MONTHLY REPORT FOR THE MONTH OF MAY 2018


Part- 1
1A.- Transmitters

(i) MW/MW DRM transmitters not on full power- Not applicable


S. no. Station Txr Radiated Reflected Low Reason Steps
power, power power power taken by
make & since the
model station/
zonal
office

(ii) SW transmitter/ SW DRM not on full power- Not applicable


S. no. Station Txr Radiated Reflected Low Reason Steps
power, power power power taken by
make & since the
model station/
zonal
office

(iii) FM transmitter not on full power


S. no. Station Txr Radiated Reflected Low Reason Steps taken by
power, power power power the station/ zonal
make & since office
model
1. Rainbow 20kW, DB 20kW 0
Electronic
a,
PF20K/DI
G
2. Gold 20kW, DB 20kW 0
Electronic
a,
PF20K/DI
G

3. Vividh 20kW, 11kW 50 2013 At full power the The company


Bharati Nautel reflection in IPA M/s Comcon
Q20 increases due to Industries had
mismatch in the brought cards
circuit as the txr’s and parts
parts were fitted required for
by cannibalizing rectification of
another txr after the fault and
the fire incidence placed at FM
in Jan 2011 Pitampura some
time back. Since
then action from
company is
awaited.

1B. Details of major breakdown in transmitters -Nil


S. no. Station Date of Time and Reasons Action
breakdown duration taken
1 FM - - - -
Rainbow
2 FM Gold - - - -
3 FM Vividh - - - -
Bharati

1C. Details of shutdown in transmitters


S. Station Date of Time and duration Reasons Action
no. shutdown taken
1. FM 22/05/18 0020-0507 04:47 Maintenance work -
Rainbow 29/05/18 0030-0200 01:30 Maintenance work
2. FM Gold 22/05/18 0020-0507 04:47 Maintenance work -
0030-0200 01:30 Maintenance work

2 Details of abnormal operation including failure of STL (VHF link)


S. no. Station Details of Date of Reason How was Steps
link failure the taken by
broadcast the
managed station/
zonal office
1 FM Gold - - - - -
2 FM - - - - -
Rainbow
3 FM Vividh - - - - -
Bharati
3A. Details of abnormal operation including failure of CES- Not applicable
S. no. Station Details of Date of Reason How was Steps
link failure the taken by
broadcast the
managed station/
zonal
office
- - - - - - -

3B. Details of abnormal operation including failure of RNT- Not applicable


S. no. Station Details of Date of Reason How was Steps
link failure the taken by
broadcast the
managed station/
zonal
office
- - - - - - -

3C. Details of abnormal operation including failure of E-1- The link ceases to exist now.

4A. Details of failure of AC plants- Nil


S. no. Station Make, Location Date of Reason Steps
tonnage, failure taken by
local no. the
station/
zonal
office
-- - - - - - -

4B. Details of failure of DG sets- Nil


S. no. Station Make, Location Date of Reason Steps
capacity, failure taken by
local no. the
station/
zonal
office
- - - - - - -
5. Details of failure of studio equipment – Not applicable
5A Studio
S. no. Station Name of Date of Defect Steps taken
equipment failure noticed by the
station/
zonal office
- - - - - -
5B Control room- Not applicable
S. no. Station Name of Date of Defect Steps taken
equipment failure noticed by the
station/
zonal office
- - - - - -

5C OB equipment- Not applicable


S. no. Station Name of Date of Defect Steps taken
equipment failure noticed by the
station/
zonal office
- - - - - -

6. Details of urgent problems related to paras 1 to 5 requiring attention of the Directorate


S. no. Station Details of Date of Current Ref. of zonal To whom
problem occurrence status office/ letter addressed
to in
Directorate. Directorate

7 Details of inspection of station during the month


S.no. Name of station Date of Inspected by Over all
Inspection whom condition of
station
- - - - -

