Condiciones de Diseño
Caudal Industrial
Fabrica de Leche
Q Fab. Leche = 1 Fabr. Leche x 5 lt agua/Leche Dia x 5000 lt agua/Lt leche
= 25000 lt/Dia = 0.289 lt/s
Curtiembre
Q Curtiembre = 2 Curtiembre x 20 Hab x 0.5 lt/m².Dia
= 20 lt/Dia = 0.000231 lt/s
Matadero
Q Matadero = 1 Matadero x 8 Reses/Dia x 300 lt/Res
= 2400 lt/Dia = 0.0278 lt/s
41.88 41.51
40.88 40.51
40.31
39.31
40.21
39.21
Caudal de Diseño
J = 0.0068 m/m
1/2.63
Q
D = 0.54
0.2875 x C x J
1/2.63
0.0418 m³/s
D =
0.2875 x 150 x 0.00675 0.54
1/0.54
Q
J = 2.63
0.2875 x C x D
1/0.54
0.0418 m³/s
J = 2.63
0.2875 x 150 x 0.208
J = 0.0055 m/m
42.71
41.71
41.88 41.51
40.88 40.51
40.31
39.31
40.21
39.21
Caudal de reparticion
q = 0.0058072 lt/s . m
[1]
[2] [3] [4] [5]
TRAMO
Long Princ Long alimentada Long total (m) Q(lt/s)
(m) (m)
1-2 212.13 600 812.13 4.72
1-4 300 850 1150 6.68
2-3 150 350 500 2.90
3-4 150 400 550 3.19
3-6 150 300 450 2.61
4-5 300 850 1150 6.68
6-5 212.13 600 812.13 4.72
TOTAL 1474.26 3950 5424.26 31.50
1 -41.817
2 4.72 5 0.0002 (Curtiembre) 9.716
3 2.90 + 3.19 0.289 (Fab. Leche) 6.387
4 6.68 6.678
5 6.68 + 4.72 11.395
6 2.61 5 0.0278 (Matadero) 7.641
Total 24.17 10 0.317 0
(QNudo 1)
1-2 40% 16.727
41.817
(QNudo 1)
1-4 60% 25.090
41.817
(Q1-2) - (QNudo 2)
2-3 7.010
16.727 - 9.716
(Q1-4) - (QNudo 4)
3-4 40% 7.365
25.090 - 6.678
(Q1-4) - (QNudo 4)
4-5 60% 11.047
25.090 - 6.678
(Q2-3) + (Q3-4) - (QNudo 3)
3-6 7.988
7.010 + 7.365 - 6.387
(Q3-6) - (QNudo 6)
6-5 0.347
7.988 - 7.641
41.82 lt/s
16
.7
lt/
s
9.72 lt/s
25.1 lt/s
7.0 lt/s
6.68 lt/s
6.39 lt/s
7.36 lt/s
7.99 lt/s
11.05 lt/s
7.64 lt/s
s
lt/
35
0.
