Vous êtes sur la page 1sur 8

Third 2008 International Conference on Convergence and Hybrid Information Technology

A Study on Application of BIM(Building Information Modeling)


to Pre-design in Construction Project

Nam-Hyuk Ham1,a, Kyung-Min Min2,b, Ju-Hyung Kim3,c, Yoon-Sun Lee4,d , Jae-Jun Kim5,e
1,2
Master Course, Dept. of Sustainable Architectural Enginr., Hanyang Univ., Seoul, Korea
3
Professor, College of Architecture, Tongmyong Univ., Busan, Korea
4
Research Prof., Dept. of Sustainable Architectural Enginr., Hanyang Univ., Seoul,
5
Professor, Dept. of Sustainable Architectural Enginr., Hanyang Univ., Seoul, Korea
a
sunkist7@naver.com, bwheninneedmin@gmail.com, cjkim@tu.ac.kr, dyoonnsunlee@korea.com,
e
jjkim0205@hotmail.com

Abstract making new decisions by related participants are


insufficient by reusing and referring to information
Construction project pre-design phase is highly gathered, processed, saved on the project. This is
influential in setting the directions for the whole because major planning relied on experiences and
business and project to proceed. Thus, it is essential to intuitions of few experts despite of many participants
collect and analyze enormous amount of data related in planning phase with broad job scope and unclear.
to construction project. So far, the pre-design phase in Therefore, there requires study on ways to support
a project was depending on experts’ experience and making major decisions by the participants, contractor
intuition. However, as construction projects become and constructor, in planning phase.
larger and more complex, the amount of related The concept of BIM (Building Information
information and analyzed data increases. Therefore, Modeling) is becoming important from the point of
the necessity arises for a plan that could directly integrated management on information generated
support the pre-design phase. In this paper, BIM was during the lifecycle of the building in advanced AEC
suggested as a tool that will support the pre-design (Architecture, Engineering, Construction) industries in
phase, and so the concept and role of pre-design BIM the US, Finland.
is defined. The framework of pre-design BIM Therefore, this study aims to expand the concept of
simulation is composed using the international BIM as a tool supporting information to support
standard model IFC and how the pre-design BIM planning and maintenance phase by expanding studies
simulation system can support the process is on BIM limited only in AEC and to present application
illustrated. plans.

1. Introduction 1.2. Methods and Procedures of Study

1.1. Background and Aim of the Study The study was conducted in the following ways to
present plans for supporting architectural planning
Each phase of jobs directly affect the life-cycle of using BIM.
construction project, that is planning, design, First, the study presented the changes in
construction, maintenance and the quantity of construction environments and the necessity of BIM
information generated from this is huge. As the application in architectural planning phase and
construction projects at present day is getting bigger, methods of study.
complex thus the quantity of information increases Second, the concept of BIM was defined presented
exponentially and efficient management and use of this as a tool to define architectural planning and analyze
information is required. Currently, there are many the trends of related studies and to support architectural
studies to increase the efficiency of projects by planning from theoretical examination.
managing this information and reusing useful Third, obtained the concept and roles of planning
information in construction project design and BIM by analyzing the concept of planning process and
construction fields. However, studies on these project lifecycle BIM.
information is insufficient in planning and maintenance Fourth, defined 3D unit space model based on the
fields and planning phase is especially where major international standard IFC space model to support
decisions on the project in general are made but architectural planning using BIM and constructed

