Vous êtes sur la page 1sur 7

Contract No: EFW – DEMS 15-2018

Contract Name: RESTORATION OF OLD GERMISTON FIRE STATION.

Client: EKURHULENI METROPOLITAN MUNICIPALITY

1. Project overview

Site handover date : 27 March 2018

Original contract period : 8 Months

Original completion date : 27 November 2018

Revised completion date : None

Estimated final contract value VAT inclusive : R 13 103 608.9

2. Project Contacts

No.

Company

Profession/ Department:

Name:

Contact No:

Email Address:

1.

City of Ekurhuleni:

DEMS; Project Manager

Emmanuel Hankanga

011 999 1479

emmanuel.hankanga@ekurhuleni.gov.za
City of Ekurhuleni:

DEMS

Lawrence Makofane

011 999 1804

Lawrence.makofane2@ekurhuleni.gov.za

City of Ekurhuleni: DEMS

Khodani Neduvhuledza

011 999 1803

Khodani.neduvhuledza@ekurhuleni.gov.za

City of Ekurhuleni:

EPMO

Kabelo Makgaka

011 999 1008

Kabelo.makgaka@ekurhuleni.gov.za

4. Professional Team

5.

Anderson Vogt Consulting

Principal Agent

Sheevan Bemram

071 871 0820

sheevan@andersonvogt.co.za
Anderson Vogt Consulting Principal Agent Boipelo Masibi 011 609 2425
boipelo.m@ndersonvogt.co.za

6. Kriel & Bismilla Quantity Surveyors Quantity Surveyors Ridwaan Ismail


082 321 3329 nawaaz@iafrica.com

9.

Construction Team

10.

Enigma B.E

Project Director

Simo Myeza

083 456 3831

info@enigmabe.co.za

Enigma B.E

Project Director

Buhle Myeza

071 871 1814

projects@enigmabe.co.za

11.

Enigma B.E

Contracts Management

Tshifhiwa Tshibubudze

076 186 0201


tt@enigmabe.co.za

Enigma B.E

Site Agent

Nqaba Ncube

079 356 7937

Enigma B.E

Site Foreman

Sello Motseki

Enigma B E

OHS Rep

Phumudzo Latane

12.

Enigma B.E

QuantitySurveyor

Calvin L. Ushe

084 808 2009

calvin@enigmabe.co.za

Enigma B.E

Procurement

Konie Tshibalo

073 018 9886


konie@enigmabe.co.za

Enigma B.E

Admin

Thabile Mbuyise

admin@enigmabe.co.za

Enigma B.E

Health & Safety Rep

Phumudzo Latane

3. Technical Organogram

4. Schedule of Planned Activities as per the Construction Programme


• Construction of Brickwalls on the first floor

• Plastering

• Layer Works

• Paving

• Shop drawings for Steel Staircase upon approval

• Repair of Doors

• Fencing

5. Construction Programme

Item Task Name %ge Complete

Restoration of Old Germiston Fire Station

1 Site handover 100%

2 Site Establishment 80%

External Works

3 Removal of Existing Tar Paved areas and Concrete Kerbs 100%

4 Removal of Existing Steel Palisade Fences 100%

5 Foundation underpinning 35%

6 Site Clearance and Stripping topsoil 100%

7 Layer Works 15%

8 Installation of Pavers 0%

9 Landscaping 0%

10 Outside painting 35%

Building Works 40%

11 Vacation of Existing Building 40%

Alterations to Existing Building

Ground Floor
12 Demolition of Generator room 100%

13 Removal of Existing Generator 100%

14 Hacking off and removal of existing floor coverings 0%