ESTUDIO DE OPERATIVIDAD – AMPLIACIÓN DE LA

CAPACIDAD DE TRANSFORMACIÓN DE LA S.E.


CHILCAYOC
60/35/2.4 kV 8.25/8.25/1.5 MVA

ANEXO 2
FLUJO DE CARGA EN ESTADO
ESTACIONARIO
ESTUDIO DE OPERATIVIDAD – AMPLIACIÓN DE LA
CAPACIDAD DE TRANSFORMACIÓN DE LA S.E.
CHILCAYOC
60/35/2.4 kV 8.25/8.25/1.5 MVA

SIN PROYECTO
DIgSILENT
L-6005/3 L-6005/1

0.43 MW ABANCAY220/ABAN..
-2.34 Mvar
5.12 % 219.5588 kV
0.24 MW 0.18 0.9980 p.u. ABANCAY220/ABAN..
-0.37 Mvar -40.9588 deg
1.05 % 219.5588 kV

L-6005/2
0.55 0.9980 p.u.
-40.9588 deg
19.09 MW 56.39 MW -75.47 MW
CHUQUI60 -0.99 Mvar -28.63 Mvar -0.26 Mvar
15.96 % 25.31 % 30.33 %
65.6133 kV 1.00 0.89 -1.00
0.9941 p.u. -0.41 MW 0.19 MW 56.39 MW
-44.3413 deg 1.41 Mvar -2.88 Mvar -28.63 Mvar 11
-0.24 MW 5.12 % 6.23 % 0.00 % 0 L-2050
0.37 Mvar 0.89
4.85 % -0.28 0.07
-0.55 0
CHACA60 ABANCAY 60
9 66.4409 kV 65.3492 kV AbancayNuevo
1.0067 p.u. 0.9901 p.u. -19.02 MW
0 -45.1733 deg -44.3335 deg 1.66 Mvar
0.41 MW 0.00 MW 10.48 MW -10.67 MW
15.96 %
0
-0.70 Mvar
11.66 %
-0.71 Mvar
1.23 %
4.59 Mvar
51.95 %
-1.70 Mvar
26.72 %
-1.00 L-2060
0.51 0.00 0.92 -0.99 ABANCAY NUEVA 138
tr3 Chuquibambilla
0.24 MW
-0.36 Mvar
4.85 % 11 L-6003 0 137.8862 kV

L-6008
0.9992 p.u.
0.55 0 0 -42.1077 deg 6.61 MW
0 12.41 MW -3.44 Mvar
CHUQUI22.9 0 -9.98 MW 1.79 Mvar 20.82 %
-4.52 Mvar 70.15 % 0.89
22.9487 kV 0.99
1.0021 p.u. 51.95 %
-0.41 MW tr3 Chacapuente -0.00 MW -0.91
-44.2985 deg

L-1007 A
0.71 Mvar -0.00 Mvar
-0.24 MW
0.36 Mvar 11.66 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.50 -1.00 -1.68 MW 12.40 MW -12.40 MW
-0.43 Mvar 2.52 Mvar -2.52 Mvar
-0.55 CHACA22.9 60.8800 kV 26.72 % 26.72 % 70.74 %
1.0147 p.u. -0.97 0.98 -0.98
23.0002 kV -47.2023 deg 8.06 MW 1.92 MW
1.0044 p.u. 3.50 Mvar 1.02 Mvar ABANCAY 13.2
Load_Chuquibambilla -45.3989 deg 42.87 % 18.56 %
0.41 MW 0.92 0.88 13.1455 kV 137.6537 kV
-0.71 Mvar 0.9959 p.u. 1.0048 p.u. ABANCAY 138
-12.4192 deg -42.3275 deg
1.68 MW

L-1007 B
0.50 -2 0.43 Mvar
0
L-6009 0.97
0
Load_Chacapuente
-0.30 MW tr3 Andahuaylas -1.62 MW -6.59 MW
-0.58 Mvar -0.37 Mvar -2.10 Mvar
18.56 % 18.56 % 20.56 %
-0.46 -0.97 -0.95

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8443 kV 13.1368 kV 137.51..
-7.77 MW 0.9976 p.u. 0.9952 p.u. 1.0186..
-3.59 Mvar -48.3867 deg 0.30 MW 161.0777 deg 1.62 MW -43.02..
42.87 % 0.58 Mvar 0.37 Mvar
-0.91
0.46 0.97
CATAHUANCA60
57.6223 kV
0.9604 p.u.
-49.4178 deg
7.77 MW Load_Andy22.9 Load_Andy13.2
3.59 Mvar
108.00 %
0.91

-1 0
0 0

0 0

-7.67 MWChilcayoc TP1 Chilcayoc TP2


-3.29 Mvar
108.00 %
-0.92

CHILCAYOC35
33.6441 kV
0.9613 p.u.
-51.0376 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.42 Mvar
1.42 Mvar

-3.83 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.83 MW
%

24.52 %
-0.94
Breaker/S.. 68.99
0.94
REG33

-12 -3.20 MW
-1.06 Mvar
25.63 %
-0.95
-3.83 MW
-1.28 Mvar
SANJERO33
68.99 %
BOLIVAR33 -0.95 29.5244 kV Inactive
0.8947 p.u.
-56.1666 deg 3.20 MW
Out of Calculation
32.1076 kV
0.9730 p.u. 1.06 Mvar De-energized
SUBESTACION Y BC

83.66 %

tr2 San Jeronimo


-57.5357 deg
1.92 MW 1.90 MW
SE BOLIVARII 3.5MVA Ampl.

0.95
0.55 Mvar 0.72 Mvar
BC PROYECTO

58.78 % 46.54 %
BC SanGe-Filtro Voltages / Loading
-10
0.96 0.93
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -3.18 MW
-0.89 Mvar 0.95 p.u.
83.66 % Upper Voltage Range
-0.96
1.05 p.u.
-1.92 MW -1.90 MW SANJERO4.16 Loading Range
-0.46 Mvar -0.65 Mvar
58.78 % 46.54 % 4.1702 kV
-0.97 -0.95 1.0024 p.u. 100. %
151.1013 deg
3.18 MW -0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.94 Mvar -0.45 Mvar -0.60 Mvar
4.0900 kV 4.2042 kV 0.85 -0.00 -0.00
0.9832 p.u. 0.00 MW 1 2
1.0106 p.u. 0.00 Mvar
-60.1521 deg 150.6321 deg
0.00 MW 1.92 MW 1.90 MW
-0.87 Mvar 1.33 Mvar 0.65 Mvar 1.00
Load_San Jeronimo
0.00 0.82 0.95 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2017MIN_SP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.50 MW ABANCAY220/ABAN..
-2.20 Mvar
4.85 % 219.2277 kV
-0.63 MW 0.22 0.9965 p.u. ABANCAY220/ABAN..
-0.26 Mvar -41.4682 deg
1.77 % 219.2277 kV

L-6005/2
-0.92 0.9965 p.u.
-41.4682 deg
21.64 MW 53.15 MW -74.78 MW
CHUQUI60 -0.46 Mvar -28.24 Mvar -1.09 Mvar
18.10 % 24.13 % 30.07 %
65.3328 kV 1.00 0.88 -1.00
0.9899 p.u. -0.48 MW 1.14 MW 53.15 MW
-45.5790 deg 1.26 Mvar -2.83 Mvar -28.24 Mvar 11
0.63 MW 4.85 % 6.58 % 0.00 % 0 L-2050
0.26 Mvar 0.88
7.58 % -0.36 0.37
0.92 0
CHACA60 ABANCAY 60
8 66.2544 kV 65.3019 kV AbancayNuevo
1.0039 p.u. 0.9894 p.u. -21.57 MW
0 -46.0252 deg -45.1369 deg 1.24 Mvar
0.48 MW 0.00 MW 10.22 MW -11.36 MW
18.10 %
0
-0.56 Mvar
10.51 %
-0.70 Mvar
1.22 %
4.07 Mvar
49.96 %
-1.24 Mvar
28.27 %
-1.00 L-2060
0.65 0.00 0.93 -0.99 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.63 MW
-0.26 Mvar
7.58 % 10 L-6003 0 137.6035 kV

L-6008
0.9971 p.u.
-0.92 0 0 -42.7745 deg 6.69 MW
0 14.88 MW -3.45 Mvar
CHUQUI22.9 0 -9.76 MW 2.21 Mvar 21.06 %
-4.07 Mvar 84.34 % 0.89
23.0692 kV 0.99
1.0074 p.u. 49.96 %
-0.48 MW tr3 Chacapuente -0.00 MW -0.92
-45.6927 deg

L-1007 A
0.57 Mvar -0.00 Mvar
0.63 MW
0.26 Mvar 10.51 % 1.22 %
ANDY60 L-1039 B L-1039 A
-0.65 -1.00 -3.45 MW 14.86 MW -14.86 MW
-1.22 Mvar 2.92 Mvar -2.92 Mvar
0.92 CHACA22.9 61.1002 kV 28.27 % 28.27 % 84.91 %
1.0183 p.u. -0.94 0.98 -0.98
23.1137 kV -48.0146 deg 6.98 MW 2.77 MW
1.0093 p.u. 3.30 Mvar 0.77 Mvar ABANCAY 13.2
Load_Chuquibambilla -46.2914 deg 37.79 % 27.73 %
0.48 MW 0.90 0.96 13.0632 kV 137.3245 kV
-0.57 Mvar 0.9896 p.u. 1.0024 p.u. ABANCAY 138
-13.5201 deg -43.0393 deg
3.45 MW

L-1007 B
0.65 -2 1.22 Mvar
0
L-6009 0.94
0
Load_Chacapuente
-0.43 MW tr3 Andahuaylas -2.35 MW -6.66 MW
0.19 Mvar -0.84 Mvar -2.06 Mvar
27.73 % 27.73 % 20.81 %
-0.91 -0.94 -0.96

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9884 kV 13.1879 kV 137.23..
-6.76 MW 1.0039 p.u. 0.9991 p.u. 1.0165..
-3.51 Mvar -49.7112 deg 0.43 MW 159.5205 deg 2.35 MW -43.70..
37.79 % -0.19 Mvar 0.84 Mvar
-0.89
0.91 0.94
CATAHUANCA60
58.1623 kV
0.9694 p.u.
-49.8397 deg
6.76 MW Load_Andy22.9 Load_Andy13.2
3.51 Mvar
95.21 %
0.89

-1 0
0 0

0 0

-6.68 MWChilcayoc TP1 Chilcayoc TP2


-3.28 Mvar
95.21 %
-0.90

CHILCAYOC35
34.0253 kV
0.9722 p.u.
-51.1922 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.40 Mvar
1.40 Mvar

-3.42 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.42 MW
%

21.66 %
-0.93
Breaker/S.. 60.95
0.93
REG33

-8 -2.77 MW
-1.28 Mvar
22.66 %
-0.91
-3.41 MW
-1.28 Mvar
SANJERO33
60.95 %
BOLIVAR33 -0.94 30.2352 kV Inactive
0.9162 p.u.
-55.1929 deg 2.77 MW
Out of Calculation
31.9619 kV
0.9685 p.u. 1.28 Mvar De-energized
SUBESTACION Y BC

73.97 %

tr2 San Jeronimo


-56.5502 deg
1.96 MW 1.45 MW
SE BOLIVARII 3.5MVA Ampl.

0.91
0.49 Mvar 0.79 Mvar
BC PROYECTO

59.53 % 37.98 %
BC SanGe-Filtro Voltages / Loading
-8
0.97 0.88
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -2.75 MW
-1.14 Mvar 0.95 p.u.
73.97 % Upper Voltage Range
-0.92
1.05 p.u.
-1.95 MW -1.45 MW SANJERO4.16 Loading Range
-0.39 Mvar -0.74 Mvar
59.53 % 37.98 % 4.1381 kV
-0.98 -0.89 0.9947 p.u. 100. %
152.4473 deg
2.75 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.88 Mvar -0.45 Mvar -0.30 Mvar
4.0769 kV 4.0702 kV 0.83 0.00 -0.00
0.9800 p.u. 0.00 MW 1 1
0.9784 p.u. 0.00 Mvar
-59.2386 deg 151.9710 deg
0.00 MW 1.95 MW 1.45 MW
-0.86 Mvar 1.26 Mvar 0.74 Mvar 1.00
Load_San Jeronimo
0.00 0.84 0.89 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2017MED_SP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.74 MW ABANCAY220/ABAN..
-2.36 Mvar
5.30 % 219.9549 kV
0.21 MW 0.30 0.9998 p.u. ABANCAY220/ABAN..
-0.34 Mvar -41.2092 deg
1.09 % 219.9549 kV

L-6005/2
0.53 0.9998 p.u.
-41.2092 deg
22.91 MW 50.07 MW -72.98 MW
CHUQUI60 -2.19 Mvar -28.16 Mvar 0.36 Mvar
19.18 % 22.95 % 29.32 %
65.9337 kV 1.00 0.87 -1.00
0.9990 p.u. -0.72 MW 0.53 MW 50.07 MW
-44.5704 deg 1.42 Mvar -2.94 Mvar -28.16 Mvar 11
-0.21 MW 5.30 % 6.40 % 0.00 % 0 L-2050
0.34 Mvar 0.87
4.42 % -0.45 0.18
-0.53 0
CHACA60 ABANCAY 60
9 66.6607 kV 65.6721 kV AbancayNuevo
1.0100 p.u. 0.9950 p.u. -22.84 MW
0 -45.5286 deg -44.5239 deg 3.03 Mvar
0.72 MW 0.00 MW 8.96 MW -9.49 MW
19.18 %
0
-0.71 Mvar
14.42 %
-0.71 Mvar
1.23 %
4.19 Mvar
45.04 %
-1.25 Mvar
23.55 %
-0.99 L-2060
0.71 0.00 0.91 -0.99 ABANCAY NUEVA 138
tr3 Chuquibambilla
0.21 MW
-0.34 Mvar
4.42 % 11 L-6003 0 138.3103 kV

L-6008
1.0022 p.u.
0.53 0 0 -42.5823 deg 9.07 MW
0 13.77 MW -4.74 Mvar
CHUQUI22.9 0 -8.59 MW 1.71 Mvar 28.49 %
-4.35 Mvar 77.36 % 0.89
23.0628 kV 0.99
1.0071 p.u. 45.04 %
-0.72 MW tr3 Chacapuente -0.00 MW -0.89
-44.5327 deg

L-1007 A
0.72 Mvar -0.00 Mvar
-0.21 MW
0.34 Mvar 14.42 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.70 -1.00 -4.21 MW 13.75 MW -13.75 MW
-0.85 Mvar 2.44 Mvar -2.44 Mvar
-0.53 CHACA22.9 61.7213 kV 23.55 % 23.55 % 77.87 %
1.0287 p.u. -0.98 0.98 -0.98
23.0779 kV -46.8596 deg 6.68 MW 1.91 MW
1.0078 p.u. 3.22 Mvar 1.13 Mvar ABANCAY 13.2
Load_Chuquibambilla -45.9181 deg 36.04 % 33.54 %
0.72 MW 0.90 0.86 13.1523 kV 138.0668 kV
-0.72 Mvar 0.9964 p.u. 1.0078 p.u. ABANCAY 138
-13.5286 deg -42.8261 deg
4.21 MW

L-1007 B
0.70 -1 0.85 Mvar
0
L-6009 0.98
0
Load_Chacapuente
1.03 MW tr3 Andahuaylas -2.94 MW -9.02 MW
-0.42 Mvar -0.61 Mvar -0.74 Mvar
33.54 % 33.54 % 28.24 %
0.93 -0.98 -1.00

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8333 kV 13.1118 kV 138.15..
-6.48 MW 0.9971 p.u. 0.9933 p.u. 1.0234..
-3.48 Mvar -48.0328 deg -1.03 MW 161.0245 deg 2.94 MW -43.87..
36.04 % 0.42 Mvar 0.61 Mvar
-0.88
-0.93 0.98
CATAHUANCA60
58.9050 kV
0.9818 p.u.
-48.5490 deg
6.48 MW Load_Andy22.9 Load_Andy13.2
3.48 Mvar
90.79 %
0.88

-1 0
0 0

0 0

-6.41 MWChilcayoc TP1 Chilcayoc TP2


-3.27 Mvar
90.79 %
-0.89

CHILCAYOC35
34.4943 kV
0.9856 p.u.
-49.8039 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.36 Mvar
1.36 Mvar

-3.06 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.06 MW
%

19.27 %
-0.91
Breaker/S.. 54.24
0.91
REG33

-5 -2.89 MW
-1.38 Mvar
23.36 %
-0.90
-3.05 MW
-1.27 Mvar
SANJERO33
54.24 %
BOLIVAR33 -0.92 30.8001 kV Inactive
0.9333 p.u.
-53.4728 deg 2.89 MW
Out of Calculation
31.9479 kV
0.9681 p.u. 1.38 Mvar De-energized
SUBESTACION Y BC

76.26 %

tr2 San Jeronimo


-54.6553 deg
1.66 MW 1.39 MW
SE BOLIVARII 3.5MVA Ampl.

0.90
0.65 Mvar 0.62 Mvar
BC PROYECTO

52.59 % 35.01 %
BC SanGe-Filtro Voltages / Loading
-7
0.93 0.91
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -2.88 MW
-1.22 Mvar 0.95 p.u.
76.26 % Upper Voltage Range
-0.92
1.05 p.u.
-1.66 MW -1.39 MW SANJERO4.16 Loading Range
-0.57 Mvar -0.58 Mvar
52.59 % 35.01 % 4.1520 kV
-0.95 -0.92 0.9981 p.u. 100. %
154.0842 deg
2.88 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.67 Mvar -0.45 Mvar 0.00 Mvar
4.0601 kV 4.1911 kV 0.86 0.00 1.00
0.9760 p.u. 0.00 MW 1 0
1.0075 p.u. 0.00 Mvar
-56.9274 deg 153.9966 deg
0.00 MW 1.66 MW 1.39 MW
-0.57 Mvar 1.14 Mvar 0.58 Mvar 1.00
Load_San Jeronimo
0.00 0.82 0.92 BC SanGe-P1 BC SanGe-P2_3
2 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2017MAX_SP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.61 MW ABANCAY220/ABAN..
-2.39 Mvar
5.22 % 225.1036 kV
-0.65 MW 0.25 1.0232 p.u. ABANCAY220/ABAN..
-0.14 Mvar -40.4953 deg
1.98 % 225.1036 kV

L-6005/2
-0.98 1.0232 p.u.
-40.4953 deg
23.00 MW -16.32 MW -6.67 MW
CHUQUI60 -11.52 Mvar -15.85 Mvar -4.04 Mvar
21.64 % 8.88 % 3.40 %
66.3807 kV 0.89 -0.72 -0.86
1.0058 p.u. -0.59 MW 1.26 MW 16.32 MW
-44.5735 deg 1.43 Mvar -3.17 Mvar 15.85 Mvar 14
0.65 MW 5.22 % 7.25 % 0.00 % 0 L-2050
0.14 Mvar 0.72
7.31 % -0.38 0.37
0.98 0
CHACA60 ABANCAY 60
10 67.2895 kV 66.2711 kV AbancayNuevo
1.0195 p.u. 1.0041 p.u. -22.93 MW
0 -45.0672 deg -44.0895 deg 12.51 Mvar
0.59 MW 0.00 MW 9.42 MW -10.68 MW
21.64 %
0
-0.70 Mvar
13.04 %
-0.72 Mvar
1.24 %
2.84 Mvar
43.94 %
0.33 Mvar
26.04 %
-0.88 L-2060
0.64 0.00 0.96 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.65 MW
-0.14 Mvar
7.31 % 12 L-6003 0 138.7850 kV

L-6008
1.0057 p.u.
-0.98 0 0 -41.8880 deg 10.24 MW
0 12.69 MW -12.13 Mvar
CHUQUI22.9 0 -9.06 MW -0.39 Mvar 44.02 %
-3.05 Mvar 70.40 % 0.65
23.0226 kV 1.00
1.0054 p.u. 43.94 %
-0.59 MW tr3 Chacapuente -0.00 MW -0.95
-44.6860 deg

L-1007 A
0.71 Mvar 0.00 Mvar
0.65 MW
0.14 Mvar 13.04 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.64 -1.00 -1.95 MW 12.67 MW -12.67 MW
-0.31 Mvar 0.36 Mvar -0.36 Mvar
0.98 CHACA22.9 62.8032 kV 26.04 % 26.04 % 70.39 %
1.0467 p.u. -0.99 1.00 -1.00
23.0816 kV -46.8186 deg 7.39 MW 1.67 MW
1.0079 p.u. 2.82 Mvar 0.23 Mvar ABANCAY 13.2
Load_Chuquibambilla -45.3797 deg 37.49 % 19.05 %
0.59 MW 0.93 0.99 13.2335 kV 138.6468 kV
-0.71 Mvar 1.0025 p.u. 1.0120 p.u. ABANCAY 138
-12.2791 deg -42.1197 deg
1.95 MW

L-1007 B
0.64 1 0.31 Mvar
0
L-6009 0.99
0
Load_Chacapuente
-0.01 MW tr3 Andahuaylas -1.66 MW -10.12 MW
0.21 Mvar -0.40 Mvar 6.75 Mvar
19.05 % 19.05 % 43.59 %
-0.04 -0.97 -0.83

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8473 kV 13.1401 kV 140.93..
-7.16 MW 0.9977 p.u. 0.9955 p.u. 1.0213..
-3.07 Mvar -47.7831 deg 0.01 MW 161.6743 deg 1.66 MW -43.56..
37.49 % -0.21 Mvar 0.40 Mvar
-0.92
0.04 0.97
CATAHUANCA60
60.0340 kV
1.0006 p.u.
-48.7811 deg
7.16 MW Load_Andy22.9 Load_Andy13.2
3.07 Mvar
94.45 %
0.92

-1 0
0 0

0 0

-7.10 MWChilcayoc TP1 Chilcayoc TP2


-2.84 Mvar
94.45 %
-0.93

CHILCAYOC35
35.2135 kV
1.0061 p.u.
-50.1677 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.06 Mvar
1.06 Mvar

-3.53 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.53 MW
%

20.69 %
-0.96
Breaker/S.. 58.23
0.96
REG33

-2 -3.07 MW
-1.21 Mvar
23.44 %
-0.93
-3.53 MW
-0.94 Mvar
SANJERO33
58.23 %
BOLIVAR33 -0.97 31.6104 kV Inactive
0.9579 p.u.
-54.4618 deg 3.07 MW
Out of Calculation
32.2299 kV
0.9767 p.u. 1.21 Mvar De-energized
SUBESTACION Y BC

76.52 %

tr2 San Jeronimo


-55.8066 deg
1.80 MW 1.73 MW
SE BOLIVARII 3.5MVA Ampl.

