Vous êtes sur la page 1sur 108

2018

18

20

23

26

27

31

32

45

47

63

71

83 Shop drawing

92

94

2|Page
3|Page
1

10

11

12

13

Tender drawing

Time Cost Quality

4|Page
1

× 3

5|Page
Lump sum 1

Unit Price 2

Cost Plus 3

25 10

15 10000

11500 15 × 10000 10000

Target Cost 4

Cost Plus

6|Page
1998 89

1998 1367

34

7|Page
2

400000
4

8|Page
7

10

Tender drawing 2
3

9|Page
1

40 12

10 | P a g e
17

18

5 10
20
10

19

11 | P a g e
11

50000

12 | P a g e
9

10

16

15

13 | P a g e
22

23

10

24

14 | P a g e
50000

55

15 | P a g e
68

89 79

5 95 6

16 | P a g e
.

17 | P a g e
22

18 | P a g e
× × ×

19 | P a g e
2008 119

2009 144

85 78

104

2.3 2.7
93 25

94

2.5 7.5
0.8 0.8
1.5 3
1.2 1.5
2 5

20 | P a g e
8

96 10

0.9
0.9

97

80

70

100

280

97

2
9 3 0.25
2 2
10 7.5 2.5
2 2
20 10
2 2
30 12.5
2
10 2.5

21 | P a g e
100

110
130
27
17
14
90
2.1

1.25 5 10

1.5

25

2
250

22 | P a g e
1

25 4

23 | P a g e
Excel Sheet

10

11

12

13

14

15

16

24 | P a g e
17

18

19

20

21

4
P5
3 15 10
3
250
48 10

25 | P a g e
20
2

26 | P a g e
1
1

880
400
2
350

1510 3
31

540 3
32

20

1144 3
2 1 50 41
25

27 | P a g e
195 3
0.8
15 250 0.4

320 3
0.4 0.8
350
2
300
28

3
100 6

65 3

790 3

6 10 20

300
1.50

454 2

p5 4
10
15
3 250 3

48 10

28 | P a g e
17500 2

0.5 3 450
3 300

6470 2

0.5 3 450
3 300
2 3.5 0.5

270 12

4685 2

50 8 40 40

10
3 300

512 2
2

15 2

364
2 4

29 | P a g e
15 2

15200 2

ACC
2
3
2

57 2.20 × 1
5×2 MDF)
5×2
4 2 7×2 4 2
5×4 3
19 3

750 2
PS

12980
15

147
2 120 240 3

30 | P a g e
31 | P a g e
1

32 | P a g e
33 | P a g e
34 | P a g e
1

35 | P a g e
1

36 | P a g e
1

37 | P a g e
1

38 | P a g e
Inspection Request
Name Project
…… ……………………………
Date Request
……….. …. …..
Quantity Unit Items No ………………………………….……………………
…………………. …………… ………………….. ……
. …….. ………………………………….……………………
Type of work ……

Mech. Elec. Finishing Civil

Contractor
Mech. A/C Elec. Plumb. Civil

Previous
Done Done Done Done Not Done
Not Done Not Done Not Done Not Done items
Done

…………………… …………………… …………………… …………………… ……………………

Contractor

39 | P a g e
1
2
3
4
5
6

7
8
9
10

11
12

13
14
15
16

17

40 | P a g e
…../…../……

48

41 | P a g e
3

42 | P a g e
16 1
17 2
18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10
26 11
27 12
28 13
29 14
30 15
31

43 | P a g e
1

10

11

44 | P a g e
English Vocabulary
Employer Contractor,s Obligations
Contractor Retesting
Engineer Cost of remediying defects
Contractor,s Representtative Manner of Execution
Sub Contractor Samples
Dates Inspection
Base Date testing
Time for Completion rejection
Contractor,s Equipments royalties
Goods The Contract
Materials Contract Agreement
Sections Specifications
Contractor,s Documents Drawings
Laws Schedules
Delayed Drawings Tenders
Delayed Instructions Bill of Quantities
Confidential Details Contractor,s Claims
Compliance With Laws Arbiration
Payment to Subcontractors Method of Measurment
Evidence of Payments Accepted Contract Amount
Performance Security Contract Price
Site Cost
Communications Final Payment Certificate
Contract Agreement Final Statement
Rates of Wages Foreign Currency
Labour Laws Statement
Working hours Instructions of the Engineer
Health and Safety Determinations
Time for complrtion The Contract Price
Rate of Progress Advance Payment
Delay Damages Schedule of Payments
Suspensionof work Delayed Payments
Resumption of work Manner of Executions
Security of the site Samples

