MARTABE GOLD MINE

Date: 3/04/2018 31-Mar-18 Daily Production Meeting


2-Apr-18 Start : 8:45 AM Finish : 9:45 AM
1-Apr
PIC. Per section STP Mine Operation Drill and Blast Mine Surveyor Geotech&Hidrogeology Mine Geology Mine Service & Project TSF Safety Management
PT.AR Morry Renandus Syafri Parulian Slamet Benny Renandus Adit Renandus
JV Adik Manulang Wiliam JJ Ramses Farid Taruli Joseph
A
HSE 1. Monitoring traffic sign all operation area & safety berm - Continue monitoring 4. Install culvert to RJ access - Today
2. Maintenance access horas office
3. ESDM site visite 4, 10-15 April, Site clean up 5. Reposition divider to look out
1. Input attribute ore at FMS report - on progress 3. Base line equipment performance - on progress
Martabe Link
2. Real time ore blend ratio report in FMS 4. Database Capacity - waiting decision IT PTAR
1. Placing waste at TSF 360, TSF 345, Rock Toe 4. Placing clay- dry out, compacting 7. Thickening foundation prep - Continue
TSF 2. Road maintenance --> all area TSF 5. Placing sand - Spreading and Compacting 8. Water surface management
3. Placing zone 5 (if material suitable) --> Continue Spreading 6. placing rock to construct zone 7 rock toe - Continue
Southern Access Phase 2 MINE SERVICES
Mine Service Unit WH Remarks Activities: Unit WH Activities & Location Remarks
EX9113 9.4 Install banching at Sa EX9109 10 Loading crush rock at RJ
& OEX608 10.4 Finishing Sa EX9104 0 BD
DZ9203 3.0 lift up MHR1 ADT (9055) 6.3 Hauling crush rock
EX01 ARM 9.2 Clean up material mud at SD1 TD9089 8 Hauling Rubbish
Project EX9138 3.3 Support TSF GD9311 3.8 Maintenance access RJ
RO9710 3.3 Maintenance access RJ
RJ Develop Stage Mining stage
2.
1. Poonton Pump activity--> PU 0900 & PU 0902 at NP running 4. Silt trap regulary monitoring
Pit Support 2. Water Truck : Continue for dust control ,2 units are available 5. Clearing barani north - Continue
3. Road Maintenance is continued 2 grader and 1 unit compactor --> TSF 345 access, MHR2 6. Clean up mud at Barani Rl 350
Loss Time Loss Time Due to
Unit No. Exc Type L/P Target (bcm) Production (bcm) W/H Prod'ty D/P waiting TSF Ready Trucks
ORE Suitable
DS NS DS NS D/S N/S
EX_9100 CAT390 - - - - - - - - - - - -
EX_9101 CAT390 - - - - - - - - - - - -
EX_9102 CAT390 NP RL 362.5, 360 5,700 5,415 14.9 363 Crusher, finger - - - - - - 5
EX_9103/9106 CAT336 NP RL 357.5 3,060 2,445 13.4 182 Finger Temporary - - - - 3
EX_9137 CAT340 NP RL 362.5 3,740 780 3.8 205 Crusher, Finger, Dump, MHR2, Yokohama - - - - - - -

Total 8,640 0.00 0.00 8


Note
ADT Usage
Purnama Barani RJ Standby Break down ROM TSF/Mine SA SD2 TOTAL
D/S 7 7 0 6 3 1 1 0 0 25
N/S 5 5 5 4 2 1 0 0 3 25
Barani Pit
Last 24Hrs Loss Time Loss Time Due to
Performance (EXC Unit No. Exc Type L/P Target (bcm) Production (bcm) W/H Prod'ty D/P ORE Suitable waiting TSF Ready Trucks
390)
DS NS DS NS D/S N/S
EX_9100 CAT390 - - - - - - - - - - - -
EX_9101 CAT390 Barani RL 367.5, 5,700 7,161 18.5 387 TSf 345, Greg Dump, TSF 350 LHS - - - 1.2 - - 5
EX_9102 CAT390 - - - - - - - - - - - -
EX_9137 CAT349 Barani RL 375 5,700 2,030 9.2 221 TSF 360 - - - - - - -
EX_9103/9106 CAT336 - - - - - - - - - -
Total 9,191 1.20 0.00 5
Ramba Joring Pit
Loss Time Loss Time Due to
Unit No. Exc Type L/P Target (bcm) Production (bcm) W/H Prod'ty D/P ORE Suitable waiting TSF Ready Trucks
DS NS DS NS D/S N/S
EX_9100 CAT390 - - - - - - - - - -
EX_9101 CAT390 - - - - - - - - - -
EX_9102 CAT390 - - - - - - - - - - -
EX_9137 CAT349 RJ RL 672.5 5,700 1,997 6.7 298 MHR 1, CH 1100 - - - - - - 5
EX_9103/9106 CAT336 - - - - - - -
Total 1,997 0.00 0.00 5