0.93
0.39 Mvar 0.55 Mvar
BC PROYECTO

53.88 % 41.25 %
BC SanGe-Filtro Voltages / Loading
-5
0.98 0.95
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -3.05 MW
-1.05 Mvar 0.95 p.u.
76.52 % Upper Voltage Range
-0.95
1.05 p.u.
-1.80 MW -1.72 MW SANJERO4.16 Loading Range
-0.31 Mvar -0.50 Mvar
53.88 % 41.25 % 4.1575 kV
-0.99 -0.96 0.9994 p.u. 100. %
152.9245 deg
3.05 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.80 Mvar -0.45 Mvar -0.30 Mvar
4.1224 kV 4.2331 kV 0.86 -0.00 0.00
0.9910 p.u. 0.00 MW 1 1
1.0176 p.u. 0.00 Mvar
-58.2367 deg 152.5455 deg
-0.00 MW 1.80 MW 1.72 MW
-0.88 Mvar 1.19 Mvar 0.50 Mvar 1.00
Load_San Jeronimo
-0.00 0.83 0.96 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2017MIN_SP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.55 MW ABANCAY220/ABAN..
-2.31 Mvar
5.10 % 222.2843 kV
-0.69 MW 0.23 1.0104 p.u. ABANCAY220/ABAN..
-0.17 Mvar -47.2555 deg
1.99 % 222.2843 kV

L-6005/2
-0.97 1.0104 p.u.
-47.2555 deg
30.13 MW -29.04 MW -1.09 MW
CHUQUI60 -3.26 Mvar -17.91 Mvar -9.46 Mvar
24.99 % 13.49 % 3.77 %
65.4925 kV 0.99 -0.85 -0.11
0.9923 p.u. -0.53 MW 1.25 MW 29.04 MW
-52.1334 deg 1.38 Mvar -3.04 Mvar 17.91 Mvar 11
0.69 MW 5.10 % 7.08 % 0.00 % 0 L-2050
0.17 Mvar 0.85
7.85 % -0.36 0.38
0.97 0
CHACA60 ABANCAY 60
9 66.4269 kV 65.4199 kV AbancayNuevo
1.0065 p.u. 0.9912 p.u. -30.05 MW
0 -52.5896 deg -51.6349 deg 4.49 Mvar
0.53 MW 0.00 MW 11.43 MW -12.68 MW
24.99 %
0
-0.67 Mvar
12.25 %
-0.71 Mvar
1.23 %
4.87 Mvar
56.23 %
-1.83 Mvar
31.65 %
-0.99 L-2060
0.62 0.00 0.92 -0.99 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.69 MW
-0.17 Mvar
7.85 % 11 L-6003 0 139.9305 kV

L-6008
1.0140 p.u.
-0.97 0 0 -49.0221 deg 13.69 MW
1 16.36 MW -7.42 Mvar
CHUQUI22.9 0 -10.85 MW 2.92 Mvar 42.83 %
-4.66 Mvar 91.64 % 0.88
22.9205 kV 0.98
1.0009 p.u. 56.23 %
-0.53 MW tr3 Chacapuente -0.00 MW -0.92
-52.2561 deg

L-1007 A
0.68 Mvar -0.00 Mvar
0.69 MW
0.17 Mvar 12.25 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.62 -1.00 -3.60 MW 16.34 MW -16.34 MW
-1.24 Mvar 3.65 Mvar -3.65 Mvar
0.97 CHACA22.9 60.6250 kV 31.65 % 31.65 % 92.31 %
1.0104 p.u. -0.95 0.98 -0.98
22.9883 kV -54.8139 deg 6.84 MW 4.01 MW
1.0039 p.u. 2.61 Mvar 2.04 Mvar ABANCAY 13.2
Load_Chuquibambilla -52.8814 deg 35.97 % 37.03 %
0.53 MW 0.93 0.89 13.1188 kV 139.6086 kV
-0.68 Mvar 0.9938 p.u. 1.0190 p.u. ABANCAY 138
-19.7754 deg -49.3017 deg
3.60 MW

L-1007 B
0.62 -3 1.24 Mvar
0
L-6009 0.95
0
Load_Chacapuente
-0.95 MW tr3 Andahuaylas -3.06 MW -13.56 MW
-0.54 Mvar -1.22 Mvar 2.05 Mvar
37.03 % 37.03 % 42.56 %
-0.87 -0.93 -0.99

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8129 kV 13.0528 kV 140.25..
-6.63 MW 0.9962 p.u. 0.9888 p.u. 1.0164..
-2.86 Mvar -57.3325 deg 0.95 MW 151.6404 deg 3.06 MW -50.97..
35.97 % 0.54 Mvar 1.22 Mvar
-0.92
0.87 0.93
CATAHUANCA60
57.9655 kV
0.9661 p.u.
-56.7606 deg
6.63 MW Load_Andy22.9 Load_Andy13.2
2.86 Mvar
90.63 %
0.92

-1 0
0 0

0 0

-6.57 MWChilcayoc TP1 Chilcayoc TP2


-2.65 Mvar
90.63 %
-0.93

CHILCAYOC35
34.0030 kV
0.9715 p.u.
-58.1366 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.25 Mvar
1.25 Mvar

-3.62 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.62 MW
%

22.23 %
-0.95
Breaker/S.. 62.56
0.95
REG33

-4 -2.51 MW
-0.88 Mvar
19.49 %
-0.94
-3.61 MW
-1.11 Mvar
SANJERO33
62.56 %
BOLIVAR33 -0.96 30.6158 kV Inactive
0.9278 p.u.
-62.3651 deg 2.51 MW
Out of Calculation
31.4674 kV
0.9536 p.u. 0.88 Mvar De-energized
SUBESTACION Y BC

63.63 %

tr2 San Jeronimo


-63.8640 deg
2.08 MW 1.54 MW
SE BOLIVARII 3.5MVA Ampl.

0.94
0.34 Mvar 0.78 Mvar
BC PROYECTO

63.05 % 40.09 %
BC SanGe-Filtro Voltages / Loading
-7
0.99 0.89
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -2.49 MW
-0.78 Mvar 0.95 p.u.
63.63 % Upper Voltage Range
-0.95
1.05 p.u.
-2.07 MW -1.53 MW SANJERO4.16 Loading Range
-0.23 Mvar -0.72 Mvar
63.05 % 40.09 % 4.1594 kV
-0.99 -0.90 0.9999 p.u. 100. %
145.4824 deg
2.49 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.53 Mvar -0.45 Mvar -0.30 Mvar
4.0276 kV 4.1149 kV 0.85 0.00 0.00
0.9682 p.u. 0.00 MW 1 1
0.9892 p.u. 0.00 Mvar
-66.8125 deg 144.6052 deg
-0.00 MW 2.07 MW 1.53 MW
-0.84 Mvar 1.07 Mvar 0.72 Mvar 1.00
Load_San Jeronimo
-0.00 0.89 0.90 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2017MED_SP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.74 MW ABANCAY220/ABAN..
-2.28 Mvar
5.14 % 223.1992 kV
-0.88 MW 0.31 1.0145 p.u. ABANCAY220/ABAN..
-0.20 Mvar -45.4616 deg
2.26 % 223.1992 kV

L-6005/2
-0.97 1.0145 p.u.
-45.4616 deg
29.52 MW -26.06 MW -3.45 MW
CHUQUI60 -6.07 Mvar -17.35 Mvar -7.46 Mvar
24.76 % 12.33 % 3.24 %
65.5746 kV 0.98 -0.83 -0.42
0.9936 p.u. -0.72 MW 1.63 MW 26.06 MW
-50.2873 deg 1.34 Mvar -2.98 Mvar 17.35 Mvar 11
0.88 MW 5.14 % 7.28 % 0.00 % 0 L-2050
0.20 Mvar 0.83
12.69 % -0.47 0.48
0.97 0
CHACA60 ABANCAY 60
8 66.4952 kV 65.5888 kV AbancayNuevo
1.0075 p.u. 0.9938 p.u. -29.44 MW
0 -50.7565 deg -49.7034 deg 7.30 Mvar
0.72 MW 0.00 MW 10.51 MW -12.14 MW
24.76 %
0
-0.63 Mvar
13.75 %
-0.71 Mvar
1.23 %
2.70 Mvar
48.67 %
0.28 Mvar
29.91 %
-0.97 L-2060
0.75 0.00 0.97 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.88 MW
-0.20 Mvar
12.69 % 11 L-6003 0 140.9019 kV

L-6008
1.0210 p.u.
-0.98 0 0 -47.1768 deg 13.83 MW
2 15.61 MW -7.39 Mvar
CHUQUI22.9 0 -10.07 MW 0.10 Mvar 42.85 %
-2.74 Mvar 85.30 % 0.88
23.1274 kV 1.00
1.0099 p.u. 48.67 %
-0.72 MW tr3 Chacapuente -0.00 MW -0.96
-50.7878 deg

L-1007 A
0.64 Mvar 0.00 Mvar
0.88 MW
0.20 Mvar 13.75 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.75 -1.00 -3.40 MW 15.59 MW -15.59 MW
-0.61 Mvar 0.84 Mvar -0.84 Mvar
0.98 CHACA22.9 61.9126 kV 29.91 % 29.91 % 85.42 %
1.0319 p.u. -0.98 1.00 -1.00
23.0040 kV -52.9457 deg 7.22 MW 2.85 MW
1.0045 p.u. 2.75 Mvar -0.01 Mvar ABANCAY 13.2
Load_Chuquibambilla -51.1517 deg 37.13 % 28.92 %
0.72 MW 0.93 1.00 13.0822 kV 140.7132 kV
-0.64 Mvar 0.9911 p.u. 1.0271 p.u. ABANCAY 138
-17.9093 deg -47.4513 deg
3.40 MW

L-1007 B
0.75 0 0.61 Mvar
0
L-6009 0.98
0
Load_Chacapuente
-0.31 MW tr3 Andahuaylas -2.54 MW -13.70 MW
0.65 Mvar -0.51 Mvar 1.95 Mvar
28.92 % 28.92 % 42.58 %
-0.43 -0.98 -0.99

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8761 kV 13.1494 kV 141.19..
-7.00 MW 0.9990 p.u. 0.9962 p.u. 1.0232..
-3.00 Mvar -54.6335 deg 0.31 MW 154.5311 deg 2.54 MW -49.12..
37.13 % -0.65 Mvar 0.51 Mvar
-0.92
0.43 0.98
CATAHUANCA60
59.1692 kV
0.9862 p.u.
-54.9176 deg
7.00 MW Load_Andy22.9 Load_Andy13.2
3.00 Mvar
93.55 %
0.92

-1 0
0 0

0 0

-6.93 MWChilcayoc TP1 Chilcayoc TP2


-2.77 Mvar
93.55 %
-0.93

CHILCAYOC35
34.7030 kV
0.9915 p.u.
-56.3115 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.23 Mvar
1.23 Mvar

-3.49 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.49 MW
%

21.10 %
-0.94
Breaker/S.. 59.38
0.94
REG33

-4 -2.95 MW
-0.98 Mvar
22.41 %
-0.95
-3.49 MW
-1.11 Mvar
SANJERO33
59.38 %
BOLIVAR33 -0.95 31.1665 kV Inactive
0.9444 p.u.
-60.6664 deg 2.95 MW
Out of Calculation
32.1050 kV
0.9729 p.u. 0.98 Mvar De-energized
SUBESTACION Y BC

73.17 %

tr2 San Jeronimo


-61.9626 deg
1.97 MW 1.52 MW
SE BOLIVARII 3.5MVA Ampl.

0.95
0.52 Mvar 0.59 Mvar
BC PROYECTO

59.81 % 37.25 %
BC SanGe-Filtro Voltages / Loading
-6
0.97 0.93
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -2.94 MW
-0.83 Mvar 0.95 p.u.
73.17 % Upper Voltage Range
-0.96
1.05 p.u.
-1.96 MW -1.52 MW SANJERO4.16 Loading Range
-0.42 Mvar -0.55 Mvar
59.81 % 37.25 % 4.1697 kV
-0.98 -0.94 1.0023 p.u. 100. %
146.8095 deg
2.94 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.89 Mvar -0.45 Mvar -0.60 Mvar
4.0930 kV 4.2137 kV 0.84 0.00 0.00
0.9839 p.u. 0.00 MW 1 2
1.0129 p.u. 0.00 Mvar
-64.6435 deg 146.5806 deg
0.00 MW 1.96 MW 1.52 MW
-0.87 Mvar 1.29 Mvar 0.55 Mvar 1.00
Load_San Jeronimo
0.00 0.84 0.94 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2017MAX_SP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.45 MW ABANCAY220/ABAN..
-2.33 Mvar
5.08 % 219.6394 kV
0.23 MW 0.19 0.9984 p.u. ABANCAY220/ABAN..
-0.38 Mvar -40.9524 deg
1.02 % 219.6394 kV

L-6005/2
0.52 0.9984 p.u.
-40.9524 deg
19.07 MW 56.42 MW -75.49 MW
CHUQUI60 -1.50 Mvar -28.44 Mvar 0.04 Mvar
15.96 % 25.28 % 30.34 %
65.8386 kV 1.00 0.89 -1.00
0.9976 p.u. -0.43 MW 0.22 MW 56.42 MW
-44.3005 deg 1.38 Mvar -2.86 Mvar -28.44 Mvar 11
-0.23 MW
0.38 Mvar
5.08 % 6.16 % 0.00 %
0.89
0 L-2050
-0.30 0.08
4.91 %
-0.52 0
CHACA60 ABANCAY 60
9 66.6551 kV 65.5863 kV
AbancayNuevo
1.0099 p.u. 0.9937 p.u. -19.00 MW
0 -45.1280 deg -44.2910 deg 2.17 Mvar
0.43 MW 0.00 MW 10.30 MW -10.52 MW 15.96 %
0
-0.67 Mvar
11.40 %
-0.71 Mvar
1.23 %
3.85 Mvar
49.68 %
-0.99 Mvar
26.04 % -0.99 L-2060
0.54 0.00 0.94 -1.00
tr3 Chuquibambilla
0.23 MW ABANCAY NUEVA 138
-0.38 Mvar
138.0109 kV
L-6003

L-6008
4.91 % 11 0
1.0001 p.u.
0.52 0 0 -42.0992 deg 6.68 MW
0 12.33 MW -3.24 Mvar
CHUQUI22.9 0 -9.85 MW 1.07 Mvar 20.69 %
-3.86 Mvar 69.13 % 0.90
23.0266 kV 1.00
1.0055 p.u. 49.68 %
-0.43 MW tr3 Chacapuente -0.00 MW -0.93

L-1007 A
-44.2597 deg 0.68 Mvar -0.00 Mvar
-0.23 MW
0.38 Mvar
11.40 % 1.23 %
ANDY60 -1.74 MW 12.32 MW -12.32 MW
L-1039 B L-1039 A
-0.53 -1.00
-0.44 Mvar 1.81 Mvar -1.81 Mvar
-0.52 CHACA22.9 61.4750 kV
1.0246 p.u.
26.04 %
-0.97
26.04 %
0.99
69.54 %
-0.99
23.0671 kV -47.2209 deg 7.86 MW 1.99 MW
1.0073 p.u. 2.80 Mvar 1.06 Mvar ABANCAY13.2
Load_Chuquibambilla -45.3612 deg
0.43 MW
40.19 % 19.38 %
0.94 0.88 13.1551 kV 137.8112 kV
-0.68 Mvar 0.9966 p.u. 1.0059 p.u. ABANCAY138
-42.3204 deg

L-1007 B
-12.4335 deg 1.74 MW
0.53 -1
0.44 Mvar
0
L-6009 0.97
0
Load_Chacapuente
-0.31 MW tr3 Andahuaylas -1.69 MW -6.65 MW
-0.60 Mvar -0.39 Mvar -2.31 Mvar
19.38 % 19.38 % 20.46 %
-0.46 -0.97 -0.94

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.7586 kV 13.0860 kV 137.56..
-7.59 MW 0.9938 p.u. 0.9914 p.u. 1.0190..
-2.97 Mvar -48.4295 deg 0.31 MW 161.0089 deg 1.69 MW -43.01..
40.19 %
-0.93 0.60 Mvar 0.39 Mvar

0.46 0.97
CATAHUANCA60
58.5612 kV
0.9760 p.u.
-49.4554 deg
7.59 MW Load_Andy22.9 Load_Andy13.2
2.97 Mvar
101.26 %
0.93

-1 -2
0 0

0 0

-7.51 MWChilcayoc TP1 Chilcayoc TP2


-2.70 Mvar
101.26 %
-0.94

CHILCAYOC35
34.3134 kV
0.9804 p.u.
-51.0217 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.17 Mvar
1.17 Mvar

-3.96 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.96 MW
65.14 %

23.15 %
-0.96
0.96
REG33

-5 -3.20 MW
Breaker/S..

-1.05 Mvar
23.88 %
-0.95
-3.96 MW
-1.02 ..
SANJERO33
65.14 % Inactive
31.6781 kV
BOLIVAR33 -0.97
0.9599 p.u.
-55.2399 deg Out of Calculation
32.9011 kV 3.20 MW
0.9970 p.u. 1.05 Mvar De-energized
SUBESTACION Y BC

tr2 San Jeronimo


-56.6592 deg 77.94 %
SE BOLIVARII 3.5MVA Ampl.