978-0-7695-3407-7/08 $25.00 © 2008 IEEE 34


42
DOI 10.1109/ICCIT.2008.190
simulation system that implements the roles of information from contractor through collection and
planning BIM based on the model. Finally, conclusion analyzing information into design from the viewpoint
presented summaries on this study and future of project lifecycle.
directions.
Table 1. Definition of Architectural Planning
2. Theoretical Examination Researcher Contents
Study to use as a tool assisting knowledge model
2.1. Definition of Architectural Planning Dong Jae
Aim to solve problems in architectural planning using
GIS
Wook
Architectural Planning is planned frequently in each Defined as a function presenting direction and
and 2 others
project but it’s not systematized due to lack of interests guide of design through collection and analysis
(2006) Def
on planning duties. As the construction projects are of information required in design as well as
getting bigger and complex the importance of feasibility and economy of the project
architectural planning is in increase recently. The Study to systemize by clearly dividing duties of
definition on architectural planning varies according to Aim
each phase of building lifecycle
the aim of the studies and it is shown on Table 1. Defined planning phase ranges from the
Dong Jae Wook and 2 others (2006) divided the Jang Sung
beginning of project to preparing guide for
planning phase of construction project into solving Jun
design phase from the viewpoint of project
problems and information flow system, many decisions (2002) Def
lifecycle and prepared job results through the
are made and explained by external environments in
participation of experts in various fields related
the planning phase as a problem solving and it is
with planning
included as definite action expressed by knowledge
system or methodology. Also, the planning phase as Study to clarify the concept of architectural
Aim
information flow has the information structure to planning
convert information required by participants on many Park Il Woo
Defined the concept of feasibility study and
problems on the projects and information related with and 1 other
economic feasibility focusing on project
projects into new building information. operation plans and a phase presenting the
(2001) Def
Park Il Woo and 1 other (2001) said that the concept direction of design and setting up design
of domestic architectural planning matches with the conditions focusing on the concept of improving
concept of architectural planning in Japan that physical ability of buildings
emphasize feasibility study and project operation plan Presented the concept of planning as a
and analyzed that “Architectural Programming” Aim
methodological approach of architecture
concept, “Pre-design” concept regarding planning as Robert. G. Regarded planning as the first stage of
planning at pre-design phase in lifecycle that are being Hershberger architecture and defined phases of setting goals
used in the US as rational and systematic design
(1999) Def of project, collecting information, extracting
methodology.
building requirements by reflecting the values of
The definition on planning by Cherry (1999), the
contractor, user and social value
concept of construction framing is strong, defined
problems that can be solved with design as studying Presented the concept of planning as
Aim
and decision making procedures to prepare rational methodological approach of architecture
standard for selecting the most appropriate types of Edith Cherry
Defined problems that can be solved with design
buildings by architects in pre-design phase and to (1999)
as research and decision making phase and it is
obtain solutions on the range of projects and design Def defined as extracting solutions on design
standards through programming procedures. standard and clarifying the scope of project by
Park Han Gyu (1998) advised to prepare all constructor
information and data required for constructor to start Basic study for matching architecture
designing through his study to apply practically Aim
methodology with actual jobs
architecture methodology. Park Han
As the following table shows, the definitions on Gyu Defined as preparing information and data
architectural planning are diverse and architectural (1998) Def needed for starting designing and completing it
planning can be summarized as a role of gathering by constructor
necessary information in advance to perform
construction projects and setting up the direction of 2.2. Advance study on architectural planning
project and as a pre-design phase for reflecting related

