DOC. NO. REV.

CAPITAL PROJECT
MANAGEMENT
CA-4010GS-CC-001 B

Project : CGS-10 Improvement FEED


Project DATE : 19 March 2014 Page : 1 OF 15

PREP'D Lusyia Octavianti LOP


SIF No. : C10-DS-TEC-SIF-CPI-RWE-0002
CHK'D Purwanto PWT
APP'D Joe F. Cox JFC

CALCULATION FOR
WASH TANK 8107T-0812 FOUNDATION

PT. CHEVRON PACIFIC INDONESIA


PETAPAHAN
Riau, Indonesia

REV DATE PAGES DESCRIPTION PREP'D CHK'D APP'D COMPANY


A 12-Mar-14 ALL ISSUED FOR REVIEW LOP PWT JFC
B 19-Mar-14 ALL ISSUED FOR APPROVAL LOP PWT JFC
CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Tabulation Of Page Revisions


REVISION
PAGE REMARKS
A B 0
1 X
2 X
3 X
4 X X
5 X X
6 X X
7 X X
8 X X
9 X X
10 X X
11 X X
12 X X
13 X X
14 X X
15 X X
16 X

CA-4010GS-CC-001 Rev B Page 2 of 15


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

CALCULATION FOR
WASH TANK 8107T-0812 FOUNDATION

TABLE OF CONTENT Page

1 GENERAL

1.1 Scope……………………………………………………………………………… 4
1.2 Code, Standard, and References…………………………………………………4
1.3 Units…………………………………………………………………………………. 4
1.4 Quality of Materials………………………………………………………………….. 4
1.5 Unit Weight of Materials…………………………………………………………….4

2 ANALYSIS…………………………………………………………………………. 4

3 DETAIL ANALYSIS……………………………………………………………….. 5

3.1 Model……………………………………………………………………………….. 5
3.2 Basic Loading……………………………………………………………………… 6
3.3 Pile Design………………………………………………………………………. 10
3.3.1 Load Combinations………………………………………………………… 10
3.3.2. Capacity of Pile Group…………………………………………………… 10
3.4 Pile Cap Design ………………………………………………………………….. 12

4 CONCLUSION……………………………………………………………………. 15

5 APPENDIX…………………………………………………………………………. 15

APPENDIX-A Pile Group Efficieny Calculation


APPENDIX-B Wash Tank Foundation Drawing

CA-4010GS-CC-001 Rev B Page 2+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

1 GENERAL

1.1 Scope

This document presents the design and calculation for the foundation of Wash Tank 8107T-0812 of CGS-
10 Improvement FEED Project.

1.2 Code, Standard, and References

- ACI - 318/31R - Building Code Requirements for Reinforced Concrete, 1995 edition
- ASCE 7-05
- API-650
- CIV-DU-5009-H Structural Design Criteria
- CIV-PU-4841-C Driven Pile Instalation
- SP-CI-GG-002 Rev 1 General Specification for Civil & Structure
- CA-4010GS-CC-008 Rev B Calculation Sheet of Single Pile Capacity B

1.3 Units
All units are in Metric system

1.4 Quality of Materials


Concrete
for leveling concrete, fc' = 141 kg/cm2 = 2000 psi
for structural concrete, fc' = 211 kg/cm2 = 3000 psi
Where
fc' = Compression strength of concrete
Steel reinforcement bar ASTM A615 grade 60 or SNI BJTD 40
yield strength of re-bar, fy = 4,200 kg/cm2
Modulus of elasticity
concrete, Ec = 8.28E+05 kg/cm2
steel, Es = 2.90E+07 kg/cm2
Pile Capacity (CA-4010GS-CC-008 Rev B Calculation Sheet of Single Pile Capacity,CPT S-6)include Pile Group Efisie
Pile Group Efisiensi
Dia. Length Axial Compression Axial Tension Lateral
Permanent Temporary Permanent Temporary Fixed Head
Permanent Temporary
(inch) (m) (T) (T) (T) (T) (T) (T)
12 10.40 22.87 30.42 12.18 16.20 1.04 1.39

