LIST OF COMPLETED

AND
ON-GOING PROJECTS

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 1


GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION

LIST OF COMPLETED AND ON-GOING PROJECTS

COMPANY NAME ADDRESS WORK DESCRIPTION REMARKS

100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● ELECTRICAL WORKS AT TANAUAN BATANGAS
COMPLETED
100%
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS
COMPLETED
● THERMAL SCANNING FOR CLEANROOM ELECTRICAL 100%
PANELS AT BIÑAN LAGUNA COMPLETED
● 110KVA GENERATOR SET INSTALLATION AT BIÑAN 100%
LAGUNA COMPLETED
● PRODUCTION ELECTRICAL INSTALLATION AT STO. 100%
TOMAS & TANAUAN BATANGAS COMPLETED
● GENSET RENTAL FOR EMERGENCY POWER SUPPLY AT 100%
SONION 1700KVA (750KVA) AT TANAUAN BATANGAS COMPLETED
100%
● INSTALLATION OF FEEDER WIRE
COMPLETED
● INSTALLATION OF 400AT ECB FOR GENERATOR 100%
REQUIREMENTS AT TAYTAY RIZAL COMPLETED
● EMERGENCY WORKS (REPLACEMENT OF POWER FUSE 100%
AT BIÑAN LAGUNA COMPLETED
● ELECTRICAL WORKS - POWER INCOMING SYSTEM 100%
(PACKAGE 1) AT EATON COOPER INDUSTRIES COMPLETED
● ELECTRICAL NEW PANEL INSTALLATION FOR 2 UNITS 100%
AIR COOLED CHILLER AT CARMONA CAVITE COMPLETED
100%
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS
COMPLETED
● INSTALLATION OF ALARM PANEL FOR 2 UNITS AIR 100%
COOLED CHILLER AT CARMONA CAVITE COMPLETED
100%
● ELECTRICAL WORKS AT TANAUAN BATANGAS
COMPLETED
● ELECTRICAL WORKS - 1200AT ACB INSTALLATION AT 100%
TAYTAY RIZAL COMPLETED
100%
● VARIOUS ADDITIONAL WORKS AT TANAUAN BATANGAS
COMPLETED
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS 100%

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 2


COMPLETED
100%
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS
COMPLETED
● VARIOUS ELECTRICAL INSTALLATION WORKS NO. 2 AT 100%
TAIKISHA PHILIPPINES INC. MAKATI CITY
TANAUAN BATANGAS COMPLETED
● VARIOUS ELECTRICAL INSTALLATION WORKS NO. 3 AT 100%
TANAUAN BATANGAS COMPLETED
● ELECTRICAL WORKS AT STO. TOMAS & TANAUAN 100%
BATANGAS COMPLETED
● EMERGENCY WORKS FOR THE REPLACEMENT OF 2
100%
UNITS CUTOUT FUSE & TESTING OF 2 UNIT POWER
COMPLETED
TRANSFORMER AT CABUYAO LAGUNA
● ELECTRICAL WORKS - THERMOGRAPHIC SCANNING AT 100%
BINAN LAGUNA COMPLETED
● SUPPLY & INSTALLATION OF 1 LOAD BREAKER SWITCH 100%
AT BINAN LAGUNA COMPLETED
● VARIOUS ADDITIONAL WORKS AT STO. TOMAS 100%
BATANGAS COMPLETED
100%
● VARIOUS ADDITIONAL WORKS AT TANAUAN BATANGAS
COMPLETED
● VARIOUS ADDITIONAL ELECTRICAL WORKS
100%
(EMERGENCY WORKS) AT STO. TOMAS & TANAUAN
COMPLETED
BATANGAS
100%
● ELECTRICAL WORKS AT CABUYAO LAGUNA
COMPLETED
● PREVENTIVE MAINTENANCE OF MARUWA ELECTRICAL
100%
ROOM & BLDG. 1 & 2 LOW VOLTAGE SIDE & SUBSTATION
COMPLETED
AT ROSARIO CAVITE
● ELECTRICAL WORKS AT STO. TOMAS & TANAUAN 100%
BATANGAS COMPLETED
● POWER SUPPLY OF EXHAUST FAN & SUPPLY FAN, 100%
CURING OVEN & CHILLER AT ROSARIO CAVITE COMPLETED
100%
● ELECTRICAL WORKS
COMPLETED
100%
● MANPOWER MONITORING AT BINAN LAGUNA
COMPLETED
100%
● VARIOUS ELECTRICAL WORKS AT BINAN LAGUNA
COMPLETED
100%
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS
COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 3


● RELOCATION OF LIGHTING FIXTURES STO. TOMAS & 100%
TANAUAN BATANGAS COMPLETED
100%
● FABRICATION OF PLATFORM AT ROSARIO CAVITE
COMPLETED
● ELECTRICAL WORKS AT STO. TOMAS & TANAUAN 100%
BATANGAS COMPLETED
● EXPLOSION PROOF OUTLET ELECTRICAL WORKS AT 100%
ROSARIO CAVITE COMPLETED
● POWER SUPPLY FOR ADDITIONAL OVEN AT STO. TOMAS 100%
TAIKISHA PHILIPPINES INC. MAKATI CITY
BATANGAS COMPLETED
● ADDITIONAL PRODUCTION EQUIPMENT (ELECTRICAL 100%
WORKS) AT STO. TOMAS BATANGAS COMPLETED
100%
● ELECTRICAL WORKS AT GEN. TRIAS CAVITE
COMPLETED
● ADDITIONAL TRAY, PANEL, & POWER SUPPLY 100%
REQUIREMENTS AT TANAUAN BATANGAS COMPLETED
● EMERGENCY REPLACEMENT PF LVSG BATCH 1 AT 100%
BINAN LAGUNA COMPLETED
● INSTALLATION OF PINLIGHT AT STO. TOMAS & TANAUAN 100%
BATANGAS COMPLETED
● ADDITIONAL ELECTRICAL WORKS AT STO. TOMAS & 100%
TANAUAN BATANGAS COMPLETED
● VARIOUS ADDITIONAL ELECTRICAL WORKS AT 100%
CABUYAO LAGUNA COMPLETED
● VARIOUS ADDITIONAL ELECTRICAL WORKS AT 100%
CABUYAO LAGUNA COMPLETED
● VARIOUS ADDITIONAL ELECTRICAL WORKS AT 100%
CABUYAO LAGUNA COMPLETED
● CONDUCT COMPLETE PACKAGE FOR TRANSFORMER 100%
CARGILL PHILIPPINES INC. PULILAN BULACAN
OIL COMPLETED
DISSOLVE GAS ANALYSIS FOR THE EXISTING 1000KVA
34.5KV/ 460V TRANSFORMER
PHILIPPINE RESINS ● PREVENTIVE MAINTENANCE FOR 8UNITS 100%
MAKATI CITY
INDUSTRIES, INC. TRANSFORMER COMPLETED
(1X6MVA, 2X1.5MVA, 2X1MVA, 1X.6MVA, 1X2MVA, 1X6MVA)
● PREVENTIVE MAINTENANCE OF LBS, TRANSFORMER 100%
MORIROKU PHILIPPINES, INC. BINAN LAGUNA
AND COMPLETED
PANELBOARD FIRST PRIVATE POLE AND TRANSFORMER
POWER TRANSFORMER LOW VOLTAGE
A.LOW VOLTAGE SWITCHGEAR 1 & 2

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 4


B. MAIN DISTRIBUTION PANELS
C. THERMOGRAPHIC SCANNING
100%
● SUPPLY AND INSTALLATION OF 150KVA AVR AND
COMPLETED
INSTALLATION OF NEW FEEDER WIRE FROM AVR TO MAIN
PANEL POWEREX AVR PS SEREIS 3Ø
100%
CCT CONSTRUCTORS CORP. MAKATI CITY ● RENTAL OF MANLIFT FOR BROTHER PROJECT
COMPLETED
FRANDEL CONSTRUCTION & 100%
STA. MARIA BULACAN ● 2ASSY LCP2, 1Ø, 2W, 230V, NEMA 4X MIAMI
DEVELOPMENT CORP. COMPLETED
● 1ASSY LCP3, 1Ø, 2W, 230V, NEMA 4X MIAMI
● 1SET MTS 160AT IN NEMA 4X
● 1SET MCB 100AT, 3P, 32KAIC 480V
● 6M POLE SINGLE ARM, HOT DIPPED GALVANIZED T-20- 100%
NEWINGTON BUILDERS, INC. BATASAN HILLS Q.C
SA COMPLETED
C/W BASEPLATE, ANCHOR BOLTS, NUTS AND WASHER
WITH
PHILIPS GREEN VISION LUMINAIRE BRP371 90 W LED
FIRST PHILEC
MANUFACTURING 100%
TAYTAY RIZAL ● SUPPLY OF LABOR & TECHNICAL EXPERTISE
TECHNOLOGIES COMPLETED
CORPORATION
100%
SAY ENTERPRISES INC ● HI-POT TESTING AT CORON PALAWAN
COMPLETED
LEGASPI VILLAGE, 100%
SUMISETSU PHILIPPINES, INC. ● SUPPLY AND INSTALLATION OF VARIOUS REQUIREMENT
MAKATI CITY COMPLETED
AT FPIP BATANGAS
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● TEMPORARY WORKS AT FPIP TANAUAN BATANGAS
COMPLETED
● PMPC REF. ASSEMBLY ELECTRICAL WORKS (SUPPLY 100%
AND INSTALLATION) AT TAYTAY RIZAL COMPLETED
100%
● SUPPLY & INSTALLATION OF GENERATOR SET AT FPIP
COMPLETED
100%
● ELECTRICAL WORKS AT FPIP
COMPLETED
● ELECTRICAL INSTALLATION OF POWER INCOMING AT 100%
CABUYAO LAGUNA COMPLETED
● ELECTRONICS REWINDING OF 2UNITS 500KVA, 230V- 100%
200V AT CABUYAO LAGUNA COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 5


● ELECTRICAL WORKS MERALCO POWER INCOMING AT 100%
FPIP COMPLETED
100%
● ELECTRICAL INSTALLATION WORKS AT FPIP
COMPLETED
● WASHING MACHINE PRODUCTION ADDITIONAL WORKS 100%
AT TAYTAY RIZAL COMPLETED
● TPI OFFICE TEMPORARY POWER SUPPLY INSTALLATION 100%
AT TAYTAY RIZAL COMPLETED
● TESTING OF 2.5MVA POWER TRANSFORMER & HI-POT 100%
OF POWER CABLE & VCB AT FPIP STO. TOMAS BATANGAS COMPLETED
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● PRODUCTION ELECTRICAL EXTENSION AT FPIP
COMPLETED
● VARIOUS ELECTRICAL INSTALLATION AT TV BUILDING 100%
AT TAYTAY RIZAL COMPLETED
● RELOCATION, REPLACEMENT & UNLOADING OF 100%
GENERATOR SET AT FPIP TANAUAN BATANGAS COMPLETED
100%
● HAULING OF CONTAINER VAN FOR NARRA PROJECT
COMPLETED
100%
● PMPC AS BUILT FOR STA. ROSA AT STO. ROSA LAGUNA
COMPLETED
● ADDITIONAL WORKS FOR WASHING AND TV BUILDING 100%
AT TAYTAY RIZAL COMPLETED
100%
● LIFTING, HAULING & POSITION WORKS AT SUBIC
COMPLETED
● MISCELLANEOUS WORKS - PPRDHP AS-BUILT AT 100%
CALAMBA LAGUNA COMPLETED
● ELECTRICAL INSTALLATION OF 2 UNITS AIR COOLED 100%
CHILLER AT CARMONA CAVITE COMPLETED
● PREVENTIVE MAINTENANCE OF ELECTRICAL FACILITIES 100%
AT FPIP TANAUAN BATANGAS COMPLETED
● VARIOUS ELECTRICAL & ELECTRONICS WORKS AT 100%
TAYTAY RIZAL COMPLETED
● DISMANTLING & REINSTALLATION OF EXISTING 100%
TRANSFORMER & H-FRAME AT CAVITE ECONOMIC ZONE COMPLETED
● EATON COOPER NEW FACTORY PHASE 1 PACKAGE 1
POWER INCOMING ROUGHING INSTALLATION WORKS AT
EATON COOPER
● OFFICE BUILDING EXTENSION ELECTRICAL AND 100%
ELECTRONICS WORKS AT MALVAR BATANGAS COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 6