1.92 MW 2.04 MW 0.95


0.17 Mvar 0.86 Mvar
BC PROYECTO

55.15 % 49.37 %
BC SanGe-Filtro Voltages / Loading
1.00 0.92 -5
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 PROYECTO Lower Voltage Range


-1 -1 0 -3.18 MW
-0.88 Mvar 0.95 p.u.
77.94 % Upper Voltage Range
-0.96
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.08 Mvar -0.78 Mvar
55.15 % 49.37 % 4.1765 kV
1.0040 p.u. 100. %
-1.00 -0.93
152.0359 deg
3.18 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.94 Mvar -0.45 Mvar -0.60 Mvar
4.2312 kV 4.1876 kV 0.85 -0.00 0.00
1.0171 p.u. 0.00 MW 1 2
1.0066 p.u. 0.00 Mvar
-59.1480 deg 151.3694 deg
0.00 MW 1.91 MW 2.04 MW
-1.24 Mvar 1.32 Mvar 0.78 Mvar 1.00
Load_San Jeronimo
0.00 0.82 0.93 BC SanGe-P1 BC SanGe-P2_3
4 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MIN_SP Date: 5/9/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.52 MW ABANCAY220/ABAN..
-2.19 Mvar
4.82 % 219.2966 kV
-0.66 MW 0.23 0.9968 p.u. ABANCAY220/ABAN..
-0.28 Mvar -41.4835 deg
1.80 % 219.2966 kV

L-6005/2
-0.92 0.9968 p.u.
-41.4835 deg
21.75 MW 53.08 MW -74.83 MW
CHUQUI60 -0.90 Mvar -28.07 Mvar -0.83 Mvar
18.20 % 24.06 % 30.09 %
65.5362 kV 1.00 0.88 -1.00
0.9930 p.u. -0.50 MW 1.18 MW 53.08 MW
-45.5971 deg 1.24 Mvar -2.81 Mvar -28.07 Mvar 11
0.66 MW
0.28 Mvar
4.82 % 6.56 % 0.00 %
0.88
0 L-2050
-0.37 0.39
7.93 %
0.92 0
CHACA60 ABANCAY 60
9 66.4510 kV 65.5191 kV
AbancayNuevo
1.0068 p.u. 0.9927 p.u. -21.69 MW
0 -46.0371 deg -45.1474 deg 1.69 Mvar
0.50 MW 0.00 MW 10.14 MW -11.32 MW 18.20 %
0
-0.54 Mvar
10.52 %
-0.71 Mvar
1.23 %
3.38 Mvar
48.25 %
-0.57 Mvar
27.97 % -1.00 L-2060
0.68 0.00 0.95 -1.00
tr3 Chuquibambilla
-0.66 MW ABANCAY NUEVA 138
-0.27 Mvar
137.7114 kV
L-6003

L-6008
7.93 % 11 0
0.9979 p.u.
-0.92 0 0 -42.7959 deg 6.70 MW
0 14.99 MW -3.27 Mvar
CHUQUI22.9 0 -9.71 MW 1.58 Mvar 20.84 %
-3.44 Mvar 84.37 % 0.90
22.9281 kV 0.99
1.0012 p.u. 48.25 %
-0.50 MW tr3 Chacapuente -0.00 MW -0.94

L-1007 A
-45.7148 deg 0.54 Mvar 0.00 Mvar
0.66 MW
0.27 Mvar
10.52 % 1.23 %
ANDY60 -3.59 MW 14.97 MW -14.97 MW
L-1039 B L-1039 A
-0.68 -1.00
-1.27 Mvar 2.29 Mvar -2.29 Mvar
0.92 CHACA22.9 61.6345 kV
1.0272 p.u.
27.97 %
-0.94
27.97 %
0.99
84.81 %
-0.99
22.9674 kV -48.1157 deg 6.83 MW 2.89 MW
1.0029 p.u. 2.61 Mvar 0.82 Mvar ABANCAY13.2
Load_Chuquibambilla -46.3119 deg
0.50 MW
35.35 % 29.00 %
0.93 0.96 13.0690 kV 137.4597 kV
-0.54 Mvar 0.9901 p.u. 1.0034 p.u. ABANCAY138
-43.0651 deg

L-1007 B
-13.5803 deg 3.59 MW
0.68 -1
1.27 Mvar
0
L-6009 0.94
0
Load_Chacapuente
-0.44 MW tr3 Andahuaylas -2.44 MW -6.67 MW
0.18 Mvar -0.87 Mvar -2.25 Mvar
29.00 % 29.00 % 20.60 %
-0.93 -0.94 -0.95

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8756 kV 13.1198 kV 137.28..
-6.62 MW 0.9989 p.u. 0.9939 p.u. 1.0169..
-2.89 Mvar -49.8508 deg 0.44 MW 159.3417 deg 2.44 MW -43.72..
35.35 %
-0.92 -0.18 Mvar 0.87 Mvar

0.93 0.94
CATAHUANCA60
59.0174 kV
0.9836 p.u.
-49.9883 deg
6.62 MW Load_Andy22.9 Load_Andy13.2
2.89 Mvar
89.07 %
0.92

-1 -2
0 0

0 0

-6.56 MWChilcayoc TP1 Chilcayoc TP2


-2.69 Mvar
89.07 %
-0.93

CHILCAYOC35
34.6399 kV
0.9897 p.u.
-51.3106 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.38 Mvar
1.38 Mvar

-3.53 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.53 MW
58.94 %

20.95 %
-0.93
0.93
REG33

-3 -2.76 MW
Breaker/S..

-0.98 Mvar
20.39 %
-3.5.. -0.94
-1.3..
-3.53 MW
-1.26 ..
20.9..
-0.93
SANJERO33
58.94 % Inactive
32.2357 kV
BOLIVAR33 -0.94
0.9768 p.u.
-54.7852 deg Out of Calculation
32.9147 kV 2.76 MW
0.9974 p.u. 0.98 Mvar De-energized
SUBESTACION Y BC

tr2 San Jeronimo


-56.0850 deg 66.55 %
SE BOLIVARII 3.5MVA Ampl.

1.96 MW 1.58 MW 0.94


0.43 Mvar 0.83 Mvar
BC PROYECTO

57.34 % 39.72 %
BC SanGe-Filtro Voltages / Loading
0.98 0.88 -3
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 PROYECTO Lower Voltage Range


-1 -2 0 -2.74 MW
-0.85 Mvar 0.95 p.u.
66.55 % Upper Voltage Range
-0.96
1.05 p.u.
-1.95 MW -1.57 MW SANJERO4.16 Loading Range
-0.34 Mvar -0.78 Mvar
57.34 % 39.72 % 4.1444 kV
0.9963 p.u. 100. %
-0.99 -0.90
152.8349 deg
2.74 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.89 Mvar -0.45 Mvar -0.60 Mvar
4.2078 kV 4.3054 kV 0.82 0.00 -0.00
1.0115 p.u. 0.00 MW 1 2
1.0349 p.u. 0.00 Mvar
-58.6170 deg 152.4812 deg
0.00 MW 1.95 MW 1.57 MW
-0.92 Mvar 1.26 Mvar 0.78 Mvar 1.00
Load_San Jeronimo
0.00 0.84 0.90 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MED_SP Date: 5/9/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.76 MW ABANCAY220/ABAN..
-2.35 Mvar
5.26 % 220.1461 kV
0.21 MW 0.31 1.0007 p.u. ABANCAY220/ABAN..
-0.35 Mvar -41.3470 deg
1.06 % 220.1461 kV

L-6005/2
0.50 1.0007 p.u.
-41.3470 deg
23.39 MW 49.58 MW -72.98 MW
CHUQUI60 -3.85 Mvar -27.61 Mvar 1.42 Mvar
19.94 % 22.65 % 29.36 %
66.2836 kV 0.99 0.87 -1.00
1.0043 p.u. -0.74 MW 0.56 MW 49.58 MW
-44.9741 deg 1.40 Mvar -2.92 Mvar -27.61 Mvar 12
-0.21 MW
0.35 Mvar
5.26 % 6.35 % 0.00 %
0.87
0 L-2050
-0.47 0.19
5.82 %
-0.50 0
CHACA60 ABANCAY 60
10 66.9953 kV 66.0330 kV
AbancayNuevo
1.0151 p.u. 1.0005 p.u. -23.33 MW
0 -45.9303 deg -44.9254 deg 4.74 Mvar
0.74 MW 0.00 MW 10.00 MW -10.57 MW 19.94 %
0
-0.68 Mvar
14.48 %
-0.72 Mvar
1.24 %
4.04 Mvar
48.52 %
-1.11 Mvar
26.00 % -0.98 L-2060
0.74 0.00 0.93 -0.99
tr3 Chuquibambilla
0.21 MW ABANCAY NUEVA 138
-0.35 Mvar
137.3086 kV
L-6003

L-6008
5.82 % 12 0
0.9950 p.u.
0.50 0 0 -42.7742 deg 8.31 MW
-1 15.02 MW -6.44 Mvar
CHUQUI22.9 0 -9.57 MW 1.71 Mvar 29.46 %
-4.10 Mvar 84.89 % 0.79
22.9194 kV 0.99
1.0008 p.u. 48.52 %
-0.74 MW tr3 Chacapuente -0.00 MW -0.92

L-1007 A
-44.8595 deg 0.69 Mvar 0.00 Mvar
-0.21 MW
0.35 Mvar
14.48 % 1.24 %
ANDY60 -4.38 MW 15.00 MW -15.00 MW
L-1039 B L-1039 A
-0.73 -1.00
-0.88 Mvar 2.41 Mvar -2.41 Mvar
-0.50 CHACA22.9 61.9341 kV
1.0322 p.u.
26.00 %
-0.98
26.00 %
0.99
85.35 %
-0.99
22.9785 kV -47.6590 deg 7.50 MW 2.07 MW
1.0034 p.u. 2.92 Mvar 1.18 Mvar ABANCAY13.2
Load_Chuquibambilla -46.3307 deg
0.74 MW
38.64 % 34.79 %
0.93 0.87 13.2178 kV 137.0504 kV
-0.69 Mvar 1.0013 p.u. 1.0004 p.u. ABANCAY138
-43.0451 deg

L-1007 B
-13.7510 deg 4.38 MW
0.73 -1
0.88 Mvar
0
L-6009 0.98
0
Load_Chacapuente
0.99 MW tr3 Andahuaylas -3.05 MW -8.25 MW
-0.43 Mvar -0.64 Mvar 1.01 Mvar
34.79 % 34.79 % 29.13 %
0.92 -0.98 -0.99

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9020 kV 13.1495 kV 137.78..
-7.26 MW 1.0001 p.u. 0.9962 p.u. 1.0207..
-3.13 Mvar -48.9201 deg -0.99 MW 160.1033 deg 3.05 MW -44.03..
38.64 %
-0.92 0.43 Mvar 0.64 Mvar

-0.92 0.98
CATAHUANCA60
59.0692 kV
0.9845 p.u.
-49.7024 deg
7.26 MW Load_Andy22.9 Load_Andy13.2
3.13 Mvar
97.35 %
0.92

-1 -2
0 0

0 0

-7.19 MWChilcayoc TP1 Chilcayoc TP2


-2.88 Mvar
97.35 %
-0.93

CHILCAYOC35
34.6137 kV
0.9890 p.u.
-51.1543 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.29 Mvar
1.29 Mvar

-3.54 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.54 MW
58.80 %

20.90 %
-0.94
0.94
REG33

-3 -3.32 MW
Breaker/S..

-1.16 Mvar
24.71 %
-3.5.. -0.94
-1.2..
-3.53 MW
-1.17 ..
20.9..
-0.94
SANJERO33
58.80 % Inactive
31.9557 kV
BOLIVAR33 -0.95
0.9684 p.u.
-55.0542 deg Out of Calculation
32.7486 kV 3.32 MW
0.9924 p.u. 1.16 Mvar De-energized
SUBESTACION Y BC

tr2 San Jeronimo


-56.2840 deg 80.65 %
SE BOLIVARII 3.5MVA Ampl.

1.94 MW 1.59 MW 0.94


0.49 Mvar 0.68 Mvar
BC PROYECTO

57.53 % 38.87 %
BC SanGe-Filtro Voltages / Loading
0.97 0.92 -4
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 PROYECTO Lower Voltage Range


-1 -2 0 -3.30 MW
-0.97 Mvar 0.95 p.u.
80.65 % Upper Voltage Range
-0.96
1.05 p.u.
-1.93 MW -1.59 MW SANJERO4.16 Loading Range
-0.39 Mvar -0.64 Mvar
57.53 % 38.87 % 4.1498 kV
0.9976 p.u. 100. %
-0.98 -0.93
152.0940 deg
3.30 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.72 Mvar -0.45 Mvar -0.30 Mvar
4.1804 kV 4.2935 kV 0.89 -0.00 0.00
1.0049 p.u. 0.00 MW 1 1
1.0321 p.u. 0.00 Mvar
-58.8180 deg 152.2467 deg
0.00 MW 1.93 MW 1.59 MW
-0.91 Mvar 1.30 Mvar 0.64 Mvar 1.00
Load_San Jeronimo
0.00 0.83 0.93 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MAX_SP Date: 5/9/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.63 MW ABANCAY220/ABAN..
-2.36 Mvar
5.17 % 224.7929 kV
-0.67 MW 0.26 1.0218 p.u. ABANCAY220/ABAN..
-0.14 Mvar -40.9038 deg
2.01 % 224.7929 kV

L-6005/2
-0.98 1.0218 p.u.
-40.9038 deg
25.70 MW -18.14 MW -7.56 MW
CHUQUI60 -9.90 Mvar -16.31 Mvar -5.11 Mvar
23.18 % 9.54 % 3.57 %
66.5311 kV 0.93 -0.74 -0.83
1.0080 p.u. -0.61 MW 1.31 MW 18.14 MW
-45.9176 deg 1.40 Mvar -3.15 Mvar 16.31 Mvar 14
0.67 MW 5.17 % 7.23 % 0.00 % 0 L-2050
0.14 Mvar 0.74
7.59 % -0.40 0.38
0.98 0
CHACA60 ABANCAY 60
10 67.4265 kV 66.4339 kV AbancayNuevo
1.0216 p.u. 1.0066 p.u. -25.63 MW
0 -46.4044 deg -45.4243 deg 11.00 Mvar
0.61 MW 0.00 MW 13.24 MW -14.55 MW
23.18 %
0
-0.67 Mvar
12.93 %
-0.73 Mvar
1.24 %
4.43 Mvar
61.77 %
-1.28 Mvar
35.53 %
-0.92 L-2060
0.67 0.00 0.95 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.67 MW
-0.14 Mvar
7.59 % 12 L-6003 0 138.3654 kV

L-6008
1.0026 p.u.
-0.98 0 0 -42.4640 deg 8.97 MW
-1 16.66 MW -12.59 Mvar
CHUQUI22.9 0 -12.53 MW 1.59 Mvar 43.00 %
-4.02 Mvar 93.22 % 0.58
23.0744 kV 1.00
1.0076 p.u. 61.77 %
-0.61 MW tr3 Chacapuente -0.00 MW -0.95
-46.0342 deg

L-1007 A
0.68 Mvar 0.00 Mvar
0.67 MW
0.14 Mvar 12.93 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.67 -1.00 -2.03 MW 16.64 MW -16.64 MW
-0.32 Mvar 2.29 Mvar -2.29 Mvar
0.98 CHACA22.9 61.5062 kV 35.53 % 35.53 % 93.62 %
1.0251 p.u. -0.99 0.99 -0.99
23.1219 kV -49.2783 deg 10.80 MW 1.74 MW
1.0097 p.u. 3.76 Mvar 0.26 Mvar ABANCAY 13.2
Load_Chuquibambilla -46.7283 deg 54.61 % 19.72 %
0.61 MW 0.94 0.99 13.3566 kV 138.0964 kV
-0.68 Mvar 1.0119 p.u. 1.0080 p.u. ABANCAY 138
-12.8300 deg -42.7614 deg
2.03 MW

L-1007 B
0.67 -1 0.32 Mvar
0
L-6009 0.99
0
Load_Chacapuente
-0.01 MW tr3 Andahuaylas -1.73 MW -8.86 MW
0.20 Mvar -0.41 Mvar 7.20 Mvar
19.72 % 19.72 % 42.55 %
-0.04 -0.97 -0.78

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9561 kV 13.2016 kV 140.7811 kV
-10.31 MW 1.0024 p.u. 1.0001 p.u. 1.0202 p.u.
-3.54 Mvar -50.3249 deg 0.01 MW 159.1158 deg 1.73 MW -43.9986 deg
54.61 % -0.20 Mvar 0.41 Mvar
-0.95
0.04 0.97
CATAHUANCA60
57.6098 kV
0.9602 p.u.
-52.4461 deg
10.31 MW Load_Andy22.9 Load_Andy13.2
3.54 Mvar
137.59 %
0.95

-2 -2
0 0

0 0

Chilcayoc TP1
-10.16 MW Chilcayoc TP2
-3.04 Mvar
137.59 %
-0.96

CHILCAYOC35
34.4362 kV
0.9839 p.u.
-54.7301 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.74 Mvar
0.74 Mvar

-5.07 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


5.07 MW
%

29.05 %
-0.99
Breaker/S.. 81.75
0.99
REG33

-8 -4.47 MW
-1.29 Mvar
33.55 %
-5.0.. -0.96
-0.7..
-5.07 MW
-0.53 Mvar
29.0..
-0.99
SANJERO33
81.75 %
BOLIVAR33 -0.99 31.1289 kV Inactive
0.9433 p.u.
-60.7464 deg 4.47 MW
Out of Calculation
33.3110 kV
1.0094 p.u. 1.29 Mvar De-energized
SUBESTACION Y BC

109.52 %

tr2 San Jeronimo


-62.4107 deg
1.92 MW 2.04 MW 1.11 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.13 Mvar 0.17 Mvar 0.23 Mvar
BC PROYECTO

54.37 % 45.11 % 32.06 %


BC SanGe-Filtro Voltages / Loading
-6
1.00 1.00 0.98
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -4.43 MW 0.00 MW
-0.97 Mvar -0.30 Mvar 0.95 p.u.
109.52 % Upper Voltage Range
-0.98 0.00
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.05 Mvar -0.10 Mvar
54.37 % 45.11 % -1.11 MW 4.1401 kV
-1.00 -1.00 -0.20 Mvar 0.9952 p.u. 100. %
32.06 % 145.3840 deg
4.43 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.98 2.30 Mvar -0.45 Mvar -0.59 Mvar
4.2875 kV 4.2905 kV 0.89 0.00 0.00
1.0307 p.u. 1.11 MW 1 2
1.0314 p.u. 0.40 Mvar
-64.8378 deg 145.6577 deg
0.00 MW 1.91 MW 2.04 MW 0.00 MW
-1.27 Mvar 1.33 Mvar 0.78 Mvar -0.68 Mvar 0.94
Load_San Jeronimo
0.00 0.82 0.93 0.00 BC SanGe-P1 BC SanGe-P2_3
4 2 6

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MIN_SP Date: 5/11/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.57 MW ABANCAY220/ABAN..
-2.34 Mvar
5.09 % 222.0283 kV
-0.72 MW 0.24 1.0092 p.u. ABANCAY220/ABAN..
-0.17 Mvar -47.5964 deg
2.03 % 222.0283 kV

L-6005/2
-0.97 1.0092 p.u.
-47.5964 deg
32.31 MW -30.49 MW -1.82 MW
CHUQUI60 -2.01 Mvar -18.23 Mvar -10.32 Mvar
26.73 % 14.06 % 4.15 %
66.6623 kV 1.00 -0.86 -0.17
1.0100 p.u. -0.55 MW 1.30 MW 30.49 MW
-53.1248 deg 1.37 Mvar -3.10 Mvar 18.23 Mvar 11
0.72 MW 5.09 % 7.11 % 0.00 % 0 L-2050
0.17 Mvar 0.86
8.10 % -0.37 0.39
0.97 0
CHACA60 ABANCAY 60
10 67.5860 kV 66.5930 kV AbancayNuevo
1.0240 p.u. 1.0090 p.u. -32.24 MW
0 -53.5670 deg -52.6266 deg 3.38 Mvar
0.55 MW 0.00 MW 14.43 MW -15.73 MW
26.73 %
0
-0.64 Mvar
12.16 %
-0.73 Mvar
1.25 %
6.07 Mvar
69.21 %
-2.97 Mvar
38.84 %
-0.99 L-2060
0.65 0.00 0.92 -0.98 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.72 MW
-0.17 Mvar
8.10 % 13 L-6003 0 139.5959 kV

