FACULTAD DE INGENIERÍA

TOPOGRAFÍA I
LEVANTAMIENTO TOPOGRÁFICO
CON ESTACIÓN TOTAL
DOCENTE
ING. RAFAEL CARRASCO SOTO
BRIGADA SECCIÓN
HEVELIUS 1976 .
INTEGRANTES
CERRON ROSALES, Juan
CHUMBIMUNI MALDONADO, Edison Y.
CORDOVA LANDA, Coco Jimmy
GUERRA PALOMINO, Jennifer Misshel
NUÑEZ ROMERO, Luis Ernesto
SANTIAGO DE LA CRUZ, Joseph
VEGA ROJAS, Paola Cristina
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

ÍNDICE

ÍNDICE _____________________________________________________________________ 2
INTRODUCCIÓN ____________________________________________________________ 3
1. GENERALIDADES _______________________________________________________ 4
2. OBJETIVOS _____________________________________________________________ 5
2.1. OBJETIVO GENERAL ______________________________________________________ 5
2.2. OBJETIVOS ESPECÍFICOS _________________________________________________ 5

3. EQUIPOS, INSTRUMENTOS Y MATERIALES EMPLEADOS _________________ 6


4. MARCO TEÓRICO ________________________________________________________ 9
5. PROCEDIMIENTO________________________________________________________ 13
6. CONCLUSIONES _______________________________________________________ 17
7. RECOMENDACIONES __________________________________________________ 18
8. BIBLIOGRAFÍA _________________________________________________________ 19
9. ANEXOS _______________________________________________________________ 20

Universidad Continental 2
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

INTRODUCCIÓN

El presente informe contiene las actividades realizadas durante la práctica de


campo y el trabajo de gabinete de los días 29/05/17 y el 05/06/17, las cuales se llevaron
a cabo gracias al esfuerzo de los integrantes del grupo y al área de topografía, quienes
nos facilitaron los materiales y equipos necesarios.

El trabajo se llevó a cabo en 6 horas académicas y el espacio que sirvió para


desarrollarlo fue una parcela de terreno designada por el docente, donde se hizo el
levantamiento topográfico, medición de distancias y ángulos, utilizando los métodos
explicados por el docente en clase.

La realización de esta práctica es de suma importancia puesto que nos ayuda a


familiarizarnos con los instrumentos topográficos como la estación total que facilita la
medición de ángulos horizontales y verticales, distancias para una medición rápida
juntamente con un prisma y el GPS (Sistema de Posicionamiento Global) para la
ubicación de los puntos delimitados

Universidad Continental 3
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

1. GENERALIDADES

A continuación, se presenta un informe técnico en el cual se desarrollaron las


actividades propias de la Topografía, necesarias para generar la información
requerida en los estudios para el diseño de un proyecto de nivelación lo más
exacto a la realidad del terreno, ubicado entre las arterias:

 Por el Este, propiedades terceros


 Por el Oeste, propiedad de terceros
 Por el Norte, propiedad de terceros (Arboleda)
 Por el Sur, propiedad de terceros

El predio se encuentra ubicado en la localidad de Chorrillos, en el Distrito de San


Carlos, Provincia de Huancayo, Región Junín.

Universidad Continental 4
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

2. OBJETIVOS

2.1. OBJETIVO GENERAL

Realizar un levantamiento topográfico geométrica de una pequeña área de


terreno limitada, ubicada en la ciudad de Huancayo, para su posterior
obtención de las curvas de nivel con lo puntos obtenidos con la Estación
Total.

2.2. OBJETIVOS ESPECÍFICOS

 Aplicar el procedimiento adecuado en el estacionamiento de la


Estación Total.
 Realizar un levantamiento topográfico de un terreno obteniendo la
mayor cantidad de puntos y sus detalles.
 Realizar el procedimiento adecuado en el programa Civil3D para la
obtención de las curva de nivel.

Universidad Continental 5
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

3. EQUIPOS, INSTRUMENTOS Y MATERIALES EMPLEADOS

Estación Total

Instrumento topográfico de precisión para la


obtención de las coordenadas de diferentes
puntos a partir de las coordenadas de la
estación.