43
35
A Architectural planning, from project life cycle based methodology. Many cases for supporting
viewpoint, is finding out the needs of construction decision making by participants by using those
participants related with project and finding out technologies and drawing control and site control are
information on pre-design phase and it should be being discovered in the fields of architect and
converted into useful information at design phase and construction due to development of information
provide tools for making decisions for contractor and technology but there are not many studies applying
architects. There needs to know about the scope and those information technologies at planning phase yet.
duties of planning to support making decisions as Kim Chang Guk (1991) researched progresses of
architectural planning phase, and supplementary means finding out problems arising at the beginning of design
to control those information should be studied for process and conceptualizing and presented basic
using information at each phase of project well in methodology on modeling to execute those processes
lifecycle. with computer, You Sang Wook and 1 other (1994)
Table 2 shows advanced studies on architectural studies concepts on architectural processes to develop
planning and broadly divided into study to present object oriented construction programming professional
architectural planning for clarifying the processes of system and selected construction programming model
planning phase and study on construction of and established theoretical conceptual model to
knowledge structure on architectural planning and construction system based on object oriented
decision making system assisting planning. development methods. Dong Jae Wook and 2 others
As shown previously, architectural planning can be (2006) along with recent NGIS Project performed
defined diversely and the scope and contents of duties studies by dividing into information analysis phase
are diverse as well. There arises duplication of duties through analysis on societies and natural environments
due to unclear planning duties and lacks cooperation and GIS analysis and feasibility analysis phase such as
between experts. A study by S Architecture Office on facility programming, feasibility study and business
planning process for systematizing architectural forecasting, and decision making phase based on
planning stated that feasibility study is conducted comprehensive business plan and planned design.
before signing contract with the contractor and As seen so far, the duties of planning phase is
performed architectural planning after signing the unclear compared to design and construction fields and
contract but in reality, it was not able to present broad and there are many participants since it is the
comprehensive planning model because feasibility beginning phase of project lifecycle thus it is difficult
study and construction is progressing at the same time to establish process and prepare plans for supporting
thus it was difficult to apply in various situations. Gang planning duties. This study intends to use BIM
Mi Sun (1997) considered the economical and social (Building Information Modeling) concept which is
gains on contractor and architectural planning aspects becoming popular in AEC(Architecture, Engineering,
in feasibility study with comprehensive viewpoints. Construction) industry as a supporting tool for
However, it is limited by limiting planning in comprehensively managing information generated
feasibility study side only. According to Architectural during the lifecycle of buildings and for duties before
Planning Theory by Japanese Architect Academy designing phase.
(1992), planning process is composed of project
proposal, planning condition analysis, planning from Table 2. Advance study on architectural planning
organization/administration/spatial/technology aspect, Class Researcher Contents
evaluation of plans and preparation but the procedures Learn lessons through project analysis
of planning duties on each phase are unclear and has Gibsond and related with initial planning processes
difficult in controlling architectural planning in terms 3 others and proved positive relationship
of construction project lifecycle. (2006) between initial planning and
improvements in project results
Kim Jin Woo (1996( and H Kim (2007) constructed
Presenting
knowledge structure of architectural planning for Architectural Performed feasibility study before
studies on construction of knowledge structure of Planning S Architect signing contract with contractor and
architectural planning. Kim Jin Wook studies ways to Process Office performed planning design in
(1998) architectural aspects after signing the
extract essential knowledge in developing knowledge contract
base meeting the characteristics of construction fields
as a base step to develop knowledge base system in Gang Mi
Presented feasibility study models in
Sun
construction design field, H. Kim defined the (1997)
economic, social, architectural aspects
relationship between object and object of buildings to
support initial design phase, and constructed those
concepts with ontology and presented knowledge

44
36
Discussed about concepts and Table 3. Definition of BIM
Gibson and definitions at initial planning phase and Organization,
Definition
2 others presented process model analyzing Scholar
(1997) functions of planning phase Provide parametric based model to reflect
Composed of project proposal, insertion, extraction, updating or altering physical,
NIBS
Japanese planning condition analysis, planning functional characteristics of building at each steps
(2007)
Architect in aspects of as needed throughout the processes to support
Academy organization/administration/spatial/ cooperation among related parties
(1992) technology, evaluation and preparation Comprehensively manage and use information on
of plans Gang Hyun all steps from planning to expiry through
H.Kim and 1 Cheol and 1 exchanging and sharing information according to
Construct space with building ontology
other other projects, processes focusing on interoperation of
Construction for supporting initial design
(2007) (2007) information through the entire lifecycle of
of
Architectural Construct knowledge base construction
planning development phase for developing Refers to the entire processes of exchanging,
Kim Jin
Knowledge knowledge base system in construction GSA reusing, controlling information generated during
Wook
Structure field and examined ways to extract (2006) the lifecycle of building through object oriented
(1996)
knowledge essential in developing artificial intelligent information model
knowledge base
Comprehensively control all information and
Performed studies by dividing into Lee Gang organization, duties and processes needed from the
information analysis phase through (2006) stage of planning for construction to its cycle of
analysis on societies and natural design, construction, maintenance and demolition
Dong Jae
environments and GIS analysis and
Wook and 2
feasibility analysis phase such as
others As seen from the above, the concept of BIM has
facility programming, feasibility study
(2006)
and business forecasting, and decision developed from the points of integrated management
making phase based on comprehensive of information thought the lifecycle of a building and
business plan and planned design
its concept is being firmly established with the
Defined the concepts on design development of CAD. Picture 2 compares efforts and
Decision processes for developing object
Making oriented APES (Architectural effects required to form BIM based on existing CAD
System You Sang system, object-oriented CAD system, parametric based
Programming Expert System), selected
supporting Wook and 1
other
construction programming model and CAD system. As shown in the picture, parametric
Planning set theoretical conceptual model to
(1994) based CAD system is most effective in forming BIM.
construct APES by integrating
structure expert system based on
object-oriented development methods

