VALORIZ

OBRA

MONTO DE LA OBRA : S/. 3'077,794.28


PLAZO DE EJECUCION S/EXP. TECNICO : 120 DIAS CALENDARIOS
FECHA DE INICIO DE LA OBRA : 07/09/2010
FECHA DE TERMINO REAL DE LA OBRA : 19/12/2011

PRESUPUESTO
PARTIDA DESCRIPCION
Und. Met. P.unit.
01 OBRAS PRELIMINARES
01.01 GUARDIANIA EN CANAL MES 4.00 450.00
01.02 ALMACEN DE OBRA MES 4.00 450.00
01.03 CARTEL DE IDENTIFICACION DE OBRA 7.20 x 3.60 M. UND. 1.00 1,061.64
TRANSPORTE DE MATERIALES, EQUIPOS Y
01.04 GLB. 1.00 8,500.00
HERRAMIENTAS
02 MOVIMIENTO DE TIERRAS
02.01 EXTRACCION DE AGREGADOS DE CANTERA
02.01.01 EXTRACCION DE AGREGADOS Y LAVADO EN CANTERA M3 3,771.13 16.77
02.01.02 ZARANDEADO DE AGREGADOS EN CANTERA M3 3,771.13 8.22
02.01.03 TRASLADO DE AGREGADOS A OBRA M3 3,771.13 18.94
02.02 EXTRACCION DE PIEDRAS DE CANTERAS
02.02.01 EXTRACCION Y SELECCIÓN DE PIEDRAS DE CANTERA M3 3,517.42 11.81
02.02.02 TRASLADO DE PIEDRAS A OBRA M3 3,517.42 16.53
03 CAPTACION Y SEDIMENTADOR
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 815.20 2.78
03.02 MOVIMIENTO DE TIERRAS
03.02.01 LIMPIEZA EN ZONA DE CAPTACION - SEDIMENTADOR M2 815.20 0.67
03.02.02 ENCAUSAMIENTO DE RIO M 70.00 23.37
03.03 MANTENIMIENTO DE COMPUERTAS
03.03.01 MANTENIMIENTO DE COMPUERTAS METALICAS TIPO I UND. 1.00 1,634.20
03.03.02 MANTENIMIENTO DE COMPUERTAS METALICAS TIPO II UND. 1.00 1,434.20
04 CANAL PRINCIPAL
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA Y DESBROCE DEL CANAL M 13,875.89 0.47
04.01.02 TRAZO Y REPLANTEO INICIAL EN CANAL M 13,875.89 1.56
TRAZO Y REPLANTEO DURANTE EL PROCESO DE
04.01.03 M 13,875.89 1.93
CONSTRUCCION
04.02 MOVIMIENTO DE TIERRAS
04.02.01 LIMPIEZA DE DERRUMBES EN CANAL M3 150.00 46.74
04.02.02 PERFILADO DE CAJA CANAL EN MATERIAL SUELTO M2 11,470.42 1.27
04.02.03 PERFILADO DE CAJA CANAL EN MATERIAL SEMI ROCOSO M2 9,484.85 2.02
04.02.04 PERFILADO DE CAJA CANAL EN MATERIAL ROCOSO M2 13,117.06 3.36
04.02.05 RELLENO Y COMPACTACION CON MATERIAL PROPIO M2 515.20 8.77
04.02.06 RETIRO DE ENROCADO EXISTENTE EN MUROS DE CANAL M3 2,156.30 16.83
04.02.07 DEMOLICION DE MUROS DE CONCRETO EXISTENTE M3 189.06 63.56
04.02.08 RETIRO DE BOLSAS DE PIEDRA EN CANAL M3 100.00 23.83
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE CANAL M3 650.24 8.39
04.03 OBRAS DE CONCRETO
ENROCADO Y EMBOQUILLADO DE CONCRETO EN MUROS
04.03.01 M2 43,967.71 14.70
DE CANAL
04.03.02 CONCRETO F'C=140 KG/CM2 M3 3,331.45 229.93
04.03.03 ENCOFRADO Y DESENCOFRADO M2 6,998.73 21.46
04.03.04 ENLUCIDO EN MUROS DE CANAL M2 44,419.39 7.91
04.04 JUNTAS DE DILATACION
04.04.01 JUNTAS DE DILATACION ASFALTICAS M 17,767.76 5.56
05 TOMAS LATERALES
05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 14.70 2.66
05.01.02 DEMOLICION DE TOMAS EXISTENTES UND. 4.00 961.61
05.02 MOVIMIENTOS DE TIERRAS
LIMPIEZA DESBROCE Y ELIMINACION DE MATERIAL
05.02.01 M2 9.19 18.60
EXISTENTE
EXCAVACION DE CAJA DE CANAL EN MATERIAL SUELTO A
05.02.02 M3 9.19 29.30
MANO
EXCAVACION DE CAJA DE CANAL EN ROCA SUELTO A
05.02.03 M3 5.70 36.92
MANO
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 CONCRETO F'C=140 KG/CM2 M3 1.88 249.86
05.03.02 CONCRETO F'C=175 KG/CM2 M3 9.28 282.34
05.03.03 CONCRETO F'C=210 KG/CM2 M3 0.61 315.85
05.03.04 ACERO F'Y=4200 KG/CM2 KG 14.12 5.13
05.03.05 ENCOFRADO Y DESENCOFRADO M2 43.20 21.46
05.04 VARIOS
05.04.01 TARRAJEO CON MORTERO CEMENTO ARENA 1:4 M2 21.60 27.17
05.04.02 COMPUERTA EN PLANCHA METALICA DE 1/8" UND. 4.00 1,024.58
05.05 JUNTAS Y SELLOS
05.05.01 JUNTAS ASFALTICAS M 603.01 3.13
06 REFACCIONES
06.01 REPARACION DE FORADOS EN CANAL REVESTIDO M3 0.21 249.86
06.02 REPARACION DE PAÑOS DAÑADOS M3 0.03 249.86
06.03 MEJORAMIENTO DE MURO LATERAL GLB. 1.00 30.00
06.04 MEJORAMIENTO DE TALUD EN MAL ESTADO GLB. 1.00 30.00
06.05 DERRUMBE EN CANAL M3 7.20 8.97
06.06 REFACCION DE DE FISURA DEL CANAL M 1.20 18.31
06.07 MANTENIMIENTO DEL CANAL M 10.00 0.26
06.08 REPARACION DE COMPUERTAS UND. 2.00 50.49
RELLENO DE PAREDES DEL CANAL CON MATERIAL
06.09 M3 182.40 44.87
PROPIO
07 CONTROL DE CALIDAD - CONCRETO
07.01 ENSAYO A LA COMPRESION DE CONCRETO GLB. 56.00 25.00
07.02 DISEÑO DE MEZCLAS GLB. 2.00 250.00
08 FLETE TERRESTRE
08.01 FLETE TERRESTRE GLB. 1.00 112,330.05
08.02 FLETE TERRESTRE A PIE DE OBRA GLB. 1.00 23,910.00
09 CAPACITACION EN SISTEMA DE RIEGO
09.01 CAPACITACION EN SISTEMA DE RIEGO GLB. 1.00 6,400.00
10 MITIGACION DE IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL EN ZONAS DEL
10.01 GLB. 1.00 8,600.00
PROYECTO