● SUPPLY AND INSTALLATION OF LIGHTING ARRESTER
100%
INCLUDING TESTING WORKS AT FPIP STO. TOMAS
COMPLETED
BATANGAS
● ELECTRICAL WORKS- DISMANTLING OF EXISTING
100%
GENERATOR AND SET IN-PLACE OF 1UNIT (NEW)
COMPLETED
GENERATOR
MAKATI CITY ● TESTING OF 2.5MVA POWER TRANSFORMER AT BINAN 100%
TAIKISHA PHILIPPINES INC.
LAGUNA COMPLETED
● ELECTRICAL INSTALLATION FOR TEMPORARY 100%
FACILITIES COMPLETED
● RENTAL OF BOOM TRUCK FOR TRANSFERRING OF
100%
CONTAINER VAN FROM CALMELRAY TO GREENFIELD STA.
COMPLETED
ROSA LAGUNA
● ELECTRICAL DISTRIBUTION INSTALLATION AT TANAUAN 100%
BATANGAS COMPLETED
100%
● ELECTRICAL POWER INCOMING INSTALLATION
COMPLETED
PRECEPTS ELECTRO-TECH BEL-AIR II STA. ROSA, 100%
CONSTRUCTION CORP. LAGUNA ● LJ FITTINGS COMPLETED
100%
● RENTAL OF MANLIFT TRUCK IN P & G COMPLETED
● P & G PROJECTS MANPOWER
100%
● TOSHIBA HIRATA POWER INCOMING MONITORING COMPLETED
(5/8 - 9/12)
● TOSHIBA HIROTA PANEL (5/24-26/12)
100%
● TRANSFORMER TESTING IN FUJITSU - 1500KVA COMPLETED
INCLUDE DGA OF TRANSFORMER OIL
100%
● TRANSFORMER DEGAR FOR FUJITSU - 1500KVA COMPLETED
INCLUDE DGA OF TRANSFORMER OIL
100%
● TOSHIBA CALMELRAY PANEL F MONITORING (1/10-12/12) COMPLETED
100%
● TOSHIBA CALMELRAY PANEL J MONITORING (1/7-9/12) COMPLETED
100%
● TOSHIBA CALMELRAY PANEL K MONITORING (1/7-9/12) COMPLETED
100%
● TOSHIBA CALMELRAY PANEL L MONITORING (1/10-12/12) COMPLETED
● TOSHIBA CALMELRAY PANEL L MONITORING (1/8-20/12) 100%

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 7


COMPLETED
● TOSHIBA CALMELRAY LVS WGRG MONITORING (4/30- 100%
5/3/12) COMPLETED
● TOSHIBA CALMELRAY LVS WGRF MONITORING (4/30- 100%
5/3/12) COMPLETED
● TOSHIBA PROJECTS MANPOWER
C.M PANCHO CONSTRUCTION, ● SUPPLY AND INSTALLATION OF ELECTRICAL SYSTEM 100%
INC. DILIMAN Q.C FOR COMPLETED
ELECTRICAL SYSTEM OF CMP LOT
100%
SAGARA METRO PLASTICS CALAMBA, LAGUNA ● ANNUEAL PREVENTIVE MAINTENANCE OF ALL COMPLETED
INDUSTRIAL CORPORATION POWER DISTRIBUTION SYSTEM PR12-1368 FOR HR
● SUPPLY OF LABOR TOOLS AND EQUIPMENTS ON THE 100%
COMPLETED
PREVENTIVE MAINTENANCE OF ALL POWER
DISTRIBUTION OF SMPIC
PR13-1397
● Various Electrical Works for Mitsubishi Cainta 100%
TAIKISHA PHILIPPINES INC. MAKATI CITY COMPLETED
● Electrical Works- Preventive Maintenance of Hoya 100%
COMPLETED
Electrical Room and Substation at FPIP Batangas
100%
● Walkway and Parking Lightings for Toshiba, COMPLETED
Biñan Laguna
100%
● Ref Renovation Electrical Installation for PMPC COMPLETED
at Taytay Rizal
100%
● Various Additional Works (Electrical Works) COMPLETED
for Austria Project at Calamba, Laguna
100%
● Additional Works- Power Supply for Equipment for COMPLETED
Toshiba Project at Biñan Laguna
100%
● Electrical Works- Elevator Intercom and Exhaust COMPLETED
System for Toshiba EMS at Biñan, Laguna
● ELECTRICAL ESD GROUNDING VARIOUS WORKS 100%
COMPLETED
AT LAGUNA TECHNOPARK

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 8


100%
● ESSD Void Area- Electrical Distribution Feeder COMPLETED
System for Toshiba EMS Project at Biñan, Laguna
100%
● Supply and Labor of Materials for Electrical Installation COMPLETED
of Various Works
● RENTAL OF FOUR (4)UNITS MANLIFT TRUCKS 100%
COMPLETED
PERIOD: DEC 2 - FEB 11, 2013 RATE: P15,000.00/ DAY
(8HRS/DAY/MANLIFT) STANDBY RATE: P7,500/DAY
MANLIFT MOBILIZATION/ DEMOLIZATION: P15,000/
MANLIFT TRANSPORTATION OF OPERATOR: P500/DAY
100%
● Electrical Works COMPLETED
● ELECTRICAL WORKS INSTALLATION OF OUTLET 100%
COMPLETED
AT SAN MIGUEL, TARLAC CITY
● ELECTRICAL WORKS VARIOUS ADDITIONAL WORKS 100%
COMPLETED
AT BINAN LAGUNA
● THERMOGRAPHIC SCANNING FOR ELECTRICAL 100%
COMPLETED
FACILITIES AT BINAN, LAGUNA
● TEMPORARY WORKS INSTALLATION OF PANEL 100%
COMPLETED
BOARD & ELECTRICAL SYSTEM FOR MURATA STAFF
FIELD OFFICE AT TANAUAN CITY BATANGAS
● ELECTRICAL WORKS & TEMPORARY POWER 100%
TAIKISHA PHILIPPINES INC. MAKATI CITY COMPLETED
SUPPLY FOR TEMFACIL AT TAYTAY RIZAL
● ELECTRICAL INSTALLATION AT CABUYAO LAGUNA 100%
COMPLETED
● POWER INCOMING - ELECTRICAL WORKS AT STA. ROSA 100%
LAGUNA COMPLETED
● PREVENTIVE MAINTENANCE OF MARUWA ELECTRICAL 100%
ROOM AT COMPLETED
ROSARIO CAVITE CITY
● SUPPLY MATERIALS & MANPOWER FOR POWER DROP 100%
TEM/ COMPLETED
HUMIDITY & ETAC CHAMBER TEMP POWER SUPPLY -

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 9


ELECTRICAL WORKS AT BINAN, LAGUNA
100%
● ELECTRICAL INSTALLATION OF VARIOUS WORK COMPLETED
100%
● TEMFACIL POWER SUPPLY WORKS AT BINAN, LAGUNA COMPLETED
100%
● ELECTRICAL WORKS AT BINAN, LAGUNA COMPLETED
● REPLACEMENT OF DRY TYPE TRANSFORMER & 100%
CONTACTOR COMPLETED
● FUJI MAGNETIC CONTACTOR 220AMP 100%
MORIROKU PHILIPPINES INC. BINAN LAGUNA COMPLETED
● FUJI MAGNETIC CONTACTOR 150AMP
● BATTERY, CONSUMABLES AND LABOR COST 100%
COMPLETED
● SUPPLY AND INSTALLATION KIT QT 11 3M 100%
COMPLETED
DOU-SYSTEM TECHNOLOGY ● Oil Purification and testing of one (1) 2MVA Oil Immersed 100%
INC. PASIG CITY transformer COMPLETED
● TRANSFORMER MAINTENANCE 100%
COMPLETED
BONIFACIO GLOBAL ● PREVENTIVE MAINTENANCE 100%
SPLASH CORPORATION CITY COMPLETED
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Rental of Manlift COMPLETED
100%
● Power Supply for General Exhaust COMPLETED
100%
● PSNP As-Built Drawings (Including Assistance COMPLETED
To Civil, Electrical and Mechanical Scope) in
Sta. Rosa Factory and Calamba Bldg. C
100%
● Additional Production Panelboard and Miscellaneous COMPLETED
Works
100%
● Supply of Tools and Manpower Equipment for COMPLETED
the Preventive Maintenance
100%
● Preventive Maintenance of Electrical Facilities COMPLETED
and FPIP Plant
100%
● Supply of Labor & Materials for the Installation of COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 10


Feeder Line
100%
● Miscellaneous Additional Works 2 COMPLETED
100%
● Supply of Labor and Materials for Electrical COMPLETED
Installation for Warehouse
100%
● Repair of Oil Leak for 1.5MVA Oil Immersed COMPLETED
Transformer Including Equipment
100%
● 750KVA Oil Immersed Transformer Replacement COMPLETED
of Oil
100%
● Supply of Manpower and Materials for Electrical COMPLETED
Works
100%
● Temfacil Works-Electrical COMPLETED
100%
● Supply of Labor and Materials for the Installation COMPLETED
of Electrical Works - Aikawa Relayout
100%
● Installation of Power Incoming COMPLETED
100%
● Supply & Installation of 1 Unit 2000A Circuit Breaker COMPLETED
100%
● Preventive Maintenance Works for Maruwa COMPLETED
Electrical Room & Building 1 & 2 Low Voltage
Side & Substation
100%
● Emergency Works Installation Replacement of Wires COMPLETED
100%
● Supply of Labor and Materials for Power Incoming COMPLETED
Transbonding IME-Electrical Works
100%
TAIKISHA PHILIPPINES INC. ● Temporary Power Supply & Lightings COMPLETED
100%
MAKATI CITY ● Installation of Panels and Feeders for Mitsubishi COMPLETED
Paintshop Ventilation
100%
● Supply of Labor and Materials for Various COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 11


Additional Works
100%
● Electrical Works-Electrical Substation Installation COMPLETED
100%
● Electrical and Mechanical Feeder Installation COMPLETED
100%
● TIPLTI Annex 2F ESSD Electrical Feeder COMPLETED
Installation P2 CSSD
100%
● Various Electrical Installation @ Ground Floor COMPLETED
Production Area
100%
● Various Electrical Works COMPLETED
100%
● Supply & Installation of Autodoor Panels and COMPLETED
Feeder for HPC & CSSD
100%
● Production Office Feeder Panel and Power Supply COMPLETED
100%
● Kitchen Feeder Panel and Power Supply COMPLETED
100%
● Production G/F and 2/F ESD Panel & ESD COMPLETED
Grounding System
100%
● SERVER NET INSTALLATION AT TARLAC CITY COMPLETED
100%
● ELECTRICAL INSTALLATION OF AHU AT TARLAC CITY COMPLETED
100%
● ELECTRICAL INSTALLATION OF WAREHOUSE AREA COMPLETED
100%
● ELECTRICAL INSTALLATION OF EMISSION EQUIPMENT COMPLETED
100%
● ELECTRICAL INSTALLATION OF VACUUM PUMP COMPLETED
● INSTALLATION OF FFU POWER SUPPLY AT BINAN 100%
LAGUNA COMPLETED
100%
● ELECTRICAL WORKS AT BINAN LAGUNA COMPLETED
100%
● ELECTRICAL WORKS FOR PUMPS AT BINAN LAGUNA COMPLETED
● TEMPORARY PANEL BOARD FOR MURATA 100%
CONSTRUCTION SIT COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 12


AT TANUAN CITY BATANGAS
● MISCELLANEOUS ELECTRICAL WORKS AT BINAN 100%
LAGUNA COMPLETED
● SUPPLY AND INSTALLATION OF PANEL BOARD AND 100%
ELECTRICAL COMPLETED
SYSTEM FOR TPI TEMPORARY FACILITIES AT TANAUAN
CITY, BATANGAS
LIMA TECHNOLOGY
KOYO MANUFACTURING CENTER, 100%
CORP. MALVAR BATANGAS ● KOYO THERMAL SCANNING OF ELECTRICAL PANELS COMPLETED
SMPIC SPECIAL
ECONOMIC ZONE
BRGY. PACIANO
SAGARA METRO PLASTICS RIZAL, CALAMBA ● PREVENTIVE MAINTENANCE OF 1ST PRIVATE POLE 100%
INDUSTRIAL CORPORATION LAGUNA TRANSFORMER & PANEL BOARD COMPLETED
77 ROSAS ST.
MASTERPACT INDUSTRIAL TWINVILLE 100%
ENTERPRISES SUBD.MARIKINA CITY ● PREVENTIVE MAINTENANCE OF DRY TYPE COMPLETED
TRANSFORMER IN GEN. TRIAS CAVITE
100%
AIKAWA STA.ROSA LAGUNA ● RELOCATION OF PANEL BOARDS AND CABLE TRAY COMPLETED
QUEZON AVENUE 100%
68 ROCES ETON PROJECT Q.C. ● SUPPLY AND INSTALLATION OF ELECTRICAL SUPPLY COMPLETED
LIGHTING LAYOUT, POWER LAYOUT, AND AUXILLIARY
LAYOUT
100%
SAN TECHNOLOGY INC. ROSARIO CAVITE ● SUPPLY AND INSTALLATION OF 250KVA DRY TYPE COMPLETED
TRANSFORMER AND PANELS FOR VCM PROJECT
100%
● INSTALLATION OF 50KW AIR COMPRESSOR COMPLETED
FOR SANYO
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Various Electrical Works COMPLETED
100%
● Electrical Works COMPLETED
100%
● Supply and Installation of Braided Busbar Connector COMPLETED
100%
● Supply & Installation of 4 Units Digital Panel Meter COMPLETED
100%
● Supply Consumable and Manpower for COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 13


