ABSTRAK
commit to user
viii
perpustakaan.uns.ac.id digilib.uns.ac.id
ABSTRACT
To calculate the quantity of waste material the Calculation of the quantity of waste
material is used, that is Waste material = Purchased material - Stock material -
Material needs, and then calculating the cost of waste material by multiplying the
number of waste material with the unit price of materials, the calculation of the
percentage of the remaining cost is the cost of the rest of the material divided by
the total cost of the rest of the material multiplied by 100%. To find the root
cause, the Root Cause Analysis is used which is a method to determine the causes
of waste material.
commit to user
ix
perpustakaan.uns.ac.id digilib.uns.ac.id
KATA PENGANTAR
Puji serta syukur penulis panjatkan kehadirat Tuhan Yang Maha Kuasa,
karena dengan rahmat, karunia, dan anugrah-Nya, Penulis dapat menyelesaikan
Skripsi dengan judul “Analisis dan Pengelolaan Sisa Material Konstruksi dan
Faktor Penyebab Pada Proyek Perumahan di Kota Solo Mengunakan Root Cause
Analysis ( RCA )” guna memenuhi syarat memperoleh gelar Sarjana Teknik dari
Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.
Dalam menyelesaikan skripsi ini, Penulis banyak dibantu oleh berbagai
pihak. Dengan penuh rasa hormat, pada kesempatan ini penulis mengucapkan
terima kasih yang sebesar-besarnya kepada :
Akhir kata semoga skripsi ini dapat memberikan manfaat bagi semua
penulis pada umumnya dan mahasiswa pada khususnya.
Penulis
commit to user
iv
perpustakaan.uns.ac.id digilib.uns.ac.id
DAFTAR ISI
HALAMAN JUDUL………………………………………………………………………i
HALAMAN PERSETUJUAN….………………………………………………………...ii
HALAMAN PENGESAHAN..………………………………………………………..…iii
MOTTO……………………………………………………………………………..……iv
PERSEMBAHAN…………………………………………………………………………v
ABSTRAK…………………………..…………………………………………...…..…viii
KATA PENGANTAR………………………………………...…………………………x
DAFTAR ISI……………………………………………………………………………..xi
DAFTAR TABEL……………………………………………………………………....xiv
DAFTAR GAMBAR……………………………………………………………………xv
BAB I PENDAHULUAN
1.1.Latar Belakang Masalah………………………………………………………………1
1.2.Rumusan Masalah………………………………………………………………….….2
1.3.Batasan Masalah………………………………………………………………………2
1.4.Tujuan Penelitian……………………………………………………………………...2
1.5.Manfaat Penelitian………………………………………………………………….…3
xi
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xii
perpustakaan.uns.ac.id digilib.uns.ac.id
DAFTAR PUSTAKA……………………………………………………………………xvii
commit to user
xiii
perpustakaan.uns.ac.id digilib.uns.ac.id
DAFTAR TABEL
commit to user
xiv
perpustakaan.uns.ac.id digilib.uns.ac.id
DAFTAR GAMBAR
Gambar 2.1. Semen PC………………………………………………………………….9
Gambar 2.2. Agregat Halus…………………………………………………………….11
Gambar 2.3. Agregat Kasar…………………………………………………………….11
Gambar 2.4. Batako…………………………………………………………………….12
Gambar 2.5. Besi Tulangan……………………………………………………….…….13
Gambar 2.6. Beton Readymix…………………………………………………….….…14
Gambar 2.7. Fishbone Diagram…………………………………………………………26
Gambar 3.1. Diagram Alir Penelitian……………………………………………………32
Gambar 4.1. Penampang Pasangan Batu Kali Talud T1...………………………………37
Gambar 4.2. Penampang Pasangan Batu Kali Talud P1...………………………………38
Gambar 4.3. Penampang Pasangan Batu Kali Talud P2...………………………………39
Gambar 4.4. Penampang Beton Foot Plate……………...………………………………40
Gambar 4.5. Penampang Beton Kolom Bawah Sloof (K1)…..…………………………40
Gambar 4.6. Penampang Beton Bawah Sloof (K2)……...………………………………41
Gambar 4.7. RCA’s diagram Kelurahan Gilingan ….…..………………………………45
Gambar 4.8. Penampang Pasangan Pondasi Batu Kali…..………………………………50
Gambar 4.9. Penampang Pasangan Pondasi Rolag Bata...………………………………51
