PRESUPUESTO

2 2.7.1 Cubierta E.KOVER PUR 50/100 mm - 0.5 prepintada m2 2,050.0

2 4.1.7 Iluminación gl 1.0

2 2.1.2 Rellenos controlados m3 9,352.0

2 2.4.4 Operación Grúa Torre mes 5.0

2 3.6.2 Ventanas Aluminio mate gl 1.0

2 2.6.1 Estructura metálica techumbre y Terraza kg 15,733.0

2 3.5.4 Hormigón afinado m2 2,610.0

2 4.1.4 Alimentadores y sub alimentadores de B.T. gl 1.0

2 4.1.5 Canalización y cableado de puntos de consumo gl 1.0


5.5 Paisajismo (valor proforma) m2 4,048.0
2.1.1 Excavación a máquina m3 10,602.0

1 3.8.12 Pintura intumescente m2 1,330.0


4.1.1 Conexión a Media Tensión gl 1.0
4.1.3 Tableros gl 1.0

1 2.5.4 Hormigón H-20 m2 2,320.0

1 4.1.6 Sistema de respaldo gl 1.0


4.1.8 Corrientes Débiles (solo canalización) gl 1.0
1.3.1 Nivelación terreno a cota 39 m3 6,525.0
1
1 3.6.3 Puertas y Tabiques vidriados gl 1.0

1 2.4.1.2 Hormigón Losas H-25 m3 204.0

1 3.5.1 Cerámico piso 45x45 cms Terre Gris m2 1,574.0


1.1.2 Instalaciones Provisorias gl 1.0
1.1.1 Construcciones Provisorias gl 1.0
2.1.5 Mejoramiento estructural m3 1,250.0
2.3.2. Hormigón Fundación H-25 m3 241.0
3.6.4 Muebles gl 1.0
1
3.3.2 Cielo acústico ExSound Romeral m2 497.0
2.4.2.2 Moldajes Losas m2 1,387.0
3.4.2.2 Enlucido de yeso en muros m2 2,140.0
2.7.3 Hojalatería Prepintada 0.6 mm gl 1.0

1.2 Cierros Provisorios ml 560.0


2.9 Mortero nivelador m2 1,415.0
3.3.4 Cielo Americano Luxalon m2 387.1
7 ASEO Y ENTREGA gl 1.0
1.3.2 Confección Caminos interiores m2 2,640.0
5.7.3 Sub-base estabilizada granular e=0,15 mt m2 3,388.0
5.7.4 Base granular CBR>100% e=0,15mt m2 3,388.0
5.1 Cierros Acmafor (Incluye portones) ml 312.0
2.3.4. Moldaje m2 1,106.0
4.2.1 Implementación y funcionamiento de sistema de detección de incendio gl 1.0

2.3.3. Enfierradura kg 12,150.0


3.5.3 Vinílico m2 603.0
3.8.3 Látex Aparejo m2 6,507.0

1 5.7.2 Suministro y colocación de soleras tipo"C" ml 850.0

1 2.2.4 Extracción de escombros m3 1,326.0

1 3.4.2.3 Cerámica muro m2 701.0

1 5.7.1 Preparación de la subrasante m2 3,388.0


3.3.1 Cielo volcanita 12.5 mm m2 1,110.0
3.8.5 Esmalte al agua en muros interiores zonas secas m2 2,942.0
4.2.4 Implementación y funcionamiento del sistema de CCTV gl 1.0
3.2.1 Impermeabilización fachada QHC m2 2,716.0
3.5.2 Cerámico franjas piso 45x45 cms Terre Grafito m2 796.0
3.4.2.1 Estuco interiores m2 865.5
4.2.2 Rack de Comunicaciones, cableado, conexionado y certificación de red gl 1.0
computacional
5.2.5 Pintura Multicancha un 2.0
3.1.1 Tabique Metalcon seco 90 mm m2 465.6
2.5.1 Rellenos m3 580.0
5.7.6 Carpeta asfáltica e= 0,04 m m2 1,158.0

