7 Quality Basics in Development

FRASER – June 17th, 2011


7 Quality Basics in Development

Opening Comments

Jean-Michel RENAUDIE
FRASER – June 17th, 2011
7 Quality Basics in Development

Introduction

Ken SATO
One reminder

Please switch off your


mobile phone and
close your laptop
Property of Faurecia - Duplication prohibited

4
Breakthrough Quality Plan

"Breakthrough Quality Plan" start from Oct.1, 2006


• Practical instead of conceptual
• Preventive action instead of fire-fighting

Customer
Quality
Development Quality

Production Quality
Supplier Quality

Breakthrough !!
Property of Faurecia - Duplication prohibited

FES Quality
( 7 Quality Basics !!
in Production & Development )
5
2008
0 S/R Alert
15 Customer PPM

The plan does not introduce any


new tools ………aims to build a
new « quality mindset »
Property of Faurecia - Duplication prohibited

I am expecting this plan to give lasting results and


will closely track its implementation by all concerned
in our company.
I am counting on your responsiveness and rigor … 6
From 6 Quality Basics
to 7 Quality Basics in Production

Quality
Variability Reduction

Standardized
Work
5S 7 Quality Basics
N° Check point By Frequency Criteria If not OK
1 Deformation Visual 100% OK - NOK sample Repair
2 Dimension A Micrometer 1/120 +0,2 mm Scrap
3 Dimension B Gauge 100% Go - No go gauge Scrap
4 ... ... ... ... ...
5 ... .. ... ... ...
6 ... .... ... ... ...
7 ... ... ... ... ...
8 ... ... ... ... ...
9 ... ... ... ... ...
10 ... ... ... ... ...

Supplier Partnership 1
5
4 7 8
1
2
Quality Employee Empowerment 3 9 60

Wall
QRCI
Property of Faurecia - Duplication prohibited

Final Self Red Rework Poka OK Quick Response


Inspection -Inspection Bins under Control Yoke 1st piece Quality Control

Includes Stop at Defect 7


Includes Temporary Quality Wall
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
8
Mandatory Program Deliverables
CUSTOMER
CUSTOMER PROGRAM CUSTOMER PRODUCTION START OF END OF
INQUIRY AWARD TOOL RELEASE PART APPROVAL PRODUCTION PRODUCTION

Program
Go/No Go Target Program GR 1 GR 2A CAR Approval GR 2B GR 3 GR 4
Review Quote Review
Quality Target Study * Quality Management Plan Gauges requirements * Initial Samples Submitted to Customer * I.S. for additional capacity
Quality Prototype control plan Prototype control plan implemented *
Pre Production control plan Pre Production control plan implemented * Production Control Plan *
Human
Resources Program Teams staffed Plant Start-up team planned Product support team staffed

Program internal contract Detailed SOW Make or Buy finalized (Subcontractors) Lessons Learned *
(program objectives)

Program Master schedule * Prototype build plan CAR approved Pre-series build plan Activities during ramp-up *
Management Control of
Single List of Issues in place Single List of Issues managed * S/R concerns solved (SLI) * process &
design
ECM for development In place ECM for pre-series & series in place change *

Finance Initial Business Plan Actual BP Actual BP

Customer Contract Agreed prototype prices Agreed tool & pre-series & series prices Updated series price with PO
Sales
Prototypes paid Pre-series parts paid Outstanding payments

Initial product concept Product definition for DV * Product definition freeze*

Design FMEA * Design FMEA Actions implemented


Product
Engineering Key characteristics * BOPs definition released

Design Validation Plan * DVP test results successful Production Validation test results successful *

Prototypes approved
Property of Faurecia - Duplication prohibited

Initial process concept Process definition Process definition released Mass Production Trial Run @ Rate * EMPT Run @ Rate

Process FMEA Process FMEA * actions launched Process flow realized *

Manufac- Prel. Manufacturing footprint Facilities / Footprint specifications Facilities definition released
turing
Initial equipment concept Production System definition Equipment & tooling specs * released Production process Instruction *

Logistic& Packaging definitions released * Logistic & packaging in place *


Initial supply chain concept
(internal/external MIFD*) Initial process capability study plan * Process capability achieved *

Purchasing Expert suppliers contracts signed Designers suppliers contracts signed BOPs, tools, gauges, equipment ordered Supplier PPAP *
5 Series
1 ACQUISITION 2A DESIGN 2B DESIGN VERIFICATION 3 PRODUCTION SET-UP 4 LAUNCH PRODUCTION
V1.0
9
PDCA in Program

• Background: Bad launches come from bad execution of:


• Costing,
Need to audit not
• Engineering key deliverables
• Quality deliverables etc…
only on Quality
• Today Quality responsible in program for:
• Training
• Audit FES Program audit

Action Plan
Reaction to Audit & <Teacher>
Feedback to standard Standardization & Training (coaching)
7 Quality basics in Dev - FES School
Mandatory Program Deliverables
Property of Faurecia - Duplication prohibited

Check Do
<Policeman> Implementation
Audit Excellent Program Plan
FES Program Audit KPI - Reporting System
10
Objective

Confirm rigor and discipline in programs.


– Level of execution must be deep enough
– Timing of execution must be respected
System audit for Programs after GR3, GR 2B and GR1 from
each R&D center (Start from 1/2008).
– Check evidences : real documents, real processes,
real products
– Check organization, timing of implementation, level
of evidence
Property of Faurecia - Duplication prohibited

11
Scope

Mandatory Program Deliverables & Reporting


– Level of completion of the 72 PMS Key Deliverables
– Program reporting system
Seven Quality Basics in Development
– Capitalization and Transversalization
– Key Characteristics
– FMEA (Failure Mode and Effect Analysis)
– Strict Control Plan
– Validated Engineering Change
– Program QRCI
– Functional Milestones, Program Steering Committee and Gate Reviews
Acquisition Process
Target definition with PLM, Acquisition phase staffing, Concept validation,
Property of Faurecia - Duplication prohibited


Costing robustness, Program Quote Review, Program Kick-off meeting with
Core Team staffing, Acquisition debriefing, Operating Margin.

12
Example: results summary

It’s “Good” level overall.


But, some of deliverables in “Product validation” are not so good. (For
example, (1).”Design FMEA actions” were not well implemented
before 2b (2)”Results of DVP tests” were not formalized before
RO)

100%
76% 77% 72%
80%
70%
53%
PROCESS 60%
INDICATOR
40%
Property of Faurecia - Duplication prohibited

20%

0%
TOTAL PROG PROD PROC COST

13
Example of “Bad” answer for “Program Quote Review”
Property of Faurecia - Duplication prohibited

14
Example of “Good” answer for “Program Quote Review”
Property of Faurecia - Duplication prohibited

15
15 items of "Good & Bad answers on Faurecia
Intranet through PMS Portal →Good&Bad examples
PMS Portal

Intranet

Bad Answer
Asnwer for Program Quote review
Example of“ Bad” answer for“ Program Quote Review

“ Do you organize internal “ Program Quote Review” with your top


managements before RFQA submission to customer ?”

- There is only “ Price estimation with assumptions”


- There is no “ Description of vehicle & targeted business” no “ Competitor
study”, no “ Customer decision making timeline” no “ Business plan (OI, IRR)”,
no “ Risk analysis”
- Finally, RFQA submission without top managements approval Good Answer for Program Quote Review
Example of “Good” answer for “Program Quote Review”

Price estimation with assumptions “ Do you organize internal“ Program Quote Review” with your top
managements before RFQA submission to customer ”?
base-price add. Value VW 250 AU353 AU210

expected Target 90,00 € 120,00 € 90,00 €


RFQA submission with top managements approval by clear presentat
ion
base-price add. Value VW 250 AU353 AU210
First BP Sittard Price estimation with assumptions
expected Target 90,00 € 120,00 € 90,00 €
acc. group values 120,00 € 170,00 € tbd
(3,7% SG&A)
Description of vehicule & targeted business Targeted business AU353 VW250 AU210 comments
Property of Faurecia - Duplication prohibited

long distance JIT price Brussels 107,00 € 155,80 Audi


€ A3 n.a.
 Complete Seat targeted from
Sittardor long distance JIT
OEM: Audi AG Market Code: AU353
 Metal incl. Mechanisms
Current Production (Faurecia)  Front seats PQ35 PQ25 PQ25 COP
location: Neuburg (Germany)
 Rear seats AU350 PQ25 PQ25 Magna-Intier /Sitech
SOP: 2004 EOP: 2011
Prod. Volume total: 770.000

Customer decision making timeline Turnover 136.180 k€


RFQ First Expected OI 6.918€ 5,0%
IRR 70,30%
Offer Award
Business plan CAPEX 1.361 k€
Competitor study CS
w 18/07 w 22/07 w 34/07 (OI,IRR)
R&D
Tooling
300 k€cash payment
200 k€ cash payment
Polo / A3
will be
market position Comments
Launch cost 943 k€
competitor on
CS
- JCI is very aggressive because they
w 20/07 w 24/07 w 34/07
A1
want to cover the lost Golf business
Risks analysis
! JCI
JCI - CS
Brussels
- JCI is current supplier of VW

- Audi requests to keep the current



The TOP Risks, if we are awarded

Capacities for additional AU210 project is not part of Faurecia


supplier-structure --> no JCI business
- no signals for aggressive behaviour
Lear
Lear - CS
due to low volume MTP and target low in TBL
- generally very agressive behaviour
Intier
Intier - CS - but not appreciate due to bad R&D
performance and to low volume
 problems in long-distance JIT concept (120kmSittard 
Sitech
Sitech - CS
- no signals for aggressive behaviour Brussels)
due to low volume

 Higher requirements on quality than Mitsubishi Colt


excellent good average limited

16
Results (Image)

better
100%
Result Indicators Program Z A: Excellent

1
80%
X
•FR1t

2
•Red Alert S/R B: Satisfactory
•Warranty 60%

•PPM Program Y C: Marginal ok

3
•Customer Quality indicators 40%
X
•Misdeliveries
•IRR D: Not ok
•Operating Income
4
0%

d c b a better
0% 60% 70% 80% 100%

Process Indicators
Property of Faurecia - Duplication prohibited

(Checked by FES program audit)


•Program Management
•Product Validation
•Process validation
•Cost Management
5 Mandatory Rules added to the 15 existing MRs
Property of Faurecia - Duplication prohibited

18
5 Mandatory Rules added to the 15 existing MRs
Property of Faurecia - Duplication prohibited

19
Property of Faurecia - Duplication prohibited

Form
Machine Evaluation

20
Property of Faurecia - Duplication prohibited

2. 2011 Plan

21
Overall 2011 Plan

3 Programs after GR3, GR2b and GR1


2 days per site => 93 programs

Méru
Brieres
System audits 100
100

80 80

60 60
40 40
20 20
0
GR1 GR2 GR3 Toledo Shanghaï 0
Property of Faurecia - Duplication prohibited

GR1 GR2 GR3


100 100

80 80

60 60

40 40

20 20

0 0
GR1 GR2 GR3 GR1 GR2 GR3

22
2011 plan: R&D centers involved

Sites

Jan : Shanghaï (S), Peine-Hagenbach


Feb: Stadthagen, Neuburg, Bavans
March: Méru, Shanghaï(FIS), Brieres
April: Columbus, Auburn hills, Troy
May: Augsburg, Audincourt, Gamersheim-Weissenburg
Jun: Neuburg, Mouzon, Stadthagen
Jul : Brieres, Peine-Hagenbach
Sep: Bavans, Méru, Limeira
Oct: Quatro-Barras, Diadema, Augsburg, Audincourt,
Property of Faurecia - Duplication prohibited

Gamersheim-Weissenburg
Nov: Troy, Columbus, Auburn Hills, Stadthagen, Neuburg
Dec: Mouzon

23
2010 Certified Auditors

Netwk PG Name Certified Netwk PG Name Certified


SATO Kiichiro Yes FAS DUDDLES Mark Yes
Group
SOULA Paul-Louis Yes KERSUZAN Olivier
FAS YGOUT Jacques HAWLEY Brian
US FIS
OBERHAUS Serena
FIS BROGNIART Eric
PMS CANIVAL J. Sebastien HACK Thomas
FECT
FECT MAJCHROWICZ Christian 1 MURRAY Todd 2
FAE ROTHAN Marie-Noelle 2 FIS OLIVEIRA Clodoaldo
KLINGAUF Lutz Brazil FAS VILLARINHO Elessandra
FECT
KUSIAK Jacek
FAS-FIS LI Li
FAS THURET Gauthier
GIELATA Pawel
China FECT
LEE YW
GAO FENG Eva

MESNARD Pierre Yes


Program KWIATKOWSKI Frank Yes
Quality FIS LACOUX Philippe 1
BECKER Rolf 1
Property of Faurecia - Duplication prohibited

MANSKE Carsten Legend:


FECT REBOURS Olivier 1 1: Only for GR1
JACQUOT Eric Yes 2: For GR1 and 2
FAE PATA Martial

24
7 Quality Basics in Development
Agenda

7:45 Welcoming coffee


8:00 Opening comments J.M. Renaudie
8:20 Introduction K.Sato
8:35 Capitalization & Tranversalization K.Sato
9:00 Key Characteristics & Strict Control Plans V.Garcia Parra
10:10 FMEA PL.Soula
11:10 Break
11:25 Validated Engineering Changes E.Jacquot
12:05 Lunch
12:45 Program QRCI J.Burke
15:45 Break
Property of Faurecia - Duplication prohibited

16:00 Functional Milestones & Gate Reviews PL.Soula


16:55 Conclusion K.Sato
17:00 End

25
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization Let’s start! Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
26
7 Quality Basics in Development

Capitalization & Transversalization

Ken SATO
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
28
Property of Faurecia - Duplication prohibited

Examples

29
2.1 Example (Blockage 1.1)

- Mistake the connection of - Risk the immobility of


harness the vehicle due to the
Bad Terminal (A)
problem of injection
Harness (2.5mm) pump
Same Same
color size
Harness (0.5mm)
Terminal (B)

• Check similar problem


OK
Terminal (A) of all harness
Property of Faurecia - Duplication prohibited

Harness (0.5mm) - Same size of terminals


- Same color of harness
Harness (2.5mm)
Terminal (B) 30
2.2 Example (Blockage 1.2)

• Ask to check, not only exact same problem, but also similar potential risk
- Found 11 exact same problems & 45 similar problems and took
countermeasure
- Capitalization : Change “Design Standard”
- Transversalization : Apply all same products (programs, plants)
C ar m aker U n it H a rn e s s T y p e o f p ro b l e m C o u n te rm e a s u re D a te
1 2 3 4 5 6
a OK OK OK B ad OK OK

A b B ad
c B ad
R E NA ULT d OK

B ... ... ... ...


Property of Faurecia - Duplication prohibited

C ... ... ... ...

... ... ... ... ... ...

