Saudi
Specializa Industrial Services At CArParking Area At ju'aymah Shops Plant
N-26
Material Receiving Handling storage and preservation Inspection of
3456 C-2542 Ordinary Portland Cement, (Type 1) 50 Kg Packing (Qty=500 Bags) P.O # PLANT N-26 18-Apr-18 2:10 PM 19-Apr-18 11:30 AM RA-819745-001-00 BAQAR MAMDOOH not in QMIS
31399 From Saudi Cement At ETE Laydown Area @ Ju'aymah Shops Plant
N-26

Material Receiving Handling storage and preservation Inspection of


3457 C-2543 Gypsum Board Regular (Size 16 MM x 1.2 Meter x 3.0 Meter ) (QTY=476) PLANT N-26 18-Apr-18 2:15 PM 19-Apr-18 11:00 AM RA-819746-001-00 BAQAR MAMDOOH
For Admin Building At ETE Laydown Area @ Ju'aymah Shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 4000 PSi for Beams of Upper Roof Slab for Stair Case Area
3458 C-2544 (East and South Sides) Grid line 6 to 7 @ GL. A (East side Stare Case) & C GULF 18-Apr-18 2:20 PM 19-Apr-18 10:00 AM RA-819729-001-00 QUADRI ISHFAQ AHMED
to E & 11 to 12, (south side) upper Roof, New Admin Building @ Gulf
Consult
Final Inspection (Visual/Dry/D.F.T.) for Weld J oints of Galvanized
3459 H-0010 Plates/Bracket of Pre-Cast Panel @ New Substation Bldg. # 2118 NEW SUB STATION 18-Apr-18 4:15 PM 19-Apr-18 10:30 AM RA-819885-001-00 LESLIE ABDUL REHMAN
(Mechanical Room-102 & Telecom Room-104) GL: 2-3/B-C. APCS-1C
(Primer)
Material Receiving ,handling S torage and Preservation Inspection of
Interlocking Tiles 1. Concrete InterLocking Bricks Rectangular Shape
Holland Rough Colour gray 100 MM x 200 MM x 80 MM (Qty=03 Box), 2.
3460 C-2545 Concrete InterLocking Bricks Rectangular Shape Holland Rough Colour PLANT N-26 18-Apr-18 4:20 PM 19-Apr-18 10:00 AM RA-819947-001-00 BAQAR ISHFAQ AHMED
Red 100 MM x 200 MM x 80 MM (Qty=03 Box), 3. Concrete InterLocking
Bricks Rectangular Shape Holland Rough Colour Yellow 100 MM x 200
MM x 80 MM (Qty=02 Box) For Car Parking Area .P.O # 31328 From New
Century Factory at CArParking Area At ju'aymah Shops Plant N-26
Fill Placement & Compaction Inspection of 1st & (Final Layer) Selectfill
3461 C-2546 Material Backfilling for Sidewalk / Island at Gride Line (4) (A-I) at New CAR PARKING 19-Apr-18 1:05 PM 21-Apr-18 8:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED not in QMIS
Parking Area, Ju'Aymah Shops Plant N-26

FDT Compaction Inspection of 1st & (Final Layer) Selectfill Material


3462 C-2547 Backfilling for Sidewalk / Island at Gride Line (4) (A- I) at New Parking Area, CAR PARKING 19-Apr-18 1:08 PM 21-Apr-18 8:15 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
Ju'Aymah Shops Plant N-26

Location,Boreholes and Elevations Inspection for Type 3 Fence (Line Post) SHIPPING & RECEIVING
3463 C-2548 19 Nos. and (Corner Post) 2 Nos. at West Side of Shipping and Receiving 19-Apr-18 1:10 PM 21-Apr-18 9:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Area, Juaymah Shops Plant N-26 AREA

Pre Pouring Inspection for Type 3 Fence (Line Post) 19 Nos. and (Corner SHIPPING & RECEIVING
3464 C-2549 Post) 2 Nos. at West Side of Shipping and Receiving Area, Juaymah Shops 19-Apr-18 1:12 PM 21-Apr-18 9:15 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Plant N-26 AREA

Concrete Placement, Sampling & Testing Inspection for Type 3 Fence (Line SHIPPING & RECEIVING
3465 C-2550 Post) 19 Nos. and (Corner Post) 2 Nos. at West Side of Shipping and 19-Apr-18 1:15 PM 21-Apr-18 10:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Receiving Area, Juaymah Shops Plant N-26 AREA

Material,Receiving Inspection for Pre- Cast Concrete Parapet Wall Panels


3466 C-2551 Roof Floor (Panel Mark) PR-A-05, PR-A-05A, PR-A-01, CR-A-01AH, CIR-A- PLANT N-26 19-Apr-18 1:25 PM 21-Apr-18 7:00 AM 0016-A-ER-003-1-9 BAQAR ISHFAQ AHMED
06, CIR-A-04, CIR-A-04A, CIR-A-03 Total 8 Nos. At Admin Building Area @
Ju'aymah Shops Plant N-26

Pre-installation Inspection for Pre- Cast Concrete Parapet Wall Panels


3467 C-2552 Roof Floor (Panel Mark) PR-A-05, PR-A-05A, PR-A-01, CR-A-01AH, CIR-A- ADMIN BUILDING 19-Apr-18 1:30 PM 21-Apr-18 7:30 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
06, CIR-A-04, CIR-A-04A, CIR-A-03 Total 8 Nos. At Admin Building Area @
Ju'aymah Shops Plant N-26

Erection and Alignment Inspection for Pre- Cast Concrete Parapet Wall
3468 C-2553 Panels Roof Floor (Panel Mark) PR-A-05, PR-A-05A, PR-A-01, CR-A-01AH, ADMIN BUILDING 19-Apr-18 1:35 PM 21-Apr-18 7:45 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
CIR-A-06, CIR-A-04, CIR-A-04A, CIR-A-03 Total 8 Nos. At Admin Building
Area @ J u'aymah Shops Plant N-26

3469 C-2554 Compaction Testing (FDT) Inspection of 3rd Layer Select fill Material at ADMIN BUILDING 19-Apr-18 1:35 PM 21-Apr-18 3:00 PM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED
North Side of New workshop @ Ju'aymah Shops, Plant N-26.

Visual Inspection for Installation of EMT Conduit for power receptacle


3470 E-0351 home run Prior to Cable Pulling for Recessed/Surface Mounted ADMIN BUILDING 19-Apr-18 2:15 PM 21-Apr-18 9:30 AM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
Recessed/S urface Mounted Inside 1st Floor of New Admin Bldg.,
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.

Visual Inspection for Installation of 4" X 4" Square Box for power recptacle
3471 E-0352 Prior to Cable Pulling for Recessed/ Surface Mounted Inside 1st Floor of ADMIN BUILDING 19-Apr-18 2:20 PM 21-Apr-18 9:45 AM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
New Admin Bldg., Ju’aymah Shop Plant N26 as per Attached highlighted
Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal/Emergency Lightings with Circuit Nos.
3472 E-0353 01, 06, 10, 15 & 20 (N26-2118- LP-031) at Room/Area Nos. 112, 107, 147, ADMIN BUILDING 19-Apr-18 2:22 PM 21-Apr-18 10:00 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
123, 132, 133, 134 & 135 Inside 2nd Floor of New Admin Bldg., Ju’aymah
Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed/Surface Mounted Normal/Emergency Lightings with
3473 E-0354 Circuit Nos. 01, 06, 10, 15 & 20 (N26-2118-LP-031) at Room/Area Nos. ADMIN BUILDING 19-Apr-18 2:25 PM 21-Apr-18 10:15 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
112, 107, 147, 123, 132, 133, 134 & 135 Inside 1st F loor of New Admin
Bldg., Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Compaction (FDT) inspection of Existing Subgrade for the Foundation of
3474 C-2555 Chiller Pad of ACCU-3 & ACCU-1 along Grid line F (out side) and ADMIN BUILDING 19-Apr-18 2:50 PM 21-Apr-18 9:30 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Foundation of Motor Pump 2 Nos. Grid Line (5 to 7) / (E to F) First Floor
New Admin Building @ Ju'aymah Shops, Plant N-26.

Site and Grade preparation prior to lean Concrete for the Foundation of
3475 C-2556 Chiller Pad of ACCU-3 & ACCU-1 along Grid line F (out side) and ADMIN BUILDING 19-Apr-18 2:55 PM 21-Apr-18 9:45 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Foundation of Motor Pump 2 Nos. Grid Line (5 to 7) / (E to F) First Floor
New Admin Building @ Ju'aymah Shops, Plant N-26.

Concrete Testing Sampling and Casting for the Foundation of Chiller Pad
3476 C-2557 of ACCU-3 & ACCU-1 along Grid line F (out side) and Foundation of Motor ADMIN BUILDING 19-Apr-18 3:00 PM 21-Apr-18 10:15 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Pump 2 Nos. Grid Line (5 to 7) / (E to F) First Floor New Admin Building @
Ju'aymah Shops, Plant N-26.

Material Receiving, Handling, Storage & preservation Inspection of CPVC


3477 P-0278 SCH-80 fittings with ¾"X½"Ø REDUCER BUSH (17 Pcs),¾"Ø TEE (10-Pcs) & PLANT N-26 19-Apr-18 3:00 PM 21-Apr-18 9:30 AM RA-819772-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
1½"X¾" REDUCER BUSH (10-Pcs) f rom AL-HODACO (ZENITH) @ ETE store,
Juaymah Shops Project, Plant N-26.

Material Receiving, Handling ,Storage & preservation Inspection of


3478 P-0279 THREADED ROD M10X3M (80-Pcs) from WOLOUF TRADING EST (Arab PLANT N-26 19-Apr-18 3:02 PM 21-Apr-18 10:00 AM RA-819772-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
Bolts) at ETE store, Juaymah Shops Project, Plant N-26

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


SCH-80 fittings with 1X½"Ø Reducer Bush (37 Pcs),1"Ø TEE (37-Pcs),1"Ø
3479 P-0280 ELB 90⁰ (25-Pcs),¾" Female Adaptor Brass Threaded (27-Pcs) 1" Female PLANT N-26 19-Apr-18 3:05 PM 21-Apr-18 10:30 AM RA-819772-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
Adaptor Brass Threaded (32-Pcs) & 2"X¾" Reducer Bush (10-Pcs)from AL-
HODACO (ZENITH) at ETE store
PVC DWV Pipes Installation & Assembly Inspection of 4", 3" & 2" Dia for
3480 P-0281 Sanitary Sewer Water Line at Second Floor for Janitor Room # 230 and ADMIN BUILDING 19-Apr-18 3:07 PM 21-Apr-18 7:30 AM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
Coffee/Tea Room # 228 attach to Male Toilet No.231 in New Admin
Building Area @ Ju'AymahShops Plant N- 26.

Pipe Hangers and Supports Installation Inspection for PVC DWV Pipes
3481 P-0282 Installation & Assembly Inspection of 4",3" & 2" Dia for Sanitary S ewer ADMIN BUILDING 19-Apr-18 3:10 PM 21-Apr-18 8:00 AM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
Water Line at Second Floor for Janitor Room # 230 and Coffee/Tea Room #
228 attach to Male Toilet No.231 in New Admin Building Area

PVC DWV Pipes Installation & Assembly Inspection of 4", 3" & 2" Dia for
3482 P-0283 Sanitary Sewer Water Line at Second Floor for Female Toilet # 211 and ADMIN BUILDING 19-Apr-18 3:12 PM 21-Apr-18 8:30 AM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
Coffee/Tea Room # 210 attach to Male Toilet No.212 in New Admin
Building Area at Ju'AymahShops Plant N- 26.

Pipe Hangers and Supports Installation Inspection for PVC DWV Pipes
3483 P-0284 Installation & Assembly Inspection of 4",3" & 2" Dia for Sanitary S ewer ADMIN BUILDING 19-Apr-18 3:15 PM 21-Apr-18 9:00 AM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
Water Line at Second Floor for Female Toilet # 211 and Coffee/Tea Room
# 210 attach to Male Toilet No.231 in New Admin Building Area

Sewer Gravity Test for PVC DWV Pipes & fittings for Coffee/Tea Room #
3484 P-0285 228, Janitor Room # 230 & Male Toilet # 231 Second Floor in New Admin ADMIN BUILDING 19-Apr-18 4:15 PM 21-Apr-18 1:00 PM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
Buiding at Ju'Aymah Shops Plant N-26.