5.2.2.6 Carpeta asfáltica en caliente e= 0,04 m m2 1,050.0


4.5 Instalación de gas licuado gl 1.0
3.1.5 Tabique divisorio WC, urinario en panel Fenólico (incl. puertas) gl 1.0
3.8.2 Pasta muro m2 6,507.0
3.8.7 Látex en muros y cielo pasillos exteriores m2 2,117.0
3.2.4 Impermeabilización de corredores y terrazas 2° piso m2 435.0
3.13.2 Barandas Metálicas Rampa B3 h=1.05 mt ml 92.0
3.5.5 Piso Fotolaminado m2 521.0
2.6.2 Viga Metálica IN 300 kg 2,794.0
2.8 Afinado mecánico losas y radier m2 3,707.0
2.1.4 Riego de Rellenos Viaj 82.0
2.5.5 Malla acma C-131 m2 2,320.0
5.7.7 Pavimento gravilla chancada m2 2,230.0
3.4.1.2 Remate de rasgos con pasticem ml 1,225.0
2.2.1 Trazado y Niveles ml 927.0
3.5.6 Piso de Goma m2 120.0
3.5.11.2 Guardapolvo de Aluminio ml 735.5
2.2.3 Relleno de Fundación m3 246.0
2.5.2 Cama de Ripio de 10 cms m2 2,320.0
3.8.1 Juntura invisible m2 2,553.0
4.1.2 Mallas de tierras gl 1.0
5.2.2.3 Sub Base estabilizada granular e=0,15m. m2 1,050.0
5.2.2.4 Base estabilizada granular e=0,15m. m2 1,050.0
5.4 Solerilla ml 566.0
3.6.1.1 Marcos de Aluminio un. 43.0
4.2.3 Rack de Comunicaciones, cableado, conexionado de Red de voz gl 1.0
3.2.3 Impermeabilización muros de recintos húmedos m2 701.0
3.4.1.1 Reparación Hormigón Visto con Pasticem m2 679.0
3.6.1.2 Puertas de madera un. 77.0
3.8.11 Esmalte sintético m2 679.0
5.2.2.1 Preparación de la subrasante m2 1,050.0
3.1.3 Tabique Metalcon seco y húmedo 90 mm m2 149.0
3.2.5 Aislación de Cielo m2 1,162.0
3.6.1.3 Puertas Metálicas un 5.0
3.7.1 Cerradura Scanavini con manilla 960 L acero inox. un 74.0
3.8.6 Látex cielos zonas seca m2 891.0
5.2.4.3 Torre basquetbol jgo 2.0
2.4.2.3 Moldaje Escaleras m2 212.0
3.13.1 Barandas Metálicas B1-B2 h=1.05 mt ml 48.0
1.3.3 Extracción de escombro m3 750.0
2.1.3 Extracción de capa vegetal m3 625.0
2.5.3 Polietileno 0.2 mm m2 2,320.0
3.8.4 Oleo semibrillo en cielos y muros zonas húmedas m2 557.0
3.9.8 Lavamanos bajo cubierta Ellipse un 21.0
2.6.3 Estructura techumbre metalcon sobre Biblioteca (zona rectangular) m2 171.0
2.7.4 Bajadas de aguas Lluvias ml 148.0
3.9.1 WC Widder s/v con Fluxor LEREN II un 10.0
3.9.13 Termo Eléctrico 500 lt un 2.0
3.13.6 Pasamanos Rampa ml 92.0
3.14 Rejilla Ulma GP150 UCA ml 15.1
2.4.1.3 Hormigón Escaleras m3 20.0
3.3.5 Limpieza y descarachado de Losas en Pasillos y Hall acceso m2 952.2
3.3.7 Cornisa Poliestireno expandido ml 1,012.0
5.6 Mastiles de Banderas y Nombre Edificio gl 1.0
1.3.4 Riego de Rellenos viaj 20.0
3.5.11.1 Guardapolvo Cerámico ml 547.2
3.9.3 WC con estanque modelo Magnet2 un 13.0
3.11.9 Bancas un 10.0
3.4.1.3 Limpieza y descarachado de muros de Pasillos y Hall acceso exterior m2 720.2
4.1.9 Documentación gl 1.0
4.6.2 Carretes de Red Húmeda un 7.0
5.3 Señalizaciones de Transito gl 1.0
2.3.1. Emplantillado H-10 m3 25.0
3.8.8 Pintura Puertas un 77.0
3.11.1 Portarrollo Jumbo Stark un 37.0
3.11.5 Secador de manos NOFER 325x2.55x1.55 Mosaico un 17.0
3.8.9 Látex en Cornisas ml 1,012.0
3.13.5 Pasamanos Terraza de evacuación ml 52.0
3.15 Señaléticas Interiores Metallex grabado gl 1.0
3.1.2 Tabique Metalcon húmedo 90 mm m2 51.0
3.9.9 Lavamanos con Pedestal modelo Magnet un 13.0
3.9.12 Ducha In situ un 12.0
3.11.3 Dispensador de Jabón Liquido Stark un 31.0
3.11.7 Espejos un 17.0
3.17 Banca Atenas BA 05 Vanghar un 6.0
5.7.5 Imprimación asfáltica m2 1,158.0
3.7.3 Bisagras un 231.0
3.9.4 WC Magnet kinder con estanque un 7.0
3.10.2 Grifería Roca Modelo Victoria para Lavamanos un 25.0
2.2.12.3 Lavadero Doble 120x60 c/atril BIGGI un 2.0
5.2.1 Replanteo, Trazado y Niveles ml 168.0
5.2.2.2 Suministro y colocación de Solerilla m2 132.0
5.2.2.5 Imprimación asfáltica m2 1,050.0
5.2.4.2 Arco de Baby Futbol jgo 2.0
3.1.6 Murete de Hormigón divisorio duchas camarín B7 m2 21.8
3.5.9 Gradas de escalera ml 61.2
3.5.10 Nariz de gradas ml 61.2
3.6.1.5 Protección de Puertas un. 22.0
3.9.2 WC Widder s/v p/ Discapacitado con Fluxor LEREN I un 3.0
2.2.12.2 Lavacopas redondo ERC, diámetro 450 mm. para empotrar un 8.0
3.16 Papelera Atenas PA 04 Vanghar un 4.0
5.2.4.1 Parante de Voleibol jgo 2.0
3.1.7 Tabique Shafts 65 mm m2 32.6
3.3.3 Franjas Enlucido de yeso Losa salas de clases primer piso m2 71.0
3.9.5 WC con estanque Quadrato Corona un 4.0
3.9.10 Urinario Mural G-Rein con Fluxor Kolben un 5.0
3.9.15 Calefón 13 lt Junker un 2.0
3.10.1 Grifo temporizado Bojen note para Lavamanos un 16.0
3.10.5 Grifería ducha temporizada c/rociador antivandalico un 6.0

