Vous êtes sur la page 1sur 2

YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, Contract No.

: M-ZOS-INFRA/048/AG2/17/001
PUBLIC REALM, CAR PARK “SHELL AND CORE”
AND DRY STACK (BOAT STORAGE FACILITY) Ref: YSD-P01-0205-SW-HIL-MS-000016
Rev. 00
TITLE: TWO PART POLYSULPHIDE JOINT SEALANT FOR STORM
WATER MANHOLES (POLYPRIME PS & POLYSEAL PS) Date : 08/07/2017

CLIENT: ENGINEER CONSULTANT CONTRACTOR

TWO PART POLYSULPHIDE JOINT SEALANT FOR STORM WATER


MANHOLES (POLYPRIME PS & POLYSEAL PS)
Reviewed By Reviewed By Reviewed By Approved By
Material Estidama Project QA/QC Construction
Rev Date Comments
Engineer Coordinator Manager Manager
(G. Varghese) (Farouk Damlouji) (Sathish E.) (Dimitrios C. L.)

00 08/07/2017 For Approval

HILAL BIL BADI AND PARTNERS CONTRACTING COMPANY WLL


YAS SOUTH DEVELOPMENT – INFRASTRUCTURE, Contract No.: M-ZOS-INFRA/048/AG2/17/001
PUBLIC REALM, CAR PARK “SHELL AND CORE”
AND DRY STACK (BOAT STORAGE FACILITY) Ref: YSD-P01-0205-SW-HIL-MS-000016
Rev. 00
TITLE: TWO PART POLYSULPHIDE JOINT SEALANT FOR STORM
WATER MANHOLES (POLYPRIME PS & POLYSEAL PS) Date : 08/07/2017

AMENDMENT RECORDS

Revision Date Status Revision Details

00 08/07/2017 For Approval Not applicable

DISTRIBUTION LIST

Copy No. Issue To


1 Project Manager
2 Construction Manager
3 Project Engineer
4 QA/QC Manager
5 Estidama Coordinator
6 Document Control
7 Material Engineer
8 Site Reference
9 Sub-contractors

HILAL BIL BADI AND PARTNERS CONTRACTING COMPANY WLL

Vous aimerez peut-être aussi