2015 8th International Conference on Intelligent Computation Technology and Automation

Research on the application of BIM Model in Interior Design

Huang Weiyan 1,a, Yang Peng 2,b


College of Art and Design, Nanjing Forestry University, Nanjing, Jiangsu Province, China 1
Nanjing Institute of Visual Arts, Nanjing, Jiangsu Province, China2
hwy45111@126.com

Abstract—In the context of the digital information era, the 2D stages, including design, construction and anaphase project
models with the major expression means of the traditional management, undergo great changes. Based on the analysis
computer graphics software, such as AutoCAD, have become of the current application process of BIM in interior design
less and less able to meet the demands on interior design of projects, the advantages brought by it and various problems
large construction projects with complex geometry. In occurred currently were discussed in this paper with a view
combination with the application of the BIM technology at the to providing better ideas and methods for interior designers
stage of design, construction design and anaphase project in the future and creating more values with the new design
management of interior projects, BIM's strengths and its working models in the era of BIM.
problems exposed at present were summarized to explore how
this new technology can better serve specific interior projects II. APPLICATION OF BIM AT THE PROGRAM
and how practitioners should meet the changes brought by STAGE OF INTERIOR DESIGN
information technology in the industry.
Designers in the past always draw various spacial
Keywords- BIM, AutoCAD, Revit, interior design, modeling, dimensions with AutoCAD or other traditional graphics
optimization software at the design stage of interior projects. It was just
the realization of computerization in design process and,
I. INTRODUCTION with the 2D drafting and without considering the overall
space, it was not substantially different from the traditional
The so-called BIM (Building Information Modeling) is a manual graphics in terms of design method, and this required
digital visualized architectural model constructed based on a strong dimensional imagination and a lot of practical
advanced 3D digital design solutions. As the name implies, experience of designers in order to avoid engaging the mere
it not only points to the model itself, but also covers the decoration of interface. Inexperienced young designers
whole process of model forming and playing its roles. This always declined to AutoCAD draftsmen due to the lack of
means that it is possible for BIM to effectively save energy design practices when they were green hands in this industry
and costs, reduce pollution and improve efficiency at various and their creativity was quenched in the long and repetitive
stages of a project, such as design, construction and use, computer operation.
because a construction project will be influenced and
controlled by BIM throughout its life cycle from the
beginning to even the operation and maintenance after the
completion. In a manner of speaking, it was the rapid
development of information technology that gave birth to
BIM during the increasingly complex interactions among the
links, such as design, construction and operation, of large
construction projects. Today's construction projects are
increasingly complex in the coordination of different links,
and there are more and more obstacles to be overcome if a
big construction project is completed by conventional means.
BIM coordinates various complex relationships with a
mathematical model through different functional simulations
and program derivations, and it also offers unlimited Figure 1. Drawing interface of AutoCAD (Drawn by the author)
possibilities to the design itself. Due to the above advantages,
the BIM working model is rapidly applied to the The working method of BIM has radically changed this
construction industry. Nowadays, the big cities where these pattern of design. In BIM, virtual 3D space will be built in a
weirdly shaped buildings emerge are precisely the direct computer at the early stage of design based on parameterized
beneficiaries of this new technology. As the complement and modeling software, such as Autodesk's Revit and Robert
supplement of architectural projects, interior design will be McNeel & Assoc's Rhino, with the link to the related
inevitably affected by the BIM model, and especially the professional files of architecture and other equipment
BIM-based building projects develop this new working professions, allowing designers to visually observe the
model and initiate the thorough renovation from drawing characteristics and basic situation of architectural space and
tools to design methods. In this process, all the links of the providing real feelings of interior space from different angles;
meanwhile, integrated analyses of building volume

