OUTLINE SPECIFICATION
SECTION 1- GENERAL
towing winch and aft overhead may be ensured by fitting full-length windows and deck
head windows. Additional CCTV monitoring is to be provided with 3 cameras with zoom
pan and wide angle facilities to cover AHT winch, Windlass, bow, Rescue zone and cargo
deck. 1 camera shall be at fwd. deck and 2 cameras at aft deck. Views from all 3 cameras
are to display simultaneously and also individually at the monitor at aft console at Wheel
house.
The accommodation is well appointed and centrally air-conditioned.
The main propulsion engines are two medium speed heavy-duty marine diesels.
All documents shall be in the English Language.
Special Considerations
Special consideration must be given to the following requirements:
• Suitably equipped for anchor handling, towing and transport of passengers, deck and
bulk cargoes.
• Provide a stable platform/deck even in rough weather conditions. To minimize
pounding and rolling, the main weight should be concentrated mid-ship and aft and the
hull form should feature a fine bow with flared section above waterline.
Safe havens for crew and passenger protection during cargo and passenger transfer
operations shall have obstruction free access and there shall be no major obstructions in
the safe havens.
102. Principal Particulars
Dimensions (approximate):
Length overall (Minimum) 70.00 m
Breadth moulded 16.00 m
Depth moulded 7.00 m
Draft Scantling 06.50 m
Draft loaded (Max.) 06.00 m
Accommodation Super Structure height Less than 13.5m at summer load
line draft, excluding masts,
funnel, antennas, etc.
Performance:
Dead Weight required 2500 T
Bollard Pull 80 T (Average pull) *
Trial Speed @100% MCR & 4.5m draft 13.5 Knots
Service Speed @ 85% MCR & 4.5m draft 12.5 Knots
Endurance 15 days @ service speed
* Corrections, for shallow water effect, helm angle, length of rope, circulation of water
(current) around propeller etc. shall be applied as approved by classification society for
certifying Bollard Pull
Capacities (approximate) :
Fuel Oil 800 cu. m
Fresh Water 800 cu. m.
Drill Water / Water Ballast 400 cu. m
Water ballast At fwd & aft, as required
Mud 400 cu. m.
Foam 20 cu. m.
Dispersant 10 cu. m.
Dry bulk 200 cu. m. (4 x 50 m3)
Lube Oil 4 x 5 Cu.m
Sewage Holding Tank 20 cu. m.
Dirty Oil Tank 10 cu.m.
Machinery:
Main Engine *2x~2750 KW each with power
take off for shaft alternator and
Fi-Fi Pump
Propulsion System CPP in nozzles ( Conventional or
Azimuth)
Generating Set 3x~400 Kw diesel driven
Shaft Alternator 2x~1200 KW (each)
Emergency Generator 1 x 120Kw diesel driven
Main Engine driven Fi-Fi pump 2x1650 cu. m with and
superstructure drenching system
Bow Thrusters 2x~500 KWCPP type **
Stern Thrusters ( Required for Conventional 1x~500 KW CPP type **
CPP)
Fuel Oil Cargo Pump 2x~100 cu.m/hr @75m head
Fresh Water 2x~100 cu.m/hr @75m head
Drill Water Pump 2x~100 cu.m/hr @75m head
Mud Pump 2x~100 cu.m/hr @75m head
* Power of Main Engine to be appropriate for the speed and bollard pull
& appropriate PTO requirement.
** Power to be not less than 12% of combined power of Main Engines
Complement:
Crew 18 men
Hospital – dedicated hospital 0 men (See clause 308)
Special personnel 20 men
Total 38 men
103. Classification
The vessel including its Hull, Machinery and outfitting equipment shall be constructed in
accordance with the latest Rules for Building & Classing of Steel Vessel to Lloyd Register
of Shipping / other IACS member classification society (hereinafter referred to as
classification) and have their class notation LRS+100A1+DP (AM)+UMS+Fi-Fi I Anchor
Handling Towing/ Supply for Unrestricted Services or equivalent . Vessel to have class
notation for IWS (In water survey)
104. Registry
The vessel will be registered at Doha, under the flag of Qatar.
105. Rules & Regulations
The Vessel and its equipment shall be designed and built in accordance with International
Shipbuilding Standards in respect of general hull, marine engineering and electrical
equipment and International Rules and Regulations which are in force at signing of
Contract/ Keel Laying. Rules which may come into force prior delivery of the vessel shall
be treated as modification.
106. Certificates
The following certificates are to be supplied to the owners at the time of delivery of the
vessel, as applicable for this category and size of vessel:
1) Builder’s Certificate
2) Classification Certificate (Hull and Machinery)
3) Safety Equipment Certificate (for a complement of 38 persons )
4) Safety Construction Certificate
5) Load Line Certificate
6) Safety Radio Certificate
7) IOPP certificate and MARPOL 1973 - Protocol 1978, Letters of Compliance with
Annex IV, V and VI issued by Classification Society
8) Tonnage Certificate
9) De ratting Certificate
10) Approved SOPEP
11) Approved Garbage management plan
12) Approved Cargo Securing Manuel
13) Type approval certificates of equipment and machinery as applicable
14) Class certificates for the Eqpt. & Machinery as applicable
15) Makers certificate for all the items
16) Load test certificate from classification for all the lifting, mooring, lashing
equipment, including overhead beams and lugs
17) Magnetic compass calibration sheet
18) All other certificates required by the classification, flag authority and owner.
The cost of all fees and charges incurred for survey, classification and issue of certificates
are to be borne by the builder.
of good welding quality, free from laminations or other harmful defects and to be blasted
and primed before using. Only mild steel to be used for hull structure. All visible plates are
to be smooth and straight wherever applicable.
Approved and accepted equipment and machinery list of all equipment and machinery to
be used in the vessel is included as attachment ‘Makers List’.
b) All woods used to be suitable for the intended purpose and of good quality. All
timber to be impregnated against rot, infestation and free from odour.
c) All smith work or fabricated fittings to be of neat design, strong, smooth & free
from defects.
All castings to be of good quality close grained and free from cracks, blowholes and other
defects. Steel castings to be manufactured to classification requirements and approval
where required.
108. Welding
Vessel to be of all welded construction, in accordance with contract plans, specification &
classification requirement.
Welding to be in accordance with classification requirements. Electrodes to be selected
from classification approved lists. Welding schedules to meet classification requirement/
standard. High standards of up-to-date welding practice and procedures are to be applied,
associated with alignment, fairness, edge preparation and gap widths. Temporary lugs are
to be removed and burs ground smooth with out any defect.
Continuous welding is to be used for all the structure up to uppermost continuous deck
and weather exposed area. Intermittent welding to be used only inside the super
structure. Shell plating is butted flush and fully welded seams. Scantlings are to class
requirements or more. Lifting eyes are provided on shell plating to facilitate propeller &
rudder removal.
Where possible, structure should be pre-fabricated in assemblies and sub-assemblies to
give the maximum possible amount of down hand welding.
109. Inspection/Supervision
Throughout the construction period prior to the delivery, the surveyors, owner’s
representative and consultants are to be given free access to the builder’s yard during
normal working hours for supervision and inspection.
Qualified personnel from main engine, propulsion system, auxiliary machinery and other
specified major equipment suppliers / manufacturers shall be in attendance during
installation, commissioning, testing, dock trials and sea trials as necessary at builder’s
expense.
Shipyard to submit QAP Plan showing inspections and control points by class and owners
representatives, within 2 months of contract signing.
110. Tests
Shop Trials
Shop trials of the following equipment are to be conducted in the presence of the owners
and classification representatives. The yard shall inform the owners giving 14 days notice
for attending the shop trials of main engines, Diesel generators, Bow thruster, Deck crane,
Towing winch and Main & emergency switch boards.
Onboard Trials
Prior to the delivery, the Hull, all machinery, electrical, piping, all equipment installed,
machinery and deck fittings, domestic equipment are to be thoroughly tested in the
presence of the classification society’s attending surveyor, owners and /or their
representative.
Alternator set load tests shall be carried out to demonstrate satisfactory electrical load
and condition. Electrical machinery and circuits shall be tested to demonstrate satisfactory
workmanship and compliance with specified requirements. Insulation measurements shall
be taken for each electrical item and associated circuits in presence of owner’s
representative and recorded.
All tanks generally complete with its fittings and piping to be tested under hydrostatic and
/ or pneumatic pressure according to the classification requirement, prior to painting in
way of the welds. All piping systems shall be pressure tested according to the
classification requirement.
111. Inclining Experiment
Before sea trials and with the vessel in as complete a condition as possible, an inclining
experiment is to be carried out to ascertain the lightship displacement and centre of
gravity. A representative of the Statutory Authority and owner’s representative are to be
present at the inclining experiment. A report on the inclining experiment is to be supplied
to the Owner.
112. Dock Trials
Dock trials are to be carried out in accordance with a programme agreed between Builder
and the Owner, to check operation of machinery. Propulsion machinery, engine room
auxiliary machinery, deck machinery, control systems, automation etc. are to be tested.
Dock trials are to be carried out in the presence of Owner’s representative.
1) All piping systems are to be fully tested, including the checking of valve name
plates
2) Electrical power points together with all lights
3) Auxiliary machinery
4) Ventilation, refrigeration machinery
5) All deck machinery
6) Air-conditioning machinery
7) All pumps etc.