31
3.1 Example (Blockage 2.1)

• Mistake of parts drawing, • Heater of seat doesn’t work


after design change properly

Over heat
= Bad
No heat

SEAT
Property of Faurecia - Duplication prohibited

= OK
• Standardize the validation
process after design change
3.1 Example (Blockage 2.2)

- Capitalization : Validation Process Standard for Design Change


- Transversalization : Apply to all programs (products, plants)

Design Review by
past quality concerns
Not OK

Design Check
Supplier Change Design Validation Production Validation
Validation for for
Parts Mass production
design the trial parts
OK OK OK
Property of Faurecia - Duplication prohibited

delivery

Design
Renault change Parts submission Good
ANPQP warrant parts
Request
Property of Faurecia - Duplication prohibited

&
Capitalization

Transversalization

34
Turning PDCA for Capitalization & Transversalization
Lessons Learned is source of Standards
>Each function department is accountable of Lessons Learned in its respective area
1. Group Quality 2. Program Quality
1-A 1-B 2-D Program
Program Management
Management System
System
(Lessons Learned )

Standard
System Standard

Acquisition Design Validation Production


Tools
Quality System

2-A Design
Design Standard
Standard
(Lessons

2-B Process
Process Engineering
Engineering Manual
Manual
Quality

2-C Supplier
Supplier Management
Management System
System
Property of Faurecia - Duplication prohibited

3. Customer Quality (Lessons Learned )


3-A Customer
Customer Quality
Quality Standard
Standard
3-B Customer
Customer PPM
PPM Data
Data base
base (8D)
(8D)
3-C S
S&&R
R Alert
Alert // Warranty
Warranty Data
Data base
base (8D)
(8D) 35
8D and Lessons learned
8D – problem solving report for Quality

D1. Description & Sketch _


D2. Risk on similar products and _
processes
D3. Containment In 1 day
D4. Root cause of non detection _
D5. Root cause of non _
conformance
D6. Countermeasure to non In 10 working
detection and non conformance days
D7. Effectiveness of action plan _
D8. Lessons learned In 60 working
days
Property of Faurecia - Duplication prohibited

> Access through Faurecia intranet


● Group Intranet Homepage -> Quality ->
8D – S&R Logistics -> FAU-F-LSG-0230
● Lessons Learned Template is the last
sheet of standard 8D
36
Lessons Learned: Practice

<4 Key points for Before/After>


1).Need picture, drawing or photo
2).Need quantitative value
3).<After> needs to prevent same or similar
problem beforehand
4).Need to understand easily even by your
wife, husband (or partner)

All BGs use the Spider System


under names of LOLA,
I-Know & Knowledge Mgt
Property of Faurecia - Duplication prohibited

37
Lessons Learned: 2 examples

LESSON LEARNED SHEET LESSON LEARNED SHEET


Application date : 08/02/2006 Application date : 8.05.2006
BG/Div/Site: SMPG /Frames-Div. / Geiselhöring Detection Logistics BG/Div/Site: SMPG, Wałbrzych Frames Detection Logistics

Type

Type
UAP/Line: UAP 1 / AU 716 Occurrence Internal UAP/Line: Wojciech Mazgis Occurrence Internal
Author : Willibald Dimpfl Management Suppliers Author : Wojciech Mazgis Management Suppliers

WHAT WAS THE PROBLEM? (5W + 2H) WHAT IS THE CAUSE? WHAT WAS THE PROBLEM? (5W + 2H) WHAT IS THE CAUSE?
What happened? Buckling of Boomerang door- and tunnelside What happened? Sensors NOK, Uncontrolled resetting
ECE-R14 test on rear seat 2nd row high variante NOK on fixed All materials inside drawing specifications Gap between side member and crossmember
Why it is a problem? Materials in N.O.K validation ca. 10%-15% weaker Why it is a problem?
The side members (bumerang) were deformed under laod Seat is on the borderline between dynamic and static requirements Wrong position of parts
and so that horizontal displacement of the H-point was not - When did it happen ?
meeting specification Parameters of materials are changing 4.11.2005
When did it happen ? - Who has detected it ?
Jan 24th 06 Boomerang must absorb the energy in crash test Customer JCI Geel
Who has detected it ? - Where has it been detected ?
SDS Validation Stadthagen and Design Engineering DIN allowed these changes At Customer site
Where has it been detected ? How has it been detected?
Faurecia Stadthagen / Validation Boomerang must be weak to fullfill the dynamic specification Visually
How has it been detected? How many ?
ECE-R14 test 1 piece
How many ? BEFORE AFTER
1 part Workstation could have been reset by conventional key by Workstation can be reset only by electronic key which cannot be
BEFORE AFTER anyone who copied it. copied without controll.

Bucket position sensor allowes to start process even when Bucket position sensor allowes to start process only when position
was out of order OK.

Possible uncontrolled unscrew operation (quick rework) Unscrew operation not possible. This function is blocked in
screwdriver.

ET
4448124 A

ZSB
4448718 A
Property of Faurecia - Duplication prohibited

without additional wire with additional wire WHAT WE LEARNED


CONTROL POINT
WHAT WE LEARNED FACTOR STANDARD / REACTION RULES
(What to do?, how?, when?, who?)
CONTROL POINT
FACTOR STANDARD / REACTION RULES
(What to do?, how?, when?, who?)

NOK procedure audit for every employee


"Confirm'"is when bad part is proceed by
Every 3 months
what: SDS Validation Stadthagen operator according NOK procedure
Following NOK procedure countinously Done by Quality Inspector
how: ECE-R14 test "Not Confirm" is when it is not proceed
Relevant factors of ECE-R14 test Confirmed in Training Records
when: see crash-test schedule result crash test (COP) acurately
who: SDS Validation Stadthagen

Potential Applicability Potential Applicability


Plant: UAP 1 AU 716 2nd row Plant: Aplicable
Division: Plant Geiselhöring Division: N/A
BG's/Group: SMPG / Frames / Plant Geiselhöring BG's/Group: N/A
38
Property of Faurecia - Duplication prohibited

FAS

39
Property of Faurecia - Duplication prohibited

FIS

40
7 Quality basics in Development Evaluation form

NAME :_____________________________Session:_____________________________________

Value added of
the module Comments
1 2 3 4

Introduction

Capitalization &
Transversalisation

Key Characteristics

FMEA

Evaluation Form
Strict control plans

to fill in
Program QRQC

Validated Engineering
Changes

Functional milestones
& Progr Steering Com
& Gate Reviews
Property of Faurecia - Duplication prohibited

How to accelerate

Conclusion

Rating: 1 = Poor 2=Average 3=Good 4= Excellent

General Appraisal 1 2 3 4 Comments:

41
7 Quality Basics in Development

Key Characteristics &


Strict Control Plans

Victor GARCIA PARRA


7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
43
Key Characteristics

Agenda

How to manage Key characteristics 20 mn


How to build a Control Plan 20 mn
Workshop 25 mn
Debriefing 5mn
Property of Faurecia - Duplication prohibited

44
Introduction

Critical dimension “X” = S/R = 1


Which dimension is critical as well? => A, B, C, D or All ?
A±a B±b C±c D±d

“Sub-Assy”

X±y 1
Property of Faurecia - Duplication prohibited

“Slide”

45
Introduction

For an appropriate answer => apply Key Characteristics Management:

• Objective: determine which dimensions are critical and which have


to be kept under control!

• Use Tolerance Chain Management (TCM)

X±y 1
A±a B±b C±c D±d
Property of Faurecia - Duplication prohibited

“Assy”

46
Property of Faurecia - Duplication prohibited

Introduction

Reality is more complex

47
Objectives

• Transform key customers requirements into a


manageable list of key characteristics

• Drive focus on priorities during product & process


development

• Allow early warning for non quality due to


capabilities not met on customers priorities

• Key characteristics management is a process which


contributes to build an efficient control plan
Property of Faurecia - Duplication prohibited

A±a B±b C±c D±d

48
How to manage “Key Characteristics”

• Understand interactions between product and


process characteristics.

• Know guidelines to minimize the initial control size.

• Implement 3 step process to define & monitor Key


Characteristics.
Property of Faurecia - Duplication prohibited

49
How to manage “Key Characteristics”

• Understand interactions between product and


process characteristics.

• Know guidelines to minimize the initial control size.

• Implement 3 step process to define & monitor Key


Characteristics.
Property of Faurecia - Duplication prohibited

50
Product & Process Characteristics

Key Product Product


Characteristics Characteristic
Product KPC which affects
Characteristics
Non-Key 1 2
Product
Characteristics
Characteristics

Key Control * Process


Characteristics Characteristic
KCC which affects
Process
Characteristics 1 2
Non-Key Control
Characteristics
Property of Faurecia - Duplication prohibited

Need to be controlled
to ensure minimized
variation of product
characteristics

* “Key Process Characteristics” = “Key Control Characteristics” / KCC 51


Interactions between KPC & KCCs

CAUSE EFFECT
Material Method Manpower
KCC
KCC
KCC KCC KCC

KCC
KPC
KCC
KCC KCC

Machine Measure Environment


Property of Faurecia - Duplication prohibited

Many KCCs
Once KCCs
Ongoing
Control factors
ofcontrol
KCCs
are of can
willKPC
defined affect
is
ensure
and in aplace,
required
that KPC
theifvariation
KCCs are
of not
KPC checks determined
themay
related
be
reduced
KPC is minimized
=> e.g. and performed
changes during
in material candesign
affect or
theproduction
KPC validation
52
Interactions between KPC & KCCs

CAUSE EFFECT
Material Method Manpower
Suspension
Deflection Qualified Training

Cushion foam Inspection operator


density measurement

Test Protocol Humidity


KPC
Mannequin H - Point
Metrology
hard & Conditioning
software
V

Machine Measure Environment Y


Property of Faurecia - Duplication prohibited

E
M
P
C

Example : H-Point / Seat H


Ch

D 53
S
How to manage “Key Characteristics”

• Understand interactions between product and


process characteristics.

• Know guidelines to minimize the initial control size.

• Implement 3 step process to define & monitor Key


Characteristics.
Property of Faurecia - Duplication prohibited

54
Guidelines to minimize control size

3.2.
1.KPC
KPCwhich
which can
is validated
needs
“Control ofbetocontrolled
and fulfill
be controlled
Process automatically
the requirements
regularly
Characteristics through
( because
KCC) inits
will DV
KCC
there &isPV
ensure because
no related
(e.g.
that the ECE,
The series control size of KPC can be reduced or eliminated along the
• KCC
FMVSS, etc) can
or Poka-Yoke beof
variation reduced
in place.
the to
Thezero or few
control numbers
issize of the
hascontrolled)
tominimized”
be “Continuous
defined
Its process
development is stable
phases asProduct
(process Characteristics
variation
following: under is
ComplianceisTesting”
• accordingly.
Poka-Yoke in placeRequirements

Design Verification Pre-Series/


KPC Series Production
KPC
KPC KPC
KPC KPC KPC
KPC Series
Initial KPC KCC
Control PMS KPC KPC KCC KCC KCC Control
KCC KPC KPC
KCC
Size KCC Size
KPC KPC
Property of Faurecia - Duplication prohibited

KCC KPC

Non Conformity Cost = ppm x called


Customer’s
called volume volume
55
How to manage “Key Characteristics”

• Understand interactions between product and


process characteristics.

• Know guidelines to minimize the initial control size.

• Implement 3 step process to define & monitor Key


Characteristics.
Property of Faurecia - Duplication prohibited

56
3 step process
Customer Program Customer
Customer
production SOP
Inquiry award tool release part approval

1 G R 1: Designate KPCs
Step1 2 a&b GR 2 3 INPUTG R 3 4 GR 4 5
KPC’s list
Management decisions
DRAWINGS Cust. requirements (CtC)
S  Warranty data
R INVESTMENT

GO / NO GO QUOTATION PROGRAM
KPC APPROVAL
Suppliers concerns
DECISION CONFIRMATION

FIT
FUNCTION
SPECS
OUTPUT
Non-KPCs Control Plans
Process Flow Diagram
PRODUCT CHARACTERISTICS
Record KPCs
Record KCCs

Responsible: R&D Engineer


Support: Program/Acquisition Manager, PQL, Buyer,
Property of Faurecia - Duplication prohibited

Supplier, Quality, Sales, Product Manager

Recommended
PRODUCT & PROCESS Tools: FA, D-FMEA,
PRODUCTION SET- UP TCM, FEA SERIES
PROPOSAL & PRE-SERIES LAUNCH
DESIGN & DEVELOPMENT
DEVELOPMEN T
C.t.C = Critical to customer lists, TCM = Tolerance Chain Management, FEA = Finite Element Analysis
PRODUCTION
57
Max 2 Months Min 3 Months Max 6 Months
3 step process
Customer Program Customer
Customer
production SOP
Inquiry award tool release part approval

1 2 a&b
G R 1 Step1 : Designate KPCsG R 2 3 Step2 : Monitor KPCs,KCCs
GR 3 4 GR 4 5
KCC KCC KCC
Management decisions
DRAWINGS
S  KP
R INVESTMENT
C
GO / NO GO QUOTATION PROGRAM
KPC APPROVAL

DECISION CONFIRMATION

FIT KCC KCC KCC


FUNCTION Cause Effect
SPECS

Non-KPCs
Input Output
PROCESS CONTROL PLAN

KPC KCC CONTROL


PRODUCT CHARACTERISTICS

S/R list Control Plans


Fit & Function list Process Flow
Product Drawings Diagram
Industrial Drawings Record KPCs
Product Specs. Record KCCs
Property of Faurecia - Duplication prohibited

Responsible : PQL
Support : Program Manager, Supplier Quality, Validation Engineer, Proto
Lab, Plant Quality, R&D, Process Pilot, Plant Launch team (Launch Mgr.)

Recommended Tools: P-FMEA, Process Flow Diagram, Control Plan, DoE,


PRODUCT
Cause-Effect & PROCESS
Diagram, PRODUCTION SET- UP
Pareto Analysis, Capability Study SERIES
PROPOSAL & PRE-SERIES LAUNCH
DESIGN & DEVELOPMENT
DEVELOPMEN T PRODUCTION
DoE = Design of Experiment 58
Max 2 Months Min 3 Months Max 6 Months
Action steps along PMS
Customer Program Customer
Customer
production SOP
Inquiry award tool release part approval
Step2 : Monitor KPCs,KCCs
Step1 : Designate KPCs
KCC KCC KCC
1 GR 1 S
R
2 a&bDRAWINGS
GR 2 3
Step2 : Plan & Apply control
GR 3
KP
4 GR 4 5
Step1 : Designate KPCs 1st :Designate KPCs duringC the
KPC system KPCs,KCCs ph.1 & 2
FIT KCC
- KCCDesign KCC team collects input data/Lessons learned
Management decisions KCC KCC KCC
FUNCTION Caus Effect
SPECS
DRAWINGS 
INVESTMENT e
of relevant characteristics, e.g. customer KPC list,
Non-KPCs S PROCESS CONTROL KP
APPROVAL
Spec.,
CONFIRMATION R
GO / NO GO QUOTATION PROGRAM
DECISION PLAN C
KPC KP KCC.t.C,
CONTRO
Warranty, supplier concerns,…
PRODUCT CHARACTERISTICS KCCC C
KCC L
KCC
FIT - Define KPCs, Non-KPCs of designed product
FUNCTION Cause Effect
SPECS - Step3
The respective
: Improve program
KPCs,KCCs team members (R&D, PQL,
INPUT
Non-KPCs KPC
Buyer, …) controls
PROCESS CONTROL PLAN
Initial KCC
identify
KPC KCC KPC Series the S/R or Fit/Function
CP KPC KCC CONTROL
Control Plans
PRODUCT CHARACTERISTICS
KCC

Process Flow KCC


VARIABLES CONTROL
CHART
Diagram Step3 : Improve KPCs,KCCs
OUTPUT
Record KPCs 2nd:Plan & Apply control systems
KPC
KPCs/KCCs during the
controls
Instructions
ph. 2 & 3
Initial KCC
Record KCCs - Reduction
Each KPC’s CP
KPC KCC KPC Series
related KCCs are determined (shown
of Variation Control records
in cause-effect
KCC
diagram)
Property of Faurecia - Duplication prohibited

VARIABLES CONTROL
- Planning ways to control KCCs or KPCs
3rd :Improve KCCs controls during the ph. 3&4 (&5) KCCif no related CHART
KCCs are
Responsible : Plant Launch Team Leader identified
(Launch Manager)
- Planning methods for reducing the
Support : Program
variation Manager,
within the targetedPlant
- Record the tests results (dimension, functional, …)
value Manager, PQL, Supplier Quality, Plant Quality, Process Pilot
- Monitoring the results
- Maintain/improve Reduction of Variation
Recommended Tools: DoE,
control planSPC,
size & DVP&R, P-FMEA, Control Plan, QRCI, QSE, R@R
frequency
PRODUCT & PROCESS PRODUCTION SET- UP SERIES
DoE = Design of Experiment, SPC = Statistical Process Control, DVP&R
PROPOSAL = Design Verification Plan & Report, LAUNCH
& PRE-SERIES
DESIGN & DEVELOPMENT
DEVELOPMEN T PRODUCTION
QRCI = Quick Reaction Quality Control, R@R = Run at Rate 59
Max 2 Months Min 3 Months Max 6 Months
Key Messages: Key Characteristics:

• Improves better understanding of customer


requirements
• Helps to focus on product & process priorities to
reduce & permits control size reduction
• Allows early warning on capabilities not met &
prevents S/R issues in the field & customer
recalls
• Can ensure robust designs
Property of Faurecia - Duplication prohibited

Is a prerequisite to define efficient control plans

60
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
61
Key Characteristics

Agenda

How to manage Key characteristics 20 mn


How to build a Control Plan 20 mn
Workshop 25 mn
Debriefing 5mn
Property of Faurecia - Duplication prohibited

