Académique Documents
Professionnel Documents
Culture Documents
E
SHAFT Ø TIE SPACING LONGITUDINAL RFG
(in) (in) EQUALLY SPACED
DI
A 16 - 6-15M19.8
ID
DI
A
MAIN RFG MAXIMUM COLUMN TIE SPACING
ID
20 10M@36 6-15M19.8
MAIN RFG
COLUMN TIE SPACING ('S') SHALL NOT EXCEED: REBAR EQ 10M@36
COL TIES BAR Ø Ø ID 24 6-15M19.8
16x THE DIA OF THE SMALLEST MAIN RFG BAR, BAR E
S
SPACING
48x THE DIA OF THE COLUMN TIE, SIZE (in) (in) (in)
30 10M@36 6-15M19.8
THE LEAST DIMENSION OF THE COLUMN, OR 10M 0.445 1.78 2.67
12" IN COMP MEMBERS HAVING BUNDLED BARS 15M 0.630 2.52 3.78 36 10M@36 6-20M19.8
CONCRETE COVER CONCRETE COVER
4 BAR 20M 0.768 4.61 4.61
CONC COVER
LAP SPLICE
6 MIN
6 BAR
CONCRETE
3" MAX
COVER
1 STN HOOK
DEVELOPMENT
LAP SPLICE
MAX
S/2
LENGTH
6" MAX CIRCULAR TIES
TYP SPACING
MAX
MAX
3" 3" S'/2
S'/2
6" MAX
AT FOUNDATION
4"
TYP SPACING
8 BAR FOR OFFSET > 3" SEE
DETAIL BELOW CRANK MAIN RFG
6"
BARS AS SHOWN
PROVIDE ADDED
LAP SPLICE
COL TIES AS SHOWN
6"
6" MAX SPIRAL TIES
MAIN RFG TO BE MAIN RFG TO BE
PLACED IN ACCORD PLACED IN ACCORD
WITH COL TIE WITH COL TIE 2-10M@12 TIES
PATTERNS U/N PATTERNS U/N FOR DOWELS
10 BAR
MAIN RFG
4"
REBAR EQ
SPACING
1'-0"
CONCRETE COVER
S'
S'
CONC COVER
SPIRAL COL TIES
1'-0"
LAP SPLICE
LAP SPLICE
12 BAR 'S' DENOTES COL
SPACING AS SPECIFIED
TIE SPACING
>3"
1-1/2"
MAX
MAX
S'/2
S'/2
6" MAX
SPIRAL COLUMN ELEVATION
DWLS TO FOUNDATION
Ld UNLESS NOTED
PROVIDE TENSION
TO MATCH COLUMN
Ld AS REQD
MAIN REINFORCING U/N
LAP SPLICE U/N
PROVIDE Ldh AS REQD
FOR BAR DEVELOPMENT
14 BAR
6" MAX
FOUNDATION SHAFT Ø
DWLS TO FOUNDATION
SHAFT TO MATCH COLUMN
MAIN REINFORCING U/N FOUNDATION SHAFT
FOUNDATION SHAFT
MAIN REINFORCING
FOUNDATION SHAFT
TIE REINFORCING
16 BAR
6" MAX
REINFORCED
CONC COLUMN
CONCRETE COLUMN
TIE REINFORCING
CONCRETE COLUMN
MAIN REINFORCING
TYPICAL COLUMN TIE PATTERNS TYPICAL TIED COLUMN SPLICES TYPICAL TIED COLUMN @ TOP