8) Control systems
9) Automation
During the astern trial the vessel is to be inspected for occurrence of local vibration.
With the vessel under full headway and the engines running at their full revolutions, the
propeller is to be reversed to full astern. After the vessel has reached full sternway and
with engines running at their full revolutions, the propellers are to be reversed to full
ahead, and the vessel is to run until the output of the engine has reached full headway.
During this trial, the rudder is to be kept amidships.
The course, time and distances for these manoeuvres are to be recorded.
114. Environmental Conditions
The vessel, plant, machinery and equipment, their components and related systems shall
be entirely suitable for service under the following conditions:
Sea water temperature 360C
Ambient air temperature 500C
Relative air humidity 92%
Wind velocity 18m/sec
Significant wave height 3.0 m
Current velocity 1.0 m/sec
Wave period 10 sec
116. Drawings
On completion, two sets of soft copies on CD ROM of the following AS-FITTED drawings to
be given with the vessel in addition to three (3) sets of paper prints.
1) General Arrangement
2) Hydrostatic Curves
3) Cross Curves
4) Stability Booklet
5) Dimensional Profile
6) Anodes plan
7) Docking Plan
8) Drain plugs drawing
9) Tank Calibration
10) Structural Profile & Deck
11) Midship Section
12) Cargo rail and Bulwark
13) Structure in way of crane
14) Engine Seating Detail
15) Plummer block drawings
16) Forward Sections
17) Aft Sections
18) Typical sections
19) All transverse and Longitudinal Bulkheads
20) Shell Expansion
21) Superstructure Detail
22) ‘A’ Bracket details
23) Shafting Arrangement
24) Rudder Arrangement
25) Rudder stock & Rudder drawing
26) Drawing of Skeg
27) Bilge keel drawing
28) Deck outfit plan
29) Anchoring and mooring arrangement plan
30) Seachest arrangements
31) Engine Room Layout
32) Thruster Tunnel Detail
33) Bilge, Ballast & Fire main System
34) Ship’s Fuel and Lube oil System
35) Engine Cooling
36) Starting air system
37) Service air system
38) Exhaust system & funnel
39) AC and Ventilation system
40) Cool & Cold room arrangements
41) Refrigeration system
42) Cooling system for AC & Refrigeration system
43) STP system
44) Domestic FW (Hot, Cold) & Sanitary System
45) Position and details of Tank Vent, Sounding & Filling Pipes
46) Oily Water filter and overboard system
47) Schematic Wiring Diagram and Reference to Fittings
48) As fitted Cable try & wiring drawing for power, lighting, communication, control
cables etc.
49) Shaft generator arrangement
50) Main Switchboard Wiring & Short Circuit Calculations etc.
51) 24V DC Radio battery Charging Panel & 24V DC Switchboard
52) Ventilation Arrangement
53) LSA Plan
119. Delivery
Delivery of the vessel is to be taken afloat adjacent to the builder’s yard at a safe berth.
Builders shall ensure that all machinery, equipment, piping, bilges, coolers and tanks are
cleaned and preserved/ painted till delivery to and acceptance by owners.
M/E and auxiliary machinery and propeller units shall be protected between shop
trials and sea trials by a method of corrosion inhibitors approved by manufacturers. The
vessel shall be delivered to the owner’s crew outside the port limit upon dropping of the
pilot with propulsion machinery running.
A joint acceptance survey shall be conducted after successful completion of trials 3 days
prior to the delivery date. The builders shall have completed rectification of all defects,
the vessel thoroughly cleaned and ready for service.
122. Practice
Any modifications or changes required by Classification Society and Government Authority,
prevailing on the date of keel laying or similar stage but not mentioned in the specification
shall be modified and installed at no extra cost to the Owner. For changes, required by class
or statutes effected after the keel laying date, shall be to buyer’s account.
123. Modification
If for any reason the Owner or Builder would wish to change brand of equipments,
components and materials, etc. outside the agreed maker’s list, both parties are to
mutually agree first and any differences in prices, if any, are to be adjusted in the contract
price, in accordance with the terms and conditions of the contract.
202. Stem
The stem is to be formed by a mild steel bar or by a formed radiused plate suitably
stiffened by webs and breast hooks as per the design.
203. Skeg
A double plate box shaped Skeg is to be fitted on the centreline aft and set forward of the
propellers.
Provision is to be made to ensure internal drainage to the drain plugs. Upon completion
the Skeg is to be provided with a float coat by filling & draining of bitumen solution or
equivalent.
Standard horizontal drive thruster for bolt-in type mounting for installation from thrusters
room. Four or five bladed NiAl propeller with variable pitch working in a flow accelerating PV
nozzle. The nozzle is to be of mild steel with Stainless steel lining in way of propeller.
208. Manholes
All manholes are to be of elongated shape with stainless steel studs and nuts. In way of
accommodation, they are to be of recessed type with flush wooden covers to match deck
level. In engine room and main deck, they are to be “raised” type.
209. Draft Marks
Draft marks are to be in metric on P+S at forward, aft and amidships as per the relevant
regulations.
211. Fenders
Half round metallic pipe fenders (300 NB, Sch 80 pipe)to be provided at the deck level,
raised deck level (if any) and at the foxle deck level on P+S.
Raked half round pipe fender(300 NB, Sch 80 pipe) to be provided between the deck line
fenders and the lower fender. The ends to be well tapered. W-type rubber fenders are to
be provided at the bow and stern. The fendering plan and the securing arrangement is to
be approved by the owners.
Adequate number of used aircraft tyres are to be installed above fenders on the sides and
stern such that the tyre fenders will be touching each other or separated by a gap less
than 50mm. Securing of tyres to be done to four points (lugs) using chains and shackles.
Freeing ports to be arranged in main deck bulwarks with area to Classification requirements.
All transitions in the bulwark top are to be made as smooth as possible to avoid snagging the
towline.
One opening each of 1.5 m wide is to be provided on the P&S side bulwarks. They are to be
suitably protected using portable wooden storm boards.
Upper forecastle bulwark rail bar to be 100 NB sch.80 pipe. Freeing ports to be cut in upper
forecastle bulwarks, as required.
Doubling plates to be fitted under bulwark stanchion feet and in way of mooring pipes, etc.
Cast steel mooring chocks to be fitted on the bulwark at the appropriate locations for passing
the mooring ropes.
218. Funnels
Twin funnel uptakes to be arranged to accommodate the exhausts and to serve as engine
room hot air exhaust.
219. Masts
The main mast is to be fitted with brackets for the navigation lights. Suitable stays to be
provided to make the mast sturdy.
Dispensation for distance between the forward and aft mast is to be arranged by the
owners.
Masts to have rungs with protective guard carried to the top, arranged for access to light
trays and necessary fittings.
Blocks for aerials, yard arms and ensign staff to be fitted and sheaves for signal flags and
shape hoists to be arranged on masts, as required.
220. Rails & Stanchions
To be fitted around wheelhouse top, bridge deck, forecastle deck and elsewhere as
necessary. To be fitted to ladder ways and round ladder way landings.
Top rails to be 32mm galvanised pipe, middle and bottom rails to be 19mm diameter solid
rod.
Stanchions to be 65mm x 14mm flat bar, spaced approximately 1800mm and welded to
deck.
Storm rails of 32mm diameter (stainless steel or plastic covered pipe) shall be provided
inside the accommodation spaces, alley ways, wheelhouse, around consoles etc.
Handgrips to be fitted in way of W.C.’s and showers and where required in way of
manholes and vertical ladders.
220A. Flood coamings
Raised flood coamings of 50mm height shall be provided on all exposed decks to prevent
staining of shipsides and superstructures.
Chain pipes and hawse pipes to be of welded steel construction designed to give easy
stowage of the anchors and cables. A permanent flushing arrangement to be provided in
the hawse pipes for cleaning the anchor cables. Spurling pipes are to be provided with 50
mm half round chaffing bar. In addition to guillotine bars, anchor lashing/securing
arrangements shall be provided on forecastle deck.
222. Seatings
Main engine, gearbox and auxiliary engine seatings are to be built by the Shipbuilders but
are to be submitted to Owners and engine builders for their approval. Suitable chock fast
resin, holding down bolts and/or fitted bolts are to be provided and carefully fitted as
required for all items of machinery.
All doors are to meet with SOLAS requirements and with baked enamel finish frames,
hung on brass / stainless steel hinges and fitted with brass / SS door fittings. Good
quality Mortise locks with three (3) keys having engraved labels each are to be fitted to
doors of all cabins (double berth cabins to have 4 keys), stores and other compartments
throughout the accommodation. Master key suitable for all these locks is to be provided.
Chrome plated brass locks are to be fitted to all drawers, cupboards, lockers, stores and
cold/freezer rooms. Escape hatches to have internal locking arrangements. All fixtures and
fittings are to be from a quality supplier approved by owners before installation. All
hardware used to be of brass. Padlocks of brass to be provided for hatches/doors as
appropriate. All doors and hatches to have ‘door catches’ to hold in open position.
Allocation of Cabins
Status No. of Bunks No. of Cabins No. of Men
Spl. Persons 1 2 2
Spl. Persons 2 5 10
Spl. Persons 4 2 8
Captain, Chief Engineer, 1 2 2
Chief officer & 2nd Engineer 1 2 2
Two men cabins 2 7 14
Total Complement 38
All 6 nos single cabins and 6 nos two men cabins to have en-suite toilet facilities. Separate
community toilets shall be provided for the crew and special personnel having no toilet
facility attached. Modular toilets shall be used everywhere. An emergency shower cum
eyewash station is to be provided at the aft end of the accommodation on the main deck
outside the toilet. The toilet on main deck, outside the accommodation, shall have water
closet, urinal and washbasin with hot & cold-water taps. A mirror cabinet, soap dishes,
towel racks etc shall also be provided in the toilet.