3.11.4 Secador de manos electrónico Smart Schnell un 4.0

3.11.6 Barras de apoyo minusválido gl 1.0

3.11.10 Asiento PVC Abatible Ducha minusválido un 2.0


3.13.3 Barandas Metálicas Escalera B4 h=1.05 mt ml 8.1
3.4.2.4 Esquineros PVC ml 197.2
3.5.7 Pavimento Pododactil m2 4.4
3.6.1.4 Mirillas 25x80 cms un 12.0
3.7.4 Topes de Puerta un 110.0
3.7.5 Cierrapuertas Hidráulica un 8.0
3.7.6 Picaportes un 17.0
3.9.6 Lavamanos con Pedestal modelo Mod Acuacer Corona un 6.0
3.10.6 Grifería para Lavaplatos, Lavaderos y Lavacopas un 15.0
2.2.12.1 Lavaplatos teka 80x44 cms 1C1E encastrar un 5.0
3.13.4 Barandas Metálicas B5-B6 h=1.05 mt ml 6.0
4.6.1 Extintores un 14.0
3.2.2 Impermeabilización pisos de baños 2°piso m2 16.0
3.3.6 Revestimiento Cerchas metálicas en cielo cubierta a la vista EKOVER m2 13.5
3.5.8 Cubrejuntas ml 32.0
3.7.2 Cerradura Puerta Metálica un 5.0
3.7.7 Celosía de aluminio un 12.0
3.9.7 Lavamanos Discapacitado Extra plano Lizt un 1.0
3.9.11 Bañera 100x70 cms Roca un 1.0
3.9.14 Termo Eléctrico de 80 lt un 1.0
3.10.4 Grifería Roca Modelo victoria para Ducha un 6.0
3.11.11 Extractor de Aire industrial 400 MM calvac un 2.0
3.1.4 Tabiques Faldón bañera prebasico 55 mm m2 2.0
3.1.8 Vigones y zócalo volcometal recintos húmedos ml 5.3
3.10.3 Grifería Roca Modelo Victoria para Bañera un 1.0
3.11.2 Percha simple OZ Stretto un 4.0
3.11.8 Barra de Ducha un 12.0
3.11.12 celosías de PVC Clip 1 blanca, de DVP un 1.0
3.11.13 Sello de Tina ml 2.4