Gambar 4.10. Penampang Beton Foot Plate FP1………....…………………………….52
Gambar 4.11. Penampang Beton Foot Plate FP2……...…..……………………………53
Gambar 4.12. Penampang Beton Sloof (S1)…………....……………………………..…54
Gambar 4.13. Penampang Beton Sloof (S2)…………....…………………………….….54
Gambar 4.14. RCA’s diagram Kelurahan Jagalan.. ….…..…………………………..…58
Gambar 4.15. Penampang Pasangan Pondasi Batu Kali..…………………………….….64
Gambar 4.16. Penampang Beton F1……….…………....…………………………….…65
Gambar 4.17. Penampang Beton F1……….…………....…………………………….…66
Gambar 4.18. Penampang Beton F3……….…………....…………………………….…67
Gambar 4.19. RCA’s diagram Kelurahan Kauman ….…..…………...…………………72
Gambar 4.20. RCA’s Diagram……….…………....…………………………….………73
Gambar 4.21. Sisa Material Pasir.……….…………....…………………………….…...76
commit to user
Gambar 4.22. Sisa Material Besi ……….…………....……………………………….…77
xv
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xvi
perpustakaan.uns.ac.id digilib.uns.ac.id
DAFTAR PUSTAKA
Bossink, B. A. G., and Brouwers, H. J. H., Construction waste: Quantification and source
evaluation, Journal of Construction Engineering and Management,March 1996. pp. 55–60.
Dobler, D.W., Burt, D.N., and Lee, Lamar Jr, Purchasing And Materials Management, McGraw-
Hill Book Company., 1990.
Budiadi, Yohanes. 2008. Evaluasi Faktor Penyebab, Kuantitas, Akibat dan Tindak Lanjut
terhadap Sisa Material pada Proyek Rumah Tinggal. Tesis, Universitas Kristen Petra Surabaya.
Farmoso, C.T., et al., Material waste in building industry: Main causes and prevention, Journal
of Construction Engineering and Management, Agustus 2002, pp. 316–325.
Gavilan, R. M., and Bernold, L. E., Source Evaluation of Solid Waste in Building Construction,
Journal of Construction Engineering and Management, September 1994. pp. 536 – 552.
Haposan, Jermias. 2009. Identifikasi Material Sisa pada Proyek Ruko San Diego Pakuwon City
Surabaya. Skripsi, Institut Teknologi Sepuluh Nopember Surabaya.
Intan, Suryanto. Analisa dan evaluasi sisa material konstruksi: Sumber penyebab, Kuantitas, dan
Biaya. Dimensi Teknik Sipil, Maret 2005. Vol.7. No.1. pp.36–45.
Loosemore, M., and Teo, M.M.M., A Theory of waste behaviour in the construction industry,
Journal construction management and economics, Mei 2001. pp. 741-751.
Nugraha, Paulus; Natan, Ishak. 1985. Manajemen Proyek Konstruksi Jilid 1, Kartika Yuda.
Rahim, Irwan Ridwan. 2001. Penilaian Sisa Material pada Pelaksanaan Proyek Perumahan
(Studi Kasus: Pembangunan Rumah Di Kawasan Tanjung Bunga, Makassar). Tesis, Institut
Teknologi Sepuluh Nopember Surabaya.
Sari, Ika Destiana. 2006. Analisa dan Evaluasi Sisa Material Konstruksi pada Pembangunan
Ruko di Kota Malang. Skripsi, Universitas Muhammadiyah Malang.
Skoyles, E.F., Material wastage: A misuse of resources, Building Research and Practice,
July/April 1976, pp. 232–243.
Tchobanoglous, G., Theisen, H., and Vigil, S.A., Integrated solid management, McGraw-Hill.
Inc., New Jersey. 1993.
Thomas, H.R., Sanvido, V.E., and Sanders, S.R., “Impact of material management on
productivity–A case study”, Journal of Construction Engineering and Management, ASCE 115
(3)., 1989. pp. 370–384.
commit to user
xvii
perpustakaan.uns.ac.id digilib.uns.ac.id
Widjaja, Katarina Raninda. 2008. Penanganan Kontraktor terhadap Direct Waste Material pada
Proyek Konstruksi di Surabaya. Skripsi, Universitas Kristen Petra Surabaya.
Intan, Suryanto. Analisa dan evaluasi sisa material konstruksi: Sumber penyebab,
Kuantitas, dan Biaya. Dimensi Teknik Sipil, Maret 2005. Vol.7. No.1. pp.36–45.
commit to user
xviii