Académique Documents
Professionnel Documents
Culture Documents
+917908795083
ankush8330@gmail.com +918348695660
Profile:
Worked as a Project Leader for the installation & commissioning of rotating equipment
including Booster gas compressors (Waukesha L7042 & 7044 GSI driving Ariel JGK4) at
Crain Vedanta Oil & Gas Limited. I also involved for maintenance of rotating equipment’s
installed in Cairn Vedanta Oil & Gas Limited Plant.
My experience in supervision of rotary equipment suits well in Oil and Gas sector, Power
plants and Rotary equipment manufacturing companies.
Credentials:
Experience Details:
Presently working as Field service Engineer/ Supervisor for the Project of Cairn Vedanta
Oil & Gas Limited from June-2017.
Cairn Oil & Gas Vedanta Limited operates around 27 percent of India’s domestic crude oil
production in 2015-16.
Responsibilities:
Page 1 of 4
Co-ordination and supervision of field Engineers and Technicians.
Preventive and Predictive Maintenance program set up and execution
Preparing Scope of Works (SOW), Schedule of Rates (SOR) documents for the
works related to maintenance activities and material.
Involved in HAZOP analysis during the procurement stage of major rotating and
static equipment.
Monitored QC related matters which included material tractability, site inspection,
certification, leak test packages and punch list of all rotating equipments.
Reporting recurring defects on Mechanical Equipment and Provide
recommendations on spare parts requirement, to secure the most reliable
operation and economic level of maintenance.
Worked as Field Service Engineer for CBM Project of Great Eastern Energy
Corporation Limited from June’ 2015 to May 2017.
Page 2 of 4
etc which incorporates different types of gas engines viz. :-Caterpillar, Waukesha,
etc. Planning for preventive maintenance of the machines under control.
Planning, coordinating, and Monitoring the Operations and Mechanical Maintenance
activities within the CNG Business Group.
To ensure that all the rotating and static equipment are maintained, improved and
replaced for optimum availability to meet the requirements.
To plan and coordinate Mechanical Maintenance activities with other departments and
sections.
In charge of in-house rebuilding Workshop.
To conduct root cause analysis of equipment failures and non-scheduled shutdowns
and recommend problem resolutions.
To ensure effective utilization of the Maximum system in managing Maintenance and
Breakdown activities.
To ensure that all the required material, spares, consumables and tools are of the
right quality and quantity and available on a continuous basis.
To enforce the implementation of Company Health, Safety and Environment
Management System (HSE-MS).
To ensure all the Maintenance activities are carried out in line with the requirements
outlined by the COMPANY system.
Working on high-pressure inflammable gas lines (pressure range 4-250 bar) with
necessary fire & safety precautions.
Responsible for managing a platform to work, for various departments of
company and consultants e.g. permit issuance for Civil/ Pipeline/ Firemen/
Instrumentation/ Electrical etc., forming proper communication channel to
minimize breakdown time, releasing field-reports/IOM's to concerning
departments in case of any abnormality in their systems.
Achievements:
Personal Profile:
Page 3 of 4
Declaration:
I here by declare that the information given above is true to the best of my knowledge
and belief.
Page 4 of 4