L-6008
1.0116 p.u.
-0.97 0 0 -49.4966 deg 12.66 MW
-1 19.58 MW -7.80 Mvar
CHUQUI22.9 0 -13.54 MW 4.43 Mvar 41.01 %
-5.35 Mvar 110.93 % 0.85
23.1177 kV 0.98
1.0095 p.u. 69.21 %
-0.55 MW tr3 Chacapuente -0.00 MW -0.93
-53.2481 deg

L-1007 A
0.65 Mvar 0.00 Mvar
0.72 MW
0.17 Mvar 12.16 % 1.25 %
ANDY60 L-1039 B L-1039 A
-0.65 -1.00 -3.75 MW 19.54 MW -19.54 MW
-1.29 Mvar 5.10 Mvar -5.10 Mvar
0.97 CHACA22.9 60.7485 kV 38.84 % 38.84 % 111.73 %
1.0125 p.u. -0.95 0.97 -0.97
22.9640 kV -56.6012 deg 9.37 MW 4.17 MW
1.0028 p.u. 3.22 Mvar 2.14 Mvar ABANCAY 13.2
Load_Chuquibambilla -53.8591 deg 48.04 % 38.50 %
0.55 MW 0.95 0.89 13.4156 kV 139.1730 kV
-0.65 Mvar 1.0163 p.u. 1.0159 p.u. ABANCAY 138
-20.2323 deg -49.8291 deg
3.75 MW

L-1007 B
0.65 -3 1.29 Mvar
0
L-6009 0.95
0
Load_Chacapuente
-0.99 MW tr3 Andahuaylas -3.18 MW -12.54 MW
-0.56 Mvar -1.27 Mvar 2.41 Mvar
38.50 % 38.50 % 40.71 %
-0.87 -0.93 -0.98

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8397 kV 13.0643 kV 140.1349 kV
-9.00 MW 0.9974 p.u. 0.9897 p.u. 1.0155 p.u.
-3.17 Mvar -59.2132 deg 0.99 MW 149.7205 deg 3.18 MW -51.3365 deg
48.04 % 0.56 Mvar 1.27 Mvar
-0.94
0.87 0.93
CATAHUANCA60
57.3197 kV
0.9553 p.u.
-59.4026 deg
9.00 MW Load_Andy22.9 Load_Andy13.2
3.17 Mvar
121.04 %
0.94

-2 -2
0 0

0 0

-8.89 MWChilcayoc TP1 Chilcayoc TP2


-2.79 Mvar
121.04 %
-0.95

CHILCAYOC35
34.3578 kV
0.9817 p.u.
-61.4045 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.98 Mvar
0.98 Mvar

-4.57 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.57 MW
%

26.34 %
-0.98
Breaker/S.. 74.12
0.98
REG33

-7 -3.83 MW
-1.08 Mvar
28.48 %
-4.5.. -0.96
-0.9..
-4.57 MW
-0.80 Mvar
26.3..
-0.98
SANJERO33
74.12 %
BOLIVAR33 -0.99 31.4183 kV Inactive
0.9521 p.u.
-66.5929 deg 3.83 MW
Out of Calculation
33.2102 kV
1.0064 p.u. 1.08 Mvar De-energized
SUBESTACION Y BC

92.97 %

tr2 San Jeronimo


-68.1291 deg
1.92 MW 1.55 MW 1.09 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.38 Mvar 0.13 Mvar 0.29 Mvar
BC PROYECTO

55.62 % 34.37 % 32.11 %


BC SanGe-Filtro Voltages / Loading
-6
0.98 1.00 0.97
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -3.81 MW -0.00 MW
-0.84 Mvar -0.31 Mvar 0.95 p.u.
92.97 % Upper Voltage Range
-0.98 -0.00
1.05 p.u.
-1.92 MW -1.55 MW SANJERO4.16 Loading Range
-0.29 Mvar -0.09 Mvar
55.62 % 34.37 % -1.09 MW 4.1955 kV
-0.99 -1.00 -0.27 Mvar 1.0085 p.u. 100. %
32.11 % 140.1565 deg
3.81 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.97 2.22 Mvar -0.46 Mvar -0.61 Mvar
4.2509 kV 4.2807 kV 0.86 0.00 -0.00
1.0219 p.u. 1.09 MW 1 2
1.0290 p.u. 0.43 Mvar
-70.5738 deg 140.3963 deg
0.00 MW 1.92 MW 1.55 MW -0.00 MW
-0.94 Mvar 1.23 Mvar 0.77 Mvar -0.68 Mvar 0.93
Load_San Jeronimo
0.00 0.84 0.90 -0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 5

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MED_SP Date: 5/11/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.78 MW ABANCAY220/ABAN..
-2.27 Mvar
5.13 % 222.5556 kV
-0.92 MW 0.33 1.0116 p.u. ABANCAY220/ABAN..
-0.21 Mvar -47.6597 deg
2.32 % 222.5556 kV

L-6005/2
-0.97 1.0116 p.u.
-47.6597 deg
32.24 MW -28.77 MW -3.47 MW
CHUQUI60 -4.61 Mvar -17.48 Mvar -8.61 Mvar
26.83 % 13.29 % 3.67 %
65.7289 kV 0.99 -0.85 -0.37
0.9959 p.u. -0.76 MW 1.71 MW 28.77 MW
-53.3149 deg 1.33 Mvar -2.96 Mvar 17.48 Mvar 11
0.92 MW 5.13 % 7.31 % 0.00 % 0 L-2050
0.21 Mvar 0.85
13.37 % -0.50 0.50
0.97 0
CHACA60 ABANCAY 60
9 66.6424 kV 65.7619 kV AbancayNuevo
1.0097 p.u. 0.9964 p.u. -32.16 MW
0 -53.7824 deg -52.7152 deg 5.99 Mvar
0.76 MW 0.00 MW 13.67 MW -15.37 MW
26.83 %
0
-0.62 Mvar
13.97 %
-0.71 Mvar
1.23 %
3.81 Mvar
63.20 %
-0.85 Mvar
37.83 %
-0.98 L-2060
0.78 0.00 0.96 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.92 MW
-0.21 Mvar
13.37 % 11 L-6003 0 140.2966 kV

L-6008
1.0166 p.u.
-0.98 0 0 -49.5444 deg 13.16 MW
1 19.00 MW -7.57 Mvar
CHUQUI22.9 0 -12.92 MW 1.59 Mvar 41.67 %
-3.33 Mvar 104.71 % 0.87
22.9673 kV 1.00
1.0029 p.u. 63.20 %
-0.76 MW tr3 Chacapuente -0.00 MW -0.97
-53.8351 deg

L-1007 A
0.63 Mvar -0.00 Mvar
0.92 MW
0.21 Mvar 13.97 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.77 -1.00 -3.53 MW 18.97 MW -18.97 MW
-0.64 Mvar 2.29 Mvar -2.29 Mvar
0.98 CHACA22.9 60.9577 kV 37.83 % 37.83 % 105.07 %
1.0160 p.u. -0.98 0.99 -0.99
23.0504 kV -56.9461 deg 9.99 MW 2.93 MW
1.0066 p.u. 3.29 Mvar 0.04 Mvar ABANCAY 13.2
Load_Chuquibambilla -54.1973 deg 50.74 % 29.77 %
0.76 MW 0.95 1.00 13.1828 kV 140.0061 kV
-0.63 Mvar 0.9987 p.u. 1.0219 p.u. ABANCAY 138
-20.2669 deg -49.8756 deg
3.53 MW

L-1007 B
0.77 -1 0.64 Mvar
0
L-6009 0.98
0
Load_Chacapuente
-0.32 MW tr3 Andahuaylas -2.61 MW -13.04 MW
0.62 Mvar -0.52 Mvar 2.14 Mvar
29.77 % 29.77 % 41.39 %
-0.46 -0.98 -0.99

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8083 kV 13.1090 kV 140.7101 kV
-9.57 MW 0.9960 p.u. 0.9931 p.u. 1.0196 p.u.
-3.18 Mvar -58.7349 deg 0.32 MW 150.4026 deg 2.61 MW -51.4240 deg
50.74 % -0.62 Mvar 0.52 Mvar
-0.95
0.46 0.98
CATAHUANCA60
57.3808 kV
0.9563 p.u.
-59.9550 deg
9.57 MW Load_Andy22.9 Load_Andy13.2
3.18 Mvar
127.83 %
0.95

-2 -2
0 0

0 0

-9.45 MWChilcayoc TP1 Chilcayoc TP2


-2.75 Mvar
127.83 %
-0.96

CHILCAYOC35
34.3739 kV
0.9821 p.u.
-62.0961 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.97 Mvar
0.97 Mvar

-4.49 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.49 MW
%

25.92 %
-0.98
Breaker/S.. 72.95
0.98
REG33

-6 -4.41 MW
-0.93 Mvar
32.34 %
-4.4.. -0.98
-0.9..
-4.49 MW
-0.79 Mvar
25.9..
-0.98
SANJERO33
72.95 %
BOLIVAR33 -0.98 31.3178 kV Inactive
0.9490 p.u.
-67.8103 deg 4.41 MW
Out of Calculation
32.9473 kV
0.9984 p.u. 0.93 Mvar De-energized
SUBESTACION Y BC

105.56 %

tr2 San Jeronimo


-69.1764 deg
1.96 MW 1.65 MW 0.88 MW
SE BOLIVARII 3.5MVA Ampl.

0.98
0.49 Mvar 0.04 Mvar 0.27 Mvar
BC PROYECTO

57.75 % 36.75 % 26.94 %


BC SanGe-Filtro Voltages / Loading
-6
0.97 1.00 0.96
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 1 -4.38 MW -0.00 MW
-0.63 Mvar -0.30 Mvar 0.95 p.u.
105.56 % Upper Voltage Range
-0.99 -0.00
1.05 p.u.
-1.95 MW -1.65 MW SANJERO4.16 Loading Range
-0.39 Mvar 0.01 Mvar
57.75 % 36.75 % -0.88 MW 4.1897 kV
-0.98 -1.00 -0.25 Mvar 1.0071 p.u. 100. %
26.94 % 138.4053 deg
4.38 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.96 2.00 Mvar -0.46 Mvar -0.61 Mvar
4.2062 kV 4.2534 kV 0.91 0.00 -0.00
1.0111 p.u. 0.88 MW 1 2
1.0224 p.u. 0.35 Mvar
-71.7062 deg 139.2270 deg
0.00 MW 1.95 MW 1.65 MW 0.00 MW
-0.92 Mvar 1.32 Mvar 0.66 Mvar -0.67 Mvar 0.93
Load_San Jeronimo
0.00 0.83 0.93 0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 3

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MAX_SP Date: 5/11/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
CON PROYECTO
DIgSILENT
L-6005/3 L-6005/1

0.63 MW ABANCAY220/ABAN..
-2.37 Mvar
5.18 % 224.8438 kV
-0.67 MW 0.26 1.0220 p.u. ABANCAY220/ABAN..
-0.14 Mvar -40.8833 deg
2.01 % 224.8438 kV

L-6005/2
-0.98 1.0220 p.u.
-40.8833 deg
25.58 MW -18.05 MW -7.52 MW
CHUQUI60 -10.21 Mvar -16.19 Mvar -4.93 Mvar
23.18 % 9.48 % 3.52 %
66.6703 kV 0.93 -0.74 -0.84
1.0102 p.u. -0.61 MW 1.31 MW 18.05 MW
-45.8412 deg 1.40 Mvar -3.16 Mvar 16.19 Mvar 14
0.67 MW 5.18 % 7.24 % 0.00 % 0 L-2050
0.14 Mvar 0.74
7.58 % -0.40 0.38
0.98 0
CHACA60 ABANCAY 60
10 67.5658 kV 66.5718 kV AbancayNuevo
1.0237 p.u. 1.0087 p.u. -25.51 MW
0 -46.3269 deg -45.3492 deg 11.31 Mvar
0.61 MW 0.00 MW 13.03 MW -14.34 MW
23.18 %
0
-0.67 Mvar
13.01 %
-0.73 Mvar
1.25 %
4.04 Mvar
60.21 %
-0.88 Mvar
34.88 %
-0.91 L-2060
0.67 0.00 0.96 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.67 MW
-0.14 Mvar
7.58 % 13 L-6003 0 138.4412 kV

L-6008
1.0032 p.u.
-0.98 0 0 -42.4351 deg 9.06 MW
-1 16.45 MW -12.47 Mvar
CHUQUI22.9 0 -12.36 MW 1.17 Mvar 42.86 %
-3.70 Mvar 91.79 % 0.59
23.1227 kV 1.00
1.0097 p.u. 60.21 %
-0.61 MW tr3 Chacapuente -0.00 MW -0.96
-45.9572 deg

L-1007 A
0.68 Mvar 0.00 Mvar
0.67 MW
0.14 Mvar 13.01 % 1.25 %
ANDY60 L-1039 B L-1039 A
-0.67 -1.00 -2.03 MW 16.43 MW -16.43 MW
-0.32 Mvar 1.87 Mvar -1.87 Mvar
0.98 CHACA22.9 61.8553 kV 34.88 % 34.88 % 92.11 %
1.0309 p.u. -0.99 0.99 -0.99
22.9637 kV -49.1808 deg 10.62 MW 1.74 MW
1.0028 p.u. 3.44 Mvar 0.26 Mvar ABANCAY 13.2
Load_Chuquibambilla -46.6488 deg 53.02 % 19.87 %
0.61 MW 0.95 0.99 13.3636 kV 138.1934 kV
-0.68 Mvar 1.0124 p.u. 1.0087 p.u. ABANCAY 138
-12.8054 deg -42.7303 deg
2.03 MW

L-1007 B
0.67 0 0.32 Mvar
0
L-6009 0.99
0
Load_Chacapuente
-0.01 MW tr3 Andahuaylas -1.73 MW -8.94 MW
0.20 Mvar -0.41 Mvar 7.08 Mvar
19.87 % 19.87 % 42.41 %
-0.04 -0.97 -0.78

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.7869 kV 13.1039 kV 140.81..
-10.16 MW 0.9951 p.u. 0.9927 p.u. 1.0204..
-3.28 Mvar -50.2156 deg 0.01 MW 159.2168 deg 1.73 MW -43.97..
53.02 % -0.20 Mvar 0.41 Mvar
-0.95
0.04 0.97
CATAHUANCA60
58.1383 kV
0.9690 p.u.
-52.3078 deg
5.38 MW 4.78 MW Load_Andy22.9 Load_Andy13.2
0.94 Mvar 2.34 Mvar
68.37 % 66.55 %
0.99 0.90

-2 -2
0 0

0 0

-5.35 MWChilcayoc TP1 -4.78 MWChilcayoc TP2


-0.82 Mvar -2.21 Mvar
68.37 % 66.55 %
-0.99 -0.91

CHILCAYOC35
35.3406 kV
1.0097 p.u.
-53.5223 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.83 Mvar
0.83 Mvar

-5.07 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


5.07 MW
%

28.27 %
-0.99
Breaker/S.. 79.54
0.99
REG33

-2 -4.46 MW
-1.28 Mvar
32.47 %
-0.96
-5.07 MW
-0.61 ..
SANJERO33
79.54 %
BOLIVAR33 -0.99 32.1253 kV Inactive
0.9735 p.u.
-59.1923 deg 4.46 MW
Out of Calculation
32.9969 kV
0.9999 p.u. 1.28 Mvar De-energized
SUBESTACION Y BC

105.99 %

tr2 San Jeronimo


-60.9387 deg
1.92 MW 2.04 MW 1.11 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.16 Mvar 0.18 Mvar 0.26 Mvar
BC PROYECTO

54.95 % 45.57 % 32.59 %


BC SanGe-Filtro Voltages / Loading
-4
1.00 1.00 0.97
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -4.43 MW 0.00 MW
-0.95 Mvar -0.30 Mvar 0.95 p.u.
105.99 % Upper Voltage Range
-0.98 0.00
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.08 Mvar -0.11 Mvar
54.95 % 45.57 % -1.11 MW 4.1622 kV
-1.00 -1.00 -0.24 Mvar 1.0005 p.u. 100. %
32.59 % 146.9760 deg
4.43 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.98 2.30 Mvar -0.45 Mvar -0.60 Mvar
4.2442 kV 4.2488 kV 0.89 -0.00 0.00
1.0202 p.u. 1.11 MW 1 2
1.0213 p.u. 0.40 Mvar
-63.4120 deg 147.0928 deg
0.00 MW 1.91 MW 2.04 MW -0.00 MW
-1.25 Mvar 1.33 Mvar 0.78 Mvar -0.67 .. 0.94
Load_San Jeronimo
0.00 0.82 0.93 -0.00 BC SanGe-P1 BC SanGe-P2_3
4 2 5

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MIN_CP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.57 MW ABANCAY220/ABAN..
-2.35 Mvar
5.09 % 222.0664 kV
-0.72 MW 0.24 1.0094 p.u. ABANCAY220/ABAN..
-0.17 Mvar -47.5809 deg
2.03 % 222.0664 kV

L-6005/2
-0.97 1.0094 p.u.
-47.5809 deg
32.22 MW -30.43 MW -1.80 MW
CHUQUI60 -2.23 Mvar -18.14 Mvar -10.19 Mvar
26.67 % 14.02 % 4.09 %
66.7630 kV 1.00 -0.86 -0.17
1.0116 p.u. -0.55 MW 1.30 MW 30.43 MW
-53.0685 deg 1.38 Mvar -3.11 Mvar 18.14 Mvar 11
0.72 MW 5.09 % 7.11 % 0.00 % 0 L-2050
0.17 Mvar 0.86
8.16 % -0.37 0.38
0.97 0
CHACA60 ABANCAY 60
11 67.6868 kV 66.6928 kV AbancayNuevo
1.0256 p.u. 1.0105 p.u. -32.15 MW
0 -53.5101 deg -52.5713 deg 3.60 Mvar
0.55 MW 0.00 MW 14.28 MW -15.58 MW
26.67 %
0
-0.64 Mvar
12.14 %
-0.73 Mvar
1.25 %
5.79 Mvar
68.02 %
-2.68 Mvar
38.30 %
-0.99 L-2060
0.65 0.00 0.93 -0.99 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.72 MW
-0.17 Mvar
8.16 % 13 L-6003 0 139.6518 kV

L-6008
1.0120 p.u.
-0.97 0 0 -49.4750 deg 12.72 MW
-1 19.42 MW -7.72 Mvar
CHUQUI22.9 0 -13.42 MW 4.12 Mvar 41.02 %
-5.13 Mvar 109.69 % 0.86
22.9441 kV 0.98
1.0019 p.u. 68.02 %
-0.55 MW tr3 Chacapuente -0.00 MW -0.93
-53.1915 deg

L-1007 A
0.65 Mvar -0.00 Mvar
0.72 MW
0.17 Mvar 12.14 % 1.25 %
ANDY60 L-1039 B L-1039 A
-0.65 -1.00 -3.75 MW 19.39 MW -19.39 MW
-1.29 Mvar 4.80 Mvar -4.80 Mvar
0.97 CHACA22.9 61.0002 kV 38.30 % 38.30 % 110.45 %
1.0167 p.u. -0.95 0.97 -0.97
22.9979 kV -56.5274 deg 9.25 MW 4.17 MW
1.0043 p.u. 3.00 Mvar 2.13 Mvar ABANCAY 13.2
Load_Chuquibambilla -53.8013 deg 46.95 % 38.33 %
0.55 MW 0.95 0.89 13.4208 kV 139.2443 kV
-0.65 Mvar 1.0167 p.u. 1.0164 p.u. ABANCAY 138
-20.2134 deg -49.8059 deg
3.75 MW

L-1007 B
0.65 -3 1.29 Mvar
0
L-6009 0.95
0
Load_Chacapuente
-0.99 MW tr3 Andahuaylas -3.18 MW -12.61 MW
-0.56 Mvar -1.27 Mvar 2.32 Mvar
38.33 % 38.33 % 40.73 %
-0.87 -0.93 -0.98