45 | P a g e
Inspection Putty
Rejection Quick Lime
Remedial Works Rendring
Extension of Time for Completion Chord
Rates of Progress Concrete Lean
Delay Damages Concrete ramming
Consequences of Suspension Curb
Elliminate Lintel
Elongate Marble
Emery Mark Price
Excess Air Trowel
Exclude Sack
Expanded metal Seal
Expansion Joint Shaker / Vibrator
Faced Spatter
Facilities Bid Bond
Facing Bid Form
Facing Bricks Bill of Material
Feather Bill of Quantity
Fees Consultant
Final Set Contract
Foreman Cost Estimating
Gauge Dead Line
Gardient Technical Specifcations
Gypsum Plaster Site Instructions
Hair Crack Schedule Start Date
Hessian Schedule Finish Date
Hand Clamp Request for Information
Honeycomb Request for Quotation
Hose Request for Propsal
Hook Quality
Humidity Project Charter
Immerse Profit
Inspect Periodic Report
Joist Timber Percent complete
Plastering Operating Method

46 | P a g e
1

47 | P a g e
1

48 | P a g e
6 ⅔ ●

𝐿 ∗ 𝜋(𝐷2 /4 )


1.3 ×

49 | P a g e
16 9 7

20 15

2 1 16

162

12

1000 ×
2
13500

× ×

50 | P a g e

5 50 22

12 16Ф7

8 20

16 1.5

𝐿 × 𝜋(𝐷2 /4 )
3
4.31 22 × 𝜋(0.52 /4 )
3
5.73 1.33 × 4.31

12

1.58 16

16 132.72 1.58 × 12 × 7

51 | P a g e
53 52.5 0.2 10.5

7 5 ●

1.255 0.4 × 3.14 𝜋𝐷

1.2

0.4 8

× ×

8 26.6 0.4 × 1.255 × 53

8 1.5 12

35 2 1.6 0.8 5 50

𝜋𝐷

1.1 0.35 × 3.14

1.58 16

× ×

16 14 1.58 ×1.1 ×8

52 | P a g e
16 132.72

8 26.6

16 14

8 26.6 16 146.72

53 | P a g e
PL 1
List ( LI ) 2

* 3

merge

PL 1
List ( LI ) 2

LI PL 2

Filter 2

54 | P a g e
1
Move 2
Total length Lisp 3

payazed – Pline – Calculate total length

Lisp ( Total Length ) Payazed


Brows 3 Load Application 2 Tools 1

Total length Folder Lisp )


TL 5 Always Load load 4

1
List PL 2

55 | P a g e
6 × 12 × 25 1
55 0.07 × 0.26 1×1 2
1

423 0.07 × 0.13 × 0.26 1×1×1 3


1

× ×

25

× × × 3

Dimension 3

10 4

56 | P a g e
2

Poly Line 1

2cm Offset 2

Area List 3

Parameter

2 10 10

10

× 2×

Poly Line 1

2cm Offset 2

4> 4< 3

Area Poly Line 1

Poly Line 2

57 | P a g e
Parameter Poly Line 1

2 10 10 10

Area Poly Line 1

Parameter

2 5 10

58 | P a g e
Side View 1

Offset ( Through ) Line 2

3
Copy

Fillet Offset 4
Boundary Join PL Poly Line 5

List 6

7

59 | P a g e
2× )

perimeter Poly line

60 | P a g e
PL 1

2 10 10 PL 2

Area PL 1

PL 2

Area

PL

TL 4

2 2

61 | P a g e
PL 1

2 1 2 1

62 | P a g e
Indirect Cost Direct Cost

Direct Cost

Indirect Cost

40 25

63 | P a g e
3
25
3
5

0.35 0.20 0.10 0.20 0.11 0.12 0.11 0.12 0.24 0.17

64 | P a g e
3
80
3
8
3
10 6

65 | P a g e
1000 50 × 20 20 1
3
125 250 0.4 0.8 1
3
175 350 0.4 0.8 1

Panelled Hollow Solid slab +


Flat Slab
Beams block Beam
3
150 120 140 : 130 120 : 110 150 120 110 90 160:140 90 70