Name Plates & Notice Boards
All cabins, rooms, workspaces etc are to be identified by plastic nameplates over doors.
All such nameplates are to indicate name of compartment.
Notice boards and nameplates as requested by Classification and authority regulations are
to be provided.
- Integrated joystick controls for propulsion & manoeuvring (at aft console only)
- Manual & Joystick selector switch for propulsion, BT & steering (aft console only)
- Horn button
- Muster alarm
- Joystick control for search lights
- PA system
- VHF (GMDSS& Charterer’s)
- Gyro/repeater, echo sounder/repeater, speed log/repeater
- GPS/DGPS
- Towing winch control, CCTV control, Bulk discharge systems, pumping systems and
flow meters for the fuel and water with printing system, tank gauging system.
- External Fi-Fi control (Aft console only)
- Portable aluminum storm covers shall be provided for W/H and other windows (As
required by class)
The equipment & devices installed on the aft console or aft region should be suitable for
operating the vessel facing aft.
Details of equipment and layout shall be provided by the builder.
2 - built-in two-tier wooden berths with plywood bases and drawers under lower tier
4 – full height double tier wardrobes
1 - book rack
2 - ashtrays, table type
4 - sets berth curtain rails
1 - waste bin
1 - table
1 – table lamp
1 - chair
1 - settee
2 - double toilet cabinet with mirror
6 - towel hooks
4 - tumbler holder
4 - hat and coat hooks
1 - Port light with dead light/ window and curtain
Common toilet is to be provided on same deck or alternately a sharing toilet between two
cabins with :
1 - wash basin
1 - toilet paper holder
1 - water closet and grab rail
1 - shower with plastic curtain
1– Fresh water hose with tap and sprayer (health faucet) near to water closet.
provided. Preferably the mess room area and recreation area shall be divided by a collapsible
partition.
310. NIL
311. Galley
To be arranged suitably and to be fitted with the following: -
All galley equipments and outfits are to be of stainless steel.
1 - Thermostatically controlled electric range with oven and 4 hot plates on top, with
mechanical exhaust canopy with grease trap over and retainer bars, thermostats, adjustable
timer clocks, bread and cake moulds etc.
1- stainless steel double deep sink With Hot and cold water faucet, sink waste
macerator and Drainer, shelves and lockers underneath and plate racks overhead.
1- dresser with cupboards and drawers under and plate rack over
1- side board
1- pan rack
1- waste food macerator with bone crusher fitted with suitable power, fresh water &
disposal connection. (make: Fax pollution system or similar)
1- garbage bin with lid and attachment
1- grease trap from galley drains (to be located under main deck. Strainer box shall be
fitted in galley)
1- large microwave oven with convection and grill / bake facility
317. Workshop
An air conditioned, well laid out workshop of about 20m2, having following machinery
shall be provided. The door of workshop shall open on to the main deck. A smoke detector
connected to main fire alarm system having a reset timer of 30 minutes duration will be
provided in the workshop.
1. Precision lathe machine with a set of tools (Knife, parting, knurling, etc)
2. Double ended heavy duty grinder mounted on a pedestal, with protecting eye-
guard and quenching box nearby.
3. Pedestal mounted drilling machine of 25mm
4. Work bench with drawers below
5. Bench vises – 150mm – 2 nos.
6. Shadow board complete with hand tools
7. Arc welding machine – 415V, 3P, 50 Hz, Heavy duty. Capable of welding plate
thickness from 1 mm to 15mm. All welding accessories are to be provided.
8. Gas welding and cutting set complete with cylinders, pressure regulators, blowback
arresters, hoses, Brazing and cutting torch with one set of nozzles, Cabinet for storing
brazing rods and one set of brazing rods (All equipment to be from UNITOR with flash-
back arresters). The gas cylinders, spaced 10 meters apart from each other, shall be
located outside the workshop in a sheltered area.
9. Pressure switch and gauge tester
10. One set of workshop tools
11. One stainless steel sink with hot & cold water connections
12. Service air connection with sufficient length of hose with quick connect couplings
13. One table for mounting the fuel injector testing equipment
Engine Control Room shall be installed with all necessary controls and equipment required
by class and owners. The control room should be provided with marine PABX/sound
powered telephone, good air-conditioning arrangement and arranged so as to get a clear
view of the engine room. A computer table complete with electrical connection points and
two chairs shall be provided. One filing cabinet is to be provided for keeping drawings &
instruction manuals. A stainless steel washbasin complete with hot & cold-water taps and
drain leading to bilge well, shall be provided outside the control room
323. Windows and Side lights
General
All windows and portholes shall have mild steel casings welded to the bulkheads and glass
frames of brass or aluminum. Bolts and screws shall be of non-rusting material.
Windows shall in general be fitted with tempered clear glass.
Portholes
All portholes on main deck are to be fitted with deadlights. Portholes in toilets are to have
translucent glass.
Porthole frames shall be spigoted through the shell sufficiently for welding and a welded
eyebrow shall be fitted above.
Fixed portholes with armoured glass / deadlights shall be provided in all weather tight
external doors to accommodation.
Accommodation windows
Windows in way of the accommodation (minimum one for each cabin) are to be glazed
with an approx. 500 mm high x 400 mm wide opening. They are to be of fixed type,
unless required by class to be of open type for use as emergency escapes.
Wheelhouse windows
Wheelhouse windows are to be of the largest possible size to give maximum visibility; this
applies particularly to the forward and aft windows, which are to be extended low enough
to allow a good view of the deck working areas and the rescue zone.
Wheelhouse windows, one fwd and one aft, shall be of anti-mist (electrically heated). All
windows are to be of fixed type.
The front and aft windows are to be installed sloping outwards going up.
Above the main windows inward sloping top windows shall be arranged sufficiently at
fwd, aft, and each side.
One of the front windows and one of the rear windows shall be provided with the clear
view screen. Straight heavy-duty marine wipers shall be arranged for the windows in the
fwd & aft , except those fitted with CVS..
A strong downward freshwater spray system shall be fitted all around the wheelhouse
windows.
SOLAR SOLV or similar foldable/roller screens are to be provided for all windows of
Wheelhouse. Overhead windows are to be fitted with antiglare films.
324. Steel Doors
All external doors on the main and forecastle deck are to be of steel with coaming heights
according to the Loadline requirement.
Six dogs workable from both sides are to be fitted with clips and grease fittings. The
doors are to be channel-framed tightened to gaskets of neoprene or similar. Fixed
portholes with armored glass and dead light to be provided on all the weather tight doors
to the accommodation.
Doors to be fitted with sturdy padlocks and holdback arrangement to retain them in open
positions, and capable of being opened from either side. Eyebrows to be fitted over
weather doors where there is no deck overhang.
Sanitary Spaces:
Ceiling: Non-Combustible panel about 9mm thick with plastic lining both sides trimmed
with binding strips.
Bulkheads: Steel, painted in a light colour
Galley Service Spaces:-
Deck heads: Non-combustible panel about 9mm thick with plastic lining both sides
trimmed with binding strips
Bulkheads: Steel bulkheads are not to be lined but painted in a light colour
328. Thermal, Acoustic & Fire Insulation
Insulation:-
The insulation is to be fixed in place with adhesive and secured with wire cleats. The
insulation is to be considered in conjunction with the capacities of the air-conditioning
plant.
Thermal Insulation:-
The following surfaces are to be insulated:
Weather-exposed walls of air-conditioned rooms.
Weather-exposed walls of the wheelhouse.
Deck heads of all domestic and catering spaces where such deck heads are located under
weather-exposed decks or under storerooms situated on deck.
Deck head of the wheelhouse
Acoustic Insulation:-
Generally noise levels to be in accordance with good marine practice and relevant IMO
code.
Particular attention must be paid to provide sound insulation of private areas from public
and machinery spaces as required.
Wardrobes to be about 500mm square internally, built of plastic faced plywood matching
the room interior and to include a hat shelf, hanging rod and shoe rail. To be ventilated
top and bottom with life jacket stowage above.
Dining tables to be 650mm wide and fitted with polished timber fiddles. Top to be heat
resisting plastic.
Knee hole desks to be of wood veneer faced plywood with cigarette proof plastic tops. To
be fitted with one column of four drawers, shallow drawers at top, deep drawers at bottom
suitable for files.
Chart table to have wood veneer plywood top and be 850mm minimum width. Drawers to
be arranged under. Drawers to have positive keeping arrangements to prevent sliding
open in heavy weather. Details to owners satisfaction.
Book racks to have fixed bar across front and raised coaming at front edge of shelf.
Exposed edges of plywood in furniture or panelling to be covered by wooden/plastic strips.
332. Painting
Paint materials and colours
All paint materials shall be of the highest quality, suitable for marine operation. The
materials selected and the application of same shall be of such quality that a substantial
lifetime of corrosion protection with minimum maintenance is guaranteed.
Technical data sheets for all referenced paints shall be submitted to Owner for
information. These data sheets shall include all necessary requirements and
recommendations concerning solid volume, calculated coverage, recommended dry film
thickness, drying time, over coating intervals, etc.