62
Introduction: Session Objectives

 Ensure a Global Understanding of Control Plans

 Improve the Content and Execution of Control


Plans

 Clarify the Contribution of each Function


Property of Faurecia - Duplication prohibited

 Be aware of incurred risks if not properly deployed


and applied

63
Bad Control Plan can kill People!

Renault Vel Satis Root cause


Red alert NOK COP test 1. Why: IP insert broken
Field campaign 2. Why: Material brittel
Aug/2003:
Property of Faurecia - Duplication prohibited

3. Why: NOK glass fiber and PU rate


16 cars NOK/400 in the 4. Why: Not checked at OK first part
field.
5. Why: Not a KPC (absent in drawing & control plan)

64
Introduction: Control Plan Objectives

 Protect Internal & External Customers


(Safety / Fit & Finish / Function)

 Efficiently ensure Product Conformity in spite


of Supplier and Process Variability,

 Define Reaction Rules in case of deviations


Property of Faurecia - Duplication prohibited

 Reduce Variability

65
Introduction: Control Plan Definition

• Written Description of Activities for Process Controlling


• List of Planned Tasks to be applied by Defined Responsible People
People
(Operators, GAP Leaders, Maintenance, Quality, Lab …) to ensure Product
Conformity
=> Who does what, when, where and why ?
• Control Plan lists all Process Parameters and Product Characteristics
Characteristics
that require Specific Quality Actions
⇒ 3 levels exist according to the Programs Phases

GR1 GR2A GR2B GR3 GR4


1 2B 3 4 5
2A
ACQUISITION DESIGN PRODUCTION LAUNCH PRODUCTION
DESIGN
Property of Faurecia - Duplication prohibited

VERIFICATION SET-UP

Prototype Pre- Production


Control Production Control
Plan Control Plan Plan 66
Prototype Control Plan Layout

Prototype Phases PT

Prototype Shop

100% 100% KC
Suppliers 0p 1 0p 2 0p 3 Visual Inspection Measurement Customer

100% Visual Inspection & Measurement Internal &


•100% Visual Inspection
•100% Measurement on of Key Characteristics @ Supplier & External
Key Characteristics Faurecia Locations Customer
Satisfaction
Complete Design Validation Plan
Initiate Production Validation Plan
Property of Faurecia - Duplication prohibited

67
Pre-Production Control Plan Layout

Target: achieve 15 Ppm &


PT 100% Efficiency @ SOP

Sorting of
Finished Goods
Manufacturing Plant on selected Key
Characteristics

Quality Wall
Incoming
Final
Goods 0p 1 0p 2 0p 3
Supplier Inspection Inspection Customer
Sorting of BOP
Quality Wall @ Supplier & Faurecia Internal &
on selected Key Locations External
Characteristics Incoming Goods Inspection Customer
 Higher Frequency & Sampling Size on Satisfaction
Property of Faurecia - Duplication prohibited

Key Characteristics Monitoring


Quality Wall
 Initiate SPC on Key Characteristics
 Complete Production Validation Plan

S
No Non-Conformity on Critical Characteristics
R
allowed on Saleable Cars 68
Production Control Plan Layout

Target: achieve 15 Ppm &


100% Efficiency @ SOP

Manufacturing Plant

0p 1 0p 2 0p 3 Final
Inspection
Supplier Customer
Adjust Frequency & Sampling Size on
Internal &
BOP Key Characteristics monitoring
delivered in External
according to Product & Process
Self-Certification Customer
Variability
Status Satisfaction
Drive Continuous Improvement through
Property of Faurecia - Duplication prohibited

SPC on Key Characteristics


Product Audit
Lessons Learned to Programs

69
How to apply Control Plan ?
(Sample Check)

Clear decision rules

Process No Natural Process Limits


is stable Need 100% check for

Natural Process Limits


Key Control Characteristics
Yes
Could be checked by sampling
with basic rules:

<Rule 1> : Suspected lot must be checked <Rule 2> : SPC control with action rule
100% with traceability UPR limit
X ACTION !!
OK Lot Suspected 100% check Action limit
Property of Faurecia - Duplication prohibited

Lot X X
Time
OK OK OK Nominal
OK OK NOK
Action limit X
OK OK OK
LWR limit

70
How to apply Control Plan ? (Instructions Sheet)

Parts name (process : final check)


N° Check point By Frequency Criteria If not OK
1 Deformation Visual 100% OK - NOK sample Repair
2 Dimension A Micro meter 1/120 + 0,2 mm Scrap
3 Dimension B Gauge 100% Go - No go gauge Scrap
4 ... ... ... ... ...
No Subjective Clear Decision Rules
5 ... ... ... ... ...
Criteria
6 ... ... ... ... ...
7 ... ... ... ... ...
8 ... ... ... ... ...
9 ... ... ... ... ...
10
Maxi
...
10 Points
...
to be Checked
...
per
...
Work Station
...

4 7
Property of Faurecia - Duplication prohibited

Pictures or Schemes5 8
to position the Criteria 10
1
2
9 6
3

71
Control Plan – Good Practices
Pre-Production CP

Reaction Rules
defined

Key Characteristics
defined with
Nominal + Tolerances
Higher Sampling
Production CP Size
Property of Faurecia - Duplication prohibited

72
Responsibilities

Actor Validator
Prototype Control
Product Development Leader
Plan + Program Quality Leader
Program Manager

Pre-
Pre-Production Program Manufacturing
Leader+ Program Quality Program Manager
Control Leader + Plant Manager
Plan Plant Quality Manager

Production Control Program Manufacturing Leader


Plant Manager
Plan + Plant Quality Manager

 Program Managers and Plant Managers are responsible


Property of Faurecia - Duplication prohibited

for the strict application of the Control Plans


 Control Plan is the “Safety Belt” to protect us about
“Past Quality Concerns”
73
How to write a control plan ?

General Information

Process parameters only:


-temperature
Product characteristics only: -pressure
-dimension,
-velocity
-appearance, -torque
-function,
Property of Faurecia - Duplication prohibited

Process / ToolsKPC KCC -part number


-force Checking / Monitoring
Reaction Rules
-handling
To be Monitored
Description -physical & chemical -positioning Methods
properties (temperature, fiber
-labeling
glass content, porosity, -scanning
crack, adhesion, etc.)
-packaging
-etc.
Poka-yoke identification nber 74
Workshop : Practical exemple (30’)
Built production control plan related to
shoot channel 8 nuts screwing
operation :
Documents provided:
 Drawing
 KPC/KCC Ishikawa diagram
 DFMEA/PFMEA
 SR fastening mandatory points
Property of Faurecia - Duplication prohibited

 Blank control plan format

Share by table conclusions

75
Interactions between KPC & KCCs
Proposed answer

CAUSE EFFECT
Material Method Manpower
Ergonomics
Backup
Stud Alloy Speed / Angle /
(tools angle,
procedure if overview, ...)
Torque ramp-up Training
Nut Alloy Poka Yoke programming
Inoperative method S/R rules
Self-locking Faurecia (eg : 2
remaining
Poka Yoke
nut P/N

part blocked at Torque & angle


threads
…)
/ stud KPC
Grease Torque
Torque Station Calibration
free
Screwdriver accuracy Maintenance Torque range Dirt or painting (6+/-1
in acc. with torque. free
Nm)
Machine Measure Environment
Property of Faurecia - Duplication prohibited

Example : Chute channel assembly


to Airbag Flap Reinforcement
76
T5 Airbag shoot channel assembly
control plan

Key Contact / Telephone Signature (Quality) Date (Original) Date (Revision)


Prototype Pre-launch Production Demmy Yoosuf / 0044 7787 12/03/03 17/03/2005
516731
Part Number / Latest Change Level Core Team D. Yoosuf, T. Giraud, L. David, Richard Customer Engineering Approval / Date (If Required)
28/11/03
FAB500150XXX (LHD NoNav), FAB500140XXX (RHD NoNav) Cornick Stephane Beaupere, Michael Levasseur, Fadel
FAB500160XXX (RHD Nav), FAB500170XXX (LHD Nav) Wade, , Manuel Ventura, Dave Herrington
Part Name / Discription Supplier / Plant Approval / Date Customer Quality Approval / Date (If Required)
TOPPER PAD ASSY NO NA V & NO NAV LH&RH 28/11/03
Supplier / Plant Supplier Code Other Approval / Date (If Required) Other Approval / Date (If Required)
Faurecia / FRADLEY CXVNA

Characteristics Sample
Part/ Process Name/ Machine, Device Specia Product / Process Evaluation/ Control Reactio Resp.
Process Operation Description Jig, Tools for Mfg. Char. Specifications / Tolerance Measurement Method Plan
Number No. Product Process Size Frequence
Class. Technique
Property of Faurecia - Duplication prohibited

77
T5 Airbag chute channel assembly
control plan

300 Assembly Line - Post-Welding

a) Follow Poka Yoke validation


Instruction a) Inform GAP Leader & Supervisor if
Screw driver with
Fixation of Airbag Chute to Georges Renault Driver b) Record results on Poka Yoke Poke Yoke system fails.
300 1 - Torque CC 6NM +/- 1NM inbuilt torque 1 Shift Start Up
Topper Pad Assembly System validation record sheet b) Inform maintenance to rectify
transducer
c) Record on start up sheet set & actual problem.
torque for 1st off part

a) Inform GAP Leader & Supervisor if


Poke Yoke system fails part.
Screw driver with b) Inform maintenance to rectify
Fixation of Airbag Chute to Georges Renault Driver
300 2 - Torque CC 6NM +/- 1NM inbuilt torque 1 Every Part a) Automated check. problem.
Topper Pad Assembly System
transducer c) Backup driver to be used if original
cannot be repaired otherwise stop
production.

Airbag Chute Recorded


Critical components
Batch, Chute electronically or a) Follow Standard Operation a) Record batch information on manual
310 Traceability Recording Scanner, Manual backup 3 - CC are traceable to 1 Every Part
fixation nuts manually held FIS-F-PS-241/EN V2 traceability sheets.
manufacturing batch
batch number logs
Property of Faurecia - Duplication prohibited

…and additionally , electrical fastener initial torque calibration


and then …regular checking !
78
Key Messages

 Control Plan is a living document!


 Continuously upgraded
 Information should be shared

 Control Plan is a contractual document!


 Strict application is mandatory
 Any deviation or modification must be submitted to
Customer before release

Control Plan is a confidential document!


Property of Faurecia - Duplication prohibited

 Control Plan is requested also from our Suppliers!

79
7 Quality basics in Development Evaluation form

NAME :_____________________________Session:_____________________________________

Value added of
the module Comments
1 2 3 4

Introduction

Capitalization &
Transversalisation

Key Characteristics

FMEA

Evaluation Form
Strict control plans

to fill in
Program QRQC

Validated Engineering
Changes

Functional milestones
& Progr Steering Com
& Gate Reviews
Property of Faurecia - Duplication prohibited

How to accelerate

Conclusion

Rating: 1 = Poor 2=Average 3=Good 4= Excellent

General Appraisal 1 2 3 4 Comments:

80
7 Quality Basics in Development
Agenda

7:45 Welcoming coffee


8:00 Opening comments J.M. Renaudie
8:20 Introduction K.Sato
8:35 Capitalization & Tranversalization K.Sato
9:00 Key Characteristics & Strict Control Plans V.Garcia Parra
10:10 FMEA PL.Soula
11:10 Break
11:25 Validated Engineering Changes E.Jacquot
12:05 Lunch
12:45 Program QRCI J.Burke
15:45 Break
Property of Faurecia - Duplication prohibited

16:00 Functional Milestones & Gate Reviews PL.Soula


16:55 Conclusion K.Sato
17:00 End

81
FMEA Training Module

Paul-Louis SOULA
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
83
Failure Mode and Effect Analysis

1. Reasons for FMEAs


2. Objective of FMEAs
3. Types of FMEAs
4. How to build a Design FMEA
5. How to build a Process FMEA
6. Workshop
Property of Faurecia - Duplication prohibited

84
Red Alert with Customer impact
Defect: No-relocking of one of the 2 slides. Bad hafting of the handle bar
inside the slide : handle bar assembly inside the leg for recall of the handle bar.

LESSON LEARNED SHEET D5 - Root Causes of Occurrence


Applica tion da te : nov- 09 1. No product poka yoke ; estimated nonnecessary by mechanisms
B G/D iv/Site : No g en t s ur Ve rn iss on Detection Lo gistics 2. New operator (2 days of experience) without the good sensibility

Type
U AP/Line: Qua li ty De pa rt Occu rre nce Internal
A uthor : All a n GOUR ET Manag ement Supp liers

WHAT WAS THE PROBLEM? (5W + 2H) WHAT IS THE CAUSE?


What happ ened? Bad hafting of the handle bar inside the slide : Possibility to assembly the handle bar in the slides but in a Sl ide
handle bar assembly inside the leg for r ecall of the handle bar. bad position in the slide's locking spring. Fema le pro file
Why it is a p ro blem? No-relocking of one of the 2 slides.

When did it happ en ? Detected the 29th Apr il of 2009.


Cr eated the 24th April of 2009 at 12AM07.

Who has det ect ed it ? Detected by operator in SOT EXO . Loc k

Where has it b een det ect ed ? Detected dur ing tr iming of the seat in

Ho w h as it been d etected ? Detected during triming of the seat : not


Gu idi ng at 22°5
Male p rofil e

Ho w m any ? 1 case

In stall ation o f the h an dle b ar


BEFORE AFTER
Possibility to put the handle bar in this hole of the locking spr ing
New design of the locking spring with adding
of a product's poka-yoke
D4 - Root Causes of Non-Detection

No specific inspection concerning this point in the control plan and


FMEA cotation at 32.
1. Assembly of the handle bar without visibility
2. FMEA Gravity at 8 : Missing of hierarchisation at 1 on the drawing
Property of Faurecia - Duplication prohibited

and preconisation from Flers


3. FMEA detection and occurence at 2 : No case before this one.
4. Detection : potentialy sensitive but depending of the operator
WHAT WE LEARNED
ITEM (Control Factor) METHOD CRITERIA
D:\maniae\A Perso\ D:\maniae\A Perso\
SRC\Alerte s Qualité\X95\JR95\Mauv
SRC\Alertesais
Qualité\X95\JR95\Mauv
ass palonnier gliss ièreai
s\Workshop
s ass palonnier
R ed ga

Assembly in t he good hole of the slide's Product poka yoke I mpossibility of assembling the handle bar in
locking spring another hole t hat necessary to it s function
9700 slides checked out of which
2000 vehicles checked at customer place
85
Background

SR Alert Re-Occurrence prevention Memo # 6442


Application date :
BG/Div/Site:
26-oct
SMPG Nompatelize
Design
Process Link to AMS
D 5 Root cause of non conformance
Mix OK/NOK
The backrest unlocking cable was set up too short.
UAP/Line: Backrest T7
Author : T.Delattre/A.Moussaïd Testing 6442
Supplier
WHAT WAS THE PROBLEM? (5W + 2H)
NC freeplay on backrest and potential recliner
Cause
Unclear definition of cable tension neither
Consequently the backrest was partially unlocked and there was
unlcking. efficient tool to set it right (gap setting)
36 NC parts segregated on July 12th by resident a noticeable freeplay
at customer PSA during function test.
Not OK (Before) OK (After) D 4 Root cause of non Detection
No clear instruction for the operator who was Gages in place to garantee repeatable cable and
left alone to decide correct fitting recliner positionning as well as proper cable Control method was not defined with clear criteria
tension
Risk was wrongly evaluated during FMEA Study and no precise
action was defined to prevent defect to be stopped

Defect detected during


Preproduction, 405 seats
checked at customer
Property of Faurecia - Duplication prohibited

86
Before to start…

1
Proposal
2A At which stage of the PMS
Design should be performed:

2B
Design A Design FMEA ?
Verification A Process FMEA ?
3
Production
Set-
Set-up
Property of Faurecia - Duplication prohibited

4
Launch
5 Sé
Séries
Production
87 87
FMEA: At what stage of PMS ?

1 FUNCTIONAL Analysis
KPC (Key Product Characteristics)
Characteristics) identified from customer Requirements
Proposal
2A Product FMEA initiation
KPC list completed
Design Expert/Designer suppliers product KPCs identified on 2D and BOM
Process FMEA initiation
KCC List identified
continuus updating

Product FMEA completed


2B Expert/Designer suppliers KPCs validated
Design KPC/KCC included in Pre-production control plan
BOPs,
BOPs, tools, gauges, equipments ordered
Verification
Process FMEA completed
3 Pre--Production Control Plan Implemented
Pre
Production PVP tests results successful
Mass Production Trial Successful
Set-
Set-up
Property of Faurecia - Duplication prohibited

Process Capability achieved

4 Production Control Plan Implemented


Launch Lessons learned

5 Sé
Séries Product and Process FMEAs review and feed back
Production
88
FMEA Objectives

1. Reduce risks related to the Product and the Risks


process definition and improve reliability and be
documented
2. Drive focus on priorities (Safety, reliability and
functionality) during product & process
development after criticality ranking
3. Identify the key needed verifications during the
product/process development phase and during
the production cycle
4. Reduce costs and Development time
Property of Faurecia - Duplication prohibited

5. D-FMEAs and P-
P-FMEAs are the links between
Key Characteristics and Control Plans

89
FMEA Definitions
Failure Mode & Effect Analysis Ref: FAU-S-DSG-3040

 The FMEA is a preventive analysis tool aimed atreducing risk during


definition and validation of the Product and the Process designs against a
functional specification. It is a way of improving product reliability

 TheDesign FMEA identifies potential failures of the product design


during the complete life cycle of the product ( part manufacturing,
subcomponents assembly, part handling, car assembly, final customer use, product end of life
etc…) It applies to all products designed by and for Faurecia.
After program is completed, the Design FMEA is updated every time there is a change in product
design that could affect the validation of the product.