978-1-4673-7644-0/15 $31.00 © 2015 IEEE 769


767
DOI 10.1109/ICICTA.2015.195
relationships, structural features and functional requirements III. APPLICATION OF BIM AT THE
can be made and the spacial forms with both artistic styling CONSTRUCTION STAGE OF INTERIOR DESIGN
and practicality can be obtained through designers'
The construction drawing of interior design is an
adjustment through these parameterized software and digital
important stage linking design and construction and it
technologies. Fig. 2 shows the unique space made through
the simulation of the actual spacial requirements in a requests that all ideas in design program should be
computer with Rhino Grasshopper software operating in a transformed into concrete practices in drawings, including
Rhino environment. planes, tops, facades and lots of detailed nodes. These
drawings are required to be accurate in dimension, have
detailed material callouts and clearly and concisely reflect
the concrete internal structure (as shown in Fig. 4).
Moreover, the construction drawings of interior design will
be affected by the adjustments in other professions on site
during drafting construction drawings, and this requires
timely follow-up modifications, which will take a lot of
labor and omissions will easily arise. That's why
construction drawings involved quite a lot of manpower and
time and repeated modifications and realignments were
Figure 2. Working interface of Grasshopper (Provided by Shanghai Gold common in the past when AutoCAD was used as an aid in
Mantis Construction Decoration Co., Ltd) drawing. AutoCAD is impotent particularly in processing
complex irregular-shaped forms in design programs.
BIM, as a way of working, not only fits interior
decoration model through software in a computer and
optimizes programs, but also realizes direct communication
with designers and makes up for the deficiencies of 2D
drawings, so it can facilitate the efficient adjustments at the
design stage. Fig. 3 shows the corrugated aluminum ceiling
of the corridor in the commercial space of a large building.
Figure 4. Detailed nodes of a set of doors in an interior project (Drawn by
By using the BIM model, designers finalized the shape and the author)
scale of corrugation, greatly improving the efficiency of
communication by solving the problem that the 2D drawings The major advantage of BIM at the construction drawing
can't effectively
y and intuitively
y communicate with designers. stage is synchronization. Revit software, for example, which
is as accurate as AutoCAD , can be used to build complete
spatial models and models of spatial components in the form
of 3D modeling, and finally the detailed façade drawings of
the final drawings are directly exported by the model (as
shown in Fig. 5). Therefore, when a local adjustment is
made, the drawings of other related parts will be adjusted
automatically. This means that all modifications are
completed synchronously in BIM, which facilitates the
interactions among different professions and eliminates the
hidden troubles caused by frequent modifications during the
construction process. Meanwhile, synchronous recording of
component information and production of schedules are
Figure 3. Data comparison of the programs of the corrugated aluminum allowed in Revit, and this information is beneficial to project
ceiling of the corridor in the commercial space of a large building(Provided material consumption statistics, and it keeps synchronous
by Shanghai Gold Mantis Construction Decoration Co., Ltd) update in the modification process, increasing efficiency and
ensuring accuracy (as shown in Fig. 6).
In fact, the new design model has also changed the
composition of project designers: the young designers are
not required to previously determine the complete space
design, and they can build a virtual 3D complete information
model in a computer and then revise and improve it under
the direction of senior designers. This process will not only
liberate them from redundant and inefficient drawings, but
also help these young designers understand the design Figure 5. Direct exportation of part dimensions of forms by using
process and design ideas in a more intuitive way and Revit(Provided by Shanghai Gold Mantis Construction Decoration Co.,
improve their design capacity by participating in the creative Ltd)
processes.

768
770
BIM has changed the traditional ways of cooperation, so
that all departments work together to provide unified and
efficient platforms for interoperability and communication
for professions, significantly reducing communication costs
and improving communication efficiency. All the work
details of a project will be recorded and shared, and any
adjustment to parameters will be reflected in the whole,
greatly reducing the probability of making a new start in
construction and avoiding unnecessary waste (as shown in
Fig. 8).

Figure 6. Statistics of component data (Provided by Shanghai Gold


Mantis Construction Decoration Co., Ltd)

The BIM system can be used to deal with regular spatial


components and its advantages lie in the solutions in the
construction drawings of complex irregular-shaped spatial
structures. As shown in Fig. 7, the irregular-shaped copper
ceiling of a lobby space is exported by using the BIM model,
and each part of copper plate is expressed in detail, and 
specific positioning programs are provided; meanwhile, the Figure 8. BIM's platforms for interoperability and communication (A
construction simulation in the BIM model ensures the picture from the Internet, source: www.autodesk.com)
feasibility of construction and can present the detailed
problems omitted in design, detect the shortages on minor BIM not only provides programs at the design modeling
details and solve them before construction. stage but builds complete constructing models and input the
information of fitting components with the optimization in a
3D level. This will not only ensure the efficiency and quality
of construction, but offers the model use data for anaphase
operation and maintenance (as shown in Fig. 9).