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9390 kV 13.1220 kV 140.15..
-8.89 MW 1.0017 p.u. 0.9941 p.u. 1.0156..
-2.99 Mvar -59.1173 deg 0.99 MW 149.8256 deg 3.18 MW -51.31..
46.95 % 0.56 Mvar 1.27 Mvar
-0.95
0.87 0.93
CATAHUANCA60
57.6940 kV
0.9616 p.u.
-59.3013 deg
4.72 MW 4.17 MW Load_Andy22.9 Load_Andy13.2
0.88 Mvar 2.11 Mvar
60.54 % 58.92 %
0.98 0.89

-2 -2
0 0

0 0

-4.69 MWChilcayoc TP1 -4.17 MWChilcayoc TP2


-0.79 Mvar -2.01 Mvar
60.54 % 58.92 %
-0.99 -0.90

CHILCAYOC35
35.0994 kV
1.0028 p.u.
-60.3772 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.99 Mvar
0.99 Mvar

-4.57 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.57 MW
%

25.72 %
-0.98
Breaker/S.. 72.37
0.98
REG33

-3 -3.83 MW
-1.13 Mvar
27.89 %
-4.5.. -0.96
-0.9..
-4.57 MW
-0.81 ..
25.7..
-0.98
SANJERO33
72.37 %
BOLIVAR33 -0.98 32.2113 kV Inactive
0.9761 p.u.
-65.3056 deg 3.83 MW
Out of Calculation
33.1538 kV
1.0047 p.u. 1.13 Mvar De-energized
SUBESTACION Y BC

91.04 %

tr2 San Jeronimo


-66.8894 deg
1.92 MW 1.55 MW 1.09 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.38 Mvar 0.13 Mvar 0.29 Mvar
BC PROYECTO

55.74 % 34.44 % 32.17 %


BC SanGe-Filtro Voltages / Loading
-3
0.98 1.00 0.97
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -3.81 MW -0.00 MW
-0.89 Mvar -0.30 Mvar 0.95 p.u.
91.04 % Upper Voltage Range
-0.97 -0.00
1.05 p.u.
-1.92 MW -1.55 MW SANJERO4.16 Loading Range
-0.30 Mvar -0.09 Mvar
55.74 % 34.44 % -1.09 MW 4.1280 kV
-0.99 -1.00 -0.27 Mvar 0.9923 p.u. 100. %
32.17 % 141.3451 deg
3.81 MW -0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.97 2.22 Mvar -0.44 Mvar -0.59 Mvar
4.2432 kV 4.2732 kV 0.86 -0.00 -0.00
1.0200 p.u. 1.09 MW 1 2
1.0272 p.u. 0.43 Mvar
-69.3424 deg 141.6310 deg
-0.00 MW 1.92 MW 1.55 MW 0.00 MW
-0.94 Mvar 1.23 Mvar 0.77 Mvar -0.68 .. 0.93
Load_San Jeronimo
-0.00 0.84 0.90 0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 5

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MED_CP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.78 MW ABANCAY220/ABAN..
-2.28 Mvar
5.14 % 222.5985 kV
-0.92 MW 0.33 1.0118 p.u. ABANCAY220/ABAN..
-0.22 Mvar -47.6533 deg
2.33 % 222.5985 kV

L-6005/2
-0.97 1.0118 p.u.
-47.6533 deg
32.20 MW -28.74 MW -3.45 MW
CHUQUI60 -4.88 Mvar -17.38 Mvar -8.46 Mvar
26.82 % 13.26 % 3.61 %
65.8509 kV 0.99 -0.86 -0.38
0.9977 p.u. -0.76 MW 1.71 MW 28.74 MW
-53.2808 deg 1.33 Mvar -2.97 Mvar 17.38 Mvar 11
0.92 MW 5.14 % 7.33 % 0.00 % 0 L-2050
0.22 Mvar 0.86
13.40 % -0.50 0.50
0.97 0
CHACA60 ABANCAY 60
9 66.7662 kV 65.8841 kV AbancayNuevo
1.0116 p.u. 0.9982 p.u. -32.12 MW
0 -53.7483 deg -52.6811 deg 6.26 Mvar
0.76 MW 0.00 MW 13.56 MW -15.27 MW
26.82 %
0
-0.62 Mvar
14.00 %
-0.71 Mvar
1.23 %
3.46 Mvar
62.17 %
-0.49 Mvar
37.48 %
-0.98 L-2060
0.78 0.00 0.97 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.92 MW
-0.21 Mvar
13.40 % 11 L-6003 0 140.3620 kV

L-6008
1.0171 p.u.
-0.98 0 0 -49.5345 deg 13.22 MW
1 18.90 MW -7.47 Mvar
CHUQUI22.9 0 -12.84 MW 1.21 Mvar 41.63 %
-3.02 Mvar 103.95 % 0.87
23.0100 kV 1.00
1.0048 p.u. 62.17 %
-0.76 MW tr3 Chacapuente -0.00 MW -0.97
-53.8010 deg

L-1007 A
0.63 Mvar -0.00 Mvar
0.92 MW
0.21 Mvar 14.00 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.77 -1.00 -3.53 MW 18.87 MW -18.87 MW
-0.64 Mvar 1.91 Mvar -1.91 Mvar
0.98 CHACA22.9 61.2572 kV 37.48 % 37.48 % 104.24 %
1.0210 p.u. -0.98 0.99 -0.99
23.0932 kV -56.9226 deg 9.88 MW 2.96 MW
1.0084 p.u. 2.98 Mvar 0.04 Mvar ABANCAY 13.2
Load_Chuquibambilla -54.1632 deg 49.50 % 29.92 %
0.76 MW 0.96 1.00 13.1884 kV 140.0894 kV
-0.63 Mvar 0.9991 p.u. 1.0226 p.u. ABANCAY 138
-20.2605 deg -49.8653 deg
3.53 MW

L-1007 B
0.77 -1 0.64 Mvar
0
L-6009 0.98
0
Load_Chacapuente
-0.32 MW tr3 Andahuaylas -2.63 MW -13.10 MW
0.62 Mvar -0.53 Mvar 2.03 Mvar
29.92 % 29.92 % 41.35 %
-0.46 -0.98 -0.99

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9203 kV 13.1734 kV 140.73..
-9.48 MW 1.0009 p.u. 0.9980 p.u. 1.0198..
-2.91 Mvar -58.7113 deg 0.32 MW 150.4262 deg 2.63 MW -51.41..
49.50 % -0.62 Mvar 0.53 Mvar
-0.96
0.46 0.98
CATAHUANCA60
57.8399 kV
0.9640 p.u.
-59.9199 deg
5.01 MW 4.47 MW Load_Andy22.9 Load_Andy13.2
0.80 Mvar 2.11 Mvar
63.83 % 62.13 %
0.99 0.90

-2 -2
0 0

0 0

-4.98 MWChilcayoc TP1 -4.47 MWChilcayoc TP2


-0.69 Mvar -2.00 Mvar
63.83 % 62.13 %
-0.99 -0.91

CHILCAYOC35
35.1906 kV
1.0054 p.u.
-61.0663 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.97 Mvar
0.97 Mvar

-4.51 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.51 MW
%

25.31 %
-0.98
Breaker/S.. 71.21
0.98
REG33

-2 -4.43 MW
-0.93 Mvar
31.54 %
-4.5.. -0.98
-0.9..
-4.50 MW
-0.80 ..
25.3..
-0.98
SANJERO33
71.21 %
BOLIVAR33 -0.98 32.2177 kV Inactive
0.9763 p.u.
-66.5120 deg 4.43 MW
Out of Calculation
33.0001 kV
1.0000 p.u. 0.93 Mvar De-energized
SUBESTACION Y BC

102.96 %

tr2 San Jeronimo


-67.9181 deg
1.96 MW 1.66 MW 0.88 MW
SE BOLIVARII 3.5MVA Ampl.

0.98
0.49 Mvar 0.04 Mvar 0.27 Mvar
BC PROYECTO

57.85 % 36.81 % 26.98 %


BC SanGe-Filtro Voltages / Loading
-4
0.97 1.00 0.96
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 1 -4.40 MW 0.00 MW
-0.63 Mvar -0.31 Mvar 0.95 p.u.
102.96 % Upper Voltage Range
-0.99 0.00
1.05 p.u.
-1.96 MW -1.65 MW SANJERO4.16 Loading Range
-0.40 Mvar 0.01 Mvar
57.85 % 36.81 % -0.88 MW 4.1967 kV
-0.98 -1.00 -0.26 Mvar 1.0088 p.u. 100. %
26.98 % 139.7036 deg
4.40 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.96 2.00 Mvar -0.46 Mvar -0.61 Mvar
4.2130 kV 4.2602 kV 0.91 0.00 0.00
1.0127 p.u. 0.88 MW 1 2
1.0241 p.u. 0.35 Mvar
-70.4479 deg 140.4853 deg
0.00 MW 1.96 MW 1.65 MW 0.00 MW
-0.92 Mvar 1.32 Mvar 0.66 Mvar -0.67 .. 0.93
Load_San Jeronimo
0.00 0.83 0.93 0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 3

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MAX_CP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
ANÁLISIS DE CONTINGENCIAS
INDISPONIBILIDAD DE LA L.T.
CACHIMAYO – ABANCAY L-1007
DIgSILENT
L-6005/3 L-6005/1

0.45 MW ABANCAY220/ABAN..
-2.36 Mvar
5.09 % 219.2458 kV
0.23 MW 0.19 0.9966 p.u. ABANCAY220/ABAN..
-0.38 Mvar -40.8078 deg
1.04 % 219.2458 kV

L-6005/2
0.52 0.9966 p.u.
-40.8078 deg
12.36 MW 58.22 MW -70.57 MW
CHUQUI60 1.40 Mvar -29.40 Mvar -1.80 Mvar
10.40 % 26.14 % 28.36 %
66.3862 kV 0.99 0.89 -1.00
1.0059 p.u. -0.43 MW 0.22 MW 58.22 MW
-43.7235 deg 1.40 Mvar -2.90 Mvar -29.40 Mvar 11
-0.23 MW 5.09 % 6.20 % 0.00 % 0 L-2050
0.38 Mvar 0.89
4.91 % -0.29 0.08
-0.52 0
CHACA60 ABANCAY 60
10 67.2038 kV 66.1301 kV AbancayNuevo
1.0182 p.u. 1.0020 p.u. -12.30 MW
0 -44.5415 deg -43.7113 deg -0.95 Mvar
0.43 MW 0.00 MW 10.28 MW -10.50 MW
10.40 %
0
-0.67 Mvar
11.41 %
-0.72 Mvar
1.24 %
3.78 Mvar
49.05 %
-0.87 Mvar
25.73 %
-1.00 L-2060
0.54 0.00 0.94 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
0.23 MW
-0.38 Mvar
4.91 % 12 L-6003 0 137.3457 kV

L-6008
0.9953 p.u.
0.52 0 0 -41.5537 deg
-1 12.30 MW
CHUQUI22.9 0 -9.83 MW 0.95 Mvar
-3.82 Mvar 69.24 %
23.0075 kV 1.00
1.0047 p.u. 49.05 %
-0.43 MW tr3 Chacapuente -0.00 MW -0.93
-43.6833 deg

L-1007 A
0.68 Mvar 0.00 Mvar
-0.23 MW
0.38 Mvar 11.41 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.53 -1.00 -1.74 MW 12.29 MW -12.29 MW
-0.44 Mvar 1.68 Mvar -1.68 Mvar
-0.52 CHACA22.9 62.0850 kV 25.73 % 25.73 % 69.61 %
1.0347 p.u. -0.97 0.99 -0.99
23.0466 kV -46.5922 deg 7.84 MW 1.99 MW
1.0064 p.u. 2.76 Mvar 1.06 Mvar ABANCAY 13.2
Load_Chuquibambilla -44.7703 deg 39.68 % 19.19 %
0.43 MW 0.94 0.88 13.2575 kV 137.1509 kV
-0.68 Mvar 1.0044 p.u. 1.0011 p.u. ABANCAY 138
-11.8895 deg -41.7770 deg
1.74 MW

L-1007 B
0.53 -1 0.44 Mvar
0
L-6009 0.97
0
Load_Chacapuente
-0.31 MW tr3 Andahuaylas -1.69 MW
-0.60 Mvar -0.39 Mvar
19.19 % 19.19 %
-0.46 -0.97

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9895 kV 13.2194 kV 136.70..
-7.58 MW 1.0039 p.u. 1.0015 p.u. 1.0126..
-2.96 Mvar -47.7769 deg 0.31 MW 161.6728 deg 1.69 MW -43.63..
39.68 % 0.60 Mvar 0.39 Mvar
-0.93
0.46 0.97
CATAHUANCA60
59.2148 kV
0.9869 p.u.
-48.7806 deg
7.58 MW Load_Andy22.9 Load_Andy13.2
2.96 Mvar
99.96 %
0.93

-1 -2
0 0

0 0

-7.50 MWChilcayoc TP1 Chilcayoc TP2


-2.70 Mvar
99.96 %
-0.94

CHILCAYOC35
34.7144 kV
0.9918 p.u.
-50.3101 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.18 Mvar
1.18 Mvar

-3.96 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.96 MW
%

22.87 %
-0.96
Breaker/S.. 64.36
0.96
REG33

-2 -3.20 MW
-1.05 Mvar
23.55 %
-0.95
-3.96 MW
-1.04 ..
SANJERO33
64.36 %
BOLIVAR33 -0.97 32.1121 kV Inactive
0.9731 p.u.
-54.4203 deg 3.20 MW
Out of Calculation
32.6957 kV
0.9908 p.u. 1.05 Mvar De-energized
SUBESTACION Y BC

76.88 %

tr2 San Jeronimo


-55.8751 deg
1.92 MW 2.04 MW
SE BOLIVARII 3.5MVA Ampl.

0.95
0.18 Mvar 0.86 Mvar
BC PROYECTO

55.55 % 49.65 %
BC SanGe-Filtro Voltages / Loading
-4
1.00 0.92
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -3.18 MW
-0.88 Mvar 0.95 p.u.
76.88 % Upper Voltage Range
-0.96
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.10 Mvar -0.78 Mvar
55.55 % 49.65 % 4.1782 kV
-1.00 -0.93 1.0044 p.u. 100. %
152.8575 deg
3.18 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.94 Mvar -0.45 Mvar -0.61 Mvar
4.2028 kV 4.2738 kV 0.85 0.00 0.00
1.0103 p.u. 0.00 MW 1 2
1.0274 p.u. 0.00 Mvar
-58.3952 deg 152.2310 deg
0.00 MW 1.91 MW 2.04 MW
-1.22 Mvar 1.32 Mvar 0.78 Mvar 1.00
Load_San Jeronimo
0.00 0.82 0.93 BC SanGe-P1 BC SanGe-P2_3
4 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MIN_C1 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.52 MW ABANCAY220/ABAN..
-2.22 Mvar
4.84 % 218.9194 kV
-0.66 MW 0.23 0.9951 p.u. ABANCAY220/ABAN..
-0.28 Mvar -41.3362 deg
1.80 % 218.9194 kV

L-6005/2
-0.92 0.9951 p.u.
-41.3362 deg
14.99 MW 54.90 MW -69.89 MW
CHUQUI60 1.85 Mvar -29.00 Mvar -2.56 Mvar
12.65 % 24.92 % 28.10 %
66.1296 kV 0.99 0.88 -1.00
1.0020 p.u. -0.50 MW 1.18 MW 54.90 MW
-44.9984 deg 1.26 Mvar -2.86 Mvar -29.00 Mvar 11
0.66 MW 4.84 % 6.59 % 0.00 % 0 L-2050
0.28 Mvar 0.88
7.93 % -0.37 0.38
0.92 0
CHACA60 ABANCAY 60
10 67.0447 kV 66.1063 kV AbancayNuevo
1.0158 p.u. 1.0016 p.u. -14.93 MW
0 -45.4349 deg -44.5535 deg -1.33 Mvar
0.50 MW 0.00 MW 10.08 MW -11.27 MW
12.65 %
0
-0.54 Mvar
10.52 %
-0.72 Mvar
1.24 %
3.18 Mvar
47.28 %
-0.32 Mvar
27.55 %
-1.00 L-2060
0.68 0.00 0.95 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.66 MW
-0.27 Mvar
7.93 % 12 L-6003 0 137.0737 kV

L-6008
0.9933 p.u.
-0.92 0 0 -42.2438 deg
-1 14.93 MW
CHUQUI22.9 0 -9.67 MW 1.33 Mvar
-3.28 Mvar 84.29 %
22.9257 kV 1.00
1.0011 p.u. 47.28 %
-0.50 MW tr3 Chacapuente -0.00 MW -0.95
-45.1140 deg

L-1007 A
0.54 Mvar 0.00 Mvar
0.66 MW
0.27 Mvar 10.52 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.68 -1.00 -3.59 MW 14.91 MW -14.91 MW
-1.27 Mvar 2.03 Mvar -2.03 Mvar
0.92 CHACA22.9 62.3479 kV 27.55 % 27.55 % 84.67 %
1.0391 p.u. -0.94 0.99 -0.99
22.9634 kV -47.4836 deg 6.79 MW 2.89 MW
1.0028 p.u. 2.46 Mvar 0.82 Mvar ABANCAY 13.2
Load_Chuquibambilla -45.7043 deg 34.50 % 29.04 %
0.50 MW 0.94 0.96 13.1738 kV 136.8331 kV
-0.54 Mvar 0.9980 p.u. 0.9988 p.u. ABANCAY 138
-13.0250 deg -42.5157 deg
3.59 MW

L-1007 B
0.68 0 1.27 Mvar
0
L-6009 0.94
0
Load_Chacapuente
-0.44 MW tr3 Andahuaylas -2.44 MW
0.18 Mvar -0.87 Mvar
29.04 % 29.04 %
-0.93 -0.94

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8440 kV 13.1016 kV 136.38..
-6.59 MW 0.9976 p.u. 0.9925 p.u. 1.0102..
-2.77 Mvar -49.1787 deg 0.44 MW 160.0116 deg 2.44 MW -44.34..
34.50 % -0.18 Mvar 0.87 Mvar
-0.92
0.93 0.94
CATAHUANCA60
59.8256 kV
0.9971 p.u.
-49.3272 deg
6.59 MW Load_Andy22.9 Load_Andy13.2
2.77 Mvar
86.92 %
0.92

-2 -2
0 0

0 0

-6.54 MWChilcayoc TP1 Chilcayoc TP2


-2.57 Mvar
86.92 %
-0.93

CHILCAYOC35
36.0781 kV
1.0308 p.u.
-50.6368 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.36 Mvar
1.36 Mvar

-3.53 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.53 MW
%

19.95 %
-0.93
Breaker/S.. 57.19
0.93
REG33

3 -2.76 MW
-0.96 Mvar
19.38 %
-0.94
-3.53 MW
-1.24 ..
SANJERO33
57.19 %
BOLIVAR33 -0.94 33.8122 kV Inactive
1.0246 p.u.
-53.8385 deg 2.76 MW
Out of Calculation
33.2224 kV
1.0067 p.u. 0.96 Mvar De-energized
SUBESTACION Y BC

63.26 %

tr2 San Jeronimo


-55.1375 deg
1.96 MW 1.58 MW
SE BOLIVARII 3.5MVA Ampl.