 The Process FMEA identifies potential failures of the product due to the
manufacturing process from raw material transformation up to customer use i.e.
Property of Faurecia - Duplication prohibited

subcomponent manufacturing ( press, injection, machining etc…), subcomponents assembly,


transportation, part handling, car assembly etc… It applies to all products manufactured inside or
outside Faurecia.
After program is completed, the process FMEA is updated every time there is a change in product
or process that could affect quality of the product.

90
REDUCE THE COST OF MODIFICATIONS
Tooling
modifications

Drawing
modifications
Property of Faurecia - Duplication prohibited

Slide version 02 91
The FMEA Types and Teams

Object When Responsible


Product Design
Design-FMEA Product Starts at End of
engineer or
(System, Component) Concept Phase
(Product-FMEA) System architect

Production process After first process Process & Tool


Process-FMEA definition Engineer

Product Product
Quality Quality
Design Design
Teams
Property of Faurecia - Duplication prohibited

Design-FMEA Process-FMEA
Team Team
Support Support
Validation Functions Manufacturing Functions
Process Process
Engineering Engineering
People with experience
92
How to perform a FMEA

D-FMEA or P-FMEA DESIGN PROCESS FMEA Number:


FMEA Date:
Design Updated on :
Type of vehicle or device : FAU-f-DSG-4040/en Drawing reference :
FMEA
Product : Engineering level/index: PILOT-leader :
Line and Plant (PFMEA) : Part or Device or Item : Life situation (DFMEA):

Detection
Design validation (D-FMEA) RPN checked after

Severity

KCC nb
KPC nb

Occur-
Process Step Product Function POTENTIAL FAILURE Recommended Corrective Actions Forecasted new RPN

Class

rence
Potential Cause of Target completion

RPN
N° Process controls (P-FMEA) Responsible Action taken actions implemented
definition definition studied failure date
(PFMEA) (DFMEA)
MODE EFFECT Prevention Detection N° Description S O D RPN S O D RPN

Class can be S/R ( or "1") or "2" (function) or no value S: Severity D : Detectability O: Occurence RPN : Risk Priority Number

1- Product function (DFMEA)


or Process step (PFMEA)
2- Potential failure Mode
3- Potential Effect 1- Potential cause of failure + occurence
4- Severity 2- Key Characteristics number
Property of Faurecia - Duplication prohibited

3- Design Validation (DFMEA)


4- Process control (PFMEA) + Detection
5- RPN calculation 1- Recommended Corrective Actions
2- Responsible & target date
3- Action taken
4- Forecasted RPN
5- RPN checked after actions implemented
93
1st Step: Identify Failure mode (1/2)

D-FMEA or P-FMEA

1- Which function to study (DFMEA) Type of vehicle or device : FAU-f-DSG-4040/en


Product :
(for each life situation) Line and Plant (PFMEA) : Part or Device or Item :

Severity

KPC nb
Process Step Product Function POTENTIAL FAILURE

Class
N° definition definition studied
(PFMEA) (DFMEA)
MODE EFFECT
2 - What can go wrong?
- No function
- Partial/over function or
degraded over time
- Intermittent function
- Unintended function
Property of Faurecia - Duplication prohibited

3 - What are the worst effects


for each failure mode? 4 – How bad is it ?
Identify a severity rating

94
“S” : SEVERITY GRADING CHART (Design and Process)
Property of Faurecia - Duplication prohibited

95
2nd step: Evaluate Root cause and Current Controls (1/2)

DESIGN PROCESS

Drawing reference :
1- Identify the associated cause Engineering level/index:
Life situation (DFMEA):
(first level and root)
2- The estimated occurrence Design validation (D-FMEA)

Detection
KCC nb
Occur-
rence
Potential Cause of

RPN
Process controls (P-FMEA)
failure
Prevention Detection

DFMEA

3- The actions already performed during Product design


Prevention: Which checks have been made or standards used
in order to make the design more robust
Detection: Which checks or tests are currently included
in the DVP design validation plan
Property of Faurecia - Duplication prohibited

4- Detection rating: How confindent are we


with current definition of the DVP to detect
a potential defect
5- RPN calculation

96
1st Step: Identify Failure mode (2/2)

D-FMEA or P-FMEA

Type of vehicle or device : FAU-f-DSG-4040/en


1- Which process to study (PFMEA) Product :
Line and Plant (PFMEA) : Part or Device or Item :

Severity

KPC nb
Process Step Product Function POTENTIAL FAILURE

Class
N° definition definition studied
(PFMEA) (DFMEA)
MODE EFFECT

2 - What can go wrong?


See below types of defects
(for function consider degraded
or intermittent due to process)
Property of Faurecia - Duplication prohibited

3 - What are the worst effects 4 – How bad is it ?


for each failure mode? Identify a severity rating?
Is it a KPC ?

97
“O” : OCCURRENCE GRADING CHART (Design & Process)
Property of Faurecia - Duplication prohibited

98
Property of Faurecia - Duplication prohibited

“D” : DETECTION GRADING CHART (Design)

99
2nd step: Evaluate Root cause and Current Controls (2/2)

DESIGN PROCESS
KCC identified as a contributor
Drawing reference : to achieve the KPC
1- Identify the associated cause Engineering level/index:
Life situation (DFMEA):
(first level and root)
2- The estimated occurrence Design validation (D-FMEA)

Detection
KCC nb
Occur-
rence
Potential Cause of

RPN
Process controls (P-FMEA)
failure
Prevention Detection

PFMEA

3- The actions already performed during Process design


Prevention: Which controls are included in the process in order
to reduce the defect to occur
Detection: Which controls are included in the process in order
to detect the defect when it occurs
Property of Faurecia - Duplication prohibited

4- Detection rating: How confindent are we


with current definition of the Process to
detect a potential defect
5- RPN calculation

100
“D” : DETECTION GRADING CHART (Process)

If a later operation (same plant) can stop a defect like a double visual check, rating could be reduced by 1
Property of Faurecia - Duplication prohibited

101
Risk priority number ( or RPN)

RPN= : S x O x D

Severity or
Probability that the Probability that
Probability that
cause/mode will it won't be
the failure will be
occur detected
Property of Faurecia - Duplication prohibited

serious

Slide version 02 102


3rd step: Corrective Actions

1- Recommended Corrective Actions for FMEA Number:


FMEA Date:
Prevention and Detection: Updated on :
PILOT-leader :

What can be done for


- Design changes, Recommended Corrective Actions Target completion Forecasted new RPN
RPN checked after
Responsible Action taken actions implemented
- Standard changes, N° Description
date
S O D RPN S O D RPN
- Process changes
- Special controls ?

2- Responsible & target date

3- Forecasted new RPN Action taken ?


Property of Faurecia - Duplication prohibited

Is action sufficient ?
4- When action has been taken ( if action is
different from initial, please mention it)

5- New RPN after actions are implemented


Is action sufficient ?

103
PREVENTIVE ACTIONS

Once critical failures are identified preventive or corrective


actions are decided for the highes
highest RPNs
RPN > allowable limit (*) => ACTION

The future of our


company depends on
risk control
Property of Faurecia - Duplication prohibited

Once actions are in place the RPN should be recalculated it


becomes: RPN'
RPN'
Faurecia
(*) may depend on customer requirement if more stringent than Faurecia rules
Slide version 01 104
What have we learned on Design FMEA

INPUTS OUTPUTS
Design validation plan
Product requirement (product tests)

Functional Formalise a critical Design Poka Yoké


Yoké
analysis
examination of product
design Prototype control
feedback
plan
Ensure that the product
Warranty, returns design conforms to List of product
and rejects special
customer and legislative
characteristics
requirements
modifications
Corrective actions
Property of Faurecia - Duplication prohibited

Programme goals plan


(ppm,
ppm, reliability,
maintainability,…
maintainability,… Measurement
concepts, gages and
Regulations instructions
FAU--S-PM-
FAU PM-3040

Slide version 02 105


What have we learned on Process FMEA

Inputs Outputs
DFMEA
Process flow
Assembly and use
chart instructions
Formalise a critical
Process examination of process design
functional Serie control plan
analysis (included Process
Ensure that the process
design allows products made Poka Yoké)
Process
assumptions conforming to customer and
legislative requirements Corrective actions
Plant Lay out plan
Capitalization ensure that products are not
damaged in handling List of process
Warranty, returns special caracteristics
and rejects (transports, storage, …)
Property of Faurecia - Duplication prohibited

including on and off site


Modifications
Measurement and
Program goals (ppm, checking instructions
reliability,
maintainability,…)
FAU--S-PM-
FAU PM-3042

Slide version 02 106


8 Quality Basics in Development
Group owners & PG Referent / Experts March 18th, 2011

7 Basics FAS FIS FAE FECT Group


Key P.Renoit/
L.Klingauf Ph.Lalaguë F.Lueder P.Mesnard
characteristics R.Mary

F.Selb/R.Mary/M.
FMEA M.Jordan C.Desplanque Stefan-Weber
V.Gosatti PL. Soula

Strict Control Y.Schneider/


TBD P.Mesnard V.Gosatti E.Jacquot
Plans JF.Wyrwas
Validated Engg JP.Gehin/
TBD R.Hilpert F.Abadie E.Jacquot
changes M.Kherbache
Y.Schneider/
QRCI L.Klingauf P.Mesnard E.Jacquot L.Klingauf
JF.Wyrwas
Funct Milestone
Program Stg & J.Ygout E.Brogniart MN.Rothan Ch.Majchrowicz PL. Soula
Property of Faurecia - Duplication prohibited

Gate Reviews

Ph.Lalaguë F.Selb/
Cap & Trans TBD M.Stefan- Ch.Sarda P.Mesnard
Weber
Supplier Ph.Cossonnièr A. Selbach/
J.Robineau Th.Rochard J.Burke
Quality e M.Schafbauer
107
Workshop on P-FMEA – 20 mn

Nut and L-profile assembly by resistance welding

1. Choose 3 failure modes


2. Establish a P-FMEA for these 3
failure modes
3. Each group to report
Property of Faurecia - Duplication prohibited

D-FMEA or P-FMEA DESIGN PROCESS FMEA Number:


FMEA Date:
Design Type of vehicle or device : FAU-f-DSG-4040/en Drawing reference : Updated on :
FMEA
Product : Engineering level/index: PILOT-leader :
Line and Plant (PFMEA) : Part or Device or Item : Life situation (DFMEA):
Detection

Design validation (D-FMEA) RPN checked after


Severity

KCC nb
KPC nb

Occur-

Process Step Product Function POTENTIAL FAILURE Recommended Corrective Actions Forecasted new RPN
Class

rence

Potential Cause of Target completion


RPN

N° Process controls (P-FMEA) Responsible Action taken actions implemented


definition definition studied
failure date
(PFMEA) (DFMEA)
MODE EFFECT Prevention Detection N° Description S O D RPN S O D RPN

Class can be S/R ( or "1") or "2" (function) or no value S: Severity D : Detectability O: Occurence RPN : Risk Priority Number

108 Slide version 02 108


Nut & L-profile assembly by resistance welding

L-profile

Nut M10
Property of Faurecia - Duplication prohibited

After electrical welding

109
Nut & L-profile assembly by resistance welding

D-FMEA or P-FMEA DESIGN PROCESS FMEA Number: J84-P-RSS-G

FMEA Date: 15/07/2004

Type of vehicle or device : J84 Renault Megane Scenic Drawing reference : 5155436/38 Updated on : 16/03/2010

Product : Rear Seat Metal Structure Engineering level/index: G PILOT-leader : ME / YOKE P.

Line and Plant (PFMEA) : UAP 3 / Nogent Part or Device or Item : Nut and L-Profile assembly Life situation (DFMEA): -

Design validation (D-FMEA) RPN checked after

D e t e c t io n
S e v e r ity

KCC nb
Process Step

KPC nb
Product Function

O c c u r-
POTENTIAL FAILURE Recommended Corrective Actions Forecasted new RPN

C la s s

re n c e
Potential Cause of Process controls (P-FMEA) Target completion actions implemented

RPN
N° definition definition studied Responsible Action taken
failure date
(PFMEA) (DFMEA) MODE EFFECT Prevention Detection N° Description S O D RPN S O D RPN
40 Resistance welding of Missing NUT No welding possible, machine 8 NUT forgotton to insert 4 Operator qualification level L Automatic machine stop 1 32
NUT on L-PROFILE stop, fastening operation (Operator failure) or higher during clamping operation
1 stopped if by pass, process (Poka Yoke no. J84/27)
interuption
Property of Faurecia - Duplication prohibited

110
Nut & L-profile assembly by resistance welding

D-FMEA or P-FMEA DESIGN PROCESS FMEA Number: J84-P-RSS-G

FMEA Date: 15/07/2004

Type of vehicle or device : J84 Renault Megane Scenic Drawing reference : 5155436/38 Updated on : 16/03/2010
Need to have a picture of the machine and how it works
Product : Rear Seat Metal Structure Engineering level/index: G PILOT-leader : ME / YOKE P.

Line and Plant (PFMEA) : UAP 3 / Nogent Part or Device or Item : Nut and L-Profile assembly Life situation (DFMEA): - Contacter Jean-Yves Loreau

Detection
Design validation (D-FMEA) RPN checked after

Severity

KCC nb
KPC nb

Occur-
Process Step Product Function POTENTIAL FAILURE Recommended Corrective Actions Forecasted new RPN

Class

rence
Potential Cause of Target completion

RPN
N° definition Process controls (P-FMEA) Responsible Action taken actions implemented
definition studied failure date
(PFMEA) (DFMEA)
MODE EFFECT Prevention Detection N° Description S O D RPN S O D RPN
40 Resistance welding of Missing NUT No welding possible, machine 8 NUT forgotton to insert 4 Operator qualification level L Automatic machine stop 1 32
NUT on L-PROFILE stop, fastening operation (Operator failure) or higher during clamping operation
1 stopped if by pass, process (Poka Yoke no. J84/27)
interuption
Missing L-PROFILE No welding possible, machine 6 L-PROFILE forgotton to 2 Operator qualification level L Automatic machine stop 1 12
stop, process interuption insert (Operator failure) or higher during clamping operation
1 (Poka Yoke no. J84/27)
Wrong NUT (material, No Belt Buckle fastening 8 1 Wrong NUT reference at 2 1 Label scan of every new box 1st piece OK check 2 32
diameter, threat,....) possible (threat diameter too 2 welding station with NUTs at welding station
2 small) (Logistical failure)
Wrong PROFILE (LH/RH) Wrong assembly reference 6 Wrong welding fixation 4 Operator qualification level L 1st piece OK check 2 48
produced but part is Ok plate used or higher
2 (Tool change failure)
NUT turned by a few Insufficient torque resistance, 10 2 NUT incorrect inserted in 4 Operator qualification level L Automatic machine stop 1 40 To be confirmed
degrees risk of stability loss during final 1 fixation plate (Operator or higher during clamping operation
assembly and endurance failure) (Poka Yoke no. J84/27)
3
Tooling damaged / worn 2 2 Preventive Maintenance plan 1st piece OK check 2 40
To be confirmed out (Maintenance failure) no. J84/40)

NUT assembled from Machine stop, no welding 6 NUT incorrect inserted in 4 Operator qualification level L Automatic machine stop 1 24 To be confrimed
wrong side possible L-PROFILE (Operator or higher during clamping operation
4 failure) (Poka Yoke no. J84/27)
Bad welding connection Insufficient torque resistance, 10 3 Wrong welding parameter 2 3, 4, 5 Restricted machine & 1st piece OK check 2 40 Do we need to do something else
(insufficient penetration) risk of stability loss during final 1 (technician failure) parameter access, parameter (resistance torque can we let Firs part Ok at 1 JY
assembly and endurance change documentation measurement) Loreau what can vwe do more ?