7 5 1
10 7 1

3 3 3 3
2 40 5 4 8 1 4 1 1

30 3 2.5 10 15

Flat slab Solid Slab

3 5 3 2 50 3 10 3

20 18 15 15 10 15 15 10 2

3 3 3 2 5 3 3

1 2 2 2 1

66 | P a g e
3 3
6 300 1 1
3
3 150 0.5 1000

440 0.07 × 0.125 × 0.26 1 3


1

55 0.07 × 0.26 1 2
1

2 3
20 3

2 2 3
35 30 2.5 40 6 300 1
2 2 3
170 150 0.5 200 9 450 1

1.5 1

2 1.5

4 2

2
200
2
150
2
30
2
25

67 | P a g e
2
6 1
2
24 1
2
10 1

2
100
2
160

2 3
2.5 40 6 300 1

2
25
2
15

68 | P a g e
2 3 3
50 3 6 300 1
2
1 7 2 0.5 24 3 0.65
6

2 4

2
5

15
2
15

2 3 3
50 3 6 300 1

2
25

2
2 1 1
2
8
2
18 15 15

2 2 2
25 200 100

69 | P a g e
40 35 × ×
3
130 110 ×

90 80 ×

70 | P a g e
2018

300 1
2,000 2
8 3
200 4
20 5
20 6
1,500 7
160 8
125 9
150 10
290 4 11
150 12
5 13
150 14
50 proctor test 15

71 | P a g e
90 1
170 2
70 3
140 4
960 5
105 6
370 7
290 8
200 9
250 2 150
520 3 10

150 11
5 12
150 13
180 14

72 | P a g e
250 1
220 2
12,250 3
12,150 4
960 5
105 6
370 7
290 8
200 9
3 10
2 250
620 11
3 350
330 12
60 13
150 14
150 15
150 16
80 17
150 18
5 19
150 20
180 21
850 22
3
75 24
3
125 25
350 25 6 26
73 | P a g e
290 1
200 2
150 3
1,500 4
5 5
150 6
160 7
125 8
150 9
850 10
960 11
370 12
105 13

74 | P a g e
1,050 1
1,300 2
150 3
150 4
150 5
15 6
550 7
900 8
150 9
290 10
150 11
200 12
350 250 13
225 14

75 | P a g e
20 1
20 2
20 3
25 3
5 4
150 5
150 6

630 6 12 25 1
3729 12 20 40 2

4746 20 20 40 3

495 6 12 25 4

918 13 12 25 5

839 6 12 25 6

550 20 20 60 7
200 8
850 9
290 10
370 11
15 12
150 13

76 | P a g e
290 1
370 2
900 3
5 4
150 5
20 6
25 7
250 8
350 9
20 10
30 11
12 12
10 15

77 | P a g e
2 1
430 24 2
295 3 3
1,450 4
8 20 20 5
185 30 30 2 6
25 15 20 7
185 16 8
38 16 9
34 13 10
300 23 11
58 23 12
25 3 13
17 14
8 15

15,000 16
3 2 500

78 | P a g e
23 " " 4" × 3" 1
55 " " 4" 2
14 " " 4" 3
16 " " 4" 4
28 " " 3" T 5
13 " " 3" 6
24 " " 3" 7
14 " " 2.5" 8
18 " " 2" Y 9
7 " " 2" 10
9 " " 2" 11
10 " " 2" 12
16 "BR" 32 × 25 T 13
10 "BR" 32 14
8 "BR" 32 15
7 "BR" 32 16
88 "BR" 32 × 1" 17
7 " " 1" 18
5 "BR" 25 19
5 "BR" 25 20
36 "BR" 50 21
22 "BR" 50 22
158 "BR" 50 × 1.5" 23
73 " " 4 × 6" 24