Finish colours shall be to Owner’s approval, this applies also for all subcontracted items
including the colours of the machinery in the engine room and equipment in the
wheelhouse.
Finishing coats in under deck spaces and tanks shall generally be of a light colour in order
to facilitate inspection.
Anti-skid paint shall be applied on specified areas of exposed main and superstructure
decks.
Procedures and supervision:
In addition to the procedures outlined in this specification, all paint works including
surface preparation, paint application and inspections shall be carried out strictly in
accordance with paint manufacturer’s standard published instructions, the agreed and
approved paint specification and work procedures. With respect to surface preparation the
following standards shall be applied:
SIS 055900 - Svensk Standard.
All surfaces shall be surveyed by Owner’s, Builder’s and paint manufacturer’s surveyors
before starting painting, between each paint coat and after finishing painting. The Owner’s
and paint manufacturer’s representatives shall have the right to inspect and report on the
standard of surface preparation and quality of coatings at all stages of application, and to
request corrective measures should deviations from either the specification or good
practice be discovered.
The surface preparation and painting work of the sub-contracted machinery, equipment
and piping shall be carried out in accordance with this specification and in agreement with
and under control of the Builder.
Paint and coating guarantee
A paint coating guarantee of 36months from delivery date on shall be given by the Builder
for all painting works.
Blisters, peeling off from substrate or between coats, loss of adhesion, cracking or flaking
shall be considered as defects for all paint guarantees, even if they are not associated
with visible corrosion.
All paint guarantees shall include the supply of materials, surface preparation, paint
application and all associated costs and expenses.
Surface Preparation
General
Abrasive blasting materials used for surface preparation shall be cleaned, hard angular,
PH neutral, dry, paint manufacturer pre-approved, and shall have a chloride level of not
more than 20 ppm and a conductivity of less than 100 µSiemens/cm (ASTM D49-40).
Before application of any coatings, all surfaces to be coated shall be cleaned by applicable
means from visible salts and other contamination such as but not limited to dust,
moisture, fats, oils, soap solution, white deposits, soot from welding and cutting, chalk
marks, marking paints and other foreign materials.
Before pressure testing of tanks and compartments butt and seam welds shall be surface
prepared and coated with shop primer for rust prevention.
Any paint damage shall be made good at each coating stage before the application of
further coats.
Primary surface preparation
All surfaces of steel plates and sections shall have mill scale and rust removed prior to use
by means of shot/grit/quartz/sand/copper slag blasting to a bright metal (Sa 2.5) finish.
After blasting plates shall be primer coated immediately with one coat of 15 microns shop
primer. During fabrication the primer coat shall be touched up where damaged by
mechanical means or by welding.
The surface preparation work of the sub-contracted machinery, equipment and piping
shall be carried out in accordance with this specification and in agreement with and under
control of the Builder.
Secondary surface preparation
Before the first paint coat is applied in ballast, freshwater, foam and detergent tanks, all
sharp edges must be ground smooth with 3C edge preparation. In other areas 1C edge
preparation shall be applied for all sharp edges.
Burr caused by gas cutting shall be removed from all cut edges of structural members.
Welding slag and spatter clinging to surfaces on and around welding beads shall be
removed by hand scraper and/or disc sander. Sharp peaks shall be ground flush.
Gas-burnt areas and other damaged parts of shop primer and weld seams shall be shot-
blasted or mechanically cleaned to SIS St 2 or 3 and touched-up with zinc epoxy shop
primer for rust prevention.
When the extent of the rusted or damaged portion of a plate caused by welding, burning,
etc. exceeds 40% of the plate area, sweep-blasting should be used for the surface
preparation. Furthermore, it should be understood that when shop-primed surfaces are
corroded to such an extent that they cannot be adequately made rust free by sweep-
blasting, full re-blasting shall be applied.
Furthermore, if areas are poorly prepared or not painted to an acceptable standard of
finish, the specified overcoating is interval exceeded or the adhesion of subsequent coats
is jeopardized, then re-blasting in parts or in whole shall be performed.
In normal circumstances, secondary surface preparation grades shall be applied as
follows:
Area: Preparation Grade:
Shell bottom and topside St 3
Weather decks St 3
Deckhouse exterior St 2
Deckhouse and ER interior St 2
Ballast, fresh water detergent and foam tanks St 3
Lube oil, bilge, dirty oil tanks St 2
Fuel oil tanks St 1
Others St 2
For this surface preparation sand blasting or power tooling by disc grinder shall generally
be applied. The use of powered wire brushes shall be minimised.
Before over coating all surfaces shall be cleaned of oil, moisture, dust and other foreign
materials with thinner, freshwater, wire brush, or compressed.
Paint Application
Conditions for paint application
No painting shall be carried out under adverse weather conditions such as rain, fog, snow
or under freezing conditions. The dew point of air shall be at least 3°C below the steel
surface temperature and the relative humidity shall not exceed 85% during paint
application. Air humidity shall be controlled during application and shall be within the
accepted limits of the applied paints. The manufacturers application recommendations
shall be obtained.
No paint application shall take place if the chloride contamination level exceeds 3µg/cm2.
Application methods
Painting work shall be performed by airless spray as far as possible. Roller and brush shall
be used only for touch-ups, minor repairs and markings.
In ballast, freshwater, foam and detergent tanks and in weather exposed areas one (1)
stripe coat shall be applied prior to each full coat. The stripe coating shall be applied to all
weld seams, edges, corners, rear ends of bulbs, fittings, and other locations not accessible
or suitable for spray gun application. Stripe coatings shall be applied by brush.
All steel structure areas where components are attached by screws and bolts shall be
stripe coated before the components are fitted.
During dry-docking before sea trials the underwater shell shall be high pressure water
washed and fresh water cleaned before the application of the last anti-fouling coat. Salt
measurement shall be performed before paint application. All defects shall be repaired
before the application of the final anti-fouling coat.
The water used for cleaning shall be clean, contamination free and have a conductivity of
less than 300 µS/cm.
Coating Quality Criteria
Painted visible surfaces shall be free of sags and runs.
The dry film thickness shall be measured after each coat to confirm adequate thickness.
The underwater hull paint thickness shall be checked and recorded before and after the
application of anti-fouling paint. No limitation shall be made on the location and number of
points for paint thickness measurements.
The dry film thickness (DFT) of the paint coats shall be measured by digital equipment.
In ballast, freshwater, foam and detergent tanks 100% of the specified DFT shall be
achieved at a minimum of 90% of the measured points, at the remaining 10% of the
measured points at least 90% of the specified DFT shall be achieved (90/10 acceptance
criteria). For all other painted surfaces an 85/15 acceptance criteria shall be applied.
The painting schedule to be as recommended by the paint manufacturer (Hempel /
International) subject to owner’s approval
Equipment, Pipes and Machinery
In general, all equipment, piping and machinery items, including, platforms and other
outfit, shall have the same coating applied as for the surrounding areas, unless otherwise
specified. Galvanised and non-ferrous items shall receive a required primer in advance.
Handrails in the engine room shall have a white finish.
Galvanizing
Galvanizing shall be carried out on:
Air vent hoods
Steel sounding, suction and discharge pipes
Exterior rails, stairs and ladders
All piping for sea and freshwater, except where otherwise noted
Exterior gratings where of steel
Other items as deemed necessary.
All galvanizing, also for piping, shall be done by hot-dip galvanizing to 15 microns.
Galvanizing shall be carried out after finishing of all the hot works.
333. Cathodic Protection
Cathodic protection for 3 years duration to be given to the external hull, stern, bow
thruster tunnel, each sea chest, pipelines where dissimilar metal components like pumps,
coolers are fitted and rudders by sacrificial anodes.
334. Markings
General
All markings shall generally be carried out with outlines in bead welding, except the
freeboard mark which shall be made of cut steel plate and welded on. All markings are in
English language only.
Superstructure Markings
A Vessels name board of suitable material shall be installed at both sides at the top of the
wheelhouse. Suitable lighting of the name boards shall be provided.
Owner’s Logo shall be provided on port & stbd sides on the funnels.
Other markings on the superstructures shall be provided as necessary.
Hull Markings
The necessary hull markings, i.e. Vessel’s name and port of registry, freeboard and draft
marks, bulkhead, tank border marks & tank identification for in-water survey, bottom plug
marks, etc.
Vessel’s name and port of registry made of cut steel plate and welded on shall be provided
fwd and aft as per Owner’s requirements.
Draft marks in decimeters shall be cut from steel plates and welded at fore, aft and
midship region. Manholes shall be marked with weld beads.
Safety Markings
All necessary safety markings such as caution plates, no smoking sign, safety instruction
notices, fire equipment designations, etc. Shall be provided in machinery spaces,
deckhouses and on weather decks according to operational procedures and as required by
the applicable rules and regulations.
The rescue boat, liferafts and other lifesaving equipment shall bear the ship’s name and
port of registry.
Markings Of Pipes
The marking of pipes shall be done according to Owner’s standards. In general, pipe
Colour strips shall clearly identify each pipe designation/purpose, and copies of the code
chart shall be mounted at appropriate locations in all machinery spaces.
Name Plates for Equipment, Outfit and Machinery
Nameplates shall be fitted for all equipment, outfit and machinery items, valves on deck
and in machinery spaces. Nameplates on exposed decks shall be of stainless steel;
nameplates for interior spaces may be of brass (for valves) or plastic.