Various Electrical Works
100%
● Supply of Labor for Preventive Maintenance of COMPLETED
Electrical Facilities
100%
● 80mm2 THHN Wire Black (2096meters) COMPLETED
100%
● Supply and Insulation of Feeder Wire for Boiler COMPLETED
100%
● Supply and Labor & Materials for the Installation COMPLETED
of 1 Unit 2500A Circuit Breaker w/ Nema 3R
100%
● Supply of Labor and Material for Modification COMPLETED
of Existing Termination Box for Sub-station and
Bldg. 2 & Rewiring of 4 Bank Transformer,
Replacement of PP4 Panel and Transformer
of Load from MDP1 to MDP2
100%
● Supply of Labor and Materials for the Replacement COMPLETED
of Power Fuse
100%
● Preventive Maintenance of Electrical and Substation COMPLETED
100%
● Supply of Labor and Materials for the Installation COMPLETED
of Exhaust Fan and Supports for Production Area
100%
● 13.8KV Automatic Voltage Regulator Medium COMPLETED
Voltage Works / Proposed New AVR
100%
● Supply and Various Electrical Installation of COMPLETED
equipment, Lightings and Accessories
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Assembly, SMT and Other Area Renovation- Electrical Works COMPLETED
100%
● Electrical Installation of Sensor Lens Machine & CRT Transfer COMPLETED
100%
● Power Supply for TPI Fabrication Temfacil & COMPLETED
Construction Area and Additional Requirement for SMT and
Assembly Line
● Electrical Works for LM Expansion (2 lines) 100%

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 14


COMPLETED
100%
● Power Supply for Nitrogen Tank COMPLETED
100%
● Panasonic Inverter Project September COMPLETED
● Fire Alarm Replacement, Trouble Shooting and Preventive 100%
Maintenance of Existing Fire Alarm COMPLETED
● Various Additional Installations of Electrical Equipments, 100%
Panels and Accessories COMPLETED
100%
● Electrical Installation for 2F Cleanroom Project COMPLETED
100%
● Temporary Facilities Installation COMPLETED
100%
● Electrical Maintenance COMPLETED
100%
● Electrical Installation Works COMPLETED
100%
● Electrical Works - Temporary Power Supply COMPLETED
100%
● Electrical Works COMPLETED
100%
● Supply of Materials and Labor for Replacement COMPLETED
100%
● Electrical Installation for Hoya Facilities Requirements COMPLETED
100%
● Electrical Installation for Generator & Fabrication COMPLETED
Panel Feeder in Site Office
100%
● Supply of Labor and Materials for the Electrical COMPLETED
Installation and Production Area
100%
● Electrical Works for Dangerous Room COMPLETED
100%
● Power Supply for Mist Exhaust COMPLETED
100%
● Lighting Works at Pump Room COMPLETED
100%
● Dismantling Works for Temporary Facilities COMPLETED
100%
● Electrical Works for OSPI Production Equipment COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 15


100%
● Additional Electrical Works COMPLETED
100%
● Supply and Installation of Cut Out Fuse 15KV,200A Frame COMPLETED
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Supply and Installation of Feeder Wire for Boiler COMPLETED
100%
● Supply of Labor and Materials for Power Incoming COMPLETED
Transbonding IME - Electrical Works
100%
ONCHO PHILIPPINES, INC. MAKATI CITY 13.8KV AUTOMATIC VOLTAGE REGULATOR COMPLETED
MEDIUM VOLTAGE WORKS FOR SMK PROJECT.
HBC CORPORATE 100%
SPLASH MANUFACTURING CENTRE SUPPLY OF LABOR, USED OF TOOLS, AND TECHNICAL COMPLETED
MINDANAO AVE,
CORPORATION NOVALICHES Q.C SUPERVISION FOR THE AS-BUILT OF SPLASH BLDG. 2
100%
P.M OF ELECTRICAL ROOM AND DISTRIBUTION PANEL COMPLETED
OF SPLASH BLDG. 2
3/F MATRINCO BLDG. 100%
FUJI-HAYA INTERNATIONAL 2178 PASONG TAMO SUPPLY & REPLACEMENT OF ONE (1) UNIT LOAD COMPLETED
CORPORATION ST. MAKATI CITY BREAKER SWITCH INTERRUPTED 34.5KV 300A S&C
BRAND AND PREVENTIVE MAINTENANCE OF LBS
IN LA SALLE AT GREENHILLS
FRANDEL CONSTRUCTION
AND STA. MARIA, BULACAN ● ELECTRICAL INSTALLATION FOR MALL IN 100% Completed
DEVELOPMENTCORPORATIO
N CALAPAN MINDORO
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Electrical Installation of Class 100K Clean Room COMPLETED
100%
● Electrical Works COMPLETED
100%
● Various Electrical Installation Works COMPLETED
100%
● Modification of Wye Point of Transformer Bank COMPLETED
100%
● LCD/Panel Inspection Room Electrical Installation COMPLETED
100%
● Miscellaneous Electrical Works COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 16


100%
● Electrical Installation Works COMPLETED
● Supply & Installation of 200KVA Transformer w/ LBS 100%
Inspection COMPLETED
100%
● Supply & Installation of Temporary Power Supply COMPLETED
100%
● Installation of Temporary Power Supply in fabrication area COMPLETED
100%
● Panasonic Thermal Scanning and Electrical Panel injection COMPLETED
● Supply of Technical Manpower, Tools and Equipment for TRP 100%
Preventive Maintenance COMPLETED
100%
● Electrical Works - Proposed Ampere and Voltage monitoring COMPLETED
● Supply and Installation of Fuse Cut Out and Current 100%
Transformer Including Testing COMPLETED
100%
● Supply and Replacement of Power Fuse Refill COMPLETED
100%
● Supply and Installation of Secondary Feeder COMPLETED
● Supply and Material and Labor for Rehabilitation of Emergency 100%
Lights- Electrical Works COMPLETED
● Supply of Material and Labor for Relocation of 1000KVA Oil 100%
Immersed Transformer-Elec. Works COMPLETED
● Supply of Material and Labor for Relocation of LVSG-1 100%
Electrical Works COMPLETED
● Supply of Material and Labor for Relocation of 1000 KVA AVR- 100%
Electrical Works COMPLETED
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Supply and Installation of Cable Tray in Electrical room COMPLETED
100%
● Supply of Material and Labor for Production Lightings COMPLETED
Changes - Electrical Works
100%
● Supply and Installation of Feeder Lines System COMPLETED
100%
● 1 Fuji Inverter, Model #FRN 3.7 ESI-4A Fuji 3.7kw COMPLETED
x 3P x 440V with Enclosure Nema 1-8 Assembly
100%
● Thermographic Scanning for PCP Electrical COMPLETED
Facilities and 24 Hours Monitoring

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 17


100%
● Supply of one (1) Assembly 2000 at ECB COMPLETED
100%
● Dismantling Works from May 1-30, 2010 COMPLETED
100%
● Miscellaneous Works COMPLETED
100%
● Testing of Transformer 7000KVA COMPLETED
100%
● Installation of MDP-2 Panel from LVSG - Nema 1 COMPLETED
● Replacement of Transformer and Installation of LVSG - Nema 100%
3R COMPLETED
100%
● Replacement of Dry Type Transformer COMPLETED
100%
● Electrical Installation for Canteen- HOGP Factory COMPLETED
100%
● Electrical Installation COMPLETED
100%
● Electrical Installation COMPLETED
100%
● Preventive Maintenance of Manual Electrical COMPLETED
Room and MD-Tech Bldg. 1 & 2 Low Voltage Side & Substation
100%
● Installation of H-Frame & Feeder Wire for PPAC COMPLETED
100%
● Replacement of Indoor LBS-Power Fuse COMPLETED
100%
● Installation of Electrical Load of MPD-2 and Distribution Panels COMPLETED
● Additional Works-Installation of Electrical Load for MDP-2 100%
Panel COMPLETED
100%
● Additional Works in Electrical Installation for COMPLETED
Canteen Area
100%
● Supply & Installation of Lighting Fixtures in COMPLETED
Perimeter Area of Waste Water. Electrical Installation for Canteen & Street Lighting
Replacement
Dismantling Works from June 1-30, 2010
100%
● Electrical Works COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 18


100%
● Dismantling Works: Period July 1 to Aug. 30, 2010 COMPLETED
100%
● Electrical Works - Street Lighting Projects COMPLETED
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● Electrical Works COMPLETED
100%
● Transformer, 600KVA Dry Type460V-100V COMPLETED
Delta Star Brand, WYE Connection 3Phase x 60Hz
AVR 3KVa, 220V 1PH - 2 units
AVR 5KVa, 220V 1PH - 1 unit
100%
● Temporary Electrical Installation COMPLETED
100%
● Various Electrical Works COMPLETED
100%
● Additional Electrical Works COMPLETED
1520 Mayhaligue cor. T.
Mapua St., Sta. Cruz, 100%
KC INDUSTRIAL Manila ● Power Monitoring for 3 Days in BPO San Lazaro COMPLETED
Cavite Economic Zone, 100%
SAN TECHNOLOGY,INC Rosario, ● REPLACEMENT OF CAPACITOR 150AT 3POLE MCCB COMPLETED
Cavite, Philippines MAGNETIC CONTACTOR & CONSUMABLES
CM PANCHO CONSTRUCTION 71-A SCOUT 100%
INC. BORROMEO ST., ● SUPPLY, DELIVERY AND INSTALLATION OF ELECTRICAL COMPLETED
SOUTH TRIANGLE,
DILIMAN Q.C WORKS OF THE PROPOSED EL MASFINO HOTEL
SAN RAFAEL BULACAN
100%
● FEEDER WIRE OF HOTEL UNDERGROUND UTILITIES COMPLETED
AT HOTEL TO MERALCO POSTINGS OF UNDERGROUND
UTILITIES
100%
● ELECTRICAL PANEL REPLACEMENT OF EXISTING COMPLETED
INSTALLATION IN CMPCI OFFICE. REPLACEMENT OF
ELECTRICAL PANEL
● SUPPLY, DELIVERY AND INSTALLATION OF FEEDER 100%
WIRE COMPLETED
DOU-SYSTEM TECHNOLOGY 3RD FLOOR. 105 A. 100%
INC. RODRIGUEZ AVE. ● OIL GAS ANALYSIS COMPLETED

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 19


DELA PAZ PASIG CITY
5/F ODC BLDG. 100%
KINDEN PHILS. CORP. INTERNATIONAL ● RENTAL OF BOOMTRUCK (3TIMES) FOR UNLOADING OF COMPLETED
PLAZA 219 SALCEDO POWER CABLES IN TOSHIBA STORAGE DEVICE LOCATED
ST., AT
LEGASPI VILLAGE,
MAKATI CITY CALMELRAY 1 CANLUBANG LAGUNA
Camp Aguinaldo, cubao
CAMP AGUINALDO Q.C. Testing and Preventive Maintertance of 1- 75kva, 100% Completed
1-50Kva, 3.6KV/120-240V Single Phase, Oil Immersed
Distribution Transformer at ISAFD Department
Supply and Installation of 1-225AT Main Circuit Breaker
and 20-30AI Branches Circuit Breaker for the replacement
of their existing Panel Boards at ISAFP Department
including re-circuit of Breakers loadside.
Supply and erection of 2-45' Concrete Pole, including
Supply and Installation of 1-unit 75KVA Oil Immersed
Dist Transformer including secondary wires for the power
of New Erected Office building.
Supply and installation of 1-167KVA Oil Immersed
Distribution Transforemer, 34.5KV-19.9KV Y / 139-227V
Self Cooled, single phase for the replacement of the
damaged 167KVA for PHIL. VETRANS AFFAIR OFFICE
Supply and installation of 1-unit 75KVA Oil Immersed
Single Phase Transformer in LOGCOM area and 2 pieces
50Ft concrete Pole for the replacement of broken
created pole in EP area
Angeles City of
HOLY ANGEL SCHOOL Pampanga Supply and Installation of Center for Kapampangan at 100% Completed
Main Bldg
bagan, Sta. Maria
BRIGHT HOMES REALITY Bulacan Dimantling of First Private Pole and accessories and 100% Completed
CORPORATION including 34.5KV Distribution Lines, Pin/ Suspension
Insulators. ASCR and 3-5KVA, 20KV/120-240V
Oil Immersed Distribution Transformer
Clark Air Base,
CLARK AIR BASE Pampanga Supply of 3-167KVA, 13.8KV/120-240. OH Immersed 100% Completed
Distribution Transformer
Supply of 1-60KVA, 1-30KVA Automatic Voltage 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 20