Total COL. SERENA GOL 1

TOTAL COSTO DIRECTO NETO $

TOTAL COSTO DIRECTO NETO UF


GASTOS GENERALES % 34.81
UTILIDADES % 8
TOTAL COSTO NETO

Valor UF del 20-07-2017 $26.635,18

Consideraciones:
_ No se considera Estructura metálica de la Terraza ni lona de PVC blanca
_ Se cambia la estructura metálica de techumbre de la Biblioteca entre ejes J´y N´ por Metalcon
_ No se considera terminaciones de la Biblioteca entre ejes J´y N´
_ Se considera pavimento de asfalto solo estacionamiento acceso, lo demás se cambio por gravilla chancada.
_ Los valores de las instalaciones en general son estimados, por no haber proyectos definitivos.
_ Se considera vidrio Termopanel solo en salas de clases y área administrativa.(hacia el exterior)
22,398 45,915,900
2.93%
39,744,213 39,744,213
2.54%
4,200 39,278,400
2.51%
7,477,500 37,387,500 209,228,595
2.39%
37,184,552 37,184,552
2.37%
2,218 34,895,794
2.23%
12,485 32,585,850
2.08%
29,787,399 29,787,399
1.90%
28,644,472 28,644,472
1.83% 21%
6,500 26,312,000
1.68%
2,340 24,808,680
1.58%
18,000 23,940,000 569,807,373
1.53%
23,398,627 23,398,627
1.49%
23,195,375 23,195,375
1.48%
9,471 21,972,720
1.40%
21,600,762 21,600,762
1.38%
20,744,105 20,744,105
1.32%
3,125 20,390,625
1.30%
18,754,848 18,754,848
1.20%
89,922 18,344,088
1.17%
10,952 17,238,448
1.10%
17,118,500 17,118,500 34,356,948
1.09%
16,980,000 16,980,000
1.08%
13,506 16,882,500 273,977,702
1.08%
69,477 16,743,957
1.07%
16,786,100 16,786,100
1.07%
33,317 16,558,549
1.06%
11,791 16,354,117
1.04%
7,156 15,313,840
0.98%
15,054,828 15,054,828
0.96%
24,605 13,778,800 13,778,800
0.88%
9,683 13,701,445 13,701,445
0.87%
34,073 13,189,658
0.84%
12,431,458 12,431,458
0.79%
4,500 11,880,000
0.76%
3,500 11,858,000
0.76%
3,500 11,858,000
0.76%
37,532 11,709,984
0.75%
10,361 11,459,266 46,885,250
0.73%
11,493,735 11,493,735
0.73%
920 11,178,000
0.71%
18,397 11,093,391
0.71%
1,696 11,035,872
0.70%
12,500 10,625,000
0.68%
7,605 10,084,230 69,902,610
0.64%
13,640 9,561,640
0.61%
2,800 9,486,400
0.61%
8,501 9,436,110
0.60%
3,097 9,111,374
0.58%
9,112,524 9,112,524 79,485,488
0.58%
3,298 8,957,368
0.57%
10,952 8,717,792
0.56%
9,789 8,472,380
0.54%
8,420,792 8,420,792
0.54%
4,234,680 8,469,360
0.54%
17,046 7,936,618
0.51%
13,506 7,833,480
0.50%
6,740 7,804,920
0.50%
6,740 7,077,000
0.45%
6,861,441 6,861,441 41,346,658
0.44%
6,689,482 6,689,482
0.43%
1,042 6,780,294
0.43%
3,073 6,505,541
0.42%
14,795 6,435,825
0.41%
70,000 6,440,000
0.41%
12,137 6,323,377
0.40%
2,200 6,146,800
0.39%
1,600 5,931,200
0.38%
70,000 5,740,000
0.37%
2,362 5,479,840 29,621,217
0.35%
2,225 4,961,750
0.32%
3,858 4,726,050
0.30%
4,782 4,432,914
0.28%
37,070 4,448,400
0.28%
5,231 3,847,401
0.25%