Tripode

Estructura metàlica que sirve


exclusivamente de soporte para los
equipos (nivel, teodolito, estación total)

Universidad Continental 6
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

Prisma

Es el complemento de la
estación total con el cual se
obtiene las coordenadas del
punto ubicado debajo del baston.

Cuaderno topográfico de campo

Es donde se anotan los datos obtenidos de


la lectura con el teodolito, datos del terreno,
y algunas observaciones que posteriormente
se procesaràn digitalmente en una hoja de
càlculo.

Baston porta Prisma

Rango de trabajo: 125,0 cm – 210,0


cm. Material: aluminio carcasa de
metal con nivel esférico de brújula
integrado. Fijación por tornillo.

Universidad Continental 7
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

Brujula Azimutera
Aguja de imán AINiCo 5 mejora el movimiento de
la aguja y aumenta la precisión. Impermeable.
Precisión de +-1/2 grado con un anillo de acimut
0-360 grados. Exactitud vertical+-1/2 con 1°
graduaciones y 10 minutos. Porcentaje con
incrementos de 5%. Aguja amortiguadora para la
inducción rápida y precisa lecturas. Ajuste de la
declinación magnética permite configuración de
declinación a 180° al este o al oeste, etc.

GPS Garmin

El GPSmap 37 con un mapa de base


mundial pregrabado y 8 Mb de memoria
interna para almacenamiento de mapas,
además de las funciones de los
navegadores de la serie 76. Es resistente al
agua gracias a su carcasa IPX7 y flota, por
lo que aguanta cualquier caída o
salpicadura accidental. Puede almacenar
en su memoria hasta 1000 de lugares.

Universidad Continental 8
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

4. MARCO TEÓRICO

4.1. ESTACION TOTAL: Se denomina estación total a un instrumento electro-óptico utilizado en


topografía, cuyo funcionamiento se apoya en la tecnología electrónica. Consiste en la
incorporación de un distanciómetro y un microprocesador a un teodolito electrónico.

4.2. PLANIMETRIA: Estudia los puntos de la superficie terrestre para proyectarlos sobre un plano
horizontal, llamado plano de referencia. Como sabemos para representar un punto en un plano,
es necesario establecer un sistema de referencias que nos sitúe los puntos medidos respecto a
un origen común.

4.3. LEVANTAMIENTO PLANIMETRICO POR RADIACION: Es el sistema más simple para medir el
terreno mediante ángulos y distancias hacia todos los puntos a levantar.

4.4. CURVA DE NIVEL: Es una línea imaginaria que conecta puntos de igual elevación.

4.4.1 Separación de las curvas:


a) Curvas muy pegadas indican pendientes grandes o fuertes.

Universidad Continental 9
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

b) Curvas muy separadas indican pendientes pequeñas o suaves.

4.4.2 Curvas concéntricas cerradas


a) Curvas de menor cota envuelven a las de mayor cota indican un cerro o
colina

b) Curvas de mayor cota envuelven a las de menor cota indican una depresión

4.4.3 Forma de dos curvas de vertientes o laderas


a) Forma de U: Donde las curvas de menor cota envuelven a las de mayor cota
representan estribos o elevaciones.

Universidad Continental 10
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

b) Forma de V: Donde las curvas de mayor cota envuelven a las de menor cota
representan un valle o vaguada.

4.5. EQUIDISTANCIA: Representa la distancia o intervalo vertical entre curvas de nivel. Se


determina con base en las aplicaciones que tendrá el plano por las características del terreno
(pendiente elevada o reducida).

Formula Equidistancia Normal: en = Denominador-Escala/ 1000

4.6. PERFILES LONGITUDINALES: El perfil longitudinal es la traza que el eje del proyecto marca
sobre el plano vertical y se puede construir a partir de las curvas de nivel.

4.7. SECCIONES TRANSVERSALES: Las secciones transversales son perfiles perpendiculares al eje
de referencia Del proyecto. Se utilizan para el cálculo del volumen del movimiento de tierras
necesarias en la construcción de un proyecto.

Universidad Continental 11
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

Universidad Continental 12
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

5. PROCEDIMIENTO

I. Procedimiento de campo
a) Reconocimos el lote de terreno a levantar, anotando los detalles más
relevantes.
b) Se estaciono al equipo en un lugar designado por el docente, desde
donde se pudo observar gran parte del terreno a levantar.
c) Se procedio a la toma de puntos con el equipo con ayuda del prisma
con el cual se pudo obtener 270 puntos capturados.