11.39 lt/s
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11]
COTAS Dcom
TRAMO H (m) L (m) J (m) Q(lt/s) D (m) D (pulg) Dinter (m)
INICIAL FINAL (pulg)
1-2 43.55 42.71 0.84 212.13 0.00396 16.73 0.159 6.260281 8 0.208
1-4 43.55 41.88 1.67 300 0.00557 25.09 0.173 6.810479 6 0.160
2-3 42.71 41.51 1.2 150 0.00800 7.01 0.099 3.893006 4 0.109
3-4 41.88 41.51 0.37 150 0.00247 7.36 0.128 5.05061 4 0.109
4-5 41.88 40.21 1.67 300 0.00557 11.05 0.127 4.98563 6 0.160
3-6 41.51 40.31 1.2 150 0.00800 7.99 0.104 4.091172 4 0.109
6-5 40.31 40.21 0.1 212.13 0.00047 0.35 0.056 2.221073 3 0.083
Nota: Los Diametros internos corresponden a Tuberias RDE41
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12]
CONDICIONES INICIALES DE ITERACION PRIMERA ITERACION
TRAMO L (m) D (pulg) D (m) Q(m³/s) J (m) H (m) H/Q ΔQ(m³/s) Q(m³/s) J (m) H (m)
1-2 212.13 8 0.208 0.0167 0.00106 0.23 13.46 0.004 0.0205 0.00154 0.33
1-4 300 6 0.160 -0.0251 0.00813 -2.44 97.22 0.004 -0.0214 0.00603 -1.81
2-3 150 4 0.109 0.0070 0.00504 0.76 107.85 0.004 0.0107 0.01111 1.67
3-4 150 4 0.109 -0.0074 0.00552 -0.83 112.48 0.001 -0.0064 0.00426 -0.64
Σ -2.29 331.00 -0.46
Correcion de Caudal
3-4 150 4 0.10872 0.0074 0.0074 0.83 112.48 -0.001 0.0064 0.00426 0.64
4-5 300 4 0.10872 -0.0110 0.0117 -3.51 317.76 0.003 -0.0083 0.00685 -2.06
3-6 150 6 0.16004 0.0080 0.0010 0.15 18.34 0.003 0.0108 0.0017 0.25
6-5 212.13 3 0.08342 0.0003 0.0001 0.01 42.85 0.003 0.0031 0.00409 0.87
Σ -2.52 491.42 -0.29
Correcion de Caudal
-2.52 -0.29
ΔQII = ΔQII =
1.85 x 491.42 1.85 x 649.93
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12]
SEGUNDA ITERACION TERCERA ITERACION
TRAMO L (m) D (pulg) D (m) Q(m³/s) J (m) H (m) H/Q ΔQ(m³/s) Q(m³/s) J (m) H (m)
1-2 212.13 8 0.20837 0.0212 0.00164 0.35 16.44 0.0001 0.0212 0.00165 0.35
1-4 300 6 0.16004 -0.0207 0.00568 -1.70 82.40 0.0001 -0.0206 0.00564 -1.69
2-3 150 4 0.10872 0.0114 0.01248 1.87 163.63 0.0001 0.0115 0.01261 1.89
3-4 150 4 0.10872 -0.0060 0.00373 -0.56 93.88 0.0000 -0.0060 0.00377 -0.57
Σ -0.04 356.35 -0.02
Correcion de Caudal
-0.04 -0.02
ΔQ = ΔQ =
1.85 x 356.35 1.85 x 357.44
ΔQ = 0.0001 ΔQ = 0.0000
3-4 150 4 0.10872 0.0060 0.00373 0.56 93.88 0.0000 0.0060 0.00377 0.57
4-5 300 4 0.10872 -0.0080 0.00648 -1.94 242.14 0.0001 -0.0079 0.00633 -1.90
3-6 150 6 0.16004 0.0110 0.00177 0.27 24.09 0.0001 0.0111 0.0018 0.27
6-5 212.13 3 0.08342 0.0034 0.0047 1.00 296.52 0.0001 0.0035 0.00497 1.05
Σ -0.12 656.63 -0.01
Correcion de Caudal
-0.12 -0.01
ΔQ = ΔQ =
1.85 x 656.63 1.85 x 662.24
ΔQ = 0.0001 ΔQ = 0.0000
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12]
CUARTA ITERACION QUINTA ITERACION
TRAMO L (m) D (pulg) D (m) Q(m³/s) J (m) H (m) H/Q ΔQ(m³/s) Q(m³/s) J (m) H (m)
