Blow Out Preventer Certification Form
Section 15.b
In accordance with Section 15.b Blow Out Preventer (“BOP”) Certification of the Consent Decree,
as Rig Manager for the named Rig, I certify as follows regarding an initial deployment on a well
operation which is likely to occur within 24-48 hours of lowering the BOP through the moonpool
into the water:
Full Name of Rig: Wacevan la naanscd
Name of Rig Manager: Garnan Kao rec
Date BOP is scheduled to be lowered uo 5=™
through the moonpool into the water: Bos TS" Dow,
maintenance provided by API Standard 53 for the BOP to be utilized has
1. Scheduled preve
been performed,
2. All repairs done to the BOP utilized Original Equipment Manufacturer (“OEM”) parts, unless the
OEM does not supply the necessary part, and have been executed in keeping with Transocean
Equipment Alert HQS-OPS-EAL-BOPS-001 and were completed or overseen by Competent
Personnel as described in the Performance Plan.
3. Alll batteries used in the BOP emergency control systems (including, e.g., deadman, autoshear)
have been maintained according to the OEM recommendations.
4, The blind shear rams were surface tested in accordance with OEM specifications and regulatory
requirements.
BOP Certification document was prepared under my direction in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information submitted
Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is to the best of my knowledge,
‘rue, accurate, and complete.
Acknowledged and Certified by:
CX.
Signature
Title: Rig Manager
Date: Susy WF sore
415.b(CD}-BOP Certification Instructions and Form (04.22.18)