Regulator. 120/208V, 3 Phase
Clark Airforce
CLARK AIRFORCE Pampanga Supply and Installation of Additional 3phrase power
Distribution at bldg. #7705, 410th maintenance wing. 100% Completed
Supply and Installation of Constant Power for PMEL 100% Completed
at bldg. #7648, 410th maintance wing
TRIPLE L ENTERPRISES Don Mariano Hi-way, Supply of 3-50KVA, Oil Immersed Distribution 100% Completed
Jordan Plane subd.
Nova. Q.C. Transformer. 19.920V/120-240V, Single Phase
M.B ENG'G CORP. Diliman Q.C. Supply of 1-150KVA Dry type transformer, 480V-230V 100% Completed
3 Phase, 60Hz TIWI POWER PLANT IN ALBAY
Testing and Preventive Maintenance of2-1500KVA,
34.5KV/480V, 3Phase Oil Immersed Transformer at
Substation area and including 1-1250KVA480V/240V,
AND 8-500KVA 480V/i20-240, Dry type transformer
PENTAX CORPORATION in Gateway, Dasmarinas
Cavite City
Installation of 2 Parallel Transmission Lines at their 100% Completed
existing Concrete Post from Toyota Substation up to
Aichi Forged Corporation, complete with new installation
of cross arm, Pin/Suspension Insulators, Cut-out, la's
with 500MCM Bare copper wire, including Hi-pot Testing
of their 34.5KV Transmission lines in TOYOTA PHILS.
INC. Sta. Rosa Laguna
Supply and Replacement of 4-drums of Transformer 100% Completed
Oil using Filter Press Machine for 1-500KVA, 416V/480V
3Phase Oil Immersed Pad Mounted Transformer and
Including Transformer Testing in FOREMOST PHILS.
in Navotas
Repair of Transformer oil leak at Primary and Secondary 100% Completed
Bushing of 1-2MV Oil Immersed Transformer,
6,600V-480V 3Phase in AICHI FORGED CORP. sta.
Rosa Laguna
Replacement of Transformer oil for 2MVA Power 100% Completed
Transformer including megger testing and oil testing in
PUREFOODS CORP. in Batangas
M.B ENG'G CORP. Diliman Q.C. Conduct the ff. transformer testing for 2-2MVA Oil 100% Completed
Immersed Transformer: TTR, Oil Test, Insulation

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 21


Test, DLRO, Substation Grounding test to include
Hi-pot testing of 15KV XLPE in I.E.W.P in Asucarera
Tarlac C/O SUMITSESU PHILS.
Testing of 2-500 Kva, 3 Phase Oil emmersed 100% Completed
Transformer at Susbstation area including 2-dry type
Transformer-TOYOTA PHILS. INC in sta. Rosa Laguna
C/O SUMISETSU PHILS.
Testing and Preventive Maitenance of2-1500KVA, 100% Completed
34.5KV/480, 3Phase Oil Immersed Transformer at
Sustation area and including 1-1250KVA480V/240V,
and 8-500KVA 480V/120-240V, Dry type transformer
SANNO CORPORATION, Gateway Dasmarinas Cavite
C/O SUMISETSU PHILS.
Testing of Oil Immersed Transformer for Paper Mills in
San Fernando Pampanga of 1-1.5MVA/ 2-2.5MVA
13.5KV/230V, 3 Phase, 60Hz Transformer
M.B.V.ENG'G CORP. Diliman Q.C. Transformer Oil Filtering of their main susbtation 100% Completed
transformer, 7.5MVA 69KV/13.3KV including conducting
Dielectric Breakdown Voltage Test and refilling of nitrogen
PUREFOODS CORP in Batangas
Preventive maitenance of their substation transformer, 100% Completed
Hipot testing of XLPE cable, testing of Substation
transformer including cleaning of electrical room
in SANYO in Asucarera C/O SUMISETSU PHILS.
ISOMETRIC ENTERPRISES Kalayaan, Diliman Q.C. Erection of 3-35' Concrete Pole, including pole 100% Completed
c/o Isometric
Enterprises dressing, wire stringing and power cable termination
and Insulation testing in PASAR MINING CORP IN LEYTE
Transformer Oil Testing of 10-Unit Main Plaant Transformer
of J.G SUMMIT AT BATANGAS PLANT
KOYO MFG. CORP. Malvar Batangas Testing of transformers, preventive maitenance of LVSG, 100% Completed
including thermo scanning before and after preventive
maintenance schedule
Installation of 4-Extenssion of Fire Alarm Control Panel
at Assembly area.
Perimeter Fence paiting only on steel fence for the 8-hectares
KOYO MFG. CORP. Malvar Batangas perimeter fence.
TERESA MARBLE CORP. Teresa Rizal Installation of 6-35' Wooden Pole at the Quarying Plant 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 22


including supply and installation of 3-16KVA Oil
immersed transformer and relocation of their existing
3-100KVA distribution transformer to e include pole
dressing and stringing of acsr, energization distribution lines
Replacement of transformer oil and testing for their
3-100KV oil immersed transformer includin supply of
1-unit 60 feet 34.5KV Hot Stick
PANGASINAN HIGH SCHOOL Pangasinan Supply of 1-37.5KVA Oil immersed transformer, 100% Completed
13.8KV-120/240, 1Phase 60Hz
ASIA POWER ENG'G AND Alabang, Muntinlupa
IND'L SALES City Supply of Steel Cross Arm and oher accessories for 100% Completed
the used of 15KV distribution lins, cut out and arrester
CARGILL/PURINA PHILS. Installation of 6-G.E. High Bay Luminaire at their 100% Completed
Production are to be included the power and its
protection
SupplY of 1-unit 75KVA dry type transformer, 480V-240V 100% Completed
3 phase, 60Hz, Delta-Wye connection and G.E Panel
Board, US Made
Installation of Low Voltage Feeder Wire at the Villasis 100% Completed
Pangasinan Purina/ Cargill Plant
Installation of 6-G.E. High Bay Luminaries at besides their 100% Completed
Mirco WareHouse including dismantling of their existing
Lightings including As-Built plan in Pulilan Plant
Re-Cicuiting of the Electrical Lightnings in the Main 100% Completed
Warehouse, Pulilan Plant 1
Installation of Motion and tempeature sensor for thuer 100% Completed
3-bucket elevator at pulilan bulacan plant
Modification of Fire Pump panel and its controller, 100% Completed
include supply and installation of new genset
breaker for the supply source of deepwel motor
in Pulilan Bulacan Plant
CARGILL/PURINA PHILS. Supply and installation of Split type curent transformer 100% Completed
for their 2-KWHR-meter on pulilan 1 and 2 Low Voltage
Switchgear including checking of their control wires
Supply and delivery for Indent Materials from Killark/ Hubell 100% Completed
USA of Killark Brand of Long Throw Switshes and
Boxes, used for Class 1, divission 2 classification

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 23


in Pulilan Bulacan Plant
Preventive Maitenance of thie 1st Provate pole, Hipot 100% Completed
Testing of XLPE cable and testing 2.5MVA
13.8KV/220V transfomer including testing of oil such as
dissolved gas analysis, water content, color and
interfacial and dielectric voltage breakdown test
in Baliwag Bulacan
Emergency Replacement of 15KV Load Break Switch, 100% Completed
600A for their 1st Private Pole in Villasis Pangasinan
Repair and testingof 1-unit 2500 Ampres Circiut Breaker 100% Completed
from ATS at Normal Power including supply of 6 pieces
50Amperes fuse link and 2 sets of 15KV Fuse Cut out
Oil Degassisfying of 1 unit 2.5MVA Oil Immersed 100% Completed
Transformer, 13.8KV/480V 3 Phase, 60hz including
Oil Gas Anaysis in Baliwag Bulacan
Supply of 1 unit of 50KVA Dry type transformer, 480/230V 100% Completed
3 Phase, 60 Hz with standard tapping in Pulilan Bulacan
Laboratiry testing of Transformer Oil for Dissolve Gas 100% Completed
Analysis of their 2.5MVA Oil Immersed Dead Front
Transformer in Baliwag Bulacan
Preventive Maintenance of 2 units Oil Immersed Pad 100% Completed
Mounted Transformer oil, Checking and cleaning of all
private pole and re-tensioning of existing ASCR in Pulilan
Bulacan
CARGILL/PURINA PHILS. Pulilan Bulacan Installation of power supply for their 3-units 1.5 KW 100% Completed
Flange Type heater for oil animal fats tank, including
installation of control, thermo controller and protection
in Villasis Pangsinan
Supply and installation of Flexible Heater including 100% Completed
installation of power supply and controller for their
animal Liquid Fats Tank in Pangasinann Bulacan
CARGILL/PURINA PHILS. Pulilan Bulacan Laboratory testing of Transformer Oil for Dissolve Gas 100% Completed
Analysis of their 2.5MVA Oil Immersed Dead Front
Transformer for the Month of June, 2004 in Baliwag Plant
Mindanao ave. cor
SPLASH CORPORATION Quirino Hi- Preventive Maitenance of their Maim Substation, MCC'S, 100% Completed
Way, Novaliches Q.C. High Voltage Switchgear, Load Break Switch 34.5KV,

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 24


including testing of high voltages equipment
R CRISTOBAL DESIGN Sta. Maria Bulacan Propose Construction of 3-Storey Residential Building 100% Completed
of Engr. R. Garcia nd Site Developments, including
Installation of Electrical, Plumbing Works and interior
HITACHE CABLE Malvar Batangas Intallation of 4 units 50AT Circiut Breaker to be 100% Completed
tapped and extend to their existing LVSG
JAE PHILS. INC Gateway Business Park Supply of 10 units Prismatic Diffuser and 10 Units 100% Completed
Gen. Trias Cavite Dust Tight Flourescent Light, 2x40W, 220V
Supply and Installation of 1 unit Load Break Interrupter 100% Completed
For the existing damage units
Preventive Maitenance of there 1.5MVA Substation 100% Completed
including high Voltage switchgear and LVSG
DAIWA SEIKO INC. Mamplasan Laguna Preventive Maitenance of their 34.5KV Load reak 100% Completed
Switch and existing private pole
Supply and installation of 2 units Digital KWHR meter 100% Completed
including accessories and breakers
Replacement of their High Bay Lightnings including
Ballasts and Bulbs
Replacement of their 34.5KV Load Break Switch including
mechanical handle and testing
APC PLANT PEZA, Rosario Cavite Testing and Preventive maintenance of their 2.5MVA 100% Completed
Oil Immersed Transformer last December 24, 2003
Preventive Maitenance of there existing substation
and all dry type transformer including LVSG and Panel
boards for APC CAV-3
Preparation of Electrical As-built Plan for the Whole
Plant 1, including checheking and verifying findings on
the sttus of their electrical system
APC PLANT PEZA, Rosario Cavite Supply and installation of Cable tray for 400V Thor's
Hammer Burn-In including installation of power supply
of 112KVA Dry type transformer and additional wires for
their existing 2.5MVA Main transformer for CAV-1
Electrical Re-circuiting of their Production Plant Area
from December 23, 2003-January 04,2004 for CAV-1
Feeder installation of 80KVA Dry type transformer for 100% Completed
the Burn In System including Supply and installation of
150AT 3P 220V Panel board and installation of C.O. for

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 25


ISX Area for CAV-1
CLARION MFG. CORP PEZA, Rosario Cavite Emergency replacement of 1 unit 2500AT, 600V 100% Completed
3 pole Draw out Circuit Breaker
OPTODEV INC. Liip Mamplasan, Laguna Installation of LAN and TEL Outlet on their Safety Office 100% Completed
including relocation of FCU control and installation of
1-set 2x 40 W Dust proof Flourescent Light
R.N. Construction Corp. Las Pinas, Muntinlupa Supply of 250KVA Dry type transformer, 480/440V 100% Completed
3 phase, 60Hz complete with standard tapping
IRRI-International Rice UP Los Banos, Laguna Supply of Labor, used of tools testing equipment for 100% Completed
Researcher Institute the preventive Maitenance of their 300KVA Oil Immersed
Distribution Transformer to be include standard testing
Supply and delivery of 9 units current Transformer (C.T.) 100% Completed
600V, 800:5A, Split Type
UFC PHILS. INC Pulo Cabayao, Laguna Chang tapping of their 3-333KVA Distribution 100% Completed
transformer including testing of ratio and oil tests.
Malhacan Meycuayan
PACIFIC TIMBER EXPORT Bul. Supply and installation of 2-Sets of Dougap Interrupter, 100% Completed
CORPORATION replacement of power Fuse holder, for 34.5KV, including
standard testing of their distribution transformer
FEDCOR Lopez Group of Co. Cutting of their Silicon Transformer Core for their 100% Completed
Sto. Tomas, Batangas manufacturing of Dry Type Transformer, for 1-100KVA,
2-75KVA, 1-50KVA, 1-40KVA, 2-30KVA, 2-15KVA
Tandang Sora Ave.,
RALGO INDUSTRIES INC. Q.C. Supply of 1-30HP, 1-20HP, Wye-Delta Starter, 440V, 3P, 100% Completed
and 6-3HP, 4-2HP, 1-1HP Direct On Line Magnetic
Starter, 440V, 3Phase, 6oHz, for the Olypic H. Tower I
A.R. ELECTRICAL Malabon Thermo Scanning of High Voltage Equipment of 100% Completed
World Center Building
GAISANUN MALL CEBU City Trouble Shooting of 220KVAR Capacitor Bank and 100% Completed
C/o SPECTRUM replacement of 20KVAR Power Capacitor, replacement
of 1-unit 200Amperes Circuit Breaker.
5th flr.,ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Electrical Installation of 6.6KV Power Incoming Lines 100% Completed
Salcedo Vill. Makati City for HKR Project inside TOYOTA Plant in Sta. Rosa
Laguna including testing of their NEWLY supplied
Oil Immersed Transformer, 1000KVA and 300KVA
Installation of Steel Cross Arm and re-arranging the 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 26