Pto Norte Este Altura Det Pto Norte Este Altura Det
1 8668279.95 478134.178 3299.2548 CARR 136 8668292.11 478111.171 3292.583 RELL
2 8668281.34 478137.64 3298.9897 CARR 137 8668287.07 478106.599 3292.6973 RELL
3 8668283.91 478136.576 3298.8843 CARR 138 8668284.21 478102.44 3292.5417 RELL
4 8668284.4 478140.361 3298.7808 CARR 139 8668287.55 478103.161 3291.5 RELL
5 8668288.01 478139.867 3298.7436 CARR 140 8668291.68 478101.831 3290.0376 RELL
6 8668288.47 478144.49 3298.643 CARR 141 8668293.62 478103.4 3290.6449 RELL
7 8668292.52 478144.339 3298.6402 CARR 142 8668295.08 478105.282 3290.6776 RELL
8 8668292.76 478147.704 3298.5851 CARR 143 8668297.01 478106.899 3290.7492 RELL
9 8668295.93 478147.134 3298.5572 CARR 144 8668301.44 478107.231 3290.3171 RELL
10 8668297.03 478150.311 3298.4138 CARR 145 8668304.44 478109.441 3291.2839 RELL
11 8668299.76 478149.139 3298.1975 CARR 146 8668308.17 478109.38 3290.8391 RELL
12 8668301.38 478151.754 3298.1126 CARR 147 8668302.2 478103.886 3288.4686 RELL
13 8668304.06 478149.497 3297.85 CARR 148 8668297.64 478102.349 3288.4707 RELL
14 8668305.49 478152.323 3297.8078 CARR 149 8668294.89 478100.832 3288.541 RELL
15 8668308.22 478149.147 3297.3593 CARR 150 8668311.81 478106.885 3288.7019 RELL
16 8668311.57 478150.742 3297.0219 CARR 151 8668318.11 478105.235 3288.9981 RELL
17 8668313.32 478147.315 3296.6207 CARR 152 8668325.8 478104.018 3288.2856 RELL
18 8668316.82 478147.757 3296.3217 CARR 153 8668336.6 478099.527 3288.0736 RELL
19 8668317.04 478144.231 3296.0315 CARR 154 8668375.94 478090.094 3291.8563 CARREBORD
20 8668320.1 478142.46 3295.8754 CARR 155 8668372.1 478091.728 3292.2604 CARREBORD
21 8668319.76 478137.417 3295.4382 CARR 156 8668369.74 478091.857 3291.1745 CARREBORD
22 8668316.06 478136.282 3295.018 CARR 157 8668366.43 478092.947 3290.8562 CARREBORD
23 8668315.5 478132.523 3294.7959 CARR 158 8668362.69 478093.933 3290.8024 CARREBORD
24 8668312.17 478133.216 3294.3696 CARR 159 8668357.03 478095.875 3290.6822 CARREBORD
25 8668311.63 478129.997 3294.2627 CARR 160 8668354.07 478096.973 3290.5672 CARREBORD
26 8668308.23 478131.302 3293.9121 CARR 161 8668354.13 478096.958 3290.5697 CARREBORD
27 8668308.26 478131.349 3293.9044 CARR 162 8668349.3 478099.494 3290.0094 CARREBORD
28 8668307.96 478127.976 3293.7896 CARR 163 8668344.86 478103.121 3290.0329 CARREBORD
29 8668303.74 478128.59 3293.4959 CARR 164 8668337.18 478110.675 3290.27 CARREBORD
30 8668304.84 478125.586 3293.2957 CARR 165 8668330.93 478112.913 3290.3709 CARREBORD
31 8668304.82 478125.558 3293.3006 CARR 166 8668329.36 478115.138 3290.2593 CARREBORD
32 8668300.49 478125.638 3293.2196 CARR 167 8668325.02 478118.468 3290.475 CARREBORD
33 8668303.09 478125.222 3293.1632 CARR 168 8668325.02 478118.462 3290.474 CARREBORD
34 8668305.87 478121.718 3292.782 CARR 169 8668316.15 478121.659 3292.3899 CARREBORD