Presented basic methods in modeling


from problems arising in the beginning
Kim Chang
to conceptual modeling and till
Guk
execution in computer based on themes
(1991)
on design problems, design models,
problem search and problem solving

2.3. BIM(Building Information Modeling)

A According to (2006), there were many


discussions on BIM at a conference held in 2005 and
Eastman & Laiserin argued that BIM should be Figure 1. BIM composition and CAD technology
regarded as the entire process exchanging, reusing and
controlling project information being generated during One building model is used through each participant
the lifecycle of buildings and not just simple and program per field to manage project information
Information model. The BIM concept defined from the on the lifecycle of building and STEP, IFC, XML are
aspect of integrated control of information generated being developed to interoperability of data in
during the lifecycle of building has stronger meaning ISO(International Organization for Standardization)
as integrated control of processes through parametric and IAI(International Alliance for Interoperability) to
modeling advancing from the concepts of existing 2D solve the problem of data compatibility. Especially,
CAD, Object CAD model and the definitions of BIM IFC (Industry Foundation Classes) of IAI integrates all
are shown on Table 3. objects of industry throughout the lifecycle of

45
37
AEC/FM project thus compatibility between BIM
exclusive program can be solved.

3. Concept and Role of Plan BIM

3.1. Concept of Plan BIM Figure 3. Planning Supporting BIM

‘Tasks and Outlooks on constructing Korean BIM’ 3.2 Roles of Plan BIM
forecasted that interoperability and the importance of
information exchanges between firms will increase as Job processes at planning phase can be defined
the steps of development increase as BIM development according to the characteristic of projects. Planning
steps of BIM based on the results of researching duty is a process of extracting optimum Plan by
European BIM market evolve into unit function BIM, comprehensively finding out information related with
job unit BIM, A/E step BIM, A/E/C step BIM, project and the role of Plan BIM should be defined on
lifecycle BIM and presented that it should become this line of thoughts.
lifecycle BIM integrating planning, designing, As defined previously, Plan Supporting BIM should
constructing, maintaining building. BIM refers to be reflected initial data related with plans and
process comprehensively managing information being requirements related with projects at initial space and
generated throughout the processes and not just simple Plan BIM with strong characteristics of initial project
information model. For planning phase, it is a phase program as shown is developed into Building Model
where the first information is generated for integrated by going through design, construction, maintenance.
management along with the start of the project and Major roles and detailed duties of Plan BIM are shown
generates basic information on design phase. on Table 4. Major roles of Plan BIM is supporting
processes of collecting and analyzing data, process
extracting optimum space plans reflected with
requirements from contractor and project.

Table 4. Role of Planning BIM


Characteristics Roles Detailed Duties
-Feasibility Study
-Research and Analysis on surround
environments (social/nature)
Data -Land analysis
collection/ -Review legal validity
Analysis (purpose, floor space, building space,
height control)
Figure 2. Concept of lifecycle BIM -Project costs analysis
-Research/compare similar buildings

Trelligence Affinity, US firm developing a system -Maximum costs for contractor


-Due Date management
supporting initial design phase, called the tools Managing -Requirements on the size of space
containing those information as Program Model and Program
Requirements -Space composition on building,
Model
these model include data at initial phase, requirements purpose
related with project (land, contractor), initial space plan -Selection of finishing materials
which is the basic information at design phase and -Examine feature of building unit
stated that this model evolves into Building Model space
gradually by going through conceptual design and -Set physical size of building
execution design, construction and maintenance phases. -Extend/reduce building (complex)
Space Plan -Layout of building
As shown from the above, BIM supporting planning -Review costs on space plan
use Program Model containing information on general -Review regulations on space plan
project and create initial BIM to manage project -Review space on contractor
through acquiring, generating, reusing information requirements
throughout the lifecycle. The concept of Plan BIM is as 4. Plans for implementing supporting
follows.
architectural plan using BIM