14,491 3,564,786
0.23%
1,567 3,635,440
0.23%
1,425 3,638,025
0.23%
3,572,594 3,572,594
0.23%
3,500 3,675,000
0.23%
3,500 3,675,000
0.23%
6,110 3,458,260
0.22%
77,905 3,349,915
0.21%
3,067,507 3,067,507
0.20%
4,357 3,054,257
0.19%
4,293 2,914,947
0.19%
39,603 3,049,431
0.19%
4,492 3,050,068
0.19%
2,800 2,940,000
0.19%
17,803 2,652,647
0.17%
2,354 2,735,348 55,045,894
0.17%
546,000 2,730,000
0.17%
35,626 2,636,324
0.17%
3,073 2,738,043
0.17%
1,311,500 2,623,000
0.17%
11,791 2,499,692 7,860,735
0.16%
51,000 2,448,000
0.16%
3,200 2,400,000
0.15%
3,840 2,400,000
0.15%
1,021 2,368,720
0.15%
3,575 1,991,275
0.13%
97,105 2,039,205
0.13%
11,193 1,914,003 5,944,483
0.12%
12,703 1,880,044 7,824,527
0.12%
181,341 1,813,410
0.12%
953,000 1,906,000
0.12%
20,000 1,840,000 11,392,662
0.12%
119,895 1,810,415
0.12%
89,922 1,798,440 5,448,855
0.11%
1,883 1,792,993
0.11%
1,764 1,785,168 12,746,426
0.11%
1,761,842 1,761,842
0.11%
80,000 1,600,000 6,940,003
0.10%
2,788 1,525,594
0.10%
115,699 1,504,087
0.10%
150,000 1,500,000
0.10%
1,883 1,356,137 11,157,022
0.09%
1,332,563 1,332,563 44,081,742
0.09%
196,740 1,377,180 2,709,743
0.09%
1,443,755 1,443,755
0.09%
51,650 1,291,250
0.08%
16,889 1,300,453
0.08%
34,314 1,269,618
0.08%
71,716 1,219,172
0.08%
1,064 1,076,768
0.07%
20,000 1,040,000
0.07%
1,116,258 1,116,258
0.07%
18,560 946,560
0.06%
67,975 883,675
0.06%
79,011 948,132
0.06%
30,062 931,922
0.06%
56,326 957,542
0.06%
161,060 966,360 3,803,956
0.06%
800 926,400
0.06%
3,176 733,656
0.05%
117,328 821,296
0.05%
33,232 830,800
0.05%
370,665 741,330 5,267,731
0.05%
4,782 803,376
0.05%
6,110 806,520
0.05%
800 840,000
0.05%
352,937 705,874
0.05%
28,867 629,301
0.04%
10,250 627,300
0.04%
9,741 596,149
0.04%
28,430 625,460
0.04%
189,867 569,601
0.04%
69,515 556,120
0.04%
141,020 564,080
0.04%
351,059 702,118
0.04%
13,768 448,837
0.03%
7,156 508,076
0.03%
100,986 403,944
0.03%
90,230 451,150
0.03%
225,940 451,880 475,801,422
0.03%
25,624 409,984
0.03%
65,852 395,112
0.03%
113,685 454,740
0.03%
502,064 502,064
0.03%
206,454 412,908
0.03%
51,000 413,100
0.03%
1,484 292,645 2,470,569
0.02%
86,857 382,171
0.02%
20,000 240,000
0.02%
2,195 241,450
0.02%
43,543 348,344
0.02%
20,311 345,287
0.02%
54,346 326,076
0.02%
17,632 264,480 5,588,646
0.02%
64,929 324,645
0.02%
51,000 306,000
0.02%
25,555 357,770
0.02%
10,982 175,712
0.01%
8,325 112,388
0.01%
3,889 124,448
0.01%
23,874 119,370
0.01%
7,800 93,600 1,162,218
0.01%
123,366 123,366
0.01%
116,674 116,674
0.01%
158,079 158,079
0.01%
37,010 222,060
0.01%
103,460 206,920
0.01%
11,885 23,770
0.00%
10,700 56,710 1,342,440
0.00%
40,519 40,519
0.00%
5,840 23,360
0.00%
6,424 77,088
0.00%
6,494 6,494
0.00%
2,706 6,494 4,401,009
0.00%