Universidad Continental 13
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

35 8668302.36 478118.089 3292.4624 CARR 170 8668309.56 478122.227 3293.4918 CARREBORD


36 8668307.8 478119.585 3292.3822 CARR 171 8668306.88 478122.824 3294.2848 CARREBORD
37 8668306.66 478114.469 3291.8767 CARR 172 8668278.81 478139.274 3299.6223 CARREBORD
38 8668310.21 478117.546 3291.7433 CARR 173 8668280.05 478142.869 3299.8458 CARREBORD
39 8668309.84 478113.172 3291.2668 CARR 174 8668283.85 478147.06 3300.2125 CARREBORD
40 8668313.56 478116.047 3291.0051 CARR 175 8668287.33 478148.006 3300.078 CARREBORD
41 8668314.63 478111.585 3290.3758 CARR 176 8668288.99 478151.587 3300.2849 CARREBORD
42 8668319.16 478114.216 3290.1196 CARR 177 8668291.92 478151.784 3300.3158 CARREBORD
43 8668319.86 478110.007 3289.8447 CARR 178 8668293.36 478156.279 3300.6451 CARREBORD
44 8668322.39 478112.434 3289.7754 CARR 179 8668295.77 478158.985 3300.9575 CARREBORD
45 8668323.89 478107.982 3289.398 CARR 180 8668299.75 478160.825 3301.0165 CARREBORD
46 8668328.09 478110.102 3289.3136 CARR 181 8668309.76 478169.296 3301.2808 CARREBORD
47 8668330.35 478105.324 3289.0661 CARR 182 8668314.75 478164.825 3302.2223 CARREBORD
48 8668334.09 478106.868 3289.0991 CARR 183 8668313.4 478165.877 3301.6108 CARREBORD
49 8668335.35 478102.505 3288.764 CARR 184 8668314.21 478162.608 3301.7672 CARREBORD
50 8668335.4 478102.544 3288.7716 CARR 185 8668316.29 478162.896 3301.9807 CARREBORD
51 8668340.28 478104.066 3288.8239 CARR 186 8668316.04 478164.56 3302.5229 CARREBORD
52 8668339.63 478099.678 3288.6669 CARR 187 8668318.14 478164.985 3301.6812 CARREBORD
53 8668343.65 478101.689 3288.7873 CARR 188 8668324.02 478161.53 3301.7946 CARREBORD
54 8668344.19 478096.483 3288.9007 CARR 189 8668338.85 478160.877 3302.1909 CARREBORD
55 8668348.27 478099.084 3288.9903 CARR 190 8668335.1 478170.72 3302.3327 CARREBORD
56 8668347.93 478095.005 3288.7733 CARR 191 8668330.1 478147.978 3301.5789 CARREBORD
57 8668352.22 478096.743 3288.7243 CARR 192 8668327.64 478148.541 3300.8517 CARREBORD
58 8668351.94 478093.202 3288.7523 CARR 193 8668325.5 478147.939 3299.4415 CARREBORD
59 8668355.4 478095.323 3288.7929 CARR 194 8668325.32 478145.412 3298.2471 CARREBORD