Machine defect or tooling 2 Preventive Maintenance plan 1st piece OK check 2 40 Jean-Yvs is it Ok ?
5 defect ( tips not Ok) no. J84/40)
5 (Equipment failure)
Changed material 4 6, 7 Yearly supplier part re- 1st piece OK check 4 160 40-1 Check of Supplier measurement Q / SERIOUS V. 18/09/2004 100% protocol 10 2 2 40 10 2 2 40
properties (Supplier qualification (resistance torque protocols (material properties) for check for NUT and
failure) measurement) every NUT and L-PROFILE batch L-PROFILE
within incoming inspection integrated in CP J84-
RSS-G at
20.09.2004
Threat of NUT or PROFILE No Belt Buckle assembly 8 4 Machine defect 2 Preventive Maintenance plan 1st piece OK check 2 32
damaged possible 2 (Equipment failure) no. J84/40)
Damaged delivered part 4 8 Yearly supplier part re- 1st piece OK check 4 128 40-1 Check of Supplier measurement Q / SERIOUS V. 18/09/2004 100% protocol 7 2 2 28 7 2 2 28
6 (Supplier failure) qualification (resistance torque protocols (material properties) for check for NUT
measurement) every NUT batch within incoming integrated in CP J84-
inspection RSS-G at
20.09.2004

Welding spatters in threat No Belt Buckle assembly 7 4 Machine defect 1 Preventive Maintenance plan 1st piece OK check 2 14 Do we keep it or not ?
of NUT possible 2 (Equipment failure) no. J84/40)
6 (defect for example)
NUT not correctly clamped Insufficient torque resistance, 10 3 Machine defect 2 9 Preventive Maintenance plan 1st piece OK check 2 40 Defect on part geometry considered
/ gap between nut and risk of stability loss during final 1 (Equipment failure) no. J84/40) ?
profile
7 assembly and endurance
Property of Faurecia - Duplication prohibited

Class can be S/R ( or "1") or "2" (function) or no value S: Severity D : Detectability O: Occurence RPN : Risk Priority Number
111
Nut & L-profile assembly by resistance welding

Detection
Design validation (D-FMEA)

Severity

KCC nb
KPC nb

Occur-
POTENTIAL FAILURE Recommended Corrective Actions

Class

rence
Potential Cause of

RPN
Process controls (P-FMEA)
failure
MODE EFFECT Prevention Detection N° Description
Missing NUT No welding possible, machine 8 NUT forgotten to insert 4 Operator qualification level L Automatic machine stop 1 32 Transfer the detection on machine stop
stop, fastening operation (Operator failure) or higher during clamping operation
1 stopped if by pass, process (Poka Yoke no. J84/27)
interruption
Missing L-PROFILE No welding possible, machine 6 L-PROFILE forgotten to 2 Operator qualification level L Automatic machine stop 1 12 Transfer the detection on machine stop
stop, process interruption- insert (Operator failure) or higher during clamping operation
1 frame cannot be assembled (Poka Yoke no. J84/27)

Wrong NUT (material, No Belt Buckle fastening 8 1 Wrong NUT reference at 2 1 1st piece OK check 5 80 Label scan of every new box with
diameter, threat,....) possible (threat diameter too 2 welding station NUTs at welding station
2 small) (Logistical failure)
Wrong PROFILE (LH/RH) Wrong assembly reference 6 Wrong welding fixation 4 Operator qualification level L 1st piece OK check 2 48
produced but part is Ok plate used or higher
2 (Tool change failure)
NUT turned by a few Insufficient torque resistance, 10 2 NUT incorrect inserted in 4 Operator qualification level L Automatic machine stop 1 40
degrees risk of stability loss during final 1 fixation plate (Operator or higher during clamping operation
assembly and endurance failure) (Poka Yoke no. J84/27)
3
Tooling damaged / worn 2 2 Preventive Maintenance plan 1st piece OK check 2 40
out (Maintenance failure) no. J84/40)
Property of Faurecia - Duplication prohibited

112
Nut & L-profile assembly by resistance welding

Detection
Design validation (D-FMEA)

Severity

KCC nb
KPC nb

Occur-
POTENTIAL FAILURE Recommended Corrective Actions

Class

rence
Potential Cause of

RPN
Process controls (P-FMEA)
failure
MODE EFFECT Prevention Detection N° Description
NUT assembled from Machine stop, no welding 6 12 NUT incorrect inserted in 4 Operator qualification level L Automatic machine stop 1 24
wrong side possible L-PROFILE (Operator or higher during clamping operation
4 failure) (Poka Yoke no. J84/27)
Cold Weld (insufficient Insufficient torque resistance, 10 3 Wrong welding parameter 2 3, 4, 5 Welding parameters vaidated 1st piece OK check 2 40 Restricted machine & parameter
penetration) risk of stability loss during final 1 (technician failure) with 30 parts (resistance torque access, parameter change
assembly and endurance measurement) documentation

Machine defect or tooling 2 Preventive Maintenance plan 1st piece OK check 2 40 Imporved Preventive Maintenance plan
5 defect ( capsnot Ok) no. J84/40) by checking nets and pipes
5 (Equipment failure)

Changed material 1 6, 7 Yearly supplier part re- 1st piece OK check 4 40 40-1 Check of Supplier measurement
properties (Supplier qualification (resistance torque protocols (material properties) for
failure) measurement) every NUT and L-PROFILE batch
within incoming inspection

Threat of NUT or PROFILE No Belt Buckle assembly 8 4 Machine defect 2 Preventive Maintenance plan 1st piece OK check 2 32
damaged possible 2 (Equipment failure) no. J84/40)
Damaged delivered part 4 8 Yearly supplier part re- 1st piece OK check 4 128 40-1 Check of Supplier measurement
6 (Supplier failure) qualification (resistance torque protocols (material properties) for
measurement) every NUT batch within incoming
inspection

RPN checked after


Recommended Corrective Actions Target completion Forecasted new RPN
Responsible Action taken actions implemented
date
N° Description S O D RPN S O D RPN

Restricted machine & parameter


access, parameter change
Property of Faurecia - Duplication prohibited

documentation

Imporved Preventive Maintenance plan


by checking nets and pipes

40-1 Check of Supplier measurement Q / SERIOUS V. 18/09/2004 100% protocol 10 1 2 20 10 2 2 40


protocols (material properties) for check for NUT and
every NUT and L-PROFILE batch L-PROFILE
within incoming inspection integrated in CP J84-
RSS-G at
20.09.2004

40-1 Check of Supplier measurement Q / SERIOUS V. 18/09/2004 100% protocol 8 2 2 32 7 2 2 28


protocols (material properties) for check for NUT
every NUT batch within incoming integrated in CP J84-
inspection RSS-G at
20.09.2004 113
7 Quality Basics in Development
Agenda

7:45 Welcoming coffee


8:00 Opening comments J.M. Renaudie
8:20 Introduction K.Sato
8:35 Capitalization & Tranversalization K.Sato
9:00 Key Characteristics & Strict Control Plans V.Garcia Parra
10:10 FMEA PL.Soula
11:10 Break
11:25 Validated Engineering Changes E.Jacquot
12:05 Lunch
12:45 Program QRCI J.Burke
15:45 Break
Property of Faurecia - Duplication prohibited

16:00 Functional Milestones & Gate Reviews PL.Soula


16:55 Conclusion K.Sato
17:00 End

114
7 Quality basics in Development Evaluation form

NAME :_____________________________Session:_____________________________________

Value added of
the module Comments
1 2 3 4

Introduction

Capitalization &
Transversalisation

Key Characteristics

FMEA

Evaluation Form
Strict control plans

to fill in
Program QRQC

Validated Engineering
Changes

Functional milestones
& Progr Steering Com
& Gate Reviews
Property of Faurecia - Duplication prohibited

How to accelerate

Conclusion

Rating: 1 = Poor 2=Average 3=Good 4= Excellent

General Appraisal 1 2 3 4 Comments:

115
Property of Faurecia - Duplication prohibited

Break

116
7 Quality Basics in Development

Validated Engineering Changes

Eric JACQUOT
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
118
Agenda

 Introduction 15 mn
 Module objectives
 Validated Engineering Change
 3 examples of Engineering Changes

 Workshop 15 mn

 Debriefing 5 mn
Property of Faurecia - Duplication prohibited

 Key messages 5 mn

119
Why this basic ?

If not validated Engineering Change, potential disturbances …


 repeat tests with additional prototypes due to test
test failures
 creation of a new problem to solve due to lack of impact
analysis
 rework even line stoppage due to non compatibility with
overall system (other parts, BOPs, gauges, manufacturing
system, packaging,…
packaging,…)
Severe human injuries in case of accidents
recall + Business hold
=> Any short-cut in Engineering Change Process will sooner or
Property of Faurecia - Duplication prohibited

later cost the company !


=> Validated Engineering Change is a basic

120
Module objectives

 Understand the sequence of the various steps to achieve a


proper validation.

 Better understand consequences and causes of non


validated engineering change.

 Know the contributors for the validation of engineering


changes.
Property of Faurecia - Duplication prohibited

121
Engineering Change by Customer, supplier or internal

QCD assessment * EC validation

Less than 5 days

Change Assess Define EC Execute Implement


ECO
Submitted ECR * +DVP & PVP DVP & PVP EC

Design Design Production


Review Validation Validation
Reject Reject
Property of Faurecia - Duplication prohibited

ECR : Engineering Change Request ECO : Engineering Change Order

* Use of checklist enables being exhaustive enough in the assessment

122
Engineering Change in PMS phases

Customer
Tool Launch PPAP SOP

1 Design 2BDesign 3 Production 5


2A 4
ACQUISITION Review DESIGN
Validation PRODUCTION
Validation LAUNCH PRODUCTION
DESIGN
VERIFICATION SET-UP

Define EC
ECO
+DVP & PVP
Define EC Execute
ECO
+DVP & PVP DVP

Define EC Execute Implement


ECO
+DVP & PVP DVP & PVP EC
Property of Faurecia - Duplication prohibited

The later it happens,

the more it costs and the higher the risk is for bad launch

123
Example 2 : wiring fixture of ECS

Before modification Customer request After modification

OEM : metal clips Two metal clips but not


Two plastic binders
Instead of plastic binders positioned as requested
Property of Faurecia - Duplication prohibited

Consequences : Car recall due to radiator leakage (1 M€)


Causes ?
Design review : lack of design review (“only 2 binders to change”)
Design validation : lack of prototype (Customer platform solution).
Production validation : no PPAP (by customer and Faurecia) 124
Example 3 : Seat locking mechanism

Before modification After modification

Locking mechanism No more washer


secured by a washer
Property of Faurecia - Duplication prohibited

Consequences : failure in rear crash test  very close to 1520 cars recall
Causes ?
Design review : lack of robust standards
Design validation : test done too late (during launch phase)
125
Example 4 : YA5 headrest insert spring

Before After

noise, scratches, Spring with Rilsan


Spring ⇒ Coating + bigger bending
sliding effort
Property of Faurecia - Duplication prohibited

Consequences : ejection of headrest during ECE 17 test  35,000 vehicles


to rework = ? M€ + 2 months task force + a lot of additional tests
Causes ? Design review : risk underestimated (“small” modification)
Production validation : no ECE 17 test performed
Supplier : lack of capitalization and transparency
126
Validated Engineering change

Workshop
ECR based on internal VA VE in Serial Phase

Passenger Airbag Chute Channel Material change from PA 6


30% GF to 10%GF
Property of Faurecia - Duplication prohibited

127
WORKSHOP : Define DVP and PVP

 Define the tests of the DESIGN VALIDATION PLAN and the


PRODUCTION VALIDATION PLAN
 Select the tests to be performed to validate the change taking
into account :
 Is it relevant with the change ?
 Is it necessary to do the test in DVP (prototype or virtual CAE ,
test criticality )
 Is it relevant to do the test in PVP ?
 Is the set of tests adequate to represent the failure mode ?
Property of Faurecia - Duplication prohibited

 Is it necessary to produce additional test even if not in


Customer specs ( Faurecia component test / guide lines )?

20 min Let’s do it!!! 128


ECR process : Design & Production Validation Plan

SUPPLIER Faurecia PART NUMBER

FAB10172PVJ + FAB10162PVJ +
FAB500052PVJ + FAB500042PVJ

NAME OF LABORATORY Faurecia Meru PART NAME

FACIA ASSY COVERED UPPER

TYPE OF TEST
DVP PVP DEVIATION
TEST METHOD REQUIREMENT NUMBER

Topper Pad Foam

Fogging DVM-
DVM-0016-
0016-MA/ SAE J1756 MA0019 X

Flammability Taiwan specification RES 30 MS 302 X

Odor DVM-
DVM-0014-
0014-MA/ SAE J1351 MA0018 (rating 2 max) X

COCKPIT

Airbag deployment SDS PB-


PB-0028v2 No bag damage X X

deployment trajectory
Property of Faurecia - Duplication prohibited

Airbag deployment DVM-


DVM-0052-
0052-AB / SDS PB-
PB-0025v2 ( +/-
+/- 9°up
up-
up-down) X X
(+/-
(+/- 4°side
side to side)

ES-
ES-F2DB-
F2DB-54044A74-
54044A74-AA Module requirement
Airbag deployment
(fragment compliant with DVM 24331)

Airbag deployment PB-


PB-0004v2 No sharp edge X X

SDS PB-
PB-0028v2
Airbag deployment No bag damage X X
129
Organization, tool and documents

 Weekly reviews of the ECRs and ECOs by ECM


workgroup
Product Data Management (PDM) = ECM tool
 DESIGN REVIEW
”Design Approved”
Approved” status in PDM
 DESIGN VALIDATION
”Engineering Approved”
Approved” status in PDM
 PRODUCTION VALIDATION (Off Tool / Off Process)
”Manufacturing Approved”
Approved” status in PDM
Property of Faurecia - Duplication prohibited

 New version of all related documents based on ECO


results:
 Drawings, BOM, FMEAs, KPCs , KCCs, control plan,
suppliers documents, End of Life Vehicle Regulations…
130
NO COMPROMISES

No trade-off with S/R validation even despite Customer


Always PPAP even if not requested by the customer

No “small change”  rigorous assessment :


 Sales,
 Product performance,
 Bought Out Parts,
 Production performance,
Property of Faurecia - Duplication prohibited

 Production Control & Logistics…


Logistics…

131
Example of “Bad” and “Good” answer

“ Engineering Change Management ”


Property of Faurecia - Duplication prohibited

132
Example of “Bad” answer for “Engineering Change
Management”

“How do you manage your Engineering changes with the customer ?”