46
38
4.1. Define unit building space model for Site inherits all attributes as Sub Object of unit
supporting planning space and has Address information as additional
attribute.
There requires a tool to contain architectural
planning information to use on construction lifecycle Table 6. VC_Site Object Definition
usefully by collecting/analyzing information at attribute description
planning phase, BIM required for supporting planning Global_ID Object identifier
at initial project phase is space model containing initial Name Object name
data on project and contractor requirements thus it
should contain attributes on definitions and usage, VC Type Object type
costs on unit space to be developed into Design BIM _Site Placement Object location information
Model. This study constructed 3D Unit Space Model
Representation Object shape information
based on space model of IFC, international standard
model. Address Address information
IFC Model being developed as standard BIM model
in construction industries has broad range of 4.1.3. Building
expressing information and open-structure in
expressing information thus has excellent advantage in Building inherits all attributes as Sub object of unit
expansion and application of BIM model. Unit space space and has ground level and address information as
model for supporting architectural planning support is additional attributes.
as follows.
Table 7. VC_Building Object Definition
attribute description
Global_ID Object identifier
Name Object name
Type Object type
VC
Placement Object location information
_Building
Representation Object shape information
GL Building height information
Address Address information

4.1.4. Storey

Storey inherits all attributes as Sub Object of unit


Figure 4. 3D Unit Space Model space and has elevation value as an additional attribute.
4.1.1. Unit Space
Table 8. VC_Storey Object Definition
attribute description
Unit space, conceptual object, is defined as attribute
contained commonly by all space objects. Global_ID Object identifier
Name Object name
Table 5. VC_UnitSpace Object Definition VC Type Object type
Attribute description _Storey Placement Object location information
Global_ID Object identifier Representation Object shape information
Name Object name Elevation Elevation information
VC Type Object type
_UnitSpace
4.1.5. Space
Placement Object location information
Space inherits all attributes as Sub Object of unit
Representation Object shape information space and has interior/exterior identifier and elevation
height as additional attributes.
4.1.2. Site Table 9. VC_Space Object Definition
Attribute description

47
39
Global_ID Object identifier identify additionally required interior and exterior and
Name Object name Elevation_from_floor displaying the height of
Type Object type elevation. Rough space planning can be planned
Placement Object location information through generated unit space.
VC
_Space Representation Object shape information
Identifying internal and
Interior_Exterior
external space
Elevation_from Height of space (based on
_floor level)

4.2. Planning Simulation using BIM

This chapter presented prototype system showing


how the system supports architect through planning
simulation system platform through unit space created
based on IFC. Figure 6. Generation of Unit Space Model
for planning space
4.2.1. Generation of Project
4.2.3. Reviewing Space Plan

Space tree will be generated on navigation on the


screen according to the types of project through unit
space model and architect can set up space plan
through those unit spaces. At this time, basic mass is
generated according to land and regulations for
reviewing unit planning and basic mass is generated by
inheriting attributes of land. Architect needs to check
Figure 5. Generation of Project the size of space and the relationship between spaces
through unit space and can adjust appropriate size
Picture 6 is the initial step of a project and this is according to space. Also, space planning outside of
where the types of project is decided and information basic mass can be derived through moving and
related with projects such as location of land, expansion/reduction, alteration of spaces.
contractor requirements is generated for the first time.
When a location of land is decided than regulations on
land will be automatically generated and user can
define laws and regulations to consider and items
related with regions, zones according to the
characteristics of projects. For land, an attribute on
address will be added on the previously constructed
unit space model attributes.

4.2.2. Generation of Unit Space Model for planning


space
Figure 7. Reviewing Space Plan
Architect classifies spaces according to purposes
through researching and comparing existing similar 4.2.4. Cost Review
buildings and calculates appropriate size according to
project desired by contractor. Planning phase requires economical review as well
Space for planning space plan inherits attributes of and space information for designing. Costs per each
unit space and basically includes Global_ID an space can be calculated when unit space model and
attribute to identify objects, Name an attribute costs are linked. Also, it is possible to calculate costs
displaying object name, Type displaying the types of per storey, purpose according to the classification of
object, Placement displaying location of object, unit space and space plan can be adjusted based on the
Representation displaying the shape of object and total costs presented by the contractor.
additionally defines Interior_Exterior an attribute to

