Académique Documents
Professionnel Documents
Culture Documents
RAMP-C
B.O.P. 0+000
CONCESSIONAIRE:
803
X = 441186.956
7.6
Y = 3562620.094
+06
LSMIM
=0
Sta
60+000 LAHORE-SIALKOT
PC
MOTORWAY
8
97
EXIT RAMP-B
0+0
9.9
E.O.P. 0+209.46 INFRASTRUCTURE
50
5
+1
X = 441265.199
MANAGEMENT (Pvt. Ltd)
=0
Y = 3562583.941
0+1
Sta
00
PT
INDEPENDENT ENGINEER:
0+
15
0
0+
20
0
EXIT RAMP-B
0
20
B.O.P. 0+000 0
05
0+
0+
X = 441157.969
0+
13
25
Y = 3562523.824
.90
0
04
59+900
+2
0+
=0
30
C
Sta
0
E.P.C. EXECUTING AGENCY:
0+
PT
15
0
0+
D
TS
0
10
35
PC
Sta 0+
=0
0
+
Sta
12 PC
3.9
62 Sta
0+
2
F.W.O.
=0
=0
10
+
0+
00
+1
1.1
40
19
48
1
Frontier Works Organization
0
.08
C
51
(Headquarter 509, Kashmir Road,
0+05
0+
R.A. Bazar Rawalpindi.
45
0
0
SC
0
PT
0+15
Sta
= 0+
14
Sta
5.96
0+
22
D
=0
50
EXIT RAMP-B E.P.C. CONSULTANT :
0
+0
54
.77
59+800
0+
13
55
0
DIRECTORATE OF DESIGN
0+
& CONSULTANCY
0+20
0
60
0
FRONT OFFICE (M.C.E.)
NISAR ROAD,
0+
65
RISALPUR CANTONMENT
0
CROSS ROAD
0+
0+
70
PROJECT
25
0
0
0+
RAMP-C
75
0+950
B.O.P. 0+989.88
0
X = 441674.895
LAHORE-SIALKOT MOTORWAY
0+
30
1
Y = 3562409.549
66
0+
59+700
0
A
8.7
80
(B.O.T.)
26
0
61
0+
.76
=
a
0+
0+
90
St
85
+2
50
CS
ST Sta = 0+907.4331
=0
0
a
St
0+900
0+
ST
90
0+
0
40
E
CS Sta
= 0+877.
0
4331
0+
95
0
0+
45
0
1+
00
0+8
0
50
RAMP-A
0+
B.O.P. 0+000
50
1+
X = 442189.113
RAMP-C
59+600
9
0
05
74
B
Y = 3562197.742
0
E .1
EXIT RAMP-A
03
9
E.O.P. 0+230.39
+6
74
0+850
1+
=0
3.1
0+
X = 442271.609
1
10
55
79
CROSS ROAD
63
a
0+
Y = 3562163.536
0
St
0
6.0
80
+
RAMP-A E.O.P. 1+336.96
=0
TS
22
Sta E.O.P. 0+863.058 X = 442329.344
+
1+
=1
15
910
X = 441695.807 Y = 3562160.066
SC
0+
0
Sta
0
50
Y = 3562255.279
6
7.1
00
0+
PC
= 1+30
1+
0+
20
75
B
0
0+65
0
0+800
PT Sta
0
0+700
45
0
1+25
0+
0
RAMP-D
1+300
E.O.P. 0+502.87
0
40
X = 441444.746
0+
59+500
DRAFT DESIGN
81
Y = 3562213.177 50
0+0
1.39
00
EXIT RAMP-A 0+2
B1
B.O.P. 0+000
22
0+750
a = 0+
35 X = 442163.793
0+
Y = 3562088.984
PT St
0
30
PC
1
0+
42
0+
15
St
.9337
ST Sta = 0+707
7.0
C
00
a
0+1
32
=
0+
0+
1
42
17
a=
0+700
7.0
0.9
St
29
72
337
0+
PC
ST
0+
3
7.9 Sta
= 0+67
10
=
0 CS Sta =0
25 +0
a
0
01.8
St
0+ 302
B1 EXIT RAMP-A
CS
C
TS
Sta
=0
0+050
50
+1
59+400
0+1
67.6
173
SC
Sta
0
65
PT
=0
0+ +1
88
St
RAMP-D
.61
a
73
=
0
0+
0+20
06
5.4 091
2.6
= 0+19
CS Sta =
B
ST Sta = 0+306.4680
SC Sta
62
TS Sta = 0+480.5744
44
6
0+510.57
00 2
0+
0+285.4
0
60
E
0+
4091
TS Sta = 0+165.
SC Sta =
680
0
0+150
25
50
B
0+
5
0+
0+300
0+350
0+400
0+450
0+500
0
0+05
59+300
RAMP-A
DRAWING TITLE:
TS Sta = 0+008.3191
SC Sta
B1
0
E A
10
0+
= 0+038.3
0+100
RAMP-B GUJRANWALA-PASRUR
191
B.O.P. 0+000
X = 441863.948
INTERCHANGE PLAN
0
15
0+
Y = 3561961.347
B1
0+050
RAMP-D
RAMP-B
B.O.P. 0+000
X = 441688.808 DESIGN BY:
Y = 3561830.616 0
59+200
0+20
CS Sta
= 0+209.0
531 DR. WASIM / DR.ANWAAR / ABID ALI
DRAWN BY:
ST Sta = 0+239.0531
RAJA FARHAT
0+250
CHECKED BY:
DR. ANWAAR
DR. WASIM
SCALE:
RAMP-B N.T.S.
E.O.P. 0+377.47
0+350 X = 441709.649
Y = 3561679.319
DATE:
DEC, 2017