Vous êtes sur la page 1sur 1

S-02

S-02
1 2 3 4 5 6 7

1 2 3 4 5 6 7

25,400
MANHOLE
D-02
200 10,000 8,200 6,800 200
GENERAL NOTES
+3,000

200 7,000 3,000 200 8,000 200 6,600 200 25,400 1. ALL dimensions are in mm unless
7,200 3,100 2,900 200 5,000 200 6,600 200 stated otherwise
200
2. ALL detailing e.g D-02 to be referred to
Down pipe Down pipe

Down pipe
Down pipe
Down pipe

A A
R 500

200

200
R 500 R 500 R 500 R 500

A R 3,500
A
the detail sheet.

200

200
3. Remove all black cotton soil.
Gullige

3,900
+3,000

3,000 3,000 3,000 R 2,000

200 2100
CLUB
BAR COUNTER
CLUB
R 2,000
4. Foundation depth to be determined on

4,800
site.
Effluent pipe

4,800
6,900
+3,000

1,500
+3,000

R 3,500 +3,000 +3,000

5. Curtain walls to be erected correctly

6,900
11350

Down pipe
R 3,500
R 500

PARKING LOT

B B
CLUB
during construction.

200
2,900
CLUB

6. Provide antitermite treatment under


Gullige Gullige Gullige

B B

S-01

200
base slab.
2,800
3,600 1,200 200 2,000 200 2,800 200

S-01

1,800
200

2,800
7. All masonry to be reinforced with hoop
C C
R 500 GENTS CHANGING ROOM

800
Down pipe

500
200 4,800 200

iron after two alternate courses.


1,600 1,000 100 2,100
D D 1,000 800 200 4,600 200

3,000
3,350

500

300
8.ONLY figured dimensions to be readm
DOWN
UP

200
D D
1
10 2 +3,000

No scaling to be done.
9 DOWN
UP

1,500
3
GENERATOR ROOM 1
200
3770
500
8

5590
10

3,700
4
WASHROOMS
100 100
2

2,500
Gullige

10G x 310
10R x 170
400 300 100
5
9

9. ALL reinforcements to be checked as


1,300 100 1,200 100 1,100 100 900
3

10G x 350

9,800
10R x 150
6 200 900 900 900 900 200 LADIES CHANGING ROOM
22,200

22,200
LIFT 8 4
COLDROOM&STORE

HALLWAY

1,000
7
Effluent pipe
5 7

10G x 310
10R x 170
STAIRCASE Gullige
5
MANHOLE
LIFT STAIRCASE

per Structural Engineer's details


MANHOLE
1,250

10G x 350
10R x 150
8
4 6

22,200
6

22,200
8,000
9
200 2,000 200 2,800 200

200
7
3

3,000
10 5
8

10. Plumbing, electrical and mechanical


2
100

WASHROOMS 4

200

200
DOWN
9
1 +3,000

200 2,800 200


3
UP 10
2

to be as per Respective technician's


1,300 100 1,200 100 1,100 100
S-03 S-03
DOWN KITCHEN

100 900
1

S-01
UP
100

100 1,300
2,800

2,700

3,802

3,802
PARKING LOT
100 100 200
S-03 S-03
400 900 1,200 900 900 200 +3,000

details.
500

S-01
100

3,000

150 150
Down pipe
Down pipe

F F
5,000
100

100
R 500 R 500 R 500

200
F
3,900 1,200
RECEPTION

200

200
2,900
Gullige

R 350
DINING HALL KITCHEN

3,000

4,798
+3,000

6,900
6,800

100

Gullige

R 3,500 R 3,500

6,800
R 3,500 R 3,500

DINING HALL +3,000

DINING HALL
Gullige +3,000

+3,000

3,000
1,800 200

200
800
1,000
G Down pipe
R 5,000
G R 500
4,125 R 500 COUNTER R 500
200

200
+1,500
±0
Down pipe
Down pipe
Down pipe Down pipe

R 5,000
G

200

200
+3,000

5,000 200 875 4,125 200 5,900 2,100 200 6,600 200
200 5,000 200 8,000 200
DINING HALL

25,400

25,400

1 2 3 4 5 6 7

1 2 3 4 5 6 7
S-02

S-02
0. BASEMENT PARKING FLOOR PLAN 1:200

1. TYPICAL UPPER FLOORS 1:200 MICHELLE NYONGESA


DIP CIVIL ENGINEERING
G F D C B A

KABETE NATIONAL
7 6 5 4 3 2 1

POLYTECHNIC
DCE/775/09/2015

FINAL PROJECT
(ARCHITECTURAL)
Drawing Name
BASEMENT PARKING FLOOR
East Elevation 1:200 North Elevation 1:200 PLAN, TYPICAL UPPER
FLOORS, East Elevation, North
Elevation, South Elevation,
West Elevation
1 2 3 4 5 6 7

Drawing Status
A B C D F G

Q3
Modified by Date
ENG MICHELLE 26/05/2018

Checked by
Date

Drawing Scale
1:200
Layout ID Revision

South Elevation 1:200 West Elevation 1:200

GSPublisherVersion 0.9.100.100

Vous aimerez peut-être aussi