404 Capstans
Two (2) electro-hydraulic/electric capstans shall be installed at main deck aft (P & S), with
pulling force of 5 tonnes @ 15m/min. Variable speed control to be located at main deck
aft.
405. Bollard, Fairlead, Loose Mooring Equipment
Around 12 bollards of 12” NB sch 80, excluding the “H” frame Bollard in front of the
anchor windlass, are to be suitably located on boar the vessel. Mooring pipes or chocks for
the above bollards are to be fitted to the bulwark as required.
Mooring lines: 4 x 160M long mooring ropes of 64 mm diameter having a breaking
strength of more than 13.5 tonne (polypropene). Ropes to have eyes at both ends.
Tow line : 1x 190M long towline of min. 34.5 tonne breaking strength (polypropene).
Diameter of rope to be not less than 64mm or diameter as specified by class which ever is
higher.
It is required to have two separate motors for each drum as this will help to operate both
drums simultaneously and independently during the anchor handling. It is also required to
have a tow wire tension/pay length meter (load cell) to enable the master to know the
length of the cable and load, which is of great use for day-to-day operation. These
indications shall be at local and remote control panels. The local control station shall have
mechanical controls (lever operated valves), which facilitate complete operation (heaving,
paying, clutch controls, etc) in the event of failure of electric remote control system.
Pressure indication at local control shall be mechanical type. Operation from the remote
control, situated at wheelhouse aft console, shall be electric. Pressure indications at
remote control console shall be electric.
The entire deck aft shall be flushed to facilitate the transfer.
Wire drums and clutches to be visible from the wheelhouse aft control station. In addition,
Video camera/monitors to be installed arranged for viewing the rope drums, clutch,
brakes, etc.
For Diesel oil, Fresh Water bulk and Mud, discharge points at port & stbd midship and port
& stbd aft end. Deck connections to be also provided on stbd side but need not be
extended up to stern. A schematic drawing to be submitted for owner’s approval, prior
commencing the work.
Save all / spill trays to be provided for all the filling / discharge lines, air vents / over flow
lines etc. for fuel oil, lube oil, hydraulic oil, dirty oil & bilge holding tanks.
417. National Colours
“Staff” to be installed at mast for national colours.
418. Escape Hatches
Watertight hatches, with counter weights to be provided for the following compartments,
except stated otherwise :
• Engine room
• Steering gear compartment
• Bow thruster room – The hatch/bolted panel shall also facilitate removal of electric
motor directly on to the exposed deck.
• One flush bolted panel of 1200 x1200 to be installed with in the out reach of the
crane above the engine room for the supply of the heavy spare parts.
Rungs or vertical ladder are to be fitted for each escape hatch and area to be illuminated
by emergency light.
419. Storm Rails
Storm rails and grab rails to be fitted all round deckhouse and wheelhouse and on exterior
bulkheads. Storm rails also to be fitted in convenient positions in toilets, engine room
and bow thruster compartments.
420. Drainage for Decks
Suitable scupper pipes minimum 50mm to be positioned in funnels, along the main deck,
forecastle deck and wheelhouse top to facilitate deck drainage.
50mm dia scuppers and drains are to be fitted in galley, each wash place and shower
sumps. Drains to be fitted to discharge from all washbasins and scuppers. Drains are to
discharge overboard through a storm valve.
Soil pipes from WC to be minimum 100mm and led to a 150 NB common soil collector line
leading to the sewage collection tank.
Each scupper to be fitted with a grating and all domestic pipes are to have water-sealed
traps and cleanout plugs at bends. Horizontal runs of drainpipes to have a slope of not
less than 1:50.
Scuppers on main deck are to be provided with rubber plugs.
All air and sounding pipes shall be galvanized. Ventilation head for fresh water and ballast
water to be provided with S.S./ brass insect screen and oil tanks to have with S.S. flame
arresters.
Filling connection is to be with flange closures. Additionally sounding pipes shall be of welded
type with closure devices. All filling connections, on deck, for fresh water, fuel oil and lube
oil shall have stainless steel Camlock couplings.
line. Save-all trays are to be provided on all filling, vent, sounding connections of fuel and
oil.
The oil fuel piping is to be arranged so that the transfer pump may draw from any of the
bunkers and discharge to either the daily service tanks or the settling tanks. A spring-
loaded draw-off cock is to be fitted to each daily service tank and settling tanks.
Each oil fuel bunker and daily service tank to be fitted with an overflow pipe led into a
common main, as far as practicable, which is to discharge into the overflow tank. Site
glass shall be provided in common main, illuminated from behind.
A single air pipe is to be arranged from the overflow tank and is to be terminated under
the forecastle deck bulwark with appropriate ball float vent head and flame arrestor
screen. The over flow line is to be fitted with an overflow alarm.
Drip trays of minimum 150mm coming height are to be fitted in way of pumps. Drain from
drip trays to be drained to dirty oil tank.
Emergency shut-off valves to be fitted on fuel oil and lub-oil tanks subjected to static
head. Emergency hand pumps to be provided.
Remote air-operated closing devices for fuel oil valves are to be provided as per Rules and
Regulation.
Fresh water and diesel oil filling line with flow meters are to be arranged with minimum
back pressure for fast filling.
Vessel shall be equipped with an accurate & easily operated sounding or gauging system.
This system should indicate true quantities of fuel in each tank. This system should have
remote display(s) together with a paper printer or other hard copy recorder in the Bridge.
The diesel fuel discharge & intake pipes shall be fitted with gauges or flow meters which
can accurately measure quantity of fuel taken on board & discharged, and in particular
quantity of fuel pumped into a well during well servicing operations.
Diesel fuel discharge & intake pipes or lines shall be fitted with pressure gauges and
sampling cocks for monitoring quality at periodic intervals during discharge and intake of
diesel fuel. The mud discharge & intake pipes will only be fitted with pressure gauge.
F.O. Purifier of about 1350 Ltrs/hour capacity to be provided to draw from service and
settling tanks and discharge to service tanks. Trolley beam or lugs to be provided near
purifier for cleaning of bowls. The settling and service tanks are to be located at a higher
level. At least one settling tank and two service tanks are to be provided. One service
tank will overflow into settling tank. The other service tank shall be fitted with high level
alarm and overflow into the designated overflow tank. The settling tank shall be provided
with low/high level cut in / cut out float switches for automatic operation of transfer
pump. Service tanks shall be provided with low level alarms.
505. Lube Oil System
Lube oil pipes of seamless black mild steel are to be arranged in accordance with engine
Manufacturer’s recommendation and to meet Classification requirements. Lube oil storage
tanks are to be provided in engine room with filling pipe and air vents with suitable save
all trays, fitted on main deck. The main and auxiliary engines are supplied with built-in
lube oil pumps. Separate lube oil/hydraulic oil tanks to be provided for each grade of oil,
with capacity sufficient to hold oil required for one change. No lube oil/hydraulic oil tank to
be located in the double bottom area. The lube oil/hydraulic oil tanks are to be located in
the wings.
Lube oil purifier Identical to fuel oil purifier (of corresponding capacity) with 2-stage
heater is to be installed and connected to the system for close circuit purification. LO
transfer pump shall be provided for inter-tank and deck transfer.
One attached pump of each type is to be supplied as spare. All plate coolers are to have
provision for regular back flushing. Permanent connections with necessary valves and
proper drainpipes are to be provided for this purpose.
The central cooling system shall not serve the air-conditioning and refrigeration
systems. The condensers of these systems shall be directly cooled by seawater.
The vessel shall be provided with minimum 46m reinforced compressed air hose on a reel,
25mm diameter and working pressure 10.3 bar. Air compressors to have automatic start
stop.
Vessel shall have a completely separate clean FW (potable water) system together with
pipes/lines & pumps, which are not used for pumping bilges, ballast or fuel. The tanks are to
be de odorised before putting into use.
A hot & coldwater dispenser is to be arranged in the mess room.
Sufficient storage tanks for domestic FW shall be provided together with the necessary
equipment for filling from a deck manifold, venting lines with insect screens, level gauging by
sight glasses, sounding facility, drain facilities etc. The clean FW discharge pipes or lines shall
be fitted with flow meter and sampling cock for monitoring quality at periodic interval during
intake & discharge of F.W.
All fresh (hot and cold) and seawater service piping in accommodation area shall be of
thick-walled copper (Not less than 3 mm thick) . Mild steel/ brass is not acceptable.
The pump capacities shall be about 3 cub.M/hr and cut in / cut out pressure range of 2.2
to 4 bar. The hydrophore tank shall be 300 ltr. Size.
Cold & hot freshwater shall be led to all sinks and basins. Hot & cold freshwater supply to
showers shall be led through mixing valves of the anti-scale type. Taps for Cold
freshwater supply to wash basins shall be spring-loaded.
One (1) hydrophore system for domestic freshwater supply of adequate capacity for the
Vessel’s complement as specified above shall be installed.
511. Freshwater System-Hot
One freshwater calorifier with adequate capacity (approximately 500 l) shall be provided
in the engine room for supply of hot water throughout the Vessel. The hot water heater
shall be electrically heated by two immersion heaters and be thermostatically controlled to
cut-in and cut-out in sequence.
The calorifier is to be adequately lagged. A thermometer is to be fitted to the heater. One
hot water circulation pump shall be installed for forced circulation to circulate the hot
water throughout the vessel.