60 8668356.97 478090.96 3288.6932 CARR 195 8668323.37 478144.344 3297.0263 CARREBORD
61 8668360.3 478092.785 3288.9227 CARR 196 8668321.87 478143.321 3295.9873 CARREBORD
62 8668361.61 478089.482 3288.9095 CARR 197 8668321.78 478148.719 3297.9243 CARREBORD
63 8668363.16 478092.249 3289.1095 CARR 198 8668322.62 478151.327 3299.456 CARREBORD
64 8668363.92 478088.799 3289.0681 CARR 199 8668323.48 478153.687 3301.2496 CARREBORD
65 8668367.68 478090.98 3289.3332 CARR 200 8668318.65 478156.231 3301.2278 CARREBORD
66 8668368.51 478087.786 3289.2861 CARR 201 8668312.67 478155.774 3301.1662 CARREBORD
67 8668371.77 478089.751 3289.49 CARR 202 8668305.73 478156.853 3301.0806 CARREBORD
68 8668371.8 478086.968 3289.442 CARR 203 8668301.48 478156.753 3300.5191 CARREBORD
69 8668374.14 478088.891 3289.5459 CARR 204 8668295.8 478154.199 3300.38 CARREBORD
70 8668375.5 478086.424 3289.617 CARR 205 8668288.66 478148.344 3300.0955 CARREBORD
71 8668378.29 478087.705 3289.779 CARR 206 8668282.84 478142.21 3299.61 CARREBORD
72 8668380.06 478085.264 3289.712 CARR 207 8668291.21 478149.24 3298.904 CARREBORD
73 8668382.89 478086.893 3289.9148 CARR 208 8668293.8 478151.024 3299.1749 CARREBORD
74 8668382.88 478086.841 3289.9156 CARR 209 8668300.89 478154.503 3299.0702 CARREBORD
75 8668383.83 478084.555 3289.913 CARR 210 8668308.35 478154.251 3298.9623 CARREBORD
76 8668383.49 478084.101 3289.7735 PARED 211 8668312.91 478152.854 3298.8478 CARREBORD
77 8668376.43 478085.894 3289.6207 PARED 212 8668317.75 478152.076 3298.423 CARREBORD
78 8668369.77 478087.536 3289.3647 PARED 213 8668321.72 478149.401 3298.1676 CARREBORD
79 8668369.77 478087.534 3289.3637 PARED 214 8668325.28 478145.479 3298.2351 CARREBORD
80 8668361.5 478089.16 3288.9268 PARED 215 8668324.7 478141.34 3297.05 CARREBORD
81 8668356.99 478090.351 3288.5944 PARED 216 8668326.85 478138.619 3297.523 CARREBORD
82 8668350.4 478092 3288.15 PARED 217 8668326.68 478136.025 3296.3794 CARREBORD
83 8668350.46 478091.982 3288.1411 PARED 218 8668326.12 478133.107 3295.3932 CARREBORD
84 8668343.68 478093.329 3288.2776 PARED 219 8668327.61 478130.83 3296.0549 CARREBORD
85 8668333.73 478095.746 3287.9343 PARED 220 8668330.24 478130.054 3297.5334 CARREBORD