P axial compression allowable due to soil = 22.87 T


Use P axial compression = 22.87 T
B

1.5 Unit Weight of Material


- Reinforced concrete = 2.40 T/m3
- Lean concrete = 2.20 T/m3
- Steel = 7.85 T/m3
- Soil = 1.765 T/m3 refer to Soil Investigation Report
- Water = 1.00 T/m3

2 ANALYSIS
Stability check due to unfactored loading combinations is used for pile design. Factored loading
combinations are subsequenly used for reinforced concrete design.
CA-4010GS-CC-001 Rev B Page 3+1 of 16
CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

3 DETAIL ANALYSIS

3.1 Model

Rp ep
bp

dia tank

SECTION A - A

ttank
A A
Wash tank 10

htank = 4.27 m
dia tank = 7.01 m

See Appendix-B for Tank Details & Pile Arrangement Drawing

TRY
Dia. Pile, D = 0.3048 m (NPS 12") Slab diameter :
dc1
unit weigth of a pile = 0.074 T/m Slab diameter, Ds = 7.92 m
weight of a pile = 0.77 T
d cap d
Pile spacing, s = 1.3e m
Tributary area of pile cap, Ap = 1.690 m2

de/2 dc2
dp = 0.05 m pile
d = 0.80 m
dc1 = cover concrete thickness reinforcement
= 0.05 m
dc2 = cover concrete thickness
= 0.15 m
de = Effective thickness of pile cap
= d - dc1-dc2-0.5xD
= 0.61 m
ep = 12.50 m
D= 19 mm

CA-4010GS-CC-001 Rev B Page 4+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

3.2 Basic Loading

Wash Tank 8107T-0812 Data


Tank Diameter = 23'
Shell Height = 14'
Refer from DataSheet Mechanical DS-4010GS-ME-003-A

CA-4010GS-CC-001 Rev B Page 5+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

# Tank type = fixed roof - atmospheric tank


# Max. design liquid, H = 4.27 m
# Nominal tank dia.,D (ID = 7.01 m
# thickness of tank = 10mm 7.02 m
# Liquid specific gravity,G = 1.00 (assumed as water sp.gr)
# Volume of tank, Vo = 164.7 m3
# Volume of tank (thickness) 0.906 m3
# Operating weight, Wo = 332962 lb (info from Mechanical)
= 151.03 T
# Test weight, WT = 419333 lb (Data Sheet Mechanical)
= 190.21 T
# Empty weight, We = 56211 lb (Data Sheet Mechanical)
# Empty weight, We = 25.50
# Operating weight, Do = Wo
= 151.03 T
# Test weight, Dt = WT
= 190.21 T

Foundation Weight ( Ds )
Weight of pile cap & slab :
Wc = Area x d x Unit Weight of Reinforced Concrete
= 0.25 x p x (7.92) x 0.8 x 2.4
= 94.70 T
Weight of foundation :
Ds = Wc
= 94.70 T

Operating Dead Load ( Do )


Operating Dead Load ( Do )
Do = Wo
= 151.03 T
Test Dead Load ( Dt )
Test Dead Load ( Dt )
Dt = Wt
= 190.21 T
Wind Load ( W )
Wind load is calculated in accordance with ASCE 7-05
Basic Wind Speed, V = 85 MPH or 37.9984 m/s
Surface roughness category = C
Directional factor, Kd = 0.95
Exposure coefficients, Kh = 0.9
Topographic Factor, Kht = 1
Importance factor, I = 1
0.613∗𝐾ℎ∗𝐾ℎ𝑡∗𝐾𝑑∗𝑉^2∗�

CA-4010GS-CC-001 Rev B Page 6+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Velocity pressure, qz = 0.613∗𝐾ℎ∗𝐾ℎ𝑡∗𝐾𝑑∗𝑉^2∗�


= 756.76 N/m2
Gust effect factor, G = 0.85
Ratio height per width, u = 0.61
Net force coefficient, Cf = 1.20
Projected area normal to wind, Af = 22.02 m2
Design wind force, Hw =𝑞𝑧∗𝐺∗𝐶𝑓∗𝐴𝑓
= 17,000.0 N

