2.0 Scope
2.1 This procedure is applied to all heat exchangers fabricated by Jutasama’s, which
require tube expansion.
3.0 Definitions
3.1 QC - Quality Control
4.0 Reference
4.1 TEMA Eighth Edition.
4.2 Tube expander manufacturer’s guide.
5.0 Responsibilities
5.1 QC Inspector to ensure that tube expansion is carried out in accordance with this
procedure and as per drawing.
5.2 Project Engineer to make selection on suitable type and range of tube expander.
5.3 Production Section (Subcontractor) to perform tube expansion work.
5.4 QC Inspector to make tube expansion measurement and report.
6.0 Procedure
6.1 Tubes expansion shall be carried on tube-to-tubesheet joint when required by design
or client.
6.2 When tube welding is required as per drawing, tube expansion shall be carried out
after completion of tube to tubesheet welding.
6.3 Before production takes place, selected welders must to undergo mock-up test on
tube to tubesheet joint.
6.4 Mock-up test specimen is then will be tested for Macroscopic Examination & Weld
Strength Test. Mock-up test specimen will also be tested with tube expansion test if it is
requested by client.
6.5 Tube expansion ratio shall be as below:
i. Tube expansion : 3% to 6%.
6.6 Tube expansion ratio shall be measured at random tube’s location. Number of tubes
to be measured shall not be less than 10% of total number of tubes.
6.7 Before expansion
a. Project Engineer shall provide suitable tube expander to production foreman.
b. QC inspector shall measure and record values for parameter below:
JUTASAMA SDN. BHD.
TUBE TO TUBESHEET JOINT (MOCK-UP TEST)
Document Title PROCEDURE & TUBE EXPANSION Document No.
PROCEDURE
Revision No. Revision Date Page Number 4 OF 2
6.9 Tube expansion report shall be prepared and submitted to client for review.
7.0 Attachment
7.1 Tubes Expansion Report (F-QC-025)