- There is no “single list” to manage ECR
- Ex 1 : Separate tables to monitor the various aspects of the technical
changes
- Ex 2 : One table for the customers changes and one for the internal
changes
- Ex 3 : Part price modification and tooling costs are monitored separately

- There is an incomplete “ single list” to manage ECR:


-Ex 1 : There is no link between ECR customer number and internal number
Property of Faurecia - Duplication prohibited

-Ex 2 : The three steps of validation ( Design Review, Design Verification


Plan and Production Validation Plan) are monitored in a separate tables

133
Example of “Good” answer for “Engineering Change
Management”
“How do you manage your Engineering changes with the customer ?”
Technical changes in process -There is a “single list” to manage ECR
Technical changed closed AFTER TOOL ORDER Feasability and Quotation
Customer Requested
Request Date Return date Feasabil
Sender request Part Mold number Modification date for Tool cost Part price
Number received requested GO / noGO
reference quotation

37993M- Customer Design wants to modify the two bases after tools
00C250098IP 04/05/2006 J. BARON Mail 30/09/2006 Base VU / VP GO 19/09/06 250k€ NA
59220/5922 debugging
Tooling has been worn out after a fire. Tooling is not able to deliver
00C250100IP 04/05/2006 J. BARON Mail 14/05/2006 Platic cover of electrical plug no GO 14/05/06 35k€ 0€
the expected quality. Quotation for refubishing of the tool.
39012M-
00C250101IP 04/05/2006 J. BARON Mail 05/05/2006 IP+ Module On cost for multi-graining - add-on separate tool drawer GO 05/05/06 330k€ 3,35 €
59031
Mistake on ATAX staples hangers: hangers are too thick and prevent
00C250112IP 11/10/2006 A. CHOPLIN Mail 18/10/2006 Façade a2/a3 37342X no GO 18/10/06 45k€ 0,80 €
to perform the isostatism study for z axis.

00C250176IP 14/10/2006 COUPE C letter 03/11/2006 Fuse drawer


One signle table for
Add a fuse compartment coverpliers GO 15/01/07 85k€ 5,45 €
various aspects

Feasability and Quotation Customer Agreement Technical change release Technical change validation
Requested Purchasing Delivery DVP=Design PVP=
Date for Customer DR:Design Launching Drawing FMEA on Closing
Part price Quotation date for request date and Validat Production Comments
quotation reference Review date date index update on date
implementon number batch Plan Valid Plan
Property of Faurecia - Duplication prohibited

DA RDV 2 Waiting from RSA on final graining spec- Caution:


NA 16/10/06 FEX61-IP98 Agreed 30/11/2006 02/11/2006 05/12/2006 A NA 20/12/2006 20/01/2007
10062929 07/02/07 New quotation could be necessary - Wk 47

0€ 05/06/06 FEX61-IP84 Refused 15/09/2006

3,35 € 05/05/06 FEX61-IP81 Agreed 01/01/07 01/01/07 Not done --- RDV 3 NA Not done Not done Waiting for JB supplier quotation

0,80 € 16/11/06 FCIA N/A N/A S01/07 Redesign the ATAX staple

FE X61-IP-
5,45 € 20/01/07
118
Negociation Wk06 3 steps validation

134
7 Quality basics in Development Evaluation form

NAME :_____________________________Session:_____________________________________

Value added of
the module Comments
1 2 3 4

Introduction

Capitalization &
Transversalisation

Key Characteristics

FMEA

Evaluation Form
Strict control plans

to fill in
Program QRQC

Validated Engineering
Changes

Functional milestones
& Progr Steering Com
& Gate Reviews
Property of Faurecia - Duplication prohibited

How to accelerate

Conclusion

Rating: 1 = Poor 2=Average 3=Good 4= Excellent

General Appraisal 1 2 3 4 Comments:

135
Property of Faurecia - Duplication prohibited

Lunch

136
7 Quality Basics in Development
Agenda

7:45 Welcoming coffee


8:00 Opening comments J.M. Renaudie
8:20 Introduction K.Sato
8:35 Capitalization & Tranversalization K.Sato
9:00 Key Characteristics & Strict Control Plans V.Garcia Parra
10:10 FMEA PL.Soula
11:10 Break
11:25 Validated Engineering Changes E.Jacquot
12:05 Lunch
12:45 Program QRCI J.Burke
15:45 Break
Property of Faurecia - Duplication prohibited

16:00 Functional Milestones & Gate Reviews PL.Soula


16:55 Conclusion K.Sato
17:00 End

137
Program Quick Response Continous
Improvement (QRCI)

John BURKE
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
139
Program QRCI - Agenda

• Presentation and video 30 mn


• Workshop 2 h 30 mn
Practical QRCI 2h
Debriefing 30 mn
Property of Faurecia - Duplication prohibited

140
Let’s start to be PRACTICAL !

Watch the VIDEO

Compare the BAD to the GOOD


Property of Faurecia - Duplication prohibited

141
Observation Part 1 – What went wrong?
Detection
– no real place (talking mainly in the office)
– no real parts (no parts in hand,….)
– no quick response ( “We ‘ll look into it on Monday” , 2 months for
solving issue at SOP period)

Communication
– Insufficient real data (testing conditions ?, dimension ?,…)
Analysis
– Insufficient in depth logical thinking (“I think it’s the spring that’s…”
,…)

Verification
– Insufficient verification (successive test failures)
Property of Faurecia - Duplication prohibited

Management: Insufficient on-the-job coaching (No quick communication ,


no regular review , no involvement , no team work , no risk monitoring
,…)

142
Observation Part 2 – What contributed to this success?
Detection
– Failures observed on the Gemba
Communication
– “Bad event” immediately displayed on board and introduced in Single List of
Issues
– Where and when it happens (16.11 in Lab , at end of cycle,…)
– Real parts available in QRCI review
– No bla-bla and fact based (data collection)
– Data (Testing conditions records ,photo , radius measurements,…) shared with all
team members the day after problem raised)
Analysis
– What is the problem? (use of 5W 2H)
– What are the countermeasures and risks on similar programs? (PDCA approach)
– What is the root cause? (use of FICS , OK/ NOK parts 5Why , ,…)
– How do I prevent reoccurrence? (capitalization through lessons learned and
guidelines review )
Verification
Property of Faurecia - Duplication prohibited

– Real place verification through testing in laboratory


Management
– Quick escalation
– Monitoring and Effective support
– Recognition

143
What is QRCI ?

A MANAGEMENT attitude to
solve ANY KIND OF PROBLEM
On the REAL PLACE

By Focusing on Our Priorities

Quick Response Continous


Property of Faurecia - Duplication prohibited

Improvement

144
QRCI foundation: the 3 REALS

San means "3" – Gen means "real" or "actual"


Shugi means "ideology"

San Gen Shugi


Understand what is behind

1. Real Place (Gen-ba) Where is Genba?


Where it happens, when it happens

2. Real Parts (Gen-butsu) What is Genbutsu?


Objects which we compare: bad and good
Property of Faurecia - Duplication prohibited

3. Reality (Gen-jitsu) What is Genjitsu?


Speak the facts with data

145
The basic tools….

What are the


Most important
Quality Tools
Property of Faurecia - Duplication prohibited

My eyes and my legs to….


see/ measure/ observe/ analyze/ record…
146
Example of “GOOD”” answer for “Single List of Issues
(SLI)”
(SLI)”

How do you manage the important issues of your program ?

Before Gate
Not various lists
1
PROGRAM QRQC DIVISION QRQC SLI
Single List of Issues (SLI)
Division: PSA Customer Division Customer: PSA Program: Program mgr: SCHMITT Jean-Pierre
Dev./Prod. Site (s): Méru Platform/Model (s): PSA Programs - all platforms Product Ref.: SLI creation date 24-11-06

Award GR1 GR2a GR2b PPAP GR3 SOP List updated 20. december 2006
NA (Div SLI) NA (Div SLI) NA (Div SLI) NA (Div SLI) NA (Div SLI) NA (Div SLI) NA (Div SLI)
Les évolutions apparaissent en bleu, les sujets clos sont hachurés sur la prochaine diffusion puis masqués
PDCA
Program Program

Deep analysis
Responsibility / Action Planned
concerned risk level Impacted

document
QRQC Action Done

number
Escalation level
Opening Date 4: S/R Area - Needed Problem description Scheduled End
No ( Program Core number Root Causes Countermeasure (C/M) Leader Real Check Date Success Checked by
( If several (DD.MM.YY) 3: High Function - Pb Experts ( 5W = 2 H ?) (Check) date
team or Division or NA evidence
within the SLI 2: Medium category
or PRC) Activity for capitalization
) 1: Low
done (LL)
Demander appui équipe Q-Achats
Feuille d'étanchéité fournisseur J. CABERO pour accélérer la Soldé au niveau Division
A76 DP 24-11-06 1 Division 3 Quality Supplier issues N MC. ILUNGA 06-12-06 11-12-06 Do
le 15/12/06
DANA toujours état WE1 clôture et la levée des derniers
points durs
Faire mettre à jour les indicateurs
Relevés de temps de maquettage
de convergence temps de
T7 IP/DP 24-11-06 2 Division 1 Process PRC pas remontés par les usines N E. PINTO 22-12-06 Check
maquettage avec décroissance
(réel/prévisionnel + pareto)
prévisionnelle en temps
Faire regrouper les indicateurs PNO
T7 IP/DP 24-11-06 3 Division 1 Quality PRC
Difficulté de lisibilité des indicateurs
validation et CTF sur PNO
N Updated par silhouette + clarification pour P. LABORDE 22-12-06 Check
lisibilité
A515 IP 24-11-06 4 Division 2
Product /
R&D
Function
review
TF1 et TF1-GR1 toujours rouges N frequently Visibilité sur clôture / gate review à
assurer
R. TOMCZAK 18-12-06 Plan
Project
Tous Absence de suivi TTP pour clôture Proposition de synthèse jalon +
24-11-06 5 Division 1 organisation / PRC N MC. ILUNGA 22-12-06 05-12-06 Check
programmes des jalons PMS status + TTP/target Div
Property of Faurecia - Duplication prohibited

Project
Décision sur communication client
Customer
B58 IP/GLC 24-11-06 7 Division 3 Quality Reconception vide-poche N de l'engagement réflexion sur R. TOMCZAK 21-12-06 Plan
issues
reconception VA/VE
Note cosignée FS/JPS vers
Interprétation de la Directive Lansade/Leroy copie JMV/I.
Function Certification CE (360€) exigée par
A76 DP 24-11-06 9 Product Group 3 Economics N Européenne par les Autorités Lopez/C. Alberte sur fait que pas JP. SCHMITT 22-12-06 Plan
review outillage
Espagnoles possible prendre en compte à
posteriori
Closing Date
Program All S/R issues
If applicable QRCI
risk level
reference
to be closed
4: S/R Priorities before Gate 3
3: High
2: Medium defined
1: Low
147
What is a red bin in programs ?
Typical unsolved issues for Program QRCI

 Customer complaint product not meeting expectation


 FMEA unsolved critical issue
 Design review unsolved critical issue
 Prototypes unexpected test failure QRCI subjects
 Initial samples not right first time Link with SLI
 PVP not passed
 Run and rate PT / MPT / EMPT failed
 Supplier IS rejected
 Tooling / gages not specified or not ready at due date

Program QRCI issues are:


Property of Faurecia - Duplication prohibited

ABNORMALITIES/ UNEXPECTED EVENTS


within program time frame
And not all Program Open points
148
QRCI Organization: All levels contribute

Program Risk level


If
Group/PG
4 Steering unsolved
Committee
Monthly issues,
PG Program Regional action
3
QRCI
Weekly meeting
Leader : Region customer VP
assigned

2 Division Program QRCI to


Daily
Leader : Customer Division Director management
Property of Faurecia - Duplication prohibited

Top 5 daily Core team meting


1 Escalated to QRCI
Leader : Program manager Immediate
action
Permanently , every Core team member (PQL, PDL, Buyer,….) will raise
mandatory
0 issues and disclose them in SLI at Core team level if unsolved.
149
Conclusion – Key messages

 Quick reaction/ Daily meeting/ Logical thinking

 3 Reals: Real part/ Real data/ Real Place

 Red bin is abnormalities versus program schedule

 Escalation to require appropriate management support


and awareness

 Get the right people assigned - cross functional actions

 Visual display area- Single List of Issues (SLI)


Property of Faurecia - Duplication prohibited

 Lessons learned are used as input for Control Plans,


Core Procedures, Standards and Guidelines to prevent
reoccurence
150
Exercice
Logical thinking is essential
What is the problem?
5W/ 2H´s IS IS NOT Retained D2 - Risks on similar Products,

D1 
QRCI-8D 1st
1st Problem
Problem Definition
(Faurecia
Definition
(Faurecia View)
View)
(is the problem) (Is not the problem) Factors N°
processes, machines, plants?
Risky
Risky process
process or
or conditions
conditions to
to report.
report.
Ref:
Ref: FAU-F-PSG-0287
FAU-F-PSG-0287
What
What is
is the
the problem
problem (customer
(customer view):
view): What
What is
is the
the problem
problem ??
Quick Response
Continuous Improvement
Team:
Team: Opened:
Opened:

D1- Problem description


Why
Why is
is itit aa problem?
problem?

Steps
Steps Meeting
Meeting dates
dates Milestone
Milestone review
review

D1
D1 toto D3
D3 D3: Quality Manager / PILOT / HSE / UAP Mgr. When
When the
the problem
problem happened?
happened? When
When was
was the
the problem
problem
(24 hh in
(24 in case
case Definition of incident clear ? YES NO created?
created?
Customer exist** &
Customer exist & Name/ Signature
HSE)
HSE) (In
(In case
case customer
customer does
does not
not exist
exist &
& Program
Program early
early Who found
Who found the
the problem?
problem? Who
Who created
created the
the problem
problem ??
phase,
phase, no
no time
time limit)
limit)

Do I have same problem elsewhere?


D4
D4 to
to D6
D6 D6: QRCI
QRCI Pilot: UAP Mgr. / HSE Mgr. /Logistic Mgr.
(10
(10 workdays
workdays in
in case Problem
Problem 2nd
2nd definition
definition

D2 
case etc.
Customer exist** &
Customer exist & Name/ Signature (Scope
(Scope reduction)
reduction)
HSE)
HSE) (In
(In case
case customer
customer does
does not
not exist
exist &
& Program
Program early
early
Where
Where was
was the
the problem
problem found?
found? Where
Where was
was the
the problem
problem
phase,
phase, no
no time
time limit)
limit)
created?
created? Detection:
D7
D7 to
to D8
D8 D8: Responsible Mgr: Plant / Program etc.
(60
(60 workdays
workdays in
in case
case Name/ Signature How
How the
the problem
problem was
was found
found ??
Customer
Customer exist*
exist* &
& (In
(In case
case customer
customer does
does not
not exist
exist &
& Program
Program early
early
HSE)
HSE) phase,
phase, no
no time
time limit)
limit)
Occurrence:
Classification:
Classification:
(HSE:
(HSE: By physical cause)
By physical cause)
How
How many?
many?

Only
HSE
Only
HSE
(HSE:
(HSE: Accident,
Accident, Environment,
Environment, Fire,
Fire, Others)
Others)
Category:
Category:
(HSE: Near
(HSE: Near Miss,
Miss, FR2t,
FR2t, FR1t
FR1t &
& FR0t)
FR0t)

** In
In case
case Customer
Customer exist
exist like
like Logistic,
Logistic, Quality,
Quality, Program
Program pre-production
pre-production &
& launching
launching phase
phase Re-
Re- occurrence
occurrence YES NO Need to warn other plants/R&D YES NO

D3 – Containment actions D3 & D7. Indicators follow-up by date of Manufacture / Occurrence / Action implemented

Plan
(Including retained factor containment based on evidence)
Comments/
Comments/ Conclusions

How to contain?
Effectiveness
Effectiveness New
New risk
riskdetected
detected Conclusions
Action PILOT
PILOT
PILOT
PILOT Dead-line
Dead-line
(Y/N)
(Y/N) (Y/N)
(Y/N)

D3 
Before incident After the incident & counter measure applied
(3 months minimum history)

D4 

show
to show
RETAINED
RETAINED FACTOR
FACTOR -D4-
-D4- Control
Control point
point Standard
Standard Real
Real situation
situation Investigation
Investigation plan
plan to
to validate/
validate/ eliminate
eliminate aa RETAINED
RETAINED FACTOR
FACTOR

What is the root cause


Real
Real vs.
vs. Std.
Std. Retained
Retained Factor
Factor
Std. OK validated
validated ??
IS/ IS NOT influence retained factor of What is the rule for risk Std. OK ?? Investigation
Investigation actions
actions

D5 to
N° How to measure/ characterize the retained factor NOK
NOK OK
OK Resp.
Resp. Dead-line
Dead-line Result
Result

Occurrence)
of Occurrence)
non- detection Prevention / Detection ?

