Vous êtes sur la page 1sur 1

PROYEK

PASANG BARU INSTALASI LISTRIK


POWER PLANT
PANEL CUBICLE TRAFO GARDU R.1 ( + 1 CELL OUTGOING ) PT. JIIPE
JL. RAYA MANYAR KM. 11
ALTERNATIF. 1 ( SATU )
GRESIK
DS/LBS GCB GCB GCB

JUDUL GAMBAR

SINGLE LINE DIAGRAM


POWER SOURCE of ELECTRICITY

BUILDING TRANSFORMER ( R.1)


NEW LV.MDP ( R.1 )
MCCB 600 A

PMT OCR OCR OCR A A A TO BMS BUILDING


R S T
CATATAN
V Hz MCB 16 A

Power Meter UTILITY R.1


CT CT CT ALTERNATIF. 1 ( SATU )
MCB 25 A
UPS Tidak terjadi Losses Tegangan
MCB 32 A Ruang Genset bisa digunakan
INDUSTRIAL PLUG Efisiensi Cost
BCC 50 mm² MCCB 500 A
20 KV / 400 V SARAN
PUMP POND 300 KW
MCCB 200 A Perlu penambahan Cubicle
N2XSY 3X1X70 Cu NYY 3X(4X1X240)+1X240 mm2 ACB 3P SWRO 100 KW 1 Cell Outgoing untuk Spare
1600 A
MCCB 800 A
TRAFO 1.250 KVA
LOAD BANK
SPARE OUTGOING
LBS 1000 A

PEMILIK BANGUNAN
INCOMING 20 KV OUTGOING 20 KV TO BMS
PT. JIIPE
NA2XSEBY 3X150 mm2 AL
575 KVAR MC LC1 D95 MCCB 100A

25 KVAR = 1 BH
50 KVAR = 11 BH

MAHENDRA SINGH
BCC 50 mm² PP MANAGER

PELAKSANA

PT. DUTA PARATEK NUSANTARA

YUSAK ADI WIDJAJA, SE


DIREKTUR