CHECKLIST FORMAT FOR WBM & ASPHALT ROAD

SHALIMAR NAME OF THE DOCUMENT CODE NO.


GROUP DEPARTMENT :
EXECUTION
NAME OF THE PAGE NO. TOTAL
DOCUMENT : PAGES.
CHECKLIST FOR WBM & 0 1 0 1
ASPHALT ROAD
CHECKLIST FOR WBM & ASPHALT ROAD

Sr.
No:
SITE : SHALIMAR LOCATION : DATE :
ANTHURIUM
Ref. Drawing No. ________________________________________

Sr. Job Description YES NO NA


No.
1. Check for LAYOUTS, GRADES &
CROSS-SECTIONS OF SUBGRADE prior
to spreading of aggregates.
2. PREPARATION OF SUBGRADE to
specified Lines and Camber. Check for
cleaning and Making up of soft spots &
other irregularities.
3. Check for uniform spread thickness of
Aggregates
4. Check for DRY ROLLING
5. Check for APPLICATION OF
SCREENINGS & BINDING MATERIAL
as per specifications.
6. Check for SPRINKLING OF WATER on
the aggregates.
7. Check for WET ROLLING of Affregates
and COMPACTION.
8. Check for FINISHED SURFCES,
COMPACTED THICKNESS.
9. CAMBER,LINES AND SLOPE Are they
acceptable ?
ASPHALT ROADWORKS
1. Check for LAYOUTS,GRADES &
CROSS=SECTIONS OF SUB-BASE prior
to spreading of Aspahlt.
2. Check for SURFACE PREPARATION OF
WBM SUB-BASE Check for ceaning and
making up of Soft spots & other
irregulaties.
3. Is the approved MIX DESIGN employed
for mixing of Premix ?
4. Is the Asphalt being laid in HOT
CONDITION ?
5. Check for UNIFORM SPREAD
THICKNESS of Premix, is it OK ?
6. Check for ROLLING is is proceeding
from edges to centre longtuidinally ?
7. Check for FINISHED SURFACES,
COMPACTED THICKNESS,CAMBER,
LINES AND SLOPE Are they acceptable
?
8. Check for LAYING, ROLLING &
COMPACTION OF SEAL COAT.Is the
SURFACE FINISH, CAMBER, SLOPE
satisfactory ?

SIGN. OF SITE ENGINEER

CORRECTIVE ACTION PROPOSED

Sign of Project Manager Sign of Project


Manager
Contractor Shalimar
Group