8 Work done report, if any in the month w. r. t. previous report


Week ending of Item no. of Brief details of Date of work Details of work
report previous report items done done(separate
sheet can be
attached)
- - - - -
List of important issues which need immediate attention of the Zonal office/ Directorate:-
(A)
S. no. Station Details of Date of Current status Steps taken by the
problem occurrence station.
1. Rainbow No UPS at Since March New UPS is Being processed.
present. 2108 under taking by
project wing.
2. Gold No UPS at Since a long Installation of the
present. time. An old 40KVA new 125 KVA UPS
- UPS has been is under taking by
taken into project wing.
circuit for the
time being.
3. Vividh No UPS at Since April New UPS is Being processed.
Bharati present. 2018 under taking by
project wing.
4. Rainbow, Spare C- C- Band used as Requisition sent to
Gold, band standby audio the central store
Vividh receivers are source.
Bharati required

(B) Other points of kind consideration:


Part-2
2A. Studio utilization report for the month - Not applicable
Name of Test Scheduled Total Total Total Progressive Progressive
studio hrs. prog. Hrs/ prog. B/D working total prog.
(1) (2) recording Hrs. hrs. hrs. (hrs- working hrs(hrs-
hrs. (hrs- (hrs- mins) hrs. (hrs- mins
(3) mins) mins) (6){2+4} mins) (8)
(4) (5) (7)
Playback - - - - - - -
studio
MP studio - - - - - - -
Talk - - - - - - -
studio
Music - - - - - - -
studio
Dubbing - - - - - - -
room
Rehearsal - - - - - - -
studio
Control - - - - - - -
room
{Note:- Report should be sent according to number of studios available}.

(i) Major breakdown:- Not applicable


Date Time Duration Cause(Gear/PSF/OC) Remarks
(hrs- mins)
From To

(ii) Minor breakdown:- Not applicable


Date Time Duration Cause(Gear/PSF/OC) Remarks
(hrs- mins)
From To
- - - - - -
(B) Report on performance of the Studio equipments for the month- Not applicable

Name of Type of Model Year of Distortion Noise Frequency Overall


studio announcer & commissioning 1kHz/10kHz level response performance
console make ± dB 63Hz-
15kHz
Playback - - - - - - -
studio
MP studio - - - - - - -
Talk studio - - - - - - -
Music - - - - - - -
studio
Dubbing - - - - - - -
room
Rehearsal - - - - - - -
studio
Control - - - - - - -
room
{Note:- Report should be sent according to number of studios available}.

RN report for the month- Not applicable

S. no. Hours of Hours of Hours of relay Hours of relay through leased


relay(National) relay(Regional) through RN line/ coaxial etc.
- - - - -
(i) Details of RNT- Not applicable

S. No Total no. of RNT No. of RNT in working condition Remarks


- - - -

STL & other links


(i) Details of STL/MLDN/ Non exchange line.
Frequency of STL- 1521MHz
S. no. Total no. of STL/MLDN/ No. of STL/MLDN/ Non exchange Annual charges Remark
Non exchange lines . lines in working condition (if any)
1. STL 1no. 01 no. Ok. - -

CES –Not applicable


(ii)Details of CES- C X C/ C X S Uplink frequency…….MHz
Downlink Frequency…….MHz

S. no. Make of CES Date of commissioning Power Orientation Size of Remarks


O/P & Reflected on satellite dish
- - - - - - -
(A) Details of equipment in CES:-
S. no. Name of equipments Quantity Working status No. of Condition
spare of spare
- - - - - -

Report of transmitter—FM

S. no. Txr. make Date of Frequency Transmitter Radiated Reflected


& model commissioning rated power power power
1 DB 28/11/17 102.6 20 kW 20kW 0W
Electronica MHz(Rainbow)
2 DB 09/04/18 100.1MHz(Gold) 20 kW 20kW 0W
Electronica
3 Nautel, 2009 106.4MHz 20kW 11kW 50W
Q20 (Vividh Bharati)
4 GCEL-136 Standby As required. 5kW 3.5kW 30W

