1.0 INTRODUCTION
ACW quantity is required to be estimated for calculation of Water Balance Diagram as well as for selection of ACW pum
ACW quantity circulated through the heat exchanger depends upon the following factors:
a) Heat Load of various auxiliaries
b) Design of the Heat Exchanger
c) Permissible temperature rise of ACW Flow quantity
2.0 THUMB-RULE
The Value of ACW quantity normally varies from 5% to 8% of CW quantity.
CW ACW as
Name of the Project Unit Size ACW Qty/Unit Qty/Unit
Sl. No. %ge of Remarks
(MW) (m3/hr) (m3/hr) CW Flow
Note:
The above project references may be useful in determining the ACW flow when the indivudual consumer data are
not available.
4.1 ACW Required at the Secondary Side of PHE for Q1 2650 m3/hr
For Unit size less than 500 M
TG Auxiliaries common PHE catering
requirements of both SG &
4.2 Q2 650 m3/hr auxiliaries are provided. He
ACW Required at the Secondary Side of PHE for the secondary circuit for tha
SG Auxiliaries system is common.
4.3 ACW Required for Vacuum Pump coolers Q3 60 m3/hr
Q=
Q1+Q2+Q
4.9 Total ACW Requirement per Unit 3+Q4+Q5 3826 m3/hr