79 | P a g e
35 " " 4 × 3" 25
52 " " 4 × 4" 26
27 " " 3.9 × 2" 27
83 "BR" 50 28
34 "BR" 32 29
23 "BR" 25 30
167 " " 6" Y 31
63 " " 6" 32
89 " " 6" 33
78 " " 6" 34
48 " " 6" 35
33 " " 4" × 6" 36
51 " " 6" 37
20 " " 10 38
4 " " 10 39
145 " " 914 1 40
162 " " 4" × 6" Y 41
55 " " 4" Y 42
62 " " 2" × 4" Y 43
20 " " 4" 44
31 " " 4" 45
26 " " 4" 46
160 "BR" 50 × 1.5" 47
38 "BR" 50 T 48
45 "BR" 32 × 50 T 49
8 " " 1.5" 50
168 "BR" 32 51

80 | P a g e
397 "BR" 50 52
20 "BR" 32 × 50 53
18 " " 2" 54
17 "BR" 25 55
5 "BR" 25 56
29 "BR" 25 × 0.5" 57
7 "BR" 25 T 58
38 "BR" 25 × 0.5" T 59
4 "BR" 25 60
12 "BR" 25 61
147 "BR" 25 62
65 " " 63
2 "BR" 0.5" 64
25 " " 65
45 " " 1.5" × 2 " 66
7 " " 1.5" 67
6 " " 1.5" 68
14 " " 1.5" Y 69

17,000 70
2 500
3

81 | P a g e
160
400
90
125
35 4 1.25
65 7 2
15
35
150
1,050 PS
1,250 PS
1,600
150
3,000
30 20
130
30
35
140,000 7

Shop drawing

82 | P a g e
2000 262

2 12
270 7.404 0.617 10
188 10.656 0.888 12
138 14.520 1.21 14
106 18.960 1.58 16
84 24 2 18
68 29.640 2.47 20
56 35.670 2.98 22
44 46.2 3.85 25
34 57.96 4.83 28
26 75.72 6.32 32
17 118.32 9.86 40

162

12

2000 2

83 | P a g e
Lap Splices

12 2

1
2007 94
2

40 60 20
40 55 25
40 50 30
40 45 35
40 42 40
40 40 45
25 1.3 ×

Center Line
84 | P a g e
85 | P a g e
16 12 10

22 20 18

1.5

12

40 20

50 30

×2

86 | P a g e
Top ( T )

Bottom ( B )

Side

87 | P a g e
88 | P a g e
89 | P a g e
1

4
10

90 | P a g e
Curves 5
2

Joint

50 1

6 13

. "L" 4

. "T" 5

10

. 11

12

91 | P a g e
Moment

α
Stiffness
one Solid Slab
way Solid Slab

M=WL2/8
Flat Slab

Two way Hollow Block Hollow Block

92 | P a g e
7 5
7 5
2.5
2

Bar Coding System

A000 10 T 25 @ 300 B L = …. m
A000 = BARS MARK
10 = Number of Bars
T = Indicates high yield
R = Indicates mild steel
25 = Diameter of bar in mm
@ = each
300 = Spacing of bars in mm
B = Indicates steel Layer
L = Bars Length

93 | P a g e
Bar Coding

Bar Coding

Bar Coding

Bar Coding

94 | P a g e
45 Flat Slab

Bar Coding
2017

Bar Coding

Bar Coding

Bar Coding

95 | P a g e
Bar Coding /

96 | P a g e
97 | P a g e
1

98 | P a g e
32 Solid Slab

1.5

99 | P a g e
49

70 30

( e = 25 CM ) a = 0.15 Ln
100 | P a g e
1.5 1 d

25 e

101 | P a g e
31

0.15

25

70 30

102 | P a g e
73

20

25

12

103 | P a g e

Offset

104 | P a g e
94

7 5 Offest

Bar mark

Section

30 70

Offset Join Lines JL Copy

105 | P a g e
106 | P a g e
Offset

Fillet Offset Explode

107 | P a g e
Extend Fillet Offset

PL Fillet

108 | P a g e

Vous aimerez peut-être aussi