Figure 7. Software-aided positioning (Provided by Shanghai Gold Mantis


Construction Decoration Co., Ltd)

IV. APPLICATION OF BIM AT THE Figure 9. Establishing a complete model database (Provided by Shanghai
Gold Mantis Construction Decoration Co., Ltd)
CONSTRUCTION AND ANAPHASE OPERATION AND
MAINTENANCE STAGE OF INTERIOR DESIGN
In the operation of traditional interior projects in the links, V. MAJOR EXISTING ISSUES IN APPLICATION OF
including design, construction, maintenance and anaphase BIM IN INTERIOR PROJECTS
management, the professions exist in the form of chain In the new age of digital information, BIM has radically
cooperation, and this leads to the inevitable problems in the improved the way of thinking in design and realized the real
coordination among them. The finalized design programs harmonization of "function and form" and provides endless
always need major modifications because of the possibilities for designers in their creation, an effective
requirements of water, electricity, heating and ventilating platform for the efficient completion of construction project
equipment installation or the specific requirements of and reliable sources for anaphase management. However, as
architectural structure on site. These modifications bring not a new system, BIM shall overcome lots of obstacles and
only the loss of efficiency but also a lot of omissions and difficulties in its development, particularly in the
great troubles in the final drawing review and construction. professional field of interior design which has more
Meanwhile, the repair of specific parts in anaphase complicated problems. Currently, BIM is primarily applied
management will involve more workload due to imperfect to the interior design of large BIM-oriented construction
drawings and incomplete component information.

769
771
projects. Compared with construction projects, the issues in [3] Fang Fengyang. A Comparative Analysis of Application of Autodesk
the application of BIM in interior projects include: Revit Architecture and AutoCAD in Interior Design (Architectural
Design Management, China, Jan. 2013), p.21-27
(1) The effective operation of BIM relies on teamwork.
At present, however, the lack of effective feedback from
design department and construction team and material
suppliers and the absence of a close two-way communication
mechanism have stopped the effective sharing of a lot of
resources;
(2) Most software in BIM is not as popular as AutoCAD
in China, and it set relatively high technical demands on
designers. The traditional AutoCAD drawing method cannot
be replaced by BIM in the short term, and this requires BIM
model to work based on the drawings of AutoCAD and dims
BIM’s efficient synchronization;
(3) No criterion for interior BIM model data has been
established and the problems caused by the confusion of file
data criteria obscures its convenience and makes it difficult
for the BIM model to play its due role in the search during
using BIM and anaphase operation and maintenance;
(4) Despite of the high overall efficiency of BIM, as a
system for construction services, BIM has the software most
of which is less adapted to the interior design in detailed
operations, such as less free drawing annotation and less
diversified expression.
These problems do not mean that BIM is deficient, but
rather reflect some shortcomings of the interior design
industry in China: the relative independence between various
professions, the lack of teamwork and awareness of sharing,
relatively lower industrial and technical threshold and weak
basis for standardization, which are in urgent need of
solutions in the new era. Meanwhile, it is necessary to
accelerate the development of technical supporting software.
VI. CONCLUSIONS
The application of BIM in design originally stemmed
from the requirements of the process of complex irregular-
shaped forms, but BIM’s obvious advantages reflected in the
process of application at all levels quickly make it a weapon
promoting the changes in the era. As an emerging
technology, BIM will inevitably go through a long period of
adjustment and improvement in its development and meet all
kinds of obstacles and difficulties during this period. In the
long term, however, the requirement for efficiency,
environmental protection and energy conservation in the era
will accelerate the development of BIM and bring a digital
revolution in various industries. It is predictable that BIM
will really lead the industry of interior design into the era of
information integration application with overall
collaboration in the near future and provide more extensive
creative space for designers.
REFERENCES
[1] Wang Yu & Chang Qian. Success in a Job Presupposes Ready Tools:
Cases of BIM of WDCE and the Experience (Journal of Architecture,
China, Jun. 2011), p.101-104
[2] Bu Yiqiu. From CAD To BIM: While the Prospects are Bright, the
Road ahead is Tortuous. (Architectural Creation, China, Jun. 2011),
p.154-158