XLPE Cable for COPAL NIDEC Plant in Sta. Rosa Laguna
Construction of Transformer Concrete Pad for Ford Phils.
Project at Sta. Rosa Laguna
Testing and preventive maitenance for ICHINOMIYA 100% Completed
PLANT IN Sta. Rosa Laguna, including Hipot testing of
their XLPE cable
Preventive Maintenance of 12 units Oil Immersed Pad 100% Completed
Mounted Transformer in NIDEC Phils in Laguna Plant
Suply and erection of 11-45 Feet concrete pole, includung 100% Completed
Pole dressing and installing of steel Cross Arm, pole
line hardwares and Stringing of ACRS dor 5KV distribution
line and lay out of XLPE Power Cable: Supply and Installation
of 34.5KV Power Fuse Assembly and termination
of Power Cable in 34.5KV/416oV Transformer, to be
include testing and commissioning in SAGARA Sta. Rosa
Laguna
Supply of 3 Units Current Transformer, used for 34.5KV 100% Completed
lines, with ration of 100/75/60/50:5A with a rating factor
of 2, Brand WTW Wirges Germany and Suppky of 3 Units
Power Fuse Refill for 2.5MVA Oil Immersed Transformer
34.5KV/22V 3 Phase, 60Hz for P.IMES Cavite Project
SPARKLINE IND'L SALES 7th Ave., Caloocan City Installation of Feeder Wire for Generator Sets for 100% Completed
ABBOT Project at Mandaluyong City including supply of
control wires
Rufoino Tower, Makati
LINBERG PHILS. City Installation of Feeder wire for secondary and primary 100% Completed
cable of 3750KVA Oil Immersed Transformer
including testing and commissioning at PHILIPS
CABUYAO PLANT Decemer 22-31 2003
BATAAN POLYETHELYNE Mariveles Bataan Installation of Transmission Lines to be tapped in 100% Completed
CORPORATION PENELCO lines including installation of Metering,
supply of transformer and testing and commission
Supply and Installation of 1-unit 15KV Load reak 100% Completed
Switch, 600Amperes, group operated, Complete with
mechanism for the replacement of the damage xisting
load break for the incoming line of the PPDC line
Supply of Telescopeic Hotstick, Fiber Glass, 35 Feet long 100% Completed
and 2 pcs of 50Amperes Fuselink

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 27


CREMBAC TECH. INC. Suite 208 CRS Tower, Transformer Oil Filtering for 5MVA Oil Immerse 100% Completed
Paco Manila Transformer for SUAL Project including Oil testing
Filtering of transformer oil for 3 x 167KVA, 7620V-240V 100% Completed
Single Phase Distriution Transformer, including megger
testing and oil testing of transformer in TIWI POWER
PLANT in Tiwi Alabay
Supplyand Replacement of 4-Drums of Transformer 100% Completed
Oil using Fiber Press Machine for 1-500KVA, 400V/480V
3Phase Oil Immersed Pad Mounted Transformer and
Sta. Rosa Laguna
West Carmen,
MN ELECTRO IND'L Pangasinan Hi-pot and meger testing of 13.8KV Main Switchgear with 100% Completed
SUPPLY AND SERVICES 5 Cuicle panels, including 69KV XLPE cales
for 25MVA 69KV/13.8KV sustation of PANELCO
Pearl Bank Center, 149
SUMISETSHU PHILS. INC. Valero Testing and Preventing Maitenance of 2-750KVA, 100% Completed
Makati city 2-450KVA Oil Immersed 34.5KV/480V 3Phase, 60Hz
Transformer including 2-150KVA dry type transformer
at NEC Cauyao Laguna Plant
PENINSULA ELECTRIC Balanga City, Bataan Supply of 25pcs G>E Current Transformer, 400:5A, Jak-o 100% Completed
COOPERATIVE-PENELCO and 1000 pieces of Guy Attachement, Timle Eye
Supply of Climer Sets and Bolt Cutters
SMA Phase 2, iiktican
TYCO DEVELOPMENT Rd. Supply and Installation of 15KV 2Way Load reak Switch 100% Completed
Suic Bay Freeport,
CORP. Zambales 600Amps, 14.4KV, 110KV IL, Pole Pak in HITACHIE
Philippines in SBMA
DEL RELIABLE ELECT'L Makati City Supply of 6 pieces 21/2"x 8' Creosoted Cross 100% Completed
CONSTRUCTION Arm for PNOC projects
No. 85 Timog Ave.,
CENTRAL ELECTRIC South Supply of 3 units 12KV, 14 Inches in Height, 10KA Bil 100% Completed
CONSTRUCTION Triangle, Quezon City Station Type Surge Arrester For Tagaytay Highlands Projects
VALUE TECH INC. Sta. Cruz, Manila Supply of technical expertise for the conversion, rewiring 100% Completed
of 18 units of Automatic Vaoltage Regulator from 3Phase
connection to single phase connection including testing
for LEIGHTON NORTH DIVERSION ROAD PROJ
MRP ELECTRICAL ENG'G West Rembo, Makati
SERVICES city Supply of Labor and used of equipment for the Erection 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 28


of 9-35 Feet Concrete Pole in Cobb's Philippines plant in Rizal
5th Flr., ODC ldg,
KINDEN PHILS. INC. Legaspi St. Termination of 5KV 50mm2 XLPE Cable and insulation 100% Completed
Salcedo Vill. Makati City testing for 400KVA 416KVA 4160V/480V, 3Phase, 60Hz for
the Chiller power supply in the SAGARA Manufaturing Plant
West Rembo, Makati
MRP ELECTRICAL ENG'G City Emergency Replacement of 20E Power Fuse Refill, 34.5KV 100% Completed
SERVICES including testing for RFM manufacturing plant in
Manggahan Pasig City
Pulling Out 3-75KVA Transformer, 13.2//7620V-240/120V 100% Completed
Single Phase, Testing and filtering of Transformer oil,
replacement of steel tank and painting, and re-installation
of the 3 transformer in TAGAYTAY HIGHLAND and
Energization.
5th Flr., ODC ldg,
KINDEN PHILS. INC. Legaspi St. Supply and fabrication of 4-1/4" x 4" Bus-bar, 3 sets for 100% Completed
Salcedo Vill. Makati City retrofitting for 1000 amperes busbar rating for PIMES
Low Voltage Switchegear Expansion Project in Rosario Cavite
FEDCOR Lopez Group of Co. Cutting of their Silicon Transformer Core for their 100% Completed
Sto. Tomas, Batangas manufacturing of Dry Type Transformer, for 1-75VA.
CARGILL/PURINA Pulilan Bulacan Emergency replacement of 3 sets of 3-100mm2 THHN wire 100% Completed
600V including wire termination, testing and commisioning
for the burned wires for the Comressor equipment in Pulilan
Bulacan Plant
PVAO compound camp
PHIL. VETRANS AFFAIRS aguinaldo Supply and installation of 1-167KVA Oil Immersed 100% Completed
OFFICE (PVAO) Santolan Quezon City Distriution Transformer, 34.5KV-19.9KV Y/139-227V
Self Cooled, single phase for the emergency replacement
of the damaged 167KVA for PVAO office
Camp Aguinaldo, Cuao
CAMP AGUINALDO Q.C. Supply delivery of 9-45ft concrete pole, pole line 100% Completed
hardwares, ACSR and miscellaneous materials including
supervision/ assistance for the emergency replacement
of the damaged distribution lines in front of enginnering
office rated 34.5KV distribution lines and in 3.6KV lines
CREMBAC TECH. INC. Suite 208 CRS Tower Testing and oil filtering of 5MVA transformer of 100% Completed
Paco Manla Purefood Bauan Batangas Plant including conducting of
Transformer oil test and insulation

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 29


5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Installation of First Private Pole 34.5Kv complete with 100% Completed
Salcedo Vill. Makati City 34.5KV Load reak Swicth, Power Fuse Assemly, W/Fuse.
including supply and erection of 1-45 concrete pole, and
other accessories to complete the project for SHINEI'S
MANUFACTURING PLANT in Batino Laguna
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Supply and lay out 50mm2 XLPE 133% Power cable from 100% Completed
Salcedo Vill. Makati City 1st Private pole going to HVSG and in 1-1500KVA, 1-500kva
34.5KV/230V, 3 Phase, 60 Hz Trnasformer , incliding
Termination using Raychem Heat Shrinkable kit, to be
include testing of transformer and hi pot testing of HVSG
and Power Cable in SHINEI'S MANUFACTURING PLANT
Rm. 1402, 14th Flr., Electrical Labor Installation of MITSUBA MANUFACTURING
DARUMA CORPORATION Marbella I PLANT 100% Completed
Condominium, 2223 Expansion project in FCIE Dasmarinas Cavite, to be include in
Roxas Blvd. scope of works full
engineering coordination and installation of all electrical
Pasay City requirements as per plan E-1 to E-16
Dated September 16, 2004 including supply of some
consummable materials.
Pearl Bank Center, 149 Testing of 1-400KVA, 13.2KV/230V 3 Phase, 60Hz, Oil
SUMISETSHU PHILS. INC. Valero Immersed, Transformer in Philippine Kyoritsu Inc. 100% Completed
(PKI) in Batangas including Dissolve Gas Analysis of 750 and
St. Makati City 400kva AVR Oil
NDCF compound camp
NATIONAL DEFENSE aguinaldo Supply and installation of 1-167KVA Oil Immeresed 100% Completed
DELEGE OF THE PHILS. Santolan Quezon City Distribution Transformer, 34.5KV-19.9KV Y/ 139-227V
Self Cooled, single phase for the emergency replacement
of the damaged 167KVA for NDCF Building
Supply of 30 pieces 4oft Creosofed Pole, class 3, with 20pieces
DEL RELIABLE ELECT'L Makati City 4"x5"x6Ft cross arms 100% Completed
and 10 pieces 8"x4' anchor ligs for TIWI GEOTHERMAL
CONSTRUCTION POWER PLANT Project in Tiwi, Albay
Mindanao ave. cor Preventive Maitenace of their Main Substation Transformer,
SPLASH CORPORATION Quirino Hi- 2.2MVA, 34.5KV/240VY 100% Completed
, MCC's High Voltage Switchgear, Load Break Switch 34.5KV,
way, Novaliches Q.C. including testing
of high voltageequipment last January 02, 2005
SPARKLINE IND'L SALES 7th Ave., Caloocan City Supply and Delivery of Hot Dipped Steel Cross Arm, 255 mtr 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 30


100mm2 and 90-250mm2
THHN Philflex Wires for their Laguna High voltage installtion
Installation of 2MVA Oil Immersed Power Transformer, supply
APC PLANT PEZA, Rosario Cavite and installation of PT's and CT's 100% Completed
for their Primary metering, including installation of ATS, MDP
and termination
of secondary side of transformer. Dismantling and hauling of
electrical equipment
from Laguna plant area going to Cavite Plant Cav1 area, to be
include testing of
transformer and commissioning. Installation of steel cross arms
and suspension
insulators and cut out fuse with fuse refill for incoming line of
transco going to metering
of APC cav1 in Cavite Plant area
SUPPLY AND
MN ELECTRO IND'L SERVICES 10MVA Power Transformer testing of Hanyang Project 100% Completed
West Crmen,
Pangasinan in Lubao Pampanga
DAIWA SEIKO INC. Mamplasan Laguna Preventive Maitenance of their 34.5KV Load Break 100% Completed
Switch and Existing private pole and including
Reparing of their Gear Mechanism of Indoor Load Break
Switch and Testing and preventive maitenance of their
2.5MVA Oil Immersed Transformer last December 30, '04
10K-E St. Kamuning,
CRSA CONSTRUCTION Q.C. Supply and delivery of 1/0 XLPE, 15Kv, 100% insulation, 100% Completed
including insulation testing and erection of 3 units
35 Feet Street Light for Petron Gasoline Station in
Batangas Startolway projects
Pearl Bank Center, 149
SUMISETSHU PHILS. INC. Valero Testing of 1-1000KVA, 13.2KV 3 Phase, 60Hz, 100% Completed
Oil Immersed, Transformer in Philippines Kyotrisu Inc. (PKI) in
St. Makati City Batangas
Laboratory testing of Transformer Oil for Dissolved Gas
CARGILL/PURINA PHILS. Baliwag Bulacan Analyssis of their 2.5MVA 100% Completed
Oil Immersed Dead Front Transformer for their Month of
Decemer, 2004 in
baliwag Plant as part of transformer monitoring for gases
CREMBAC TECHNOLOGIES Pandacan Manila Preventive maitenance of their sustation equipment, 100% Completed
conduct standard transformer testing for 7 units 2MVA

