Vous êtes sur la page 1sur 8
KHALED MORAD OMAR LABIB Civil Engineer Personal Data Name: Khaled Morad Omar Labib Social Status: Married "Nationality : Egyptian Religion : Musiim Military Status : Completed Date Of Birth : August 3rd 1961 Contact ‘§& 01017234237 - 33906737 1 khaledmorad1961@gmallcom 9 315 D pyramids gardens Language Skills Arabic : Native Language English : Good command of written, spoken, understanding Computer Skills windows xp Office 2007 ‘AutoCad Primavera Project Planner Education > Educational Qualification : BC's of Civil Engineering, University: Faculty of Engineering, Cairo University. Rate of appreciation : (Good) (73.2%) Project : Reinforced Concrete Grade of the project : Very Good © Year of graduation : 1984 Previous Experiences: Period: From November 2007 - Till Now ‘Company : Alexandria Company for construction Job : Director of Roads, Faciities, Settlement, Golf and External Fences at Al Rabwa Project in Sheikh Zayed City on 6th of October (Director of the implementation (of Vin Line Aluminum Factory in éth of October Industrial City - Director of Concrete and Finishing Sector in Al Rabwa Extension Project - Project description : The project consists of 390 villas, with different models on an area of 40% of the total area of the project, which consists of 190 acres and represents the rest area roads and green areas, the lake area and the golf course and the main gates and external fences and the mosque building or a total of £650 milion pounds - In the éth of October City continued Alexandria Company for construction with a total area of 8500 m 2 for 20 million and consists of an administrative building with four floors and the factory hhas two floors and a water reservoir land of 250 m3 and the number of five buildings services. KHALED MORAD OMAR LABIB Civil Engineer Previous Experiences: © Period: from November 2005 to October 2007 ‘Company: Al Askar Engineering Office Engineers Consulting Job: Project Manager Consultant Project: Establishment of Technical College in ‘Wadi Al Dawasir City, Saudi Arabia Project description: The project consists of «ight main buildings six buildings services football field two playgrounds terraces spectral water tank below the ground water tank and fire above the ground water well irrigation network network fire network drainage water network Network compressed air network electricity telephone network and computer system air ‘conditioning system parking for 900 cars asphalt roads number of eight main power transformers ‘The projects located on an area of 250 thousand square meters Value of the project: 46 milion Sauai rivals © Period: from may 2001 to 2002 ‘Company: EI Gabry Contracting Co. Position: Project Manager Project: The establishment ofthe village of Zahraa Arish in the city of Arsh (first stage) © Project Description: The project consists of sixty villas and 15 residential units three floors Value ofthe project: 39 milion Egyptian pounds © Period: from November 2003 to 2005 ‘Company: Al Askar Engineering Otfice Engineers Consulting Job: Project Manager Consultant Project: Establishment of Technical College in Hall, Saudi Arabia Project Description: The project consists of ten main buildings Seven buildings Services of a tank above the ground Water tank and fre above the ground A drainage station with a ‘capacity of 150 m3 / day Desalination plant Drinking water Network irrigation Network fire Network drainage Water network Compressed air Electricity network Telephone network and ‘computer system Gas network Central air ‘system Parking for 1200 cars Asphalt roads Eleven main power transformers The project is completely furished with office furniture, laboratories, classrooms and specialized ‘workshops. The project is located on an area of 500 thousand square meters ( Period: from may 1999 to 2001 ‘Company: El Gabry Contracting Co. Position: Project Manager Project: Establishment of the Higher Technological Institute in 10th of Ramadan City Project Description: The project consists of a ‘main building consisting of four