Fill Placement & Compaction Inspection of 1st & (Final Layer) Selectfill
3485 C-2558 Material Backfilling for Sidewalk / Island at Grideline (3) (A-I) at New CAR PARKING 21-Apr-18 1:00 PM 22-Apr-18 2:00 PM RA-819946-001-00 ACIELO ISHFAQ AHMED not in QMIS
Parking Area, Juaymah Shops Plant N-26

FDT Compaction Inspection of 1st & (Final Layer) Selectfill Material


3486 C-2559 Backfilling for Sidewalk / Island at Grideline (3) (A-I) at New Parking Area, CAR PARKING 21-Apr-18 1:02 PM 22-Apr-18 2:15 PM RA-819946-001-00 ACIELO ISHFAQ AHMED
Juaymah Shops Plant N-26

Grade & Site Preparation Inspection for Gantry Crane Slab on Grade SHIPPING & RECEIVING
3487 C-2560 (between Foundations) (1st Half 25m.) Shipping and Receiving Area AREA 21-Apr-18 1:05 PM 22-Apr-18 3:00 PM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Juaymah Shops Plant N-26.

Formworks Inspection for Gantry Crane Slab on Grade (between


3488 C-2561 Foundations) (1st Half 25m.) Shipping and Receiving Area Juaymah Shops SHIPPINGAREA
& RECEIVING 21-Apr-18 1:07 PM 22-Apr-18 3:15 PM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Plant N-26.

FBE S teel Bars, Embedded Items & Formclosure Inspection for Gantry
3489 C-2562 Crane Slab on Grade (between Foundations) (1st Half 25m.) Shipping and SHIPPINGAREA
& RECEIVING 21-Apr-18 1:10 PM 22-Apr-18 3:30 PM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Receiving Area Juaymah Shops Plant N-26.

Sewer Gravity Test for PVC DWV Pipes & fittings for Coffee/Tea Room #
3490 P-0286 210, Female Toilet # 211 & Male Toilet # 212 Second Floor in New Admin ADMIN BUILDING 21-Apr-18 3:50 PM 22-Apr-18 1:00 PM RA-819777-001-00 FAHEEM SYED SHAFIULLAH
Buiding at Ju'Aymah Shops Plant N-26.

CMU Surface Preparation and Protection Inspection of Grid Line 5 And


3491 C-2432-A Grid Line A-B Inside Room No. 142 & 143 South Face ) At Admin Building ADMIN BUILDING 21-Apr-18 3:05 PM 22-Apr-18 10:00 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
@ J a'Aymah,shops Plant N-26

CMU Surface Preparation and Protection Inspection of Grid Line 10-12


3492 C-2434-A And Grid Line E Inside Room No 129 A East Face ) At Admin Building @ ADMIN BUILDING 21-Apr-18 3:07 PM 22-Apr-18 10:30 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
Ja'Aymah,shops Plant N-26

CMU Surface Preparation, Protection and Plaster accessory Inspection


3493 C-2442-A (Grid Line 8 / E-F Room # 125 South Face) and (Grid Line 11 / E-F ROOM ADMIN BUILDING 21-Apr-18 3:10 PM 22-Apr-18 9:30 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
no 148 & 141 North Face) First F loor At Admin Building @
Ja'Aymah,shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3494 C-2563 Building Roof Floor panel Panel Mark :CIR-A-02, CR-A-03, PM-A-26, PM-A- GULF 21-Apr-18 3:25 PM 22-Apr-18 10:30 AM 0016-A-ER-003-1-9 QUADRI ISHFAQ AHMED
27, PM-A-27A, CR-A- 02, CIR-A-01 At Inco Pre-Cast fabricartion Yard,
Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3495 C-2564 Building Roof Floor panel Panel Mark :CIR-A-02, CR-A-03, PM-A-26, PM-A- GULF 21-Apr-18 3:30 PM 22-Apr-18 10:45 AM 0016-A-ER-003-1-9 QUADRI SYED SHAFIULLAH
27, PM-A-27A, CR-A- 02, CIR-A-01 At Inco Pre-Cast fabricartion Yard,
Ju'aymah Shops Plant N-26 @ Gulf Consult

Materials Receiving Visual Inspection of Unistrut Channel Support 1" &


3496 E-0355 3/4" ( 100-EA. 1" & 100-EA 3/4") At ETE Laydown Store, Upgrade PLANT N-26 21-Apr-18 3:35 PM 22-Apr-18 1:30 PM RA-819460-001-0F2 NOLI ALI M. AL YASEEN
Ju'aymah Shop Project Plant N26.
Cement Based Non-S hrink Grout Surface preparation, Soaking &
Formwork Inspection for S ubstation Building for wall Panel. Panel Mark
3497 C-2565 (SS-WIG-01,SS-WIG-02B,SS-WIG-03, SS-WIG-04, SS-WIG-02C, SS- WIG-05, NEW SUB STATION 22-Apr-18 7:00 AM 23-Apr-18 8:00 AM 0016-ER-003-1-7 SALMAAN ISHFAQ AHMED
SS-WIG-06, SS-WIG-07, SS -WIG-12H, SS-WIG-13, SS-WIG-14, SS-WIG-115,
SS-WIG-22, SS-WIG-02 and S S-WIG-23) New Substation Building at
Ju'aymahBased
Cement shops. Plant
Non-S N-26
hrink Grout Mixing, Testing, Sampling and Placing
Inspection for Substation Building for wall Panel. Panel Mark (SS-WIG-
3498 C-2566 01,SS- WIG-02B,SS-WIG-03, SS-WIG-04, S S- WIG-02C, SS-WIG-05, SS-WIG- NEW SUB STATION 22-Apr-18 7:05 AM 23-Apr-18 9:00 AM 0016-ER-003-1-7 SALMAAN ISHFAQ AHMED
06, SS-WIG-07, SS-WIG-12H, SS- WIG-13, SS-WIG-14, SS-WIG-115, SS-WIG-
22, SS-WIG-02 and SS-WIG-23) New Substation Building at Ju'aymah
shops. Plant N-26
Curing inspection for Type 3 Fence (Line post) 20 nos.north side and (line
3499 C-2567 post) 8 nos.north east side of Shipping and Receiving Area,Juaymah Shops SHIPPINGAREA
& RECEIVING 22-Apr-18 10:00 AM 23-Apr-18 7:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
,Plant N-26

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


3500 C-2568 Screed upon double Tee Slab for Panel # 1 and 3 (as per Drawing SD- NEW SUB STATION 22-Apr-18 10:03 AM 23-Apr-18 8:30 AM 0016-ER-002-1-7 SALMAAN ISHFAQ AHMED
10037-001-00) Roof Slab of New Substation Building ju'aymah shops,
plant N-26.

FBE Rebar (Wire Mesh) Embedded items and formwork closure Inspection
3501 C-2569 prior to Cast Screed upon double Tee Slab for Panel # 1 and 3 (as per NEW SUB STATION 22-Apr-18 10:05 AM 23-Apr-18 9:30 AM 0016-ER-002-1-7 SALMAAN ISHFAQ AHMED
Drawing SD-10037-001-00) Roof Slab of New S ubstation Building
ju'aymah shops, plant N-26.

Screed (Concrte) Testing, Sampling and Casting Inspection prior to Cast


3502 C-2570 Screed upon double Tee Slab for Panel # 1 and 3 (as per Drawing SD- NEW SUB STATION 22-Apr-18 10:10 AM 23-Apr-18 10:30 AM 0016-ER-002-1-7 SALMAAN ISHFAQ AHMED
10037-001-00) Roof Slab of New Substation Building ju'aymah shops,
plant N-26.

3503 C-2571 Geo Grid installation above Telecom Duct Bank 60/L.M North side of WORK SHOP 22-Apr-18 10:12 AM 23-Apr-18 3:00 PM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
New work shop @ ju'aymah shops, plant N-26.

Fill Placement Inspection of Base Course material Backfilling above


3504 C-2572 Telecom Duct Bank 60/L.M North side of New work shop @ ju'aymah WORK SHOP 22-Apr-18 10:15 AM 23-Apr-18 9:00 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED not in QMIS
shops, plant N-26.

FDT Compaction Inspection of Base Course material Backfilling above


3505 C-2573 Telecom Duct Bank 60/L.M North side of New work shop @ ju'aymah WORK SHOP 22-Apr-18 10:20 AM 23-Apr-18 9:15 AM RA-819517-001-0F2 SALMAAN ISHFAQ AHMED
shops, plant N-26.

Visual inspection for heavy duty epoxy floor screed application ( 1st part
3506 C-2574 25% only ) on concrete slab at Shipping and Receiving area,Juaymah SHIPPING & RECEIVING 22-Apr-18 1:10 PM 23-Apr-18 8:00 AM RA-819992-001-0F3 ACIELO ISHFAQ AHMED not in QMIS
AREA
Shops Plant N/26

3507 C-2575 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 22-Apr-18 1:15 PM 23-Apr-18 10:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
Osais (Qty=131 M3) at ETE Laydown Area @ J u'aymah Shops Plant N-26

3508 C-2576 Material Receiving Inspection of Clean Sand l From Al-Osais (Qty= 71 M3) PLANT N-26 22-Apr-18 1:20 PM 23-Apr-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
@ ETE Laydown,JaAymah,shops Plant N-26

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3509 C-2577 Building Roof Floor panel (Panel Mark:PR-A-05H, M-A-28, PM-A-27B, PM- GULF 22-Apr-18 1:25 PM 23-Apr-18 10:30 AM 0016-A-ER-003-1-9 QUADRI ISHFAQ AHMED
A-26A, CR-A-04, CIR-A-01A, CY-A-01A, CY-A-02, CY-A-01 (3 NOS)At Inco
Pre-Cast fabricartion Yard, Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3510 C-2578 Building Roof Floor panel (Panel Mark:PR-A-05H, M-A-28, PM-A-27B, PM- GULF 22-Apr-18 1:30 PM 23-Apr-18 10:45 AM 0016-A-ER-003-1-9 QUADRI ISHFAQ AHMED
A-26A, CR-A-04, CIR-A-01A, CY-A-01A, CY-A-02, CY-A-01 (3 NOS)At Inco
Pre-Cast fabricartion Yard, Ju'aymah Shops Plant N-26 @ Gulf Consult
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

CMU Surface Preparation, Protection and Plaster accessory Inspection


3511 C-2579 (Grid Line E & between 4 to 9 Room # Corridor-112 First Floor At New ADMIN BUILDING 22-Apr-18 1:35 PM 23-Apr-18 9:45 AM RA-819745-003-00 SALMAAN MAMDOOH
Admin Building @ Ja'Aymah,shops Plant N-26

Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal / Emergency Lightings with Circuit
3512 E-0356 Nos. 07, 06, 04 & 10 (N26-2118-LP-031) at Room/Area Nos. 123, 124, ADMIN BUILDING 22-Apr-18 11:00 AM 23-Apr-18 9:00 AM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
125,116 & 115 Inside 1st Floor of New Admin Bldg., @ Ju’aymah Shop
Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed/Surface Mounted Norma / Emergency Lightings with
3513 E-0357 Circuit Nos.07, 06, 04 & 10 (N26-2118-LP-031) at Room/Area Nos. 123, ADMIN BUILDING 22-Apr-18 11:05 AM 23-Apr-18 9:15 AM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
124, 125,116 & 115 Inside 1st Floor of New Admin Bldg., @ Ju’aymah
Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal/Emergency Lightings with Circuit Nos.
3514 E-0358 15, 16, 17 & 18 (N26-2118-LP-031) at Room/Area Nos. 236, 238A, 235, ADMIN BUILDING 22-Apr-18 11:10 AM 23-Apr-18 9:30 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
239, 234, 233, 232 & 233A, At 2nd Floor of New Admin Bldg., @
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed/Surface Mounted Normal/Emergency Lightings with
3515 E-0359 Circuit Nos. 15, 16, 17 & 18 (N26-2118-LP-031) at Room/Area Nos. 236, ADMIN BUILDING 22-Apr-18 11:20 AM 23-Apr-18 1:30 PM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
238A, 235, 239, 234, 233, 232 & 233A, At 2nd Floor of New Admin Bldg.,
@ J u’aymah Shop Plant N26 as per Attached Highlighted Drawing.