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 31


34.5/480VY including Power Factor testing, cleaning and
retightening of their HVSG for Asia Brewelry in Cabuyao
PHIL. NAT'L OIL CORP. Taguig Metro Manla Testing of feeder wires and replacement of busted mat's 100% Completed
for their strret lightning in PNOC PPDC compound in
Batangas Dos, Mariveles Bataan
CARGILL/PURINA PHILS. Pulilan Bulacan Peventive maitenance of 1.5MVA Transformer, 34.5KV/480V, 100% Completed
inluding standard testing for their transformer and
degassifying of transformer oil to eliminate
dissolve gasses involved in the oil and conduct dissolve gas
analysis of the oil.
Pearl Bank Center, 149
SUMISETSU PHILS. INC. Valero Testing of 1-400KVA, 13.2KV/230V 3 Phase, 60Hz, 100% Completed
St. Makati City Oil Immersed, AVR Transformer in Philippines Kyoritsu Inc.
(PKI) in Batangas
Leak repair of 10MVA Transformer in NIDEC Laguna Plant 100% Completed
NEWTON IND'L Valenzuela City Transformer Degasifying using Vacuum Purifier complete 100% Completed
with Heater and filter for the Strong Hold Steel Company
in Angeles Pampanga for the following transformer with
insulating testing, 2-10MVA, 1-5MVA, 2-2.5MVA and
1-2MVA Transformer
Power Facror testing for 44,000KVA Generating Sets, 100% Completed
13.8KV in Ilocos Power Plant
SPARKLINE IND'L SALES 7th Ave., Caloocan City Supply of various electrical for wires, Philflex Brand 100% Completed
CARGILL/PURINA PHILS. Pulilan Bulacan Supply and installation of 15KV Load Break Switch for the 100% Completed
replacement of Damage Existing Load Break Swicth in
First Private Pole in Pulilan Plant
Supply and installation of 1-45 Feet Concrete pole, for 100% Completed
the replacement of existing Creosoted pole for their
distribution lines
Supply and installatio of 20pcs-40KV Cover line for their 100% Completed
existing distribution lines
Rm. 1402, 14th Flr.,
DARUMA CORPORATION Marbella I Supply of Labor, Technical expertise and used of tools 100% Completed
Condominium, 2223
Roxas Blvd. and equipment for the Electrical Installation of ANIMO
Pasay City Proposed Two Storey Condominium in SUBIC
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Preventive maitenance of Main Distribution Panel and 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 32


Salcedo Vill. Makati City testing of breakers, replacement of 1-400AT/AF 3P
cicuit breaker in NICHIVI plant in roasrio cavite
TDK Fujitsu Phils Sta. Rosa Laguna Supply of 2 units panel board, 3phase 380V and 240V 100% Completed
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Emergency testing for the insulation testing and repair of 100% Completed
Salcedo Vill. Makati City load break switch testing of HVSG and LVSG including
testing of transformer for TDK Fujitsu Phils in Sta. Rosa
WILLIE CRUZ ENG'G Sauyo Road, Q.C. Installation of 2-40 Feet Concrete pole and construction 100% Completed
of H-Frame for the 3 units 333KVA Transformer complete
Lightning Arrester and Fuse Cut Out, including assistance
in energization
CARGILL/PURINA PHILS. Pulilan Bulacan Preventive Maitenance of their primary lines, 15KV and 100% Completed
their Low Voltage Switchgear, including testing and
cleaning of parts of the equipments
Supply and installation of Fiber Glass Barrier for their 100% Completed
electrical controller and swichgear for their protection
including installation of Breaker Handle Mechanism of the
MCC's breaker.
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Emergency works for the NIDEC Philippines in Sta. Rosa 100% Completed
Salcedo Vill. Makati City Laguna, including testing and replacement of damaged electrical
Lightning arrester, replacement of XLPE cable including
termination
E. Gardiola Construction 1st Elgor St. Filinvest Supply and Delivery of 1-45KVA Oil Immersed Transformer 100% Completed
Batasan Hills, Quezon
City Looped Feed, Deadfront 4160V / 240-139V Y, Delta-Wye
connection, complete with standard accessories for the
NAIA T2 and T3 project.
Supply and Delivery of 4500m XLPE Cable, 35mm2, 7.2KV 100% Completed
Maximum System Voltage, Leader Cable Brand Malaysia
IRRI-International Rice UP Los Banos, Laguna Preventive maintenance of their Pad Mounted Oil Immersed 100% Completed
transformer, including testing and painting of housing and
Researcher Institute substation fence
Subic Bay, Freeport
ANIMO JWS CORPORATION SBMA Supply and Delivery of 750KVA Oil Immersed Looped Feed 100% Completed
Deadfront Transformer, 13.8KV - 240V, 3Phase, 60Hz for
their Condominium Projects.
CARGILL/PURINA PHILS. Pulilan Bulacan Supply and installation of 112.5KVA Dry type transformer, 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 33


440V-240V, 3Phase 60Hz for the replacement of existing
Overload 75KVA Transformer for the Admin power supply at
Pulilan Plant
Installation of Anti Single Phasing Devices for the 2000AT 100% Completed
Circuit Breaker in Pulilan 1 and 2 electrical rooms.
Emergency works for the replacement of their 15KV XLPE 100% Completed
Power Cable, 2/0 complete with termination works and
supply and installation of Load Break Elbow for the Dead
front transformer termination for the Pulilan 2 electrical power
supply
Emergency replacment of 15KV Fuse cut out for their Pulilan
Primary 100% Completed
protection complete with fuse link and testing of their
equipments.
Supply of 6 pieces 65K fuse Link for their primary lines
protections 100% Completed
Rm. 1402, 14th Flr.,
DARUMA CORPORATION Marbella I Supply and installation of 45 Ft concrete pole including 100% Completed
Condominium, 2223
Roxas Blvd. erection and supply and installation of 15KV Load Break
Pasay City Switch and its accessories for the Incoming power
supply of 750KVA Deadfront transformer complete with
1/0 15KV XLPE power cable on underground installation
for Animo Condominium project in subic.
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Termination works for the NIDEC 15KV XLPE wire 100% Completed
Salcedo Vill. Makati City at Sta. Rosa Laguna
Emergency works for the testing and checking of XLPE 100% Completed
cable and switchgear for their incoming power supply
Hi-pot testing for the XLPE Power Cable for Feeder of 100% Completed
Transformer at AMI's project in Sto. Tomas Batangas
West Rembo, Makati Supply and erection of 1 unit 35 Feet Concrete pole for the
MRP ELECTRICAL ENG'G City Tagaytay 100% Completed
Highland Projects and supply of 24m 2/0 15KV XLPE power
SERVICES cable
PHIL. NAT'L OIL CORP. Taguig Metro Manla Supply and erection of 1 unit 50 Feet concrete pole in 100% Completed
PNOC PPDC compound in Batangas Dos, Mariveles Bataan
for the replacement of their existing Creosoted pole
E. Gardiola Construction 1st Elgor St. Filinvest Rental of Bum Trucks including assistance in installation 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 34


Batasan Hills, Quezon
City of Street lightings at their DPWH project in Paranaque
Installation of 2-40 Feet Concrete pole and construction of H-
WILLIE CRUZ ENG'G Sauyo Road, Q.C. Frame 100% Completed
for the 3 units 333KVA Transformer complete Lightning Arrester
and Fuse Cut Out, including assistance in energization
E. Gardiola Construction 1st Elgor St. Filinvest Supply and Delivery of 1-45KVA Oil Immersed Transformer 100% Completed
Batasan Hills, Quezon
City Looped Feed, Deadfront 460V / 240-139V Y, Delta-Wye
connection, complete with standard accessories for the
NAIA T2 and T3 project.
Labor Installation for 3 1250 meters XLPE wire from 100% Completed
existing NAIA Electrical Room going to the New Installed
transformer for street lightings.
CARGILL/PURINA PHILS. Baliwag Bulacan Laboratory testing of Transformer Oil for Dissolve Gas 100% Completed
Analysis of their 2.5MVA Oil Immersed Dead Front
Transformer for the Month of November, 2005 in
Baliwag Plant as part of transformer monitoring for
gases and replacement of Existing Elbow Lightning arrester
for the transformer protection
TDK Fujitsu Phils Sta. Rosa Laguna Electrical Installation of their Clean room electrical 100% Completed
requirements and ESD grounding
West Rembo, Makati
MRP ELECTRICAL ENG'G City Supply and delivery of 1/0 15KV, 133% I.L. Power Cable for 100% Completed
SERVICES the Tagaytay Highland Projects
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Supply and fabrication of Panel Breaker and retrofitting 100% Completed
Salcedo Vill. Makati City of the existing Switchgear of Alegro Panel Boards
Laboratory testing of Transformer Oil for Dissolve Gas 100% Completed
Analysis of their 2.5MVA Oil Immersed Dead Front
Transformer for NIDEC Sta. Rosa Projects
SPARKLINE IND'L SALES 7th Ave. Caloocan City Supply and delivery of 1/0 15KV, 133% I.L. Power Cable for 100% Completed
Bataan Projects
Camp Aguinaldo,
CAMP AGUINALDO Cubao Q.C. Metering Installation for the Different Area inside the 100% Completed
Camp Aguinaldo Area including analysis & engineeering works
Supply and installation of Transformer for the E.P. 100% Completed
Condominium Project including Installation of Perimeter

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 35


Lightings and Power of condominium
TAISEI PHILIPPINES Makati City Supply and erection of 3 35 feet concrete pole and 100% Completed
installation of secondary rack for the secondary installa-
tion of feeder wire for their temporary facilities in Republic
Asahi Glass in Pasig City, complete with metering installation
TAISEI PHILIPPINES Makati City Aircon Feeder Installation for Production room, re- 100% Completed
installatin of existing 2x40W Fluorescent lights in
warehouse area and installation of U.V. machine in
Bridgestone Project
Electrical Installation of Feeder Aircon in Semitec
Production Clean Room Area.
Pearl Bank Center, 149
SUMISETSU PHILS. INC. Valero Testing and preventive maintenance of 2-750KVA, 100% Completed
St. Makati City 2-450KVA Oil Immersed 34.5KV/480V 3 Phase, 60Hz
Transformer including 5-150KVA dry type transformer
and cleaning of LVSG and Insulation testing of feeder wire
at NEC Calamba Laguna Plant lasts January 1, 2006
Testing and preventive maintenance of 2-2MVA Oil 100% Completed
Immersed transformer, 34.5KV-480V, including conducting
Dissolve Gas Analysis for each transformer Oil for
laboratory testing and testing of 11 units assorted Dry
type transformer in Sumiden Circuits in LISP Cabuyao
Laguna lasts December 31, 2005
Alabang, Muntinlupa
MATEC PHILIPPINES City Preventive maintenance of 2.5MVA, 1MVA, 2-750KVA and 100% Completed
1-500KVA Oil Immersed Transformer and Its HVSG
on each substation including insulation of XLPE cable,
testing of Over current relays for HVSG protection,
Cleaning and inspection of each HVSG and transformer in
EMI Cavite lasts December 22, 2005 thru Power Build and
Taikisha Philippines.
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Transformer testing for 1-1250KVA and 1-2500KVA 100% Completed
Salcedo Vill. Makati City Oil Immersed Transformer in Ford Sta. Rosa Laguna for
their Up grading of Substation
Supply of 3 Units 100:5 Current Transformer, ITC Brand 100% Completed
Split Core type, for the protection relay of 2500KVA
Oil Immersed Transformer