Arm to foundation base, a (HE) = 2.13 m

Overturning moment by wind, Mw = Hw x a


3.63 T-m

Earthquake Load, E
Seismic load is calculated in accordance with API-650

Seismic zone = 2
Seismic zone factor, Z = 0.15
Seismic importance factor, I = 1.00
Site coefficient for soil, S = 1.20
Lateral force coefficient, C1 = 0.60
Diameter to height ratio = D/H
= 1.64
Total weight of tank shell, Ws = p x D x H x Thick x g steel
= 7.388 T
Height from bottom to the shell's c.o.g, Xs 2.134 m
Total weight of tank roof, Wr = 2 x 1/4 p D2 x thickness x g steel
3.030 T
Total height of tank shell, Ht = 4.267 m

CA-4010GS-CC-001 Rev B Page 7+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

CA-4010GS-CC-001 Rev B Page 8+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Coeff. factor, k = 0.60 (see from Figure E-4)


Natural period of 1st sloshing mode, T = k x D0.5
= 2.88 sec
Lateral seismic coefficient, C2 = 0.31

W1/WT

W2/WT

Effective mass tank content weight,W1 = 0.70 WT (see from Figure E-2)
= 106 T

W2.X2

W1.X1

Centroid of W1, X1 = 0.38 H (see from Figure E-3)


= 1.62 m
Eff. mass tank in 1st sloshing,W2 = 0.35 WT (see from Figure E-2)
= 67 T
Centroid of W2, X2 = 0.65 H (see from Figure E-3)
= 2.77 m
Seismic overturning moment on shell bttm, ME = Z.I (C1.Ws.Xs + C1.Wr.Ht + C1.W1.X1 + C2.W2.X2)

CA-4010GS-CC-001 Rev B Page 9+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Seismic overturning moment on shell bttm, ME = 26.67 T-m


Design seismic force, HE = 12.50 T
3.3 Pile Design
3.3.1 Load Combination
Unfactored load combination for pile capacity design:
1. LC 101 = Ds + Do Operating Weight
2. LC 102 = Ds + Dt Test Weight
3. LC 103 = Ds + Do + W Operating Weight + Wind
4. LC 104 = Ds + Do + E Operating Weight + Earthquake

where :
Ds = Selfweight of foundation
Do = Operating dead load (empty weight of equipment + maximum content weight for normal oprtn)
Dt = Test dead load (empty weight of equipment + test weight)
W = Wind load
E = Earthquake load

LOAD COMBINATION
LC # DESCRIPTION
Axial (T) Lateral (T) Moment (T-m)
LC 101 Ds + Do 245.73 - -
LC 102 Ds + Dt 284.91 - -
LC 103 Ds + Do + W 245.73 1.70 3.63
LC 104 Ds + Do + E 245.73 12.50 26.67

B
3.3.2 Capacity of Pile Group
Pile geometry tabulation
Pile ni Xi Yi n i X i2 Xi n iY i2 Yi
Number S ni Xi 2
S n iY i2
(m) (m) ( m2 ) ( 1/m ) (m2 ) ( 1/m )
1 1 -0.80 2.40 0.6 -0.0284 5.8 0.0852
2 1 0.80 2.40 0.6 0.0284 5.8 0.0852
3 1 -2.40 0.80 5.8 -0.0852 0.6 0.0284
4 1 -0.80 0.80 0.6 -0.0284 0.6 0.0284
5 1 0.80 0.80 0.6 0.0284 0.6 0.0284
6 1 2.40 0.80 5.8 0.0852 0.6 0.0284
7 1 -2.40 -0.80 5.8 -0.0852 0.6 -0.0284
8 1 -0.80 -0.80 0.6 -0.0284 0.6 -0.0284
9 1 0.80 -0.80 0.6 0.0284 0.6 -0.0284
10 1 2.40 -0.80 5.8 0.0852 0.6 -0.0284
11 1 -0.80 -2.40 0.6 -0.0284 5.8 -0.0852
12 1 0.80 -2.40 0.6 0.0284 5.8 -0.0852

S ni = 12 S ni Xi2 = 28.2 S ni Yi2 = 28.2

CA-4010GS-CC-001 Rev B Page 10+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

CAPACITY CHECK
PERMANENT
due to axial load (operating load)
Compression B

Fvi = Fa = Ds + Do = 20.48 T < 22.87 ok


S ni
due to Lateral force H, (lateral force due to wind load)
H= 1.70 T
Hi = H / S ni
= 0.14 T < 1.04 ok

due to combine load (operating load and wind load)