Gypsum Board Framing and Pre-Installation Inspection @ Grid Line A to B


3516 C-2580 / 2 to 4 2nd Floor at New Admin Building. @ Ju'aymah shops, plant N- ADMIN BUILDING 22-Apr-18 1:55 PM 23-Apr-18 10:00 AM RA-819745-001-00 SALMAAN MAMDOOH
26.

Concrete placement,Sampling & Testing inspection Inspection for Gantry SHIPPING & RECEIVING
3517 C-2581 Crane Slab on Grade (between Foundations) (1st Half 25m.) Shipping and AREA 22-Apr-18 4:10 PM 23-Apr-18 8:30 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Receiving Area Juaymah Shops Plant N-26.

FDT Compaction Inspection of Select Fill Material above Raw and Potable
3518 C-2582 Water Line from Booster Pump 2 to Workshop Length 130 LM @ Ju'aymah WORK SHOP 22-Apr-18 4:15 PM 23-Apr-18 3:00 PM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED
Shops, Plant N-26.

3519 C-2583 Material Receiving Inspection of Select Fill Material From Al-Osais (Qty= PLANT N-26 22-Apr-18 4:20 PM 23-Apr-18 10:30 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED not in QMIS
92 M3) @ ETE Laydown,JaAymah,shops Plant N-26

Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal Emergency Lightings with Circuit Nos.
3520 E-0360 07, 06, 04 & 10 (N26-2118-LP-031) at Room/Area Nos. 123, 124, 125,116 ADMIN BUILDING 22-Apr-18 4:25 PM 23-Apr-18 9:00 AM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
& 115 Inside 1st Floor of New Admin Bldg., Ju’aymah Shop Plant N26 as
per Attached Highlighted Drawing.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3521 C-2584 Building Roof Floor panel (Panel Mark: PM- A-07A, PM-A-06, CR-A-01A, GULF 23-Apr-18 2:00 PM 24-Apr-18 10:30 AM 0016-A-ER-003-1-7 QUADRI ISHFAQ AHMED
PM-A-04A, PR-A-02, CIR-A-04A, CR-A-01B, CR-A-07, SB-A-01 (4 NOS), SC-
A-01 (4 NOS) At Inco Pre-Cast fabricartion Yard, Ju'aymah Shops Plant N-
26 @ Gulf28
Concrete Consult
Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3522 C-2585 Building Roof Floor panel (Panel Mark: PM- A-07A, PM-A-06, CR-A-01A, GULF 23-Apr-18 2:05 PM 24-Apr-18 10:45 AM 0016-A-ER-003-1-7 QUADRI ISHFAQ AHMED
PM-A-04A, PR-A-02, CIR-A-04A, CR-A-01B, CR-A-07, SB-A-01 (4 NOS), SC-
A-01 (4 NOS) At Inco Pre-Cast fabricartion Yard, Ju'aymah Shops Plant N-
26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3523 C-2586 Inspection of 5000 PSi for for Pre-Cast Light pols Foundations (15 Nos), at GULF 23-Apr-18 2:10 PM 24-Apr-18 11:00 AM RA-819463-001-00 QUADRI ISHFAQ AHMED
Pre-Cast Yard, North Side of New Admin Building, ju'aymah shops. Plant
# N-26.@ Gulf Consult

Gypsum Board Framing and Pre-Installation Inspection @ Grid Line 12 / C


3524 C-2587 to E Room # 130 1st F loor at New Admin Building. @ Ju'aymah shops, ADMIN BUILDING 23-Apr-18 3:00 PM 24-Apr-18 10:00 AM RA-819746-001-00 SALMAAN MAMDOOH
plant N-26.

Material,Receiving Inspection for Pre- Cast Concrete Parapet Wall Panels


3525 C-2588 Roof Floor (Panel Mark) PM-A-04A, PM-A-03A, PM-A-12, PM-A-13, PM-A- ADMIN BUILDING 23-Apr-18 3:05 PM 24-Apr-18 7:00 AM 0016-A-ER-003-1-7 BAQAR ISHFAQ AHMED
03, PM-A-13A, CR-A- 07, CR- A-07A, SS-A-01, SS-A-01, SS-A-01, SS-A-01A At
Admin Building Area @ Ju'aymah Shops Plant N-26

Pre-Installation Inspection for Admin Building Parapet Wall Panels Roof


3526 C-2589 Floor (Panel Mark) PM-A-04A, PM-A-03A, PM-A-12, PM-A-13, PM-A-03, ADMIN BUILDING 23-Apr-18 3:10 PM 24-Apr-18 7:30 AM 0016-A-ER-003-1-7 SALMAAN ISHFAQ AHMED
PM-A-13A, CR-A-07, CR-A- 07A, SS-A-01, SS-A-01, SS-A-01, S S-A-01A At
Admin Building Area @ Ju'aymah Shops Plant N-26
Pre-cast Concre Panels Erection and Alignment Inspection for Admin
Building Parapet Wall Panels Roof Floor (Panel Mark) PM-A-04A, PM-A-
3527 C-2590 03A, PM-A-12, PM-A-13, PM-A-03, PM-A-13A, CR-A-07, CR-A-07A, SS-A- ADMIN BUILDING 23-Apr-18 3:15 PM 24-Apr-18 7:45 AM 0016-A-ER-003-1-7 SALMAAN ISHFAQ AHMED
01, SS-A-01, SS-A-01, SS -A-01A At Admin Building Area @ J u'aymah Shops
Plant N-26
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed/Surface Mounted Normal / Emergency Lightings with
3528 E-0361 Circuit Nos 10 & 11 (N26-2118-LP- 033) at Room / Area Nos. 221, 222, ADMIN BUILDING 23-Apr-18 4:00 PM 24-Apr-18 9:15 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
223, 224 & 225 at 2nd Floor of New Admin Bldg., Ju’aymah Shop Plant
N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal / Emergency Lightings with Circuit
3529 E-0362 Nos 10 & 11 (N26-2118-LP-033) at Room / Area Nos. 221, 222, 223, 224 ADMIN BUILDING 23-Apr-18 4:05 PM 24-Apr-18 9:00 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
& 225 at 2nd Floor of New Admin Bldg., Ju’aymah Shop Plant N26 as per
Attached Highlighted Drawing.

3530 C-2591 FDT Compaction Inspection of Subgrade for Ramp Foundation North Side ADMIN BUILDING 24-Apr-18 10:00 AM 25-Apr-18 8:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
of New Adming Building @ Ju'aymah Shops, Plant N-26.

3531 C-2592 Grade and Site Preparation Inspection for Ramp Foundation North Side of ADMIN BUILDING 24-Apr-18 10:05 AM 25-Apr-18 8:15 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
New Adming Building @ Ju'aymah Shops, Plant N-26.

3532 C-2593 Lean Concrete Testing, Sampling and Casting for Ramp Foundation North ADMIN BUILDING 24-Apr-18 10:10 AM 25-Apr-18 8:30 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Side of New Adming Building @ Ju'aymah Shops, Plant N-26.

Masonry Units (CMU) and Plaster Installation Inspection at Grid Line 8 / E


3533 C-2594 to F room # 125 South face, Grid line 11 / E to F room # 148 & 141 north ADMIN BUILDING 24-Apr-18 10:12 AM 25-Apr-18 9:45 AM RA-819745-001-00 SALMAAN ISHFAQ AHMED
face, Grid Line E / between GL.4 & 9 room # Corridor-112. First Floor At
New Admin Building @ J a'Aymah,shops Plant N-26.

Geo Grid Installation Inspection of above Raw water and potable Water
3534 C-2595 Line (130LM) From Booster pump to New Work Shop. @ Ju'aymah WORK SHOP 24-Apr-18 10:15 AM 25-Apr-18 2:00 PM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED not in QMIS
shops, plant N-26.

Fill Placement of Basecourse material Inspection above Raw water and


3535 C-2596 potable Water Line (130LM) F rom Booster pump to New Work Shop. @ ADMIN BUILDING 24-Apr-18 10:17 AM 25-Apr-18 2:45 PM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED not in QMIS
Ju'aymah shops, plant N-26.

Curing inspection for Type 4 Fence (Line post) 20 nos.(End post) 1 no. SHIPPING & RECEIVING
3536 C-2597 southside and (line post) 21 nos.(End post) 1 no.west side of New Car 24-Apr-18 10:00 AM 25-Apr-18 7:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED not in QMIS
Parking Area Juaymah Shops ,Plant N-26 AREA

Concrete 28 Days Compressive Strength Testing & Final Acceptance


Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3537 C-2598 Building Roof Floor Panel (Panel Mark: PM-A-04, PM-A-07, CR-A-07A, PM- GULF 24-Apr-18 11:00 AM 25-Apr-18 10:30 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
A-06A, CR-A-01H, CR-A-01AH, CY-A-01 (3 NOS) At Inco Pre-Cast
fabricartion Yard, J u'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3538 C-2599 Building Roof Floor Panel (Panel Mark: PM-A-04, PM-A-07, CR-A-07A, PM- GULF 24-Apr-18 11:05 AM 25-Apr-18 10:45 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
A-06A, CR-A-01H, CR-A-01AH, CY-A-01 (3 NOS) At Inco Pre-Cast
fabricartion Yard, J u'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3539 C-2600 Inspection of 4000 PSi for Transformer Foundations # XRF-X01, XRF-X02 GULF 24-Apr-18 11:10 AM 25-Apr-18 11:00 AM RA-819867-001-0F5 QUADRI ISHFAQ AHMED
XRF-X03, XRF -X04, Transformer Yard, New Sub Station At ju'aymah shops,
plant N-26.@ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3540 C-2601 Inspection of 4000 PSi for Lean Concrete Neutralization Tank, East Side of GULF 24-Apr-18 11:15 AM 25-Apr-18 11:15 AM RA-819486-001-00 QUADRI ISHFAQ AHMED
New Substation Building at ju'aymah shops. Plant # N-26.@ Gulf Consult.

FDT Compaction Inspection of Subgrade for Telecome Duct Bank Trench


3541 C-2602 (8.0 LM) at Inner Patrol Road ELE-DB-22 West Side of Substation -03 in JNGL 24-Apr-18 1:40 PM 25-Apr-18 8:00 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
side J NGL @ Ju'Aymah, Shops Plant N- 26

Site & Grade Preparation Inspection for Telecome Duct Bank Trench (8.0
3542 C-2603 LM) at Inner Patrol Road ELE-DB-22 West Side of Substation -03 in side JNGL 24-Apr-18 1:45 PM 25-Apr-18 8:15 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
JNGL @ Ju'Aymah, S hops Plant N- 26

Concrete Sampling,Testing & Placement Inspection for Telecome Duct


3543 C-2604 Bank Trench (8.0 LM) at Inner Patrol Road ELE-DB-22 West Side of JNGL 24-Apr-18 1:50 PM 25-Apr-18 8:30 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Substation -03 in side JNGL @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection Subgrade for LV direct buried Cable from ELE
3544 C-2605 DB-5 to ELE DB-06 (95.0 LM) Near New Admin Building @ Ju'aymah ADMIN BUILDING 24-Apr-18 2:00 PM 25-Apr-18 8:00 AM RA-819460-002-0F2 SALMAAN ISHFAQ AHMED
shops, plant N-26.
Material Receiving ,handling S torage and Preservation Inspection of
Interlocking Tiles 8 CM (105.60 M2) 1.Concrete InterLocking Bricks
Rectangular S hape Holland Rough Colour gray (2 BOX), 2.Concrete
3545 C-2606 InterLocking Bricks Rectangular Shape Holland Rough Colour Red (2 BOX), PLANT N-26 24-Apr-18 3:00 PM 25-Apr-18 10:00 AM RA-819947-001-00 BAQAR ISHFAQ AHMED not in QMIS
3.Concrete InterLocking Bricks Rectangular Shape Holland Rough Colour
Yellow (2 BOX) for Car Parking Area .P.O # 31328 From New Century
Factory @ CArParking Area At ju'ay mah Shops Plant N-26
Cement Based Non-S hrink Grout Surface Preparation ,Soaking &
3546 C-2607 Formwouk Inspection for New Substation Building wall Panels. Panel NEW SUB STATION 24-Apr-18 3:05 PM 25-Apr-18 7:30 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
MARK (SS-WIG-21, SS-WIG-20H, SS-WIG-20, SS-WIG-19, SS-WIG-18) @
Ju'aymah shops, plant N-26.