COSTO DIRECTO
GASTOS GENERALES (10% CD)
SUB TOTAL
SUPERVISION DE OBRA (5% CD)
TOTAL PRESUPUESTO

EXISTE UN ERROR EN LA PARTIDA DE L PRESUPUESTO EN LA MULTIPLICACION DICE DEBE DECIR


VALORIZACION FINAL DE OBRA

DIAS REAL DE EJECUCION


RETRASO DE EJECUCION DE OBRA
PEDIDO DE AMPLIACION DE PLAZO

AVANCES
ESUPUESTO
ANTERIOR ACTUAL ACUMULADO
Valoriz. Valoriz.
Presup. Metr. Metr. Metr. Valoriz.
S/. S/.

1,800.00 0.00 0.00 4.00 1,800.00 4.00 1,800.00


1,800.00 0.00 0.00 4.00 1,800.00 4.00 1,800.00
1,061.64 0.00 0.00 1.00 1,061.64 1.00 1,061.64
8,500.00 0.00 0.00 1.00 8,500.00 1.00 8,500.00

63,241.85 0.00 0.00 3,771.00 63,239.67 3,771.00 63,239.67


30,998.69 0.00 0.00 3,771.00 30,997.62 3,771.00 30,997.62
71,425.20 0.00 0.00 3,771.00 71,422.74 3,771.00 71,422.74

41,540.73 0.00 0.00 3,517.42 41,540.73 3,517.42 41,540.73


58,142.95 0.00 0.00 3,517.42 58,142.95 3,517.42 58,142.95

2,266.26 0.00 0.00 815.20 2,266.26 815.20 2,266.26

546.18 0.00 0.00 815.20 546.18 815.20 546.18


1,635.90 0.00 0.00 70.00 1,635.90 70.00 1,635.90

1,634.20 0.00 0.00 1.00 1,634.20 1.00 1,634.20


1,434.20 0.00 0.00 1.00 1,434.20 1.00 1,434.20

6,521.67 0.00 0.00 11,290.00 5,306.30 11,290.00 5,306.30


21,646.39 0.00 0.00 13,875.89 21,646.39 13,875.89 21,646.39
26,780.47 0.00 0.00 11,290.00 21,789.70 11,290.00 21,789.70

7,011.00 0.00 0.00 150.00 7,011.00 150.00 7,011.00


14,567.43 0.00 0.00 11,470.00 14,566.90 11,470.00 14,566.90
19,159.40 0.00 0.00 9,484.85 19,159.40 9,484.85 19,159.40
44,274.92 0.00 0.00 12,120.00 40,723.20 12,120.00 40,723.20
4,518.30 0.00 0.00 515.20 4,518.30 515.20 4,518.30
36,290.53 0.00 0.00 2,156.30 36,290.53 2,156.30 36,290.53
12,016.65 0.00 0.00 189.06 12,016.65 189.06 12,016.65
2,383.00 0.00 0.00 100.00 2,383.00 100.00 2,383.00
5,455.51 0.00 0.00 650.24 5,455.51 650.24 5,455.51

