CLIENT PMC SUPERVISION CONSULTANT COST CONSULTANT

YAS SOUTH DEVELOPMENT


SUBJECT/TITLE : Method Statement for General Lifting Works ORIGINATOR : HILALCO

DOCUMENT REF. NO : YSD-P01-0005-PM-HIL-MT-000005 REVISION No. : 00

Sl No. Comments Response

MSRA(Method Statement and Risk Assessment), Toolbox Talk and JSA (Job Safety Analysis)
1 shall be properly understand / communicated to all person involved before work start.SA

Follow the approved format for Risk Assessment as discussed and agreed. Additional
2 column to be included for the Responsible person.

Hilalco to revise the allowable/maximum Wind Speed of 2S knots section 6 of


Methodology.
3 Refer: OSHAD -SF CoP 34.0 Safe use of Lifting Equipment and Lifting accessories,
3.6.6 Wind Speed (e) In all cases employers shall ensure that lifting operation cease when
the recorded wind speed reaches or gusts in excess of 38km/hr (20.5) Knots.

Hilalco shall Include that all heavy equipment vehicle to be use, specially crane having a
4 valid vehicle registration and third party certificates.
Hialalco shall include in the Risk Assessment consider the following general hazards and
risks associated with the use of lifting Equipment and lifting accessories in Section 3.4.3(b)
5 Risk Assessment of OSHAD -SF CoP 34.0 Safe use of Lifting Equipment and Lifting
accessories.
Hilalco's Lifting Permit format to be changes use /follow the approved Lifting Permit
6 Format that has been provided.

Note that Specific Lifting Plan and Risk Assessment had to be provided for Specific
7 kind/type of site activities, and to be forwarded to KBR/Hyder for review prior for
approval.

Template Ref. No.: YSD-GEN-0000-OA-KBR-FO-000058 [01] Page 1 of 3


CLIENT PMC SUPERVISION CONSULTANT COST CONSULTANT

YAS SOUTH DEVELOPMENT


SUBJECT/TITLE : Method Statement for General Lifting Works ORIGINATOR : HILALCO

DOCUMENT REF. NO : YSD-P01-0005-PM-HIL-MT-000005 REVISION No. : 00

Sl No. Comments Response

Template Ref. No.: YSD-GEN-0000-OA-KBR-FO-000058 [01] Page 2 of 3


CLIENT PMC SUPERVISION CONSULTANT COST CONSULTANT

YAS SOUTH DEVELOPMENT


SUBJECT/TITLE : PROJECT QUALITY PLAN (PQP) ORIGINATOR : HILALCO
DOCUMENT REF. NO : YSD-P01-0005-QM-HIL-PL-000001 REVISION NO. : Rev. 00

SI. No. Comments Response


Scope of works to be mentioned completely, not only Infrastructure and Public Realm
24
Construction (many areas)
25 Section 2: Project Document management Procedure should be included in reference
Abbreviation "QA/QC" mentioned in different parts of the PQP; Should be definitive whether it is
26 Team/Manager/Engineer/Inspector

Section 4.7 - Project Weekly & Monthly Quality meetings with Consultants/PMC/Client
27 representative not mentioned

Sections 4.10, 4.11, 4.13, 4.14, 4.16 are general not project specific - All these sections
28 management procedure, Project Numbering systems and Communication protocol

29 Section 5 - PQP should be reviewed/revised minimum once in year

Section 7 - Not only major sub-contractors in the project shall follow the Project Quality
30 Requirements including documentation

31 Appendix C - Cross reference not matching with PQP section numbers

Appendix F - Roles & Responsibilities does not include Construction Manager, HSE Manager,
32 QA/QC Engineer/Inspector, M&P Engineers and Sub-Contractors

Appendix M - Overall scope of works is not considered in developing the method statement list
33 (Dry Stack & Car Park works not considered)

Reviewed/Commented by : Date : 25 January 2017

Template Ref. No.: YSD-GEN-0000-OA-KBR-FO-000058 [01] Page 3 of 3