1 1 Maret 2018 Training Ahadiyat on DSO 2 Location : DSO 2 JTI 08:00 – 18:00
2 2 Maret 2018 Training Ahadiyat on DSO 2 Location : DSO 2 JTI 08:00 – 18:00
3 Saturday Weekend Saturday Weekend Saturday Weekend Saturday
Weekend
4 Sunday Weekend Sunday Weekend Sunday Weekend Sunday Weekend
5 On Leave On Leave On Leave On Leave
6 6 Maret 2018 - helping user who can’t print. Location : JTI Tower B 08:00 – 18:00
- reimaging laptop
- meeting internal with Wiji and
Wahyudi about Tower C project
- coordinate with Ahadiyat about DO
7 7 Maret 2018 - demo with barco Location : JTI Tower B 08:00 – 18:00
- look around JTI Tower C condition
- meeting internal with Wiji and
Wahyudi about Tower C project
8 8 Maret 2018 - Create permission to working on Tower Location : JTI Tower C 08:00 – 18:00
C
- meet with raised floor team
- MoS raised floor from vachile to 8th
Floor
9 9 Maret 2018 - make SOP of finger access DSO 2 Location : JTI Tower B 08:00 – 19:00
- laptop user problem
- coordinate with Ahadiyat about JTI
DSO 2 Inventory
-
10 Saturday Weekend Saturday Weekend Saturday Weekend Saturday
Weekend
11 11 Maret 2018 - Checking latest update of raised floor Location : JTI Tower C 10:00 – 17:00
condition
- checking system security and laying
cable update
12 12 Maret 2018 - Create permission to working on Tower Location : JTI Tower C 10:00 – 17:00
C
- Checking latest update for cable and
raised floor
- Meeting internal with Wahyudi
13 13 Maret 2018 - MoS Rack from vechile to 8th floor Location : JTI Tower C 09:00 – 19:00
- Supervise raised floor team

14 14 Maret 2018 - Supervise all team (cable & system Location : JTI Tower C 11:00 – 20:00
security)
15 15 Maret 2018 - Measure screen box Location : JTI Tower C 09:00 – 17:00
- Supervise all team (cable & system
security)
16 16 Maret 2018