Forced circulation to be provided by electric driven centrifugal pump having Cast Iron casing,
bronze impeller and stainless steel shaft.
One (1) 10-litre electric hot water heater, with automatic filling and thermostatic controls, is
to be provided for the galley.
512. Sanitary Water System
A pressure system identical to the fresh water system is to be fitted. The domestic sea
water system shall be used only for toilet flushing. System to supply sanitary water to
water closets and to taps for washing down purpose. The pumps in sanitary system is to
have bronze casings, bronze impeller and Stainless steel shaft. The piping in
accommodation area behind panelling shall be of copper not less than 3mm in thickness.
The FW and Sanitary pumps are to be identical.
One (1) hydrophore system supplying seawater for toilet flushing of adequate capacity for
the Vessel’s complement as specified above shall be installed
The SW hydrophore pump should have identical capacity as that of the FW hydrophore
system.
The SW sanitary pump shall be provided a suction line from the freshwater tanks/system,
through isolating valves and spectacle blanks to provide flexibility for using either fresh or
sea water for the sanitary system. Similarly, the outlets from the pressure tanks shall be
interconnected through isolating valves spectacle blanks to facilitate only one pump
supplying the sanitary and domestic freshwater system when using freshwater for both
systems.
F.W and sanitary pumps shall be identical.
513. Scupper & Discharges
Discharges from washbasins, showers, sinks are to be grouped into common cross
main(s) to discharge overboard through storm valve(s). Internal scuppers from
accommodation are to be taken separately. Discharge from W.C. is to be led to a sewage
treatment plant adequate for 33 persons.
Scuppers from the refrigeration spaces are to be led to the bilges. Scupper from AHU
drain is to be led to deck scupper.
50mm scuppers to be fitted in toilets. Laundry and galley scuppers to be 80mm. All
internal scuppers are to be sloped, and fitted with portable gratings. Scuppers to be of
JIS standard or similar.
Discharges and traps generally to be as follows:
Showers : 50mm with P-trap
Washbasins : 32mm with deep seal bottle trap
Galley sink : 65mm with water and grease trap, strainer to be fitted
W.C.s : 100mm
Cleaning plugs to be fitted as may be required.
Open superstructure/deckhouse decks to be drained by 50mm scuppers. Scuppers on
main deck are to be supplied with rubber plugs.
The plant shall cool the wheelhouse and all living spaces within Accommodation area. The
workshop and ECR is also to be air-conditioned. Galley and dry provision store to have
spot cooling. The air duct to Wheelhouse is to be separate from other branches.
The combined filling and discharge points on deck shall be colour coded and with the
following sizes for various cargos: -
• Cargo fresh water - 100mm N.B.
• Cargo fuel oil - 130mm N.B.
• Cargo drill water - 100mm N.B.
• Dry bulk - 130mm N.B. (5 inches)
• Liquid mud - 100 mm N.B.
Deck termination shall be fitted with appropriately sized “CAMLOCK” female type quick
coupling. Butterfly valve (S.S.) to be fitted adjacent to the quick coupling.
518A. Cement System
Cement System General: -
The system is designed for simultaneously loading/discharging of 2 grades of cargo i.e.
cement and one chemical with a maximum specific gravity of 2.8. Discharge rate
minimum 80m3 / hr. at 5.6 Bar.
Loading/discharge station arranged at deck - on port and on starboard sides amidships
and aft. Each tank to have independent Loading / Discharge lines.
Loading/discharge operation to be from Central Control Panel to be located in
Wheelhouse. Quick couplings are to be provided complete with reducer.
Cargo Capacity : Approx 200m3 total (50m3x4) .
Operation Pressure : 5.6 Bar
Classification : LRS
Cargoes : Cement, Barite, Bentonite, Crushed Marble.
Tanks: -
Four (4) off vertical segregated cement tanks of 50 m3 each with completely independent
filling and discharge arrangement. Fillng tanks at Portside and discharge at stbd. side.
All tanks for 5.6 bar working pressure.
Test pressure 1.5 times working pressure.
To be complete with aeration system hatch, lifting eyes, legs and pipe connection for
discharge, fill and vent lines and air supply plus high level indicators, pressure valve and
safety valve which can be preset at any level. Cargo pipes to be kept as short and straight
as possible. The length between the pipe couplings shall not be more than two (2) meters.
The pipe couplings shall be of ‘victualic grooved coupling” or similar.
The cement tanks shall be individual filled and vented. No interconnection of tanks are
permitted except for relief valve. The bulk system shall be remote operated with the
exception of butterfly valves (manual operated) located on the main deck. Deck
connection shall be of quick disconnecting type CAMLOCK or equal coupling.
Remote control stand for four(4) tanks operation, having two purge valves for each tanks
and two(2) compressor stop buttons incorporated. It shall be located in Wheel House
facing aft.
Certificates are to be provided for setting of all relief/safety valves. Set pressures are to
be marked on the valves.
Compressors: -
2 off electrically driven screw compressor each capable of providing the discharge rate
independently, seawater cooled, with de-humidifiers and water separators. One
compressor system shall be 100% standby for the other.
Capacity : as required to achieve 80 CuM/hr discharge rate
Working pressure : 5.6bar
After-coolers complete with moisture separator and auto drain trap, all to manufacturer’s
recommendation.
or equivalent) and built for ‘radio interference suppression’. The local indicator shall be
mechanical with tamperproof sealing. The remote shall be digital display.
The system shall have two pumps and capacity of each water transfer pump shall not be
less than 100 M3/Hour at 75-meter head.
1 set of adaptors (5” to 4” and 4” to 3”) fitting the CAMLOCK couplings shall be provided.
Pump start/stop switch with safety cap for cargo fuel oil transfer pump shall be provided
at aft console in wheelhouse , near flow meter and near main deck bunker stations.
Selector switch shall be provided at local and remote control station (wheelhouse).
Fire main:
A fire main with suitable hydrants are to be installed, on various deck levels and in engine
room. 15M canvas fire hose c/w brass coupling and nozzle is to be supplied and stowed
alongside each hydrant in a protective box. All nozzles are to be dual jet/spay type.
International shore connection is to be provided as per SOLAS
vessel.
Throw height 55m measured vertically from sea level assuming a
mean impact area located at a horizontal distance not
less than 70 m from nearest part of vessel. Horizontal
and vertical movement with limit stops restricting
monitor discharge on any part of the vessel.
Elevation and rotation Minimum of 230 degrees in horizontal and -20 to +70
of monitors degrees in vertical directions.
Foam shall be introduced to the monitor from branch pipe directly and expansion in the
foam barrel for application.
Monitor control
The monitor remote control system consisting of the following:
• One (1) main control panel - logic for operation of monitors.
• One (1) joystick panel for installation in wheelhouse with the following remote
functions
i) elevation and rotation of monitors.
ii) clutch in/out operation of fire pumps.
Two (2) units of VHF-radio telephone, 25 W with remote handsets are to be provided.
Both to be multi channel 25 watt RF output power and 1 watt reduced RF output switch
fitted with digital selective calling (DSC) and capable of receiving on 156.525 MHz
(Channel 70). Remote handsets to be located at the forward and aft control stations.
Item not specified above but required by the relevant Authority are to be supplied.
607. Internal Communication
One (1) auto-telephone system with about 50 lines and 50 lines spare capacity is to be
provided. Electrical supply: 230 volt, 1 Phase, 50 Hz and DC 24 volts. Internal telephone
system to be provided in all rooms namely:
• Cabins
• Offices
• Common spaces
• Workshops
• All control positions
• Stores
• Tool room etc.
• Engine room
• Wheelhouse
Computer Network
Server based LAN should be installed for emailing purposes, with the server at
Wheelhouse and computer terminals with all the accessories in following spaces
1. Wheelhouse,
2. Chief Engineer’s cabin,
3. Master’s cabin
4. Owners
5. All the offices to be provided with terminals, except ships office where the
computer shall also be provided.
6. Engine Control Room.
The cables used for computer network is CAT5/CAT6 type. The connection outlets for PCs
are to be RJ-45. Each equipment is connected to network with 3meter grey jacketed fly
lead to wall outlet. 1-meter patch cable is to be provided inside the patch panel. All outlet
positions to be sequentially numbered and labelled with corresponding labels on the patch
panel ports and cable. LAN hubs are 16-port auto sensing stackable 10/100 base TX/FX
Ethernet switch (d-link/3 com). OFC cables are to be of multimode 8-core cable. Sockets
connections for OFC to have outlets facing downward to avoid sharp bends in cable.
Separate routing and deck penetrations to be provided for LAN cables so as to avoid
interference with other power/signal cables. The server to be located in a lockable cabinet
in the wheelhouse. The computers to meet the following specification.
1. Processors to be centrino dual core.
2. 2 GB RAM
3. DVD writer.
4. Mouse to be of Optical Type.
5. Computers and servers Makes to be of IBM/COMPAQ with International Warranty
Services. Total numbers to 6 nos
609. Flags
One (1) complete set of International signalling flags, numerical and alphabetical,
Qatar national flags – 2,
610. Horns
One (1) air horn (to be operable from forward and aft control).
One electrically operated automatic fog horn from Zollner or similar to be provided.
614. Sextant
One (1) unit sextant to be provided.
615. Chronometer
One (1) unit chronometer to be provided
618. Clinometer
Two (2) units, wall mounted (one in wheelhouse, one in engine room).
