CONCRETE BOQ OF TRANSFER HOUSE-TH10

PROJECT
COAL HANDLING PLANT AND SILO LOADING DOC. NO. REV.0
ARRANGEMENT AT ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE CONCRETE BOQ OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 TO 003 JTP SM
TOTAL
LENGT WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
H (m) (m) (m) ITEM (m )
3
PCE.
(m3)
EARTH WORK EXCAVATION
PILE CAP 23.65 18.65 2.075 915.225 1 915.23

TOTAL EARTH WORK EXCAVATION 915.23


PCC-M10
RAFT 23.65 18.65 0.075 33.080 1 33.08
PB1 17.00 0.45 0.075 0.574 3 1.72
PB2 5.50 0.45 0.075 0.186 1 0.19
PB3 11.50 0.45 0.075 0.388 2 0.78
PB4 12.50 0.45 0.075 0.422 2 0.84
PB5 3.00 0.55 0.075 0.124 1 0.12
TOTAL PCC-M10 36.73
CONCRETE-M30
NON SHRINK GROUT 0.85 0.80 0.025 0.017 14 0.24
TOTAL CONCRETE-M30 0.24

CONCRETE-M25
RAFT 23.50 18.50 1.000 434.750 1 434.75
TOTAL CONCRETE (RAFT) 434.75
PEDESTAL
PD1 1.00 1.000 3.475 3.475 14 48.65
TOTAL CONCRETE (PEDESTAL) 48.65
PLINTH BEAM
PB1 17.00 0.30 0.600 3.060 3 9.18
PB2 5.50 0.30 0.600 0.990 1 0.99
PB3 11.50 0.30 0.600 2.070 2 4.14
PB4 12.50 0.30 0.750 2.813 2 5.63
PB5 3.00 0.40 0.400 0.480 1 0.48
PD2 0.30 0.450 0.300 0.041 2 0.08
TOTAL CONCRETE (PLINTH BEAM) 20.50

TOTAL CONCRETE M25 503.90


REINF. BBS OF TRANSFER HOUSE-TH10

PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE RAFT - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 & 002 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .

RAFT 1 T20 1 185 185 26775 38 800 25376 800 /160

2 T20 1 235 235 20775 38 800 19376 800 /160

3 T20 1 148 148 26775 38 800 25376 800 /160

4 T20 1 188 188 20775 38 800 19376 800 /160

5 T12 1 10 10 22500 20 22500 /0

6 T12 1 10 10 21575 38 1350 19000 1350 /100

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 0 0 441 0 17704 0 0 0 m
Total weight 0 0 391 0 43729 0 0 0 kg
This schedule complies with BS 4466
* Specified in multiples of 5 mm ** Specified in multiples of 25 mm
REINF. BBS OF TRANSFER HOUSE-TH10

PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE PEDESTAL - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 & 002 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .

PD1 7 T32 14 24 336 5350 38 750 4325 600 /250

8 T10 14 44 616 3725 61 900 900 /30

9 T10 14 176 2464 2875 61 476 900 /30

10 T10 14 88 1232 1125 33 900 /30

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 0 10765 0 0 0 0 0 1798 m
Total weight 0 6642 0 0 0 0 0 11343 kg
This schedule complies with BS 4466
REINF. BBS OF TRANSFER HOUSE-TH10

* Specified in multiples of 5 mm ** Specified in multiples of 25 mm


REINF. BBS OF TRANSFER HOUSE-TH10

PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE PLINTH BEAM - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-003 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .

PB1 1 T16 3 3 9 22150 38 300 21700 300 /125

2 T16 3 4 12 2700 37 300 2450 /48

3 T20 3 4 12 4000 20 4000 . /0

4 T20 3 3 9 22300 38 300 21900 300 /160

5 T12 3 2 6 21400 20 21400 /0

6 T8 3 143 429 1500 61 200 500 /24

PB2 7 T16 1 3 3 7850 38 300 7400 300 /125

8 T16 1 3 3 7850 38 300 7400 300 /125

9 T12 1 2 2 7300 20 7300 /0

10 T8 1 45 45 1500 61 200 500 /24

PB3 11 T16 2 3 6 16650 38 300 16200 300 /125

12 T16 2 2 4 5425 37 3000 2450

13 T20 2 2 4 4000 20 4000 /0

14 T25 2 2 4 5675 37 300 5450 /100

15 T20 2 3 6 16800 38 300 16400 300 /160

16 T16 2 2 4 3500 37 300 3250 /48

17 T12 2 2 4 15900 20 15900 /0

18 T8 2 103 206 1500 61 200 500 /24

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 1020 0 207 414 366 23 0 0 m
Total weight 403 0 183 655 903 87 0 0 kg
This schedule complies with BS 4466
REINF. BBS OF TRANSFER HOUSE-TH10

* Specified in multiples of 5 mm ** Specified in multiples of 25 mm


REINF. BBS OF TRANSFER HOUSE-TH10

PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE PLINTH BEAM - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-003 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .

PB4 19 T16 2 3 6 16650 38 300 16200 300 /125

20 T16 2 2 4 2700 37 300 2450 /48

21 T20 2 2 4 4800 20 4800 . /0

22 T20 2 2 4 3100 37 300 2850 /60

23 T20 2 3 6 16800 38 300 16400 300 /160

24 T12 2 4 8 15900 20 15900 /0

25 T8 2 109 218 2000 61 300 650 /24

PB5 26 T16 1 3 3 3950 38 300 3500 300 /125

27 T16 1 3 3 3950 38 300 3500 300 /125

28 T8 1 21 21 1300 61 300 300 /24

PD2 29 T16 2 3 6 2150 38 1050 200 1050 /125

30 T8 2 4 8 1100 61 200 300

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0

0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 472 0 127 147 132 0 0 0 m
Total weight 186 0 113 233 327 0 0 0 kg
This schedule complies with BS 4466
REINF. BBS OF TRANSFER HOUSE-TH10

* Specified in multiples of 5 mm ** Specified in multiples of 25 mm


BBS SUMMARY OF TRANSFER HOUSE-TH10

PROJECT
COAL HANDLING PLANT AND SILO LOADING DOC. NO.
ARRANGEMENT AT ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE BOQ & BBS FOR TH10 CIVIL WORK - SUMMARY DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 TO 003 JTP SM

1 TOTAL EARTH WORK EXCAVATION 915 m3

2 TOTAL PCC - M10 37 m3

3 Concrete and Reinforcement quantities

S.No ITEMS CONCRETE in cubic REINFORCEMENT in Metric tonnes


meter
M25 M30 T8 T10 T12 T16 T20 T25 T32
0 0 0 0 0 0 0
1 Raft 435 - 0 0 0.39 0 43.73 0 0
2 Pedestals 49 - 0 6.64 0 0 0 0 11.34
3 Plinth Beams 20 - 0.59 0 0.3 0.89 1.23 0.09 0
4 Non Shrink Grout - 0.24 - - - - - - -
Total 504 0.24 0.59 6.64 0.69 0.89 44.96 0.09 11.34
BBS SUMMARY OF TRANSFER HOUSE-TH10

DOC. NO.
01-CHP01-TH10-DC-CE-001
CHECKED
SM

REINFORCEMENT in Metric tonnes

TOTAL

44.12
17.98
3.10
-
65.20