BOREHOLE DRILLING DATA SHEET Borehole No.

Page _____ of _____


Project No. Project Name Site Name Supervisor
Start Date Borehole Location Surface RL Groundwater RL
Finish Date Drilling Contractor Driller Drill Rig
NDD Contractor Water Truck Water Load Vol Security
Drilling Method From To Run
Core Loss RQD
Sample
In Situ Testing Material Description
/ Sample Type Depth Depth Length >100 No. SPT Blows / N Soil: Colour, Moisture, Consistency
From To Rec % %
mm PP / FSV Value Rock: Colour, Grain Size, Strength,

TIME LOG Including set-up, mix mud, cart water, lunch, standby and so on.
Date From To Activity Date From To Activity

SUMMARY OF QUANTITIES
Casing (m) Tubes (No.) SPTs (No.) Shear Veins (No.) Core Trays (No.)
Soil Drilling (m) Rock Drilling (m) Consumed Drill Bits Bentonite Mud (kg) Polymer Mud (L)
Water Truck Loads Standby Time Piezo installed

GEOT026/4