Compression
Fvmax = Fa + MOV Xi = 20.80 T < 22.87 ok
S n i X i2
Fvmin = Fa - MOV Xi = 20.20 T < 22.87 ok
S n i X i2

Fvmax = Fa + MOV Yi = 20.80 T < 22.87 ok


S n iY i 2

Fvmin = Fa - MOV Yi = 20.20 T < 22.87 ok


S n iY i2

TEMPORARY
due to Lateral force H, (lateral force due to earthquake load)
H= 12.50 T
Hi = H / S ni
= 1.04 T < 1.39 ok

CA-4010GS-CC-001 Rev B Page 11+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

due to axial load (test load)


Compression
Fvi = Fa = Ds + Dt = 23.74 T < 30.42 ok
S ni

due to combine load (operating load and earthquake load)


Compression
Fvmax = Fa + MOV Xi = 22.80 T < 30.42 ok
S n i X i2
Fvmin = Fa - MOV Xi = 18.20 T < 30.42 ok
S n i X i2

Fvmax = Fa + MOV Yi = 22.80 T < 30.42 ok


S n iY i2
Fvmin = Fa - MOV Yi = 18.20 T < 30.42 ok
S n iY i2

Used diameter of pile 12 inch and depth of penetration is 10m


Total of pile (nos) = 12

3.4 Pile Cap Design

Factored load combination for concrete & foundation design (refer to table 6, CIV-DU-5009-H):
1. LC 201 = 1.4 (Ds + Do) Operating Weight
2. LC 202 = 1.2 (Ds + Do) +
(1.6 W or 1.0 Eo 1,6L Operating Weight + Live Load
3. LC 203 = ) Operating Weight + Wind or Earthquake
4. LC 204 = 0.9 (Ds + De) + 1.6 W Empty Weight + Wind (Wind Uplift Case)
5. LC 205 = 0.9 (Ds + Do) + 1.0Ee Operating Weightc + Earthquake (Uplift Case)
6. LC 206 = 0.9 (Ds + De) + 1.0 Ee Empty Weight + Earthquake (Uplift Case)
7. LC 207 = 0.9 (Ds + Df) + 1.6 Wp Erection Weight + Partial Wind (Uplift Case)
8. LC 208 = 1.4 (Ds + Dt) Test Weight
9. LC 209 = 1.2 (Ds + Dt) + 1.6 Wp Test Weight + Partial Wind

LOAD COMBINATION
LC # DESCRIPTION
Axial (T) Lateral (T) Moment (T-m)
LC 201 1.4 (Ds + Do) 344.03 - -
LC 202 1.2
(1.6(Ds + Do)
W or + 1,6L
1.0 Eo
294.88 - -
LC 203 ) 294.88 12.50 26.67
LC 204 0.9 (Ds + De) + 1.6 W 108.18 2.72 -
LC 205 0.9 (Ds + Do) + 1.0Ee 221.16 12.50 26.67
LC 206 0.9 (Ds + De) + 1.0 Ee 108.18 12.50 26.67
LC 207 0.9 (Ds + Df) + 1.6 Wp 108.18 1.70 3.63
LC 208 1.4 (Ds + Dt) 398.87 - -
LC 209 1.2 (Ds + Dt) + 1.6 Wp 341.89 2.72 5.80

CA-4010GS-CC-001 Rev B Page 12+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Slab Design
Flexural Reinforcement

Reinforcement is designed per b = 1.00 m width of slab


Loading for concrete and foundation design
1. Factored load due to operating load
Fa = 1.4(Ds + Do) = 28.7 T
S ni
2. Factored load due to earthquake load
Fvmax = Fa + MOV Xi = 99.00 T
S ni Xi 2

Fvmax = Fa + MOV Yi = 34.10 T


S niYi 2

Fm = MOV Xi = 70.3 T or
S ni Xi 2

Fm = MOV Yi = 41.7 T
S ni Yi2
1) Fa = 28.67 T 2) Fa = 28.67 T
Fm = 70.33 T+
Total = 99.00 T

