Company Address DAILY PROGRESS REPORT

T: F:

Project Information

Project Name Caltex Station Site Development Works Project No. 001
Town Km 36 SLEX Southbound, Mamplasan, Binan, Laguna Date 4-Jan-18
Contractor Lego Builders Day of Week Thursday

Weather Number of Resources (Personnel & Major Equipment)


Weather Fair Personnel Major Plant and Equipment
Temp >30C

TOTAL PERSONNEL
Wind Light

TOTAL PLANT
Humidity Low

Electrician
Carpenter
Foreman

Plumber
Mason

Labor
Contractor / Subcontractors Hours
Legobuilders Inc. 14 2 10 1 1 16 30 0

Location / Area Activity / Description of Work Quantity %Prog


STP Formwork stripping m3 %
Road 1 Sidewalk concrete compaction m3 %
Road 3 Pavement concreting 26 m3 %
Parking near Mcdo Curb and gutter concreting %
Road 1 Asphalt filling on expansion joints %
Additional parking area near Shakeys Dropping of rc drain pipes %

Hinderance / Effect to Normal Progress (weather, accidents, breakdowns, delays, etc)


1. Written confirmation by Marcbilt to cover concrete (material) cost for the replacememt of cracked areas. 2. Approval of additional
change orders 3. Need for additional plate compactor 4. Replacement of defective asphalt

Material Deliveries Official Visitors


Supplier Description Qty Name Surname Representing Time
Robig Ready Mix Concrete 29

Report prepared by
Name Surname Position / Title
Henry Florendo Project Manager

This Daily Report was generated using an http://www.online-templatestore.com template.


Curb and gutter near Mcdo coreting

Concreting of sidewalk at road 1

Sidewalk preparation at road 1

Pavement concreting at road 3


Dropping of RC pipes near Shakeys
additional parking