Cement Based Non-S hrink Grout Mixing, Testing, Sampling and Placing
3547 C2608 Inspection for New Substation Building wall Panels. Panel MARK (SS-WIG- NEW SUB STATION 24-Apr-18 3:10 PM 25-Apr-18 7:45 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
21, SS-WIG-20H, SS-WIG-20, SS- WIG-19, SS-WIG-18) @ Ju'aymah shops,
plant N-26.

Materials Receiving Visual Inspection for EMT Conduit 3/4" x 3.05


3548 E-0363 MTRS .ITCC. (100 EA.) From Arabia Dunes, At ETE Store Ju'aymah Shop PLANT N-26 24-Apr-18 3:30 PM 25-Apr-18 9:00 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
Plant N26. As per attached highlighted Document.

Materials Receiving Visual Inspection for EMT Conduit & Fittings


3549 E-0364 Accessories, EMT Compression Coupling 3/4" (100 EA),From Arabia PLANT N-26 24-Apr-18 3:35 PM 25-Apr-18 9:15 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
dunes, At ETE Store Ju'aymah Shop Plant N26. As per attached
highlighted Document.

Visual Inspection of Excavation and Trenching for the FOC pvc conduits
3550 T-0113 below inner patrol roads near existing substation area, length is 8meter. JNGL 24-Apr-18 3:40 PM 25-Apr-18 8:00 AM RA-819460-001-0F2 AFREEN M. Z. NAVEED
As per attached highlighted drawing @ Upgraded Ju'aymah Shops Plant
N-26.

Visual Inspection of installation & Initial Mandrel test of 3-4” pvc conduits
3551 T-0114 for the FOC Duct bank at inner patrol roads near existing substation area, JNGL 24-Apr-18 3:45 PM 25-Apr-18 8:30 AM RA-819460-001-0F2 AFREEN M. Z. NAVEED
length is 8meter. As per attached highlighted drawing @ Upgraded
Ju'aymah Shops Plant N-26.

Visual Inspection of Pulling inner ducts in HDPE Pipe Prior to FOC Cable
3552 T-0115 Pulling as per highlighted in drawing and coordinates are shown at 11 to JNGL 24-Apr-18 3:50 PM 25-Apr-18 9:00 AM RA-819460-001-0F2 AFREEN M. Z. NAVEED
12 @ ETE Store J uAymah Shops Plant N-26
Material Receiving Inspection for Car Parking Shade for fabricated steel
structures (partial delivery, check attached material delivery note) @ Car
3553 ST-0035 Parking Area, Ju'aymah Shops, Plant N26. Column Square Tube 200mm x PLANT N-26 24-Apr-18 4:00 PM 25-Apr-18 4:15 PM RA-819946-001-00 OMAR M. HASSAN
200mm x 10mm, 4M length - 42 no.s Box Connections 300mm x 230mm x
12mm - 42 no.s, Box Connections 200mm x 230mm x 12mm - 42 no.s,
Support Square Tube 80mm x 80mm x 5mm, 675mm length - 60 no.s
FDT Compaction Inspection of Sub Grade for LV Cable Direct Buried SHIPPING & RECEIVING
3554 C-2609 Trench (37 LM) at North Side of Shipping & Receiving Area @ Ju'Aymah 24-Apr-18 4:50 PM 25-Apr-18 10:00 AM RA-819460-001-0F2 ACIELO ISHFAQ AHMED
Shops Plant N-26 AREA

Masonry Units and Plaster Installation Inspection at Grid line 5 / A to B


3555 C-2433-A romm # 142 and 143 South face, First Floor At New Admin Building @ ADMIN BUILDING 24-Apr-18 2:05 PM 25-Apr-18 9:00 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
Ja'Aymah,shops Plant N-26

Masonry Units and Plaster Installation Inspection at Grid Line E / 10 to 12


3556 C-2435-A room # 129A East face, First Floor At New Admin Building @ ADMIN BUILDING 24-Apr-18 2:10 PM 25-Apr-18 9:30 AM RA-819745-003-00 SALMAAN ISHFAQ AHMED
Ja'Aymah,shops Plant N-26

Materials Receiving Visual Inspection for EMT Conduit 3/4" x 3.05


3557 E-0365 MTRS .TA (600 EA.) From Tabalsa Arabia At ETE Store Ju'aymah Shop Plant PLANT N-26 25-Apr-18 11:00 AM 26-Apr-18 9:00 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
N26. As per attached highlighted Document.

Visual Inspection of Excavation & Trenching Before Installation of 6" SHIPPING & RECEIVING
3558 E-0366 direct Burried PVC Conduit Pipe at Shipping & Receiving Area, J u’aymah 25-Apr-18 11:05 AM 26-Apr-18 9:15 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
Shop Plant N26. As per Attached Highlighted Drawing AREA

Visual Inspection of 6" (2 No.) Direct Burried PVC conduit Pipe & spacers
3559 E-0367 Installation , and Embedded Hardware, Prior to Final Backfilling of LV SHIPPING & RECEIVING 25-Apr-18 11:10 AM 26-Apr-18 9:30 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
Electrical Trench, At Shipping & Receiving Area As per Attached AREA
Highlighted Drawing

Visual Inspection of Final Backfilling for 4" Direct Buried PVC Conduit
3560 E-0368 Pipes Installation for LV Power Cable At Shipping & Receiving Area. As per SHIPPING & RECEIVING 25-Apr-18 11:15 AM 26-Apr-18 10:30 AM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
Attached highlighted drawing. AREA

Material Receiving Handling storage and preservation Inspection of


Gypsum Board Asscescries For Admin Building 1.Runner
3561 C-2610 63MMx0.9MMx3.0 Meter QTY=600 2.Runner 92MMx0.9MMx3.0 Meter PLANT N-26 25-Apr-18 1:50 PM 26-Apr-18 9:00 AM RA-819746-001-00 BAQAR MAMDOOH
QTY=500 P.O # 31374 From International Co.LTD (Binex) At ETE Laydown
Area @ J u'aymah Shops Plant N-26
Material, Receiving Inspection for Pre- Cast Concrete Parapet Wall Panels
3562 C-2611 Roof Floor (Panel Mark) CR-A-06A, PR-A-05AH, CR-A-01, CR-A-05, PR-A- PLANT N-26 25-Apr-18 1:52 PM 26-Apr-18 7:00 AM 0016-A-ER-003-1-9 BAQAR ISHFAQ AHMED
06A, PR-A-06, CR-A-01H, CR-A-06) At Admin Building Area @ Ju'aymah
Shops Plant N-26

Pre Installation Inspection of Pre- Cast Concrete Parapet Wall Panels Roof
3563 C-2612 Floor (Panel Mark) CR-A-06A, PR-A-05AH, CR-A- 01, CR- A-05, PR-A-06A, ADMIN BUILDING 25-Apr-18 1:55 PM 26-Apr-18 7:30 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
PR-A-06, CR-A-01H, CR-A-06) At Admin Building Area @ Ju'aymah Shops
Plant N-26

Pre- Cast Concrete Erection and Alignment Inspection for Parapet Wall
3564 C-2613 Panels Roof Floor (Panel Mark) CR-A-06A, PR-A-05AH, CR-A-01, CR-A-05, ADMIN BUILDING 25-Apr-18 1:57 PM 26-Apr-18 7:45 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
PR-A-06A, PR-A- 06, CR- A-01H, CR- A-06) At Admin Building Area @
Ju'aymah Shops Plant N-26
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3565 C-2614 Building Roof Floor panel (Panel Mark: PM- A-12, PR-A-02A, PM-A-13, CR- GULF 25-Apr-18 2:00 PM 26-Apr-18 10:30 AM 0016-ER-003-1-7 QUADRI ISHFAQ AHMED
A-02B, CR-A-02A, SB-A-01 (4 Nos.), SC-A-01 (4 Nos.), At Inco Pre-Cast
fabricartion Yard, J u'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3566 C-2615 Building Roof Floor panel (Panel Mark: PM- A-12, PR-A-02A, PM-A-13, CR- GULF 25-Apr-18 2:03 PM 26-Apr-18 10:45 AM 0016-ER-003-1-7 QUADRI ISHFAQ AHMED
A-02B, CR-A-02A, SB-A-01 (4 Nos.), SC-A-01 (4 Nos.), At Inco Pre-Cast
fabricartion Yard, J u'aymah Shops Plant N-26 @ Gulf Consult

CMU Surface Preparation and Plaster Accessories Inspection Prior to


3567 C-2616 apply plaster Room no 107, 113 and 138 First floor At Admin Building @ ADMIN BUILDING 25-Apr-18 2:05 PM 26-Apr-18 10:00 AM RA-819745-001-00 SALMAAN MAMDOOH
Ja'Aymah,shops Plant N-26

Gypsum Board Framing and Pre-Installation Inspection for Room # 123


3568 C-2617 Grid Line F alond with Pre-Cast wall First Floor at New Admin Building @ ADMIN BUILDING 25-Apr-18 2:07 PM 26-Apr-18 10:30 AM RA-819745-001-00 SALMAAN MAMDOOH
Ju'aymah shops, plant N-26.

Concrete Finishing & Curing Inspection for Electrical Duct Bank Trench
3569 C-2618 ( 12 LM & 24 LM ) and Telecom Duct Bank Trench ( 08 LM ) at West Side JNGL 25-Apr-18 2:10 PM 26-Apr-18 7:00 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
of Substation -03 in side JNGL @ Ju'Aymah, Shops Plant N- 26

Placement and compaction of Subbase inspection for asphalt pavement


3570 C-2619 area (west side) of Shipping and Receiving area Juaymah Shops Plant N- SHIPPING & RECEIVING 25-Apr-18 2:15 PM 26-Apr-18 11:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
AREA
26

3571 C-2620 FDT inspection of Subbase for asphalt pavement area (west side) of SHIPPING & RECEIVING 25-Apr-18 2:20 PM 26-Apr-18 11:15 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Shipping and Receiving area Juaymah Shops Plant N-26 AREA

Material Receiving, Handling ,Storage & preservation Inspection of CPVC


3572 P-0287 SCH-80 Fittings with ½" FEMALE ADAPTOR BRASS THREADED-24 Pcs, ¾" ADMIN BUILDING 25-Apr-18 4:00 PM 26-Apr-18 8:00 AM RA-819770-001-00 FAHEEM SYED SHAFIULLAH not in QMIS
TEE-17 Pcs, & 1" ELBOW 90⁰-7Pcs FROM AL HUDACO (Z ENITH) at ETE
Store, Plant N-26.

Inspection of support foundation prior to Car Parking Shade Installation


3573 ST-0036 (check attached survey reports and civil clearance RFIs) @ Car Parking CAR PARKING 25-Apr-18 4:45 PM 26-Apr-18 8:15 AM RA-819946-001-00 OMAR M. HASSAN
Area, Ju'aymah Shops, Plant N26.

Cast-In-Place Concrete Formwork and surface Inspection prior to Cast


3574 C-2621 Screed upon Double Tee Slab for Panel # 2 and 4 (as per Drawing SD- NEW SUB STATION 26-Apr-18 1:05 PM 28-Apr-18 8:30 AM 0016-ER-002-1-7 SALMAAN ISHFAQ AHMED
10037-001-00) Roof Slab of New Substation Building ju'aymah shops,
plant N-26.

FBE Rebar (Wire Mesh) Embedded Item and Formwork Closure Inspection
3575 C-2622 prior to Cast Screed upon Double Tee Slab for Panel # 2 and 4 (as per NEW SUB STATION 26-Apr-18 1:07 PM 28-Apr-18 9:00 AM 0016-ER-002-1-7 SALMAAN ISHFAQ AHMED
Drawing SD-10037-001-00) Roof Slab of New S ubstation Building
ju'aymah shops, plant N-26.

Screed Concrete Testing, Sampling and Pouring inspection upon Double


3576 C-2623 Tee Slab for Panel # 2 and 4 (as per Drawing S D-10037-001-00) Roof Slab NEW SUB STATION 26-Apr-18 1:10 PM 28-Apr-18 9:30 AM 0016-ER-002-1-7 SALMAAN ISHFAQ AHMED
of New Substation Building ju'aymah shops, plant N-26.