646,325.34 0.00 0.00 38,220.00 561,834.00 38,220.00 561,834.00


766,000.30 0.00 0.00 2,880.00 662,198.40 2,880.00 662,198.40
150,192.75 0.00 0.00 6,565.48 140,895.20 6,565.48 140,895.20
351,357.37 0.00 0.00 38,511.39 304,625.09 38,511.39 304,625.09

98,788.75 0.00 0.00 15,700.00 87,292.00 15,700.00 87,292.00

39.10 0.00 0.00 14.70 39.10 14.70 39.10


3,846.44 0.00 0.00 4.00 3,846.44 4.00 3,846.44

170.93 0.00 0.00 9.19 170.93 9.19 170.93

269.27 0.00 0.00 9.19 269.27 9.19 269.27

210.44 0.00 0.00 5.70 210.44 5.70 210.44

469.74 0.00 0.00 1.88 469.74 1.88 469.74


2,620.12 0.00 0.00 9.28 2,620.12 9.28 2,620.12
192.67 0.00 0.00 0.61 192.67 0.61 192.67
72.44 0.00 0.00 14.12 72.44 14.12 72.44
927.07 0.00 0.00 43.20 927.07 43.20 927.07

586.87 0.00 0.00 21.60 586.87 21.60 586.87


4,098.32 0.00 0.00 4.00 4,098.32 4.00 4,098.32

1,887.42 0.00 0.00 0.00 0.00 0.00 0.00

52.47 0.00 0.00 0.00 0.00 0.00 0.00


7.50 0.00 0.00 0.00 0.00 0.00 0.00
30.00 0.00 0.00 0.00 0.00 0.00 0.00
30.00 0.00 0.00 0.00 0.00 0.00 0.00
64.58 0.00 0.00 0.00 0.00 0.00 0.00
21.97 0.00 0.00 0.00 0.00 0.00 0.00
2.60 0.00 0.00 0.00 0.00 0.00 0.00
100.98 0.00 0.00 0.00 0.00 0.00 0.00
8,184.29 0.00 0.00 182.40 8,184.29 182.40 8,184.29

1,400.00 0.00 0.00 56.00 1,400.00 56.00 1,400.00


500.00 0.00 0.00 2.00 500.00 2.00 500.00

112,330.05 0.00 0.00 1.00 112,330.05 1.00 112,330.05


23,910.00 0.00 0.00 0.97 23,192.70 0.97 23,192.70

6,400.00 0.00 0.00 1.00 6,400.00 1.00 6,400.00


8,600.00 0.00 0.00 0.79 6,794.00 0.79 6,794.00

2,676,342.85 0.00 2,406,038.11 2,406,038.11


267,634.29 0.00 240,603.81 240,603.81
2,943,977.14 0.00 2,646,641.92 2,646,641.92
133,817.14 0.00 120,301.91 120,301.91
3,077,794.28 0.00 0.00% 2,766,943.83 89.90% 2,766,943.83

ACION DICE DEBE DECIR , POR LO QUE EN LA VALORIZACION SE ESTA CONSIDERANDO ESTE ERROR
: 453 DIAS CALENDARIOS
CION DE OBRA : 333 DIAS CALENDARIOS
ACION DE PLAZO : SIN APROBACION

SALDO
ULADO
% Metr. Valoriz. %

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00

100.00 0.13 2.18 0.00


100.00 0.13 1.07 0.00
0.00 0.13 2.46 100.00

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00

81.36 2,585.89 1,215.37 18.64


100.00 0.00 0.00 0.00
81.36 2,585.89 4,990.77 18.64

100.00 0.00 0.00 0.00


100.00 0.42 0.53 0.00
100.00 0.00 0.00 0.00
92.40 1,057.06 3,551.72 7.60 44,274.92
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00

86.93 5,747.71 84,491.34 13.07


86.45 451.45 103,801.90 13.55
93.81 433.25 9,297.55 6.19
86.70 5,908.00 46,732.28 13.30

88.36 2,067.76 11,496.75 11.64

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00
100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00

0.00 603.01 1,887.42 100.00

0.00 0.21 52.47 100.00


0.00 0.03 7.50 100.00
0.00 1.00 30.00 100.00
0.00 1.00 30.00 100.00
0.00 7.20 64.58 100.00
0.00 1.20 21.97 100.00
0.00 10.00 2.60 100.00
0.00 2.00 100.98 100.00
100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00

100.00 0.00 0.00 0.00


97.00 0.03 717.30 3.00

100.00 0.00 0.00 0.00


79.00 0.21 1,806.00 21.00

270,304.74
27,030.47
297,335.21
13,515.24
89.90% 310,850.45 10.10%