Vous êtes sur la page 1sur 22

SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia

Gray Water Supply Fixture Unit (WSFU) Calculation (Grand Total for Gray Water)
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET - 7 9 9 7 5 5 5 6 5 - 58 58 0 58 8.00 464.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOS - - 1 1 1 1 1 1 1 1 - 8 8 0 8 8.00 64.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (V - - 4 - - - - - 8 - - 12 12 0 12 2.50 30.00 GRAVITY TA

JS JANITOR SINK - 2 2 2 2 2 2 2 2 2 - 18 18 18 36 2.00 72.00 MIXING VA

HB HOSE BIBB FAUCET 4 4 5 3 3 3 3 3 4 5 1 38 38 0 38 2.50 95.00 FAUCET

TOTALS 4 13 21 15 13 11 11 11 21 13 1 134 134 18 152 - 725.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 725.00

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 166.50 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø 4"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
) Calculation (Grand Total for Gray Water)
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

37.81 m3/H

Ø100 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Roof Annex Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 - 5 5 0 5 8.00 40.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 - 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) - - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK 2 - 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 5 1 6 6 0 6 2.50 15.00 FAUCET

TOTALS 13 1 14 14 2 16 - 71.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 71.00

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 59.90 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
SFU) Calculation for Roof Annex Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

13.60 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Sixth Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 6 6 6 0 6 8.00 48.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) 8 8 8 0 8 2.50 20.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 4 4 4 0 4 2.50 10.00 FAUCET

TOTALS 21 21 21 2 23 - 94.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 94.00

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 65.90 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
(WSFU) Calculation for Sixth Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

14.96 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Fifth Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 4 4 4 0 4 2.50 10.00 FAUCET

TOTALS 12 12 12 2 14 - 66.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 66.00

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 57.30 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
(WSFU) Calculation for Fifth Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

13.01 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Fourth Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 11 11 11 2 13 - 63.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 63.50

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 57.30 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
WSFU) Calculation for Fourth Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

13.01 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Third Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 11 11 11 2 13 - 63.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 63.50

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 57.30 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
(WSFU) Calculation for Third Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

13.01 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Second Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) 3 3 3 0 3 2.50 7.50 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 14 14 14 2 16 - 71.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 71.00

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 58.00 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
WSFU) Calculation for Second Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

13.17 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for First Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 9 9 9 0 9 8.00 72.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 15 15 15 2 17 - 95.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 95.50

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 69.10 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
(WSFU) Calculation for First Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

15.69 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Ground Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 8 8 8 0 8 8.00 64.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) 4 4 4 0 4 2.50 10.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 5 5 5 0 5 2.50 12.50 FAUCET

TOTALS 20 20 20 2 22 - 102.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 102.50

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 73.50 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
WSFU) Calculation for Ground Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

16.69 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for 1st Basement Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 7 7 7 0 7 8.00 56.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOSET - 0 0 0 0 8.00 0.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VA

HB HOSE BIBB FAUCET 5 5 5 0 5 2.50 12.50 FAUCET

TOTALS 14 14 14 2 16 - 76.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 76.50

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 60.80 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
FU) Calculation for 1st Basement Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

13.80 m3/H

Ø65 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for 2nd Basement Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUP
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTRO
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET - 0 0 0 0 8.00 0.00 FLUSH VAL

WC-2 HANDICAPPED WATER CLOS - 0 0 0 0 8.00 0.00 FLUSH VAL

WC-3 WESTERN WATER CLOSET (V - 0 0 0 0 2.50 0.00 GRAVITY TA

JS JANITOR SINK - 0 0 0 0 2.00 0.00 MIXING VA

HB HOSE BIBB FAUCET 4 4 4 0 4 2.50 10.00 FAUCET

TOTALS 4 4 4 0 4 - 10.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 10.00

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 27 GPM


Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø 2"

SELECTED PIPE MATERIAL FISIOTHERM P

ARKITECTONICA Engineering Consultants November 2013


adquater in Jeddah, Saudi Arabia
FU) Calculation for 2nd Basement Floor
WATER SUPPLY

CONTROL TYPE

FLUSH VALVE

FLUSH VALVE SENSO

GRAVITY TANK

MIXING VALVE

FAUCET

WSFU

6.13 m3/H

Ø50 mm.

FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013