0.94
0.41 Mvar 0.83 Mvar
BC PROYECTO

56.68 % 39.34 %
BC SanGe-Filtro Voltages / Loading
0
0.98 0.88
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -2.74 MW
-0.83 Mvar 0.95 p.u.
63.26 % Upper Voltage Range
-0.96
1.05 p.u.
-1.95 MW -1.57 MW SANJERO4.16 Loading Range
-0.32 Mvar -0.78 Mvar
56.68 % 39.34 % 4.1871 kV
-0.99 -0.90 1.0065 p.u. 100. %
153.8264 deg
2.74 MW -0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.89 Mvar -0.46 Mvar -0.61 Mvar
4.2499 kV 4.3468 kV 0.82 -0.00 -0.00
1.0216 p.u. 0.00 MW 1 2
1.0449 p.u. 0.00 Mvar
-57.6227 deg 153.4554 deg
0.00 MW 1.95 MW 1.57 MW
-0.94 Mvar 1.26 Mvar 0.78 Mvar 1.00
Load_San Jeronimo
0.00 0.84 0.90 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MED_C1 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.76 MW ABANCAY220/ABAN..
-2.36 Mvar
5.27 % 219.3864 kV
0.21 MW 0.31 0.9972 p.u. ABANCAY220/ABAN..
-0.35 Mvar -41.1760 deg
1.07 % 219.3864 kV

L-6005/2
0.50 0.9972 p.u.
-41.1760 deg
15.07 MW 51.64 MW -66.71 MW
CHUQUI60 2.18 Mvar -29.52 Mvar -2.50 Mvar
12.77 % 23.83 % 26.78 %
66.4861 kV 0.99 0.87 -1.00
1.0074 p.u. -0.74 MW 0.56 MW 51.64 MW
-44.2957 deg 1.41 Mvar -2.94 Mvar -29.52 Mvar 12
-0.21 MW 5.27 % 6.36 % 0.00 % 0 L-2050
0.35 Mvar 0.87
5.80 % -0.47 0.19
-0.50 0
CHACA60 ABANCAY 60
10 67.1986 kV 66.2340 kV AbancayNuevo
1.0182 p.u. 1.0035 p.u. -15.01 MW
0 -45.2475 deg -44.2462 deg -1.66 Mvar
0.74 MW 0.00 MW 9.99 MW -10.55 MW
12.77 %
0
-0.68 Mvar
14.44 %
-0.72 Mvar
1.24 %
3.99 Mvar
48.25 %
-1.05 Mvar
25.87 %
-0.99 L-2060
0.74 0.00 0.93 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
0.21 MW
-0.35 Mvar
5.80 % 12 L-6003 0 135.9527 kV

L-6008
0.9852 p.u.
0.50 0 0 -42.1026 deg
-2 15.01 MW
CHUQUI22.9 0 -9.56 MW 1.66 Mvar
-4.06 Mvar 85.63 %
22.9899 kV 0.99
1.0039 p.u. 48.25 %
-0.74 MW tr3 Chacapuente -0.00 MW -0.92
-44.1818 deg

L-1007 A
0.69 Mvar -0.00 Mvar
-0.21 MW
0.35 Mvar 14.44 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.73 -1.00 -4.38 MW 14.99 MW -14.99 MW
-0.88 Mvar 2.34 Mvar -2.34 Mvar
-0.50 CHACA22.9 62.1679 kV 25.87 % 25.87 % 86.07 %
1.0361 p.u. -0.98 0.99 -0.99
23.0474 kV -46.9660 deg 7.49 MW 2.07 MW
1.0064 p.u. 2.88 Mvar 1.18 Mvar ABANCAY 13.2
Load_Chuquibambilla -45.6456 deg 38.41 % 34.66 %
0.74 MW 0.93 0.87 13.2548 kV 135.6947 kV
-0.69 Mvar 1.0042 p.u. 0.9905 p.u. ABANCAY 138
-13.0815 deg -42.3790 deg
4.38 MW

L-1007 B
0.73 -1 0.88 Mvar
0
L-6009 0.98
0
Load_Chacapuente
0.99 MW tr3 Andahuaylas -3.05 MW
-0.43 Mvar -0.64 Mvar
34.66 % 34.66 %
0.92 -0.98

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9907 kV 13.2008 kV 137.40..
-7.26 MW 1.0040 p.u. 1.0001 p.u. 1.0178..
-3.11 Mvar -48.2175 deg -0.99 MW 160.8134 deg 3.05 MW -44.88..
38.41 % 0.43 Mvar 0.64 Mvar
-0.92
-0.92 0.98
CATAHUANCA60
59.3265 kV
0.9888 p.u.
-48.9963 deg
7.26 MW Load_Andy22.9 Load_Andy13.2
3.11 Mvar
96.76 %
0.92

-1 -2
0 0

0 0

-7.18 MWChilcayoc TP1 Chilcayoc TP2


-2.87 Mvar
96.76 %
-0.93

CHILCAYOC35
34.7739 kV
0.9935 p.u.
-50.4355 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.29 Mvar
1.29 Mvar

-3.54 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.54 MW
%

20.79 %
-0.94
Breaker/S.. 58.50
0.94
REG33

-2 -3.32 MW
-1.15 Mvar
24.54 %
-0.95
-3.53 MW
-1.17 ..
SANJERO33
58.50 %
BOLIVAR33 -0.95 32.1364 kV Inactive
0.9738 p.u.
-54.3011 deg 3.32 MW
Out of Calculation
32.7164 kV
0.9914 p.u. 1.15 Mvar De-energized
SUBESTACION Y BC

80.10 %

tr2 San Jeronimo


-55.5369 deg
1.94 MW 1.59 MW
SE BOLIVARII 3.5MVA Ampl.

0.95
0.49 Mvar 0.69 Mvar
BC PROYECTO

57.60 % 38.91 %
BC SanGe-Filtro Voltages / Loading
-4
0.97 0.92
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -3.30 MW
-0.96 Mvar 0.95 p.u.
80.10 % Upper Voltage Range
-0.96
1.05 p.u.
-1.93 MW -1.59 MW SANJERO4.16 Loading Range
-0.40 Mvar -0.64 Mvar
57.60 % 38.91 % 4.1750 kV
-0.98 -0.93 1.0036 p.u. 100. %
152.8795 deg
3.30 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.72 Mvar -0.45 Mvar -0.30 Mvar
4.1760 kV 4.2891 kV 0.89 0.00 0.00
1.0038 p.u. 0.00 MW 1 1
1.0310 p.u. 0.00 Mvar
-58.0760 deg 152.9908 deg
-0.00 MW 1.93 MW 1.59 MW
-0.91 Mvar 1.30 Mvar 0.64 Mvar 1.00
Load_San Jeronimo
-0.00 0.83 0.93 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MAX_C1 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.63 MW ABANCAY220/ABAN..
-2.32 Mvar
5.15 % 223.3911 kV
-0.67 MW 0.26 1.0154 p.u. ABANCAY220/ABAN..
-0.14 Mvar -40.6907 deg
2.01 % 223.3911 kV

L-6005/2
-0.98 1.0154 p.u.
-40.6907 deg
16.64 MW -15.71 MW -0.93 MW
CHUQUI60 2.29 Mvar -20.34 Mvar -12.88 Mvar
13.84 % 10.11 % 5.08 %
65.6865 kV 0.99 -0.61 -0.07
0.9953 p.u. -0.61 MW 1.31 MW 15.71 MW
-45.1881 deg 1.38 Mvar -3.08 Mvar 20.34 Mvar 12
0.67 MW 5.15 % 7.19 % 0.00 % 0 L-2050
0.14 Mvar 0.61
7.69 % -0.40 0.39
0.98 0
CHACA60 ABANCAY 60
10 66.5810 kV 65.5972 kV AbancayNuevo
1.0088 p.u. 0.9939 p.u. -16.58 MW
0 -45.6809 deg -44.6865 deg -1.71 Mvar
0.61 MW 0.00 MW 13.16 MW -14.47 MW
13.84 %
0
-0.67 Mvar
13.09 %
-0.71 Mvar
1.23 %
4.47 Mvar
62.26 %
-1.38 Mvar
35.80 %
-0.99 L-2060
0.67 0.00 0.95 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.67 MW
-0.14 Mvar
7.69 % 12 L-6003 0 138.4308 kV

L-6008
1.0031 p.u.
-0.98 0 0 -41.6778 deg
0 16.58 MW
CHUQUI22.9 0 -12.44 MW 1.71 Mvar
-4.02 Mvar 92.80 %
22.7812 kV 0.99
0.9948 p.u. 62.26 %
-0.61 MW tr3 Chacapuente -0.00 MW -0.95
-45.3077 deg

L-1007 A
0.68 Mvar 0.00 Mvar
0.67 MW
0.14 Mvar 13.09 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.67 -1.00 -2.03 MW 16.56 MW -16.56 MW
-0.32 Mvar 2.41 Mvar -2.41 Mvar
0.98 CHACA22.9 60.6151 kV 35.80 % 35.80 % 93.22 %
1.0103 p.u. -0.99 0.99 -0.99
22.8356 kV -48.6094 deg 10.70 MW 1.74 MW
0.9972 p.u. 3.76 Mvar 0.26 Mvar ABANCAY 13.2
Load_Chuquibambilla -46.0131 deg 54.97 % 19.75 %
0.61 MW 0.94 0.99 13.1957 kV 138.1575 kV
-0.68 Mvar 0.9997 p.u. 1.0084 p.u. ABANCAY 138
-12.0450 deg -41.9729 deg
2.03 MW

L-1007 B
0.67 -2 0.32 Mvar
0
L-6009 0.99
0
Load_Chacapuente
-0.01 MW tr3 Andahuaylas -1.73 MW
0.20 Mvar -0.41 Mvar
19.75 % 19.75 %
-0.04 -0.97

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.9236 kV 13.1828 kV 141.35..
-10.21 MW 1.0010 p.u. 0.9987 p.u. 1.0243..
-3.51 Mvar -49.6871 deg 0.01 MW 159.7521 deg 1.73 MW -44.67..
54.97 % -0.20 Mvar 0.41 Mvar
-0.95
0.04 0.97
CATAHUANCA60
56.6874 kV
0.9448 p.u.
-51.8423 deg
5.42 MW 4.78 MW Load_Andy22.9 Load_Andy13.2
1.05 Mvar 2.46 Mvar
70.89 % 69.00 %
0.98 0.89

-2 -2
0 0

0 0

-5.39 MWChilcayoc TP1 -4.78 MWChilcayoc TP2


-0.92 Mvar -2.32 Mvar
70.89 % 69.00 %
-0.99 -0.90

CHILCAYOC35
34.4218 kV
0.9835 p.u.
-53.1228 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.97 Mvar
0.97 Mvar

-5.07 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


5.07 MW
%

29.35 %
-0.98
Breaker/S.. 82.58
0.98
REG33

-8 -4.46 MW
-1.25 Mvar
33.55 %
-5.0.. -0.96
-0.9..
-5.07 MW
-0.75 ..
29.3..
-0.98
SANJERO33
82.58 %
BOLIVAR33 -0.99 31.0452 kV Inactive
0.9408 p.u.
-59.1136 deg 4.46 MW
Out of Calculation
33.1563 kV
1.0047 p.u. 1.25 Mvar De-energized
SUBESTACION Y BC

109.52 %

tr2 San Jeronimo


-60.7795 deg
1.92 MW 2.04 MW 1.11 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.15 Mvar 0.18 Mvar 0.43 Mvar
BC PROYECTO

54.66 % 45.34 % 33.82 %


BC SanGe-Filtro Voltages / Loading
-7
1.00 1.00 0.93
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -4.43 MW -0.00 MW
-0.93 Mvar -0.30 Mvar 0.95 p.u.
109.52 % Upper Voltage Range
-0.98 -0.00
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.06 Mvar -0.11 Mvar
54.66 % 45.34 % -1.11 MW 4.1902 kV
-1.00 -1.00 -0.40 Mvar 1.0073 p.u. 100. %
33.82 % 147.1019 deg
4.43 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.94 2.30 Mvar -0.46 Mvar -0.61 Mvar
4.2662 kV 4.2700 kV 0.89 0.00 -0.00
1.0255 p.u. 1.11 MW 1 2
1.0264 p.u. 0.40 Mvar
-63.2292 deg 147.2709 deg
0.00 MW 1.91 MW 2.04 MW 0.00 MW
-1.26 Mvar 1.33 Mvar 0.78 Mvar -0.67 .. 0.94
Load_San Jeronimo
0.00 0.82 0.93 0.00 BC SanGe-P1 BC SanGe-P2_3
4 2 5

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MIN_C1 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.57 MW ABANCAY220/ABAN..
-2.31 Mvar
5.07 % 221.1876 kV
-0.72 MW 0.24 1.0054 p.u. ABANCAY220/ABAN..
-0.17 Mvar -47.3144 deg
2.03 % 221.1876 kV

L-6005/2
-0.97 1.0054 p.u.
-47.3144 deg
19.57 MW -27.02 MW 7.46 MW
CHUQUI60 5.12 Mvar -20.91 Mvar -14.54 Mvar
16.76 % 13.57 % 6.49 %
65.8946 kV 0.97 -0.79 0.46
0.9984 p.u. -0.55 MW 1.30 MW 27.02 MW
-52.1686 deg 1.36 Mvar -3.04 Mvar 20.91 Mvar 11
0.72 MW 5.07 % 7.07 % 0.00 % 0 L-2050
0.17 Mvar 0.79
8.12 % -0.38 0.39
0.97 0
CHACA60 ABANCAY 60
9 66.8178 kV 65.8329 kV AbancayNuevo
1.0124 p.u. 0.9975 p.u. -19.50 MW
0 -52.6152 deg -51.6628 deg -4.41 Mvar
0.55 MW 0.00 MW 14.36 MW -15.65 MW
16.76 %
0
-0.64 Mvar
12.08 %
-0.71 Mvar
1.23 %
5.96 Mvar
69.48 %
-2.92 Mvar
39.08 %
-0.98 L-2060
0.65 0.00 0.92 -0.98 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.72 MW
-0.17 Mvar
8.12 % 11 L-6003 0 138.0296 kV

L-6008
1.0002 p.u.
-0.97 0 0 -48.4757 deg
-1 19.50 MW
CHUQUI22.9 0 -13.46 MW 4.41 Mvar
-5.22 Mvar 111.76 %
23.0609 kV 0.98
1.0070 p.u. 69.48 %
-0.55 MW tr3 Chacapuente -0.00 MW -0.93
-52.2947 deg

L-1007 A
0.65 Mvar 0.00 Mvar
0.72 MW
0.17 Mvar 12.08 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.65 -1.00 -3.75 MW 19.47 MW -19.47 MW
-1.29 Mvar 5.07 Mvar -5.07 Mvar
0.97 CHACA22.9 59.9885 kV 39.08 % 39.08 % 112.55 %
0.9998 p.u. -0.95 0.97 -0.97
23.1159 kV -55.7319 deg 9.29 MW 4.17 MW
1.0094 p.u. 3.07 Mvar 2.14 Mvar ABANCAY 13.2
Load_Chuquibambilla -52.9154 deg 48.00 % 38.48 %
0.55 MW 0.95 0.89 13.2626 kV 137.6038 kV
-0.65 Mvar 1.0047 p.u. 1.0044 p.u. ABANCAY 138
-19.2291 deg -48.8146 deg
3.75 MW

L-1007 B
0.65 -4 1.29 Mvar
0
L-6009 0.95
0
Load_Chacapuente
-0.99 MW tr3 Andahuaylas -3.18 MW
-0.56 Mvar -1.27 Mvar
38.48 % 38.48 %
-0.87 -0.93

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8492 kV 13.0698 kV 139.91..
-8.91 MW 0.9978 p.u. 0.9901 p.u. 1.0139..
-3.02 Mvar -58.4127 deg 0.99 MW 150.5218 deg 3.18 MW -52.22..
48.00 % 0.56 Mvar 1.27 Mvar
-0.95
0.87 0.93
CATAHUANCA60
56.5959 kV
0.9433 p.u.
-58.6080 deg
4.73 MW 4.18 MW Load_Andy22.9 Load_Andy13.2
0.90 Mvar 2.12 Mvar
61.90 % 60.25 %
0.98 0.89

-2 -2
0 0

0 0

-4.70 MWChilcayoc TP1 -4.18 MWChilcayoc TP2


-0.79 Mvar -2.02 Mvar
61.90 % 60.25 %
-0.99 -0.90

CHILCAYOC35
34.4170 kV
0.9833 p.u.
-59.7290 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.96 Mvar
0.96 Mvar

-4.57 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.57 MW
%

26.28 %
-0.98
Breaker/S.. 73.94
0.98
REG33

-5 -3.83 MW
-1.12 Mvar
28.52 %
-4.5.. -0.96
-0.9..
-4.57 MW
-0.78 ..
26.2..
-0.98
SANJERO33
73.94 %
BOLIVAR33 -0.99 31.4679 kV Inactive
0.9536 p.u.
-64.8836 deg 3.83 MW
Out of Calculation
32.8354 kV
0.9950 p.u. 1.12 Mvar De-energized
SUBESTACION Y BC

93.11 %

tr2 San Jeronimo


-66.4809 deg
1.92 MW 1.55 MW 1.09 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.40 Mvar 0.15 Mvar 0.23 Mvar
BC PROYECTO

56.41 % 34.80 % 32.07 %


BC SanGe-Filtro Voltages / Loading
-5
0.98 1.00 0.98
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -3.81 MW -0.00 MW
-0.88 Mvar -0.30 Mvar 0.95 p.u.
93.11 % Upper Voltage Range
-0.97 -0.00
1.05 p.u.
-1.92 MW -1.55 MW SANJERO4.16 Loading Range
-0.32 Mvar -0.11 Mvar
56.41 % 34.80 % -1.09 MW 4.1414 kV
-0.99 -1.00 -0.21 Mvar 0.9955 p.u. 100. %
32.07 % 141.7871 deg
3.81 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.98 2.22 Mvar -0.45 Mvar -0.59 Mvar
4.1997 kV 4.2309 kV 0.86 0.00 -0.00
1.0095 p.u. 1.09 MW 1 2
1.0171 p.u. 0.43 Mvar
-68.9819 deg 142.0109 deg
0.00 MW 1.92 MW 1.55 MW 0.00 MW
-0.92 Mvar 1.23 Mvar 0.77 Mvar -0.66 .. 0.93
Load_San Jeronimo
0.00 0.84 0.90 0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 7

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MED_C1 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.77 MW ABANCAY220/ABAN..
-2.24 Mvar
5.10 % 222.1910 kV
-0.91 MW 0.32 1.0100 p.u. ABANCAY220/ABAN..
-0.21 Mvar -45.5098 deg
2.32 % 222.1910 kV

L-6005/2
-0.97 1.0100 p.u.
-45.5098 deg
18.77 MW -24.01 MW 5.24 MW
CHUQUI60 1.73 Mvar -20.15 Mvar -12.18 Mvar
15.55 % 12.40 % 5.24 %
65.3094 kV 1.00 -0.77 0.40
0.9895 p.u. -0.75 MW 1.69 MW 24.01 MW
-50.3739 deg 1.31 Mvar -2.92 Mvar 20.15 Mvar 11
0.91 MW 5.10 % 7.27 % 0.00 % 0 L-2050
0.21 Mvar 0.77
13.26 % -0.50 0.50
0.97 0
CHACA60 ABANCAY 60
8 66.2196 kV 65.3450 kV AbancayNuevo
1.0033 p.u. 0.9901 p.u. -18.70 MW
0 -50.8391 deg -49.7718 deg -1.07 Mvar
0.75 MW 0.00 MW 13.38 MW -15.07 MW
15.55 %
0
-0.61 Mvar
13.75 %
-0.70 Mvar
1.22 %
3.27 Mvar
61.66 %
-0.35 Mvar
37.28 %
-1.00 L-2060
0.78 0.00 0.97 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.91 MW
-0.20 Mvar
13.26 % 10 L-6003 0 139.1478 kV

L-6008
1.0083 p.u.
-0.98 0 0 -46.6130 deg
1 18.70 MW
CHUQUI22.9 0 -12.67 MW 1.07 Mvar
-2.84 Mvar 103.70 %
23.0316 kV 1.00
1.0057 p.u. 61.66 %
-0.75 MW tr3 Chacapuente -0.00 MW -0.98
-50.8989 deg

L-1007 A
0.62 Mvar -0.00 Mvar
0.91 MW
0.20 Mvar 13.75 % 1.22 %
ANDY60 L-1039 B L-1039 A
-0.77 -1.00 -3.54 MW 18.67 MW -18.67 MW
-0.64 Mvar 1.76 Mvar -1.76 Mvar
0.98 CHACA22.9 60.8054 kV 37.28 % 37.28 % 103.97 %
1.0134 p.u. -0.98 1.00 -1.00
23.1126 kV -54.0564 deg 9.70 MW 2.97 MW
1.0093 p.u. 2.79 Mvar 0.05 Mvar ABANCAY 13.2
Load_Chuquibambilla -51.2547 deg 48.75 % 30.26 %
0.75 MW 0.96 1.00 13.0730 kV 138.8812 kV
-0.62 Mvar 0.9904 p.u. 1.0137 p.u. ABANCAY 138
-17.3556 deg -46.9466 deg
3.54 MW

L-1007 B
0.77 -1 0.64 Mvar
0
L-6009 0.98
0
Load_Chacapuente
-0.32 MW tr3 Andahuaylas -2.65 MW
0.62 Mvar -0.53 Mvar
30.26 % 30.26 %
-0.46 -0.98

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.7500 kV 13.0747 kV 140.82..
-9.31 MW 0.9934 p.u. 0.9905 p.u. 1.0205..
-2.73 Mvar -55.8782 deg 0.32 MW 153.2428 deg 2.65 MW -50.35..
48.75 % -0.62 Mvar 0.53 Mvar
-0.96
0.46 0.98
CATAHUANCA60
57.4791 kV
0.9580 p.u.
-57.0711 deg
4.92 MW 4.40 MW Load_Andy22.9 Load_Andy13.2
0.72 Mvar 2.01 Mvar
62.86 % 61.18 %
0.99 0.91

-2 -2
0 0

0 0

-4.89 MWChilcayoc TP1 -4.40 MWChilcayoc TP2


-0.62 Mvar -1.90 Mvar
62.86 % 61.18 %
-0.99 -0.92

CHILCAYOC35
34.9829 kV
0.9995 p.u.
-58.2135 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.86 Mvar
0.86 Mvar

-4.43 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.43 MW
%

24.89 %
-0.98
Breaker/S.. 70.05
0.98
REG33

-4 -4.35 MW
-0.90 Mvar
31.09 %
-4.4.. -0.98
-0.8..
-4.43 MW
-0.69 ..
24.8..
-0.98
SANJERO33
70.05 %
BOLIVAR33 -0.99 32.0913 kV Inactive
0.9725 p.u.
-63.6555 deg 4.35 MW
Out of Calculation
33.3184 kV
1.0096 p.u. 0.90 Mvar De-energized
SUBESTACION Y BC

101.47 %

tr2 San Jeronimo


-64.9931 deg
1.92 MW 1.58 MW 0.93 MW
SE BOLIVARII 3.5MVA Ampl.