Compaction Testing (FDT) of Basecourse material Inspection above Raw


3577 C-2624 water and potable Water Line (130LM) From Booster pump to New Work WORK SHOP 26-Apr-18 1:12 PM 28-Apr-18 12:00 AM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED
Shop. @ Ju'aymah shops, plant N-26.

3578 C-2441-A Asphalt Core Density Testing Inspection of Binder and Wearing course in CAR PARKING 26-Apr-18 1:15 PM 28-Apr-18 4:00 PM RA-819946-001-00 ACIELO ISHFAQ AHMED
New Parking area at gridline (1-4)(A-I) at Juaymah Shops Plant N-26

Cast in place Concrete Formwork Inspection for 2 no's of AHU foundation


3579 C-2625 1st Floor and 2nd between grid line E to F / 6 to 7 at New Admin Building ADMIN BUILDING 26-Apr-18 1:20 PM 28-Apr-18 7:45 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
. @ Ju'aymah shops, plant N-26. ( RA-819724 Sheet 1 Rev. 00F1 )

FBE Rebars, Embedded Item and Formwork Closure Inspection for 2 no's
3580 C-2626 of AHU foundation 1st Floor and 2nd between grid line E to F / 6 to 7 at ADMIN BUILDING 26-Apr-18 1:22 PM 28-Apr-18 8:00 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
New Admin Building . @ Ju'aymah shops, plant N-26. ( RA-819724
Sheet 1 Rev. 00F1 )

Concrete Testing, Sampling and Pouring Inspectio for 2 no's of AHU


3581 C-2627 foundation 1st Floor and 2nd between grid line E to F / 6 to 7 at New ADMIN BUILDING 26-Apr-18 1:25 PM 28-Apr-18 8:15 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Admin Building . @ Ju'aymah shops, plant N-26. ( RA-819724 Sheet 1
Rev. 00F1 )

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3582 C-2628 Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin GULF 26-Apr-18 1:30 PM 28-Apr-18 10:30 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
Building Roof Floor panel (Panel Mark: PR-A-01) At Inco Pre-Cast
fabricartion Yard, J u'aymah Shops Plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3583 C-2629 Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin GULF 26-Apr-18 1:32 PM 28-Apr-18 10:45 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
Building Roof Floor panel (Panel Mark: PR-A-01) At Inco Pre-Cast
fabricartion Yard, J u'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3584 C-2630 Building Roof Floor Panel (Panel Mark: PM-A-03A, PM-A-03, PM-A-13A, GULF 26-Apr-18 1:35 PM 28-Apr-18 11:00 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
CIR-A-12, CR-A-05H, CY-A-01 (03 Nos.) At Inco Pre-Cast fabricartion Yard,
Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3585 C-2631 Building Roof Floor Panel (Panel Mark: PM-A-03A, PM-A-03, PM-A-13A, GULF 26-Apr-18 1:37 PM 28-Apr-18 11:15 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
CIR-A-12, CR-A-05H, CY-A-01 (03 Nos.) At Inco Pre-Cast fabricartion Yard,
Ju'aymah Shops Plant N-26 @ Gulf Consult
Material Receiving ,handling S torage and Preservation Inspection of
Interlocking Tiles 1.Concrete InterLocking Bricks Rectangular Shape
3586 C-2632 Holland Rough Colour gray (4 Box), 2.Concrete InterLocking Bricks PLANT N-26 26-Apr-18 1:40 PM 28-Apr-18 10:00 AM RA-819947-001-00 BAQAR ISHFAQ AHMED not in QMIS
Rectangular S hape Holland Rough Colour Red (4 Box) For Car Parking Area
.P.O # 31328 From New Century Factory At CArParking Area At ju'aymah
Shops Plant N-26
Grade & Site Preparation Inspection for Gantry Crane Slab on Grade
3587 C-2633 (between Foundations) (2nd Half 25m.) @ Shipping and Receiving area SHIPPING & RECEIVING 26-Apr-18 2:30 PM 28-Apr-18 9:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
AREA
Juaymah Shops, Plant N-26

Formwork Inspection for Gantry Crane Slab on Grade (between


3588 C-2634 Foundations) (2nd Half 25m.) @ Shipping and Receiving area Juaymah SHIPPING & RECEIVING 26-Apr-18 2:33 PM 28-Apr-18 9:15 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Shops, Plant N-26 AREA
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks

FBE S teel Bars, Embedded Items & Formclosure Inspection for Gantry SHIPPING & RECEIVING
3589 C-2635 Crane Slab on Grade (between Foundations) (2nd Half 25m.) @ Shipping AREA 26-Apr-18 2:35 PM 28-Apr-18 9:30 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
and Receiving area Juaymah Shops, Plant N-26

Concrete Placement, Sampling & Testing Inspection for Gantry Crane Slab SHIPPING & RECEIVING
3590 C-2636 on Grade (between Foundations) (2nd Half 25m.) @ Shipping and AREA 26-Apr-18 2:40 PM 28-Apr-18 10:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED
Receiving area Juaymah Shops, Plant N-26

FDT Compaction Inspection of Subgrade for Electrical Duct Bank DB-22,


3591 C-2637 Trench (8.0 LM) at Inner Patrol Road West Side of Substation - 03 in Side JNGL 26-Apr-18 3:05 PM 28-Apr-18 1:30 PM RA-819460-002-0F1 QUADRI ISHFAQ AHMED
JNGL @ Ju'Aymah, Shops Plant N- 26

Ground Electrode System, Ground Rod & Conductor Trench Excavation


Visual Inspection (Before Conductor Laying) for fencing post Grounding & SHIPPING & RECEIVING
3592 E-0369 bonding, At Shipping & Receiving Area, Ju’aymah Shop Plant N26. As per AREA 26-Apr-18 2:00 PM 28-Apr-18 9:00 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached Highlighted Drawing

Visual Inspection of Copper Grounding Rod Installation 5/8 16mm X 2.4 SHIPPING & RECEIVING
3593 E-0370 mtrs, At Shipping & Receiving Area.As per As per attached Highlighted AREA 26-Apr-18 2:05 PM 28-Apr-18 9:15 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Drawing.

Visual Inspection of 25 mm² Copper Insulated Grounding Conductor SHIPPING & RECEIVING
3594 E-0371 Laying for for the fence post Grounding, at New Shipping & Receiving AREA 26-Apr-18 2:10 PM 28-Apr-18 9:30 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Area. As per Attached highlighted Drawing.

Visual Inspection for Exothermic Thermite Cadwelding of Grounding Rod SHIPPING & RECEIVING
3595 E-0372 to Cable 25mm2 for Fencing Post Grounding Grounding at New Shipping AREA 26-Apr-18 2:15 PM 28-Apr-18 9:45 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
& Receiving Area. As per Attached Highlighted Drawing.

Visual Inspection for Backfilling Trench of Fencing Grounding Post After SHIPPING & RECEIVING
3596 E-0373 Grounding Cable Laying at New Shipping & Receiving Area. As per AREA 26-Apr-18 2:17 PM 28-Apr-18 2:00 PM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
Attached highlighted Drawing,

Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
Recessed/S urface Mounted Normal / Emergency Lightings with Circuit
3597 E-0374 Nos. 07, 08, 13, 14, 27 & 28 (N26-2118-LP-033) at Room/Area Nos. 215, JNGL 26-Apr-18 2:20 PM 28-Apr-18 2:00 PM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
216, 217, 218, 228, 229, 240 & 231 At 2nd F loor of New Admin Bldg.,
Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
Pulling for Recessed/Surface Mounted Normal/Emergency Lightings with
3598 E-0375 Circuit Nos 07, 08, 13, 14, 27 & 28 (N26-2118-LP-033) at Room/Area Nos. JNGL 26-Apr-18 2:25 PM 28-Apr-18 2:15 PM RA-819711-002-0F1 NOLI ALI M. AL YASEEN
215, 216, 217, 218, 228, 229, 240 & 231 At 2nd Floor of New Admin
Bldg., Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Material Receiving Inspection for Pre- Cast Concrete Parapet Wall Panels
Roof Floor (Panel Mark) (CM-A-01, CM-A-01, CM-A-02, CM-A-02, CM-A-
3599 C-2638 02A, CM-A-03, CY-A-04, CY-A-05, CY-A-05, CY-A-06, CY-A-06A, PM-A-12B, ADMIN BUILDING 26-Apr-18 4:05 PM 28-Apr-18 7:00 AM 0016-A-ER-003-1-9 BAQAR MAMDOOH
PM-A-23, PM-A-23A, PM- A-23H, SB-01 (4 Nos), SC-01 (4 Nos) At Admin
Building Area @ Ju'aymah Shops Plant N-26
Pre-installation for Pre- Cast Concrete Parapet Wall Panels Roof Floor
(Panel Mark) (CM-A-01, CM-A-01, CM-A-02, CM-A-02, CM-A-02A, CM-A-
3600 C-2639 03, CY-A-04, CY-A-05, CY-A-05, CY-A-06, CY-A-06A, PM-A-12B, PM-A-23, ADMIN BUILDING 26-Apr-18 4:08 PM 28-Apr-18 7:30 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
PM-A-23A, PM-A-23H, SB-01 (4 Nos), SC-01 (4 Nos) At Admin Building
Area @ J u'aymah Shops Plant N-26
Pre-cast Concre Parapet Wall Panels Erection and Alignment Inspection
for Roof Floor (Panel Mark) (CM-A-01, CM-A-01, CM-A-02, CM-A-02, CM-
3601 C-2640 A-02A, CM-A-03, CY-A-04, CY-A-05, CY-A-05, CY-A-06, CY-A-06A, PM-A- ADMIN BUILDING 26-Apr-18 4:10 PM 28-Apr-18 7:45 AM 0016-A-ER-003-1-9 SALMAAN ISHFAQ AHMED
12B, PM- A-23, PM-A-23A, PM-A-23H, SB-01 (4 Nos), SC-01 (4 Nos) At
Admin Building Area @ Ju'aymah Shops Plant N-26

Material Receiving Inspection of GI Metal Duct ,S Cclip, C Clip,as per


3602 HV-0005 attached Delivery note-ZAD-2003 From Zamil air conditioners at ETE PLANT N-26 26-Apr-18 4:15 PM 28-Apr-18 2:30 PM RA-819287-002-00 FAISAL ZIAULLAH
Storage Laydown Area@J uaymah shop plant N-26

Concrete Finishing & Curing Inspection for Type 3 Fence (Line Post) 19 SHIPPING & RECEIVING
3603 C-2641 Nos. and (Corner Post) 2 Nos. at West Side of Shipping and Receiving 28-Apr-18 7:35 AM 29-Apr-18 7:00 AM RA819473-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
Area, Juaymah Shops, Plant N-26 AREA

Visual inspection of Individual Grounding Rod Resistance Test for Fencing SHIPPING & RECEIVING
3604 E-0376 Grounding Post at New Shipping & Receiving Area, @ J u'aymah shops 28-Apr-18 11:00 AM 29-Apr-18 9:00 AM RA-819982-001-0F1 NOLI ALI M. AL YASEEN
plant N-26, As per attached drawing. AREA

Cement Based Non-S hrink Grout Surface Preparation, Soaking &


3605 C-2642 Formwork Inspection for New Substation Building Wall Panels (in Recess). NEW SUB STATION 28-Apr-18 11:45 AM 29-Apr-18 7:30 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
Panel Mark (SS-WG-01, SS-WG-02, SS-WG-03, SS-WG- 04, SS-WIG-12H, SS-
WIG-23, SS-WIG- 02F) @ Ju'aymah shops, plant N-26.

Cement Based Non-S hrink Grout Minxing, Testing, Sampling and Placing
3606 C-2643 Inspection for New Substation Building Wall Panels (in Recess). Panel NEW SUB STATION 28-Apr-18 11:50 AM 29-Apr-18 8:00 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
Mark (SS-WG-01, SS-WG-02, SS- WG-03, SS-WG-04, SS-WIG-12H, SS-WIG-
23, SS-WIG-02F ) @ Ju'aymah shops, plant N-26.

