STRAIGHT LINE DIAGRAM

AS-BUILT DRAWINGS

BEG. OF EXCEPTION (ABUT. "A" MATADBATAD BR.)


K0 941+492.60

941+000 941+100 941+200 941+300 941+400 941+500

ABUTMENT "A" DAGUITAN BRIDGE ABUT. "B" DAGUITAN BRIDGE


ABUTMENT "B" MATADBATAD BR. K0 941+775.80 K0 941+967.80
K0 941+507.600
941+500 941+600 941+700 941+800 941+900 942+000

E X C E P T I O N E X C E P T I O N

942+000 942+100 942+200 942+300 942+400 942+500

E X C E P T I O N E X C E P T I O N

942+500 942+600 942+700 942+800 942+900 943+000

E X C E P T I O N E X C E P T I O N

943+000 943+100 943+200 943+300 943+400 943+500

E X C E P T I O N E X C E P T I O N
943+040.00

943+220.00

943+400.00
END OF EXCEPTION
K0 943+588.800

943+500 943+600 943+700 943+800 943+900 944+000

E X C E P T I O N
943+600.00

943+740.00

943+764.00

943+800.00

943+980.00
LEGEND:
CONSTRUCT LINED-DITCH ALL MATERIALS TESTING REQUIREMENTS WHERE UNDERTAKEN
GROUTED RIPRAP, LINED-DITCH CANAL
CANALS w/ CONCRETE COVER AND THAT ALL MATERIALS USED COMPLIED WITH THE REQUIRED
SPECIFICATIONS.
CLEANING OF EXISTING
JONARD M. PONFERRADA
LINED-CANALS MATERIALS ENGINEER
ELMER A. IGNACIO
PROJECT ENGINEER III
DPWH - RO8 DPWH - RMC1 / UPMO

PREPARED BY: CHECKED AND VERIFIED BY: RECOMMENDING APPROVAL: APPROVED: PROJECT TITLE & LOCATION: SHEET CONTENTS: SHEET NO.:
RMC1 - BILATERAL, UPMO REGIONAL OFFICE VIII RMC1 - BILATERAL , UPMO See Cover Sheet for Signature AWP-2 / PM 07 DAANG MAHARLIKA
(DULAG - MAYORGA SECTION)
Republic of the Philippines STRAIGHTLINE DIAGRAM B - 1a
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROVINCE OF LEYTE
ERICSON A. SALAZAR ELMER A. IGNACIO EDGAR B. TABACON , CESO IV VIRGILIO C. CASTILLO EMIL K. SADAIN , CESO II FOR DRAINAGE AND 7a 36
CENTRAL OFFICE SECTION ID: 15Z00015, REGION VIII
AVP FOR OPERATION Manila
PROJECT ENGINEER III REGIONAL DIRECTOR PROJECT DIRECTOR UNDERSECRETARY SLOPE PROTECTIONS
CONTRACTOR DPWH - RMC1 , BILATERAL - UPMO FOR UPMO OPERATION
(KO935+000.00 TO KO950+000.00)
LENGTH = 15.00 Km.