1-2 212.13 8 0.20837 0.0212 0.00165 0.35 16.50 0.0000 0.0212 0.00165 0.35
1-4 300 6 0.16004 -0.0206 0.00563 -1.69 82.09 0.0000 -0.0206 0.00563 -1.69
2-3 150 4 0.10872 0.0115 0.01266 1.90 164.75 0.0000 0.0115 0.01267 1.90
3-4 150 4 0.10872 -0.0060 0.00375 -0.56 94.12 0.0000 -0.0060 0.00375 -0.56
Σ 0.00 357.46 0.00
Correcion de Caudal
0.00 0.00
ΔQ = ΔQ =
1.85 x 357.46 1.85 x 357.50
ΔQ = 0.0000 ΔQ = 0.0000
3-4 150 4 0.10872 0.0060 0.00375 0.56 94.12 0.0000 0.0060 0.00375 0.56
4-5 300 4 0.10872 -0.0079 0.00632 -1.90 239.33 0.0000 -0.0079 0.00631 -1.89
3-6 150 6 0.16004 0.0111 0.0018 0.27 24.29 0.0000 0.0111 0.0018 0.27
6-5 212.13 3 0.08342 0.0035 0.00499 1.06 304.72 0.0000 0.0035 0.005 1.06
Σ 0.00 662.45 0.00
Correcion de Caudal
0.00 0.00
ΔQ = ΔQ =
1.85 x 662.45 1.85 x 662.66
ΔQ = 0.0000 ΔQ = 0.0000
Resultados Definitivos
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11]
Velocidad Caida Elevacion Piezometrica Presion
TRAMO L (m) D (pulg) A(m²) Q(m³/s)
V(m/s) Condicion H (m) Nudo Final Nudo Final (m)
1-2 212.13 8 0.0341 0.0212 0.62 Ok 0.35 41.71 60.46 18.75
1-4 300 6 0.02012 0.0206 1.02 Ok 1.70 40.88 59.11 18.23
2-3 150 4 0.00928 0.0115 1.24 Ok 1.87 40.51 60.46 19.95
3-4 150 4 0.00928 0.0060 0.64 Ok 0.56 40.51 60.46 19.95
4-5 300 6 0.02012 0.0079 0.39 Vel Baja" 1.94 39.31 58.52 19.21
3-6 150 4 0.00928 0.0111 1.20 Ok 0.27 39.21 58.11 18.90
6-5 212.13 3 0.00547 0.0035 0.64 Ok 1.00 39.31 58.11 18.80
CONDICION
TRAMO
1-2
1-4
2-3
3-4
3-6
4-5
6-5
TOTAL
Nudo
1
2
3
4
5
6
Cross
[13] [14]
IMERA ITERACION
H/Q ΔQ(m³/s)
15.9803 0.0007
84.7493 0.0007
155.159 0.0007
99.8454 0.0004
355.73
-0.46
355.73
99.8454 -0.0004
248.42 0.0002
23.6333 0.0002
278.034 0.0002
649.93
-0.29
649.93
[13] [14]
RA ITERACION
H/Q ΔQ(m³/s)
16.4827 0.0000
82.1829 0.0000
164.426 0.0000
94.3515 0.0000
357.44
-0.02
357.44
94.3515 0.0000
239.555 0.0000
24.2782 0.0000
304.06 0.0000
662.24
-0.01
662.24
[13] [14]
TA ITERACION
H/Q ΔQ(m³/s)
16.5016 0.0000
82.0856 0.0000
164.775 0.0000
94.1349 0.0000
357.50
0.00
357.50
94.1349 0.0000
239.233 0.0000
24.3015 0.0000
304.995 0.0000
662.66
0.00
662.66
-Williams)
[11] [12]
Presion
(m) Condicion
18.75 OK
18.23 OK
19.95 OK
19.95 OK
19.21 OK
18.90 OK
18.80 OK
ministrar edificios de
Diametro Int Prom m
0.08342
0.109
0.160
0.208
0.260
0.308
0.338
0.387
0.435
0.484
0.580
CONDICIONES TRAMOS
LONGITUD m diametro m diametro (pulg) cota final
212.13 0.208 8 42.71
300 0.160 6 41.88
150 0.109 4 41.51
150 0.109 4 41.51
150 0.160 6 40.21
300 0.109 4 40.31
212.13 0.083 3 40.21
1474.26
Cota
43.55
42.71
41.51
41.88
40.21
40.31
Diseño Red de Distribucion
Condiciones de Diseño
[17]8/3 [ 13]1/2
[18] = 312
0.013
[18] x 4
[19] = 100
π [17]2
V [26]
NF = =
√(g*H) √g*[32]
[35] = k kΔ [30]
E 40.93