1,567,287,925 1,567,287,925
100%

1,567,287,925

58,842.78
20,483.17
4,707.42
84,033.37
NIVEL 1 NIVEL 2 NIVEL 3

Movimiento de Tierras
Excavaciones
NIVEL 1
Hormigón Fundación H-25
ITEM O DESCRIPCIÓN
PARTIDA
Enfierradura
Hormigón Muros,vigas y pilares H-25
Hormigón afinado Radier Trazado Inicial Replanteo y Niveles.
Hormigón Losas H-25
Hormigón Escaleras
Moldajes Muros,vigas y pilares
Moldajes Losas
Moldaje Escaleras Fundaciones
Estructura metálica techumbre y Terraza

Viga Metálica IP 300


Cubierta E.KOVER PUR 50/100 mm - 0.5
prepintada
Muros, Vigas, Pilares
Hojalatería Prepintada 0.6 mm
Bajadas de aguas Lluvias Hormigones
Vistos
Impermeabilización fachada QHC

Impermeabilización pisos de baños 2°piso


Losas
Impermeabilización muros de recintos
húmedos
Impermeabilización de corredores y terrazas
2° piso
Cielo volcanita 12.5 mm Radier
Cielo acústico ExSound Romeral
Instalación eléctrica y Corrientes débiles

Acero para hormigón


Enfierradura armado

Moldaje Instalación de Moldaje

Impermeabilización
Fachada

Impermeabilización Pisos
Impermeabilizaci de Recintos húmedos2do
ones piso
Impermeabilizaci
ones

Impermeabilización
muros recintos Húmedos

Instalaciones de Agua
Potable

Instalación Agua Potable


Instalación de
Agua Potable
Instalación de Artefactos
Sanitarios
Instalación Alcantarillado

Puertas
Ventanas Instalacion de Tuberías
de Alcantarillado
Muebles
Artecfactos sanitarios Instalación de
Tabiques Alcantarillado

Instalación de tuberías
de Colector de
Alcantarillado

Instalación electrica
Corrientes Fuertes

Instalación
eléctrica

Instalación Eléctrica
Corrientes débiles
NIVEL 1 NIVEL 2
PROCEDIMIENTO ITEM O
REGISTRO DESCRIPCIÓN
APLICABLE PARTIDA

Procedimiento de Trazados y Protocolo de Trazados Excavaciones masicas


Excavaciones
Niveles y Niveles para edificios

Procedimiento de
hormigonado.Hormigón
Visto.
Protocolo de
Instructivo Hormigonado hormigonado
Muros

Instructivo hormigonado Cubierta


Losas Instapanel
EKOVER PUR Instalación de Cubierta
50/100mm
PREPINTADA
Instructivo Hormigonados
Radier
Protocolo Reparación
de Nidos en Hormigón.

.Instructivo Reparación de
nidos

Procedimiento de
enfierradura.
Protocolo Instalación
de enfierradura
Instructivo Enfierradura de
Losa Pre Armada

Procedimiento instalación de Protocolo instalación


moldajes de moldajes

Instructivo Limpieza de Protocolo Limpieza


moldaje Moldaje.

