PAWAN HANS LIMITED DOC. REF. NO.


JUHU AERODROME, MUMBAI : 400 056 EQ 08 DES 40

PROCEDURE SHEET FOR CHARGING OF NICKLE


REV. 2
CADMIUM BATTERY PART NO. 20HKBH-25-J3 OF
AUG 2015
MI-172 HELICOPTER WITH TV3-11VM ENGINES

APPROVED VIDE CAM LETTER NO. PHHL/WR/ENGG/DQC/5069, DATED 17 /08/2015

Removed From Work Order No.


Component Sl.No. C.V. No.
TSBC/TSI. C.V. Date
Reason for
T.S.N.
Removal

REFERANCE: MAINTENANCE REQUIREMENT CARDS OF 20 HKBH-25-J3 MAINTENANCE


SCHEDULE

TESTERS
S/N DESCRIPTION SL. NO. CAL. VALIDITY
1 RF 80K/80H REFLEX CHARGER/ ANALYZER
2 Megger 500V DC
3 Digital Multimeter
4 Torque Wrench

TOOLS & EQUIPMENTS

Screw Driver, Spanners, Electrolyte filling device, Valve Key, Calibrated Nozzle, Stiff
Bristle Brush(non metallic), Safety Gloves, Goggles & Protective Apron

CONSUMABLES : Lint free cloths, Boric Acid Solution, Distilled Water, Detergent Powder

S/N PROCEDURE TECH AME


CAUTION
Exercise extreme care when working on aircraft batteries. Do
not use metal brushes or metal brush supports for cleaning.
Remove all metallic articles from hands. These may cause short
circuit when comes in contact with cell terminals which may
result in severe skin burns and damage to the battery. Use safety
goggles, gloves & apron while working.
Page 2 of 4

PAWAN HANS LIMITED DOC. REF. NO.


JUHU AERODROME, MUMBAI : 400 056 EQ 08 DES 40

PROCEDURE SHEET FOR CHARGING OF NICKLE


REV. 2
CADMIUM BATTERY PART NO. 20HKBH-25-J3 OF
AUG 2015
MI-172 HELICOPTER WITH TV3-11VM ENGINES

S/N PROCEDURE TECH AME


1. BATTERY ACCEPTANCE CHECK
- While receiving the battery, check that it is complete in all respect including
documents.
- Visually inspect the battery container, cover and external connector. For any
mechanical damage.
- Remove the cover of the battery. Visually inspect cell links, terminal post for condition,
overheating and looseness.
- Unscrew the vent valve with the help of valve key but should not be removed.

2. DISCHARGING
- Discharge the battery at current 10A up to voltage 20V. When the battery
voltage reaches the value 21V, measure the voltage of each cell without
disconnecting the battery from the battery charger unit.
- Disconnect the battery from the battery charger unit.

3. DISASSEMBLY
- Disassemble the battery as per Maintenance Requirement Card 12 and inspect.

4. CLEANING AND CHECKING VENT PLUGS


- Clean and check vent plugs as per Maintenance Requirement Card 16.

5. ASSEMBLY
- Assemble the battery as per Maintenance Requirement Card 12.

6. CHARGING
- Connect the battery to the charger and charge by any one of the following
method.
a) Method No.1: Charge the battery in two steps.
First Step : 10 Amps for 3 hours.
Second Step : 5 Amps for 2 hours.
At the end of charge, measure and record individual cell voltage and battery
terminal voltage.
.
Page 3 of 4

PAWAN HANS LIMITED DOC. REF. NO.


JUHU AERODROME, MUMBAI : 400 056 EQ 08 DES 40

PROCEDURE SHEET FOR CHARGING OF NICKLE


REV. 2
CADMIUM BATTERY PART NO. 20HKBH-25-J3 OF
AUG 2015
MI-172 HELICOPTER WITH TV3-11VM ENGINES

S/N PROCEDURE TECH AME


5.
Cell No. 1 2 3 4 5 6 7 8 9 10

Cell No. 11 12 13 14 15 16 17 18 19 20

Battery Terminal Voltage

6. Screw out vent plugs from and hold the battery with open plugs for 15 hours
at least for gas removal.

7. After gas removal, check the electrolyte level in each cell. Level must be
between the marks on the window. Top up with distilled water if required.

8. Insulation Check
Measure the insulation resistance between the body and positive terminal of
the battery. It should be 20 K-Ohm or higher.

VALUE OBTAINED

9. FINAL JOB
- Close the vents of the cells.
- Clean the battery.
- Install the cover of the battery.
- Complete the documentation.
Page 4 of 4

PAWAN HANS LIMITED DOC. REF. NO.


JUHU AERODROME, MUMBAI : 400 056 EQ 08 DES 40

PROCEDURE SHEET FOR CHARGING OF NICKLE


REV. 2
CADMIUM BATTERY PART NO. 20HKBH-25-J3 OF
AUG 2015
MI-172 HELICOPTER WITH TV3-11VM ENGINES

S/N PROCEDURE TECH AME


10. LIST OF PARTS REPLACED
SL. PART DESCRIPTION QTY REMARKS
NO. NO.

I/we certify that aircraft/aircraft components/item of equipments enumerated above have been
removed/installed/inspected/modified/repaired/replaced/tested for operation as detailed above and meets
the requirements of Aircraft rules, Civil Airworthiness requirements and PHHL, MOE.