Universidad Continental 14
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

86 8668330.31 478096.022 3287.821 PARED 221 8668328.69 478132.875 3298.5013 CARREBORD


87 8668322.01 478098.029 3288.0845 PARED 222 8668328.34 478136.464 3300.0085 CARREBORD
88 8668313.54 478100.038 3288.2292 PARED 223 8668329.62 478140.204 3300.3098 CARREBORD
89 8668303.06 478099.35 3288.3834 PARED 224 8668332.23 478141.03 3301.7623 CARREBORD
90 8668297.66 478098.98 3288.4216 PARED 225 8668337.03 478137.324 3301.9554 CARREBORD
91 8668293.61 478098.464 3288.3758 PARED 226 8668341.66 478138.164 3302.2147 CARREBORD
92 8668288.51 478097.966 3289.7726 PARED 227 8668343.82 478145.166 3301.9885 CARREBORD
93 8668285.68 478097.726 3290.3783 PARED 228 8668345.31 478131.026 3300.4882 CARREBORD
94 8668282.24 478097.405 3290.7198 PARED 229 8668345.22 478129.114 3299.3062 CARREBORD
95 8668289.75 478136.515 3298.5646 RELL 230 8668340.26 478128.331 3297.6737 CARREBORD
96 8668291.43 478136.103 3297.513 RELL 231 8668335.14 478129.157 3298.2317 CARREBORD
97 8668291.38 478136.1 3297.5158 RELL 232 8668330.64 478127.243 3295.2935 CARREBORD
98 8668293.08 478136.554 3296.7619 RELL 233 8668337.36 478125.575 3294.8725 CARREBORD
99 8668292.77 478139.07 3297.7585 RELL 234 8668337.59 478122.65 3293.8404 CARREBORD
100 8668294.86 478140.491 3297.0578 RELL 235 8668343.15 478117.978 3292.9871 CARREBORD
101 8668297.09 478142.6 3297.0296 RELL 236 8668336.33 478111.969 3290.4705 CARREBORD
102 8668299.95 478145.334 3296.8894 RELL 237 8668330.67 478119.329 3291.3724 CARREBORD
103 8668304.39 478146.931 3296.8981 RELL 238 8668329.59 478117.063 3290.2614 CARREBORD
104 8668307.99 478146.182 3296.0839 RELL 239 8668327.84 478119.077 3290.5549 CARREBORD
105 8668308.88 478144.86 3295.4628 RELL 240 8668326.47 478125.526 3293.6471 CARREBORD
106 8668308.74 478144.738 3295.4446 RELL 241 8668325.36 478128.879 3295.2924 CARREBORD
107 8668309.06 478144.582 3295.4129 RELL 242 8668321.21 478122.255 3291.8256 CARREBORD
108 8668306.33 478144.395 3295.5658 RELL 243 8668316.03 478122.982 3292.7409 CARREBORD
109 8668308.01 478142.576 3295.6599 RELL 244 8668318.25 478127.785 3295.5956 CARREBORD
110 8668307.72 478143.824 3296.015 RELL 245 8668315.73 478128.107 3294.7716 CARREBORD
111 8668309.33 478143.578 3295.527 RELL 246 8668318.2 478129.397 3294.9591 CARREBORD
112 8668310.6 478141.82 3294.9929 RELL 247 8668314.46 478129.679 3294.7306 CARREBORD
113 8668308.73 478139.169 3294.5439 RELL 248 8668314.5 478128.394 3295.1441 CARREBORD
114 8668306.84 478139.354 3294.9743 RELL 249 8668312.51 478124.806 3293.6421 CARREBORD
115 8668304.22 478140.754 3295.5341 RELL 250 8668310.58 478118.555 3292.2307 CARREBORD
116 8668304.95 478138.422 3295.0881 RELL 251 8668306.95 478122.793 3294.2826 CARREBORD
117 8668303.1 478138.066 3294.7436 RELL 252 8668307.76 478124.997 3293.8481 CARREBORD
118 8668302.6 478136.464 3294.3249 RELL 253 8668322.18 478112.907 3289.7839 CARREBORD
119 8668301.14 478136.943 3294.6957 RELL 254 8668318.92 478131.996 3295.8355 CARREBORD
120 8668299.42 478135.205 3293.8159 RELL 255 8668319.57 478134.167 3295.1924 CARREBORD
121 8668295.14 478135.681 3295.0183 RELL 256 8668321.41 478132.087 3295.1893 CARREBORD
122 8668294.62 478131.858 3295.0538 RELL 257 8668324.8 478131.891 3295.7549 CARREBORD
123 8668292.84 478129.569 3296.0099 RELL 258 8668326.94 478133.54 3296.0125 CARREBORD
124 8668295.91 478127.873 3294.0266 RELL 259 8668326.38 478131.207 3295.2964 CARREBORD
125 8668300.34 478129.003 3293.3855 RELL 260 8668325.26 478136.08 3296.0067 CARREBORD
126 8668305.2 478133.366 3293.9871 RELL 261 8668281.88 478128.761 3299.5049 CARREBORD
127 8668311.22 478139.098 3294.6742 RELL 262 8668267.09 478126.078 3299.0879 CARREBORD
128 8668314.85 478143.535 3296.0336 RELL 263 8668270.35 478134.483 3299.3917 CARREBORD
129 8668305.59 478148.619 3297.642 RELL 264 8668265.04 478115.768 3298.9334 RELL
130 8668296.52 478145.403 3298.7521 RELL 265 8668276.25 478117.553 3299.1593 RELL
131 8668291.39 478140.451 3298.9998 RELL 266 8668280.09 478111.717 3298.808 RELL
132 8668285.58 478122.527 3298.1629 RELL 267 8668281.21 478116.643 3298.3613 RELL
133 8668284.67 478118.877 3296.6746 RELL 268 8668283.84 478119.257 3297.2649 RELL
134 8668286.03 478116.739 3295.3582 RELL 269 8668282.08 478122.6 3299.1732 RELL
135 8668288.56 478115.269 3293.8138 RELL 270 8668283.66 478124.53 3299.7264 RELL