Risk
Defect // Risk

after D5
comes after
Y N

of Defect

D4 comes
Y N

cause of
non-detection of
D5

?)
found ?)
Y N

the cause
of non-detection

exist, D4
not found
Y N

not exist,
(non detection and occurrence)

detect the
(Why not
Y N

couldn't detect
does not
(Why
customer does
Y N

Cause of

Why couldn't
D4 -- Cause

case customer
Y N

Y N

Why
D4

(In case
Y N

(In
Y N

RETAINED
RETAINED FACTOR
FACTOR -D5-
-D5- Control
Control point
point Standard
Standard Real
Real situation
situation Investigation
Investigation plan
plan to
to validate/
validate/ eliminate
eliminate aa RETAINED
RETAINED FACTOR
FACTOR
What is the rule for risk
Real
Real vs.
vs. Std.
Std. Retained
Retained Factor
Factor
IS/ IS NOT influence retained factor of Investigation
Investigation actions
actions validated
validated ??
N° occurrence
How to measure/ characterize the retained factor Prevention NOK
NOK OK
OK Std.
Std. OK
OK ?? Resp.
Resp. Dead-line
Dead-line Result
Result
/ Occurrence?

D4)
before D4)
Y N

come before
time)
other time)
Y N

D5 come
What are corrective actions plan?
Y N

no other
Do

occurrence
of occurrence
D6 

exist, D5
Y N

& no
not exist,
time &
Y N

this time
Cause of

does not
Y N

D5 -- Cause
happens this
customer does
Y N

(Why happens
case customer
D5
Y N

(Why
Y N

(In case
Y N

(In
Y N

Y N
Property of Faurecia - Duplication prohibited

N° Why
Why ?? VV Why
Why ?? VV Why
Why ?? VV Why
Why ?? VV Why
Why ?? VV D4
D4 Root
Root cause
cause (( Management
Management issue
issue ?? ))

issues)
or

management issues)
times or
Check
(Minimum 55 times
reach
to reach
How to check efficiency?
Why's
D4 55 Why's
D7 
management
more to
(Minimum
more
D4
N° Why
Why ?? VV Why
Why ?? VV Why
Why ?? VV Why
Why ?? VV Why
Why ?? VV D5
D5 Root
Root cause
cause (( Management
Management issue
issue ?? ))

or

issues)
times or

management issues)
(Minimum 55 times
reach
to reach
Why's
D5 55 Why's

management
more to
(Minimum
more
D5 OO= OK, X=
XX NOK, ∆=
∆∆ Doubt, V=
VV Verification (To be used in D4 & D5 at columns "Real vs Std" and "Std OK?" and Validation of each Why)

D6 – Corrective actions
D8 - Lessons learned
(Process, Machines, Standards, Hazard identification, risk assessment and determining controls)

What did we learn?


Risk
Validated
Validatedretained
retained
Actions Technical Dead-line Responsible
Risk
Effectiveness
Effectiveness
New
Newrisk
risk
Action
Action Resp. Dead-line/
Check
Check
detected Dead-line/ Done

Act
factor
factor Dead-line Responsible Assessment
Assessment detected Resp. Done

D8 
(Y/N)
(Y/N) (Y // N)
(Y N)

N° (Y/N)
(Y/N) (Y/N)
(Y/N)

All
All actions
actions validated
validated and
and implemented
implemented

Operators
Operators // team
team members
members informed
informed

Standardized
Standardized work
work created
created // updated
updated

FMEA
FMEA // Risk
Risk assessment
assessment updated
updated

(How to capitalize and transversalize ?)


Control
Control Plan
Plan updated
updated
Lessons
Lessons learned
learned (LL)
(LL) created
created

Validated
Validatedretained
retained Actions Management (or escalated to Sr. Management)
factor
factor Dead-line
Dead-line Responsible
Responsible Lessons
Lessons learned
learned shared
shared

Follow
Follow up
up by
by Core
Core teams
teams

151
5W/ 2H´s IS IS NOT Retained D2 - Risks on similar processes,
QRCI-8D 1st Problem Definition N° machines, plants?
(Faurecia View)
Factors Risky process or conditions to report.

What is the problem ?

Team: Opened:

D1

D1- Problem description


Why is it a problem?

Steps Meeting dates Milestone review


D1 to D3 D3: Quality Manager / PILOT / Hse / UAP Mgr. When the problem happened? When was the problem
24 h Definition of incident clear ? YES NO created?
Name/ Signature
Who found the problem? Who created the problem ?

D4 to D6 D6: QRCI Pilot: UAP Mgr. / Hse Mgr. /Logistic Mgr.


10 workdays etc.
Name/ Signature
Where was the problem found? Where was the problem
created?
2nd Problem Redefinition
(Scope reduction)
D2
D7 to D8 D8: Responsible Mgr: Plant / Program etc.
60 workdays Name/ Signature How the problem was found ?

Classification:
(HSE: By physical cause)
How many?

QRCI
(HSE: Accident, Environment, Fire, Others)
Category:
(HSE: FR2t, FR1t & FR0t)

Re- occurrence YES NO Need to warn other plants/R&D YES NO

D3 – Containment actions D3 & D7. Indicators follow-up by date of Manufacture / Occurrence / Action implemented

D3Action PILOT
PILOT Dead-line
Effectiveness New risk detected
(Y/N) (Y/N)
Comments/ Conclusions

form
D3&D7
to use
(Cause of non-detection of

FACTOR -D4- Control point Standard Real situation Real vs. Std. Investigation plan to validate/ eliminate a FACTOR
D4 - Factor of non-

Factor validated ?

IS/ IS NOT influence factor of non-
How to measure/ characterize the factor
What is the rule for risk
NOK OK Std. OK ? Investigation actions
Resp. Dead-line Result
Defect / Risk)

detection Prevention / Detection ?


detection

Y N

Y N

Y N

D4
Y N

Y N

Y N

FACTOR -D5- Control point Standard Real situation Investigation plan to validate/ eliminate a FACTOR
What is the rule for risk Real vs. Std.
Investigation actions Factor validated ?
(Why happened ?)

N° IS/ IS NOT influence factor of occurrence How to measure/ characterize the factor Prevention NOK OK Std. OK ? Resp. Dead-line Result
D5 - Factor of

/ Occurrence?
occurrence

Y N
Y N

D5
Y N

Y N
Y N
Y N
Y N

Why ? V Why ? V Why ? V Why ? V Why ? V D4 Root cause ( Management issue ? )


D5 5 Why's D4 5 Why´s


Property of Faurecia - Duplication prohibited

N° Why ? V Why ? V Why ? V Why ? V Why ? V D5 Root cause ( Management issue ? )

O = OK, X= NOK, ∆= Doubt, V= Verification

D6 – Corrective actions
D8 - Lessons learned
Validated
factor

D6 (Process, Machines, Standards, Hazard identification, risk assessment and determining controls)
Actions
Dead-line Responsible
Risk
Assessmen Effectiveness
t
(Y/N)
(Y/N)
New risk
detected
(Y/N) D8
Action Resp. Dead-line/ Done
Check
(Y / N)

All actions validated and implemented

Operators informed
Instructions at WS updated

FMEA / Risk assessment updated

Lessons learned (LL) created

Lessons learned shared


Follow up by Core teams
152
Program QRCI Workshop

Leak test values higher than


internal specification found during prototype assembly

Brazed
connection
• Build the QRCI (one
per table) with your
trainer on the QRCI
Form. Perform all 8D
steps (60 mn)
• Trainer will give to
each group necessary
Property of Faurecia - Duplication prohibited

available information
• Debriefing (30 mn)

153
Exhaust pipe assembly with brazing

WASHING
1 - Process Flow in Prototype Shop
DIAMETER
TUBE MILL BENDING END WASHING SIZING BRAZING
RAW FORMING
MATERIAL

RING
RING
Ok
2 – Leak Testing Results LEAK TESTING
Property of Faurecia - Duplication prohibited

NOk
Ok parts Nok parts

Bubles detected with soap


154
7 Quality Basics in Development
Agenda

7:45 Welcoming coffee


8:00 Opening comments J.M. Renaudie
8:20 Introduction K.Sato
8:35 Capitalization & Tranversalization K.Sato
9:00 Key Characteristics & Strict Control Plans V.Garcia Parra
10:10 FMEA PL.Soula
11:10 Break
11:25 Validated Engineering Changes E.Jacquot
12:05 Lunch
12:45 Program QRCI J.Burke
15:45 Break
Property of Faurecia - Duplication prohibited

16:00 Functional Milestones & Gate Reviews PL.Soula


16:55 Conclusion K.Sato
17:00 End

155
Property of Faurecia - Duplication prohibited

Break

156
7 Quality Basics in Development

Functional Milestones +
Program Steering Committee & Gate Reviews

Paul-Louis SOULA
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
158
Why this basic?

Too many bad launches:


Red SOP status (Mar 2011): 27% Red Programs
( Jun 2011 25%)

Delay for passing gates:


Time To Pass Gate (Mare 2011): 41 days
(Jun 2011=>33 days)
Property of Faurecia - Duplication prohibited

159
Module objectives

 Understand basics of Functional Milestones , QVR


(Quality Validation Reviews), TVR (Team validation
Reviews) and Gate Reviews

 Highlight factors for successful program steering


and Gate Reviews
 Remember: Delayed event has consequences
Property of Faurecia - Duplication prohibited

(efficiency, costs) and comes from malfunctioning

160
Property of Faurecia - Duplication prohibited

Video Part 1

161
Live exchange – What went wrong?

Consequences
→ Gate red for 4 months
→ Airs shipment of 120 k€
Core team:
→ No precise lead time to recover 2 wks
delay on knee impact
→ Risks identified but not treated
Gate Review
→ PSC members late + 3 function heads
missing
Property of Faurecia - Duplication prohibited

→ Product definition freeze is borderline


→ Packaging not validated by plant
→ Late contribution of functions
162
Property of Faurecia - Duplication prohibited

Video Part 2

163
Live exchange – What went well ?

Core team:
Driven by SLI - weekly meetings- On time escalation -
Early experts involvment – Shopfloor review
Early escalation to customer
Preventive measures taken during meeting
Functional Milestones
Function Management engagement
Priorities driven by SLI and anticipation
Review with evidence, facts and data
Property of Faurecia - Duplication prohibited

Gate Review
Green at 1st review – Key Deliverables
Key Deliverables – Detailed validation
Proactive management for next gate review
164
Property of Faurecia - Duplication prohibited

Functional Milestones

165
Objectives of Functional Milestones

Validate the program progress against


Standards & Guidelines and internal expertise while taking
Into account Customer Requirements

Make sure that Functional Managers are committed and


involved in key decisions concerning programs
– Up to date FAURECIA knowledge is used in programs
– Program risks are well-evaluated and treated
– Improve resource management
– Increased standardization and carry over
Property of Faurecia - Duplication prohibited

– Enable continuous improvement


 Improve the robustness of Gate Review decisions
 Improve our global Time To Pass Gate
166
Functional Milestone Definition
in “PMS Overview” – FAU-P-DSC-2200

Occur during each phase and involve Core Team members


presenting to a group of Experts, i.e. Functional Managers, and
Technical Experts.
Cover Engineering, Manufacturing, Purchasing, and any other
functions to assess the content and the quality of deliverables
Performed before
• QVR (Quality Validation Review lead by Quality Director) or
• TVR (Team Validation Review co-
co-lead by Program and Quality Directors)

Gate Review happens after a “Green” QVR or TVR


Property of Faurecia - Duplication prohibited

Note: For more details on Functional Milestones see also FCP Manage Gates and Functional Milestones (FAU-P-DSC-2240) 167
Program Management System

CUSTOMER
CUSTOMER PROGRAM CUSTOMER PRODUCTION START OF END OF
INQUIRY AWARD TOOL RELEASE PART APPROVAL PRODUCTION PRODUCTION

GR 1 GR 2A GR 2B GR 3 GR 4

1 2A 2B 3 4 5

ACQUISITION PRODUCT DESIGN PRODUCTION SET- LAUNCH PRODUCTION


& VERIFICATION UP
PROCESS
Property of Faurecia - Duplication prohibited

DESIGN

168
PMS Functional Milestones and Gate Reviews

Gate Reviews
 Management’s commitment and support of program for next phase
 Program risks agreement
 Prepared by Functional Milestones and Quality Validation Reviews

Customer Acquisition Design Design Verification Production Setup Launch


RFQ Award TL PPAP SOP

Executives GR 1 GR 2B GR 3 GR 4
GR 2A
Milestones
Concept Proposal
Validation
QVR* TVR** QVR* TVR** QVR* TVR** QVR* TVR**

FM1A FM1 FM2A FM2B FM3


Milestones
Functional

Engineering
Manufacturing
Purchasing
Quality
Property of Faurecia - Duplication prohibited

Finance
QVR* : Quality Validation Review TVR** : Team Validation Review

Functional Milestones
• Ensure Faurecia best knowledge is used
• Identify technical risks and build subsequent corrective actions
• Ensure propagation of technical and design best practices 169
Roles of function versus program

PROGRAM FUNCTION

What When How


Resources
QCD performance
Coordination Standards
Expertise

Global budget Stick with commited cost

Veto
Property of Faurecia - Duplication prohibited

Decision/ Escalade

Reporting towards customer Validate and dive

170
PSA OEM Benchmark

Program Objectives Function Objectives


e.g. Program Manager e.g. R&D Director, Purchasing
Director, ME Director

Q C D and Q R T and Communication (int. / ext.)


Performance
Technical
Standards
State of the art
Resources/People
Quantity and Competence
Results
Property of Faurecia - Duplication prohibited

Quality System
Definition of way of working,
functional objectives
and organization

171
Functional Milestone Review Attendees

Engineering Functional Review Date:


Milestone Review
ASPG
Status: E2B Attempt: 1st
Division: VW Group
Program: VW 250
Product: JIT complete seat
Owner: J.Schnabel
EFM Review Committee Members:
Function: M/O: Invited: Attended:
R&D Vice President M T.Ludewig R.Hanauske
Director SSD - NEC M R.Hanauske R.Hanauske

SDS - Manager M T.Collette


SSD - PCA Manager O D.Kraft D.Kraft
SSD - SSA Manager O A.Spormann A.Spormann
SSD - CTCM Manager O S.Kroener S.Kroener
SSD - SECI Manager O R. Deppe R. Deppe
Programmdirector O K.Schlueter K.Schlueter
Property of Faurecia - Duplication prohibited

SSD - SSA Manager SEC O F.Meyer Joachim Mai


SSD - DFA Manager O A. Buddensiek
QPS-Manager M R. Oberbeck R. Oberbeck
PQL VW 250 M J.Etzel J.Etzel
SA VW 250 M J.Schnabel J.Schnabel
O
M: Mandatory - O: Optional

172
Functional Milestone Checklists

Owned and maintained


by BG Functions
Property of Faurecia - Duplication prohibited

173
Property of Faurecia - Duplication prohibited

&
Gate Reviews
Program Steering Committee

174
PMS: Levels of control
3. Governance

FAURECIA STRATEGIC
MGMT OBJECTIVES
DECISIONS MANAGEMENT

GATE REVIEW
Program Steering PROGRAM
#1-4 Committee OBJECTIVES

FUNCTIONAL LINE MANAGEMENT TECHNICAL &


MILESTONES FUNCTIONAL
OBJECTIVES
KPI Monitoring
PROGRAM MANAGER PROGRAM
PROGRESS
Property of Faurecia - Duplication prohibited

DETAILED REPORTS
BY FUNCTION
PQL PML PDL PB PM

DESIGN PRODUCT PROGRAM


VALIDATION PROCESS Readiness SUPPLIER PROGRESS
Readiness Readiness
175
Who is on the Program Steering Committee
(PSC)?
Regional VP (Chairman)

Quality Regional Director of Quality

Human Resources Regional Director of Human Resources

Program Management PG or Regional Director of Programs

Finance Regional Controller

Sales Appropriate Customer Division Manager


Property of Faurecia - Duplication prohibited

Product Engineering Regional Director of Product Engineering

Manufacturing Regional Director of Manufacturing

Purchasing Regional Director of Purchasing

176
Mind-set change: Company wide expectations…

Gate Review repetitions are not acceptable


 1st pass of all / majority of Mandatory Deliverables
 2nd run to close any open issues raised in 1st run