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 36


PHIL. NAT'L OIL CORP. Taguig Metro Manla Supply and Installation of 8 units Steel Pole with 250W 100% Completed
Floodlight, HPS for the reservoir 1 and 2 at PPDC Bataan
Supply/Installation and replacement of the existing
Change Over Switch, Non Fusible type, 200Amps 3Pole
Double throw in R2 location at PPDC Bataan
PHIL. NAT'L OIL CORP. Taguig Metro Manla Supply/Installation and replacement of the existing
Change Over Switch, fusible type, 200Amps 3 Pole
Double throw in P1 location at PPDC Bataan
TDK Fujitsu Phils Sta. Rosa Laguna Installation of C.O. Duct in Crest near chemical draft 100% Completed
Chamber at HGA Aquoeus Area
Installation of ESD Busbar at P/V area 100% Completed
Installation of ESD Busbar at PQC area 100% Completed
Installation of Powr Supply for 4 units of PC for BSP 100% Completed
monitoring at MC2 cell 23
IRRI-International Rice UP Los Banos, Laguna Technical supervision and erection of 1-35feet stud pole, 100% Completed
Researcher Institute Relocate overhead guy wire for 69KV line, provide additional
guy wire, clamps connector and anchor rod
TAISEI PHILIPPINES Makati City Supply and installation of KWHR meter, 3 Phase 4 wire for 100% Completed
Temporary Power supply for ASAHI Glass project in Pasig
Rm. 1402, 14th Flr.,
DARUMA CORPORATION Marbella I Supply and installation of 3 Concrete pole complete with 100% Completed
Condominium, 2223
Roxas Blvd. Primary lines, 34.5KV, including supply and installation
Pasay City of 3 units 75KVA Oil Immersed Transformer for
J-film project in CEPZA Rosario Cavite
TAIKISHA PHILIPPINES Makati City Electrical Installation for cleanroom extension project 100% Completed
in Bridgestone Precissions in CEPZA Rosario Cavite
Additional Power Supply for Dryer and Washing Equipment 100% Completed
including supply and installation of Panel Boards for the
Cleanroom expansion of Bridgestone project in Rosario Cavite
Electrical Installation of Machine Dryers, and feeder 100% Completed
Installation of New Panel Boards for Bridgestone Project
Secondary Electrical works for the installation of power 100% Completed
supply and starter for 1 unit 5hp Blower in Semitec
Supply and installation of 10 units wall fan for Ichinomiya 100% Completed
Installation of Ventilation Fan, Shotblast and Barrel RM 100% Completed
A/C at Ichinomiya Project

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 37


Installation of 12 units Ceiling Fan and Controller for 100% Completed
Canteen Requirements of Ichinomiya Projects
Supply and installation of 1.5Hp and 2HP airconditioning 100% Completed
unit in NIDEC project in LTI Binan Laguna
TAIKISHA PHILIPPINES Makati City Supply and installation of MDP, Panelboards, wires, 100% Completed
Temporary Housing of all panels, including steel posts,
with secondary rack for the temporary power supply of
Construction site of ROHM projects
Electrical installation of field office for ROHM projects
including supply and installation of Perimeter lightings of
construction site of ROHM complete with supports / brackets
Supply and installation of 5 units 2hp Split type Aircondi- 100% Completed
tioning unit and 6 units Exhaust fan for the field office for
ROHM projects
Supply and installation of 900m 125mm2 THHN wire with 100% Completed
100m 30mm2 THHN wire for the Emergency works of
Installation of Power Feeder of Panel of Blower and
Compressor and transferring of loads and termination of
existing panel boards in Ichinomiya project in Laguna
FUJIHAYA INT'L Makati City Supply and Erection of 45feet concrete pole including 100% Completed
supply and installation of Load break switch, power fuse
assembly, Lightning arrester to complete the First
Private pole requirements for DAITOH project in
FPIP in Batangas
SAGARA METRO PLASTIC Canlubang, Laguna Preventive and servicing of Power Distribution system 100% Completed
of the Entire Plant last April 12, 2006
Pearl Bank Center, 149
SUMISETSU PHILS. INC. Valero Relocation of CCTV and telephone line at President room 100% Completed
St. Makati City at East Ceramic Phils.
Electrical Relocation of Spot Welding Machine in Mahle
Filter System in FCIE Dasmarinas Cavite 100% Completed
Electrical Installation of 6 units Production Machine 100% Completed
including installation of Cable trays and Panel board for
Mahle Filter System
Testing of 1500KVA Transformer in NEOMAX lasts 100% Completed
April 13, 2006 including Dissolve Gas Analysis for Transformer
RMR ELECTRIC CORP West Ave. Quezon City Conduct Transforerm Preventive Maintenance for 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 38


Purefoods Projects
Rewinding of and Reconditioning of 3 units Oil Immersed 100% Completed
Distribution Transformer for Purefoods projects
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Removing of existing concrete pole in the NIDEC project 100% Completed
Salcedo Vill. Makati City including supply and installation of messenger wire for the
aerial instalallation of existing XLPE cables, installation
of guying and supports.
Laguna Bel-Air, Sta.
POWERBUILD CONSTRUC- Rosa Electrical Installation of TRP INC incoming Power for 100% Completed
TION AND DEVELOPMENT Proposed Expansion of its substation, including installation
CORPORATION of transformer, MVSG and LVSG. Transfering of existing
Load of LVSG in the New LVSG including ATS supply for
the existing circuits
Installation of Temporary Power supply for the Aikawa 100% Completed
Project in FPIP Batangas icluding erection of 1 wooden
pole complete with mesenger wire and guying supports for
the aerial installation of 3-250mm2 THHN wires.
Purging of SF6 gas for 34.5KV SF6 Breaker in EMI 100% Completed
Manufacturing in Aguinaldo Hi way Cavite.
Aerial installation of 2 sets of 3-250mm2 THHN wire 100% Completed
for NIPPON Projects
CARGILL/PURINA PHILS. Baliwag Bulacan Laboratoy testing of Transformer Oil for Dissolve Gas 100% Completed
Analysis of their 2.5MVA Oil Immersed Dead Front
Transformer including Standard Transformer Testing
and preventive maintenance of 1st Private pole, cleaning
and lubrication of all pivot parts in the 1st private pole
and insulation testing of existing 15KV XLPE.
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Electrical Installation of Various Machines for Sagara 100% Completed
Electrical Installation of Various Projects including Application
Salcedo Vill. Makati City Fee 100% Completed
West Carmen,
MN ELECTRO IND'L Pangasinan 10MVA Power Transformer testing in Pangasinan including 100% Completed
Power factor testing of HVSG and all accessorie like PT's and
SUPPLY AND SERVICES CT's.
5th Flr., ODC Bldg,
KINDEN PHILS. INC. Legaspi St. Emergency testing for NIDEC equipment including 100% Completed
Salcedo Vill. Makati City checking and testing of XLPE cables, 1st private pole,

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 39


transformers and replacement of busted fuse refill for
34.5KV incoming power lines
Hipot testing for FORD XLPE cables 100% Completed
Pearl Bank Center, 149
SUMISETSU PHILS. INC. Valero Emergency testing for transformer of MITSUA and 100% Completed
St. Makati City replacement of existing silica gel and fuse link
Emergency testing for KNK transformer and submit final 100% Completed
recommendation
Supply of Labor and Technical Expertise for testing of 100% Completed
11 Units of Oil Immersed Pad mounted Transformer in bacolod
airport
Emergency Testing for existing 3 units 333KVA Oil Immersed
TERESA MARBLE CORP. Teresa Rizal Transformer 100% Completed
located and installed at the top of the Teresa Marble Quarry
Area
Rufoino Tower, Makati
LINBERG PHILS. City Emergency Installation of 3150KVA Oil Immersed 100% Completed
Transformer for the replacement of Existing Damaged
3750KVA Transformer including installation of supports and
brackets and busbarring for the extension of primary and
secondary terminals of transformers
TAIKISHA PHILIPPINES Makati City Supply and installation of groundings, lightings and switches, 100% Completed
to be include Panel boards for the Genset building extension
for Toshiba Projects in Sta. Rosa Laguna
Supply and installation of High bay lightings, Electronic 100% Completed
Scoreboard complete with Horn and ShotClock timer for the
Proposed Basketball court installation for Toshiba project
Electrical Installation of Secondary Power for UV Machine 100% Completed
and oven in Bridgestone Projects
Relocation of Electrical Installation of U.V. Machine, 100% Completed
Fluorescent lightings and Dismantling in Clean Room
at Bridgestone Project in Cavite
Relocation of Existing Panel in Ichinomiya Project for 100% Completed
transfer besides wall
Installation of C.O. in Canteen Area and Installation 100% Completed
of Intercom Handset in Ichinomiya Projects
Installation of Wall Fan and Battery Charger for 100% Completed
Ichinomiya Projects

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 40


Supply and replacement of Existing Heater in the Left 100% Completed
portion of Food Warmer in TRP Canteen including instal-
lation of Digital Thermocontroller
Supply and installation of Smoke Detector and re-installa- 100% Completed
tion of Existing Fluorescent lamps for Bridgestone Projects
Relocation of Lightings and installation of Outlets and Feeder
TAIKISHA PHILIPPINES Makati City Installation 100% Completed
of Exhaust Fan and Blower for Bridgestone Projects
Supply and Installation of Lightning Arrester for the 100% Completed
Newly constructed Basketball court and replacement of the
existing Lightning protection in Toshiba Projects
Supply and installation of paging system and amplifier for 100% Completed
Installation of MIC for paging system 100% Completed
Electrical and mechanical installation of 750KVA Genset 100% Completed
Installation of C.O. at canteen area and intercom handset 100% Completed
at cleanroom including supply and replacement of Transformer
oil
for the Existing 1500KVA Transformer and testing at Ichinomiya
projects
Various electrical installation works for Toshiba projects 100% Completed
Signage installation and installation of additional lightings 100% Completed
for basketball court and perimeter lighting installations
Temporary power supply of Pres of Ichinomiya House 100% Completed
Installation of wall fan and Battery Charger and relocation
existing panel 100% Completed
Dela Paz St. Pandacan
310 CONSTRUCTION Mla. Installation of Street lightings for Tumana Bridge 100% Completed
SPECIALIST CORP. Marikina City
TAISEI PHIL. CONSTRUCTION, Paseo De Roxas,
INC. Salcedo Installation of ESD grounding including supply of copper 100% Completed
Vill. Makati City plate for the 1st to 4th floor production room in ROHM
Project in Carmona Cavite
TDK FUJITSU PHILS. Sta. Rosa Laguna Supply and installation of Power supply for loadgram 100% Completed
PC at overhead ionizer and FFU at HGA assembly.
Supply and installation of Power supply for Microscope 100% Completed
and overhead ionizer for SFC at G/F PQC
Installation of Electrical installation for Ultrasonic 100% Completed
Cleaner and Photo Vacuum area

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 41


Electrical Installation for luminar bench and tester at 2/f 100% Completed
Old PQC
Electrical Installation for electrical requirements of 100% Completed
Portable Ultrasonic at HGA Aqueous.
TDK FUJITSU PHILS. Sta. Rosa Laguna Electrical Installation for electrical requirements of 100% Completed
Hot plate slider vacuum area.
TDK FUJITSU PHILS. Sta. Rosa Laguna Electrical Installation for electrical requirements of 100% Completed
Yamato Box Oven at MC2 Feeder Line
Electrical Installation for electrical requirements of
the Installation of ESD/Equipment grounding busbar for 100% Completed
DLM machine at HGA allegro class 100
PHIL. NAT'L OIL CORP. Taguig Metro Manla Supply of labor, used of tools and equipment for the testing 100% Completed
of existing lines for street lightings, to be include the
supply and replacement of busted bulbs, ballasts,
capacitor and ignitor for the 49 units existing street
lights in PPDC compound in Mariveles Bataan
Supply of materials and labor for the replacement of 100% Completed
TPW No. 3 Power Supply line of Transformer feeder in
Pump house in PPDC Bataan
Emergency Installation and erection of concrete pole 100% Completed
for their Primary Lines, 13.8KV in PNOC PPDC Bataan
West Rembo, Makati
MRP ELECTRICAL ENG'G City Emergency reconnection of existing 3phase connection 100% Completed
SERVICES to open Delta Connection for Swift San Jose Plant
including rewinding of 1 unit 167KVA Oil Immersed transformer
SUMISETSU PHILS. INC. Pearl Bank Center, 149 Emergency testing of transformer in Nanbu 1 and K & K 100% Completed
Valero St. Makati City Electronics plant in Cavite and Batangas area
Testing of Transformer for Bacolod airport 100% Completed
Mindanao ave. cor Emergency testing of substation and replacement of 30KV
SPLASH CORPORATION Quirino Hi- Lightning 100% Completed
arrester for their Canumay manufacturing plant in Valenzuela
way, Novaliches Q.C. City
AMERICAN POWER CONV- PEZA Rosario, Cavite Installation of JD and CW aircon including battery 100% Completed
VERSION CORP. charger, Installation of new 6 drops of electrical require-
ments for the TLI project and icluding installation of
Admin building aircon feeder wire
Preventive maintenance of their existing Panel board 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 42