48
40
for construction project”, Collection thesis from Korean
Architect Academy, Vol. 22, No. 9, 2006 pp. 101-110
[6] Park Il Woo, Park Young Gi, “Study on establishing the
concept of architectural planning”, Collection thesis from
Korean Architect Academy, Vol. 17, No. 8, 2001, pp. 67-74
[7] Park Han Gyu, “Study on using programming in
architecture at Korean architect firms”, Collection thesis
from Korean Architect Academy, Vol. 14, No. 3, 2006, pp.
69-80
Figure 8. Cost Review [8] You Sang Wook, Jung Mu Woon, “Basic study on the
development of professional system for construction
5. Conclusion programming”, Collection thesis from Korean Architect
Academy, Vol. 10, No. 6, 1994, pp. 33-42
This study aimed to present the concept of Plan BIM [9] Lee Gang, “Key technology for managing building
and its applications to support decision makings by lifecycle”, Collection of Thesis from Korean Architect
participants of planning phase. Academy Seminar, 2006, pp. 145-149
It established the concept and role of Planning BIM [10] Japanese Architect Academy, “Architect Planning”,1992
efficiently supporting decision makings at planning [11] Jang Sung Jun, “Collection of lectures on architect
phase through defining architectural planning and planning”, Myungji University, School of Architect, 1998
analyzing advanced studies, defining BIM, and studied [12] Jang Sung Jun, “Study on duty division of architects
the role of planning supporting BIM according to each and job results”, Collection thesis from Korean Architect
Academy, Vol. 18, No. 9, 2002, pp. 51-58
situation by creating simulation screen to check how
[13] Autodesk. Building Information Modeling in Practice.
planning duties can be supported based on unit space Press Releases White Paper, http://usa.autodesk.com/adsk/se
model by establishing 3D unit space model based on Rvlet/item/?siteID=123112&id=8127972, 2006
space model based on IFC model by taking into [14] G. E. Gibson, J.H. Kaczmarowski, H. E. Lore,
account expendability and compatibility from the point “Preproject-Planning Process for Capital Facilities”, Journal
of view from project lifecycle. Finally, there required of Construction Engineering and Management, Vol. 121, No.
studies to define the relationships between unit space 3, 1995, pp. 312-318
models according to space formation and purposes, [15] G. E. Gibson, Y. R. Wang, C. S. Cho, M.. P. Pappas,
contractor requirements and it is believed that there “Waht is Preproject Planning, Anyway?”, Journal of
Management Engineering, Vol. 22, No. 1, 2006, pp. 35-42
needs studies on expansion of planning supporting
[16] GSA Building Information Modeling Guide Series (01-
BIM when we think that construction project planning GSA BIM Guide Overview), 2006
will expand from building to complex, region, city [17] R. G. Hershberger, “Architectural Programming &
units. Predesign Manager”, McGraw-Hill, 1999
[18] IAI Korea, Technology seminar and reports on activities,
References Construction Standard IFC, Advance construction,
CAD&Graphics, 2006, pp. 50-51, http://iai.or.kr/
[1] Gang Mi Sun, “Study on methods of analyzing [19] H. Kim, F. Grobler, “Building Ontology To Support
FEASIBILITY at architectural planning phase”, Doctorate Reasoning In Early Design”, Computing in Engineering,
thesis for Seoul National University, 1997 2007
[20] National BIM Standard Version 1.0-Part 1 : Overview,
[2] Gang Hyun Cheol, Lee Myung Shik, “Study on Principles and Methodology by NIBS, 2007
development of construction duty integration model through [21] http://ce.vtt.fi/iaiIFCprojects/
analysis on BIM cases”, Collection of Thesis from Korean [22] http://www.trelligence.com
Architect Academy Seminar, Vol. 27, No. 1, 2007, pp. 61-64.
[3] Kim Jin Wook, “Study on Knowledge Acquisition
method for developing architect knowledge base”, Collection
thesis from Korean Architect Academy, Vol. 12, No. 6, 1996,
pp. 47-62
[4] Kim Chang Guk, “Basic study on using Cad in
construction programming environments”, Collection thesis
from Korean Architect Academy, Vol. 7, No. 3, 1991, p. 3-8
[5] Dong Jae Wook, Go In Yong, Lee Hwa Ryong, “Case
Study on using geographic information system in planning

49
41

Vous aimerez peut-être aussi