0.98
0.43 Mvar -0.01 Mvar 0.28 Mvar
BC PROYECTO

55.54 % 34.75 % 27.59 %


BC SanGe-Filtro Voltages / Loading
-4
0.98 1.00 0.96
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 -1 -4.32 MW -0.00 MW
-0.60 Mvar -0.30 Mvar 0.95 p.u.
101.47 % Upper Voltage Range
-0.99 -0.00
1.05 p.u.
-1.91 MW -1.58 MW SANJERO4.16 Loading Range
-0.34 Mvar 0.05 Mvar
55.54 % 34.75 % -0.93 MW 4.1820 kV
-0.98 -1.00 -0.26 Mvar 1.0053 p.u. 100. %
27.59 % 142.5970 deg
4.32 MW 0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.96 1.97 Mvar -0.45 Mvar -0.61 Mvar
4.2604 kV 4.3050 kV 0.91 0.00 -0.00
1.0241 p.u. 0.93 MW 1 2
1.0349 p.u. 0.37 Mvar
-67.4121 deg 143.5128 deg
-0.00 MW 1.91 MW 1.58 MW -0.00 MW
-0.94 Mvar 1.29 Mvar 0.63 Mvar -0.69 .. 0.93
Load_San Jeronimo
-0.00 0.83 0.93 -0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 3

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Fujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MAX_C1 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
INDISPONIBILIDAD DEL
TRANSFORMADOR DE LA S.E.
ABANCAY NUEVA 120 MVA 220/138
kV
DIgSILENT
L-6005/3 L-6005/1

0.45 MW ABANCAY220/ABAN..
-2.32 Mvar
5.07 % 219.6871 kV
0.23 MW 0.19 0.9986 p.u. ABANCAY220/ABAN..
-0.38 Mvar -40.6110 deg
1.02 % 219.6871 kV

L-6005/2
0.52 0.9986 p.u.
-40.6110 deg
61.28 MW -61.28 MW
CHUQUI60 -28.34 Mvar -1.58 Mvar
27.01 % 24.63 %
65.7526 kV 0.91 -1.00
0.9963 p.u. -0.43 MW 0.22 MW 61.28 MW
-48.9703 deg 1.38 Mvar -2.85 Mvar -28.34 Mvar 11
-0.23 MW 5.07 % 6.15 % 0.00 % 0 L-2050
0.38 Mvar 0.91
4.92 % -0.30 0.08
-0.52 0
CHACA60 ABANCAY 60
9 66.5689 kV 65.5009 kV AbancayNuevo
1.0086 p.u. 0.9924 p.u.
0 -49.7993 deg -48.9613 deg
0.43 MW 0.00 MW 10.31 MW -10.53 MW
0
-0.67 Mvar
11.42 %
-0.71 Mvar
1.23 %
3.88 Mvar
49.83 %
-1.03 Mvar
26.10 %
L-2060
0.54 0.00 0.94 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
0.23 MW
-0.38 Mvar
4.92 % 11 L-6003 0 136.1358 kV

L-6008
0.9865 p.u.
0.52 0 0 -46.7574 deg -12.34 MW
-1 12.34 MW -1.13 Mvar
CHUQUI22.9 0 -9.85 MW 1.13 Mvar 35.03 %
-3.89 Mvar 70.16 % -1.00
22.9964 kV 1.00
1.0042 p.u. 49.83 %
-0.43 MW tr3 Chacapuente -0.00 MW -0.93
-48.9294 deg

L-1007 A
0.68 Mvar -0.00 Mvar
-0.23 MW
0.38 Mvar 11.42 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.53 -1.00 -1.74 MW 12.32 MW -12.32 MW
-0.44 Mvar 1.85 Mvar -1.85 Mvar
-0.52 CHACA22.9 61.3701 kV 26.10 % 26.10 % 70.57 %
1.0228 p.u. -0.97 0.99 -0.99
23.0377 kV -51.8959 deg 7.86 MW 1.99 MW
1.0060 p.u. 2.83 Mvar 1.06 Mvar ABANCAY 13.2
Load_Chuquibambilla -50.0331 deg 40.32 % 19.16 %
0.43 MW 0.94 0.88 13.1400 kV 135.9310 kV
-0.68 Mvar 0.9955 p.u. 0.9922 p.u. ABANCAY 138
-17.0977 deg -46.9847 deg
1.74 MW

L-1007 B
0.53 -2 0.44 Mvar
0
L-6009 0.97
0
Load_Chacapuente
-0.31 MW tr3 Andahuaylas -1.69 MW 12.44 MW
-0.60 Mvar -0.39 Mvar -4.03 Mvar
19.16 % 19.16 % 36.80 %
-0.46 -0.97 0.95

ANDY22.9 ANDY13.2 CACHIMAYO 138


23.0221 kV 13.2383 kV 136.77..
-7.60 MW 1.0053 p.u. 1.0029 p.u. 1.0131..
-2.99 Mvar -53.1089 deg 0.31 MW 156.3424 deg 1.69 MW -44.99..
40.32 % 0.60 Mvar 0.39 Mvar
-0.93
0.46 0.97
CATAHUANCA60
58.4412 kV
0.9740 p.u.
-54.1352 deg
7.60 MW Load_Andy22.9 Load_Andy13.2
2.99 Mvar
101.59 %
0.93

-1 -2
0 0

0 0

-7.52 MWChilcayoc TP1 Chilcayoc TP2


-2.72 Mvar
101.59 %
-0.94

CHILCAYOC35
34.2372 kV
0.9782 p.u.
-55.7075 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.17 Mvar
1.17 Mvar

-3.96 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.96 MW
%

23.22 %
-0.96
Breaker/S.. 65.34
0.96
REG33

-5 -3.20 MW
-1.06 Mvar
23.96 %
-0.95
-3.96 MW
-1.03 ..
SANJERO33
65.34 %
BOLIVAR33 -0.97 31.5885 kV Inactive
0.9572 p.u.
-59.9414 deg 3.20 MW
Out of Calculation
32.8090 kV
0.9942 p.u. 1.06 Mvar De-energized
SUBESTACION Y BC

78.22 %

tr2 San Jeronimo


-61.3701 deg
1.92 MW 2.04 MW
SE BOLIVARII 3.5MVA Ampl.

0.95
0.17 Mvar 0.85 Mvar
BC PROYECTO

55.33 % 49.47 %
BC SanGe-Filtro Voltages / Loading
-5
1.00 0.92
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -3.18 MW
-0.89 Mvar 0.95 p.u.
78.22 % Upper Voltage Range
-0.96
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.09 Mvar -0.78 Mvar
55.33 % 49.47 % 4.1638 kV
-1.00 -0.93 1.0009 p.u. 100. %
147.3189 deg
3.18 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.94 Mvar -0.45 Mvar -0.60 Mvar
4.2185 kV 4.2891 kV 0.85 -0.00 0.00
1.0141 p.u. 0.00 MW 1 2
1.0310 p.u. 0.00 Mvar
-63.8728 deg 146.7493 deg
0.00 MW 1.91 MW 2.04 MW
-1.23 Mvar 1.32 Mvar 0.78 Mvar 1.00
Load_San Jeronimo
0.00 0.82 0.93 BC SanGe-P1 BC SanGe-P2_3
4 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MIN_C2 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.52 MW ABANCAY220/ABAN..
-2.21 Mvar
4.83 % 219.4436 kV
-0.66 MW 0.23 0.9975 p.u. ABANCAY220/ABAN..
-0.28 Mvar -41.1053 deg
1.80 % 219.4436 kV

L-6005/2
-0.92 0.9975 p.u.
-41.1053 deg
58.61 MW -58.61 MW
CHUQUI60 -27.74 Mvar -2.11 Mvar
25.97 % 23.58 %
66.0583 kV 0.90 -1.00
1.0009 p.u. -0.50 MW 1.18 MW 58.61 MW
-50.8969 deg 1.26 Mvar -2.85 Mvar -27.74 Mvar 11
0.66 MW 4.83 % 6.59 % 0.00 % 0 L-2050
0.28 Mvar 0.90
7.87 % -0.37 0.38
0.92 0
CHACA60 ABANCAY 60
9 66.9734 kV 66.0357 kV AbancayNuevo
1.0147 p.u. 1.0005 p.u.
0 -51.3339 deg -50.4515 deg
0.50 MW 0.00 MW 10.09 MW -11.27 MW
0
-0.54 Mvar
10.53 %
-0.72 Mvar
1.24 %
3.20 Mvar
47.39 %
-0.35 Mvar
27.60 %
L-2060
0.68 0.00 0.95 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.66 MW
-0.27 Mvar
7.87 % 12 L-6003 0 135.2175 kV

L-6008
0.9798 p.u.
-0.92 0 0 -48.1295 deg -14.94 MW
-2 14.94 MW -1.38 Mvar
CHUQUI22.9 0 -9.67 MW 1.38 Mvar 42.70 %
-3.30 Mvar 85.50 % -1.00
23.1111 kV 1.00
1.0092 p.u. 47.39 %
-0.50 MW tr3 Chacapuente -0.00 MW -0.95
-51.0127 deg

L-1007 A
0.54 Mvar 0.00 Mvar
0.66 MW
0.27 Mvar 10.53 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.68 -1.00 -3.59 MW 14.92 MW -14.92 MW
-1.27 Mvar 2.06 Mvar -2.06 Mvar
0.92 CHACA22.9 62.2628 kV 27.60 % 27.60 % 85.89 %
1.0377 p.u. -0.94 0.99 -0.99
22.9392 kV -53.3852 deg 6.79 MW 2.89 MW
1.0017 p.u. 2.48 Mvar 0.82 Mvar ABANCAY 13.2
Load_Chuquibambilla -51.6038 deg 34.60 % 29.08 %
0.50 MW 0.94 0.96 13.1612 kV 134.9715 kV
-0.54 Mvar 0.9971 p.u. 0.9852 p.u. ABANCAY 138
-18.9189 deg -48.4088 deg
3.59 MW

L-1007 B
0.68 0 1.27 Mvar
0
L-6009 0.94
0
Load_Chacapuente
-0.44 MW tr3 Andahuaylas -2.44 MW 15.09 MW
0.18 Mvar -0.87 Mvar -3.55 Mvar
29.08 % 29.08 % 43.79 %
-0.93 -0.94 0.97

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8123 kV 13.0832 kV 136.21..
-6.60 MW 0.9962 p.u. 0.9911 p.u. 1.0090..
-2.78 Mvar -55.0850 deg 0.44 MW 154.1030 deg 2.44 MW -45.99..
34.60 % -0.18 Mvar 0.87 Mvar
-0.92
0.93 0.94
CATAHUANCA60
59.7295 kV
0.9955 p.u.
-55.2314 deg
6.60 MW Load_Andy22.9 Load_Andy13.2
2.78 Mvar
87.16 %
0.92

-2 -2
0 0

0 0

-6.54 MWChilcayoc TP1 Chilcayoc TP2


-2.58 Mvar
87.16 %
-0.93

CHILCAYOC35
36.0158 kV
1.0290 p.u.
-56.5447 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.36 Mvar
1.36 Mvar

-3.53 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.53 MW
%

20.00 %
-0.93
Breaker/S.. 57.34
0.93
REG33

3 -2.76 MW
-0.96 Mvar
19.43 %
-0.94
-3.53 MW
-1.24 ..
SANJERO33
57.34 %
BOLIVAR33 -0.94 33.7403 kV Inactive
1.0224 p.u.
-59.7546 deg 2.76 MW
Out of Calculation
33.1511 kV
1.0046 p.u. 0.96 Mvar De-energized
SUBESTACION Y BC

63.44 %

tr2 San Jeronimo


-61.0602 deg
1.96 MW 1.58 MW
SE BOLIVARII 3.5MVA Ampl.

0.94
0.41 Mvar 0.83 Mvar
BC PROYECTO

56.83 % 39.43 %
BC SanGe-Filtro Voltages / Loading
0
0.98 0.88
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -2.74 MW
-0.83 Mvar 0.95 p.u.
63.44 % Upper Voltage Range
-0.96
1.05 p.u.
-1.95 MW -1.57 MW SANJERO4.16 Loading Range
-0.32 Mvar -0.78 Mvar
56.83 % 39.43 % 4.1775 kV
-0.99 -0.90 1.0042 p.u. 100. %
147.9003 deg
2.74 MW -0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.89 Mvar -0.45 Mvar -0.61 Mvar
4.2401 kV 4.3372 kV 0.82 -0.00 -0.00
1.0193 p.u. 0.00 MW 1 2
1.0426 p.u. 0.00 Mvar
-63.5561 deg 147.5266 deg
-0.00 MW 1.95 MW 1.57 MW
-0.94 Mvar 1.26 Mvar 0.78 Mvar 1.00
Load_San Jeronimo
-0.00 0.84 0.90 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MED_C2 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.76 MW ABANCAY220/ABAN..
-2.37 Mvar
5.27 % 219.9423 kV
0.21 MW 0.31 0.9997 p.u. ABANCAY220/ABAN..
-0.35 Mvar -40.9482 deg
1.07 % 219.9423 kV

L-6005/2
0.50 0.9997 p.u.
-40.9482 deg
55.38 MW -55.38 MW
CHUQUI60 -28.19 Mvar -1.79 Mvar
24.83 % 22.26 %
66.5815 kV 0.89 -1.00
1.0088 p.u. -0.74 MW 0.56 MW 55.38 MW
-50.8265 deg 1.41 Mvar -2.95 Mvar -28.19 Mvar 12
-0.21 MW 5.27 % 6.37 % 0.00 % 0 L-2050
0.35 Mvar 0.89
5.80 % -0.47 0.19
-0.50 0
CHACA60 ABANCAY 60
10 67.2945 kV 66.3289 kV AbancayNuevo
1.0196 p.u. 1.0050 p.u.
0 -51.7764 deg -50.7768 deg
0.74 MW 0.00 MW 9.98 MW -10.55 MW
0
-0.68 Mvar
14.42 %
-0.72 Mvar
1.24 %
3.96 Mvar
48.09 %
-1.01 Mvar
25.81 %
L-2060
0.74 0.00 0.93 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
0.21 MW
-0.35 Mvar
5.80 % 12 L-6003 0 136.1232 kV

L-6008
0.9864 p.u.
0.50 0 0 -48.6400 deg -15.00 MW
-2 15.00 MW -1.61 Mvar
CHUQUI22.9 0 -9.56 MW 1.61 Mvar 42.66 %
-4.04 Mvar 85.44 % -0.99
23.0232 kV 0.99
1.0054 p.u. 48.09 %
-0.74 MW tr3 Chacapuente -0.00 MW -0.92
-50.7130 deg

L-1007 A
0.69 Mvar 0.00 Mvar
-0.21 MW
0.35 Mvar 14.42 % 1.24 %
ANDY60 L-1039 B L-1039 A
-0.73 -1.00 -4.38 MW 14.98 MW -14.98 MW
-0.88 Mvar 2.30 Mvar -2.30 Mvar
-0.50 CHACA22.9 62.2838 kV 25.81 % 25.81 % 85.88 %
1.0381 p.u. -0.98 0.99 -0.99
23.0798 kV -53.4921 deg 7.49 MW 2.07 MW
1.0079 p.u. 2.86 Mvar 1.18 Mvar ABANCAY 13.2
Load_Chuquibambilla -52.1733 deg 38.27 % 34.59 %
0.74 MW 0.93 0.87 13.2716 kV 135.8677 kV
-0.69 Mvar 1.0054 p.u. 0.9917 p.u. ABANCAY 138
-19.6168 deg -48.9158 deg
4.38 MW

L-1007 B
0.73 -1 0.88 Mvar
0
L-6009 0.98
0
Load_Chacapuente
0.99 MW tr3 Andahuaylas -3.05 MW 15.15 MW
-0.43 Mvar -0.64 Mvar -3.40 Mvar
34.59 % 34.59 % 43.57 %
0.92 -0.98 0.98

ANDY22.9 ANDY13.2 CACHIMAYO 138


23.0346 kV 13.2263 kV 137.18..
-7.25 MW 1.0059 p.u. 1.0020 p.u. 1.0162..
-3.09 Mvar -54.7389 deg -0.99 MW 154.2958 deg 3.05 MW -46.53..
38.27 % 0.43 Mvar 0.64 Mvar
-0.92
-0.92 0.98
CATAHUANCA60
59.4584 kV
0.9910 p.u.
-55.5179 deg
7.25 MW Load_Andy22.9 Load_Andy13.2
3.09 Mvar
96.41 %
0.92

-1 -2
0 0

0 0

-7.18 MWChilcayoc TP1 Chilcayoc TP2


-2.85 Mvar
96.41 %
-0.93

CHILCAYOC35
34.8575 kV
0.9959 p.u.
-56.9512 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-1.28 Mvar
1.28 Mvar

-3.54 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


3.54 MW
%

20.71 %
-0.94
Breaker/S.. 58.29
0.94
REG33

-2 -3.32 MW
-1.14 Mvar
24.45 %
-0.95
-3.53 MW
-1.17 ..
SANJERO33
58.29 %
BOLIVAR33 -0.95 32.2341 kV Inactive
0.9768 p.u.
-60.8013 deg 3.32 MW
Out of Calculation
32.8161 kV
0.9944 p.u. 1.14 Mvar De-energized
SUBESTACION Y BC

79.81 %

tr2 San Jeronimo


-62.0285 deg
1.94 MW 1.59 MW
SE BOLIVARII 3.5MVA Ampl.

