Académique Documents
Professionnel Documents
Culture Documents
Schedule T1A: Particulars of ACSR "Drake" 795 MCM Conductor Only input in pink cells
Al: 26
Component of stranded wires (Nos)
St: 7
Particulars of ACSR "Drake" Conductor
Structure of Conductor:
- Centre: steel strands (Nos/Dia.) 1/3.454
- Layer 1: steel strands (Nos/Dia.) 6/3.454
- Layer 2: aluminium strands (Nos/Dia.) 10/3.456
- Layer 3: aluminium strands (Nos/Dia.) 16/3.456
- Inner layer 10 ~ 16
- Outer layer 10 ~ 14
Type of grease
Calculated long term current rating for 40°C ambient temperature, 75°C maximum
conductor temperature, 100m elevation, 1200 W/m 2 solar radiation, 0.5 emissivity, 0.5
absorption and:
mm
mm
mm
MPa
%
Ω/km
mm
MPa
%
Unit Comments
g/m2
No
Unit Comments
No/mm
No/mm
No/mm
No/mm
times
times
times
mm2
mm2
mm2
mm
kA
kA2s
kg/km
kg/km
°C
kN
Unit Comments
GPa
deg C
Ω/km
t
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T1B: Particulars of Alternate Conductor Only input in pink cells
The schedule below is indicative of the level of detail required from the Tenderer in completing this schedule for the alternate
conductor nominated.
Structure of Conductor:
- Centre: steel strands (Nos/Dia.)
- Layer 1: steel strands (Nos/Dia.)
- Layer 2: aluminium strands (Nos/Dia.)
- Layer 3: aluminium strands (Nos/Dia.)
- Inner layer
- Outer layer
Particulars of Alternate Conductor
Method of grease
Type of grease
Modulus of elasticity
Calculated long term current rating for 40°C ambient temperature, 75°C maximum
conductor temperature, 100m elevation, 1200 W/m 2 solar radiation, 0.5 emissivity, 0.5
absorption and:
mm
mm
mm
MPa
%
Ω/km
mm
MPa
Unit Comments
g/m2
No
No/mm
No/mm
No/mm
No/mm
times
times
times
Unit Comments
mm2
mm2
mm2
mm
kA
kA2s
kg/km
kg/km
°C
kN
GPa
deg C
Ω/km
t
Unit Comments
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T2: Particulars of Insulators and Conductor Fittings
Tenderer's Name:
Item Required
Insulator Units
Manufacturer
Country of origin
- Suspension 210
- Tension 300
- Tension 505
- Suspension
- Tension
Mass of unit:
- Suspension
- Tension
- Suspension 130
- Tension 130
Coupling size:
- Suspension 20
- Tension 24
Overall length of complete assembly from centre of conductor to tower attachment point
Overall length of complete assembly from centre of conductor to tower attachment point
Conductor Fittings
Item Required
Vibration Dampers
Type
Manufacturer
Country of manufacture
- Weight
- Messenger cable
Weight
- [400m]
- [450m]
- [Add rows as necessary]
Distance from dead end or suspension clamp to first damper
Spacer Damper
Type
Manufacturer
Country of manufacture
- Clamp
- Body
Weight
Test results and calculations to support recommendations for spacer damper placement
Compression Joints
Conductor mid-span:
- Manufacturer
- Materials
- Manufacturer
- Materials
- Manufacturer
- Materials
[Please Complete]
mm
mm
kN
kN
mm
mm
mm
mm
kg
kg
kV
kV
mm
mm
mm
kg
deg
mm
mm
mm
kg
mm
kg
mm
mm
kg
mm
mm
mm
Nm
mm
mm
kg
mm
Nm
mm
m
kN
kN
kN
kN
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T3: Particulars of OPGW Ground Wire and Fittings Only input in pink cells
OPGW Fibres
Type of optical fibre Single Mode
Cladding material
Coating-cladding concentricity 12
Attenuation coefficient:
- 1310 nm 0.4
- 1550 nm 0.35
Minimum bending radius of coated optical fibre under tension (0.1% strain)
Country of manufacture
AA: 12
Component of stranded wires (Nos) ACS: 6
SUS Tube:1
Weight 483
Type of grease
Lay ratio:
- 1st layer 16 ~ 26
- 2nd layer 10 ~ 16
Vibration Dampers
Type of damper
Manufacturer
Materials
Number of dampers per span end for range of span lengths (Tenderer to nominate span
lengths in meters):
- [400m]
- [450m]
- [Add rows as necessary]
Distance from dead end or suspension clamp to first damper
Suspension Assembly
Manufacturer of suspension unit
Tension Assembly
Manufacturer of tension unit
Downlead Clamp
Manufacturer of downlead clamp
Joint Boxes
Joint box manufacturer
Manufacturer's type
Country of manufacture
Splice capacity
Fibre optic splicing unit with carry case, tools, leads rechargeable battery and charger