Procedimiento de
Impermeabilización

Instructivo Protocolo de
Impermeabilización Fachada Impermeabilización
Protocolo de
Impermeabilización

Instructivo de
Impermeabilización de Pisos
y muros de Recintos
húmedos

Protocolo Instalaciones
de Agua Potable
Procedimiento de
Instalaciones de agua
potable
Protocolo Instalación
de artefactos
Sanitarios

Procedimiento de Tuberías Protocolo de


de Alcanatarillado alcantarillado

Procedimiento de Tuberías
de colector de Alcantarillado Protocolo de Colector

Procedimiento de Instalación Protocolo de


eléctrica Instalación eléctrica
NIVEL 2 NIVEL 3
ITEM O
REGISTRO DESCRIPCIÓN
PARTIDA

Protocolo de
Excavaciones para
Edificios

Protocolo de Instalación
de cubierta

Instalación de
Estructura de estructura de
techumbre techumbre

Protocolo de Prueba de
agua en cubierta

Instalación de
Cielos falsos cielos falsos de
yeso-cartón

Instalación de
Marcos de
Aluminio
Marcos y puertas

Instalación de
puertas Pino
Oregón

Instalación de
ventanas de
Aluminio
Ventanas
Ventanas
Impermeabilizació
n muros recintos
Húmedos
ITEM O DESCRIPCIÓN REGISTRO
PARTIDA

Excavaciones Protocolo de
Excavaciones masicas para Excavaciones para
edificios Edificios

Protocolo de
Instalación de
Cubierta cubierta
Instapanel
Instalación de EKOVER PUR
cubierta 50/100mm
PREPINTADA Protocolo de
Prueba de agua en
cubierta

ITEM O PROCEDIMIENT
DESCRIPCIÓN REGISTRO
PARTIDA O APLICABLE
Procedimiento de
Replanteo y Trazados y Niveles Protocolo de Trazados
Trazado Inicial Niveles. y Niveles

Procedimiento de
hormigonado.Horm
Fundaciones igón Visto.
Protocolo de
Instructivo hormigonado
Hormigonado
Muros
Muros, Vigas,
Hormigones Pilares Instructivo
Vistos hormigonado Losas

Instructivo
Hormigonados Protocolo Reparación
Losas Radier de Nidos en
Hormigón.
.Instructivo
Reparación de
Radier nidos

Procedimiento de
enfierradura.
Acero para Protocolo Instalación
Enfierradura hormigón Instructivo de enfierradura
armado Enfierradura de
Losa Pre Armada
Procedimiento Protocolo instalación
instalación de de moldajes
Instalación de moldajes
Moldaje
Moldaje
Instructivo Limpieza Protocolo Limpieza
de moldaje Moldaje.

Impermeabilizaci Procedimiento de
ón Fachada Impermeabilización

Impermeabilizaci
ón Pisos de Instructivo
Recintos Impermeabilización
Impermeabilizaci húmedos2do Fachada Protocolo de
ones piso Impermeabilización

Impermeabilizaci Instructivo de
ón muros Impermeabilización
recintos de Pisos y muros de
Húmedos Recintos húmedos

Protocolo
Instalaciones de Instalaciones de Agua
Agua Potable
Procedimiento de Potable
Instalación de Instalaciones de
Agua Potable
Instalación de agua potable Protocolo Instalación
Artefactos de artefactos
Sanitarios Sanitarios

Instalacion de Procedimiento de Protocolo de


Tuberías de Tuberías de alcantarillado
Alcantarillado Alcanatarillado
Instalación de
Alcantarillado
Instalación de Procedimiento de
tuberías de Tuberías de Protocolo de Colector
Colector de colector de
Alcantarillado Alcantarillado

Instalación
electrica
Corrientes
Fuertes
Instalación Procedimiento de Protocolo de
eléctrica Instalación eléctrica Instalación eléctrica
Instalación
Eléctrica
Corrientes
débiles

Vous aimerez peut-être aussi