0.95
0.48 Mvar 0.68 Mvar
BC PROYECTO

57.38 % 38.78 %
BC SanGe-Filtro Voltages / Loading
-4
0.97 0.92
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -2 0 -3.30 MW
-0.96 Mvar 0.95 p.u.
79.81 % Upper Voltage Range
-0.96
1.05 p.u.
-1.93 MW -1.59 MW SANJERO4.16 Loading Range
-0.39 Mvar -0.64 Mvar
57.38 % 38.78 % 4.1886 kV
-0.98 -0.93 1.0069 p.u. 100. %
146.3966 deg
3.30 MW 0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B 1.72 Mvar -0.46 Mvar -0.30 Mvar
4.1897 kV 4.3025 kV 0.89 0.00 0.00
1.0071 p.u. 0.00 MW 1 1
1.0343 p.u. 0.00 Mvar
-64.5520 deg 146.5083 deg
-0.00 MW 1.93 MW 1.59 MW
-0.91 Mvar 1.30 Mvar 0.64 Mvar 1.00
Load_San Jeronimo
-0.00 0.83 0.93 BC SanGe-P1 BC SanGe-P2_3
3 0 0

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] AVE2018MAX_C2 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Sin Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.63 MW ABANCAY220/ABAN..
-2.37 Mvar
5.18 % 224.8438 kV
-0.67 MW 0.26 1.0220 p.u. ABANCAY220/ABAN..
-0.14 Mvar -40.8833 deg
2.01 % 224.8438 kV

L-6005/2
-0.98 1.0220 p.u.
-40.8833 deg
25.58 MW -18.05 MW -7.52 MW
CHUQUI60 -10.21 Mvar -16.19 Mvar -4.93 Mvar
23.18 % 9.48 % 3.52 %
66.6703 kV 0.93 -0.74 -0.84
1.0102 p.u. -0.61 MW 1.31 MW 18.05 MW
-45.8412 deg 1.40 Mvar -3.16 Mvar 16.19 Mvar 14
0.67 MW 5.18 % 7.24 % 0.00 % 0 L-2050
0.14 Mvar 0.74
7.58 % -0.40 0.38
0.98 0
CHACA60 ABANCAY 60
10 67.5658 kV 66.5718 kV AbancayNuevo
1.0237 p.u. 1.0087 p.u. -25.51 MW
0 -46.3269 deg -45.3492 deg 11.31 Mvar
0.61 MW 0.00 MW 13.03 MW -14.34 MW
23.18 %
0
-0.67 Mvar
13.01 %
-0.73 Mvar
1.25 %
4.04 Mvar
60.21 %
-0.88 Mvar
34.88 %
-0.91 L-2060
0.67 0.00 0.96 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.67 MW
-0.14 Mvar
7.58 % 13 L-6003 0 138.4412 kV

L-6008
1.0032 p.u.
-0.98 0 0 -42.4351 deg 9.06 MW
-1 16.45 MW -12.47 Mvar
CHUQUI22.9 0 -12.36 MW 1.17 Mvar 42.86 %
-3.70 Mvar 91.79 % 0.59
23.1227 kV 1.00
1.0097 p.u. 60.21 %
-0.61 MW tr3 Chacapuente -0.00 MW -0.96
-45.9572 deg

L-1007 A
0.68 Mvar 0.00 Mvar
0.67 MW
0.14 Mvar 13.01 % 1.25 %
ANDY60 L-1039 B L-1039 A
-0.67 -1.00 -2.03 MW 16.43 MW -16.43 MW
-0.32 Mvar 1.87 Mvar -1.87 Mvar
0.98 CHACA22.9 61.8553 kV 34.88 % 34.88 % 92.11 %
1.0309 p.u. -0.99 0.99 -0.99
22.9637 kV -49.1808 deg 10.62 MW 1.74 MW
1.0028 p.u. 3.44 Mvar 0.26 Mvar ABANCAY 13.2
Load_Chuquibambilla -46.6488 deg 53.02 % 19.87 %
0.61 MW 0.95 0.99 13.3636 kV 138.1934 kV
-0.68 Mvar 1.0124 p.u. 1.0087 p.u. ABANCAY 138
-12.8054 deg -42.7303 deg
2.03 MW

L-1007 B
0.67 0 0.32 Mvar
0
L-6009 0.99
0
Load_Chacapuente
-0.01 MW tr3 Andahuaylas -1.73 MW -8.94 MW
0.20 Mvar -0.41 Mvar 7.08 Mvar
19.87 % 19.87 % 42.41 %
-0.04 -0.97 -0.78

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.7869 kV 13.1039 kV 140.81..
-10.16 MW 0.9951 p.u. 0.9927 p.u. 1.0204..
-3.28 Mvar -50.2156 deg 0.01 MW 159.2168 deg 1.73 MW -43.97..
53.02 % -0.20 Mvar 0.41 Mvar
-0.95
0.04 0.97
CATAHUANCA60
58.1383 kV
0.9690 p.u.
-52.3078 deg
5.38 MW 4.78 MW Load_Andy22.9 Load_Andy13.2
0.94 Mvar 2.34 Mvar
68.37 % 66.55 %
0.99 0.90

-2 -2
0 0

0 0

-5.35 MWChilcayoc TP1 -4.78 MWChilcayoc TP2


-0.82 Mvar -2.21 Mvar
68.37 % 66.55 %
-0.99 -0.91

CHILCAYOC35
35.3406 kV
1.0097 p.u.
-53.5223 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.83 Mvar
0.83 Mvar

-5.07 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


5.07 MW
%

28.27 %
-0.99
Breaker/S.. 79.54
0.99
REG33

-2 -4.46 MW
-1.28 Mvar
32.47 %
Skss.. -0.96
Ikss..
-5.07 MW
-0.61 ..
ip:A..
I0x3..
SANJERO33
79.54 %
BOLIVAR33 -0.99 32.1253 kV Inactive
0.9735 p.u.
-59.1923 deg 4.46 MW
Out of Calculation
32.9969 kV
0.9999 p.u. 1.28 Mvar De-energized
SUBESTACION Y BC

105.99 %

tr2 San Jeronimo


-60.9387 deg
1.92 MW 2.04 MW 1.11 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.16 Mvar 0.18 Mvar 0.26 Mvar
BC PROYECTO

54.95 % 45.57 % 32.59 %


BC SanGe-Filtro Voltages / Loading
-4
1.00 1.00 0.97
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -4.43 MW 0.00 MW
-0.95 Mvar -0.30 Mvar 0.95 p.u.
105.99 % Upper Voltage Range
-0.98 0.00
1.05 p.u.
-1.91 MW -2.04 MW SANJERO4.16 Loading Range
-0.08 Mvar -0.11 Mvar
54.95 % 45.57 % -1.11 MW 4.1622 kV
-1.00 -1.00 -0.24 Mvar 1.0005 p.u. 100. %
32.59 % 146.9760 deg
4.43 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.98 2.30 Mvar -0.45 Mvar -0.60 Mvar
4.2442 kV 4.2488 kV 0.89 -0.00 0.00
1.0202 p.u. 1.11 MW 1 2
1.0213 p.u. 0.40 Mvar
-63.4120 deg 147.0928 deg
0.00 MW 1.91 MW 2.04 MW -0.00 MW
-1.25 Mvar 1.33 Mvar 0.78 Mvar -0.67 .. 0.94
Load_San Jeronimo
0.00 0.82 0.93 -0.00 BC SanGe-P1 BC SanGe-P2_3
4 2 5

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MIN_CP Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.57 MW ABANCAY220/ABAN..
-2.28 Mvar
5.06 % 222.0200 kV
-0.72 MW 0.24 1.0092 p.u. ABANCAY220/ABAN..
-0.17 Mvar -46.9599 deg
2.03 % 222.0200 kV

L-6005/2
-0.97 1.0092 p.u.
-46.9599 deg
-22.00 MW 22.00 MW
CHUQUI60 -19.45 Mvar -11.11 Mvar
11.62 % 9.75 %
65.4732 kV -0.75 0.89
0.9920 p.u. -0.55 MW 1.30 MW 22.00 MW
-59.9290 deg 1.35 Mvar -3.01 Mvar 19.45 Mvar 11
0.72 MW 5.06 % 7.05 % 0.00 % 0 L-2050
0.17 Mvar 0.75
8.10 % -0.38 0.40
0.97 0
CHACA60 ABANCAY 60
8 66.3963 kV 65.4157 kV AbancayNuevo
1.0060 p.u. 0.9911 p.u.
0 -60.3782 deg -59.4190 deg
0.55 MW 0.00 MW 14.34 MW -15.63 MW
0
-0.64 Mvar
12.15 %
-0.70 Mvar
1.23 %
5.61 Mvar
69.17 %
-2.60 Mvar
39.14 %
L-2060
0.65 0.00 0.93 -0.99 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.72 MW
-0.17 Mvar
8.10 % 11 L-6003 0 137.0242 kV

L-6008
0.9929 p.u.
-0.97 0 0 -56.1894 deg -19.48 MW
-1 19.48 MW -4.11 Mvar
CHUQUI22.9 0 -13.45 MW 4.11 Mvar 55.92 %
-4.87 Mvar 112.08 % -0.98
23.1254 kV 0.98
1.0098 p.u. 69.17 %
-0.55 MW tr3 Chacapuente -0.00 MW -0.94
-60.0567 deg

L-1007 A
0.65 Mvar -0.00 Mvar
0.72 MW
0.17 Mvar 12.15 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.65 -1.00 -3.75 MW 19.45 MW -19.45 MW
-1.29 Mvar 4.75 Mvar -4.75 Mvar
0.97 CHACA22.9 59.6910 kV 39.14 % 39.14 % 112.81 %
0.9948 p.u. -0.95 0.97 -0.97
22.9718 kV -63.6081 deg 9.28 MW 4.17 MW
1.0031 p.u. 2.72 Mvar 2.14 Mvar ABANCAY 13.2
Load_Chuquibambilla -60.6822 deg 47.57 % 38.14 %
0.55 MW 0.96 0.89 13.1639 kV 136.6094 kV
-0.65 Mvar 0.9973 p.u. 0.9971 p.u. ABANCAY 138
-26.9566 deg -56.5343 deg
3.75 MW

L-1007 B
0.65 -5 1.29 Mvar
0
L-6009 0.95
0
Load_Chacapuente
-0.99 MW tr3 Andahuaylas -3.18 MW 19.73 MW
-0.56 Mvar -1.27 Mvar -0.66 Mvar
38.14 % 38.14 % 55.81 %
-0.87 -0.93 1.00

ANDY22.9 ANDY13.2 CACHIMAYO 138


23.0465 kV 13.1845 kV 139.33..
-8.91 MW 1.0064 p.u. 0.9988 p.u. 1.0097..
-2.67 Mvar -66.3169 deg 0.99 MW 142.6359 deg 3.18 MW -53.61..
47.57 % 0.56 Mvar 1.27 Mvar
-0.96
0.87 0.93
CATAHUANCA60
56.4272 kV
0.9405 p.u.
-66.5843 deg
4.70 MW 4.20 MW Load_Andy22.9 Load_Andy13.2
0.72 Mvar 1.95 Mvar
61.34 % 59.70 %
0.99 0.91

-2 -2
0 0

0 0

-4.68 MWChilcayoc TP1 -4.20 MWChilcayoc TP2


-0.62 Mvar -1.85 Mvar
61.34 % 59.70 %
-0.99 -0.92

CHILCAYOC35
34.3399 kV
0.9811 p.u.
-67.7165 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.64 Mvar
0.64 Mvar

-4.57 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.57 MW
%

25.93 %
-0.99
Breaker/S.. 72.97
0.99
REG33

-6 -3.83 MW
-1.12 Mvar
28.48 %
-4.5.. -0.96
-0.6..
-4.57 MW
-0.47 ..
25.9..
-0.99
SANJERO33
72.97 %
BOLIVAR33 -0.99 31.5082 kV Inactive
0.9548 p.u.
-72.9695 deg 3.83 MW
Out of Calculation
33.1810 kV
1.0055 p.u. 1.12 Mvar De-energized
SUBESTACION Y BC

92.96 %

tr2 San Jeronimo


-74.5318 deg
1.92 MW 1.55 MW 1.09 MW
SE BOLIVARII 3.5MVA Ampl.

0.96
0.05 Mvar 0.13 Mvar 0.29 Mvar
BC PROYECTO

54.63 % 34.40 % 32.14 %


BC SanGe-Filtro Voltages / Loading
-5
1.00 1.00 0.97
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 0 -3.81 MW -0.00 MW
-0.87 Mvar -0.30 Mvar 0.95 p.u.
92.96 % Upper Voltage Range
-0.97 -0.00
1.05 p.u.
-1.92 MW -1.55 MW SANJERO4.16 Loading Range
0.04 Mvar -0.09 Mvar
54.63 % 34.40 % -1.09 MW 4.1473 kV
-1.00 -1.00 -0.27 Mvar 0.9969 p.u. 100. %
32.14 % 133.7098 deg
3.81 MW -0.00 MW -0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.97 2.22 Mvar -0.45 Mvar -0.60 Mvar
4.2790 kV 4.2768 kV 0.86 -0.00 -0.00
1.0286 p.u. 1.09 MW 1 2
1.0281 p.u. 0.43 Mvar
-76.9870 deg 133.9910 deg
0.00 MW 1.92 MW 1.55 MW 0.00 MW
-1.27 Mvar 1.23 Mvar 0.77 Mvar -0.68 .. 0.93
Load_San Jeronimo
0.00 0.84 0.90 0.00 BC SanGe-P1 BC SanGe-P2_3
4 2 5

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MED_C2 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02
DIgSILENT
L-6005/3 L-6005/1

0.77 MW ABANCAY220/ABAN..
-2.25 Mvar
5.10 % 222.6443 kV
-0.91 MW 0.32 1.0120 p.u. ABANCAY220/ABAN..
-0.21 Mvar -45.1732 deg
2.31 % 222.6443 kV

L-6005/2
-0.97 1.0120 p.u.
-45.1732 deg
-19.21 MW 19.21 MW
CHUQUI60 -19.64 Mvar -11.09 Mvar
10.84 % 8.75 %
65.5005 kV -0.70 0.87
0.9924 p.u. -0.75 MW 1.69 MW 19.21 MW
-57.9772 deg 1.31 Mvar -2.94 Mvar 19.64 Mvar 11
0.91 MW 5.10 % 7.28 % 0.00 % 0 L-2050
0.21 Mvar 0.70
13.22 % -0.50 0.50
0.97 0
CHACA60 ABANCAY 60
8 66.4108 kV 65.5339 kV AbancayNuevo
1.0062 p.u. 0.9929 p.u.
0 -58.4411 deg -57.3775 deg
0.75 MW 0.00 MW 13.38 MW -15.07 MW
0
-0.61 Mvar
13.84 %
-0.71 Mvar
1.23 %
3.29 Mvar
61.49 %
-0.36 Mvar
37.16 %
L-2060
0.78 0.00 0.97 -1.00 ABANCAY NUEVA 138
tr3 Chuquibambilla
-0.91 MW
-0.20 Mvar
13.22 % 11 L-6003 0 139.5501 kV

L-6008
1.0112 p.u.
-0.98 0 0 -54.2385 deg -18.70 MW
1 18.70 MW -1.07 Mvar
CHUQUI22.9 0 -12.67 MW 1.07 Mvar 51.65 %
-2.88 Mvar 103.37 % -1.00
23.0992 kV 1.00
1.0087 p.u. 61.49 %
-0.75 MW tr3 Chacapuente -0.00 MW -0.98
-58.4991 deg

L-1007 A
0.62 Mvar 0.00 Mvar
0.91 MW
0.20 Mvar 13.84 % 1.23 %
ANDY60 L-1039 B L-1039 A
-0.77 -1.00 -3.54 MW 18.67 MW -18.67 MW
-0.64 Mvar 1.77 Mvar -1.77 Mvar
0.98 CHACA22.9 60.9951 kV 37.16 % 37.16 % 103.64 %
1.0166 p.u. -0.98 1.00 -1.00
22.9695 kV -61.6271 deg 9.70 MW 2.97 MW
1.0030 p.u. 2.83 Mvar 0.05 Mvar ABANCAY 13.2
Load_Chuquibambilla -58.8534 deg 48.65 % 30.17 %
0.75 MW 0.96 1.00 13.1113 kV 139.2842 kV
-0.62 Mvar 0.9933 p.u. 1.0167 p.u. ABANCAY 138
-24.9767 deg -54.5700 deg
3.54 MW

L-1007 B
0.77 -1 0.64 Mvar
0
L-6009 0.98
0
Load_Chacapuente
-0.32 MW tr3 Andahuaylas -2.65 MW 18.92 MW
0.62 Mvar -0.53 Mvar -3.96 Mvar
30.17 % 30.17 % 52.86 %
-0.46 -0.98 0.98

ANDY22.9 ANDY13.2 CACHIMAYO 138


22.8211 kV 13.1158 kV 140.73..
-9.31 MW 0.9966 p.u. 0.9936 p.u. 1.0198..
-2.77 Mvar -63.4376 deg 0.32 MW 145.6889 deg 2.65 MW -51.72..
48.65 % -0.62 Mvar 0.53 Mvar
-0.96
0.46 0.98
CATAHUANCA60
57.6627 kV
0.9610 p.u.
-64.6123 deg
4.92 MW 4.40 MW Load_Andy22.9 Load_Andy13.2
0.74 Mvar 2.03 Mvar
62.74 % 61.06 %
0.99 0.91

-2 -2
0 0

0 0

-4.89 MWChilcayoc TP1 -4.40 MWChilcayoc TP2


-0.64 Mvar -1.93 Mvar
62.74 % 61.06 %
-0.99 -0.92

CHILCAYOC35
35.0930 kV
1.0027 p.u.
-65.7465 deg

AMPLIACIÓN
Lne Chilc Boliv33_T2

SUBESTACIÓN CHILCAYOC
-0.88 Mvar
0.88 Mvar

-4.43 MW

Lne Derv Bolivar33 Lne Derv San Jeronimo


4.43 MW
%

24.83 %
-0.98
Breaker/S.. 69.88
0.98
REG33

-3 -4.35 MW
-0.94 Mvar
31.05 %
-4.4.. -0.98
-0.8..
-4.43 MW
-0.71 ..
24.8..
-0.98
SANJERO33
69.88 %
BOLIVAR33 -0.99 32.1888 kV Inactive
0.9754 p.u.
-71.1335 deg 4.35 MW
Out of Calculation
33.2018 kV
1.0061 p.u. 0.94 Mvar De-energized
SUBESTACION Y BC

101.35 %

tr2 San Jeronimo


-72.4973 deg
1.92 MW 1.58 MW 0.93 MW
SE BOLIVARII 3.5MVA Ampl.

0.98
0.44 Mvar -0.01 Mvar 0.28 Mvar
BC PROYECTO

55.78 % 34.87 % 27.70 %


BC SanGe-Filtro Voltages / Loading
-3
0.98 1.00 0.96
PROYECTO
PROYECTO
tr2 Bolivar TP1

tr2 Bolivar TP2

1 Lower Voltage Range


-1 -1 -1 -4.32 MW 0.00 MW
-0.63 Mvar -0.30 Mvar 0.95 p.u.
101.35 % Upper Voltage Range
-0.99 0.00
1.05 p.u.
-1.91 MW -1.58 MW SANJERO4.16 Loading Range
-0.35 Mvar 0.05 Mvar
55.78 % 34.87 % -0.93 MW 4.1365 kV
-0.98 -1.00 -0.27 Mvar 0.9944 p.u. 100. %
27.70 % 135.0421 deg
4.32 MW -0.00 MW 0.00 MW
BOLIVAR4.16A BOLIVAR4.16B -0.96 1.97 Mvar -0.44 Mvar -0.59 Mvar
4.2445 kV 4.2896 kV 0.91 -0.00 0.00
1.0203 p.u. 0.93 MW 1 2
1.0311 p.u. 0.37 Mvar
-74.9334 deg 135.9982 deg
-0.00 MW 1.91 MW 1.58 MW 0.00 MW
-0.94 Mvar 1.29 Mvar 0.63 Mvar -0.68 .. 0.93
Load_San Jeronimo
-0.00 0.83 0.93 0.00 BC SanGe-P1 BC SanGe-P2_3
3 2 3

Load_BolivarA Load_BolivarB Load_AmplBolivar


BC Bolivar BC_ProyBol1 BC_ProyBol2

Load Flow Balanced


Nodes Branches
Line-Line Voltage, Magnitude [kV] Active Power [MW] AMPLIACIÓN SUBESTACIÓN CHILCAYOC Project: CHILCAYOC
Voltage, Magnitude [p.u.] Reactive Power [Mvar] Graphic: SE CHILCAYOC
Flujo de Potencia
Voltage, Angle [deg] Maximum Loading [%] EST2018MAX_C2 Date: 5/10/2018
Power Factor [-] PowerFactory 15.1.7 Con Proyecto Annex: 02