Fill placement and Compaction Inspection of 1st Layer (Final) Selectfill SHIPPING & RECEIVING
3607 C-2644 Backfill for Sidewalk / Island at Grideline (2) (A-I) at New Parking Area, 28-Apr-18 1:50 PM 29-Apr-18 9:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED not in QMIS
Juaymah Shops Plant N-26 AREA

FDT Compaction Inspection of 1st Layer (F inal) Selectfill Backfill for SHIPPING & RECEIVING
3608 C-2645 Sidewalk / Island at Grideline (2) (A-I) at New Parking Area, Juaymah 28-Apr-18 1:52 PM 29-Apr-18 9:15 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
Shops Plant N-26 AREA

Visual Inspection for Geo Grid Installation for LV Direct Buried Cable SHIPPING & RECEIVING
3609 C-2646 Trench (8.8 m) North-East of Shipping and Receiving Area, Juaymah Shops 28-Apr-18 2:00 PM 29-Apr-18 8:00 AM RA-819460-002-0F2 ACIELO ISHFAQ AHMED not in QMIS
Plant N-26 AREA

Fill Placement & Compaction Inspection of Aggregate Basecourse at LV SHIPPING & RECEIVING
3610 C-2647 Direct Buried Cable Trench (8.8 m) North-East of Shipping and Receiving 28-Apr-18 2:02 PM 29-Apr-18 11:00 AM RA-819460-002-0F2 ACIELO ISHFAQ AHMED not in QMIS
Area, Juaymah Shops Plant N-26 AREA

3611 C-2648 FDT Compaction Inspection of LV Direct Buried Cable Trench (8.8 m) SHIPPING & RECEIVING 28-Apr-18 2:05 PM 29-Apr-18 11:15 AM RA-819460-002-0F2 ACIELO ISHFAQ AHMED
North-East of Shipping and Receiving Area, Juaymah Shops Plant N-26 AREA

Gypsum Board Framing and Pre-Installation Inspection for Room # 124


3612 C-2649 (Mechanical Room) First F loor at New Admin Building @ Ju'aymah shops, ADMIN BUILDING 28-Apr-18 2:10 PM 29-Apr-18 10:30 AM RA-819745-001-00 SALMAAN MAMDOOH
plant N-26.

CMU Surface Preparation and Plaster Accessories Inspection Prior to


3613 C-2650 apply plaster Room no 114, 147 and 115 North side wall, corridore room ADMIN BUILDING 28-Apr-18 2:12 PM 29-Apr-18 10:00 AM RA-819745-001-00 SALMAAN MAMDOOH
no 117 east side wall First floor At Admin Building @ Ja'Aymah,shops
Plant N-26
Material Receiving Handling storage and preservation Inspection of
Gypsum Board And Asscescries 1.Gypsum Board Regular 16 MM x 1.2
Meter x 3.0 Meter (QTY=424 Pcs), 2.Stud 63MMx0.9MMx3.0 Meter
3614 C-2651 (QTY=407 Pcs), 3. 32 MM Dry Wall Angle Bead x3.0 Meter(QTY=500 Pcs), PLANT N-26 28-Apr-18 4:20 PM 29-Apr-18 11:00 AM RA-819746-001-00 BAQAR MAMDOOH
4.USG SheetRock Joint Compound 28 KG (QTY=17 Can) P.O # 25105 From
International Co.LTD (Binex) At ETE Laydown Area @ Ju'aymah Shops
Plant N-2628 Days Compressive Strength Testing & Final Acceptance
Concrete
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3615 C-2652 Building Roof Floor panel (Panel Mark: PM- A-12B, CIR- A-04, PM-A-23, GULF 28-Apr-18 4:22 PM 29-Apr-18 10:30 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
CM-A-02A, CIR-A-05, CR-A-05AH, CR-A-05A, SC-A-01A, SC-A-01 (2Nos.),
SB-A-01 (Total 11 Nos.) At Inco Pre-Cast fabricartion Yard, Ju'aymah Shops
Plant N-2628@Days
Concrete GulfCompressive
Consult Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3616 C-2653 Building Roof Floor panel (Panel Mark: PM- A-12B, CIR- A-04, PM-A-23, GULF 28-Apr-18 4:25 PM 29-Apr-18 10:45 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
CM-A-02A, CIR-A-05, CR-A-05AH, CR-A-05A, SC-A-01A, SC-A-01 (2Nos.),
SB-A-01 (Total 11 Nos.) At Inco Pre-Cast fabricartion Yard, Ju'aymah Shops
Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3617 C-2654 Building Roof Floor panel (Panel Mark: PR-A-05 (Total 1 No.)At Inco Pre- GULF 28-Apr-18 4:30 PM 29-Apr-18 11:00 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
Cast fabricartion Yard, Ju'aymah Shops Plant N-26 @ Gulf Consult At Inco
Pre-Cast fabricartion Yard, Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3618 C-2655 Building Roof Floor panel (Panel Mark: PR-A-05 (Total 1 No.)At Inco Pre- GULF 28-Apr-18 4:35 PM 29-Apr-18 11:15 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
Cast fabricartion Yard, Ju'aymah Shops Plant N-26 @ Gulf Consult At Inco
Pre-Cast fabricartion Yard, Ju'aymah Shops Plant N-26 @ Gulf Consult

Concrete 28 Days Compressive Strength Testing & Final Acceptance


3619 C-2656 Inspection of 4000 Psi for Parapet Wall of Stair Case Room Grid line 1 to 2 GULF 29-Apr-18 8:00 AM 29-Apr-18 11:30 AM RA-819729-001-00 QUADRI ISHFAQ AHMED
& B to C, upper Roof, New Admin Building @ ju'aymah shops. Plant N-26.
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3620 C-2657 Building Roof Floor panel (Panel Mark:SB-A-01(2 Nos. PM-A-23A, PR-A-06, GULF 29-Apr-18 10:00 AM 30-Apr-18 10:30 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
PM-A-23H, S S-A-01A, CM-A-01A, CM-A-02 (2 Nos.)CY-A-02 (2 Nos.) CY-A-
04 (2 Nos.) (Total 13 Nos.) @ Inco Pre-Cast fabricartion Yard, Ju'aymah
Shops Plant
Concrete 28 N-26
Days At Gulf ConsultStrength Testing & Final Acceptance
Compressive
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3621 C-2658 Building Roof Floor panel (Panel Mark:SB-A-01(2 Nos. PM-A-23A, PR-A-06, GULF 29-Apr-18 10:05 AM 30-Apr-18 10:45 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
PM-A-23H, S S-A-01A, CM-A-01A, CM-A-02 (2 Nos.)CY-A-02 (2 Nos.) CY-A-
04 (2 Nos.) (Total 13 Nos.) @ Inco Pre-Cast fabricartion Yard, Ju'aymah
Shops Plant N-26 At Gulf Consult
Fill Placement & Compaction inspection of 1st Layer (F inal) Selectfill
3622 C-2659 Backfilling for Sidewalk / Island at Grideline (1) (A-I) @ New Parking Area, CAR PARKING 29-Apr-18 10:10 AM 30-Apr-18 9:00 AM RA-819946-001-00 ACIELO ISHFAQ AHMED not in QMIS
Juaymah Shops Plant N-26

FDT Compaction inspection of 1st Layer (Final) S electfill Backfilling for


3623 C-2660 Sidewalk / Island at Grideline (1) (A-I) @ New Parking Area, Juaymah CAR PARKING 29-Apr-18 10:15 AM 30-Apr-18 9:15 AM RA-819946-001-00 ACIELO ISHFAQ AHMED
Shops Plant N-26
Material Receiving ,handling S torage and Preservation Inspection of
Interlocking Tiles 1.Concrete InterLocking Bricks Rectangular Shape
Holland Rough Colour Gray (Qty=03 Box), 2.Concrete InterLocking Bricks
3624 C-2661 Rectangular S hape Holland Rough Colour Red (Qty=03 Box), 3.Concrete PLANT N-26 29-Apr-18 10:20 AM 30-Apr-18 10:00 AM RA-819947-001-00 BAQAR ISHFAQ AHMED not in QMIS
InterLocking Bricks Rectangular Shape Holland Rough Colour Yellow
(Qty=02 Box) For Car Parking Area .P.O # 31328 From New Century
Factory At CArParking Area At ju'ay mah Shops Plant N-26

3625 C-2662 Masonry Units and Plaster Installation Inspection Room no 107, 113 and ADMIN BUILDING 29-Apr-18 11:00 AM 30-Apr-18 10:00 AM RA-819745-001-00 SALMAAN MAMDOOH
138 First floor At Admin Building @ Ja'Aymah,shops Plant N-26

Masonry Units and Plaster Installation Room no 114, 147 and 115 North
3626 C-2663 side wall, corridore room no 117 east side wall First floor At Admin ADMIN BUILDING 29-Apr-18 11:02 AM 30-Apr-18 10:15 AM RA-819745-001-00 SALMAAN MAMDOOH
Building @ Ja'Aymah,shops Plant N-26

3627 C-2664 Formwork Inspection for Ramp Foundation North Side of New Adming ADMIN BUILDING 29-Apr-18 11:05 AM 30-Apr-18 8:15 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
Building @ Ju'aymah Shops, Plant N-26.

FBE Rebar, Embedded Items and Formwork Closure Inspection for Ramp
3628 C-2665 Foundation North Side of New Adming Building @ Ju'aymah Shops, Plant ADMIN BUILDING 29-Apr-18 11:07 AM 30-Apr-18 1:30 PM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
N-26.

3629 C-2666 Concrete Testing, Sampling and Casting Inspection Ramp Foundation ADMIN BUILDING 29-Apr-18 11:10 AM 30-Apr-18 2:00 PM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
North Side of New Adming Building @ Ju'aymah Shops, Plant N-26.

Fill Placement & Compaction Inspection of Backfilling 1st Layer Selectfill


3630 C-2667 Material for Electrical Trench (08 LM ) 3 Nos at Inner Patrol Road West JNGL 29-Apr-18 1:15 PM 30-Apr-18 10:15 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Side of Sub S tation-03 In Side JNGL @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 1st Layer Selectfill Material for


3631 C-2668 Electrical Trench (08 LM ) 3 Nos at Inner Patrol Road West S ide of Sub JNGL 29-Apr-18 1:17 PM 30-Apr-18 10:30 AM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Station-03 In Side JNGL @ Ju'Ay mah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 2nd Layer Selectfill Material for


3632 C-2669 Electrical Trench (08 LM ) 3 Nos at Inner Patrol Road West S ide of Sub JNGL 29-Apr-18 1:20 PM 30-Apr-18 1:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Station-03 In Side JNGL @ Ju'Ay mah, Shops Plant N- 26

Fill Placement & Compaction Inspection of Backfilling 3rd Layer Selectfill


3633 C-2670 Material for Electrical Trench (08 LM ) 3 Nos at Inner Patrol Road West JNGL 29-Apr-18 1:22 PM 30-Apr-18 2:00 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED not in QMIS
Side of Sub S tation-03 In Side JNGL @ Ju'Aymah, Shops Plant N- 26

FDT Compaction Inspection of Backfilling 3rd Layer Selectfill Material for


3634 C-2671 Electrical Trench (08 LM ) 3 Nos at Inner Patrol Road West S ide of Sub JNGL 29-Apr-18 1:25 PM 30-Apr-18 2:15 PM RA-819460-001-0F2 QUADRI ISHFAQ AHMED
Station-03 In Side JNGL @ Ju'Ay mah, Shops Plant N- 26

FDT Compaction Inspection of 5th layer Selectfill Material Backfilling


3635 C-2672 around New Admin Building Grid Line 8 to 12 / F and B to F / 12 @ ADMIN BUILDING 29-Apr-18 1:30 PM 30-Apr-18 2:30 PM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Gypsum Board Framing and Pre-Installation Inspection for Room # 148


3636 C-2673 (Office Tye-1) First Floor at New Admin Building @ Ju'aymah shops, plant ADMIN BUILDING 29-Apr-18 1:35 PM 30-Apr-18 1:45 PM RA-819745-001-00 SALMAAN MAMDOOH
N-26.

