40. Sun Control Film
& Reflective films Llumar, 3M
47. CHEMICAL USED FOR NOCIL (Dursban TC), LUPIN (Classic 20)
ANTI-TERMITE TREATMENT MONTARI INDUSTRIES (Pyramid)
CHLORPYERIPHOS 20%EC
4
d) PRAKASH
e) PRAYAG
f) POLYMERS
g) FINOLEX
MILD STEEL PIPES, PLATES, a) TISCO
CHEQUERRED PLATE, b) SAIL
BEAMS, STRIPS ETC. c) RASHTRIA ISPAT
RESIN BASED ADHESIVE a) FEVICOL
b) VAMICOL
NON-METALIC MINERAL a) “DRYSHAKE” BY MC BRAUCHMIE
BASED FLOOR HARDENER b) FOSROC
c) SUNANDU CHEMICALS
LIME SATANA LIME WORKS
POLYSULPHIDE SEALANT a) CHOKSEY CHEMICAL
FOR EXPANSION JOINTS b) STRUCTURAL WATER PROOFING
CO.
c) SHALIMAR TAR PRODUCTS
d) SUNANDA CHEMICALS
SANITARY FITTINGS &
FIXTURES, ELECTRICAL: -
Mastic Compound Tarplastic of Shalimar tar products
Nahani Traps Neco, Reiko, Cieco
A.C.Pipes Swastic, Guru
G.I.Pipes ITC make, ISI marked
PVC flush tank Commander, Prince
C.I.Pipes Neco, BIS
Switches, switch fuses, plugs, Anchor
holders, sockets and all other
electrical fixtures
Epoxy Sunanda specialty chemicals (I) Ltd.
Steel Fiber Reinforced Concrete Pratibha Industries
Manhole Covers
Micro silica Elkem Materials
NOTE:-
1. The contractor shall produce samples before procurement of the material for
approval of the Employer for all materials required for works. Samples can be
submitted from any of the above makes and they shall conform to specifications.
Samples as approved by the Employer shall only be used on the works and the
decisions of the Employer regarding sample shall be final.
2. In respect of materials for which approved makes are not specified as above, the
same shall be decided by Employer and shall be as per sample got approved from
Employer before procurement.
3. The contractor shall submit samples of all materials three months before the date
of work for approval from the Employer.