Vous êtes sur la page 1sur 1

Preliminary Mechanical Acceptance Report No.

: –––––

Report for Instrumentation


Client: ––––– Subcontractor: –––––
Project No.: ––––– Subcontract P.O. No.: –––––
Project Name: –––––
Additional Information:

Reference Document:

Tag No. Installed Proc. Pneum. Cable Calibration Loop test Remarks
Piping

Note: in column 2 to 7 indicate ‘A’ for accept, ‘R’ for reject.

Accepted for Subcontractor Accepted for Company Accepted for Client


Name: ––––– Name: ––––– Name: –––––
Signature: Signature: Signature:

Date: ––––– Date: ––––– Date: –––––

C:\RB_Forms\RB26K18.DOT\ www.red-bag.com

Vous aimerez peut-être aussi