Visual Inspection for Installation of EMT Conduit Prior to Cable Pulling for
3637 E-0377 Embided wall Power Receptacle Outlet with Circuit Nos. 10 & 11 (N26- ADMIN BUILDING 30-Apr-18 6:30 AM 30-Apr-18 9:00 AM RA-819712-001-0F3 NOLI ALI M. AL YASEEN
2118-PP-033) at Room/Area Nos. At 1st. Floor of New Admin Bldg.,
Ju’aymah Shop Plant N26.As per Attached Highlighted Drawing.

Visual Inspection for Installation of 2" X 4" Utility Box Prior to Cable
3638 E-0378 Pulling for Embided wall Power Receptacle Outlet with Circuit Nos. 10 & ADMIN BUILDING 30-Apr-18 6:35 AM 30-Apr-18 9:15 AM RA-819712-001-0F3 NOLI ALI M. AL YASEEN
11 (N26-2118-PP-033) at Room/Area Nos. At 1st Floor of New Admin
Bldg., Ju’aymah Shop Plant N26 as perAttached Highlighted Drawing.
Material Receiving Inspection of Fence Gates and Components 1. Gate
Double Leaf,Welded 2.00" OD 4.00 x 2.75 Meter Frame 3 Line (Qty=10
Set), 2. Gate Double Leaf,Welded 2.00" OD 2.60 x 2.75 Meter Frame 3 Line
3639 C-2674 (Qty=01 Set), 3. Gate S ingle Leaf,Welded 2.00" OD 1.00 x 2.75 Meter PLANT N-26 30-Apr-18 11:00 AM 1-May-18 9:00 AM RA-818474-001-0F4 BAQAR ISHFAQ AHMED
Frame 3 Line (Qty=02 Set) For Shipping & Receiving ,CarParking &
Substation From BRC (P.O # 25101) At ETE Laydown Area @ Ju'aymah
Shops Plant
Concrete 28 N-26
Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3640 C-2675 Building Roof Floor panel (Panel Mark: PR-A-05A, CM-A-03) (Total 2 Nos.) GULF 30-Apr-18 11:05 AM 1-May-18 10:30 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
@ Inco Pre-Cast fabricartion Yard Ju'aymah Shops Plant N-26 At Gulf
Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3641 C-2676 Building Roof Floor panel (Panel Mark: PR-A-05A, CM-A-03) (Total 2 Nos.) GULF 30-Apr-18 11:10 AM 1-May-18 10:45 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
@ Inco Pre-Cast fabricartion Yard Ju'aymah Shops Plant N-26 At Gulf
Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3642 C-2677 Building Roof Floor panel (Panel Mark: CM-A-02 (2NOS), CM-A-01, CY-A- GULF 30-Apr-18 11:15 AM 1-May-18 11:00 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
01B, CY-A-06, CY-A-06A, CR- A-05, CIR-A-06 (Total 08 Nos.) At Inco Pre-Cast
fabricartion Yard Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3643 C-2678 Building Roof Floor panel (Panel Mark: CM-A-02 (2NOS), CM-A-01, CY-A- GULF 30-Apr-18 11:20 AM 1-May-18 11:15 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
01B, CY-A-06, CY-A-06A, CR- A-05, CIR-A-06 (Total 08 Nos.) At Inco Pre-Cast
fabricartion Yard Ju'aymah Shops Plant N-26 @ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
3644 C-2679 Inspection of 4000 PSi for Transformer Foundations (2 nos), # XFR-1 & GULF 30-Apr-18 11:25 AM 1-May-18 11:30 AM RA-8189867-001-0F5 QUADRI ISHFAQ AHMED
XF R-2 at Transformer Yard, New Substation Building at ju'aymah shops.
Plant # N-26.@ Gulf Consult

Concrete curing inspection for Gantry Crane slab on grade(1st half) (25m) SHIPPING & RECEIVING
3645 C-2680 (between foundations) Shipping and Receiving area Juaymah Shops, Plant AREA 30-Apr-18 11:30 AM 1-May-18 7:00 AM RA-819473-001-0F2 ACIELO ISHFAQ AHMED not in QMIS
N-26

3646 C-2681 Material Receiving Inspection of Base Course Class-A Material From Al- PLANT N-26 30-Apr-18 11:35 AM 1-May-18 9:00 AM RA-819500-001-0F1 BAQAR ISHFAQ AHMED
Osais (Qty=92 M3) at ETE Laydown Area @ Ju'aymah Shops Plant N- 26

FDT inspection of subgrade for LV direct buried cable trench (9.0 m)


3647 C-2682 (continuation) north-east of Shipping and Receiving area, Juaymah Shops SHIPPINGAREA
& RECEIVING 30-Apr-18 11:40 AM 1-May-18 3:00 PM RA-819460-001-0F2 ACIELO ISHFAQ AHMED
Plant N/26

Compaction Testing (FDT) inspection of 6th layer Select fill Inspection


3648 C-2683 around New Admin Building Grid Line 8 to 12 / F and B to F / 12 @ ADMIN BUILDING 30-Apr-18 11:45 AM 1-May-18 7:30 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Compaction Testing (FDT) inspection of 7th layer Select fill Inspection


3649 C-2684 around New Admin Building Grid Line 8 to 12 / F and B to F / 12 @ ADMIN BUILDING 30-Apr-18 11:45 AM 1-May-18 1:30 PM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Compaction Testing (FDT) inspection of Subgrade for Raw Water Line


3650 C-2685 South side of New Admin Building near to main Entrance @ ju'aymah ADMIN BUILDING 30-Apr-18 11:55 AM 1-May-18 7:30 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
shops, plant N-26.

Compaction Testing (FDT) inspection of Sand Bedding for Raw Water Line
3651 C-2686 South side of New Admin Building near to main Entrance @ ju'aymah ADMIN BUILDING 30-Apr-18 1:05 PM 1-May-18 9:30 AM RA-819770-001-00 SALMAAN ISHFAQ AHMED not in QMIS
shops, plant N-26.

Fill Placement of Sweet Sand of Sand Bedding for Raw Water Line South
3652 C-2687 side of New Admin Building near to main Entrance @ ju'aymah shops, ADMIN BUILDING 30-Apr-18 1:10 PM 1-May-18 8:30 AM RA-819770-001-00 SALMAAN ISHFAQ AHMED not in QMIS
plant N-26.

Visual Inspection for Installation of EMT Conduit 3/4" Prior to Cable


3653 E-0379 Pulling for Recessed/Surface Mounted Lighting with Circuit Nos. 04 & 05 ADMIN BUILDING 30-Apr-18 1:15 PM 1-May-18 2:00 PM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
(N26-2118 LP-032) Of Outdoor Lighting at 1st. Floor of New Admin Bldg.,
Ju’aymah Shop Plant N26.As per Attached Highlighted Drawing.

Visual Inspection for Installation of 4" X 4" Square Box Prior to Cable
3654 E-0380 Pulling for Recessed/Surface Mounted Lightings with Circuit Nos. 04 & 05 ADMIN BUILDING 30-Apr-18 1:20 PM 1-May-18 2:15 PM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
(N26-2118-LP- 032) OF Outdoor Lighting AT 1st. F loor of New Admin
Bldg. Ju’aymah Shop Plant N26 as per Attached Highlighted Drawing.
Materials Receiving Visual Inspection for EMT Conduit & Fittings
Accessories, As Follows: 1) EMT Compression Coupling 3/4" = 750 EA., 2)
3655 E-0381 EMT Compression Connector 3/4" = 500 EA. 3) EMT Two Hole Strap 3/4" = PLANT N-26 30-Apr-18 1:25 PM 1-May-18 2:30 PM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
500 EA. 4) Lock Nut 3/4" = 500 EA. F rom Tabalsa Arabia, At ETE Store
Ju'aymah Shop Plant N26. As per attached highlighted Document.

Visual Inspection and installation of 4-1” Sub ducts from PED#JY351 to


3656 T-0116 Telecom room (104) New Substation Building (2118), Length is 27 NEW SUB STATION 30-Apr-18 2:30 PM 1-May-18 8:00 AM RA-819517-001-0F2 AFREEN M. Z. NAVEED
meters.As per Attached Highlighted Drawing.. @Ju’Aymah Shop Plant N26.

Material Receiving, Handling ,Storage & Preservation Inspection of PIPE


3657 P-0288 SUPPORT CLAMP WITH RUBBER PADDING HDG 2" (50-Pcs), 1X½" (50-Pcs), PLANT N-26 30-Apr-18 2:35 PM 1-May-18 8:00 AM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
1" (50-Pcs), ¾" (50-Pcs) & ½ " (50-Pcs) from WOLOUF TRADING EST (ARAB
BOLTS ) @ ETE store,Juaymah Shops Project, Plant N-26.

CPVC Pipes & fittings Installation & Assembly Inspection for HOT WATER
3658 P-0289 SUPPLY (HWS) line in JANITOR ROOM # 134, LAVOTARY & COFFEE/TEA ADMIN BUILDING 30-Apr-18 2:40 PM 1-May-18 9:00 AM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
ROOM # 132 attach to MALE TOILET # 135 inside New Admin Building at
First Floor @ Ju'aymah Shop Plant N-26.
Pipe Hangers and Supports Installation Inspection for CPVC Pipes &
fittings Installation & Assembly Inspection for HOT WATER SUPPLY (HWS)
3659 P-0290 line in JANITOR ROOM # 134, LAVATORY & COFFEE/TEA ROOM # 132 ADMIN BUILDING 30-Apr-18 14l45 1-May-18 11:45 AM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
attach to MALE TOILET # 135 inside New Admin Building at First Floor @
Ju'aymah Shop Plant N- 26.
CPVC Pipes & fittings Installation & Assembly Inspection for RAW WATER
3660 P-0291 (RW) line in JANITOR ROOM # 134 & MALE TOILET # 135 (Urinals,Water ADMIN BUILDING 30-Apr-18 2:50 PM 1-May-18 1:15 PM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
Closets & Hose Bibbs) inside New Admin Building at First Floor @
Ju'aymah Shop Plant N- 26.
Pipe Hangers and Supports Installation Inspection for CPVC Pipes &
fittings Installation & Assembly Inspection for RAW WATER (RW) line in
3661 P-0292 JANITOR ROOM # 134 & MALE TOILET #135 (Urinals,Water Closets & Hose ADMIN BUILDING 30-Apr-18 2:55 PM 1-May-18 1:30 PM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
Bibb) inside New Admin Building at First Floor @ Ju'aymah Shop Plant N-
26.
CPVC Pipes & fittings Installation & Assembly Inspection for POTABLE
3662 P-0293 WATER (PW) line in COFFEE/TEA ROOM # 132 attach to MALE TOILET # ADMIN BUILDING 30-Apr-18 3:00 PM 1-May-18 1:45 PM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
135 inside New Admin Building at First Floor @ Ju'aymah Shop Plant N-
26.

