SUM 6.962
SUM 7.422
2A26 Gym & Warm-up Areas 136,90 141,35 n cost n cost
GYM A 1 350 X 33,6 1848
WARM-UP & STRECHING ZONE 114,00 C 33,75 810 V 10,75 1075
D 78 2.574
F 135,35 1.083
J 105,45 2.953
L 135,35 677
N 105,45 4.745
SUM 16.114
SUM 6.185
SUM 1.519
2A33 Public Common areas (Stairs & Lift) 74,50 218,00 n cost n cost
STAIRS 20,20
LIFT D 57,4 1.894 T 4,37 589,95
INNER STAIRS E 54,2 325
STAIRS F 54,2 434
LIFT L 54,2 271
INNER STAIRS M 10,11 607
J 10,11 283
SUM 4.404
SUM 28.676
SUM 1.878
2A39 Coaches, Staff & Referees Rooms 73,90 610,86 n cost n cost
STAFF LOCKER ROOM A 1 350 N 15,05 677,25
FIGURE SKATING COACHES ROOM B 1 150 P 1 265
DRESSING ROOM REFEREES C 13,92 334 Q 2 300
DRESSING ROOM HOCKEY COACHES 20,80 D 35,37 1.167 R 2 450
E 69,02 414 X 1,2 66
G 60,06 2.703 Y 3,96 336,6
H 14,56 728 Z 2 260
J 17 4.505
SUM 12.706
SUM 7.675
SUM 2.689
2A43 Under seats zone low height 279,15 21,38 n cost n cost
L 351 1.755 B 2 300
C 175,5 4212
SUM 5.967
UNDER SEATS ZONE (HEIGHT MINUS 2,50)
E CEMENT COATING M2 6
F GYPSUM COATING M2 8
G VINYL COATING M2 24
H TILE COATING M2 50
I METAL.LIC CEILING M2 42
J PLASTERBOARD CEILING -PAINTED M2 28
K VINYL CEILING M2 32
L PAINT M2 5
M TILE FLOORING M2 60
N RUBBER FLOORING M2 45
O CARPET FLOORING M2 42
P WC UNIT UN 265
Q SHOWER UNIT UN 150
R SINK UNIT WITH FAWCET UN 225
S URINARY UNIT UN 135
T RAILING ML 80