including checking of current for each panel board
ISUZU AUTOPARTS MANU Laguna Technopark, Purging of SF6 gas for their 1 Unit special machine/equip- 100% Completed
FACTURING CORP. Binan laguna ment for production area requirments
RFM corporate bldg.,
SWIFT FOODS, INC. Pioneer Supply and delivery of 75KVA Dry type transformer 100% Completed
St. Mandaluyong City for Cebu requirments
Emergency testing of Transformer of Petron Mega Plaza in
RMR ELECTRIC CORP West Ave. Quezon City Makati city 100% Completed
TAIKISHA PHILIPPINES Makati City Electrical Works for Bridgestone 100% Completed
Supply Installed of Rubber Mat for Electrical Works 100% Completed
Replacement of Explosion Proof Light 100% Completed
Miscellaneous Electrical Works 100% Completed
Electrical Works for Modification of Power System 100% Completed
Testing of High Voltage Cable 100% Completed
Supply of Labor & Equipment for ROHM Project 100% Completed
Installed & Hauling of 500KW Genset 100% Completed
Emergency Light Installation 100% Completed
Supply and Installation of Electrical Materials 100% Completed
Miscellaneous Cleanroom Works 100% Completed
Relocation of Lan Box Panel and Networking system 100% Completed
Replacement of Terminal Lugs 100% Completed
Supply of Labor & Materials for the Modicafication of 100% Completed
Cable Connection
Cabling Works for Savicnet Fx from Server room to chiller stage 100% Completed
S&C High Voltage Power Fuse ( Replaced Busted Fuse at
SPLASH CORPORATION Quezon City Private Pole) 100% Completed
Paseo De Roxas,
TAISEI PHIL. Salcedo Electrical Works @ Temporary Office Feeder Wire for 100% Completed
CONSTRUCTION, INC. Vill. Makati City Panel Boards Electrical Installation Aircondition
Office Telephone and LAN System
Supply of Materials, labor used of tools and equipment for 100% Completed
Intallation of Concuvtive PVC Tiles Grounding Works
including technical supervision for the REPI LSI III
factory project in Carmona Cavite
Various Additional Works for Electrical, Modification &
TAIKISHA PHILIPPINES Makati City Renovation 100% Completed
Electrical Additional Works 100% Completed
Supply of Labor and Materials for the Repair of MTS 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 43


Machine Relocation and Door Modification 100% Completed
Supply of Labor & Materials for New Machine Installation 100% Completed
Supply & Insatallation of Fiber Optic Cables Switchport 100% Completed
& Accessories include Cable Tray 7 Piping Works
SAN TECHNOLOGY, INC. Rosario, Cavite Phil. Preventitve Maintenance of Substitution and Power
Monitoring for STA-P 100% Completed
Transformer Change Oil 100% Completed
Preventive Maintenance of Service Entrance and Transformer at
SAN TECHNOLOGY, INC. Rosario, Cavite Phil. VCM 100% Completed
( Supply & Installation 34.5KV Load Break for replacement of
damaged unit)
Transformer Reconditioning 100% Completed
Oil Immerse Transformer 250KVA 100% Completed
Transformer Rental 250KVA 100% Completed
Request for Power Monitoring of 2 Load Banks of Transformer to 100% Completed
Determine Load Consumption that cause Overheating ( 3-
333KVA & 3-225 KVA)
Replacement of Oil or to Process Oil Purifying of Transformer
found
with Combustile Gases and need to eliminate ( 2-225KVA & 3-
333KVA Transformer)
Ground Mat 100% Completed
Power Monitoring ( 7 days of Monitoring )
Preventive Maintenance of Transformer inlcuding Service
Entrance 100% Completed
@ Neomax 1 ( Transformer Testing for 3-333KVA & 3-250KVA
Oil Immersed Transformer)
Preventive Maintenance of Service Entrance @ Neomax 2 100% Completed
( Supply and Installation of 34.5KVA Load Break Switch for
Replacement of Existing Damaged Unit)
TAIKISHA PHILIPPINES Makati City Supply and Labor Electrical Works 100% Completed
Electrical Works 100% Completed
Electrical Works 100% Completed
Additional Works 100% Completed
Electrical Works 100% Completed
Supply & Installation of 3-100KVA Transformer 100% Completed
Supply & Installation of Feeder Wire of Vacuum 100% Completed
Feeder Relocation of Oven & New Trunkline Feeder production
area 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 44


Trunkline Feeder Installation
SAGARA METRO PLASTIC Canlubang , Laguna In- Rep and Maintj-Equip Service of Private Pole 100% Completed
Due to Blown Out Arrester
I-PPE-CAPEX ITEMS 100% Completed
Supply & Installation of 34.5 KV load Breakdown
switch brand S and C 600A side break US made replacement
of existing 34.5KV damage LBS from incoming line from
meralco CAPEX 07-0218 for maint
I-PPE-CAPEX ITEM
SAGARA METRO PLASTIC Canlubang , Laguna PM of 1st Private Pole, transformer & board
Scope: 1. First Private Pole, HVSG & Transformer
2. Low Voltage Side Capex 07-0219 Maint
SAN TECHNOLOGY, INC. Rosario, Cavite Phil. Installation of 750KVA transformer Delta-star 100% Completed
(Pad Mounted) and Primary Metering
CPIP Brgy. Batino,
AVON Calamba, Supply and Installation of copper Grounding Including testing 100% Completed
Laguna for Existing Conveyor inside Production area.
Carson st. Laguna bel
PRECEPTS ELECTRO-TECH air Thermographic Scanning for the TRP electrical facilities 100% Completed
CONSTRUCTION II, Sta. Rosa, Laguna and preventive Maintenance of Transformer and Private Pole
SAN TECHNOLOGY, INC. Rosario, Cavite Phil. Replacement of Wye Point Wire Cable of Transformer 100% Completed
SPLASH CORPORATION Quezon City PM of Power Substation & 1st Private Pole 100% Completed
TAISEI PHILIPPINES CONST.. Paseo De Roxas
INC. Salcedo Emergency light and Exit Light 100% Completed
VILLAGE, MAKATI
CITY
TAIKISHA PHILIPPINES Makati City Installation of Compressor Motor Including Electrical Works 100% Completed
Electrical Works for ORT Area 100% Completed
Electrical Works 100% Completed
Relocation of trunkling system and mechanical installation 100% Completed
inside cleanroom area
Re-Installation fo Feeder wire of a existing machine 100% Completed
Electrical Works for additional pumps and motors 100% Completed
Temporary office facilities works 100% Completed
Supply and Installation of Nema 3R Enclosure 100% Completed
TAIKISHA PHILIPPINES Makati City Installation of Inverter 100% Completed
Various Electrical Installation 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 45


Duraflex, 60mm2 THHN Wire, 600V (311mtrs.) 100% Completed
Duraflex, 22mm2 THHN Wire, 600V (Delivery Charge)
Electrical Installation Works 100% Completed
Secondary Wiring & Installation of KWHR meter C/R area 100% Completed
Thermographic Scanning for Bridgestone Electrical Facilities 100% Completed
Installation of Shun Trip for 2 units main breaker including 100% Completed
inverter motor controller for B.S.
Secondary Works Cable Tray Installation 100% Completed
Electrical Installation of Additional Cooling toer System 100% Completed
Relocation and Installation of New Feeder of 2 Units Injection
Machine 100% Completed
Feeder rewiring for existing motor 100% Completed
Thermal Scanning of MDP 3200 & sub Panel 100% Completed
Installation of 34.5KV Load Break switch, 600 ampere 100% Completed
Transformer DGA for 3 Units Oil Immersed Transformer 100% Completed
Supply and Installation of Emergency Light exit light 100% Completed
& Fload Light and Relocation of 1 unit exit light
Supply and Installation of time relay 100% Completed
Thermographic Scanning 100% Completed
Supply and Installation of 3HP fuji control 100% Completed
Various Miscellaneous Works 100% Completed
Installation of 3 units cut out fuse 27 100% Completed
Various Miscellaneous and Installation Works 100% Completed
Modification of cable trench cover 100% Completed
Preventive maintenance of maruwa electrical room and 100% Completed
MD-TECH bldg. 1 & 2 low voltage side and sub-station
Supply and Installation of news Panel injection machine 100% Completed
Preventive maintenance of electrical room and sub-station 100% Completed
Power Monitoring 100% Completed
Relocation of AHU 100% Completed
Modification of cable trench cover 100% Completed
Replacement of flourescent lamp and ballasts 100% Completed
Manpower for maintenance Period covered: Aug 16 to 31, 2008 100% Completed
Manpower Supply for maintenance period covered: August 1 to
15, 2008 100% Completed
Maintenance works period covered: September 1-15, 2008 100% Completed
Supply of electrical materials and installation 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 46


TAIKISHA PHILIPPINES Makati City Emergency installation for damaged electrical installation 100% Completed
Various miscellaneous works 100% Completed
Existing lighting painting and renovation 100% Completed
Installation of lighting in various areas 100% Completed
Proposed toilet and perimeter area electrical installation 100% Completed
Manpower for maintenance period: Sep 16-30, 2008 100% Completed
Complete rehabilitation of GSP pump 3 Phase 220VAC 60Hz,
3500RPM 100% Completed
Supply and installation of emergency light, exit light, fire 100% Completed
alarm bell, heat detector and speaker ceiling mounted
Electrical works 100% Completed
Thermographic scanning of electrical facilities 100% Completed
GRC thermal scanning and relocation of neutral to static
CARGILL/PURINA PHILS. Baliwag Bulacan conductor of primary line 100% Completed
SAN TECHNOLOGY, INC Cavite Economic Zone, Supply and Installation of transfer switch for genset and new 100% Completed
Rosario,Cavite,
Philippines panel chillers
POWER BUILD
CONSTRUCTION Block 08 lot 17 Laguna Supply and Installation of concrete pole for the 6.6kv 100% Completed
bel-air subd. IV Sta.
AND DEVELOPMENT CORP. Rosa City primary lines of TRP power incoming lines
TAIKISHA PHILIPPINES Makati City Manpower for maintenance period: 10/1/2008 to 10/15/2008 100% Completed
Supply and installation of power fuse 100% Completed
Supply of transformer and HVSG including other materials 100% Completed
and consumables and supervision works
Manpower for Maintenance period: Oct. 16-31, 2008 100% Completed
Supply of Material and labor for HVSG relocation & 100% Completed
re installation electrical works
Modification of transmission line 100% Completed
Temporary facilities work 100% Completed
AMERICAN POWER LOT 3, BLOCK 14
CONVERSION PHASE III Thermal Scanning for Panels and Breakers 100% Completed
CAVITE ECONOMIC P
ROCESSING Z
ROSARIO,
PHILIPPINES
TAIKISHA PHILIPPINES Makati City Additional Electrical Works 100% Completed
Additional Electrical Works 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 47


Preventive maintenance of FAS and replacement of Four 100% Completed
(4) pcs High-bay bulb
TAIKISHA PHILIPPINES Makati City Manpower maintenance for the period of nov. 1-15, 2008 100% Completed
Supply and installation of 250KVA transformer 34.5KV/ 100% Completed
220V, 3PH x 60Hz
Power Incoming System 100% Completed
Preventive maintenance of FAS and replacement of four 100% Completed
(4) pcs High-bay bulb
SAN TECHNOLOGY, Cavite Economic Zone, Suplly and installation of breaker 1600AT GE 100% Completed
Rosario,Cavite,
INCORPORATED Philippines (replacement of defective breaker)
Installation of lightning arrester 100% Completed
RM. 705 7F PARK
NORLEAF CONSTRUCTION & TRADE CRANE RENTAL 100% Completed
CENTER BLDG.
SUPPLY, INC. INVESTMENT DRIVE
MADRIGAL BUSINESS
PARK, CRANE RENTAL 100% Completed
ALABANG,
MUNTINLUPA CITY
Dampol St. Pulilan
CARGILL PHILIPPINES INC. Bulacan installation of 1 unit 100KVA automatic regulator (AVR) 100% Completed
for central lab building
SAGARA METRO PLASTIC Canlubang , Laguna replacement of 3units interrupter 100% Completed
repair of 3units load break switch interrupter 100% Completed
switch gears and panel boards 100% Completed
TAIKISHA PHILIPPINES Makati City Panasonic additional works for FAS @ Cainta rizal 100% Completed
Kyoritsu digital insulation tester 4 units 100% Completed
Preventive maintenance of Hoya electric room and sub-station 100% Completed
SAN TECHNOLOGY, Cavite Economic Zone, 2000AT GE Breaker and reconditioning of existing 1600AT 100% Completed
Rosario, Cavite,
INCORPORATED Philippines GE breaker
Installation of lightning arrester 100% Completed

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 48


PROGRESS PHOTOS
AT
SITE PROJECTS

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 49


SOLAR PROJECT
AT
SAN ILDEFONSO
BULACAN

GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 50


GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 51
GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 52
GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 53
GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 54
GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 55
GLOBAL ELECTRIC POWER DEVELOPMENT CORPORATION 56