(A) Service details


S. no. Transmitter Test hrs. Prog. Total B/D Prog. Total
Hrs:mins. Hrs:mins Hrs:mins working
(Including SD) radiated Hrs:mins
1 Rainbow 0 737:43 00:11 737:32 737:32
2 Gold 0 737:43 00:09 737:34 737:34
3 Vividh Bharati 31 534:45 00:09 534:36 565:36

(B) Breakdown details


Major Breakdown Minor Breakdown % Breakdown %Total
Transmitter Gear PSF O/C Gear PSF O/C Gear PSF O/C
Rainbow 00:00 00:00 00:00 00:00 00:11 00:00 0.0 0.0248 0.000 0.0248
Gold 00:00 00:00 00:00 00:00 00:09 00:00 00:00 0.0203 0.000 0.0203
Vividh 00:00 00:00 00:00 00:00 00:09 00:00 00:00 0.02806 0.000 0.02806
Bharati
(C)Shutdown (Hrs:mins)
Transmitter Shutdown Duration
Rainbow 06:17
Gold 06:17
Vividh Bharati 00:00

(D) Performance of transmitters


(1) AM/SW transmitters- Not applicable
S. no. Description Qty. Make& model SNR at 80% modulation at THD at 30, Frequency
of equips. 1kHz(without filter) 60 & 90% response
modulation 63Hz- 10kHz
at 60%
modulation ±
Hz
- - - - - - -
*(a) 63Hz-7.5 for valve type Xtr. (b) 63Hz-10KHz for solid state txr.
*Station may take the measurements in sweep mode & preferably send graphical printouts,
if required measuring equipments are available.
(2) FM transmitters
s. no. Description Qty. Make& SNR THD Frequency
of equips. model response
- - - - - - -
- - - - - - -
- - - - - - -
THD, SNR & Frequency Response as per AIR standard measurement pro forma (with
both exciters).

ATU & Mast/ FM antenna tower

Report of ATU & mast

S. no. Description Current status/ Step taken by the Remarks


Details station
1 Height of FM Tower and OK - -
their numbers-241 mtrs
2 Status of feeder Lines of OK - -
MW/SW/ FM,
Transmitter.
3 Status of Aviation lights OK, maintained by - -
DDK
4 Guy anchors and - - -
associated hardware
5 Guy Insulators - - -
6 RF Chokes - - -
7 Guy Wires Rope - - -
8 Earthing System OK - -
9 Last date of verticality test Maintained by DDK - -
of mast
10 Date of Erection of -
Mast/Tower
11 Last date of mast /Tower Maintained by DDK
painting
Report of Diesel Generators

(i)

S. Make, Date of Average Hours of Average Hours of Total


no. model, rating commissioning consumption use on consumption use in consumpti
&location on normal normal in idling(Hrs:m ons
load(ltrs/hrs) load(Hrs idling(ltrs/hrs ins) “C”
“A” :mins) ) “B”
1 Kirloskar, 1/5/17 - 6:49 - 04:03 288
6KSWITC105,
250kVA, for
Rainbow
2 Kirloskar, - 00:00 - 04:07 13
6RI080TA,
125kVA, for
Gold

(ii)
DG for the Txr Diesel in tank Diesel Total Diesel in Diesel Difference %
at beginning added (ltrs) tank at consumed (H-C) Difference
of the during the (D+E) end (ltrs) during the “I” (I/C) X100
month(ltrs) month(ltrs) “G” “F” month
“D” “E” (G-F)
“H”
Rainbow 280 200 480 192 288 0 0
Gold 188 0 188 175 13 0 0

Report of AC plant for the month- As per the list attached


Total no. of AC/Heating plants :-…. No.s (Central AC/Heating Plant of (Make & Model).___
S. Type/make Year of Wattage/Tonnage Hours of Location Performance Remarks
No. installation utilization
1. Package 2011 7.5 Ton *2 No.s 120 Above OK For
type false Gold,
2*7.5 Ton ceiling Rainbow
& VBS