DS NS Total Persentage MTD OTC (tonage) Daily Actual Blend in Pit (BCM)
Tonnes Tonnes Tonnes (%) PLAN ACTUAL Exc Volume Ratio
Direct from Pit 7,189 8,815 16,004 83% EX_390 5,415 4
28,936 24,746
Last 24Hrs Ore to Rehandle from ROM 1,705 1,501 3,206 17% EX_30T 1,275 1
Crusher Total 8,894 10,316 19,210 100% -4,190
W/H 9 11 20
Productivity (ton/hr) 988 938 960

Ore ( Daily Plan ) Waste ( Daily Plan ) Total Material


daily to Date
Achievement Target Actual Variance Target Actual Variance Target Actual Variance
6937.4 8241 1,304 7,134 11,586 4,452 14,071 19,827 5,756
Ore ( Weekly Plan ) Waste ( Weekly Plan ) Total Material
Week to Date
Achievement Target Actual Variance Target Actual Variance Target Actual Variance
21,609 17,189 -4,421 8,429 21,206 12,777 30,038 38,395 8,357
Ore ( 3 Mth Plan ) Waste ( 3 Mth Plan ) Total Material
Month to Date
Achievement Target Actual Variance Target Actual Variance Target Actual Variance %Age
13,875 11,339 -2,536 14,268 20,516 6,248 28,143 31,854 3,711 13%
Current Area for Loading point and Exc. 30 T activities (Day Shift) Next Area for Loading Point and Exc. 30 T activities
Unit No. Exc Type Trucks
L/P Cut to RL Material L/P Cut to RL Material
EX_9137 CAT 390D Barani 375.0 Waste 3
EX_9101 CAT 390D Barani 365.0 Waste Barani 367.5 Waste 5
EX_9102 CAT 390D Purnama 360.0 Ore Purnama 360.0 Ore 4
EX_9140 CAT 336D Purnama 357.5 PO
OEX_606 CAT 336D ROM
EX_9122 CAT 349D RJ 660.0 Waste RJ 672.5 Waste 5
Next 24Hrs EX_9106 CAT 336D
Performance Total 17
(EXC 390) Note
Any Steel Rod at Digging area ? YES No √
Bund wall check at Barani
1. EX_9101 : Continue loading waste at Barani RL 365, 362.5 class 3 & 4 dumping to TSF
2. EX_9102 : Continue loading ore at Purnama RL 360 direct to crusher
3. EX_9140 : Continue loading PO at Purnama RL 357.5 100 load dumping to finger temporary
4. OEX_606 : Rehandle
5. EX_9106 : Service
6. EX_9137: Continue loading waste rock support to SA on-off with 40T RJ
1. Yesterday Plan And Actual :
Blasting Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm)
Plan
Actual
Variance - -
Blasting Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm)
Plan
Actual
Variance - - -
Blasting Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm)
Plan
Actual
Variance - - -
Sleep Blast Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm)
Plan
Actual
Variance - - -
Sleep Blast Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm)
Plan
Actual
Variance - - -
2. Sleep Blast :
Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm) Explosive
Drill-Blast Issues Purnama 365.00 17.00 3.30 3.80 400.0 5.50 0.89 50,160.00 44,642.40

3. Blasting :
Location Elevation Time Burden Spacing Total Holes Angle Holes Extra Holes Depth (m) PF Vol (Bcm) Explosive