Fibre optic toolkit including jacket stripper, fibre holder and precision cleaving tool
mm
MPa
%
Ω/km
mm
MPa
%
Ω/km
µm
µm
µm
µm
%
µm
µm
dB/km
dB/km
nm
nm
ps/nm2.km
dB
dB
mm
mm
°C
mm2
mm2
mm
mm3
mm
kg/km
kN
GPa
deg C
mm
mm
mm
kN/mm
kA
kA2s
deg C
deg C
Ω/km
kg/km
°C
kN
kN
kg
Unit Comments
mm
mm
mm
kN
kN
kg
mm
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T4: Particulars of Towers
Tenderer's Name:
Item A (Suspension)
Tower
Nominal span
Weight span:
- Minimum tension
- Maximum tension
OPGW earth conductor maximum shielding angle from vertical at tower attachment point over line conductors
- Bottom - middle
- Middle - top
- top - OPGW
Minimum height of conductor above ground at point of support for standard height tower ± 0
Height of bottom crossarm above ground level for standard height tower ± 0
- Bottom
- Middle
- Top
Total mass of tower structure for various tower body extensions (including legs):
- 2 meter reduced
- 1 meter reduced
- 1 meter extended
- 2 meter extended
- 3 meter extended
PLS Tower calculations file (i.e. compression/uplift load per foundation, overturning moments, etc.)
Quality of Tower Materials
Item Required
- Grade Fe 360 B
- Elongation on breaking
- Grade SS 540
- Elongation on breaking
- Grade Q 235
- Elongation on breaking
- Yield point as percentage of breaking stress
- Grade C62D
[Please Complete]
degree
degree
m
( )W x ( )D ( )W x ( )D ( )W x ( )D ( )W x ( )D ( )W x ( )D mxm
( )W x ( )D ( )W x ( )D ( )W x ( )D ( )W x ( )D ( )W x ( )D mxm
mm
mm
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
Guaranteed by
Unit Comments
Tenderer
N/mm2
N/mm2
N/mm2
N/mm2
N/mm2
N/mm2
%
%
g/m2
g/m2
µm
µm
Comments
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T5: Particulars of Foundations Only input in pink cells
Foundations
Assumed density of earth resisting uplift
Assumed ultimate earth pressure for standard foundation under specified loadings
Ultimate lateral earth pressure, including factor of safety for chimney design
Density of backfill
Minimum portion of stub loads to be allowed for in the design of stub cleats
Foundation Design Particulars
Mass Foundation
Base size and depth for footing ( )L ( )W ( )D ( )L ( )W ( )D
Volume of excavation per footing
Drilled Shaft
Type of casing proposed (if required)
Pile Foundation
Type of piling proposed
Diameter of pile
Depth of pile
Pile material
Pile volume
Pile weight
Rock Anchor
Type of rock anchor proposed
kg/m2
degree
kg/m2
kg/m2
kPa
MPa
kPa
MPa
kg/m2
%
Special Usage Tower (i.e.
C (Tension) D/DE (Dead End) T (Transposition) Unit
river crossing)
( )L ( )W ( )D ( )L ( )W ( )D ( )L ( )W ( )D ( )L ( )W ( )D mxmxm
m3
m3
kg
mm
m3
m3
kg
mm
m3
m3
kg
m3
kg
m3
m3
kg
Comments
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T6: Particulars of Tower Earthing System
Item
Cross-section
3.5 mm
mm2
Clamp
3 m
16 mm
Clamp
mm2
Clamp
Copper clad steel wires
3.5 mm
mm2
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T7: Site Organisation and Construction Equipment
Tenderer's Name:
Item Number
Mechanical excavators
Concrete mixers
Foundation templates
Vibrators
Water pumps
Sets of tower erection gear including derricks, motorised winches and all ancillary tools and equipment
- ACSR conductors
- ACSR conductors
Drum stands
- ACSR conductors
- Railway crossing
- Number of camps
- Proposed location
[Please Complete]
Fabrication
Tower tests
Insulators
Conductor
OPGW
Factors of Safety
Item
Towers
Normal operating conditions
Maintenance conditions
- Still air, everyday temperature, final tension based on ultimate nominal breaking load (normal line + river crossing)
- Anchor clamps and mid-span joints based on conductor ultimate nominal breaking load
OPGW:
- Still air, every day temperature, final tension based on ultimate nominal breaking load for normal line
- Still air, every day temperature, final tension based on ultimate nominal breaking load for river crossing
1.75
1.5
2.5
4.5
0.95
2.5
5.7
0.95
3
Kanbauk Integrated Gas to Power Project - Transmission Line Facility
Schedule T11: List of Deviations from Specification
[Please Complete]