619. Clock
In all the living spaces, working and mess room spaces, including wheelhouse and engine
room. Clocks to be battery clocks, Quartz type. Shipyard to propose locations.
622. Telegraphs
Two (2) sets electric push button telegraphs operating on 24V D.C for twin screw
propulsion consisting of the following commands to be mounted at the two (2) wheelhouse
control consoles. Instruments and equipment selected for the aft consoles should be
suitable for operation facing aft.
2 x 11 orders, 2 units type with changeover for forward and aft wheelhouse consoles.
2 x 11 order means: Full astern
Half astern
Slow astern
Dead slow astern
STOP
Dead slow ahead
Slow ahead
Half ahead
Full ahead
Wheelhouse control
Finished with engine and standby
623. PA System
PA system with talkback facility is to be installed with one (1) loudspeaker at the forward,
two (2) loudspeaker at the aft and Two (2) in engine room, each loudspeaker with 60
watts capacity to be audible with all the machinery running.. Talk back facility to be
provided at all operational points like workshops, Engine Room, B/T room, Steering gear
room, fwd deck, aft deck bulkhead and at the Crane column. One talk back facility with
headphone is to be located near the local control for the CPP in the engine room. Electrical
supply: 230 volt, 1 Phase, 50 Hz and 24V DC. PA system is to be connected with auto
telephone system for ‘paging’. Microphones at fwd and aft consoles are to be hands free
type.
625. Anemometer
One (1) 0-100 mph anemometer comprising transmitter and receiver of the dial type shall
be installed.
629. Binoculars
Two (2) normal ship binocular sets; 7 x 50
630. Owner required equipment in addition to GMDSS.
1. 2 nos. wall/panel mounted VHF – Sailor RT2048. These shall be programmed to
Charterer’s frequencies. One each shall be mounted at the forward and aft console.
2. 1 no. wall/panel mounted VHF – Sailor RT2048, programmed to Charterer’s
frequencies and mounted in the hospital for communication to shore based doctors. One
slave unit shall be in Master’s cabin.
3. 1 no. wall/panel mounted VHF – Sailor RT2048, programmed to Charterer’s
frequencies and mounted in the ‘Fast rescue boat’ in water tight container.
4. 4 nos. VHF radio portable (Intrinsically safe, having 10 channels) – To be
programmed to Charterer’s frequencies as below. Standard channels should also be
available. Spare batteries and chargers shall be provided for each set. Charger for one set
shall be provided in the ECR. Internal antenna wiring shall be provided in the ECR, in
Engine room, and in steering gear room.
SECTION 7 – MACHINERY
700. General - Machinery
Propulsion is to be provided by two uni-directional marine diesel engines arranged to supply
power independently via reduction gearboxes through twin propeller shafts to two
controllable pitch propellers fitted in Kort nozzles.
All main and auxiliary machinery is to be rated for continuous maximum output under
tropical conditions as described in cl. 114..
Manoeuvring control of the propulsion units, propellers and gearboxes is to be provided from
two stations in the wheelhouse along with relevant indicators, one forward and one aft.
Diesel engines are to have NOX certification in accordance with Classification Society Rules.
Joystick control, integrating the main engines (CPP), independent steering gear,
bow and stern thrusters, is to be provided.
Two (2) independent propulsion plants, each unit shall consist of:
• One (1) Main Engine
• One (1) Controllable Pitch Propeller with fixed / Azimuthing nozzle
The entire propulsion plant is to be designed, constructed and installed according to the
rules and requirements of Classification Society, IMO and National Societies.
Exhaust gas emission limitations, according to IMO, shall be noted as well as measures for
sea- going vessels for the prevention of marine pollution by oil, sewage and garbage in
conformity with MARPOL 73/78.
Each engine to be about 2750 KW continuous rated and is to be coupled to one (1)
Controllable Pitch Propeller Unit via a reduction gear or directly to Azimuth CPP
The engine shall comply with the latest IMO requirement for NOx emission and shall be
supplied with EIAPP certificate.
702. Gearbox
Each of the main engine to drive the propeller through a marine reduction gear. Gear ratio is
to match the engine for appropriate propeller. Gearboxes are to have built in hydraulic
clutches. Rotation configuration shall be made to ensure correct propeller rotation direction.
Each gearbox should have a vertical offset power take off (PTO) to drive shaft alternator ( in
case of conventional CPP) All alarms and safety requirements as per class and in accordance
with good Shipbuilding practice are to be provided.
Electric driven standby gearbox lub oil pump shall be provided for each gearbox. The pump
shall start automatically in the event of low lub oil pressure. A visual and audible warning
alarm in ECR & Wheel House shall be provided.
In case of Azimuth CPP, The Engine PTO drives a single input, dual out put step up gear box
to drive both the shaft generator and Fire Pump. The gear box to have independent cluth for
engaging the Shaft Generator and Fire Pump.
Propeller shaft brackets are to be of “Y” type fabricated of MS. Upper part to support shaft aft
bossing and lower part to prevent wires entering nozzle thus protecting propellers.
Stainless steel net cutters and MS rope guards shall be provided.
703B. Propellers
Two (2) four bladed controllable pitch propellers are to be installed, operating in fixed
nozzles.
Propeller material to be of approved nickel aluminium bronze and are to be manufactured to
ISO/TC 8 Class II standard and statically balanced.
Propellers are to be designed to give speed performance and bollard pull as specified.
One (1) set of spare propeller blades, one LH and one RH to be provided.
All relevant tools for opening of blades, seals and couplings shall be provided.
• Diesel Generators
Voltage : 415 V, 3 phases
Frequency : 50 Hz
Output of each set : 400 KW
• Shaft Alternators
Voltage : 415 V, 3 phases
Frequency : 50 Hz
Output of each set : 1200 KW
Shipyard to submit ME power balance chart and electric load chart before placing order for
DG sets and shaft alternators.
The three DG sets are to be able to operate in parallel, for automatic load sharing /
transfer and while supplying to BT or ST.
.
Builder shall provide numbers, capacities, NPSH charts and detailed specification of pumps
for each system including standby pumps for the main engines &, diesel generators.
All pumps shall have locally mounted starter panels with ammeter, running / stop
indication lights. Remote start / stop panel with selector switch and running / stop
indication lights shall be provided in ECR.
One (1) F.W. kit pump and one SW kit pump is to be provided for each engine and one
spare.
In the Engine cooling system cooler back flushing and cathodic protection shall be
provided for the connecting joints at the dissimilar metal flange of cooler.
The cooling water systems of main engines, diesel generators, cement compressors and
hydraulic systems will be integrated with the central cooling system as described in clause
506 of the specification.
722. Air Compressors - Starting Air
Two (2) sets of starting-air compressor, being air-cooled and electric driven, direct-
coupled type, shall be installed onboard. The capacity of each unit is to be according to
the regulations and main engine maker requirement. The compressors shall be direct
driven by 415V, 3 phase 50Hz electric motor through a flexible coupling.
• One (1) of the compressor to be supplied with alternate source of power from
emergency generator for dead ship start.
An additional control air bottle c/w control panel, filter, oil and moisture removal shall be
provided for the control air system.
Compressor and motor shall be mounted on a common skid/foundation with resilient
mounting.
Air compressors to have automatic start/stop with pre selection switch.
722A. Starting Air Receiver
Two (2) sets of starting-air receiver with sufficient volume and necessary fittings shall be
provided. Pipes and air bottles shall be designed according to the regulations. The pipes are
to be of seamless steel pipes with suitable connection.
Timer operated, solenoid valve controlled, automatic condensate drain system, with manual
bypass, shall be provided from both air receivers. Isolating valves shall be provided before
the solenoid valves. The drains shall be piped in to splash protected open funnels and lead to
nearest bilge well.
2- daily service oil fuel header tanks, each sufficient for 24 hours running of two main
engines and one generator. At least one (preferably two) settling tanks, each of about 20
M3 capacity shall be provided for diesel fuel. The transfer pump shall be arranged for
automatic start/stop operation depending on the tank level.
Built in clean lubricating oil storage tank (as per section 505)
2- fresh water header tanks for main engines
1- stern tube lube oil storage tank
2- stern lube oil header tanks
1- Dirty oil/sludge tank
1- Header tank for LO Purification
1- Tank for each grade of oil used on the vessel.
727. Ventilation
Engine room : Two(2) forced supply (reversible)
& natural exhaust. Additionally, one forced draft fan shall be provided for exhaust.
Wash places and Galley : Forced exhaust and natural supply
Bow Thruster, Stern Thruster
and cement tank compartment: Forced supply and natural exhaust
The exhaust / supply fans & ducts shall be so designed that the room temperatures in the
machinery spaces, including thrusters and cement rooms will not rise more than 5 degree
Celsius above the ambient temperature.
728. Engine Exhausts
The system is to consist of the following elements:
¾ Two (2) exhaust gas silencers, being able to suppress noise by about 25
dBA and equipped with spark arrestor and suitable for oil field operation
¾ Exhaust gas supports to be provided by flexible suspensions. The exhaust
pipe supports, immediately after the turbo chargers shall be of rigid type.