Maximum force to be used for concrete design, Pa = 99.00 T


qu due to pile cap = Pa x b T/m
Ap
= 58.58 T/m

Maximum distance center to center pile foundation, s = 1.3000 m

Maximum moment
10
at center of slab, Mu = 0.125 x qu x s2
= 12.375 Tm
f = 0.85
fy = 4,200 kg/cm2 = 412.28 Mpa 412.2804
fc' = 211 kg/cm2 = 20.70 Mpa 5.09 20.704417
Mn = 5.99 Tm 59.93 kn-m
b = 1.00 m 1000 mm
de = 0.61 m 608.7 mm
Rn = Mn = 0.162 Mpa
bd2
Rn = r fy (1-0.59 rfy)
fc'
4844.69 r2 - 412.28r + 0.146 = 0
r = 0.00039
√(𝑓𝑐′)/4𝑓𝑦 bw.d, and not less than 1.4/𝑓𝑦 for Beam and 0.0018 for Slab (ACI
r min = 318R-08 SI unit
= 0.0018
r bal = 0.85 x b x fc' 600
fy 600 + fy
= 0.022
r max = 0.75 x r bal
= 0.016
Reinforcement that use is r = 0.0018

CA-4010GS-CC-001 Rev B Page 13+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Total Area of flexural reinforcement, As req. = r min x b x de


= 10.957 cm2 / m width of cap
Used bar D19 - therefore the area of steel for one bar, As = 2.835 cm2
*D 19 Number of bar = 4
As provided = 11.341 cm2 > As req (10.975 cm2)
Use: D 19 - 200 mm

Shear Reinforcement

Allowable shear strength provided by concrete for slab without reinforcement


bw = 1.00 m
Vc = 2Öfc' * bw * de
= 55.9 T
Maximum shear at edge of pedestal, Vu = 0.5 x qu x s
= 38.077 T
Vu < 0.5 Vc Not OK Used stirrups
so Use D13-200 mm for Stirrups

Punching Shear

de/2 bo (critical section)

Allowable punching shear for slab without reinforcement


bo = p * ( D+de/2 )
= 2.868 m
Vu = 2Öfc' * bo * de
= 160.4 T
FVu = 144.3 T
Vu = 99.00 T < FVu ok

Use minimum for shear reinforcement

CA-4010GS-CC-001 Rev B Page 14+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

4 CONCLUSION
Based on the given condition in the structural analysis, the concrete structure is considered adequate
in meeting with the design criteria

Concrete slab thickness, d = 0.80 m


Reinforcement design D 19 - 200 mm

5 APPENDIX

CA-4010GS-CC-001 Rev B Page 15+1 of 16


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Appendix A

Pile Group Efficiency Calculation


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Pile Group Efficiency

Method : Converse - Labbare Equation

Pile Data :
- Pile length, Lp = 10.40 m
- Shape = Circle
- Size, D = 0.324 m (NPS 12")

Geometric Data :
- Number of columns, m = 4 nos
- Number of rows, n = 4 nos
- Number of pile, Np = 12 nos
- Pile spacing, s = 1.100 m

Result :

1  DD  (degree)
==tan
tan 1   
 LpLp 
- q = 10.78 deg. B

q
= 1=
Eg Eg
 n  n1.m1.m m  m1.n1.n
1q 90 .90
m .n.m .n
- Group efficiency, Eg = 0.82 or 82 %

Refer to CA-4010GS-CC-008 Rev A Calculation Sheet of Single Pile Capacity , therefore the pile
capacity (CPT S-01) : With Group Eff.
- All. Axial compression capacity : Permanent condition = 27.88 T= 22.87 T
Temporary condition = 37.08 T= 30.42 T
- All. Axial tension capacity : Permanent condition = 14.85 T= 12.18 T
Temporary condition = 19.75 T= 16.20 T
- Lateral pile capacity : Permanent condition = 1.27 T= 1.04 T
Temporary condition = 1.69 T= 1.39 T

CA-4010GS-CC-001 Rev B Appendix A-1


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

Appendix B

Wash Tank Foundation Drawing


CGS-10 Improvement FEED Project Calculation for Wash Tank Foundation

CA-4010GS-CC-001 Rev B Appendix B-1