2 Package type 2015 5.5 Ton *2No.s 570 Above OK For


2*5.5 Ton false Gold,
ceiling Rainbow
& VBS
3 Package type 2018 5 Ton*4No.s 624 Above OK For
4*5.5Ton false Gold,
ceiling Rainbow
& VBS
3 Split type 2011/2018 1.5 Ton*11 Nos 400 - For XTR
Hall
Area,5
KW st-
by xtr,
combine
r room,
porta
cabin.
4 Window type 2017 2 Tons*4 No.s 360 For
Combin
ers and
IGNOU
transmit
ter

Special points:-
1 Conductivity of the water of Not applicable
transmitters one reading each month
2 The latest date when the different filters of the transmitters As per schedule
washed/cleaned.
3 The date on which the water of the Cooling system of the transmitter was Not applicable
changed last
4 Mast base impedance Not applicable
5 Antenna Current Not applicable
6 Feeder Current Not applicable
7 PA Grid Current Not applicable
8 PA screen Grid current Not applicable
9 H.T. Voltage Not applicable
10 Pressure level of water of different water flow meters provided in Not applicable
the transmitters.

11 Working condition of different AVRs OK


12 Working of UPS Vividh Bharati UPS is ok,
Rainbow UPS is under
Replacement by ADG NZ
Project wing
13 Working of standby equipment where-ever provided in Transmitter, OK.
STL,RN Downlinks etc

14 Working condition of various high speed fans provided for cooling Not applicable
thyristors stacks thycon unit and other equipment at the
station.

15 Date of cleaning of Mast Base Insulator, Feeder hut, Spark gape, Not applicable
Horn gape.

16 Status of Aviation Obstruction Light (AOL) Under Doordarshan


17 Status of Studio & Tx. Link OK
18 Status of Electric supply feeder OK
19 Status of Sub-station OK
20 Last date of Oil Testing --
21 Height of mast 235m
22 No. of Masts One
23 Height of STL Tower at Studio end Not applicable
24 Height of STL Tower at Tx. end 100 Mtr.

General
(A)Site Data -- Studio Not applicable
Studio Site coordinate Not applicable
Studio Site area Not applicable
HAMSL Not applicable
Date of Commissioning Not applicable

(B)Transmitter
Tx. site coordinate 28.6944˚N, 77.1529˚E
Tx. site area Data not available
HAMSL Data not available
Date of Commissioning Data not available

2 Staff report meant for gazzetted and non gazzetted employees


(a) Details of employees who have joined the station during the month- As per the monthly report of
SW txr HPT Kingsway
S.No Name & Date of Joining Transferred from Order no.
Designation
-- - - - -
(b)Details of employees who have joined the station during the month- As per the monthly report
of SW txr HPT Kingsway
S.No Name & Date of Relieving Transferred to Order no.
Designation
-- - - - -
©Staff position as on the last day of the month- As per the monthly report of SW txr HPT Kingsway

S. no. Cadre Sanctioned post Post filled Vacant post


DDG (E) -- - -
DDE/DE -- - -
AD(E) -- - -
A. E. -- - -
SEA -- - -
EA -- - -
Sr. Tech. -- - -
Tech. -- - -
D. Tech. -- - -
D. E. D. -- - -
Helper -- - -

(a) Staff transferred to the station (joining awaited)


S. no. Name & designation Transferred from Order no. with date
-- - - -

2. Report of Salient technical activities/Maintenance Work done at the Studio & Control Room,
Transmitter during the month & Points for attention of ADG (E) -NZ (AVM).
1. On 9/5/18 two new 2ton split ACs were installed in the combiner room.
2. On 15/5/18 the filters of the FM Gold and FM Rainbow- DB make transmitters were thoroughly
cleaned.
3. On 1/5/18, 6/5/18,14/5/18 and 21/5/18 the routine checks and maintenance thereof was
carried out in the FM Rainbow and FM Gold DG sets.
4. On 22/5/18, one UPS and isolation transformer were connected in FM Gold DB make
transmitter.
5. On 29/5/18, the maintenance of the RF rigid lines at private FM end was carried out. All loose