¾ Two (2) exhaust gas compensators, stainless steel construction, after turbo
charger and also where necessary
¾ Insulations to be equipped with stainless steel sheet covering
¾ Drains
¾ External spark arresters shall be provided on all exhaust pipes of diesel
engines
AC System
The electrical generation plant on board this vessel comprises:
Two (2) – 1200 KW, 415V, 3 phase, 50 Hz, 0.8 PF alternator P.T.O. from main engine
Three (3) – 400 KW, 415V, 3 phase, 50 Hz, 0.8 PF alternator driven by auxiliary diesel
engines.
Each main generator shall be capable of taking entire electrical load of the vessel during
cruising. Redundancy of one diesel generator (out of three) is to be ensured during all
working conditions of the vessel (Cruising, harbour operation, platform operation, Fire
fighting operation, etc)
The auxiliary diesel engine driven alternator sets are able to run in parallel and
continuously when required. The generator sets must therefore be suitable for parallel
operation and must be completed with necessary control kits for continuous parallel
operation and auto load sharing in proportion to their capacity.
The shaft generators shall be capable of continuous parallel operation with main
generators and between shaft alternators for a period of 30 minutes for load transfer. A
tiebreaker is to be provided between the MSB and the common bus bars of shaft
generators. The shaft generators shall supply the MSB during cruising.
Emergency Supply:
One (1) 120KW output diesel driven emergency generator to be provided c/w an
independent day tank for at last 18 hours continuous running. Emergency generator to
have sufficient capacity to cater for emergency lights, navigation lights, flood lights,
search lights, intercom system, navigation aids, fire detection and alarm system and aldis
light for 18 hours. This generator sets should be able to take the entire harbour load
(without cargo operations) when feeding to MSB and shall be arranged with independent
automatic battery/air starting in the event the main power supply fails.
Shore Supply:
A 200 Amp T.P 415/3/50, 3-wire watertight shore supply complete with kwh, phase
meter, connection box, sequence indicator, circuit breaker and connected to the main
switchboard. One length of 30m cable c/w terminal connections is to be supplied, to
connect between the shore & shore connection. The shore connection box to be placed on
the main deck within the superstructure and connected to shore supply through watertight
bulkhead opening.
The shore connection box is to include:
• Ammeter
• Voltmeter
• Power Indicator Light
• Phase Indicator
• Frequency meter
D.C Supply:
i) The 24V DC supply is to be obtained from 1 bank of 200AH, 24V DC regulated output
transformer/rectifier with the input coming from the main switchboard. A second unit is to
be provided as ‘spare’ to meet classification requirements.
ii) (Emergency generator is auto starting) A 24V DC supply for the radio is to be
obtained from 2 banks of 24V, 200AH batteries via the radio battery-charging panel.
iii) One (1) 40A, 24V DC output static battery charger to be provided.
Care is to be taken for appropriate arrangement of switches, fuses, protections and control
equipment to ensure ease of maintenance and operation.
Interlocking between shore power connection and shaft, main generators shall be fitted. An
earthing indication light and testing switch shall be fitted and also a selector switch for
ammeter and voltmeter.
The internal wiring of the switchboard shall be carried out in EPR insulated wire to
Classification and specification with a maximum operating temperature and having the
following insulation grades:
• Power Cables: 660 volts
• Control Cables: 250 volts
On completion of manufacture the switchboard shall be subject to an electrical voltage
test of 2000 volts at a frequency between 25 to 100 cycles in accordance with
Classification requirements.
All necessary detailed drawings and material list shall be submitted to the Owner’s
Representative (two sets) for approval prior to commencement with manufacturing of the
switchboard.
A rubber-insulating mat of 2000V shall be laid full length in front of and behind the MSB,
ESB, and starter panel of bow/stern thrusters. It shall have a minimum width of 600 mm
and thickness of 12 mm.
All components throughout the switchboard shall be provided with white-black-white
triplicate nameplates clearly indicating the components service and normal full load
current ratings. The plates shall be secured with brass pins or screws.
An insulated handrail shall be fitted to the front of the switchboard; it shall be at a
convenient height and run the full length of the switchboard.
Voltage, frequency and ammeter shall also be provided in the shore supply section of the
MSB.
Operation
The design shall ensure that, during the cruising, the electrical equipment can be fed
either by main generators or by the shaft generator (s).
The necessary arrangement shall be made to guarantee an uninterrupted operation of all
essential consumers in case that the loads have to be taken over by stand-by generator.
In harbour, emergency diesel generator or shore connection box with 415 V, 3 phases, 50
Hz, shall feed the electrical equipment instead.
804. Switchboard - Emergency
One (1) emergency switchboard similar in construction to main AC switchboard and shall be
fed via a bus tie cable from main switchboard in normal operating conditions for the control
of one (1) 120KW, 415V/3 Ph/50 Hz/3 wire, radiator-cooled diesel engine driven alternator
set. During normal operation the emergency switchboard shall receive power from the main
switchboard. Distribution of electrical power shall be made available both at 415V and at
230V levels. The 230V distribution shall be derived from a 415/230V transformer.
The radio switch panel shall be powered from the radio battery via the radio-charging panel.
It shall be fitted with indication lights, ampere and voltage meters, fuses, circuit breakers
and alarm indicator.
Navigation Light Switch Panel (24V D.C.)
This panel shall be fitted with a built-in transformer rectifier of 230V AC/24V DC indicators,
switches, buzzers, fuses, failure alarm indicator and changeover switch. Main supply is
obtained from 230/1/50A.C supply and emergency from the main batteries.
812. Motors
All motors shall be suitable for working in climatic conditions and in accordance with the
requirements of Classification.
Generators and motors in excess of 50 KW shall have built in space heaters.
A drip proof supply switch fuse box with male type plug receptacles shall be fitted on the
main deck in a convenient position and be permanently wired via a changeover switch, and
phase reversal switch to the main switchboard.
The system shall be arranged so that it is not possible to parallel ship’s alternators with shore
supply.
The connection box shall be complete with circuit breaker, phase sequence indicator, pilot
lamps and socket.
818. Switches
All switches in the accommodation are to be flush mounted and switches in the engine room
and other machinery and watertight compartments are to be watertight and metal mould
(marine type)
Control switches shall be suitably sized to circuit requirements.
All switch, sockets, plugs etc shall be UK type (British type) suitable for use in Qatar.
also to be fitted. The installation shall meet SOLAS, Classification and relevant Authority
requirements.
901 General
The Vessel shall be fitted with Dynamic Positioning System (DPS) and is required to hold
position in any of the loading conditions and under following environmental conditions
Water Depth - 300 Meters
Wind Velocity - 30 Knots.
Significant wave height -3.0 M (Frequency of 6 -8 seconds equivalent to a force 6
gale
on Beaufort Scale)
Current velocity - 1.0 m/sec
Fully operational single DP system shall keep the Vessel in position and working. The
system must have the ability to plot and print capability graphs.
Hipap trunk with 500NB gate valve, Electric or Hydraulic operated will be installed for
future installation of the HIPAP unit. Hipap trunk will have 2 Manholes, 1 door and a
vertical ladder. The valve to have open close limit indication using limit switches. The
indication should be available locally and near DP console.
All required HiPAP cabling to be done
The spare parts shall be tropicalised for long term storage, identified and listed. They are
to be packed in boxes.
Item Makers
Machinery
Main Engine. Wartsila ,Yanmar, MAK
Main DG Caterpillar, Volvo, Man Lindenberg
Azimuth Thrusters. Rolls Royce, Schottel, Lips,
Bow Thruster Rolls Royce, Schottel, Lips,
Motors, Transformers, Frequency Drives Stamford, Leroy Somer, Scandinavian
Electricals, Alstom,
Switch Boards & Controls. Alstom, Scandinavian Electrical, Terasaki,
Marine Electricals
Emergency Generator Caterpillar, Volvo, Man Lindenberg
Fire Pump Kvaerner, Hamworthy, Nijhuis, Allied
Pumps
Fire Monitors Unitor, Hamworthy, Kvaerner, Skum.
Pumps & Hydrophore Desmi, Bombass Azcue, All Weiler, PBG
Norway,
Starting air compressors Hatlapa, Sperry, JP Sauer,
Oily Water Separator. Hamworthy, Ocean Clean, B + V
Industrtrietechnik.
Sewage Treatment - Biological Hamworthy, Envirovac, Hamman.
Air Conditioning System Bitzer, Carrier, Sabore, York
Refrigeration Plant Bitzer, Carrier, Sabore, York
Purifiers Alfa-Laval, Westfalia
Tank Gauging System GWK, Rolls Royce, Alstom
Marine Growth Prevention System Cathelco, Corintec, KC Ltd., Korea.
Valves Econosto, Keystone, Apollo, KS Valve
(India), Medana & Visca
Hull and Deck Equipment
Paint Hempel
Hydraulic Deck Machinery Karmoy, Hatlapa, Rolls Royce , SEC
Deck Crane Hydralift, EBI Cranes, TTS, Dragon.
Item Makers
Doppler speed log Furuno, Skipper, JRC, Tokimec
ECDIS, VDR JRC, Furuno, Simrad.
Communication Equipment
P.A. System Amplidan, Zeintel, Phontec
GMDSS Sailor, JRC, Furuno, Sait Marine
Sound powered telephone/ Intercom Amplidan, Zeintel, Phontec
Fog Signaling System Kokum Sonic, Zollner, Shan Sin - Japan
Fleet 77 Thrane & Thrane, JRC
Marine PABX Zeintel, Philips, Alcatel, Phonetec,
Search Light Francis, Glamox, Norselight