Vous êtes sur la page 1sur 2

COLLEGE OF COMPUTER STUDIES

Bachelor of Science in Computer Science

I.T RESOURCE PLANNING

COMPANY NAME: _____________________________________

FINAL PROJECT PRESENTATION RUBRIC

Planning and Time Management: This score indicates the amount of time spent planning the project and the effectiveness of time
management skills throughout the completion of the project (meeting assigned deadlines, turning in paperwork, etc.).
Indicator Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
PLANNING & No evidence of Procrastination lead to Little planning or Basic planning and time Planning and time Exhibits a
planning incomplete project forethought management needs management professional level
TIME necessary for project exhibited enhance of planning and
MANAGEMENT Project hastily completion met the overall project time management
completed for deadline
Circle one 0 1 1.5 2 2.5 3 3.5 4 4.5 5

Comments:

Points Possible: 5
Score

Time and Effort: This score indicates the amount of time and effort the student expended completing the project.
Indicator Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
No evidence of Little or no “authentic” Minimal effort Meets basic time and Time and effort Exhibits a
TIME AND effort time spent on project effort required to expended on project professional level of
Met minimum time complete project enhances the overall time and effort
EFFORT requirements and didn’t project expended on project
complete project
Circle one 0 1 1.5 2 2.5 3 3.5 4 4.5 5

Comments:

Points Possible: 5
Score

Evidence of Learning and Risk Factor: This score indicates the level of knowledge gained by the student evident through the project,
and the extent to which the student was “stretched” or took risks through the project experience.
Indicator Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
EVIDENCE OF No evidence of Student never Little demonstration of Project demonstrates Project and project Student took several
genuine learning stretched their genuine learning; genuine learning/risks experience clearly risks to achieve a
LEARNING knowledge/capabilities limited risks taken were taken for expand- “stretched” student superior level of
AND RISK ing knowledge and knowledge and knowledge and
FACTOR skills skills skills through the
project process
Circle one 0 1 1.5 2 2.5 3 3.5 4 4.5 5

Comments:

Points Possible: 5
Score

Updated: April 20, 2011


Degree of Difficulty: This score indicates the variety and complexity of the components to completing the project.
Indicator Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Project Not appropriate effort Little degree of effort Project comprised of Project comprised Project complexity
DEGREE OF incomplete evident more than one of multiple approaches
EXERTED component of exerted components or professional quality
EFFORT One dimensional effort components exhibit
project great effort
Circle one 0 1 1.5 2 2.5 3 3.5 4 4.5 5

Comments:

Points Possible: 5
Score

Portfolio Preparation: This score indicates the quality of the portfolio.


Indicator Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Missing portfolio Incomplete portfolio Portfolio has major Portfolio complete with Portfolio complete Portfolio clear,
formatting and/or many several minor errors with very few minor concise, accessible,
PORTFOLIO Some required sections spelling errors errors with unique content
PREPARATION missing
Contents concise No formatting or
and accessible spelling errors
Circle one 0 1 1.5 2 2.5 3 3.5 4 4.5 5

Comments:

Points Possible: 5
Score

Quality of Final Project: This score indicates the actual quality of the physical product or quality of the project experience, with
“professional” quality being a score of 5.
Indicator Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
QUALITY OF No physical Little concern for Project completed but Project demonstrates High quality project Professional quality
FINAL project or project quality or demonstrates low appropriate quality illustrates student product or project
documentation of incomplete project quality work ethic experience
PROJECT project experience
Circle one 0 1 1.5 2 2.5 3 3.5 4 4.5 5

Comments:

Points Possible: 5
Score

Comments:

Total Score________ Final Points________

Percent ________ Rank ______

Vous aimerez peut-être aussi