floors on a 4500 ‘m2 and an administrative bullding area of 1500 ‘mand the project contains a central air Conditioning site of 100 thousand m 2 including parking and asphalt roads Value of the project: 56 million Egyptian pounds KHALED MORAD OMAR LABIB Civil Engineer Previous Experiences: Period: from may 1998 to 1999 ‘Company: El Gabry Contracting Co. Position: Project Manager Project: Establishment of housing project for I staff and faculty members at Calre University Project description: The project consists of ‘eight tower towers consisting of ten floors and a parking garage Value of the project: 185 milion Eeytian pounds Period: from jan 1991 to march 1994 ‘Company: Hussam Trading & Contracting Co. Position: Site Manager Project: Establishment ‘of a telephone network expansion project in ‘Qassim, Saudi Arabia Project Description: The project consists of five exchanges and all civil ‘works related to the expansion of the telephone network in Al-Qassim area in the Kingdom of Saudi Arabia Value of the project: SR 85 milion Period: From November 1988 to march 1990 ‘Company: Hussam Trading & Contracting Co. Job Title: Executive Engineer Project: Establishment of residential project in Riyadh city, Saudi Arabia Project Description: The project consists of ninety villas and fifty villas, O one role as well as facilities and roads and telephone network Value of the project: 94 million Saudi ryals © Periods from april 1994 to October 1998 ‘Company: Orient Contracting Company Position: Director of the Technical Office (April 1994 - December 1994) Director of the site of the mosque ofthe Custodian of the Two Sharif In Khobar January 1995 - January 1997) Director of the site of the mosque of the ‘Custodian of the Two Holy Mosques and settied Imam and Muazin in Dammam and Deputy Dect ofthe project Lanuary 1997 tober © Project: Establishment of the mosque project of the Custodian of the Two Holy Mosques and ‘Al-Imam and Muzain in Al-Khobar and Dammam in Saudi Arabia Project description: The project of the mosque ‘of the Custodian of the Two Holy Mosques in ‘Al-Khobar city consists of a mosque with an area ‘of 3600 m 2 with a pyramid dome of 900 m 2 ‘with a height of 26 m and an outdoor courtyard with an area of 3100 m 2 containing two tents ‘with a height of 56 m for an acre and a 27,000 m 2 site containing two buildings for ablution with, ‘an area of 360 m 2. Ground Mechanics for ‘Surface Adjustment Machines 180 m 2 for Room ‘Ground Water Tank Parking Structures for Housing Front and Muezzin Value of the project: 60 million riyals Period: From 1984 to November 1987 ‘Company: E| Gabry Contracting Co. Job Title: Executive Engineer Project: Construction of a residential project in the new city of Madi Highway Project Description: The project ‘consists of 35 housing units nine floors Value of » the project: 18 milion Egyptian pounds KHALED MORAD OMAR LABIB Civil Engineer ‘Some pictures of the mosque project of "the Custodian of the Two Holy Mosques” In AF-Khobar, Saud Arabia, From 1994 to 1997 The Bowl of the Mosque The frontage of the Mosque and the Courtyard (Outdoor parking ‘Ablution Building KHALED MORAD OMAR LABIB Civil Engineer ‘Some pictures of the Mosque project of the Custodian of the Two Holy Mosques In Dammam, Kingdom of Saudi Arabia , From 1997 to 1998 Granite works for the frontage ‘The frontage of the mosque and the courtyard ‘The interior arches of the mosque G.R.C KHALED MORAD OMAR LABIB Civil Engineer ‘Some pictures of the establishment of the high technological institute In the tenth of Ramadan From 1999 to 2001 Escape ladder to lecture hall ‘The inner courtyard of the project KHALED MORAD OMAR »~ ‘Some pictures of the Tech In Hail, Saudi Arabia, From 2003 to 2005 KHALED MORAD OMAR LABIB Civil Engineer ‘Some photos of the technical college project In Wadi AL-Dawasir in the Kingdom of Saudi Arabia From 2005 to 2007 Building Electrical Technology ‘Administrative building ‘The mosque building ‘Water and fire reservoir building Mechanical Technology Building

Vous aimerez peut-être aussi