Académique Documents
Professionnel Documents
Culture Documents
AND
ON-GOING PROJECTS
100%
TAIKISHA PHILIPPINES INC. MAKATI CITY ● ELECTRICAL WORKS AT TANAUAN BATANGAS
COMPLETED
100%
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS
COMPLETED
● THERMAL SCANNING FOR CLEANROOM ELECTRICAL 100%
PANELS AT BIÑAN LAGUNA COMPLETED
● 110KVA GENERATOR SET INSTALLATION AT BIÑAN 100%
LAGUNA COMPLETED
● PRODUCTION ELECTRICAL INSTALLATION AT STO. 100%
TOMAS & TANAUAN BATANGAS COMPLETED
● GENSET RENTAL FOR EMERGENCY POWER SUPPLY AT 100%
SONION 1700KVA (750KVA) AT TANAUAN BATANGAS COMPLETED
100%
● INSTALLATION OF FEEDER WIRE
COMPLETED
● INSTALLATION OF 400AT ECB FOR GENERATOR 100%
REQUIREMENTS AT TAYTAY RIZAL COMPLETED
● EMERGENCY WORKS (REPLACEMENT OF POWER FUSE 100%
AT BIÑAN LAGUNA COMPLETED
● ELECTRICAL WORKS - POWER INCOMING SYSTEM 100%
(PACKAGE 1) AT EATON COOPER INDUSTRIES COMPLETED
● ELECTRICAL NEW PANEL INSTALLATION FOR 2 UNITS 100%
AIR COOLED CHILLER AT CARMONA CAVITE COMPLETED
100%
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS
COMPLETED
● INSTALLATION OF ALARM PANEL FOR 2 UNITS AIR 100%
COOLED CHILLER AT CARMONA CAVITE COMPLETED
100%
● ELECTRICAL WORKS AT TANAUAN BATANGAS
COMPLETED
● ELECTRICAL WORKS - 1200AT ACB INSTALLATION AT 100%
TAYTAY RIZAL COMPLETED
100%
● VARIOUS ADDITIONAL WORKS AT TANAUAN BATANGAS
COMPLETED
● MISCELLANEOUS WORKS AT TANAUAN BATANGAS 100%