Pipe Hangers and Supports Installation Inspection for CPVC Pipes &
3663 P-0294 fittings Installation & Assembly Inspection for POTABLE WATER (PW) line ADMIN BUILDING 30-Apr-18 3:05 PM 1-May-18 2:00 PM RA-819779-001-00 FAHEEM SYED SHAFIULLAH
in COFF EE/TEA ROOM # 132 attach to MALE TOILET # 135 inside New
Admin
On Reel Test Inspection of (Cable Continuity & Insulation Resistance Test)
for LV Cable with 1) 13258324- 1KV=3C X 400mm2 = 204 mtrs/), 2)
13237623- 1KV= 3C X 240mm2= 404 mtrs, 3) 13256118- 1KV= 3C X
3664 E-0382 500mm2 = 501 mtrs, 4) 13255623 - 1KV =3 X 500mm2 = 505 mtrs, 5) PLANT N-26 1-May-18 2:00 PM 2-May-18 9:00 AM RA-819711-001-0F1 NOLI ALI M. AL YASEEN
13256116 - 1KV = 3C X 500mm2 = 502 mtrs, 6) 13256734 - 1KV = 3C X
500mm2 = 509 mtrs, 7) 13255839 - 1KV = 3C X 500mm2 =508 mtrs, 8)
1325611528
Concrete - 1KV
Days= Compressive
3C X 500mm2Strength
= 505 mtrs/ At ETE
Testing Laydown
& Final Yard.
Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 1st Layer for Admin
3665 C-2688 Building Roof Floor panel (Panel Mark: PR-A-05AH, CM-A-04,CM-A-01, GULF 1-May-18 11:00 AM 2-May-18 10:30 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
CM-A-01, PR-A-06A, CY-A-01A, CY-A-01A, CY-A-01A, SS-A-01 (Total 09
Nos.) Ju'aymah Shops Plant N-26 At Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 5000 PSi for Pre-Cast & Concrete 2nd Layer for Admin
3666 C-2689 Building Roof Floor panel (Panel Mark: PR-A-05AH, CM-A-04,CM-A-01, GULF 1-May-18 11:05 AM 2-May-18 10:45 AM 0016-A-ER-003-1-9 QUADRI MAMDOOH
CM-A-01, PR-A-06A, CY-A-01A, CY-A-01A, CY-A-01A, SS-A-01 (Total 09
Nos.) Ju'aymah Shops Plant N-26 At Gulf Consult
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for 8 nos. Lental Beams for (Doors) Room # 208
3667 C-2690 D5, Room # 212 D4A & D4 Room # 219 D5, Room # 220 D7, Room # 221 GULF 1-May-18 11:10 AM 2-May-18 11:00 AM RA-819746-001-00 QUADRI ISHFAQ AHMED
D5, Room # 226 D5 and Room # 230 D4 Second Floor, New Admin
Building. at ju'aymah shops. Plant # N-26.@ Gulf Consult
Concrete 28 Days Compressive Strength Testing & Final Acceptance
Inspection of 4000 PSi for Parapet of Upper Roof of Stair Case Rooms
3668 C-2691 (East and South Sides) Grid lne 6 to 7 @ GL. A (East side Stair Case) & C to GULF 1-May-18 11:15 AM 2-May-18 11:15 AM RA-819729-001-00 QUADRI MAMDOOH
E & 11 to 12, (south side) upper Roof, New Admin Building at ju'aymah
shops. Plant # N-26.@ Gulf Consult
Cement Based Non-S hrink Grout Surface Preparation ,Soaking &
FormworkInspection for New Substation Building wall Panels Panel
3669 C-2692 Mark(Panels Mark SS-WIG-02A, SS-WG-09, SS-WG-08 SS-WG-05, SS-WG- NEW SUB STATION 1-May-18 11:20 AM 2-May-18 7:00 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
10, SS-WG-06, SS-WG-07, SS-WIG- 12, SS-WIG-16, SS-WIG-02, SS-WIG-17,
SS-WIG-02E) @ Ju'aymah shops, plant N-26.
Inspection for New Substation Building wall Panels Panel Mark(Panels
Mark SS-WIG- 02A, SS-WG-09, SS-WG-08 SS-WG-05, SS-WG-10, SS-WG-06,
3670 C-2693 SS-WG-07, SS-WIG-12, SS-WIG-16, SS-WIG-02, SS-WIG-17, SS-WIG- 02E) NEW SUB STATION 1-May-18 11:25 AM 2-May-18 7:30 AM 0016-ER-001-1-11 SALMAAN ISHFAQ AHMED
@ J u'aymah shops, plant N-26.

Compaction Testing (FDT) Inspection for Subgrade of LV Diredt Cabel


3671 C-2694 Trench from Duct Bank-5 to Duct Bank-4 (30LM) Near Existing Wilding WORK SHOP 1-May-18 11:30 AM 2-May-18 2:00 PM RA-819500-001-0F1 SALMAAN ISHFAQ AHMED
Shop. @ Ju'aymah shops, plant N-26.

Gypsum Board Framing and Pre-Installation Inspection for Room # 129A


3672 C-2695 (Printer / File Room) First Floor at New Admin Building @ Ju'aymah ADMIN BUILDING 1-May-18 11:35 AM 2-May-18 10:30 AM RA-819745-001-00 SALMAAN MAMDOOH
shops, plant N-26.

Gypsum Board Installation Inspection (One Side) for Room # 126, 127, 121
3673 C-2696 and 120 First Floor at New Admin Building @ Ju'aymah shops, plant N- ADMIN BUILDING 1-May-18 11:40 AM 2-May-18 10:45 AM RA-819745-001-00 SALMAAN MAMDOOH
26.

CMU Surface Preparation and Plaster Accessories Inspection Prior to


3674 C-2697 apply plaster Room no 130, 111, 103 (Lobby) 133 and 134 Corredore side ADMIN BUILDING 1-May-18 11:45 AM 2-May-18 10:15 AM RA-819745-001-00 SALMAAN MAMDOOH
wall First floor At Admin Building @ Ja'Aymah,shops Plant N-26

Compaction Testing (FDT) inspection of 5th layer Select fill Inspection


3675 C-2698 around New Admin Building Grid Line 11 to 12 / A to B, and 9 to 4 / A @ ADMIN BUILDING 1-May-18 11:50 AM 2-May-18 8:15 AM RA-819722-001-0F4 SALMAAN ISHFAQ AHMED
ju'aymah shops, plant N-26.

Inspection / review to close LBE # 474 (AHU Foundation Rebar and


3676 C-2699 formwork ) 1st & 2nd Floor at Admin Buildin RFI will be raise C-2625-A & ADMIN BUILDING 1-May-18 11:55 AM 2-May-18 8:30 AM RA-819722-001-0F5 SALMAAN ISHFAQ AHMED
C-2626 @ ju'aymah shops, plant N-26.

Pre-Test Punch Listing for Hydro Test Package UJS-ADMB-RW-006- 00


3677 P-0295 [RAW WATER] [WITH OUT GATE VALVES] at Male toilet # 135 [Including ADMIN BUILDING 1-May-18 3:00 PM 2-May-18 8:00 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs] at First
Floor , inside New Admin Building Juaymah Shops Project N-26

Internal Cleaning and/or Flushing for Hydro Test Package UJS-ADMB-RW-


3678 P-0296 006-00 [RAW WATER] [ WITH OUT GATE VALVES] at Male toilet # 135 ADMIN BUILDING 1-May-18 3:05 PM 2-May-18 8:15 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
[Including Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs]
at First Floor , inside New Admin Building J uaymah Shops Project N-26.

Verification of Testing Equipment for Hydro Test Package UJS-ADMB-RW-


3679 P-0297 006-00 [RAW WATER] [ WITH OUT GATE VALVES] at Male toilet # 135 ADMIN BUILDING 1-May-18 3:10 PM 2-May-18 8:30 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
[Including Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs]
at First Floor , inside New Admin Building J uaymah Shops Project N-26

Verification of Test Preparation for Hydro Test Package UJS-ADMB-RW-


3680 P-0298 006-00 [RAW WATER] [ WITH OUT GATE VALVES] at Male toilet # 135 ADMIN BUILDING 1-May-18 3:15 PM 2-May-18 8:45 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
[Including Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs]
at First Floor , inside New Admin Building J uaymah Shops Project N-26

Filling and Pressurization for Hydro Test Package UJS-ADMB-RW-006-00


3681 P-0299 [RAW WATER] [WITH OUT GATE VALVES] at Male toilet # 135 [Including ADMIN BUILDING 1-May-18 3:20 PM 2-May-18 9:00 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs] at First
Floor , inside New Admin Building Juaymah Shops Project N-26

Visual Inspection at Test Pressure for Hydro Test Package UJS-ADMB-RW-


3682 P-0300 006-00 [RAW WATER] [ WITH OUT GATE VALVES] at Male toilet # 135 ADMIN BUILDING 1-May-18 3:25 PM 2-May-18 10:00 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
[Including Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs]
at First Floor , inside New Admin Building J uaymah Shops Project N-26

De- Pressurization and Water Disposal for Hydro Test Package UJS-ADMB-
3683 P-0301 RW-006-00 [RAW WATER] [WITH OUT GATE VALVES] at Male toilet # 135 ADMIN BUILDING 1-May-18 3:30 PM 2-May-18 2:30 PM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
[Including Lavatories, Janitor Sink, Water Closets, Urinals and Hose Bibbs]
at First Floor , inside New Admin Building J uaymah Shops Project N-26

CPVC Pipes, fittings Installation and assembly Inspection for Hot Water
3684 P-0302 Supply line in Lavatories [Male Toilet #116, Female Toilet # 115, Executive ADMIN BUILDING 1-May-18 3:35 PM 2-May-18 11:00 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
Toilet # 147 and beside EWH Room] at First Floor inside New Admin
Building Area at Juaymah Shops Plant N-26

Pipe Hangers and Supports Installation and Inspection for CPVC Pipes,
3685 P-0303 fittings for Hot Water Supply line in Lavatories [Male Toilet #116, Female ADMIN BUILDING 1-May-18 3:40 PM 2-May-18 11:15 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
Toilet # 115, Executive Toilet # 147 and beside EWH Room at First Floor
inside New Admin Building Area at Juaymah Shops Plant N-26

CPVC Pipes, fittings Installation and assembly Inspection for Raw Water
3686 P-0304 line in Male Toilet # 116, Female Toilet # 115 and Executive Toilet # 147 ADMIN BUILDING 1-May-18 3:45 PM 2-May-18 11:30 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
[Urinals, Water Closets and Hose Bibbs] at First Floor inside New Admin
Building Area at Juaymah Shops Plant N-26

Hangers and Supports Installation and Inspection for CPVC Pipes, fittings
3687 P-0305 for Raw Water line in Male Toilet # 116, Female Toilet # 115 and Executive ADMIN BUILDING 1-May-18 3:50 PM 2-May-18 11:45 AM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
Toilet # 147 [Urinals, Water Closets and Hose Bibbs] at First F loor inside
New Admin Building Area at Juaymah Shops Plant N-26

CPVC Pipes, fittings Installation and assembly Inspection for Potable


3688 P-0306 Water line in Coffee/Tea Room # 114 and 145, Kitchen Sink attach to Male ADMIN BUILDING 1-May-18 3:55 PM 2-May-18 1:00 PM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
Toilet # 116 and Mechanical Room # 124 at First Floor inside New Admin
Building Area at Juaymah Shops Plant N-26

Hangers and Supports Installation and Inspection for CPVC Pipes, fittings
3689 P-0307 for Potable Water line in Coffee/Tea Room # 114 and 145, Kitchen Sink ADMIN BUILDING 1-May-18 4:00 PM 2-May-18 1:30 PM RA-819799-001-00 FAHEEM SYED SHAFIULLAH
attach to Male Toilet # 116 and Mechanical Room # 124 at First Floor
inside New Admin Building Area at Juaymah Shops Plant N-26
EASTERN TRADING & CONST. EST.
Document No. ETE/QA/F/013 Rev. 00
Contract No. 6600036980
BI: 10-01545
UPGRADE JUAYMAH SHOPS PROJECT JO: 10-01545-0001
Date: 2-May-18
RFI LOG

Serial No RFI No. Activities / Inspection Item Location / Area Submittal Date Submittal Time Submit To Request Date Request Time DRAWING # ETE Inspector Aramco Inspector Remarks
EASTERN TRADING & CONST. EST.
UAYMAH SHOPS PROJECT (BI-10-01545 JO-10-01545-0001)
RFI Status and FDT Log
#REF!
RFI STATUS

ISSUED #REF!

ACCEPTED #REF!

CANCELLED #REF!

REJECTED #REF!

HOLD #REF!

RESCHEDULE #REF!

INSPECTED #REF!

CLOSED #REF!

OPEN #REF!

FDT STATUS
TOTAL POINT
TESTED 11

PASSED 11
EASTERN TRADING & CONST. EST.
UPGRADE JUAYMAH SHOPS PROJECT (BI-10-
01545 JO-10-01545-0001)
RFI STATUS

Discipline
LocationFROM 09-Sep-2017 TO 14-Sep-2017
Issued
Accepted
Cancelled
Rejected
Hold
Reschedule
Inspected
Closed
Open
Civil 20 0 0 0 0 0 0 0 0
Elect 1 0 0 0 0 0 0 0 0
Pipi Upgr 0 0 0 0 0 0 0 0 0
Coat ade 0 0 0 0 0 0 0 0 0
Ju'Ay
Inst mah 0 0 0 0 0 0 0 0 0
PlumShop 1 0 0 0 0 0 0 0 0
s
RTR Proje 0 0 0 0 0 0 0 0 0
Struc ct 0 0 0 0 0 0 0 0 0
Tele 0 0 0 0 0 0 0 0 0
Weld 0 0 0 0 0 0 0 0 0
TOTAL >>> 22 0 0 0 0 0 0 0 0
% >>> ### ### ### ### ### ###
Report Prin ###