Universidad Continental 15
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

d) Posterior al trabajo de Campo nos trasladamos al trabajo de


laboratorio donde con ayuda de Diseño Asistido por Computadora
(Civil3D Metric) se pudo diseñar las curvas de nivel del terreno
designado.
e) Se opto por trabajar los Planos Topográficos en papel A2 mientras
que el de Ubicación y localización en papel A3, y para ello se ha
seleccionado trabajar en las siguientes escalas obtenidas de
acuerdo a los cálculos hechos en Gabinete.
ESCALA
Plano Topográfico 01 1:250
Ev 1: 50
Plano Topográfico 02
Eh 1: 500
Plano de Ubicación 1:250
Plano de Localización 1:2000

f) Se realizó el cálculo del área de la poligonal, así como, el cálculo


del perímetro del terreno.

ÁREA 4491,904 m2
PERÍMETRO 341,668 m

g) Finalmente se procedio a la redacción del informe torpografico final.

Universidad Continental 16
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

6. CONCLUSIONES

 Esta práctica fue de gran apoyo para nosotros porque aprendimos a


manipular y operar el teodolito.
 La Estacion Total resulta muy útil para trabajos de precisión pero si no se
acatan ciertas recomendaciones, los resultados pueden llegar a ser
imprecisos.
 Datos de muy poca precisión en la poligonal producen mayor error en cada
detalle, con ello cabe destacar que por más que el programa corrija
nuestras coordenadas, en un caso de vida real estese ve afectado
dependiendo del trabajo que se va a hacer, si se requiere una alta precisión,
como la de un aeropuerto o el pedido de un cliente, hasta uno de poco
precisión pero aun así el detalle de ver la precisión se debe de hacer con
mucho cuidado.
 La recolección adecuada de datos se hace con el software adecuado, así
también guardar en un único archivo el dato de todos los puntos.

Universidad Continental 17
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

7. RECOMENDACIONES

 Colocar el trípode de manera que la plataforma base quede lo más nivelada


posible a simple vista y que la apertura de las patas transfieran estabilidad al
instrumento para evitar una caída accidental.

 Colocar la estación sobre la plataforma base, (previamente se aconseja que los


tornillos de nivelación de la plataforma nivelante del instrumento estén a la mitad
de recorrido).

 El instrumento se cogerá por su asa y no se soltará hasta que esté atornillado a


la base del trípode.

 Nivelar la plataforma nivelada y situar la estación sobre el punto a estacionar,


(clavo en el suelo, gavilla, estaca, etc...)

 Para empezar encendemos la estación y con ayuda del nivel electrónico y la


plomada láser (pulsar botón USER) terminamos de situarla sobre el punto base
de la estación.

 Una vez NIVELADO, pasamos al ESTACIONAMIENTO propiamente dicho, el cual


consta en determinar el nombre del trabajo, las coordenadas del punto base sobre
el que estamos situados, la altura del instrumento y la orientación de la estación.

 Al momento del realizar las mediciones se recomienda tener un radio por el cual
puedan comunicarse y así realizar el trabajo de medir mucho más óptimo.

Universidad Continental 18
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

8. BIBLIOGRAFÍA

 Miguel Montes de Oca. (1989). Topografía. México: Alfa Omega.

 Fernando García Márquez. (1994). Curso básico de topografía. México: Árbol


editorial.

 Ing. William Abreu L.. (2011). Apuntes de Topografía. Barcelona: Instituto


politécnico.

 ING. Juan Carlos Dextre, Manuel de campo de topografía universidad católica.

Universidad Continental 19
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

9. ANEXOS

Fotografia N° 01: Se procedió a colocar la estación total, con


referencia a un punto base designado por el docente, para
guardar los datos primordiales para el visado.

Fotografia N° 02: Una vez ubicado el punto base, se hizo uso del
bastón y el prisma, en un punto determinado, para así determinar la
distancia, ángulos y referencia desde el punto base.

Universidad Continental 20
INFORME 3: LEVANTAMIENTO TOPOGRÁFICO CON TEODOLITO TOPOGRAFÍA I

Fotografia N° 03: La brigada Hevelius reconociendo el terreno a


levantarse y viendo la mejor ubicación del equipo para una mejor
lectura.

Fotografia N° 04: con la Estación Total estacionada se procedio


a la captura de los puntos obteniéndose 270 puntos capturados.