Escalation is not only for information exchange, it is really for


problem resolution
 Increase information transparency – do not kill the
messenger
 Focus on preventive problem solving and set the example
for timely management involvement
Property of Faurecia - Duplication prohibited

177
PMS Mandatory Program Deliverables
* mandatory deliverables linked to Quality Validation Review minimum necessity items 1. Process
CUSTOMER
CUSTOMER PROGRAM CUSTOMER PRODUCTION START OF END OF
INQUIRY AWARD TOOL RELEASE PART APPROVAL PRODUCTION PRODUCTION

Program
Go/No Go Target Program GR 1 GR 2A CAR Approval GR 2B GR 3 GR 4
Review Quote Review
Quality Target Study * Quality Management Plan Gauges requirements * Initial Samples Submitted to Customer * I.S. for additional capacity
Quality Prototype control plan Prototype control plan implemented *
Pre Production control plan Pre Production control plan implemented * Production Control Plan *
Human
Resources Program Teams staffed Plant Start-up team planned Product support team staffed

Program internal contract Detailed SOW Make or Buy finalized (Subcontractors) Lessons Learned *
(program objectives)

Program Master schedule * Prototype build plan CAR approved Pre-series build plan Activities during ramp-up *
Management Control of
Single List of Issues in place Single List of Issues managed * S/R concerns solved (SLI) * process &
design
ECM for development In place ECM for pre-series & series in place change *

Finance Initial Business Plan Actual BP Actual BP

Customer Contract Agreed prototype prices Agreed tool & pre-series & series prices Updated series price with PO
Sales
Prototypes paid Pre-series parts paid Outstanding payments

Initial product concept Product definition for DV * Product definition freeze*

Design FMEA * Design FMEA Actions implemented


Product
Engineering Key characteristics * BOPs definition released

Design Validation Plan * DVP test results successful Production Validation test results successful *

Prototypes approved
Property of Faurecia - Duplication prohibited

Initial process concept Process definition Process definition released Mass Production Trial Run @ Rate * EMPT Run @ Rate

Process FMEA Process FMEA * actions launched Process flow realized *

Manufac- Prel. Manufacturing footprint Facilities / Footprint specifications Facilities definition released
turing
Initial equipment concept Production System definition Equipment & tooling specs * released Production process Instruction *

Logistic& Packaging definitions released * Logistic & packaging in place *


Initial supply chain concept
(internal/external MIFD*) Initial process capability study plan * Process capability achieved *

Purchasing Expert suppliers contracts signed Designers suppliers contracts signed BOPs, tools, gauges, equipment ordered Supplier PPAP *
5 Series
1 ACQUISITION 2A DESIGN 2B DESIGN VERIFICATION 3 PRODUCTION SET-UP 4 LAUNCH PRODUCTION
V1.0
178
Version 2 - 14 Dec 2009

Program Internal Contract (program objectives) - GR#1


Description
The Program Internal Contract articulates the performance boundaries of a program (objectives) committed to by the
PSC Chairman as agreed by the Program Steering Committee (PSC), the Program Core Team (PCT), and associated
Functional Managers at the Gate Review.
The Program Internal Contract is prepared in the acquisition phase between the Program Quote Review and the
Program Team Kick-off. The Program Internal Contract is first approved at the Gate Review #1 by the PSC. The PSC
reviews the Program Internal Contract at subsequent Gate Reviews. It is possible that the threshold level of some
contract parameters are changed during subsequent Gate Reviews.
Input
Program Quote Review minutes
Customer requirements
Initial Product and Process Concept
Preliminary Manufacturing Footprint
Initial Equipment Concept
Initial Supply Chain Concept
Required output
Property of Faurecia - Duplication prohibited

Completed Program Internal Contract with full commitment of Program Team, Functional Managers and the Product
Steering Committee
Documents to be used
Program Internal Contract
Responsibility
Validator: Program Steering Committee
Actor: Acqusition Manager up to Program Kick-off, Program Manager after Program Kick-off
179
Program Internal Contract

 Prepared between the Program Quote Review & Program


Team Kick-off
 Highlights the major program risks

 First approved at the Gate Review #1 by the PSC


 Functions have committed to their associated key
program challenges

 The PSC reviews the Program Internal Contract at


subsequent Gate Reviews
Property of Faurecia - Duplication prohibited

 The right level of staffing is reserved in order to


close the gaps

180
Program Internal Contract
Program Internal Contract indicator Units Target Actual Seuil Alerte
Safety Customer
Product specification (
performance Safety/Regulation incl.NCAP) Tests status R/Y/G G Y
Weight
Regulation 66kg
Tests status
Articulate the performance boundaries of a program as mutually agreed by the
Interface with vehicule % parts in carry over
R/Y/G
%
G
10%
70kg7%
Y
TBD
Innovative functions/new applications Number of new functions number 1 1
Program Steering Committee (PSC) and the Program Core Team.
Innovation 1 - BA3 Milestone status M1-M4 M4 Status M4 < M3
Weight % = actual/customer target % 66kg 70kg TBD
Perceived quality Electrical Noise dB dB <40 36
Functional Noise Zero V3 Quotation RSA Subjective 0 >0
Prepared between the Program Quote Review and the Aspect Number of DMT points number 0V1 et (V2+V3)<0.03 @ SOP TBD
Program Team Kick-off. effort Newtons number 100% to specification 1 Non conformance
Reliability & endurance Status of endurance test R/Y/G G Y
First approved at the Gate Review #1 by the PSC.
Design for manufacturing R/G 100% operation GO au Gate 2 R
The PSC reviews the Program Internal AGREPTContractNumber
at subsequent
of points < 5 number 0-5 5+1
Gate Reviews.
Product cost (Provisional Product Cost
with current definition and current
Cost Committed product
manufacturing deliverables are defined. Previsional cost / target cost
performance) 381.49 387.22
Hard toOImeasure customer expected performance
IRR % IRR
OI
targets are % 15
6
6.8
2.6
5%
0
identified.
Upfront Upfront en ME 13.3 15 20%
QualityTarget and
PPM atthe0km actual values are compared and PPM the magnitude 40 150 10%
of the gaps are estimated.
The right level of staffing is reserved in order toK°close
3 Months Warranty Claims
the
/°° = Cases per 1000
B: 1,3
C: 6,9
2.15 10%
gaps.
Resources Staffing CT & ET Zero Open Position * 1
Major program challenges
Turnover on Core Team and key are highlighted early.
functions (Program Manager, Core
Main program
Team Members,stakes are transferred into the Program Single
Architect) % 0 0 1
List
Delivery of Issues
Definition Freeze for DV juin-06 NA
Complementary
Tool Launch
PPAP
gap closure projects are launched. avr-07
juil-08
NA
Na
The program scope is adjusted. 6, ACL (JIT), St. Jao Madere
Property of Faurecia - Duplication prohibited

(Foam), St. Jao Madere


Functions have committed to their associated key program (Metal), St. Jao Madere
challenges.
Manufacturing
Footprint Number and names of plants
Production Volumes
LCC
Number and name
Unit forecast
30%
Number and name Poland (Slides)
1,000,000
20%
(Insitu), STEA (Trim Covers), 84, Coife (3
Suppliers)
NA
Any change
5%
Program
Specific
Targets/Challene
ges LCC % LCC Supplier Pannel % 30% 20% 5%
Plant built, equiped, staffed
New Plant and approved 0
New Customer 0
New Concept 0 181
New Development Venture 0
“Good” answer for
“Functional milestones & Gate Reviews”
How do you perform your Functional Milestones and your Gate Reviews ?
Clear list of attendees (plan/real) Clear check list with conclusion Action plan with Responsible
including expert and mandatory if (Ok/NOk) & deadline in single file
needed ( clear criteria to conclude Ok)
Critical item QUALITY FUNCTIONAL MILESTONE
Phase 2B

Program Product type Complete Seat PQL & contributors Katharina Jahn
E84 1st row

Review Date Review Stadthagen Reviewed by Jacek Kusiak


07/10/2008
location

WP planned
Work Packages PQL Outputs Quality Key Deliverables Critical Status Comments / Actions Detailed description of PQL output
closure date
PIST level actual
Product performance - PIST Level 94,96% (h-point in BMW production adjustment) PIST level for KPCs has achieved the customer target
78,92% (h-point in LH- addjustment)
target 60% for phase 2b

--> to add root cause action pilot and deadline in the PIST database

Prototype control plan Actions are defined and agreed with the customer
Proto #2 Quality Performance
2E14 07/07/08 implemented C G - H-point - discussion with Karmann and BMW because LH - adjustment is
Analyzed
Final Key Characteristics List Gauges requirements necessary, planned for cw 48; BMW and Karmann know this problem (because of Key Characteristics List reviewed and updated based on the prototype
carry over parts the h-point E84 could not reach LH-adjustment, but BMW- tests, measurement results
production and ECE adjustments are fulfilled)

Key Characteristics are updated (last update 25.09.2008 Rev. 05)


69 characteristics (class 1 = 12; class 2 = 27; check criteria = 30) --> PIST&PIPC -
12 characteristics --> class 1 = 0, class 2 = 4, check criteria = 8

Prototype control plan implemented and signed off


Prototype control plan Product audit tracking is ongoing Action plan defined to correct non conformance based on PIST values,
2E15 Internal Quality Objectives Updated Development Convergence Plan 22/09/08 C G
implemented DV test results and any other non conformities (complaints..etc.).
reference to Convergenceplan E84_Fehlerübersicht_KJ_20080809

Flow Chart/Machines, Tools used in the process / KPC, KCC /


Pre-Production Controlplan is defined and signed off Frequency of control / Inspection methods, gauges, tools../ Record
Pre-Production Control Plan Pre-Production Control Plan
Inspection instructions are defined (based on E90) Update format and duration / Reaction rules in case of non conformity (Rework?)
2E25 07/07/08 Pre-Production Control Plan Y
Established --> next update of inspection instruction will be during PVL-phase in 02/2009, / Approval by Plant and Program Manager
training material is available in plant now
References for measurement / Characteristics to be measured with
Pre-Production Inspection Instructions
tolerance and classification
QSE plan with implementation dates in line with
QSE plan for 2. semester 2008 is defined together with the plant QSE Coordinator -
FPT, MPT & EMPT requirements and schedule
(Bernd Schmeisser / Michael W ende) date for R@R implemented; planned dates:
FPT (20.02.2009), MPT (22.05.2009), EMPT (24.09.2009) will be implemented in
the next update of semester 1-2/2009
2E+28 QSE deployment plan defined 25.06.08 Pre-Production Control Plan G
QSE Training & coaching plan -
New Training and choaching for E84 is not necessary, because of carry over E90
(statement UAP Manager Y. Kermarrec) Budget 2009 :2 new Trainers and 1 new
employee (50%) planned

Regular Program risk assessment - Prototype (SLI /or customer specific


- - Program risk assessment ongoing G Shareplace is updated and in use / also 3PR and LOP / SLI / PRC list, 3PR, PRC, PQL Sharepoint, Risks identified and under control or
escalated when necessary)

Prototype control plan QVR conclusion positive (status A or A-) or QVR scheduled (if QFM is
- - Quality Validation Review 23/09/08 G 23.09.2008 09:30 - 11:00 result A-
implemented performed earlier than QVR )

Conclusion: PASS :___YES____ FAIL: ______

Re-Review Necessary ? YES:_______ NO:___X_____

Program Quality Manager


Signature Name

Kusiaz Jacek
Date

7-oct.-08 Ok
Comments:

Calendar for next ( six months Engineering / Manufacturing / Time to pass Gate is
at least) Functional Milestones Purchasing Functional monitored and achieving
& Gate Review Milestones target line
Property of Faurecia - Duplication prohibited

ENGINEER

MANUF

PURCHASING

182
Key Messages
 Focus on the PMS Mandatory Deliverables
 The Program Steering Committee isa cross
functional business management team
 The PSC guarantees the full engagement of the
line organization to meet program objectives
 Gate Reviews are about decision
 Change organization mind-set to assure first
Property of Faurecia - Duplication prohibited

pass yield of Gate Reviews

183
7 Quality Basics in Development

2011 Group sessions in Regions

Asia Shanghaï May 12th 8h-18h00


USA A.Hills-Frazer Jun 17th 8h-18h00
France Meru Jun 30th 8h-18h00
Germany Augsburg Jul 8th 8h-18h00
SAO Curitiba Sep 30th 8h-18h00
Property of Faurecia - Duplication prohibited

India Pune Oct 14th 8h-18h00

184
7 Quality Basics in Development

Conclusion

Ken SATO
Mandatory Program Deliverables
CUSTOMER
CUSTOMER PROGRAM CUSTOMER PRODUCTION START OF END OF
INQUIRY AWARD TOOL RELEASE PART APPROVAL PRODUCTION PRODUCTION

Program
Go/No Go Target Program GR 1 GR 2A CAR Approval GR 2B GR 3 GR 4
Review Quote Review
Quality Target Study * Quality Management Plan Gauges requirements * Initial Samples Submitted to Customer * I.S. for additional capacity
Quality Prototype control plan Prototype control plan implemented *
Pre Production control plan Pre Production control plan implemented * Production Control Plan *
Human
Resources Program Teams staffed Plant Start-up team planned Product support team staffed

Program internal contract Detailed SOW Make or Buy finalized (Subcontractors) Lessons Learned *
(program objectives)

Program Master schedule * Prototype build plan CAR approved Pre-series build plan Activities during ramp-up *
Management Control of
Single List of Issues in place Single List of Issues managed * S/R concerns solved (SLI) * process &
design
ECM for development In place ECM for pre-series & series in place change *

Finance Initial Business Plan Actual BP Actual BP

Customer Contract Agreed prototype prices Agreed tool & pre-series & series prices Updated series price with PO
Sales
Prototypes paid Pre-series parts paid Outstanding payments

Initial product concept Product definition for DV * Product definition freeze*

Design FMEA * Design FMEA Actions implemented


Product
Engineering Key characteristics * BOPs definition released

Design Validation Plan * DVP test results successful Production Validation test results successful *
Property of Faurecia - Duplication prohibited

Prototypes approved

Initial process concept Process definition Process definition released Mass Production Trial Run @ Rate * EMPT Run @ Rate

Process FMEA Process FMEA * actions launched Process flow realized *

Manufac- Prel. Manufacturing footprint Facilities / Footprint specifications Facilities definition released
turing
Initial equipment concept Production System definition Equipment & tooling specs * released Production process Instruction *

Logistic& Packaging definitions released * Logistic & packaging in place *


Initial supply chain concept
(internal/external MIFD*) Initial process capability study plan * Process capability achieved *

Purchasing Expert suppliers contracts signed Designers suppliers contracts signed BOPs, tools, gauges, equipment ordered Supplier PPAP *
5 Series
1 ACQUISITION 2A DESIGN 2B DESIGN VERIFICATION 3 PRODUCTION SET-UP 4 LAUNCH 186
PRODUCTION
V1.0
7 Quality Basics in Development

Program Functional Milestones,


QRCI Program Steering Committee
and Gate Reviews

Capitalization &
Transversalization
Validated
Property of Faurecia - Duplication prohibited

Strict Control Engineering


FMEA Plans Changes
Key Characteristics
187
The basic rule:

We are all allowed to make a mistake


once
But: we are not allowed to repeat twice
the same mistake

This is true for:


Individuals
Teams
Property of Faurecia - Duplication prohibited

FAURECIA
188
Who is in charge?

Who is responsible for Development Quality?


Who has to implement the 7 Quality basics in
Development?

The 7 Quality Basics in Development


They are our basic
are not tools for
Property of Faurecia - Duplication prohibited

Development tools
Quality and PMS people
189
7 Quality basics in Development Evaluation form

NAME :_____________________________Session:_____________________________________

Value added of
the module Comments
1 2 3 4

Introduction

Capitalization &
Transversalisation

Key Characteristics

FMEA

Evaluation Form
Strict control plans

to fill in
Program QRQC

Validated Engineering
Changes

Functional milestones
& Progr Steering Com
& Gate Reviews
Property of Faurecia - Duplication prohibited

How to accelerate

Conclusion

Rating: 1 = Poor 2=Average 3=Good 4= Excellent

General Appraisal 1 2 3 4 Comments:

190
Property of Faurecia - Duplication prohibited

191