4. Drilling : Purnama RL 365 6. Prepare area : Purnama RL 385


5. Next Drill : Purnama 365 Sutoyo
7. Broken muck updated
VOLUME DIGGING DIGGING
VOLUME UP Daily MTD
DATE ZONE LAST VOLUME BLASTING VOLUME (Blast VOLUME Mat_Type Inside 3MRP Outside 3MRP 3MRP (Blast)
(Free Dig) DATE
(Adjust) stock)
Ramba Joring 24,772 - 1,725 - 23,047 Total -
Barani 244,448 - 9,525 - 234,923 Total -
3/04/2018 Zone 1 146,496 - - - 146,496 Ore 216,784 127,112 Target 12,537 25,073
Zone 2 274,945 - 6,733 - 268,212 Waste 199,738 49,786 Actual - 32,962
Zone 3 57,125 - 1,860 - 55,265 Total 416,522 176,898 Variance - 12,537 7,888
Total - 19,843 - 727,943
8. Meter Drill Target 9. PF Target
Monthly m drill MTD Daily PF Plan Forecast to EOP 31 Jan Close Stock on EOP
Explosive Current Stock
Target 1,921 961 MTD achieve (KG) Target Actual Variance PF (PLAN VS ACT) 2016 23rd Dec'15
Actual 1,331 534 MTD 17,301 34,280 16,979 0.69 AN (kg)
Variance -590 -427 Daily 8,650 - -8,650 1.04 Emulsion (kg)
Note
Survey issues Survey AR Survey JV
1. Stakeout Ore/waste Block, RCGC, RCResDev dan Pickup RCGC, RCResDev, ROM Finger 1. Update topo at Purnama,Barani,TSF continue. 7. Stake out drill pattern -->
2. Update Topo Purnama, Barani, Ramba Joring dan Install TBM untuk area Loading Point 2. Sloping/ scaling Barani --> 380 8. Monitoring floor achievment
3. Sloping/ scaling purnama --> 337.5 9. Sealing layer --> Continue
3. Sloping Pur 337.5, Bar 380 4. Control and monitoring sloping at TSF 360, 350, 340 (Zona
10. Monitoring
1,2 &5) sealing layer
4. Monitoring souhtern access - prism at Tower 20 5. Monitoring weekly Plan boundary --> week 14 11. Review payload ADT RJ
5. Monitoring MHR1 access lift up project
1. Support monitoring western edge activity Purnama & Barani
2. Pumping at VD01 (2 hrs/day)--> Continue pumping DS 5. SA instability monitoring & under drain construction
3. Pumping at VD 02 processing Plant--> Continue pumping DS & NS
4. AGS work progress - Shotcrete RL 342.5, Meshing and friction
Location RL Cut Next level (Y/N) Comments
Purnama RL 342.5 N OK
Geotech issues
Purnama RL 337.5 N Scaling
Slope Purnama RL 347.5 N OK
Trimming Barani
Barani RL 380 N OK
Barani
Barani
1. Production Ore + MW
Actual Daily Actual MTD Forcast MTD Variance
18,541 23,866 32,455 -8,589
2. Ore Blend to crusher
Plan Yesterday Actual Yesterday Plan Today - D/S
HG MG LG PO HG MG LG PO HG MG LG PO
2.0 3.0 2.0 1.0 1.5 1.7 1.0 0.4 1 2 1 1.0
3. % Direct Tipping to crusher
Daily Plan Actual Variance MTD Actual MTD Target MTD Variance HG MG LG PO
90% 83% -7% 85% 75% 10% 1 2 1 1.0
Mine Geology
Issues 4. Ore Block --> 6. ResDev --> 141 m
5. Update info at ROM Finger 7. RCGC --> 296 m
Finger Total RF_Capacity(ton) Finger Status HG 18,871 8. AMD --> m
RF01_HG 19,795 FEEDING MG 26,470
RF01_MG 25,246 FEEDING LG 45,163
RF01_LG 42,625 FEEDING PO 54,994
RF02_PO 54,994 DUMPING `
Total 145,498
RF03_PO - FEEDING
RF04_HG (924) DUMPING SP 09 2,048,260
RF04_MG 1,224 DUMPING
RF04_LG 2,538 DUMPING
1. Supply water to Aggreko SI 003
Dayworks (SI)

Production Note :
1 MW Purnama to SP09 & MW Barnai to TSF 5. Mud at Purnama northern RL340 side should dumped to Cover dump. 9. no ore to finger ROM Capacity 150,000
2 Buildup ROM capacity up to 150,000 Ton 6. ADT ore & rehandle ore at ROM use Cat 745 10. Cannot blast 2 locations on 2 pits at same time
3 Fixed and monitoring all drainage at Pit area 7. 2x Small digger continue loading if crusher down >1 hrs 11. While EX9102 B/D, 2 small digger running (30T no extra rate) 18/08/2017
4 Leave 5 metre material for buffer 8. 2x Small digger can loading if approval by PTAR

NKE-MACMAHON REPRESENTATIVE PT. AR REPRESENTATIVE